Permit GraphShortlistSan Francisco building permits since 2000

Block 8709, lot 007

1700 Owens St

City’s use
Commercial Office
Lot
43,124 sq ft
Zoning
NA
Construction type
NA

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

179 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Apr 1, 2024Completed
final sign-off Oct 2024
1700 Owens StEveron Llcfire alarm as-built per pa# 2023-0825-5302; remove leak detection from sequence of operations as generator does not have this output
Details
Permit
202404019044
Permit issued
Apr 4, 2024
Final sign-off
Oct 3, 2024

fire alarm as-built per pa# 2023-0825-5302; remove leak detection from sequence of operations as generator does not have this output

Open the permit page

Aug 25, 2023Completed
final sign-off Apr 2024
1700 Owens StEveron Llcfire only. add existing generator monitoring points to bldg f/a system. utilize equipment already in placed. scope is for tie in and programming.
Details
Permit
202308255302
Permit issued
Aug 29, 2023
Final sign-off
Apr 30, 2024

fire only. add existing generator monitoring points to bldg f/a system. utilize equipment already in placed. scope is for tie in and programming.

Open the permit page

$2,000
Jun 22, 2022Never finaled
issued Mar 2023, no final
1700 Owens StTherma Llcprovide & install 2 cda compressors, 1 air dryer & 1 air tank on roof. provide & install 1 nitrogen generator on 2nd fl mechancial room. relocate (e) dryer in mechanical room.
Details
Permit
202206226812
Permit issued
Mar 9, 2023

provide & install 2 cda compressors, 1 air dryer & 1 air tank on roof. provide & install 1 nitrogen generator on 2nd fl mechancial room. relocate (e) dryer in mechanical room.

Open the permit page

$82,750
Nov 3, 2021Completed
final sign-off Nov 2021
1700 Owens StFire Stop Sprinkler Companyadd 1 fume hood to plan & submit as an as built to original pa 2021-0902-7661 per inspector'sn request for final
Details
Permit
202111031708
Permit issued
Nov 3, 2021
Final sign-off
Nov 16, 2021

add 1 fume hood to plan & submit as an as built to original pa 2021-0902-7661 per inspector'sn request for final

Open the permit page

$35,400
Sep 27, 2021Completed
final sign-off Feb 2022
1700 Owens StEveron Llcvoluntary fire alarm system replacement. replace (e) obsolete system with new test-3 system. replace 1 new annunicator, add 1 new cellular communicator. reuse all exising devices and wiring. add booster power supply
Details
Permit
202109279214
Permit issued
Sep 27, 2021
Final sign-off
Feb 14, 2022

voluntary fire alarm system replacement. replace (e) obsolete system with new test-3 system. replace 1 new annunicator, add 1 new cellular communicator. reuse all exising devices and wiring. add booster power supply

Open the permit page

$5,000
Sep 15, 2021Completed
final sign-off Nov 2021
1700 Owens StEveron Llcfire alarm t.i. on 2nd fl. add 6 wall mount horn/strobes & 9 monitoring modules for valve temper ref pa# 2021-0716-4528
Details
Permit
202109158446
Permit issued
Sep 15, 2021
Final sign-off
Nov 16, 2021

fire alarm t.i. on 2nd fl. add 6 wall mount horn/strobes & 9 monitoring modules for valve temper ref pa# 2021-0716-4528

Open the permit page

$8,000
Sep 2, 2021Completed
final sign-off Nov 2021
1700 Owens StFire Stop Sprinkler Company2nd flr - replace 3 pendent heads & add 8 pendent heads for fume hoods. ref 202107164528
Details
Permit
202109027661
Permit issued
Sep 2, 2021
Final sign-off
Nov 16, 2021

2nd flr - replace 3 pendent heads & add 8 pendent heads for fume hoods. ref 202107164528

Open the permit page

$35,400
Jul 16, 2021Completed
final sign-off Jan 2022
1700 Owens StMai Construction Inc.t.i. of existing labs/medical & offices on the 2nd floor. incuding demolition & installation of walls. ceilings, lab furniture, fumehoods, lab equipment & associated mech, plumb & ele changes. this project does not change occupancy & egress path of bldg.
Details
Permit
202107164528
Permit issued
Aug 31, 2021
Final sign-off
Jan 4, 2022

t.i. of existing labs/medical & offices on the 2nd floor. incuding demolition & installation of walls. ceilings, lab furniture, fumehoods, lab equipment & associated mech, plumb & ele changes. this project does not change occupancy & egress path of bldg.

Open the permit page

$952,727
Feb 4, 2021Never finaled
issued May 2021, no final
1700 Owens StDiscount Signs & Neon Incinstall 1 illuminated building sign " esposto's delicatezza" (24" x 72")
Details
Permit
202102044015
Permit issued
May 14, 2021

install 1 illuminated building sign " esposto's delicatezza" (24" x 72")

Open the permit page

$5,000
Oct 1, 2019Completed
final sign-off May 2020
1700 Owens StRossi Builders Inc.revision to 201905019428, structural updates to pergola. maher n/a
Details
Permit
201910013233
Permit issued
Oct 22, 2019
Final sign-off
May 19, 2020

revision to 201905019428, structural updates to pergola. maher n/a

Open the permit page

Jun 19, 2019Completed
final sign-off Aug 2019
1700 Owens StMorrow-Meadows Corp Dba: Arc Electric Co5/f suite 535: modification to extg fire alarm system consisting of relocating 1 horn strobe and adding 1 ceiling horn/strobe. t.i. app#201904258886 n/a for maher
Details
Permit
201906193816
Permit issued
Jun 19, 2019
Final sign-off
Aug 16, 2019

5/f suite 535: modification to extg fire alarm system consisting of relocating 1 horn strobe and adding 1 ceiling horn/strobe. t.i. app#201904258886 n/a for maher

Open the permit page

$3,000
Jun 18, 2019Completed
final sign-off Jul 2019
1700 Owens St5th fl, ste 535-- ti upgrade of existing fire sprinkler system. 4 relocate pendent sprinklers. ref pa 201-0425-8886
Details
Permit
201906183745
Permit issued
Jun 18, 2019
Final sign-off
Jul 1, 2019

5th fl, ste 535-- ti upgrade of existing fire sprinkler system. 4 relocate pendent sprinklers. ref pa 201-0425-8886

Open the permit page

$800
Jun 11, 2019Completed
final sign-off Aug 2019
1700 Owens StRossi Builders Inc.ref pa# 2019-0425-8886: electrical scope- furnish and install new lighting at conference office and meeting area and connect to exieting lighting circuits.
Details
Permit
201906113150
Permit issued
Jun 12, 2019
Final sign-off
Aug 30, 2019

ref pa# 2019-0425-8886: electrical scope- furnish and install new lighting at conference office and meeting area and connect to exieting lighting circuits.

Open the permit page

$57,000
Jun 11, 2019Completed
final sign-off Aug 2019
1700 Owens StRossi Builders Inc.ste: 535: ref pa# 2019-0425-8886: hvac- grille, ductwork to be demolished and relocated.
Details
Permit
201906113149
Permit issued
Jun 12, 2019
Final sign-off
Aug 30, 2019

ste: 535: ref pa# 2019-0425-8886: hvac- grille, ductwork to be demolished and relocated.

Open the permit page

$19,000
May 1, 2019Completed
final sign-off May 2020
1700 Owens StRossi Builders Inc.revision to 201809059128 addition of pergola at southeast plaza to serve (e) retail
Details
Permit
201905019428
Permit issued
Aug 27, 2019
Final sign-off
May 19, 2020

revision to 201809059128 addition of pergola at southeast plaza to serve (e) retail

Open the permit page

$22,000
Apr 25, 2019Completed
final sign-off Aug 2019
1700 Owens StRossi Builders Inc.ste 535 -project consists of joining two separate tenants suites including - demo of (e) partitions and associated power/data lighting and finishes. all work to occur on the 5th fl of a 5 story building. (e) tenant suite will be unoccupied time of construction. mep, life, safety and sprinkler system
Details
Permit
201904258886
Permit issued
Jun 4, 2019
Final sign-off
Aug 30, 2019

ste 535 -project consists of joining two separate tenants suites including - demo of (e) partitions and associated power/data lighting and finishes. all work to occur on the 5th fl of a 5 story building. (e) tenant suite will be unoccupied time of construction. mep, life, safety and sprinkler system

Open the permit page

$76,581
Feb 8, 2019Completed
final sign-off Feb 2020
1700 Owens StRed Hawk Fire & Security Ca Llcfire alarm ti lobby, relocate 4 horn strobes, add 2 wall mounts horn strobes, 2 ceiling mount horn strobes
Details
Permit
201902082519
Permit issued
Feb 8, 2019
Final sign-off
Feb 4, 2020

fire alarm ti lobby, relocate 4 horn strobes, add 2 wall mounts horn strobes, 2 ceiling mount horn strobes

Open the permit page

$3,000
Feb 4, 2019Completed
final sign-off Aug 2019
1700 Owens Stt.i. upgrade of the extg fire sprinkler system: 44 relocate pendent sprinlkers. 14 additional pendent sprinklers. 4 removal pendent sprinkler, 3 relocate upright sprinkler. ref app#201809059128.n/a for maher
Details
Permit
201902041980
Permit issued
Feb 4, 2019
Final sign-off
Aug 23, 2019

t.i. upgrade of the extg fire sprinkler system: 44 relocate pendent sprinlkers. 14 additional pendent sprinklers. 4 removal pendent sprinkler, 3 relocate upright sprinkler. ref app#201809059128.n/a for maher

Open the permit page

$13,600
Jan 9, 2019Completed
final sign-off May 2020
1700 Owens StRossi Builders Inc.revision to 201809059128 - replace fireplace spec
Details
Permit
201901099888
Permit issued
Jan 14, 2019
Final sign-off
May 19, 2020

revision to 201809059128 - replace fireplace spec

Open the permit page

$10,000
Nov 15, 2018Completed
final sign-off Dec 2018
1700 Owens StWalschon Fire Protection Incf/s; relocate sprinkler heads due to new walls and ceiling. total 13 heads.
Details
Permit
201811155956
Permit issued
Nov 15, 2018
Final sign-off
Dec 4, 2018

f/s; relocate sprinkler heads due to new walls and ceiling. total 13 heads.

