Block 1145, lot 003

2445 Golden Gate Av

The 200 most recent permits filed for this property.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jan 5, 2026Completed2445 Golden Gate Avto obtain final inspection for work approved under pa# 202201055392. all work is complete.
Jan 5, 2026Completed2445 Golden Gate Avto obtain final inspection for work approved under pa# 202003126946. all work is complete.
Jan 5, 2026Completed2445 Golden Gate Avto obtain final inspection for work approved under pa# 201910083932. all work is complete.
Jan 5, 2026Completed2445 Golden Gate Avto obtain final inspection for work approved under pa# 201911157450. all work is complete.
Mar 31, 2025Completed2335 Golden Gate AvCahill Contractors Llc.revision to permit 202306270974 and 202105210845. removal of title 24 special inspection code.
Jan 21, 2025In progress2335 Golden Gate Avnew guardrail at existing dock loading area ramp. new truck bumpers.$150,000
Apr 5, 2024Completed2445 Golden Gate AvC B 2 Builders Incorporatedrevision to issued pa# 2022-0105-5392: enhancement of the applicable shaft fire-resistance rated separation from 2 hours to 3 hours based on engineering analyis and judgement confirmed by ab-005.
Nov 16, 2023In progress650 Parker AvPribuss Engineering Incinstall one new 6" underground fire service from curb into bldg. *point of connection at city main to be done by others. overhead fire sprinkler under separate permit. fire pump will be included$7,500
Sep 22, 2023Completed2335 Golden Gate AvCahill Contractors Llc.deferred submittal, shop drawings, aac glass guardrails for the annex level and main lobby, ref pa# 202105210845
Aug 31, 2023Completed2335 Golden Gate AvCahill Contractors Llc.deferred submittal, shop drawings, olson steel handrails for the interior stairs and retaining wall. ref 202105210845
Aug 31, 2023Completed2335 Golden Gate AvCahill Contractors Llc.deferred submittal-shop drawings-draper inc. gym equipment. install 4 ceiling-suspended, side-folding basketball backstops model tbs-26-b. ref pa 202105210845.
Aug 7, 2023Completed2335 Golden Gate Avevacuation maps (9) total.$2,250
Jun 27, 2023Completed2335 Golden Gate AvCahill Contractors Llc.revision to approved hvac system under issued pa#202105210845. separate units & associated controls relocated to the rear of the property on the lower annex roof.$191,880
Jun 15, 2023Completed2335 Golden Gate AvUnited Systems Fire And Security Llcrev to pa#202210204801, remove elevator shunt trip, beam detectors & replaced them w/ area smoke detectors in the basketball court.$5,200
May 25, 2023Completed2497 Golden Gate AvSkyline Constructionreplacement in kind of (e) exterior windows approx 50. approx 25 street visible. existing and proposed aluminum windows.$400,000
Apr 24, 2023Completed2335 Golden Gate AvCahill Contractors Llc.deferred submittal - shop drawings for acc glass inc window wall system - fixed window located high above the end of the basketball court (ref pa 2021-0521-0845)
Apr 24, 2023Completed2335 Golden Gate AvSan Francisco Elevator Services Llcdeferred submittal: shop drawings for hydraulic elevator system ref pa 2021-0521-0845
Apr 24, 2023Completed2335 Golden Gate AvCahill Contractors Llc.deferred submittal - shop drawings for bendheim channel glass panel system - stair enclosure. ref pa 202105210845
Jan 17, 2023Completed2445 Golden Gate AvFire Alarm System Servicesadd (3) relay, (4) dual input modules, (4) smokes, (2) duct smokes, (21) horn strobes, (5) strobes. ref pa 202010277461$10,000
Nov 18, 2022Completed2345 Golden Gate AvFire Alarm System Servicesrecord decibel testing or audible devices in sleeping areas to ensure code compoliant sound pressure levels. phelan toler 2345 golden gate
Nov 10, 2022Completed2335 Golden Gate AvRcm Fire Protection Inc.install a new fire sprinkler system. ref pa 202105210845.
