Block 1145, lot 003
2445 Golden Gate Av
The 200 most recent permits filed for this property.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 5, 2026 | Completed | 2445 Golden Gate Av | to obtain final inspection for work approved under pa# 202201055392. all work is complete. | ||
| Jan 5, 2026 | Completed | 2445 Golden Gate Av | to obtain final inspection for work approved under pa# 202003126946. all work is complete. | ||
| Jan 5, 2026 | Completed | 2445 Golden Gate Av | to obtain final inspection for work approved under pa# 201910083932. all work is complete. | ||
| Jan 5, 2026 | Completed | 2445 Golden Gate Av | to obtain final inspection for work approved under pa# 201911157450. all work is complete. | ||
| Mar 31, 2025 | Completed | 2335 Golden Gate Av | Cahill Contractors Llc. | revision to permit 202306270974 and 202105210845. removal of title 24 special inspection code. | |
| Jan 21, 2025 | In progress | 2335 Golden Gate Av | new guardrail at existing dock loading area ramp. new truck bumpers. | $150,000 | |
| Apr 5, 2024 | Completed | 2445 Golden Gate Av | C B 2 Builders Incorporated | revision to issued pa# 2022-0105-5392: enhancement of the applicable shaft fire-resistance rated separation from 2 hours to 3 hours based on engineering analyis and judgement confirmed by ab-005. | |
| Nov 16, 2023 | In progress | 650 Parker Av | Pribuss Engineering Inc | install one new 6" underground fire service from curb into bldg. *point of connection at city main to be done by others. overhead fire sprinkler under separate permit. fire pump will be included | $7,500 |
| Sep 22, 2023 | Completed | 2335 Golden Gate Av | Cahill Contractors Llc. | deferred submittal, shop drawings, aac glass guardrails for the annex level and main lobby, ref pa# 202105210845 | |
| Aug 31, 2023 | Completed | 2335 Golden Gate Av | Cahill Contractors Llc. | deferred submittal, shop drawings, olson steel handrails for the interior stairs and retaining wall. ref 202105210845 | |
| Aug 31, 2023 | Completed | 2335 Golden Gate Av | Cahill Contractors Llc. | deferred submittal-shop drawings-draper inc. gym equipment. install 4 ceiling-suspended, side-folding basketball backstops model tbs-26-b. ref pa 202105210845. | |
| Aug 7, 2023 | Completed | 2335 Golden Gate Av | evacuation maps (9) total. | $2,250 | |
| Jun 27, 2023 | Completed | 2335 Golden Gate Av | Cahill Contractors Llc. | revision to approved hvac system under issued pa#202105210845. separate units & associated controls relocated to the rear of the property on the lower annex roof. | $191,880 |
| Jun 15, 2023 | Completed | 2335 Golden Gate Av | United Systems Fire And Security Llc | rev to pa#202210204801, remove elevator shunt trip, beam detectors & replaced them w/ area smoke detectors in the basketball court. | $5,200 |
| May 25, 2023 | Completed | 2497 Golden Gate Av | Skyline Construction | replacement in kind of (e) exterior windows approx 50. approx 25 street visible. existing and proposed aluminum windows. | $400,000 |
| Apr 24, 2023 | Completed | 2335 Golden Gate Av | Cahill Contractors Llc. | deferred submittal - shop drawings for acc glass inc window wall system - fixed window located high above the end of the basketball court (ref pa 2021-0521-0845) | |
| Apr 24, 2023 | Completed | 2335 Golden Gate Av | San Francisco Elevator Services Llc | deferred submittal: shop drawings for hydraulic elevator system ref pa 2021-0521-0845 | |
| Apr 24, 2023 | Completed | 2335 Golden Gate Av | Cahill Contractors Llc. | deferred submittal - shop drawings for bendheim channel glass panel system - stair enclosure. ref pa 202105210845 | |
| Jan 17, 2023 | Completed | 2445 Golden Gate Av | Fire Alarm System Services | add (3) relay, (4) dual input modules, (4) smokes, (2) duct smokes, (21) horn strobes, (5) strobes. ref pa 202010277461 | $10,000 |
| Nov 18, 2022 | Completed | 2345 Golden Gate Av | Fire Alarm System Services | record decibel testing or audible devices in sleeping areas to ensure code compoliant sound pressure levels. phelan toler 2345 golden gate | |