Open the permit page

$5,500
Oct 17, 2018Never finaled
issued Dec 2018, no final
1700 Owens StR C Benson & Sons Inc.5/f: revision to 201809140196. design change per client. removing 6' - 0" tall free standing partition wall
Details
Permit
201810173426
Permit issued
Dec 5, 2018

5/f: revision to 201809140196. design change per client. removing 6' - 0" tall free standing partition wall

Open the permit page

Sep 21, 2018Completed
final sign-off Dec 2018
1700 Owens StMorrow-Meadows Corp Dba: Arc Electric Co5th flr modification to (e) fire alarm system consisting of relocating 1 wall strobe adding 1 ceiling horn/strobe. relocation 1 wall horn/strobe mahre na
Details
Permit
201809211032
Permit issued
Sep 21, 2018
Final sign-off
Dec 14, 2018

5th flr modification to (e) fire alarm system consisting of relocating 1 wall strobe adding 1 ceiling horn/strobe. relocation 1 wall horn/strobe mahre na

Open the permit page

$4,000
Sep 14, 2018Completed
final sign-off Jan 2019
1700 Owens StR C Benson & Sons Inc.5th flr. construction of non-load bearing partitions, (e) modifications to ceiling grid and tile, light fixture relocation and 4 new including switches, new office, doors and frames, salvage and re-use (e) selected materials, millwork and (n) finishes. maher n/a
Details
Permit
201809140196
Permit issued
Sep 27, 2018
Final sign-off
Jan 17, 2019

5th flr. construction of non-load bearing partitions, (e) modifications to ceiling grid and tile, light fixture relocation and 4 new including switches, new office, doors and frames, salvage and re-use (e) selected materials, millwork and (n) finishes. maher n/a

Open the permit page

$259,008
Sep 5, 2018Completed
final sign-off May 2020
1700 Owens StRossi Builders Inc.ti 0 (e) lobby, construction includes new partitions, finishes, lighting, equipment & mezzanine. exterior ti of (e) plazas construction includes new planters, ramps, steps & paving maher na
Details
Permit
201809059128
Permit issued
Nov 7, 2018
Final sign-off
May 21, 2020

ti 0 (e) lobby, construction includes new partitions, finishes, lighting, equipment & mezzanine. exterior ti of (e) plazas construction includes new planters, ramps, steps & paving maher na

Open the permit page

$1,900,000
Jun 12, 2018Expired or cancelled
cancelled Jul 2024
1700 Owens Stinstall 2x tower of stem power store model 3.2.2 total 132kw/235 kwh energy storage. this system is reffered to as behind the meter and will be used to reduce peakloads. the system will be minitored remotely maher na
Details
Permit
201806121590

install 2x tower of stem power store model 3.2.2 total 132kw/235 kwh energy storage. this system is reffered to as behind the meter and will be used to reduce peakloads. the system will be minitored remotely maher na

Open the permit page

$80,000
May 12, 2017Completed
final sign-off Sep 2017
1700 Owens StPeacock Construction5/f- install new de-mountable partitions, reconfigure lights, mechanical, electrical and fire sprinklers where needed. n/a ordinance #155-13
Details
Permit
201705126504
Permit issued
May 22, 2017
Final sign-off
Sep 5, 2017

5/f- install new de-mountable partitions, reconfigure lights, mechanical, electrical and fire sprinklers where needed. n/a ordinance #155-13

Open the permit page

$40,000
Apr 18, 2017Never finaled
issued Apr 2017, no final
1700 Owens StMai Construction Inc.installation of nitrogen generator into extg 2nd floor mechanical room. includes structural anchorage and process piping. n/a maher ord. 155-13
Details
Permit
201704184214
Permit issued
Apr 20, 2017

installation of nitrogen generator into extg 2nd floor mechanical room. includes structural anchorage and process piping. n/a maher ord. 155-13

Open the permit page

$300,000
Aug 26, 2016Completed
final sign-off Oct 2016
1700 Owens StAeco Systems, Increvision to pa 2016-0719-2668 - adding (6) water flow devices at hood films. n/a maher ord. 155-13
Details
Permit
201608266078
Permit issued
Aug 26, 2016
Final sign-off
Oct 17, 2016

revision to pa 2016-0719-2668 - adding (6) water flow devices at hood films. n/a maher ord. 155-13

Open the permit page

$2,000
Aug 8, 2016Completed
final sign-off Sep 2016
1700 Owens StSeamless Fire Protection2nd & 4th floors: relocate pendent sprinklers for new gyp boars clgs & interior walls maher na
Details
Permit
201608084407
Permit issued
Aug 8, 2016
Final sign-off
Sep 26, 2016

2nd & 4th floors: relocate pendent sprinklers for new gyp boars clgs & interior walls maher na

Open the permit page

$15,000
Jul 19, 2016Completed
final sign-off Oct 2016
1700 Owens StAeco Systems, Incmodifications to (e) fire alarm system due to ti (201606079349) consisting of 1 horn/strobe on the 4th floor
Details
Permit
201607192668
Permit issued
Jul 19, 2016
Final sign-off
Oct 17, 2016

modifications to (e) fire alarm system due to ti (201606079349) consisting of 1 horn/strobe on the 4th floor

Open the permit page

$4,000
Jul 12, 2016Expired or cancelled
cancelled Aug 2023
1700 Owens StSeamless Fire Protection2nd & 4th flr: relocate (e) pendent sperinklers for new gyp board clgs and interior walls. maher na ref pa 201606079437
Details
Permit
201607122057

2nd & 4th flr: relocate (e) pendent sperinklers for new gyp board clgs and interior walls. maher na ref pa 201606079437

Open the permit page

$1,500
Jun 7, 2016Never finaled
issued Jun 2016, no final
1700 Owens StMai Construction Inc.demo (e) cleanroom on level 4. new vivarium in its place - new process piping in (e) chem lab, new process piping in converted storage to analytical lab. new fume hood in chem (e) 2nd floor to receive new cold room inside (e) mecn space. maher na
Details
Permit
201606079349
Permit issued
Jun 16, 2016

demo (e) cleanroom on level 4. new vivarium in its place - new process piping in (e) chem lab, new process piping in converted storage to analytical lab. new fume hood in chem (e) 2nd floor to receive new cold room inside (e) mecn space. maher na

Open the permit page

$850,000
Apr 13, 2016Completed
final sign-off Jun 2016
1700 Owens StA M S Electric Incsuite #500: modifications to extg fire alarm system consisting of adding one ceiling horn/strobe and 8 ceiling strobes. n/a for maher. ref app#201512044170
Details
Permit
201604134651
Permit issued
Apr 13, 2016
Final sign-off
Jun 13, 2016

suite #500: modifications to extg fire alarm system consisting of adding one ceiling horn/strobe and 8 ceiling strobes. n/a for maher. ref app#201512044170

Open the permit page

$15,000
Mar 31, 2016Completed
final sign-off May 2016
1700 Owens St5th floor: fire sprinkler t.i. 26 relocated pendent sprinkler, 6 added pendent sprinklers, 7 deleted pendent sprinklers, 2 relocated upright sprinklers, 4 adeded upright sprinklers. n/a for maher. ref app#201512044170
Details
Permit
201603313637
Permit issued
Mar 31, 2016
Final sign-off
May 31, 2016

5th floor: fire sprinkler t.i. 26 relocated pendent sprinkler, 6 added pendent sprinklers, 7 deleted pendent sprinklers, 2 relocated upright sprinklers, 4 adeded upright sprinklers. n/a for maher. ref app#201512044170

Open the permit page

$23,716
Mar 17, 2016Completed
final sign-off Jun 2016
1700 Owens StA M S Electric Increvision to ref pa 2015 1206 4170: update title 24
Details
Permit
201603172333
Permit issued
Mar 17, 2016
Final sign-off
Jun 27, 2016

revision to ref pa 2015 1206 4170: update title 24

Open the permit page

Mar 14, 2016Completed
final sign-off Jun 2016
1700 Owens StWestern Allied Mechanical Inc.revision to 201512044170. new mechanical. mechanical drawings submitted on this permit. n/a maher ord. 155-13
Details
Permit
201603141967
Permit issued
Mar 16, 2016
Final sign-off
Jun 15, 2016

revision to 201512044170. new mechanical. mechanical drawings submitted on this permit. n/a maher ord. 155-13

Open the permit page

Jan 20, 2016Completed
final sign-off Jan 2016
1700 Owens StWalschon Fire Protection Inc2n floor: relocate 5 extg sprinkler pendents for coverage of new wall layout on 5 story bldg. demolish one extra ssp not requiered for new wall layout. n/a for maher
Details
Permit
201601207451
Permit issued
Jan 20, 2016
Final sign-off
Jan 29, 2016

2n floor: relocate 5 extg sprinkler pendents for coverage of new wall layout on 5 story bldg. demolish one extra ssp not requiered for new wall layout. n/a for maher

Open the permit page

$9,414
Jan 14, 2016Completed
final sign-off Feb 2016
1700 Owens StRossi Builders Inc.2nd floor - expanding an existing tissue culture lab (340 sf) work includes demolition, new wall construction, & assoc mech work.
Details
Permit
201601147065
Permit issued
Jan 14, 2016
Final sign-off
Feb 29, 2016

2nd floor - expanding an existing tissue culture lab (340 sf) work includes demolition, new wall construction, & assoc mech work.

Open the permit page

$60,000
Dec 4, 2015Completed
final sign-off Jun 2016
1700 Owens StBcci Construction Companyt.i. of an (e) office and common area on the 5/f, scope of work to demo 9e) offices to create open work space. n/a ordinance #155-13
Details
Permit
201512044170
Permit issued
Dec 11, 2015
Final sign-off
Jun 27, 2016

t.i. of an (e) office and common area on the 5/f, scope of work to demo 9e) offices to create open work space. n/a ordinance #155-13

Open the permit page

$748,000
Mar 2, 2015Completed
final sign-off May 2015
1700 Owens StWalschon Fire Protection Increlocate (11) existing sprinkler pendants. add (30) new sprinkler pendants for coverage of new wall layout. add (6) new factory wax coated sprinkler pendants in new fume. maher - not req'd parent permit: 2014 1118 1795
Details
Permit
201503029665
Permit issued
Mar 2, 2015
Final sign-off
May 1, 2015

relocate (11) existing sprinkler pendants. add (30) new sprinkler pendants for coverage of new wall layout. add (6) new factory wax coated sprinkler pendants in new fume. maher - not req'd parent permit: 2014 1118 1795

Open the permit page

$10,710
Nov 18, 2014Completed
final sign-off Feb 2015
1700 Owens StR C Benson & Sons Inc.5th floor: demolition of non structural walls, patching, new lighwell and power.
Details
Permit
201411181775
Permit issued
Nov 25, 2014
Final sign-off
Feb 20, 2015

5th floor: demolition of non structural walls, patching, new lighwell and power.

