- 1 permit filed
20 permits since 2000: 17 completed, 3 never finaled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 20, 2026 | Completed final sign-off Mar 2026 | 680 Folsom St | suite 145: demolition of concrete wall in front of glass wall. removal of wall mounted cameras and clocks. removal of fcu's above ceilings etc. ab-017 exception to requirements for disabled access to vacant spaces. suite shall remain unoccupied until tenant improvement is filed.Details
suite 145: demolition of concrete wall in front of glass wall. removal of wall mounted cameras and clocks. removal of fcu's above ceilings etc. ab-017 exception to requirements for disabled access to vacant spaces. suite shall remain unoccupied until tenant improvement is filed. | $250,000 |
| Dec 3, 2021 | Completed final sign-off Jun 2022 | 455 Mission Bay Blvd South | ti of (e) labs on 4th floor including demo and installation of walls and doors, ceilings, lab furniture and equipment to build new tc labs. includes mep modifications. fire alarm/sprinkler deferred.Details
ti of (e) labs on 4th floor including demo and installation of walls and doors, ceilings, lab furniture and equipment to build new tc labs. includes mep modifications. fire alarm/sprinkler deferred. | $1,022,340 |
| Jul 16, 2021 | Completed final sign-off Jan 2022 | 1700 Owens St | t.i. of existing labs/medical & offices on the 2nd floor. incuding demolition & installation of walls. ceilings, lab furniture, fumehoods, lab equipment & associated mech, plumb & ele changes. this project does not change occupancy & egress path of bldg.Details
t.i. of existing labs/medical & offices on the 2nd floor. incuding demolition & installation of walls. ceilings, lab furniture, fumehoods, lab equipment & associated mech, plumb & ele changes. this project does not change occupancy & egress path of bldg. | $952,727 |
| Jun 12, 2019 | Completed final sign-off Nov 2019 | 2130 Fulton St | renovations to (e0 office area. constructioon of new private & open plan office. modification to suspended ceilings to accomodate new floor plan.Details
renovations to (e0 office area. constructioon of new private & open plan office. modification to suspended ceilings to accomodate new floor plan. | $750,000 |
| Sep 4, 2018 | Completed final sign-off Jan 2019 | 2445 Golden Gate Av | remodel existing lab room 3323. (n) finishes and casework. remove fume hood exhaust rebalance general lab air. replace sinks and emergency shower/eyewash. new biosafty cabinet/incubator emergency power.Details
remodel existing lab room 3323. (n) finishes and casework. remove fume hood exhaust rebalance general lab air. replace sinks and emergency shower/eyewash. new biosafty cabinet/incubator emergency power. | $109,000 |
| Mar 19, 2018 | Completed final sign-off Oct 2018 | 2130 Fulton St | conversion of (e) janitorial closet into (n) gender neutral shower, restroom & changing room adjacent to (e) pool & men's/women's locker rooms maher naDetails
conversion of (e) janitorial closet into (n) gender neutral shower, restroom & changing room adjacent to (e) pool & men's/women's locker rooms maher na | $70,602 |
| Dec 15, 2017 | Completed final sign-off Feb 2018 | 2350 Turk Bl | removal of an (e) stud partition wall & renovation of (e) offices & classrooms maher naDetails
removal of an (e) stud partition wall & renovation of (e) offices & classrooms maher na | $100,000 |
| Apr 18, 2017 | Never finaled issued Apr 2017, no final | 1700 Owens St | installation of nitrogen generator into extg 2nd floor mechanical room. includes structural anchorage and process piping. n/a maher ord. 155-13Details
installation of nitrogen generator into extg 2nd floor mechanical room. includes structural anchorage and process piping. n/a maher ord. 155-13 | $300,000 |
| Jul 26, 2016 | Completed final sign-off Aug 2016 | 31 Geary St | revision to bpa 2016 0429 6133; title 24, electrical drawings & load calculations only, no other work.Details
revision to bpa 2016 0429 6133; title 24, electrical drawings & load calculations only, no other work. | |