Oct 21, 2022Completed2305 Golden Gate AvFire Alarm System Services2305 golden gate - usf hayes-healy; record decibel testing of audible devices in sleeping areas to ensure code compliant sound pressure levels.$2,000
Oct 20, 2022Completed2335 Golden Gate AvUnited Systems Fire And Security Llcnew f/a for the new basketball training gym, addition with adj new offices and restroom facilities.addition shall consist of providing the following: new voice evacuation facp, new annunicator at entry lobby, notification devices throughout, detection and control for elevator,mech,f/s syst.$41,360
Oct 20, 2022Completed2335 Golden Gate AvUnited Systems Fire And Security Llcnew installation of elevator emergency 2-way communication system for new basketball traning gymnasiaum. main command center located in the ground level electrical room. ref pa202105210845$19,438
Oct 3, 2022Completed2305 Golden Gate AvJudge Netting Incimprovements to ulrich field & benedetti diamond baseball field, install (2) metal surface batter's eye screens: (1) north/south 22'highx20'length screen parallel to masonic blvd, (1) east/west 22'highx40'length screen parallel to blank wall of adjacent building.(top edge 30ft from ground).$230,000
Jul 11, 2022Completed2335 Golden Gate AvCahill Contractors Llc.new micropile supported foundation to support future gymnasium - under separate permit pa# 202105210845.$1,800,000
Jun 21, 2022In progress2305 Golden Gate AvFire Alarm System Servicesrecord decibel testing of aubible devices in sleeping areas to ensure code compliant sound pressure levels. 2130 fulton street usf hayes healy$4,000
May 25, 2022Completed2305 Golden Gate AvFire Alarm System Servicesinstall celllar transmitter to replace pots lines at hayes-healy.$4,000
May 24, 2022Completed2345 Golden Gate AvFire Alarm System Servicesinstall celllar transmitter to replace pots lines at phelan-toler.$4,000
May 23, 2022Completed2130 Fulton StFire Alarm System Servicesinstall celllar transmitter to replace pots lines at university center.$4,000
May 23, 2022Completed2130 Fulton StFire Alarm System Servicesharney hall - install cellular transmitter to replace pots lines.$4,000
May 23, 2022Completed2130 Fulton StFire Alarm System Servicescowell hall - install celluar transmitter to replace pots lines.$4,000
May 23, 2022Completed2130 Fulton StFire Alarm System Servicesgleeson library - install celluar transmitter to replace pots lines.$4,000
May 23, 2022Completed2325 Golden Gate AvFire Alarm System Servicesgillson hall - install celluar transmitter to replace pots lines.$4,000
May 23, 2022Completed2497 Golden Gate AvFire Alarm System Servicesathletic field - install celluar transmitter to replace pots lines.$4,000
May 23, 2022Never finaled2497 Golden Gate AvFire Alarm System Servicesfromm hall - install celluar transmitter to replace pots lines.$4,000
Apr 14, 2022Completed2445 Golden Gate AvWestates Mechanical Corporation Increvised drawings to original permit pa #202004227244. total add/relocate 78. t.i. ref pa #201910083932
Jan 5, 2022Expired or cancelled2445 Golden Gate AvSkyline Constructionrevision to 201910083932, revision to ground floor plan and associated elevations/details and equipment list. added shafts, including related structural reinforcing for existing slab, from gr fl to roof for dust collection system located on gr floor and laser cutter room located on level one.$389,600
Nov 22, 2021Completed2335 Golden Gate AvWestates Mechanical Corporation Incnew sprinkler system tie in to (e) 1st/f system. total 34 sprinklers$9,000
Nov 8, 2021Completed2335 Golden Gate AvCahill Contractors Llc.minor interior alteration to exhibit gallery in (e) lobby space located at 1st fl north side lobby area. ref pa #202103045888. eletrical and fire protection under separate permit$563,792
Sep 8, 2021Completed2335 Golden Gate AvFire Alarm System Servicesadd cell transmittor, add annunciator & (5) horn strobes, relocate main fire panel & (2) pulls; as-built for f/a pa# 202106253250$5,000
Sep 8, 2021Completed2445 Golden Gate AvFire Alarm System Servicesadd 1 smoke and 1 horn strobe.$4,000
Jul 21, 2021Completed2445 Golden Gate AvSkyline Constructiont.i to former lecture space plan for new research exam room with new pressure plates and assoicated computer data pcs.$55,000
Jul 19, 2021Completed2335 Golden Gate AvGarnett Signs Llcevacuation maps (9) for lone mountain dining commons.$2,250
Jun 25, 2021Completed2335 Golden Gate AvFire Alarm System Servicesadd 1 pull, 1 control relay, 6 high current relays, 9 duct smokes, 12 horn storbes 5 strobes and 3 monitor modules.$16,000
May 21, 2021Completed2335 Golden Gate AvCahill Contractors Llc.construct (n) approx 15,600 sf addition, 45-ft basketball practice facility on the usf lower campus. 1 full basketball court, 2 partial shooting/drills courts, coaches' offices, conf rms, restrms, & storage room.$15,000,000
May 20, 2021Completed2325 Golden Gate AvFire Alarm System Servicesthis is to record decibel testing of sleeping units performed to assure code compliant sound pressure levels
Mar 4, 2021Completed2335 Golden Gate AvCahill Contractors Llc.interior demolition only of: floor finishes in the north lobby. floor finishes, partitions, & ceilings in 2 offices and storage area. no structural demolition. arch, mep, and fire protetion scope under seperate permit.$24,464
Jan 22, 2021Never finaled2455 Golden Gate AvAcco Engineered Systems Inc. Dba Acco Enremove and replace 100 ton carrier steam fired absorbtion and replace with like-for-like chiller$250,000
Jan 14, 2021Completed2335 Golden Gate AvWestates Mechanical Corporation Incadd 15 uprights @ level 1 & 22 pendents, relocate & change 7 and change uprights to pendent 5. total of 34 sprinklers at mezzanine. tie in to newly installed 4" main @ level 1.