| Nov 10, 2022 | Completed | 2335 Golden Gate Av | Rcm Fire Protection Inc. | install a new fire sprinkler system. ref pa 202105210845. | |
| Oct 21, 2022 | Completed | 2305 Golden Gate Av | Fire Alarm System Services | 2305 golden gate - usf hayes-healy; record decibel testing of audible devices in sleeping areas to ensure code compliant sound pressure levels. | $2,000 |
| Oct 20, 2022 | Completed | 2335 Golden Gate Av | United Systems Fire And Security Llc | new f/a for the new basketball training gym, addition with adj new offices and restroom facilities.addition shall consist of providing the following: new voice evacuation facp, new annunicator at entry lobby, notification devices throughout, detection and control for elevator,mech,f/s syst. | $41,360 |
| Oct 20, 2022 | Completed | 2335 Golden Gate Av | United Systems Fire And Security Llc | new installation of elevator emergency 2-way communication system for new basketball traning gymnasiaum. main command center located in the ground level electrical room. ref pa202105210845 | $19,438 |
| Oct 3, 2022 | Completed | 2305 Golden Gate Av | Judge Netting Inc | improvements to ulrich field & benedetti diamond baseball field, install (2) metal surface batter's eye screens: (1) north/south 22'highx20'length screen parallel to masonic blvd, (1) east/west 22'highx40'length screen parallel to blank wall of adjacent building.(top edge 30ft from ground). | $230,000 |
| Jul 11, 2022 | Completed | 2335 Golden Gate Av | Cahill Contractors Llc. | new micropile supported foundation to support future gymnasium - under separate permit pa# 202105210845. | $1,800,000 |
| Jun 21, 2022 | In progress | 2305 Golden Gate Av | Fire Alarm System Services | record decibel testing of aubible devices in sleeping areas to ensure code compliant sound pressure levels. 2130 fulton street usf hayes healy | $4,000 |
| May 25, 2022 | Completed | 2305 Golden Gate Av | Fire Alarm System Services | install celllar transmitter to replace pots lines at hayes-healy. | $4,000 |
| May 24, 2022 | Completed | 2345 Golden Gate Av | Fire Alarm System Services | install celllar transmitter to replace pots lines at phelan-toler. | $4,000 |
| May 23, 2022 | Completed | 2130 Fulton St | Fire Alarm System Services | install celllar transmitter to replace pots lines at university center. | $4,000 |
| May 23, 2022 | Completed | 2130 Fulton St | Fire Alarm System Services | harney hall - install cellular transmitter to replace pots lines. | $4,000 |
| May 23, 2022 | Completed | 2130 Fulton St | Fire Alarm System Services | cowell hall - install celluar transmitter to replace pots lines. | $4,000 |
| May 23, 2022 | Completed | 2130 Fulton St | Fire Alarm System Services | gleeson library - install celluar transmitter to replace pots lines. | $4,000 |
| May 23, 2022 | Completed | 2325 Golden Gate Av | Fire Alarm System Services | gillson hall - install celluar transmitter to replace pots lines. | $4,000 |
| May 23, 2022 | Completed | 2497 Golden Gate Av | Fire Alarm System Services | athletic field - install celluar transmitter to replace pots lines. | $4,000 |
| May 23, 2022 | Never finaled | 2497 Golden Gate Av | Fire Alarm System Services | fromm hall - install celluar transmitter to replace pots lines. | $4,000 |
| Apr 14, 2022 | Completed | 2445 Golden Gate Av | Westates Mechanical Corporation Inc | revised drawings to original permit pa #202004227244. total add/relocate 78. t.i. ref pa #201910083932 | |
| Jan 5, 2022 | Expired or cancelled | 2445 Golden Gate Av | Skyline Construction | revision to 201910083932, revision to ground floor plan and associated elevations/details and equipment list. added shafts, including related structural reinforcing for existing slab, from gr fl to roof for dust collection system located on gr floor and laser cutter room located on level one. | $389,600 |
| Nov 22, 2021 | Completed | 2335 Golden Gate Av | Westates Mechanical Corporation Inc | new sprinkler system tie in to (e) 1st/f system. total 34 sprinklers | $9,000 |