Open the permit page

$85,000
Nov 18, 2014Never finaled
issued Feb 2015, no final
1700 Owens StRossi Builders Inc.2nd fl tenant improvement. minor modification to (e) "b" occ. lab/office tenant improvements- mech'l , plumbing,& relacted elect, interior wall modifications, add'l fumehoods, demo of int. non. strl, walls to open up, offices, minor add'l accessiblity sinage. maher n/a.
Details
Permit
201411181795
Permit issued
Feb 25, 2015

2nd fl tenant improvement. minor modification to (e) "b" occ. lab/office tenant improvements- mech'l , plumbing,& relacted elect, interior wall modifications, add'l fumehoods, demo of int. non. strl, walls to open up, offices, minor add'l accessiblity sinage. maher n/a.

Open the permit page

$350,000
Oct 9, 2014Never finaled
issued Oct 2014, no final
1700 Owens StIntegrated Engineering Services4th floor - install laboratory coater & oven conncect to existing laboratory exhaust, connect to exisitng electrical panel. n/a maher ordinance
Details
Permit
201410098526
Permit issued
Oct 9, 2014

4th floor - install laboratory coater & oven conncect to existing laboratory exhaust, connect to exisitng electrical panel. n/a maher ordinance

Open the permit page

$15,000
May 22, 2014Completed
final sign-off Aug 2014
1700 Owens StAd Art Inc.1/f, 2/f- 7 evacuation plan maps. n/a ordinance #155-13.
Details
Permit
201405226459
Permit issued
May 22, 2014
Final sign-off
Aug 5, 2014

1/f, 2/f- 7 evacuation plan maps. n/a ordinance #155-13.

Open the permit page

$2,100
May 16, 2014Never finaled
filed May 2014, never issued
1700 Owens St
Details
Permit
201405166028

Open the permit page

$45,000
Apr 30, 2014Completed
final sign-off Jun 2014
1700 Owens StWalschon Fire Protection Inc2nd floor - install (5) new sprinkler heads into new fume hoods. ref #2014.0416.3328. compliance with ordinance #155-13 not required
Details
Permit
201404304539
Permit issued
Apr 30, 2014
Final sign-off
Jun 11, 2014

2nd floor - install (5) new sprinkler heads into new fume hoods. ref #2014.0416.3328. compliance with ordinance #155-13 not required

Open the permit page

$8,000
Apr 16, 2014Completed
final sign-off Jul 2014
1700 Owens StRossi Builders Inc.2nd floor phase 2 - addition of (5) new fume hoods & laboratory casework relocation & assoc mep work in an existing chemistry lab. compliance with ordinance # 155-13 not required
Details
Permit
201404163328
Permit issued
Apr 23, 2014
Final sign-off
Jul 2, 2014

2nd floor phase 2 - addition of (5) new fume hoods & laboratory casework relocation & assoc mep work in an existing chemistry lab. compliance with ordinance # 155-13 not required

Open the permit page

$198,500
Feb 3, 2014Completed
final sign-off Jul 2014
1700 Owens StTherma Corporationinstallation & operation of a floor mounted walk-in fume hood. life safety under separate permit. maher ordinance not required.
Details
Permit
201402037671
Permit issued
Jun 18, 2014
Final sign-off
Jul 29, 2014

installation & operation of a floor mounted walk-in fume hood. life safety under separate permit. maher ordinance not required.

Open the permit page

$10,480
Nov 25, 2013Completed
final sign-off Jan 2014
1700 Owens StMorrow-Meadows Corp Dba: Arc Electric Comove 2 speaker/ strobes and change strobe settings.
Details
Permit
201311252756
Permit issued
Nov 25, 2013
Final sign-off
Jan 2, 2014

move 2 speaker/ strobes and change strobe settings.

Open the permit page

$2,000
Nov 19, 2013Completed
final sign-off Jan 2014
1700 Owens StWalschon Fire Protection Inc1st floor:fire sprinkler t.i. . relocating 3 pendent heads and adding 4 pendent heads. t.i. app #201311141889
Details
Permit
201311192227
Permit issued
Nov 19, 2013
Final sign-off
Jan 2, 2014

1st floor:fire sprinkler t.i. . relocating 3 pendent heads and adding 4 pendent heads. t.i. app #201311141889

Open the permit page

$6,600
Nov 14, 2013Completed
final sign-off Dec 2013
1700 Owens StR C Benson & Sons Inc.office ti : new ceiling high drywall, 2 new interior doors, relocate one light, add outlets, modify hvac.
Details
Permit
201311141889
Permit issued
Nov 15, 2013
Final sign-off
Dec 19, 2013

office ti : new ceiling high drywall, 2 new interior doors, relocate one light, add outlets, modify hvac.

Open the permit page

$84,000
Oct 8, 2013Completed
final sign-off Nov 2013
1700 Owens StR C Benson & Sons Inc.revision to appl #2013.0808.3808 - relcoate one door & wall, relocate one light, add two swks.
Details
Permit
201310088769
Permit issued
Oct 8, 2013
Final sign-off
Nov 13, 2013

revision to appl #2013.0808.3808 - relcoate one door & wall, relocate one light, add two swks.

Open the permit page

$6,500
Sep 13, 2013Completed
final sign-off Oct 2013
1700 Owens StWalschon Fire Protection Inc3/f, 4/f - add & relocate existing sprinkler heads. 3/f- 4 new & no relocated, 4/f- 3 new & 6 relocated heads. ref #2013-0808-3808
Details
Permit
201309136717
Permit issued
Sep 27, 2013
Final sign-off
Oct 15, 2013

3/f, 4/f - add & relocate existing sprinkler heads. 3/f- 4 new & no relocated, 4/f- 3 new & 6 relocated heads. ref #2013-0808-3808

Open the permit page

$7,500
Aug 8, 2013Completed
final sign-off Dec 2013
1700 Owens StR C Benson & Sons Inc.modificaction to va 3rd and 4th floor office and labs. work includes mechanical, electrical, plumbing mops. new interior chan link fencing, walls and doors.
Details
Permit
201308083808
Permit issued
Aug 19, 2013
Final sign-off
Dec 4, 2013

modificaction to va 3rd and 4th floor office and labs. work includes mechanical, electrical, plumbing mops. new interior chan link fencing, walls and doors.

Open the permit page

$665,000
May 15, 2013Completed
final sign-off Jun 2013
1700 Owens StWalschon Fire Protection Inc4th floor: add and relocate 18 sprinkler heads for new walls and ceiling grid.
Details
Permit
201305156933
Permit issued
May 15, 2013
Final sign-off
Jun 7, 2013

4th floor: add and relocate 18 sprinkler heads for new walls and ceiling grid.

Open the permit page

$5,950
May 9, 2013Never finaled
issued May 2013, no final
1700 Owens StMorrow-Meadows Corp Dba: Arc Electric Co4th floor modify exisitng fire alarm due to tenant improvement, add (2) strobes.
Details
Permit
201305096497
Permit issued
May 9, 2013

4th floor modify exisitng fire alarm due to tenant improvement, add (2) strobes.

Open the permit page

$2,000
Apr 12, 2013Never finaled
issued May 2013, no final
1700 Owens StR C Benson & Sons Inc.modify gpy area to new breakroom - 4th fl chemical lab add new air turret - 4th fl convert part of lab to new cleanroom - 4th fl new inside fencing at hazardous storage room - 1st fl. fire alarm & fire sprinkler deffered.
Details
Permit
201304124402
Permit issued
May 13, 2013

modify gpy area to new breakroom - 4th fl chemical lab add new air turret - 4th fl convert part of lab to new cleanroom - 4th fl new inside fencing at hazardous storage room - 1st fl. fire alarm & fire sprinkler deffered.

Open the permit page

$568,000
Jan 9, 2013Completed
final sign-off Feb 2013
1700 Owens StR C Benson & Sons Inc.revision to pa# 2012-1212-6062-change new door to slider & put a jog in the wall on new partitions to be built
Details
Permit
201301097607
Permit issued
Jan 9, 2013
Final sign-off
Feb 28, 2013

revision to pa# 2012-1212-6062-change new door to slider & put a jog in the wall on new partitions to be built

Open the permit page

Dec 26, 2012Completed
final sign-off Jun 2013
1700 Owens StMorrow-Meadows Corp Dba: Arc Electric Co5th floor:modify extg fire alarm due to tenant improvement.
Details
Permit
201212266838
Permit issued
Dec 26, 2012
Final sign-off
Jun 7, 2013

5th floor:modify extg fire alarm due to tenant improvement.

Open the permit page

$4,000
Dec 17, 2012Completed
final sign-off Jan 2013
1700 Owens StWalschon Fire Protection Inc5th floor:relocating 7 pen. head, adding 2 pendent head. relocating 2 upright, adding 2 upright. t.i. app#201212126062
Details
Permit
201212176307
Permit issued
Dec 17, 2012
Final sign-off
Jan 8, 2013

5th floor:relocating 7 pen. head, adding 2 pendent head. relocating 2 upright, adding 2 upright. t.i. app#201212126062

Open the permit page

$2,500
Dec 12, 2012Completed
final sign-off Feb 2013
1700 Owens StR C Benson & Sons Inc.remove partitions, construct drywall, relocate doors, modify hvac, electrical & fire sprinklers for tenant improvment
Details
Permit
201212126062
Permit issued
Dec 13, 2012
Final sign-off
Feb 28, 2013

remove partitions, construct drywall, relocate doors, modify hvac, electrical & fire sprinklers for tenant improvment

Open the permit page

$143,000
Feb 28, 2012Completed
final sign-off Mar 2012
1700 Owens StR C Benson & Sons Inc.controll access alteration on the 4th floor. remove 2 card readers and add 1
Details
Permit
201202285025
Permit issued
Mar 2, 2012
Final sign-off
Mar 14, 2012

controll access alteration on the 4th floor. remove 2 card readers and add 1

Open the permit page

$6,000
Oct 21, 2011Never finaled
issued Nov 2011, no final
1700 Owens StDiscount Signs & Neon Incnew sign for esposto's delicatessen
Details
Permit
201110217377
Permit issued
Nov 7, 2011

new sign for esposto's delicatessen

Open the permit page

$1,000
Oct 7, 2011Completed
final sign-off Nov 2011
1700 Owens StR C Benson & Sons Inc.add structural detail, as requested by field inspector for slab on ground in-fill, to existing pa# 2011-0721-0713
Details
Permit
201110076325
Permit issued
Oct 12, 2011
Final sign-off
Nov 7, 2011

add structural detail, as requested by field inspector for slab on ground in-fill, to existing pa# 2011-0721-0713

Open the permit page

$10,000
Sep 19, 2011Completed
final sign-off Nov 2011
1700 Owens Strevision to pa# 2011.08.26.3355. deletion of 2 pull stations, change ceiling horn/strob to wall strobe on the 1st fl
Details
Permit
201109195004
Permit issued
Sep 20, 2011
Final sign-off
Nov 7, 2011

revision to pa# 2011.08.26.3355. deletion of 2 pull stations, change ceiling horn/strob to wall strobe on the 1st fl

Open the permit page

$1,000
Sep 8, 2011Completed
final sign-off Nov 2011
1700 Owens StAaa Restaurant Fire Control/Dba Aaa Fireinstallation of ansul r 102 fire suppression system
Details
Permit
201109084111
Permit issued
Sep 8, 2011
Final sign-off
Nov 7, 2011

installation of ansul r 102 fire suppression system

Open the permit page

$2,000
Aug 26, 2011Completed
final sign-off Nov 2011
1700 Owens StAeco Systems, Incmodification to (e) fire alarm system consisting of 1-pull station, 1-horn/strobe, 3-strobes, 1-monitoring point for ansul system.
Details
Permit
201108263355
Permit issued
Aug 29, 2011
Final sign-off
Nov 7, 2011

modification to (e) fire alarm system consisting of 1-pull station, 1-horn/strobe, 3-strobes, 1-monitoring point for ansul system.