| Jun 7, 2016 | Never finaled issued Jun 2016, no final | 1700 Owens St | demo (e) cleanroom on level 4. new vivarium in its place - new process piping in (e) chem lab, new process piping in converted storage to analytical lab. new fume hood in chem (e) 2nd floor to receive new cold room inside (e) mecn space. maher naDetails
demo (e) cleanroom on level 4. new vivarium in its place - new process piping in (e) chem lab, new process piping in converted storage to analytical lab. new fume hood in chem (e) 2nd floor to receive new cold room inside (e) mecn space. maher na | $850,000 |
| May 20, 2016 | Completed final sign-off Dec 2016 | 2445 Golden Gate Av | electrical only (title 24 compliance) for pa#201506259951. n/a ordinance #155-13Details
electrical only (title 24 compliance) for pa#201506259951. n/a ordinance #155-13 | $25,000 |
| May 13, 2016 | Completed final sign-off Dec 2016 | 2445 Golden Gate Av | interior renovations to an existing 'b' occupancy area within the 3/f of a 5-story bldg. renovations to include new offices and laboratory. n/a ordinance #155-13Details
interior renovations to an existing 'b' occupancy area within the 3/f of a 5-story bldg. renovations to include new offices and laboratory. n/a ordinance #155-13 | $750,000 |
| May 4, 2016 | Completed final sign-off Jan 2017 | 2495 Golden Gate Av | replacement of 2 existing 550 gallon lube oil storage tanks with 2 new 550 gallon double wall lube oil storage tanks in existing mechanical equipment pit. maher not reqDetails
replacement of 2 existing 550 gallon lube oil storage tanks with 2 new 550 gallon double wall lube oil storage tanks in existing mechanical equipment pit. maher not req | $20,000 |
| Apr 29, 2016 | Completed final sign-off Aug 2016 | 31 Geary St | g/f- change of use ti of existing retail to salon unit on ground floor. add (n) restroom and (n) partition wall.Details
g/f- change of use ti of existing retail to salon unit on ground floor. add (n) restroom and (n) partition wall. | $15,000 |
| Aug 4, 2015 | Completed final sign-off Apr 2017 | 2345 Golden Gate Av | new exhaust ductwork & associated penetrations in the interior & exterior structur walls for boiler room exhaust/relief. n/a maher ord. 155-13Details
new exhaust ductwork & associated penetrations in the interior & exterior structur walls for boiler room exhaust/relief. n/a maher ord. 155-13 | $30,000 |
| Jun 25, 2015 | Completed final sign-off Dec 2016 | 2445 Golden Gate Av | demolition of existing b occupancy aera within 4th fl of 5 story building. renovations to include new offices and storage. mep/life safety deferred.Details
demolition of existing b occupancy aera within 4th fl of 5 story building. renovations to include new offices and storage. mep/life safety deferred. | $100,000 |
| Jul 8, 2013 | Completed final sign-off Nov 2013 | 2130 Fulton St | 5th floor-interior renovation to (e) partial area-5, 9 new offices, new finishes, renovation of (e) restrooms. mep under separate permit.Details
5th floor-interior renovation to (e) partial area-5, 9 new offices, new finishes, renovation of (e) restrooms. mep under separate permit. | $350,000 |
| Dec 12, 2011 | Completed final sign-off Aug 2012 | 2350 Turk Bl | 3rd floor-remodel (e) 3rd floor for new nursing simulation suite. no exterior workDetails
3rd floor-remodel (e) 3rd floor for new nursing simulation suite. no exterior work | $128,000 |
| Aug 5, 2011 | Never finaled issued Aug 2011, no final | 2335 Golden Gate Av | univ. of sf gymmnasium. install a new atm pad and kiosk at the rear of memorial gym. work includes (n) con.pad and 3 sided kios enclosure. work is free standing outside of bldg. atm to be installed and reviewed for accessibilty compliance under separate permit.Details
univ. of sf gymmnasium. install a new atm pad and kiosk at the rear of memorial gym. work includes (n) con.pad and 3 sided kios enclosure. work is free standing outside of bldg. atm to be installed and reviewed for accessibilty compliance under separate permit. | $82,000 |
| Jun 21, 2011 | Completed final sign-off Aug 2011 | 222 Stanyan St | removal of non structural clerestory windows and rpelace with new clerestory windows and replace with new clerestory windows at same locationDetails
removal of non structural clerestory windows and rpelace with new clerestory windows and replace with new clerestory windows at same location | $225,000 |