Oct 27, 2020Never finaled2445 Golden Gate AvFire Alarm System Servicesadd 1 pull, 6 output modules, 4 smoke detectors, 21 horn strobes and 5 strobes.$12,000
Sep 8, 2020Completed2335 Golden Gate AvWestates Mechanical Corporation Incnew sprinkler system tie into existing basement system. 126 sprinklers.$98,000
Aug 19, 2020Completed2335 Golden Gate AvCahill Contractors Llc.revision to pa 201908148782 cover sheet info; no work is proposed. for record purposes only to memorialize the deletion of the 3 items identified as ¿deferred approvals¿ on approved cover sheet a0.01:- metal framed curtain walls- roof mounted screens- scissor lift
Jul 17, 2020Never finaled2335 Golden Gate Avstreet space
Jul 9, 2020Never finaled2335 Golden Gate Avstreet space
Jun 12, 2020Completed2335 Golden Gate AvFire Alarm System Services(1) manual pull station(1) control relay for av system shutdown(4) high power control relays for fan control(4) duct smoke detectors(12) horn-strobes and (5) strobes. ref t.i. 202005197611.$13,000
May 19, 2020Completed2335 Golden Gate AvCahill Contractors Llc.improvement of (e) gym seating area that adds ada seating, food warming area, beverage counter and one all gender restroom.**maher n/a**$1,051,241
Apr 22, 2020Never finaled2445 Golden Gate AvWestates Mechanical Corporation Incupgrade the harney science center building with a new backflow preventer; control stations on the boiler basement, g/f, and level 1; a new section of main piping in the level 1 corridor; and provide a fire protection system in the boiler basement.all other (e) piping outside the area remains.$56,000
Apr 22, 2020Never finaled2445 Golden Gate AvWestates Mechanical Corporation Incg/f & 1/f: provide a fire prpotection of the (e) harney science center buiding in the areas of work, each system to include a new inspectors test. all othermain piping outside the area of work are to remain. 29 (n) upright sprinklres, (66) new pendent sprinklers, 1 new sidewall sprinklers. total 96.$65,300
Mar 12, 2020Expired or cancelled2445 Golden Gate Avrevision to app#201910083932. usf - renovation of previously approved class room to accommodate new lab facility, including installation of isolated pressure plate treadmill system.$150,000
Jan 9, 2020Never finaled2445 Golden Gate Avstreet space
Dec 27, 2019Completed2445 Golden Gate AvSkyline Constructioninterior non-structural soft demo. to comply with ab-17; refer to pa#2019-10-08-3932
Dec 26, 2019Never finaled2335 Golden Gate Avstreet space
Dec 20, 2019Never finaled2335 Golden Gate Avstreet space
Nov 15, 2019Expired or cancelled2445 Golden Gate AvSkyline Constructionmechanical, electrical & plumbing permit for work under pa #2019-1008-3932.
Oct 8, 2019Expired or cancelled2445 Golden Gate AvSkyline Constructioninterior demolition & renovation of a portion of the ground & 1st levels to create new maker spaces, lounge & office. ** maher: n/a **$1,712,718
Sep 19, 2019Completed2130 Fulton StFire Alarm System Servicesadd 6 horn strobes$3,600
Sep 13, 2019Completed2130 Fulton StFire Stop Sprinkler Companyref pa# 201906123231; relocate 12 pendents sprinlers heads for new wall layout$5,000
Aug 14, 2019Completed2130 Fulton StTherma Llcinstall 6 additional chilled water, heating hot water, fan coils. ref pa 201906123231$180,000
Aug 14, 2019Completed2335 Golden Gate AvCahill Contractors Llc., Devcon Constructionrevision to pa #201811156026, reduction in the scope of project, elimination of the enlargement of the south lobby entrance & addition of a canvenience stairway, minor revision to mechanical rm, it does not change bldg use, occup, height or measurably impact egress or life safety.