Open the permit page

$4,000
Aug 10, 2011Completed
final sign-off Nov 2011
1700 Owens StWalschon Fire Protection Inc1st floor-fire sprinkler tenant improvement-adding 12 pend heads from (e) sprig-up, adding 1 dry pend from (e) sprig-up, adding 2 upright using mechanical tee. t.i pa# 2011-0721-0713
Details
Permit
201108102128
Permit issued
Aug 10, 2011
Final sign-off
Nov 7, 2011

1st floor-fire sprinkler tenant improvement-adding 12 pend heads from (e) sprig-up, adding 1 dry pend from (e) sprig-up, adding 2 upright using mechanical tee. t.i pa# 2011-0721-0713

Open the permit page

$4,000
Jul 21, 2011Completed
final sign-off Nov 2011
1700 Owens StR C Benson & Sons Inc.construction new deli, 1st time tenant. walls, ceiling, plumbing, mechanical
Details
Permit
201107210713
Permit issued
Aug 8, 2011
Final sign-off
Nov 7, 2011

construction new deli, 1st time tenant. walls, ceiling, plumbing, mechanical

Open the permit page

$274,000
Jun 14, 2011Completed
final sign-off Jul 2011
1700 Owens StWalschon Fire Protection Inc1st floor-add 1 new branchline to supply 2 new pendent heads below new mezzaine
Details
Permit
201106148042
Permit issued
Jun 14, 2011
Final sign-off
Jul 6, 2011

1st floor-add 1 new branchline to supply 2 new pendent heads below new mezzaine

Open the permit page

$1,000
May 20, 2011Completed
final sign-off Jun 2011
1700 Owens StAeco Systems, Incfire alarm ti on 1st floor. change of space use from office to conference room. no added devices.
Details
Permit
201105206450
Permit issued
May 20, 2011
Final sign-off
Jun 29, 2011

fire alarm ti on 1st floor. change of space use from office to conference room. no added devices.

Open the permit page

$4,000
May 10, 2011Completed
final sign-off Jun 2011
1700 Owens StR C Benson & Sons Inc.1st floor-minor alterations to (e) lab/office at ste #125-new conference room, door size change to storage & minor alterations to (e) plumbing, electrical & hvac systems
Details
Permit
201105105737
Permit issued
May 10, 2011
Final sign-off
Jun 29, 2011

1st floor-minor alterations to (e) lab/office at ste #125-new conference room, door size change to storage & minor alterations to (e) plumbing, electrical & hvac systems

Open the permit page

$168,567
Dec 15, 2010Completed
final sign-off Feb 2011
1700 Owens StTherma Corporationsubmit as built drawings for record existing appl 2010-10-18-3206.
Details
Permit
201012156738
Permit issued
Dec 15, 2010
Final sign-off
Feb 7, 2011

submit as built drawings for record existing appl 2010-10-18-3206.

Open the permit page

Oct 18, 2010Completed
final sign-off Feb 2011
1700 Owens StTherma Corporation4th floor - add (1) 4" exhaust duct. add (1) new nx drop from ex bottles. (1) new he drop from existing bottles
Details
Permit
201010183206
Permit issued
Oct 18, 2010
Final sign-off
Feb 7, 2011

4th floor - add (1) 4" exhaust duct. add (1) new nx drop from ex bottles. (1) new he drop from existing bottles

Open the permit page

$15,000
Sep 10, 2010Expired or cancelled
expired Mar 2012
1700 Owens Stto erect non electrical projecting sign
Details
Permit
201009100643
Permit issued
Sep 13, 2010

to erect non electrical projecting sign

Open the permit page

$1,000
Aug 4, 2010Completed
final sign-off Sep 2010
1700 Owens StTherma Corporationadd 1 new exhaust duct and 1 new n2 service drop
Details
Permit
201008048107
Permit issued
Aug 12, 2010
Final sign-off
Sep 1, 2010

add 1 new exhaust duct and 1 new n2 service drop

Open the permit page

$6,000
Mar 10, 2010Completed
final sign-off Jun 2010
1700 Owens StWalschon Fire Protection Incmodify fire protection system on 1st. flr. adding 3-uprights & -3 pendants for new ceiling . ref. appl. #2010/0211/6388.
Details
Permit
201003107930
Permit issued
Mar 10, 2010
Final sign-off
Jun 7, 2010

modify fire protection system on 1st. flr. adding 3-uprights & -3 pendants for new ceiling . ref. appl. #2010/0211/6388.

Open the permit page

$2,500
Feb 11, 2010Completed
final sign-off Jun 2010
1700 Owens StR C Benson & Sons Inc.new yogurt shop (loving cup) approx. 434 sq.ft. work to include plumbing , electrical, hvac, drywall, flooring and ceiling.
Details
Permit
201002116388
Permit issued
Mar 2, 2010
Final sign-off
Jun 16, 2010

new yogurt shop (loving cup) approx. 434 sq.ft. work to include plumbing , electrical, hvac, drywall, flooring and ceiling.

Open the permit page

$102,000
Feb 10, 2010Completed
final sign-off Apr 2010
1700 Owens StAeco Systems, Inc5th floor. extension of (e0 est quickstar 4 firw alarm system. new notification devices powered by a new booster panel, battery circulations are included, this expansion does not infriinge on (e) system
Details
Permit
201002106273
Permit issued
Feb 10, 2010
Final sign-off
Apr 28, 2010

5th floor. extension of (e0 est quickstar 4 firw alarm system. new notification devices powered by a new booster panel, battery circulations are included, this expansion does not infriinge on (e) system

Open the permit page

$5,000
Jan 25, 2010Completed
final sign-off Apr 2010
1700 Owens StWalschon Fire Protection Inc5th floor - modify (e) fire sprinkler system as required to facilitate new walls and ceiling in office area. approx. 5,000 sq. ft. area of work. ref. appl.#2010/0113/1680.
Details
Permit
201001255238
Permit issued
Jan 25, 2010
Final sign-off
Apr 28, 2010

5th floor - modify (e) fire sprinkler system as required to facilitate new walls and ceiling in office area. approx. 5,000 sq. ft. area of work. ref. appl.#2010/0113/1680.

Open the permit page

$15,000
Jan 14, 2010Completed
final sign-off Jun 2010
1700 Owens StCaruso Construction Inc.1st floor. installation of new notification devices to be powered by an existing bps 6a booster panel power supply. battery calculations and voltage drops are included on this set of drawings.
Details
Permit
201001144746
Permit issued
Jan 14, 2010
Final sign-off
Jun 7, 2010

1st floor. installation of new notification devices to be powered by an existing bps 6a booster panel power supply. battery calculations and voltage drops are included on this set of drawings.

Open the permit page

$5,000
Jan 13, 2010Completed
final sign-off May 2010
1700 Owens StR C Benson & Sons Inc.completion of 5th floor space including new partitions, ceilings, flooring, electrical, break room sink, hvac. approx 5000 sf fire sprinklers separate permit
Details
Permit
201001134680
Permit issued
Jan 19, 2010
Final sign-off
May 19, 2010

completion of 5th floor space including new partitions, ceilings, flooring, electrical, break room sink, hvac. approx 5000 sf fire sprinklers separate permit

Open the permit page

$460,000
Apr 9, 2009Completed
final sign-off Apr 2009
1700 Owens St5th floor - to obtain final inspection for work approved under pa 200604078473. oti-2 mep. all work has been completed.
Details
Permit
200904095971
Permit issued
Apr 9, 2009
Final sign-off
Apr 14, 2009

5th floor - to obtain final inspection for work approved under pa 200604078473. oti-2 mep. all work has been completed.

Open the permit page

Dec 16, 2008Completed
final sign-off Jan 2009
1700 Owens StTherma Corporationaddition of local oxygen & carbon dioxide cylinders & distribution piping in 1st fl lab 125-13 tissue culture, revision to pa #200808139057r1.(all work within one room.)
Details
Permit
200812168578
Permit issued
Dec 19, 2008
Final sign-off
Jan 12, 2009

addition of local oxygen & carbon dioxide cylinders & distribution piping in 1st fl lab 125-13 tissue culture, revision to pa #200808139057r1.(all work within one room.)

Open the permit page

$10,000
Oct 17, 2008Completed
final sign-off Jan 2009
1700 Owens StWalschon Fire Protection Inc1/f #125- modify fire protection system for 1st floor-adding 105 pendent heads, 9 uprights, 2 wax coated pendent heads and 2 wax coated sidewalll head
Details
Permit
200810174506
Permit issued
Oct 22, 2008
Final sign-off
Jan 12, 2009

1/f #125- modify fire protection system for 1st floor-adding 105 pendent heads, 9 uprights, 2 wax coated pendent heads and 2 wax coated sidewalll head

Open the permit page

$29,860
Oct 10, 2008Completed
final sign-off Jan 2009
1700 Owens StAeco Systems, Incmodifications to existing fire alarm due to tenant improvements, 15 devices.
Details
Permit
200810103875
Permit issued
Oct 10, 2008
Final sign-off
Jan 12, 2009

modifications to existing fire alarm due to tenant improvements, 15 devices.

Open the permit page

$5,000
Aug 13, 2008Completed
final sign-off Jan 2009
1700 Owens St#125- construct new offices and "b" occupancy lab at tenant space. sprinkler & fire alarm under separate permit.
Details
Permit
200808139057
Permit issued
Oct 8, 2008
Final sign-off
Jan 20, 2009

#125- construct new offices and "b" occupancy lab at tenant space. sprinkler & fire alarm under separate permit.