| Nov 8, 2021 | Completed | 2335 Golden Gate Av | Cahill Contractors Llc. | minor interior alteration to exhibit gallery in (e) lobby space located at 1st fl north side lobby area. ref pa #202103045888. eletrical and fire protection under separate permit | $563,792 |
| Sep 8, 2021 | Completed | 2335 Golden Gate Av | Fire Alarm System Services | add cell transmittor, add annunciator & (5) horn strobes, relocate main fire panel & (2) pulls; as-built for f/a pa# 202106253250 | $5,000 |
| Sep 8, 2021 | Completed | 2445 Golden Gate Av | Fire Alarm System Services | add 1 smoke and 1 horn strobe. | $4,000 |
| Jul 21, 2021 | Completed | 2445 Golden Gate Av | Skyline Construction | t.i to former lecture space plan for new research exam room with new pressure plates and assoicated computer data pcs. | $55,000 |
| Jul 19, 2021 | Completed | 2335 Golden Gate Av | Garnett Signs Llc | evacuation maps (9) for lone mountain dining commons. | $2,250 |
| Jun 25, 2021 | Completed | 2335 Golden Gate Av | Fire Alarm System Services | add 1 pull, 1 control relay, 6 high current relays, 9 duct smokes, 12 horn storbes 5 strobes and 3 monitor modules. | $16,000 |
| May 21, 2021 | Completed | 2335 Golden Gate Av | Cahill Contractors Llc. | construct (n) approx 15,600 sf addition, 45-ft basketball practice facility on the usf lower campus. 1 full basketball court, 2 partial shooting/drills courts, coaches' offices, conf rms, restrms, & storage room. | $15,000,000 |
| May 20, 2021 | Completed | 2325 Golden Gate Av | Fire Alarm System Services | this is to record decibel testing of sleeping units performed to assure code compliant sound pressure levels | |
| Mar 4, 2021 | Completed | 2335 Golden Gate Av | Cahill Contractors Llc. | interior demolition only of: floor finishes in the north lobby. floor finishes, partitions, & ceilings in 2 offices and storage area. no structural demolition. arch, mep, and fire protetion scope under seperate permit. | $24,464 |
| Jan 22, 2021 | Never finaled | 2455 Golden Gate Av | Acco Engineered Systems Inc. Dba Acco En | remove and replace 100 ton carrier steam fired absorbtion and replace with like-for-like chiller | $250,000 |
| Jan 14, 2021 | Completed | 2335 Golden Gate Av | Westates Mechanical Corporation Inc | add 15 uprights @ level 1 & 22 pendents, relocate & change 7 and change uprights to pendent 5. total of 34 sprinklers at mezzanine. tie in to newly installed 4" main @ level 1. | |
| Oct 27, 2020 | Never finaled | 2445 Golden Gate Av | Fire Alarm System Services | add 1 pull, 6 output modules, 4 smoke detectors, 21 horn strobes and 5 strobes. | $12,000 |
| Sep 8, 2020 | Completed | 2335 Golden Gate Av | Westates Mechanical Corporation Inc | new sprinkler system tie into existing basement system. 126 sprinklers. | $98,000 |
| Aug 19, 2020 | Completed | 2335 Golden Gate Av | Cahill Contractors Llc. | revision to pa 201908148782 cover sheet info; no work is proposed. for record purposes only to memorialize the deletion of the 3 items identified as ¿deferred approvals¿ on approved cover sheet a0.01:- metal framed curtain walls- roof mounted screens- scissor lift | |
| Jul 17, 2020 | Never finaled | 2335 Golden Gate Av | street space | ||
| Jul 9, 2020 | Never finaled | 2335 Golden Gate Av | street space | ||
| Jun 12, 2020 | Completed | 2335 Golden Gate Av | Fire Alarm System Services | (1) manual pull station(1) control relay for av system shutdown(4) high power control relays for fan control(4) duct smoke detectors(12) horn-strobes and (5) strobes. ref t.i. 202005197611. | $13,000 |
| May 19, 2020 | Completed | 2335 Golden Gate Av | Cahill Contractors Llc. | improvement of (e) gym seating area that adds ada seating, food warming area, beverage counter and one all gender restroom.**maher n/a** | $1,051,241 |