Jul 30, 2019Never finaled2335 Golden Gate Avstreet space
Jun 26, 2019Completed2497 Golden Gate AvFire Alarm System Servicesvoluntary fire alarm system replacement at customer request.$78,000
Jun 24, 2019Never finaled2335 Golden Gate Avstreet space
Jun 12, 2019Completed2130 Fulton StMai Construction Inc.renovations to (e0 office area. constructioon of new private & open plan office. modification to suspended ceilings to accomodate new floor plan.$750,000
Nov 15, 2018Completed2335 Golden Gate AvCahill Contractors Llc., Devcon Constructionaddition of approx 4,900 sq ft. reconfigure west side upper level to create (n) west entry lobby, southwest corner & club/event space. will reduce total seating capacity by approx 650. minor alteration to south entrance & interiors of north & south lobbies are included.$6,800,000
Nov 9, 2018Completed2445 Golden Gate AvFire Alarm System Servicesadd 1 booster, 2 horn stroe, 4 strobes & 1 module. ref pa 2018-0904-9034$6,000
Sep 4, 2018Completed2445 Golden Gate AvMai Construction Inc.remodel existing lab room 3323. (n) finishes and casework. remove fume hood exhaust rebalance general lab air. replace sinks and emergency shower/eyewash. new biosafty cabinet/incubator emergency power.$109,000
Aug 3, 2018Completed2335 Golden Gate AvR L H Fire Protection Incti / upgrade (e) fire sprinkler system. relocate 1 pendent, add 5 pendents, add 1 upright pendent. maher n/a$3,200
Jul 30, 2018Completed2335 Golden Gate AvFire Alarm System Servicesadd horn strobes and relocate (e) horn strobes. ref pa 201805219686 maher na$4,200
Jul 24, 2018Completed2130 Fulton StFire Stop Sprinkler Companyf/s: basement add 2 pendent sprinkler heads in locker room. ref #201803193982. n/a for maher.$3,000
Jun 28, 2018Completed2335 Golden Gate AvAll Temperature Service Air Conditioningrework existing hvac in mens and womens locker rooms ref 201805219686$69,000
May 21, 2018Completed2335 Golden Gate AvSkyline Constructionsobrato center: interior alterations to include: interior renovation of (3) three (e) locker rooms, no exteior alt under this scope of work. no added or removed (e) bldg square footage under this scope of work.$98,000
May 8, 2018Completed2130 Fulton StFire Alarm System Servicesreplace existing fire alarm system using existing wiring. new fire alarm panel, new led annunciator, new booster power supply panels & new devices to meet nfpa 72. maher na$180,000
Mar 19, 2018Completed2130 Fulton StMai Construction Inc.conversion of (e) janitorial closet into (n) gender neutral shower, restroom & changing room adjacent to (e) pool & men's/women's locker rooms maher na$70,602
Aug 31, 2017Never finaled2335 Golden Gate AvFire Alarm System Servicesadd 1 horn/strobe$3,600
Aug 1, 2017Never finaled2335 Golden Gate AvSuperior Automatic Sprinkleradd (7) new sprinklers at new storage and mech rooms.$15,000
Jun 15, 2017Never finaled2445 Golden Gate AvFire Alarm System Servicesadd smoke and horn for lab maher na$3,500
May 16, 2017Never finaled2335 Golden Gate Avstreet space
Jan 20, 2017Completed2130 Fulton StDevcon Constructionto obtain final inspection for work approved under pa # 200507127459. all work is complete. n/a maher
Nov 16, 2016Completed2335 Golden Gate AvBuild Group Inc.addition of below grade storage & equipment rooms to war memorial gymnasium; 718 ground square footage addition. ** maher: n/a **$2,100,000
Sep 9, 2016Completed2305 Golden Gate AvFire Alarm System Servicesadd one relay for fire hat in elevator. n/a for maher$2,000
Sep 9, 2016Completed2335 Golden Gate AvFire Alarm System Servicesadd/relocate horn/strobes. add smokes and heat for elevator addition. ref app#201603172390. n/a for maher$6,000
Jul 8, 2016Completed2445 Golden Gate AvFire Alarm System Services3rd floor - add/relocate smokes & horn strobes. add door lock relay, add 4 horn strobe, add 1 smoke, add 1 relay for security doors. ref t.i. #201605137396.$6,000
Jun 22, 2016Never finaled2335 Golden Gate AvSuperior Automatic Sprinklerrelocate (2) branch lines for (n) elevator & relocate (2) fire hose cabinets. n/a maher ordinance$10,000
May 20, 2016Completed2445 Golden Gate AvMai Construction Inc.electrical only (title 24 compliance) for pa#201506259951. n/a ordinance #155-13$25,000
May 13, 2016Completed2445 Golden Gate AvMai Construction Inc.interior renovations to an existing 'b' occupancy area within the 3/f of a 5-story bldg. renovations to include new offices and laboratory. n/a ordinance #155-13$750,000
May 4, 2016Completed2495 Golden Gate AvMai Construction Inc.replacement of 2 existing 550 gallon lube oil storage tanks with 2 new 550 gallon double wall lube oil storage tanks in existing mechanical equipment pit. maher not req$20,000
Apr 4, 2016Never finaled2305 Golden Gate Avstreet space
Mar 28, 2016Never finaled2305 Golden Gate Avstreet space
Mar 17, 2016Completed2335 Golden Gate AvBuild Group Inc.int. alterations to (e) bldg; minor vol. seismic strengthening of bldg structure; voluntary remodeling of (e) public rstrms; addition of a new elevator serving all flr levels; replace certain (e) bldg mech equip., no ext. alter. & no added or removed (e) bldg sq. ft. under this scope of work.$1,300,000
Feb 23, 2016Completed2497 Golden Gate AvFire Alarm System Servicesnew fire alarm instalation, building permit 201506300354; maher n/a$8,200
Jan 19, 2016Never finaled2305 Golden Gate Avstreet space
Nov 30, 2015Completed2445 Golden Gate AvTherma Corporationharney science- revision to pa# 201506259951 to obtain mechanical permit, adding dx system. n/a ordinance #155-13$35,000
Nov 5, 2015Never finaled2130 Fulton Ststreet space permit
Nov 2, 2015Completed2497 Golden Gate AvBuild Group Inc.revision to p/a#201506300360 solely for clarificatin of the construction of the public restroom facilities, previously indicated as " pre-fabricated under a deferred submittal. n/a for maher ordinance 155-13.$1,000
Oct 15, 2015Completed2497 Golden Gate AvBuild Group Inc.revision to 2015-06-30-0360 solely for the purpose of changing the structural system from concrete/smu/steel to cast-in-place concrete at owner's direction. maher ord n/a.