Open the permit page

$1,500,000
Jul 10, 2008Completed
final sign-off Jul 2008
1700 Owens StAeco Systems, Increlocation of extg devices due to tenant modifications (3) devices
Details
Permit
200807106404
Permit issued
Jul 10, 2008
Final sign-off
Jul 31, 2008

relocation of extg devices due to tenant modifications (3) devices

Open the permit page

$2,000
Jun 23, 2008Completed
final sign-off Oct 2008
1700 Owens StAeco Systems, Incmodifications to (e) fire alarm system due to tenant improvements - 7 devices.
Details
Permit
200806235064
Permit issued
Jun 23, 2008
Final sign-off
Oct 2, 2008

modifications to (e) fire alarm system due to tenant improvements - 7 devices.

Open the permit page

$3,000
Jun 20, 2008Never finaled
issued Jun 2008, no final
1700 Owens StCosco Fire Protection Inc.ti for fire sprinklers on the 4th flr. relocate 3 sprinkler heads in the post formulation prep area to accomondate new walls and ceilings. add 1 head in mass specs rm.
Details
Permit
200806204993
Permit issued
Jun 20, 2008

ti for fire sprinklers on the 4th flr. relocate 3 sprinkler heads in the post formulation prep area to accomondate new walls and ceilings. add 1 head in mass specs rm.

Open the permit page

$1,500
Jun 18, 2008Completed
final sign-off Jul 2008
1700 Owens StTurner Construction Co4th floor-reference arch plans #2008-0604-3651-mechanical relocate 2 hoods ducting capping off some (e) hood ducting, re-balancing etc..
Details
Permit
200806184764
Permit issued
Jul 25, 2008
Final sign-off
Jul 31, 2008

4th floor-reference arch plans #2008-0604-3651-mechanical relocate 2 hoods ducting capping off some (e) hood ducting, re-balancing etc..

Open the permit page

$25,000
Jun 4, 2008Completed
final sign-off Aug 2008
1700 Owens StTurner Construction Co4th floor, remove walls, door,ceiling grid. construct new walls,ceiling, new case work wall cabinets, fume hoods & other equipment. relocate (e) freezers & refrigerators. no change to plumbing fixtures. mep under separate permit.
Details
Permit
200806043651
Permit issued
Jun 6, 2008
Final sign-off
Aug 1, 2008

4th floor, remove walls, door,ceiling grid. construct new walls,ceiling, new case work wall cabinets, fume hoods & other equipment. relocate (e) freezers & refrigerators. no change to plumbing fixtures. mep under separate permit.

Open the permit page

$268,896
May 8, 2008Completed
final sign-off Jun 2008
1700 Owens StAeco Systems, Inc1st floor-addendum to pa# 2008-0313-7017-as built drawing-added 1 smoke detector, 1 relay module and 2 input module
Details
Permit
200805081595
Permit issued
May 8, 2008
Final sign-off
Jun 11, 2008

1st floor-addendum to pa# 2008-0313-7017-as built drawing-added 1 smoke detector, 1 relay module and 2 input module

Open the permit page

$3,000
Apr 29, 2008Never finaled
issued Apr 2008, no final
1700 Owens StR C Benson & Sons Inc.modify fire protection system for 1st floor. add 51 pendants & 10 uprights heads for new offices.
Details
Permit
200804290826
Permit issued
Apr 29, 2008

modify fire protection system for 1st floor. add 51 pendants & 10 uprights heads for new offices.

Open the permit page

$19,250
Apr 22, 2008Completed
final sign-off May 2008
1700 Owens StAeco Systems, Increvision to pa# 2008/03/13/7020 for as-built to add 1 horn/strobe, 1 duct detector and 1 smoke detector to the original work on the 1st floor.
Details
Permit
200804220301
Permit issued
Apr 22, 2008
Final sign-off
May 12, 2008

revision to pa# 2008/03/13/7020 for as-built to add 1 horn/strobe, 1 duct detector and 1 smoke detector to the original work on the 1st floor.

Open the permit page

$4,000
Apr 10, 2008Completed
final sign-off Oct 2008
1700 Owens Stground floor tenant improvement of 4,027 sf "b" occupancy office space for m.s. society of northern ca. new office partitions and m.e.p. no exterior work. sprinkler and fire alarm under separate permit.
Details
Permit
200804109338
Permit issued
Apr 22, 2008
Final sign-off
Oct 2, 2008

ground floor tenant improvement of 4,027 sf "b" occupancy office space for m.s. society of northern ca. new office partitions and m.e.p. no exterior work. sprinkler and fire alarm under separate permit.

Open the permit page

$440,000
Apr 3, 2008Expired or cancelled
expired Aug 2009
1700 Owens StPribuss Engineering Incfire sprinkler ti 16 sprinkler heads
Details
Permit
200804038671
Permit issued
Apr 3, 2008

fire sprinkler ti 16 sprinkler heads

Open the permit page

$4,000
Mar 13, 2008Completed
final sign-off Jun 2008
1700 Owens StAeco Systems, Inc1st floor: modifications to existing fire alarm system due to tenant improvements - 3 devices (strobes). starbucks.
Details
Permit
200803137017
Permit issued
Mar 13, 2008
Final sign-off
Jun 11, 2008

1st floor: modifications to existing fire alarm system due to tenant improvements - 3 devices (strobes). starbucks.

Open the permit page

$4,000
Mar 13, 2008Completed
final sign-off May 2008
1700 Owens StAeco Systems, Inc1st floor: modifications to existing fire alarm system due to tenant improvements - 2 devices (strobes).
Details
Permit
200803137020
Permit issued
Mar 13, 2008
Final sign-off
May 12, 2008

1st floor: modifications to existing fire alarm system due to tenant improvements - 2 devices (strobes).

Open the permit page

$4,000
Feb 28, 2008Expired or cancelled
expired Aug 2009
1700 Owens StPribuss Engineering Inc1st floor-fire sprinkler t.i.-(e) sprinkler relocated-33, added sprinklers-6. total 39
Details
Permit
200802285808
Permit issued
Feb 28, 2008

1st floor-fire sprinkler t.i.-(e) sprinkler relocated-33, added sprinklers-6. total 39

Open the permit page

$8,100
Feb 22, 2008Completed
final sign-off May 2008
1700 Owens Strevision to appl #200711168426, revise mechanical plan for 1st floor marketing center, no work in "lab" occupancy.
Details
Permit
200802225392
Permit issued
Feb 26, 2008
Final sign-off
May 12, 2008

revision to appl #200711168426, revise mechanical plan for 1st floor marketing center, no work in "lab" occupancy.

Open the permit page

$27,000
Feb 21, 2008Completed
final sign-off Mar 2008
1700 Owens StAeco Systems, Incti of ex. fire alarm system on the 5th floor. add 2 horn/strobes and 2 devices.
Details
Permit
200802215216
Permit issued
Feb 21, 2008
Final sign-off
Mar 13, 2008

ti of ex. fire alarm system on the 5th floor. add 2 horn/strobes and 2 devices.

Open the permit page

$3,000
Feb 1, 2008Expired or cancelled
expired Aug 2009
1700 Owens StWalschon Fire Protection Incadd 1 sprinkler head at 10 ft. ceiling in new open office suite 270. all drops from existing plugged outlets. t.i uder app. # 200712211160.
Details
Permit
200802013746
Permit issued
Feb 1, 2008

add 1 sprinkler head at 10 ft. ceiling in new open office suite 270. all drops from existing plugged outlets. t.i uder app. # 200712211160.

Open the permit page

$1,500
Jan 25, 2008Expired or cancelled
expired Aug 2009
1700 Owens StWalschon Fire Protection Incmodify (e) fire sprinkler system for 5th flr office suites-ste #525-9 ceiling sprinkler (new); ste #530-new 10 ceiling sprinkler heads & relocate 2 uprights. total sprinlkers 21, all new sprinlkler drop to new ceiling height
Details
Permit
200801253256
Permit issued
Jan 25, 2008

modify (e) fire sprinkler system for 5th flr office suites-ste #525-9 ceiling sprinkler (new); ste #530-new 10 ceiling sprinkler heads & relocate 2 uprights. total sprinlkers 21, all new sprinlkler drop to new ceiling height

Open the permit page

$8,000
Jan 25, 2008Completed
final sign-off Mar 2008
1700 Owens Streference appl # 200712211160 to install 1 fume hood in room 274.
Details
Permit
200801253267
Permit issued
Jan 30, 2008
Final sign-off
Mar 13, 2008

reference appl # 200712211160 to install 1 fume hood in room 274.

Open the permit page

$25,000
Jan 7, 2008Completed
final sign-off Mar 2008
1700 Owens StR C Benson & Sons Inc.tenant improvement of suites 525 & 530 new offices partitions. (5th floor). fire alarm & sprinkler under seperate permit. all non structural.
Details
Permit
200801071934
Permit issued
Jan 15, 2008
Final sign-off
Mar 13, 2008

tenant improvement of suites 525 & 530 new offices partitions. (5th floor). fire alarm & sprinkler under seperate permit. all non structural.

Open the permit page

$245,000
Dec 21, 2007Completed
final sign-off Mar 2008
1700 Owens Stti on 2nd floor construct 3 new work stations and 4 new offices with non-rated partition walls in an ex. space (room 270). mep under seperate permit.
Details
Permit
200712211160
Permit issued
Jan 25, 2008
Final sign-off
Mar 13, 2008

ti on 2nd floor construct 3 new work stations and 4 new offices with non-rated partition walls in an ex. space (room 270). mep under seperate permit.

Open the permit page

$125,000
Dec 10, 2007Never finaled
issued Dec 2007, no final
1700 Owens StSuperior Electrical Advertising Inchanging interior window illuminated sign
Details
Permit
200712100100
Permit issued
Dec 14, 2007

hanging interior window illuminated sign

Open the permit page

$1,500
Dec 10, 2007Never finaled
issued Dec 2007, no final
1700 Owens StSuperior Electrical Advertising Incinterior illuminated channel letter wall sign on front door
Details
Permit
200712100103
Permit issued
Dec 14, 2007

interior illuminated channel letter wall sign on front door

Open the permit page

$4,300
Dec 10, 2007Never finaled
issued Dec 2007, no final
1700 Owens StSuperior Electrical Advertising Incnew illuminated projecting sign
Details
Permit
200712100096
Permit issued
Dec 14, 2007

new illuminated projecting sign

Open the permit page

$2,600
Nov 16, 2007Completed
final sign-off May 2008
1700 Owens Stnew ground floor office marketing cneter & maintanence office. (6) new b occupancy storage (n o hazardous materials). no work in h3 or h8 occupancy. b occupancy work only. no exterior work. sprinkler & fire alarm under separate permit.
Details
Permit
200711168426
Permit issued
Nov 26, 2007
Final sign-off
May 12, 2008

new ground floor office marketing cneter & maintanence office. (6) new b occupancy storage (n o hazardous materials). no work in h3 or h8 occupancy. b occupancy work only. no exterior work. sprinkler & fire alarm under separate permit.