| Apr 22, 2020 | Never finaled | 2445 Golden Gate Av | Westates Mechanical Corporation Inc | upgrade the harney science center building with a new backflow preventer; control stations on the boiler basement, g/f, and level 1; a new section of main piping in the level 1 corridor; and provide a fire protection system in the boiler basement.all other (e) piping outside the area remains. | $56,000 |
| Apr 22, 2020 | Never finaled | 2445 Golden Gate Av | Westates Mechanical Corporation Inc | g/f & 1/f: provide a fire prpotection of the (e) harney science center buiding in the areas of work, each system to include a new inspectors test. all othermain piping outside the area of work are to remain. 29 (n) upright sprinklres, (66) new pendent sprinklers, 1 new sidewall sprinklers. total 96. | $65,300 |
| Mar 12, 2020 | Expired or cancelled | 2445 Golden Gate Av | revision to app#201910083932. usf - renovation of previously approved class room to accommodate new lab facility, including installation of isolated pressure plate treadmill system. | $150,000 | |
| Jan 9, 2020 | Never finaled | 2445 Golden Gate Av | street space | ||
| Dec 27, 2019 | Completed | 2445 Golden Gate Av | Skyline Construction | interior non-structural soft demo. to comply with ab-17; refer to pa#2019-10-08-3932 | |
| Dec 26, 2019 | Never finaled | 2335 Golden Gate Av | street space | ||
| Dec 20, 2019 | Never finaled | 2335 Golden Gate Av | street space | ||
| Nov 15, 2019 | Expired or cancelled | 2445 Golden Gate Av | Skyline Construction | mechanical, electrical & plumbing permit for work under pa #2019-1008-3932. | |
| Oct 8, 2019 | Expired or cancelled | 2445 Golden Gate Av | Skyline Construction | interior demolition & renovation of a portion of the ground & 1st levels to create new maker spaces, lounge & office. ** maher: n/a ** | $1,712,718 |
| Sep 19, 2019 | Completed | 2130 Fulton St | Fire Alarm System Services | add 6 horn strobes | $3,600 |
| Sep 13, 2019 | Completed | 2130 Fulton St | Fire Stop Sprinkler Company | ref pa# 201906123231; relocate 12 pendents sprinlers heads for new wall layout | $5,000 |
| Aug 14, 2019 | Completed | 2130 Fulton St | Therma Llc | install 6 additional chilled water, heating hot water, fan coils. ref pa 201906123231 | $180,000 |
| Aug 14, 2019 | Completed | 2335 Golden Gate Av | Cahill Contractors Llc., Devcon Construction | revision to pa #201811156026, reduction in the scope of project, elimination of the enlargement of the south lobby entrance & addition of a canvenience stairway, minor revision to mechanical rm, it does not change bldg use, occup, height or measurably impact egress or life safety. | |
| Jul 30, 2019 | Never finaled | 2335 Golden Gate Av | street space | ||
| Jun 26, 2019 | Completed | 2497 Golden Gate Av | Fire Alarm System Services | voluntary fire alarm system replacement at customer request. | $78,000 |
| Jun 24, 2019 | Never finaled | 2335 Golden Gate Av | street space | ||
| Jun 12, 2019 | Completed | 2130 Fulton St | Mai Construction Inc. | renovations to (e0 office area. constructioon of new private & open plan office. modification to suspended ceilings to accomodate new floor plan. | $750,000 |
| Nov 15, 2018 | Completed | 2335 Golden Gate Av | Cahill Contractors Llc., Devcon Construction | addition of approx 4,900 sq ft. reconfigure west side upper level to create (n) west entry lobby, southwest corner & club/event space. will reduce total seating capacity by approx 650. minor alteration to south entrance & interiors of north & south lobbies are included. | $6,800,000 |
| Nov 9, 2018 | Completed | 2445 Golden Gate Av | Fire Alarm System Services | add 1 booster, 2 horn stroe, 4 strobes & 1 module. ref pa 2018-0904-9034 | $6,000 |
| Sep 4, 2018 | Completed | 2445 Golden Gate Av | Mai Construction Inc. | remodel existing lab room 3323. (n) finishes and casework. remove fume hood exhaust rebalance general lab air. replace sinks and emergency shower/eyewash. new biosafty cabinet/incubator emergency power. | $109,000 |
| Aug 3, 2018 | Completed | 2335 Golden Gate Av | R L H Fire Protection Inc | ti / upgrade (e) fire sprinkler system. relocate 1 pendent, add 5 pendents, add 1 upright pendent. maher n/a | $3,200 |