Sep 24, 2015Never finaled2130 Fulton Ststreet space
Aug 4, 2015Completed2345 Golden Gate AvMai Construction Inc.new exhaust ductwork & associated penetrations in the interior & exterior structur walls for boiler room exhaust/relief. n/a maher ord. 155-13$30,000
Jul 22, 2015Completed2130 Fulton StMartinelli Environmental Graphrefurb/reskin 2 extg signs (monument signs). one sign at the corner of turk st and parker st. one sign at the corner of golden gate ave and masonic ave. each sign is : 213 1/2 " w x 73 1/8 h x 15" depth. n/a for the maher.$14,000
Jun 30, 2015Completed2497 Golden Gate Avremoval of existing field turf & subsoil, new baseball field set at 1 or 2 feet lower elevation; new field to be synthetic turf with fill, sub-drainage, liner to meet sfpuc requirements.maher ordinance n/a$900,000
Jun 30, 2015Completed2497 Golden Gate AvBuild Group Inc.erect one-story fire sprinklered recreation building.$3,200,000
Jun 25, 2015Completed2445 Golden Gate AvMai Construction Inc.demolition of existing b occupancy aera within 4th fl of 5 story building. renovations to include new offices and storage. mep/life safety deferred.$100,000
Jun 9, 2015Completed2497 Golden Gate Av(bldd c).demolish visiting team dugout (baseball)$10,000
Jun 9, 2015Completed2497 Golden Gate Av(bldg a). demolish hitting facility (baseball) n/a for maher ordinance.$31,000
Jun 9, 2015Completed2497 Golden Gate Av(bldg b).demolish press box, dug out (baseball) n/a for maher.$20,000
Sep 15, 2014Completed2345 Golden Gate Avto obtain final inspection for work approved under pa# 201104154222. all work is complete.
Sep 15, 2014Completed2345 Golden Gate AvAllied Heating & Air Conditioningto obtain final inspection for work approved under pa# 201107069551. all work is complete.
Aug 13, 2014Never finaled2445 Golden Gate Avstreet space
Jun 18, 2014Completed2130 Fulton StWestower Communicationsremove antennas, coax and conduit, and radio equipment. (nextel) n/a for the maher ordinance #155-13$10,000
May 29, 2014Never finaled2445 Golden Gate Avstreet space
Mar 5, 2014Expired or cancelled2497 Golden Gate Avconstruction of new concrete pad and chain link fence to serve as an enclosure for a waste bin adjacent to building (fromm hall); compliance with ord 155-13 not required.$2,000
Jan 6, 2014Completed2495 Golden Gate AvI C S Integrated Communication Systems3rd floor fire alarm ti modification, smoke detectors & duct detectors with notification appliance devices are being added to an existing fire alarm system. ref pa #2013.09.27.7937. ordiance no. 155-13 not required.$20,000
Oct 8, 2013Expired or cancelled2130 Fulton St5/f- rev. to pa# 201307081302 restroom accessibility.