Open the permit page

$450,000
Oct 19, 2007Expired or cancelled
expired Jul 2009
1700 Owens StAeco Systems, Inc5th floor for novo, modification to (e) fire alarm system to t.i. total (2) device: 1 strobe and 1 horn/strobe.
Details
Permit
200710195870
Permit issued
Oct 19, 2007

5th floor for novo, modification to (e) fire alarm system to t.i. total (2) device: 1 strobe and 1 horn/strobe.

Open the permit page

$4,000
Oct 19, 2007Expired or cancelled
expired Jul 2009
1700 Owens StAeco Systems, Inc5th floor for synergenics, modifications to (e) fire alarm system due to t.i. total (4) devices: 3 horn-strobes and 1 strobe.
Details
Permit
200710195868
Permit issued
Oct 19, 2007

5th floor for synergenics, modifications to (e) fire alarm system due to t.i. total (4) devices: 3 horn-strobes and 1 strobe.

Open the permit page

$4,000
Oct 11, 2007Expired or cancelled
expired Jul 2009
1700 Owens StWalschon Fire Protection Inc5th floor-17 sprinkler relocates on the 5th floor
Details
Permit
200710115072
Permit issued
Oct 11, 2007

5th floor-17 sprinkler relocates on the 5th floor

Open the permit page

$3,400
Sep 24, 2007Completed
final sign-off Oct 2007
1700 Owens StAeco Systems, Incnote: this is a duplicate of p.a. 2007-06-15-4116 per request of applicant due to contractor losing approved plans. scope of work: modifications to (e) fire alarm system due to t.i. for 3rd floor; 8 smoke detectors, 4 control relays, 25 horn/strobe, 3 strobes, 4 duct detectors, 1 booster panel.
Details
Permit
200709243551
Permit issued
Sep 24, 2007
Final sign-off
Oct 17, 2007

note: this is a duplicate of p.a. 2007-06-15-4116 per request of applicant due to contractor losing approved plans. scope of work: modifications to (e) fire alarm system due to t.i. for 3rd floor; 8 smoke detectors, 4 control relays, 25 horn/strobe, 3 strobes, 4 duct detectors, 1 booster panel.

Open the permit page

Sep 19, 2007Completed
final sign-off Jun 2008
1700 Owens Stnew coffee retail establihment ( starbucks) in commercial retail space. one handicap bathroom, new counter, new non-structural walls, ceiling, electrical, plumbing, equipment, floor tiles, new heat and ventilation.
Details
Permit
200709193110
Permit issued
Oct 2, 2007
Final sign-off
Jun 12, 2008

new coffee retail establihment ( starbucks) in commercial retail space. one handicap bathroom, new counter, new non-structural walls, ceiling, electrical, plumbing, equipment, floor tiles, new heat and ventilation.

Open the permit page

$150,000
Sep 13, 2007Completed
final sign-off Jan 2008
1700 Owens Stoffice tenant improvement on the 5th fl. "novo suite" 250 sqft.
Details
Permit
200709132613
Permit issued
Oct 5, 2007
Final sign-off
Jan 25, 2008

office tenant improvement on the 5th fl. "novo suite" 250 sqft.

Open the permit page

$80,000
Sep 13, 2007Completed
final sign-off Dec 2007
1700 Owens Stoffice tenant improvement on the 5th fl."synergenics" 1,800 sq.ft.
Details
Permit
200709132616
Permit issued
Oct 5, 2007
Final sign-off
Dec 10, 2007

office tenant improvement on the 5th fl."synergenics" 1,800 sq.ft.

Open the permit page

$280,000
Aug 27, 2007Completed
final sign-off Oct 2007
1700 Owens StTurner Construction Cosequence of operation for refridgeration room to permit 200412282235/s3 per inspection yuen on 8/25/07
Details
Permit
200708270889
Permit issued
Aug 27, 2007
Final sign-off
Oct 2, 2007

sequence of operation for refridgeration room to permit 200412282235/s3 per inspection yuen on 8/25/07

Open the permit page

$4,000
Aug 23, 2007Expired or cancelled
expired Jun 2009
1700 Owens StAeco Systems, Inc1st floor-modifications to fire alarm system due to tenant changes-3 devices
Details
Permit
200708230665
Permit issued
Aug 23, 2007

1st floor-modifications to fire alarm system due to tenant changes-3 devices

Open the permit page

$4,000
Aug 21, 2007Completed
final sign-off Oct 2007
1700 Owens StR C Benson & Sons Inc.2nd floor demising wall with existing tenant space. no electrical, no plumbing, no hvac work to be performed under this permit.
Details
Permit
200708210452
Permit issued
Aug 21, 2007
Final sign-off
Oct 31, 2007

2nd floor demising wall with existing tenant space. no electrical, no plumbing, no hvac work to be performed under this permit.

Open the permit page

$12,000
Aug 17, 2007Completed
final sign-off Oct 2007
1700 Owens Strevision to approved pa# 2006.1026.6108 for deleting shower area from scope of work. all work on the 3rd floor.
Details
Permit
200708170199
Permit issued
Aug 17, 2007
Final sign-off
Oct 17, 2007

revision to approved pa# 2006.1026.6108 for deleting shower area from scope of work. all work on the 3rd floor.

Open the permit page

Aug 9, 2007Completed
final sign-off Oct 2007
1700 Owens StCosco Fire Protection Inc.add 8 new window sprinklers for the purpose of exposure protection off of existing system.
Details
Permit
200708099287
Permit issued
Aug 9, 2007
Final sign-off
Oct 10, 2007

add 8 new window sprinklers for the purpose of exposure protection off of existing system.

Open the permit page

$5,800
Jul 27, 2007Completed
final sign-off Oct 2007
1700 Owens StWalschon Fire Protection Inc5th floor - modify (e) fire sprinkler system for 5th floor. add & relocate 17 and add 1 upright, 1725 sq ft.
Details
Permit
200707277921
Permit issued
Jul 27, 2007
Final sign-off
Oct 15, 2007

5th floor - modify (e) fire sprinkler system for 5th floor. add & relocate 17 and add 1 upright, 1725 sq ft.

Open the permit page

$4,350
Jul 27, 2007Completed
final sign-off Oct 2007
1700 Owens StWalschon Fire Protection Incground floor - modify fire sprinkler system for 1st floor. 1073 sq ft. add 9 pehd head & 4 upright heads for new fitness center on ground floor for accessory use by office tenants. under appl #200707056030.
Details
Permit
200707277919
Permit issued
Jul 27, 2007
Final sign-off
Oct 18, 2007

ground floor - modify fire sprinkler system for 1st floor. 1073 sq ft. add 9 pehd head & 4 upright heads for new fitness center on ground floor for accessory use by office tenants. under appl #200707056030.

Open the permit page

$4,250
Jul 18, 2007Completed
final sign-off Oct 2007
1700 Owens StAeco Systems, Incmodification to fire alarm system on 5th floor.
Details
Permit
200707187077
Permit issued
Jul 18, 2007
Final sign-off
Oct 15, 2007

modification to fire alarm system on 5th floor.

Open the permit page

$3,000
Jul 6, 2007Completed
final sign-off Oct 2007
1700 Owens StAllied Fire Protectiont.i relocate fire sprinkler for tenant improvements. relocated (21) . ti#200604068434.
Details
Permit
200707066192
Permit issued
Jul 6, 2007
Final sign-off
Oct 10, 2007

t.i relocate fire sprinkler for tenant improvements. relocated (21) . ti#200604068434.

Open the permit page

$5,260
Jul 5, 2007Completed
final sign-off Jul 2009
1700 Owens StR C Benson & Sons Inc.new fitness center on ground floor for accessory use by office tenanats. fire alarm and sprinkler under seperate permit.
Details
Permit
200707056030
Permit issued
Jul 18, 2007
Final sign-off
Jul 1, 2009

new fitness center on ground floor for accessory use by office tenanats. fire alarm and sprinkler under seperate permit.

Open the permit page

$200,000
Jul 5, 2007Completed
final sign-off Oct 2007
1700 Owens StR C Benson & Sons Inc.5th fl tenant remodel 1725 sqft . partion walls lighting mechanical sprinkler & fire alarm under seperate permit.
Details
Permit
200707056039
Permit issued
Jul 25, 2007
Final sign-off
Oct 11, 2007

5th fl tenant remodel 1725 sqft . partion walls lighting mechanical sprinkler & fire alarm under seperate permit.

Open the permit page

$98,000
Jul 2, 2007Completed
final sign-off Oct 2007
1700 Owens StWalschon Fire Protection Inc30 fire sprinklers - 27 dropped below new ceiling same count as above 3 new aboue corridor (heads remain in plenigm)
Details
Permit
200707025685
Permit issued
Jul 2, 2007
Final sign-off
Oct 18, 2007

30 fire sprinklers - 27 dropped below new ceiling same count as above 3 new aboue corridor (heads remain in plenigm)

Open the permit page

$8,000
Jun 19, 2007Never finaled
issued Jun 2007, no final
1700 Owens Stnew mechanical and lighting, 5thflr
Details
Permit
200706194400
Permit issued
Jun 26, 2007

new mechanical and lighting, 5thflr

Open the permit page

$16,000
Jun 15, 2007Completed
final sign-off Oct 2007
1700 Owens StAeco Systems, Incmodifications to existing fire alarm system due to tenant improvements for the 3rd floor, 8 smoke detectors, 4 control relay, 25 horn storbes, 3 storbes, 4 duct detector, 1 booster panel, 7 ceiling horn stobes.
Details
Permit
200706154116
Permit issued
Jun 15, 2007
Final sign-off
Oct 17, 2007

modifications to existing fire alarm system due to tenant improvements for the 3rd floor, 8 smoke detectors, 4 control relay, 25 horn storbes, 3 storbes, 4 duct detector, 1 booster panel, 7 ceiling horn stobes.

Open the permit page

$12,000
Jun 15, 2007Expired or cancelled
expired Jun 2009
1700 Owens StAeco Systems, Incmoifications to existing fire alarm system due to tenant imporvemkents for the column group 5th fl 3 hor strobes, 2 ceiling horn stobes, 1 ceiling stobes
Details
Permit
200706154104
Permit issued
Jun 15, 2007

moifications to existing fire alarm system due to tenant imporvemkents for the column group 5th fl 3 hor strobes, 2 ceiling horn stobes, 1 ceiling stobes

Open the permit page

$3,000
Jun 15, 2007Completed
final sign-off Oct 2007
1700 Owens StAeco Systems, Incmodifications to existing firm alarm sytem due to tenant imporvements on second floor on.y.
Details
Permit
200706154108
Permit issued
Jun 15, 2007
Final sign-off
Oct 17, 2007

modifications to existing firm alarm sytem due to tenant imporvements on second floor on.y.