| Jul 30, 2018 | Completed | 2335 Golden Gate Av | Fire Alarm System Services | add horn strobes and relocate (e) horn strobes. ref pa 201805219686 maher na | $4,200 |
| Jul 24, 2018 | Completed | 2130 Fulton St | Fire Stop Sprinkler Company | f/s: basement add 2 pendent sprinkler heads in locker room. ref #201803193982. n/a for maher. | $3,000 |
| Jun 28, 2018 | Completed | 2335 Golden Gate Av | All Temperature Service Air Conditioning | rework existing hvac in mens and womens locker rooms ref 201805219686 | $69,000 |
| May 21, 2018 | Completed | 2335 Golden Gate Av | Skyline Construction | sobrato center: interior alterations to include: interior renovation of (3) three (e) locker rooms, no exteior alt under this scope of work. no added or removed (e) bldg square footage under this scope of work. | $98,000 |
| May 8, 2018 | Completed | 2130 Fulton St | Fire Alarm System Services | replace existing fire alarm system using existing wiring. new fire alarm panel, new led annunciator, new booster power supply panels & new devices to meet nfpa 72. maher na | $180,000 |
| Mar 19, 2018 | Completed | 2130 Fulton St | Mai Construction Inc. | conversion of (e) janitorial closet into (n) gender neutral shower, restroom & changing room adjacent to (e) pool & men's/women's locker rooms maher na | $70,602 |
| Aug 31, 2017 | Never finaled | 2335 Golden Gate Av | Fire Alarm System Services | add 1 horn/strobe | $3,600 |
| Aug 1, 2017 | Never finaled | 2335 Golden Gate Av | Superior Automatic Sprinkler | add (7) new sprinklers at new storage and mech rooms. | $15,000 |
| Jun 15, 2017 | Never finaled | 2445 Golden Gate Av | Fire Alarm System Services | add smoke and horn for lab maher na | $3,500 |
| May 16, 2017 | Never finaled | 2335 Golden Gate Av | street space | ||
| Jan 20, 2017 | Completed | 2130 Fulton St | Devcon Construction | to obtain final inspection for work approved under pa # 200507127459. all work is complete. n/a maher | |
| Nov 16, 2016 | Completed | 2335 Golden Gate Av | Build Group Inc. | addition of below grade storage & equipment rooms to war memorial gymnasium; 718 ground square footage addition. ** maher: n/a ** | $2,100,000 |
| Sep 9, 2016 | Completed | 2305 Golden Gate Av | Fire Alarm System Services | add one relay for fire hat in elevator. n/a for maher | $2,000 |
| Sep 9, 2016 | Completed | 2335 Golden Gate Av | Fire Alarm System Services | add/relocate horn/strobes. add smokes and heat for elevator addition. ref app#201603172390. n/a for maher | $6,000 |
| Jul 8, 2016 | Completed | 2445 Golden Gate Av | Fire Alarm System Services | 3rd floor - add/relocate smokes & horn strobes. add door lock relay, add 4 horn strobe, add 1 smoke, add 1 relay for security doors. ref t.i. #201605137396. | $6,000 |
| Jun 22, 2016 | Never finaled | 2335 Golden Gate Av | Superior Automatic Sprinkler | relocate (2) branch lines for (n) elevator & relocate (2) fire hose cabinets. n/a maher ordinance | $10,000 |
| May 20, 2016 | Completed | 2445 Golden Gate Av | Mai Construction Inc. | electrical only (title 24 compliance) for pa#201506259951. n/a ordinance #155-13 | $25,000 |
| May 13, 2016 | Completed | 2445 Golden Gate Av | Mai Construction Inc. | interior renovations to an existing 'b' occupancy area within the 3/f of a 5-story bldg. renovations to include new offices and laboratory. n/a ordinance #155-13 | $750,000 |
| May 4, 2016 | Completed | 2495 Golden Gate Av | Mai Construction Inc. | replacement of 2 existing 550 gallon lube oil storage tanks with 2 new 550 gallon double wall lube oil storage tanks in existing mechanical equipment pit. maher not req | $20,000 |
| Apr 4, 2016 | Never finaled | 2305 Golden Gate Av | street space | ||
| Mar 28, 2016 | Never finaled | 2305 Golden Gate Av | street space | ||
| Mar 17, 2016 | Completed | 2335 Golden Gate Av | Build Group Inc. | int. alterations to (e) bldg; minor vol. seismic strengthening of bldg structure; voluntary remodeling of (e) public rstrms; addition of a new elevator serving all flr levels; replace certain (e) bldg mech equip., no ext. alter. & no added or removed (e) bldg sq. ft. under this scope of work. | $1,300,000 |