Sep 27, 2013Completed2495 Golden Gate AvTurner Construction Cointerior renovation of existing rave book room within existing libaray, scope includes expanded secure storage/library stacks, new ceiling, lighting, mechanical & related partitions. new interior store front system and doors, security, fire alarm, plumbing and shelving also included.$750,000
Sep 5, 2013Completed2130 Fulton StRed Hawk Fire & Security Ca Llc5th floor-addition of fire alarm tenant improvement-adding 2 duct detectors, 3 audio visual, booster power, 1 smoke detector, sync. module & 2 notification appliances.$5,000
Aug 12, 2013Never finaled2455 Golden Gate Avstreet space
Aug 2, 2013Completed2345 Golden Gate AvPaganini Electric Corp(See Signatories)phelan hall 1st & 2nd floor:install 31 horn/strobes, 27 horns, 4 strobes, 11 smoke detectors, 2 control relays, 2 interposing relays. 1 booster supply. 1 synchronization module. all additions are tied into the extg system.$25,000
Jul 30, 2013Never finaled2130 Fulton Ststreet space
Jul 12, 2013Completed2495 Golden Gate AvTurner Construction Cointerior demolition of rare book room. demo to include finishes, lighting, select millwork and walls, ro remain vacant per ab-017$23,808
Jul 8, 2013Completed2130 Fulton StMai Construction Inc.5th floor-interior renovation to (e) partial area-5, 9 new offices, new finishes, renovation of (e) restrooms. mep under separate permit.$350,000
Jul 2, 2013Completed2345 Golden Gate AvRcm Fire Protection Inc.t.i. add 14 relocate 6 sprinklers for new ceiling configurations or layout.$7,350
Jun 10, 2013Never finaled2455 Golden Gate Avstreet space
Jun 10, 2013Completed2455 Golden Gate AvR L H Fire Protection Incfire sprinkler - underground as built, ref pa #2010.08.06.8321-s7
Jun 6, 2013Completed2445 Golden Gate AvMonterey Mechanical Coremoval of existing 75 kw standby generator in harney scence center mech room. new 230 kw standby diesel generator at the roof of the harney science center with piping and conduits routed to a new fuel storage tank at gr level$230,000
May 21, 2013Completed2345 Golden Gate AvTurner Construction Coreduce scope of work from application #201207034034. remove planter, new landscape in its place. all work on campus.
Mar 1, 2013Never finaled2455 Golden Gate Avstreet space
Feb 28, 2013Never finaled2130 Fulton Ststreet space permit
Feb 21, 2013Completed2455 Golden Gate AvEagle Bay Enterprises, Inc (Dba Garnettinstall evacuation signs on floors b, g, l1, l2, l3. 17 total.$4,500
Jan 22, 2013Never finaled2130 Fulton Ststreet space
Nov 7, 2012Completed2345 Golden Gate AvRed Hawk Fire & Security Ca Llcupdate as builts, all room designations changed, floors moved up 1 level$2,500
Nov 5, 2012Never finaled2130 Fulton Stremoval of existing 4" steam and 2" condensate return piping. installatin of new 8" steam and 2 1/2 " return piping$485,000
Aug 30, 2012Never finaled2455 Golden Gate Avstreet space permit
Aug 27, 2012Never finaled2305 Golden Gate AvRed Hawk Fire & Security Ca Llc2nd floor fire alarm system - add 3 horn/strobes.$6,000
Aug 9, 2012Completed2345 Golden Gate AvRed Hawk Fire & Security Ca Llcfire alarm ti for floors 2 to 5.added 18 smoke detectors; added 40 horn/strobes; added 10 strobes; added 22 fsds$20,000
Aug 6, 2012Never finaled2455 Golden Gate AvA & B Constructioninstall 95' of 6" cl250 dip fire water service from backflow @ sidewalk on golden gate avenue to 5' from face of building. excavation & installation & backfill of piping is to be carried.$15,000
Aug 3, 2012Completed2375 Golden Gate AvRcm Fire Protection Inc.install new fire protection system for the pre-occupied area. renovation of phelan residential hall at 1st floor.$19,600
Jul 27, 2012Completed2345 Golden Gate AvPaganini Electric Corp(See Signatories)install 2 strobes, 17 horn/strobes, 3 horns,10 interposing relays, 3 duct detectors, 1 heat detector, 23 smoke detectors, 2 pull stations, and 19 control relays. relocate facp.$29,000
Jul 24, 2012Completed2375 Golden Gate AvRcm Fire Protection Inc.add and relocate heads to fit new ceiling configuration. for t.i. work in second floor faculty lounge. new cross main and eq bracing w/end of line restraints. 17 adds, 10 relocates$8,200
Jul 17, 2012Completed2375 Golden Gate AvPaganini Electric Corp(See Signatories)3rd floor-add 5 pull stations, 5 control relays, 2 smoke detectors, 2 duct detectors, 5 interposing relays, 15 speaker/strobes, 3 strobes & 2 door holders to (e) system$9,500
Jul 17, 2012Completed2375 Golden Gate AvRcm Fire Protection Inc.revision to appl #2012.06.28.3667 - relocate standpipe for new fire sprinkler system.connect (e) 5-inch dsp to (n) 6-inch combination standpipe.$3,200