Open the permit page

$10,000
Jun 7, 2007Completed
final sign-off Oct 2007
1700 Owens StR C Benson & Sons Inc.oti-1, the column group, 5th floor, el, me, ls, sp.
Details
Permit
200706073294
Permit issued
Jun 26, 2007
Final sign-off
Oct 18, 2007

oti-1, the column group, 5th floor, el, me, ls, sp.

Open the permit page

$76,960
May 10, 2007Completed
final sign-off Oct 2007
1700 Owens StAllied Fire Protectionprovide tenant improvement sprinkler heads for 3rd floor, 14 adds and rest relocates
Details
Permit
200705100841
Permit issued
May 10, 2007
Final sign-off
Oct 17, 2007

provide tenant improvement sprinkler heads for 3rd floor, 14 adds and rest relocates

Open the permit page

$36,000
May 9, 2007Completed
final sign-off Oct 2007
1700 Owens StTurner Construction Co4th floor - revision to approved appl #200604068434. alteration of vivarium area on 4th floor. new showers and reconfigure cage wash area.
Details
Permit
200705090775
Permit issued
Jul 13, 2007
Final sign-off
Oct 10, 2007

4th floor - revision to approved appl #200604068434. alteration of vivarium area on 4th floor. new showers and reconfigure cage wash area.

Open the permit page

$630,000
Apr 24, 2007Completed
final sign-off Oct 2007
1700 Owens StCosco Fire Protection Inc.4th floor-revision to pa# 200611167943-different alarm panel installed, same specifications, different manufacture. inspector request for as built submittal.
Details
Permit
200704249552
Permit issued
Apr 24, 2007
Final sign-off
Oct 10, 2007

4th floor-revision to pa# 200611167943-different alarm panel installed, same specifications, different manufacture. inspector request for as built submittal.

Open the permit page

Apr 19, 2007Completed
final sign-off Oct 2007
1700 Owens StAllied Fire Protection2nd floor-provide tenant improvement (pharmion) sprinkler heads for balance of 2nd floor.
Details
Permit
200704199161
Permit issued
Apr 19, 2007
Final sign-off
Oct 17, 2007

2nd floor-provide tenant improvement (pharmion) sprinkler heads for balance of 2nd floor.

Open the permit page

$24,000
Mar 20, 2007Completed
final sign-off Oct 2007
1700 Owens Stinterior bio-tech tenant improvement on 2nd floor, new offices and lab areas.
Details
Permit
200703206711
Permit issued
May 24, 2007
Final sign-off
Oct 17, 2007

interior bio-tech tenant improvement on 2nd floor, new offices and lab areas.

Open the permit page

$1,800,000
Mar 15, 2007Completed
final sign-off Oct 2007
1700 Owens St2nd floor - revision to 200607136440. add 2 door release pull stations at card readers per field inspectors request.
Details
Permit
200703156374
Permit issued
Mar 15, 2007
Final sign-off
Oct 17, 2007

2nd floor - revision to 200607136440. add 2 door release pull stations at card readers per field inspectors request.

Open the permit page

$5,000
Mar 6, 2007Completed
final sign-off Oct 2007
1700 Owens StCosco Fire Protection Inc.fire sprinkler tenant improvement at 5th fl, for "arch ventures", 6 relocated hds-no adds no change in occupancy, no additonal square footage.
Details
Permit
200703065555
Permit issued
Mar 6, 2007
Final sign-off
Oct 10, 2007

fire sprinkler tenant improvement at 5th fl, for "arch ventures", 6 relocated hds-no adds no change in occupancy, no additonal square footage.

Open the permit page

$3,500
Feb 2, 2007Completed
final sign-off Oct 2007
1700 Owens StTurner Construction Corevise entry step to accessible ramp at future retail entry per sf dbi condition for temporary certificate of occupancy. see attached dbi documents. revised app #200412282235
Details
Permit
200702023233
Permit issued
Mar 2, 2007
Final sign-off
Oct 2, 2007

revise entry step to accessible ramp at future retail entry per sf dbi condition for temporary certificate of occupancy. see attached dbi documents. revised app #200412282235

Open the permit page

$18,000
Jan 18, 2007Completed
final sign-off Oct 2007
1700 Owens StTurner Construction Corevision to pa# 2006/08/11/9245. original permit developed a portion of room 123 hazmat storage. as an h-3 occupancy, with future expansion indicated. this revision will extend the concrete block low walls, double containment berms, gratings, & exhaust ductwork into the rest of the room.
Details
Permit
200701181895
Permit issued
Jun 28, 2007
Final sign-off
Oct 2, 2007

revision to pa# 2006/08/11/9245. original permit developed a portion of room 123 hazmat storage. as an h-3 occupancy, with future expansion indicated. this revision will extend the concrete block low walls, double containment berms, gratings, & exhaust ductwork into the rest of the room.

Open the permit page

$225,000
Jan 11, 2007Completed
final sign-off Oct 2007
1700 Owens Stoti-2 alexandria real estate 5th floor, el, me
Details
Permit
200701111505
Permit issued
Jan 11, 2007
Final sign-off
Oct 10, 2007

oti-2 alexandria real estate 5th floor, el, me

Open the permit page

$25,000
Jan 11, 2007Completed
final sign-off Oct 2007
1700 Owens Stoti-1 5/f alexandria real estate el, me, sp, ls
Details
Permit
200701111503
Permit issued
Jan 11, 2007
Final sign-off
Oct 10, 2007

oti-1 5/f alexandria real estate el, me, sp, ls

Open the permit page

$25,000
Dec 18, 2006Completed
final sign-off Oct 2007
1700 Owens StTurner Construction Co2nd floor - revision to approved app 2006/07/13/6440. reconfigure office area on 2nd floor only.
Details
Permit
200612180056
Permit issued
Feb 23, 2007
Final sign-off
Oct 17, 2007

2nd floor - revision to approved app 2006/07/13/6440. reconfigure office area on 2nd floor only.

Open the permit page

$200,000
Nov 28, 2006Completed
final sign-off Oct 2007
1700 Owens StAeco Systems, Incmodifications to fire alarm system due to tenant improvements (27 devices).
Details
Permit
200611288543
Permit issued
Dec 5, 2006
Final sign-off
Oct 10, 2007

modifications to fire alarm system due to tenant improvements (27 devices).

Open the permit page

$10,000
Nov 22, 2006Completed
final sign-off Oct 2007
1700 Owens StAeco Systems, Incoti-3, 5th floor, ls
Details
Permit
200611228346
Permit issued
Nov 22, 2006
Final sign-off
Oct 10, 2007

oti-3, 5th floor, ls

Open the permit page

$5,000
Nov 22, 2006Completed
final sign-off Oct 2007
1700 Owens StAeco Systems, Incoti-3 5th floor ls
Details
Permit
200611228345
Permit issued
Nov 22, 2006
Final sign-off
Oct 10, 2007

oti-3 5th floor ls

Open the permit page

$5,000
Nov 16, 2006Completed
final sign-off Oct 2007
1700 Owens StCosco Fire Protection Inc.install a fm200 system in the existing server room 408. system consist of 1 control panel, 2 smoke detectors, 1 pull station with abort, 1 bell, 1 fm200 cylinder, 2 nozzles and all warning signage.
Details
Permit
200611167943
Permit issued
Dec 11, 2006
Final sign-off
Oct 10, 2007

install a fm200 system in the existing server room 408. system consist of 1 control panel, 2 smoke detectors, 1 pull station with abort, 1 bell, 1 fm200 cylinder, 2 nozzles and all warning signage.

Open the permit page

$25,000
Oct 26, 2006Completed
final sign-off Oct 2007
1700 Owens St3rd floor - tenant improvement of 3/f. new offices & open office areas. new "b" occupancy lab areas.
Details
Permit
200610266108
Permit issued
May 24, 2007
Final sign-off
Oct 17, 2007

3rd floor - tenant improvement of 3/f. new offices & open office areas. new "b" occupancy lab areas.

Open the permit page

$3,700,000
Oct 19, 2006Completed
final sign-off Oct 2007
1700 Owens Stoti-1 (rev.) 5th floor. revision to appl#200608109137 provide glazing in corridor and maintain 1 hr. fire rating of existing corridor. sprinkler system under seperate permit.
Details
Permit
200610195461
Permit issued
Oct 19, 2006
Final sign-off
Oct 10, 2007

oti-1 (rev.) 5th floor. revision to appl#200608109137 provide glazing in corridor and maintain 1 hr. fire rating of existing corridor. sprinkler system under seperate permit.

Open the permit page

$16,000
Oct 19, 2006Completed
final sign-off Oct 2007
1700 Owens StAeco Systems, Incoti-2, 5th floor, ls.
Details
Permit
200610195483
Permit issued
Nov 28, 2006
Final sign-off
Oct 10, 2007

oti-2, 5th floor, ls.

Open the permit page

$15,000
Oct 19, 2006Completed
final sign-off Oct 2007
1700 Owens StCosco Fire Protection Inc.oti-3 5th floor sp
Details
Permit
200610195438
Permit issued
Oct 19, 2006
Final sign-off
Oct 10, 2007

oti-3 5th floor sp

Open the permit page

$35,400
Oct 19, 2006Completed
final sign-off Oct 2007
1700 Owens StAllied Fire Protectionprovide t.i. sprinkler heads for 60% of 2/f (148 sprinkler heads).
Details
Permit
200610195431
Permit issued
Oct 19, 2006
Final sign-off
Oct 17, 2007

provide t.i. sprinkler heads for 60% of 2/f (148 sprinkler heads).

Open the permit page

$29,000
Oct 19, 2006Completed
final sign-off Oct 2007
1700 Owens StCosco Fire Protection Inc.fire sprinkler tenant improvement at 5th floor novo & versnat suites, no added floor space no change in occupancy (26) sprinkler heads with (o) adds, (7) plugged outlets on original system (26) relocates
Details
Permit
200610195436
Permit issued
Oct 19, 2006
Final sign-off
Oct 10, 2007

fire sprinkler tenant improvement at 5th floor novo & versnat suites, no added floor space no change in occupancy (26) sprinkler heads with (o) adds, (7) plugged outlets on original system (26) relocates

Open the permit page

$11,000
Oct 17, 2006Completed
final sign-off Oct 2007
1700 Owens Stoti-2, 5th floor, me, el.
Details
Permit
200610175239
Permit issued
Nov 27, 2006
Final sign-off
Oct 10, 2007

oti-2, 5th floor, me, el.

Open the permit page

$11,000
Oct 17, 2006Completed
final sign-off Oct 2007
1700 Owens Stoti-1 5th floor el,m sp, me,ls
Details
Permit
200610175235
Permit issued
Nov 16, 2006
Final sign-off
Oct 10, 2007

oti-1 5th floor el,m sp, me,ls

Open the permit page

$18,000
Oct 11, 2006Completed
final sign-off Oct 2007
1700 Owens StAeco Systems, Inc4th floor - modificatoins to fire alarm system due to tenant changes.
Details
Permit
200610114674
Permit issued
Nov 16, 2006
Final sign-off
Oct 10, 2007

4th floor - modificatoins to fire alarm system due to tenant changes.

Open the permit page

$20,000
Oct 11, 2006Completed
final sign-off Oct 2007
1700 Owens StAeco Systems, Inc1st floor - modificatoins to fire alarm system due to tenant changes.
Details
Permit
200610114677
Permit issued
Nov 30, 2006
Final sign-off
Oct 10, 2007

1st floor - modificatoins to fire alarm system due to tenant changes.

Open the permit page

$14,000
Oct 10, 2006Completed
final sign-off Oct 2007
1700 Owens Stoti-2 on 5th floor, new m.e.p.
Details
Permit
200610104514
Permit issued
Oct 17, 2006
Final sign-off
Oct 10, 2007

oti-2 on 5th floor, new m.e.p.

Open the permit page

$13,500
Oct 10, 2006Completed
final sign-off Oct 2007
1700 Owens Stoti-1 of partial 5th floor (1670 sq.ft.), new partitions for divided office space. first time tenant built out office space.
Details
Permit
200610104512
Permit issued
Oct 20, 2006
Final sign-off
Oct 10, 2007

oti-1 of partial 5th floor (1670 sq.ft.), new partitions for divided office space. first time tenant built out office space.

Open the permit page

$25,000
Oct 6, 2006Completed
final sign-off Oct 2007
1700 Owens Strevision to approved pa# 200604068432. as built changes to 1st floor lobby. relocate maintenance & building service offices. fire sprinkler and life safety under seperate permit.
Details
Permit
200610064418
Permit issued
Oct 6, 2006
Final sign-off
Oct 10, 2007

revision to approved pa# 200604068432. as built changes to 1st floor lobby. relocate maintenance & building service offices. fire sprinkler and life safety under seperate permit.

Open the permit page

$38,000
Sep 28, 2006Completed
final sign-off Oct 2007
1700 Owens StCosco Fire Protection Inc.fired spnklr tenant impr. at 1st floor lobby and corridors. approx (62) heads over 3,500 sq ft of work, 59 rel0cates and 3 adds. no added floor space, or any change in occupancy #200603166798 with drawn, origainal app #200412282235
Details
Permit
200609283593
Permit issued
Sep 28, 2006
Final sign-off
Oct 10, 2007

fired spnklr tenant impr. at 1st floor lobby and corridors. approx (62) heads over 3,500 sq ft of work, 59 rel0cates and 3 adds. no added floor space, or any change in occupancy #200603166798 with drawn, origainal app #200412282235

Open the permit page

$21,000
Sep 28, 2006Completed
final sign-off Oct 2007
1700 Owens StCosco Fire Protection Inc.fire sprinkler tenant improvement at 4th floor. no added floor space, no change in occupancy. approx 291 sprinkler heads, with 22 adds, 37 plugged outlets on orig system and 269 relocates.
Details
Permit
200609283605
Permit issued
Oct 13, 2006
Final sign-off
Oct 10, 2007

fire sprinkler tenant improvement at 4th floor. no added floor space, no change in occupancy. approx 291 sprinkler heads, with 22 adds, 37 plugged outlets on orig system and 269 relocates.

Open the permit page

$60,000
Aug 17, 2006Completed
final sign-off Oct 2007
1700 Owens Stoti-2 rev. 5th floor, el, me.
Details
Permit
200608179799
Permit issued
Aug 17, 2006
Final sign-off
Oct 10, 2007

oti-2 rev. 5th floor, el, me.

Open the permit page

$37,000
Aug 11, 2006Completed
final sign-off Oct 2007
1700 Owens StTurner Construction Coref 2004122892235.revise hazmay room from b to h3 occupancy-see attached letter.construct interior improvements to suit first tenant-grating,conrete block walls.revisions impact addenda 2&3 already permitted.ref to 200412282235.
Details
Permit
200608119245
Permit issued
Nov 30, 2006
Final sign-off
Oct 2, 2007

ref 2004122892235.revise hazmay room from b to h3 occupancy-see attached letter.construct interior improvements to suit first tenant-grating,conrete block walls.revisions impact addenda 2&3 already permitted.ref to 200412282235.

Open the permit page

$90,000
Aug 10, 2006Completed
final sign-off Oct 2007
1700 Owens St5th floor-revision to approved pa# 200604078474, delete partial office area from scope of work. revision to oti-1, 200604078474.
Details
Permit
200608109137
Permit issued
Aug 10, 2006
Final sign-off
Oct 10, 2007

5th floor-revision to approved pa# 200604078474, delete partial office area from scope of work. revision to oti-1, 200604078474.

Open the permit page

Jul 13, 2006Completed
final sign-off Oct 2007
1700 Owens StTurner Construction Cotenant improvement of 2nd floor. build out of offices and open "b" occupancy lab areas.
Details
Permit
200607136440
Permit issued
Nov 29, 2006
Final sign-off
Oct 10, 2007

tenant improvement of 2nd floor. build out of offices and open "b" occupancy lab areas.

Open the permit page

$2,600,000
May 12, 2006Completed
final sign-off Oct 2007
1700 Owens StMorrow-Meadows Corp Dba: Arc Electric Coinstall 1 750 kw emergency deisel generator. install 1 250 kw emergency deisel gerator enclosure.
Details
Permit
200605121483
Permit issued
Oct 23, 2006
Final sign-off
Oct 2, 2007

install 1 750 kw emergency deisel generator. install 1 250 kw emergency deisel gerator enclosure.

Open the permit page

$62,000
Apr 7, 2006Never finaled
issued Jun 2006, no final
1700 Owens Stoti-2, 5th floor, el, me.
Details
Permit
200604078473
Permit issued
Jun 21, 2006

oti-2, 5th floor, el, me.

Open the permit page

$260,000
Apr 7, 2006Completed
final sign-off Oct 2007
1700 Owens StTurner Construction Cooti-1, 5th fl, el, me, ls, sp. office areas (lab areas under seperate permit)
Details
Permit
200604078474
Permit issued
Aug 3, 2006
Final sign-off
Oct 10, 2007

oti-1, 5th fl, el, me, ls, sp. office areas (lab areas under seperate permit)

Open the permit page

$692,000
Apr 6, 2006Completed
final sign-off Oct 2007
1700 Owens StTurner Construction Co4th floor - tenant improvement of 4th floor/1st time build-out for a "b" occupancy non educational lab/new partitions and m.e.p.
Details
Permit
200604068434
Permit issued
Jul 17, 2006
Final sign-off
Oct 10, 2007

4th floor - tenant improvement of 4th floor/1st time build-out for a "b" occupancy non educational lab/new partitions and m.e.p.

Open the permit page

$3,700,000
Apr 6, 2006Completed
final sign-off Oct 2007
1700 Owens StTurner Construction Cotenant improvement of 1st floor lobby area. new partitions(rated & non rated) and finish work
Details
Permit
200604068432
Permit issued
Jul 26, 2006
Final sign-off
Oct 10, 2007

tenant improvement of 1st floor lobby area. new partitions(rated & non rated) and finish work

Open the permit page

$670,000
Apr 6, 2006Expired or cancelled
withdrawn Oct 2006
1700 Owens Sttenant improvements of partial 5th floor "b" occupancy lab/new partitions and m.e.p. build out of lab areas only (offices under seterate permit)
Details
Permit
200604068437

tenant improvements of partial 5th floor "b" occupancy lab/new partitions and m.e.p. build out of lab areas only (offices under seterate permit)

Open the permit page

$2,600,000
Mar 16, 2006Expired or cancelled
withdrawn Sep 2006
1700 Owens StAllied Fire Protectioncomplete fire sprinkler system all 5 floors
Details
Permit
200603166798

complete fire sprinkler system all 5 floors

Open the permit page

$290,000
Aug 23, 2005Completed
final sign-off Oct 2007
1700 Owens StTurner Construction Corevised files and connections to file caps. dws. structural #s1.1,2.1,4.1,4.2 (foundation revision)
Details
Permit
200508231019
Permit issued
Sep 30, 2005
Final sign-off
Oct 2, 2007

revised files and connections to file caps. dws. structural #s1.1,2.1,4.1,4.2 (foundation revision)

Open the permit page

Dec 28, 2004Completed
final sign-off Oct 2007
1700 Owens Stto erect research and development in mission bay
Details
Permit
200412282235
Permit issued
Jun 6, 2005
Final sign-off
Oct 2, 2007

to erect research and development in mission bay

Open the permit page

$24,086,511

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Aeco Systems, Inc (27), R C Benson & Sons Inc. (21), Walschon Fire Protection Inc (19), Turner Construction Co (13), Rossi Builders Inc. (10), Cosco Fire Protection Inc. (9), Morrow-Meadows Corp Dba: Arc Electric Co (6), Allied Fire Protection (5), Therma Corporation (5), Everon Llc (4), Mai Construction Inc. (3), Superior Electrical Advertising Inc (3), A M S Electric Inc (2), Discount Signs & Neon Inc (2), Fire Stop Sprinkler Company (2), Pribuss Engineering Inc (2), Seamless Fire Protection (2), Aaa Restaurant Fire Control/Dba Aaa Fire, Ad Art Inc., Bcci Construction Company, Caruso Construction Inc., Integrated Engineering Services, Peacock Construction, Red Hawk Fire & Security Ca Llc, Therma Llc, Western Allied Mechanical Inc.
Architects
Randall Dowler (19), Erik Sueberkrop (12), Joelle Kristina Rosander (3), Marc Pfenninger (2), Ashley Miller, Claudette Bleijenberg, D G A Architects, Jason Mccarthy, Steven Hall
Engineers
Brian Featherston, Brian Pyle, Clark Lowe, Joelle Rosander, Karen Lee, Rizik J Michael, Steven Joseph Rusconi, Tfg, William Hadinger
Designers
A D T Commercial Llc

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.