Jul 3, 2012Completed2345 Golden Gate AvTurner Construction Coaccessiblity entry upgrade with elevation & internal renovations. mep under separate permit. include new entry steps to (e) exterior & new curtain wall system & 1st floor north side. demo (e) office & restroom & install new replacement accessible restroom & relocated.$2,000,000
Jul 2, 2012Completed2375 Golden Gate AvTurner Construction Com.e.p. work only for t.i. on 3rd floor approved under pa $2012.06.13.2519. fire protection under separate permit.$324,000
Jul 2, 2012Expired or cancelled2455 Golden Gate AvSabah International Incorporatedprovide a new automatic and manual fa system. shall include selective coverage of automatic smk detector throughout bldg.except in areas indicated to have combination smk/heat det or heat only det shall be used. manual pull stations exists. water flow and valve tamper monitoring. duct smk detecor$75,600
Jul 2, 2012Completed2375 Golden Gate AvTurner Construction Co3rd floor-install modular wall system, interior renovation under 201206132519. install locking system for sliding doors that are part of wall system above. comply with cbc-2010 section 1008.1.9.8$125,000
Jun 29, 2012Never finaled2130 Fulton Ststreet space for work done at usf:malloy hall
Jun 28, 2012Completed2375 Golden Gate AvRcm Fire Protection Inc.install new fire protection system for the renovated areas of the basement and ground floor of phelan residence hall. total 85 heads; installl 30-feet +/- of 6-inch underground; fire service w/ dac; and new fire hydrant.$44,625
Jun 21, 2012Never finaled2130 Fulton Ststreet space
Jun 13, 2012Completed2375 Golden Gate AvTurner Construction Co3rd floor:t.i. for 3rd floor of university center bldg. work includes new partitions, ceiling, fixtures, finishes. mep and fire protection under seperate permit.$40,000
Jun 13, 2012Completed2375 Golden Gate AvRcm Fire Protection Inc.sprinklers tenant improvement for renovated areas of 3rd floor of university cener bldg. connecting to exisiting sprinkler riser, new bracing calculations-$61,950
Jun 7, 2012Completed2375 Golden Gate AvTurner Construction Conew fireplace & new entry door along with new ceiling & interior finiahes. m.e.p under seperate permit$200,000
May 25, 2012Completed2375 Golden Gate AvTurner Construction Co3rd floor tenant improvement to (e) building, full floor tenant suite demolition work to remove (e) walls, ceilings (per ab-017).$105,000
May 11, 2012Never finaled2455 Golden Gate Avstreetspace
Apr 5, 2012Completed2455 Golden Gate AvCahill Const Service Incclarification of fdc locations and fire alarm monitoring to approved app#201008068321 s5r-1
Feb 24, 2012Never finaled2455 Golden Gate Avstreet space
Feb 13, 2012Completed2345 Golden Gate AvTurner Construction Cointerior remodel of basement, ground floor and 1st floor. work to include restroom upgrades, new finishes and dorm room remodel. existing residential dorms on the basement level, ground floor and 1st floor. no change of use.$6,000,000
Feb 8, 2012Completed2130 Fulton StParagon Mechanical Incinstallation of replacment chiller on roof of harney science center. removal of existing chiller and cooling tower in 1st floor of harney science center$250,000
Feb 3, 2012Completed2455 Golden Gate AvCahill Contractors Incclarification of occupant load to approved app#201008068321 for purposes of meeting requirements for area of refuge. no construction work under this permit.revision to app#201008068321
Jan 27, 2012Completed2345 Golden Gate AvTurner Construction Cointerior remodel of ground floor entry area and floors 2-6 dorm rooms and bathrooms$2,000,000
Jan 10, 2012Never finaled2130 Fulton Ststreet space permit.
Dec 22, 2011Completed2130 Fulton StTurner Construction Conew exterior fountain to be constructed in e south east corner of kalmanovitz hall courtyard. work is unrelated to any bldg. structure-landing only$25,000
Nov 29, 2011Completed2305 Golden Gate Avdemolition of (e) fence & installation of new 8' fence on property line & trees$20,000
Nov 22, 2011Expired or cancelled2345 Golden Gate AvRed Hawk Fire & Security Ca Llcfire alarm t.i at 2345 golden gate, phelan hall. 1-monitor module 5-synch module 6-control relays 6 - smoke detectors 1- duct detector 1- booster power supply 40 - hornstrobes - wall 10 strobes - wall$23,000
Oct 24, 2011Never finaled2455 Golden Gate Avstreet space
Sep 1, 2011Completed2305 Golden Gate AvRed Hawk Fire & Security Ca Llcfire alarm t.i. at usf, student center.1 dual monitor module for sprinkler for 3rd floor restroom$7,238
Aug 19, 2011Completed2345 Golden Gate AvRed Hawk Fire & Security Ca Llcf/a upgrade at usf phelan hall. permit is to allow insp of existing devices refitted in "phase 1" and existg areas. phase 2 is pending completion and will have both phases incorporated. 5-new smoke detectrs' 5-new switching modules & 5 new horn/strobes for ada. plans req before final.
Aug 5, 2011Never finaled2335 Golden Gate AvMai Construction Inc.univ. of sf gymmnasium. install a new atm pad and kiosk at the rear of memorial gym. work includes (n) con.pad and 3 sided kios enclosure. work is free standing outside of bldg. atm to be installed and reviewed for accessibilty compliance under separate permit.$82,000
Jul 21, 2011Never finaled2130 Fulton Ststreet space & sidewalk
Jul 11, 2011Completed2455 Golden Gate AvCahill Contractors Increvision to pa# 2011-0516-6098-tower crane foundation, revised cost per dbi request-from $7500 to $30k$22,500
Jul 6, 2011Expired or cancelled2345 Golden Gate AvAllied Heating & Air Conditioning2nd, 3rd, 4th, 5th & 6th flrs-revision to pa# 2011-0627-8978-change exhaust fsd's to subducts with exhaust at roof on emergency power
Jun 30, 2011Completed2375 Golden Gate AvAyoob & Peery Plumbing Co Inc2nd & 3rd floors-add 7 sprinkler in restrooms, add 5 sprinklers in restrooms$6,574
Jun 27, 2011Never finaled2130 Fulton Stre-build 2 (e) ramps on ground floor to meet code requirements. no other work$30,000
Jun 27, 2011Never finaled2495 Golden Gate Avre-build (e) ramp on ground floor to meet code requirements.$15,000
Jun 27, 2011Completed2345 Golden Gate AvAllied Heating & Air Conditioningrefer to arch pa# 2011-0127-9178-replace shower room exhaust fan, install new exhaust fan & air handling unit on roof. new supply & exhaust ductwork for 5 floors.$321,000
Jun 21, 2011Completed2130 Fulton StBcci Construction Company2nd & 3rd floors-refer to arch pa# 2011-0524-6692 & 2011-0523-6617-electrical & title-24$35,500
Jun 3, 2011Completed2345 Golden Gate AvRcm Fire Protection Inc.install piping system in core area of 2nd thur 6th flrs which compries the common bathrm area, accessible bedrm area. the i.t room, reading rom & the prefect aptment & elevator lobby. piping in corridors shall not be installed until the commencement of phase #2 construction$120,000
May 24, 2011Completed2130 Fulton StBcci Construction Companybarrier removal at restrooms on floor 2$150,000
May 23, 2011Completed2130 Fulton StBcci Construction Companybarrier removal at restroom on the 3rd floor.$150,000
May 20, 2011Never finaled2455 Golden Gate Avstreet space
May 17, 2011Completed2375 Golden Gate AvAyoob & Peery Plumbing Co Incadd 16 sprinklers @ new patio on ground floor.$8,000
May 16, 2011Never finaled2455 Golden Gate AvCahill Contractors Inctower crane foundation permit in accordance w/ ab-023$5,000
May 6, 2011Completed2345 Golden Gate AvTurner Construction Cousf voluntary seismic upgrade of (e) bldg (mcclarren hall), no change of occupancy. in tandem permit with phelan hall pa# 2011/03/02/1231. for same scope of work. both bldgs share same address/ block/lot. this pa is for mclaren hall (per general portion of asce 41 procedure with certain exception$150,000
May 5, 2011Completed2345 Golden Gate AvTurner Construction Cowindow replacement to 180 windows. partially visible from street. u </= 0.47 for all replacement window. existing alum & steel wndows replaced to alum. no change in opening size.$65,000
Apr 19, 2011Completed2375 Golden Gate AvCahill Const Service Increvision to approved pa# 201103142016 (adjacent 2011-0311-1941 for minor changes in shoring & underpinning related to bldg pa# 2010-0806-8321$4,500
Apr 15, 2011Completed2345 Golden Gate AvTurner Construction Corevision to pa# 2011-0127-9178-install carbon fiber reinforcement at new mechanical, plumbing openings in (e) concrete slab on 5 floors (2-6). infill openings with new concrete. no exterior work no change of use$30,000
Mar 30, 2011Completed2375 Golden Gate AvDiversified Fire Productsfire alarm ti at usf media center. 1 new horn/strobes,1 relocate pull station,1 relocate annunciator.$2,300
Mar 17, 2011Completed2375 Golden Gate AvAyoob & Peery Plumbing Co Inc1st floor-relocate 16 pendent/upright 16, replace 2 sprinklers at media room (viewing)$15,000
Mar 14, 2011Completed2375 Golden Gate AvCahill Const Service Incshoring & underpinning dor work related to (n) construction on neighboring site in conjunction with (n) bldg permit approved under site appl #201008068321.$25,000
Mar 11, 2011Completed2375 Golden Gate AvSwinerton Buildersremove non structural partitions,(e) lights, flooring, fixts. extend (e) ceiling and flooring from adjacent lounge into space. (n) lighting with less total wattage than (e) lighting so no title 24 reqd. no change to e mech system. changes to sprinklers or alarm on sep permit revision to 201007166852$16,500
Mar 11, 2011Never finaled2445 Golden Gate AvCahill Const Service Incshoring and underpinning for harney science bldg in prep for future construction. no other work.bldg permit approved under app#201008068321$10,000
Mar 2, 2011Completed2345 Golden Gate AvTurner Construction Cousf phelan hall. for limited voluntary seismic upgrade to existing basement thru the sixth floor of the 7-story bldg. local structural member strengthening. no change of occupancy (per general portion of asce-41 procedure with certain exceptions). see engineer's statement dated 4-18-11 attached.$890,000