| Feb 23, 2016 | Completed | 2497 Golden Gate Av | Fire Alarm System Services | new fire alarm instalation, building permit 201506300354; maher n/a | $8,200 |
| Jan 19, 2016 | Never finaled | 2305 Golden Gate Av | street space | ||
| Nov 30, 2015 | Completed | 2445 Golden Gate Av | Therma Corporation | harney science- revision to pa# 201506259951 to obtain mechanical permit, adding dx system. n/a ordinance #155-13 | $35,000 |
| Nov 5, 2015 | Never finaled | 2130 Fulton St | street space permit | ||
| Nov 2, 2015 | Completed | 2497 Golden Gate Av | Build Group Inc. | revision to p/a#201506300360 solely for clarificatin of the construction of the public restroom facilities, previously indicated as " pre-fabricated under a deferred submittal. n/a for maher ordinance 155-13. | $1,000 |
| Oct 15, 2015 | Completed | 2497 Golden Gate Av | Build Group Inc. | revision to 2015-06-30-0360 solely for the purpose of changing the structural system from concrete/smu/steel to cast-in-place concrete at owner's direction. maher ord n/a. | |
| Sep 24, 2015 | Never finaled | 2130 Fulton St | street space | ||
| Aug 4, 2015 | Completed | 2345 Golden Gate Av | Mai Construction Inc. | new exhaust ductwork & associated penetrations in the interior & exterior structur walls for boiler room exhaust/relief. n/a maher ord. 155-13 | $30,000 |
| Jul 22, 2015 | Completed | 2130 Fulton St | Martinelli Environmental Graph | refurb/reskin 2 extg signs (monument signs). one sign at the corner of turk st and parker st. one sign at the corner of golden gate ave and masonic ave. each sign is : 213 1/2 " w x 73 1/8 h x 15" depth. n/a for the maher. | $14,000 |
| Jun 30, 2015 | Completed | 2497 Golden Gate Av | removal of existing field turf & subsoil, new baseball field set at 1 or 2 feet lower elevation; new field to be synthetic turf with fill, sub-drainage, liner to meet sfpuc requirements.maher ordinance n/a | $900,000 | |
| Jun 30, 2015 | Completed | 2497 Golden Gate Av | Build Group Inc. | erect one-story fire sprinklered recreation building. | $3,200,000 |
| Jun 25, 2015 | Completed | 2445 Golden Gate Av | Mai Construction Inc. | demolition of existing b occupancy aera within 4th fl of 5 story building. renovations to include new offices and storage. mep/life safety deferred. | $100,000 |
| Jun 9, 2015 | Completed | 2497 Golden Gate Av | (bldd c).demolish visiting team dugout (baseball) | $10,000 | |
| Jun 9, 2015 | Completed | 2497 Golden Gate Av | (bldg a). demolish hitting facility (baseball) n/a for maher ordinance. | $31,000 | |
| Jun 9, 2015 | Completed | 2497 Golden Gate Av | (bldg b).demolish press box, dug out (baseball) n/a for maher. | $20,000 | |
| Sep 15, 2014 | Completed | 2345 Golden Gate Av | to obtain final inspection for work approved under pa# 201104154222. all work is complete. | ||
| Sep 15, 2014 | Completed | 2345 Golden Gate Av | Allied Heating & Air Conditioning | to obtain final inspection for work approved under pa# 201107069551. all work is complete. | |
| Aug 13, 2014 | Never finaled | 2445 Golden Gate Av | street space | ||
| Jun 18, 2014 | Completed | 2130 Fulton St | Westower Communications | remove antennas, coax and conduit, and radio equipment. (nextel) n/a for the maher ordinance #155-13 | $10,000 |
| May 29, 2014 | Never finaled | 2445 Golden Gate Av | street space | ||
| Mar 5, 2014 | Expired or cancelled | 2497 Golden Gate Av | construction of new concrete pad and chain link fence to serve as an enclosure for a waste bin adjacent to building (fromm hall); compliance with ord 155-13 not required. | $2,000 | |
| Jan 6, 2014 | Completed | 2495 Golden Gate Av | I C S Integrated Communication Systems | 3rd floor fire alarm ti modification, smoke detectors & duct detectors with notification appliance devices are being added to an existing fire alarm system. ref pa #2013.09.27.7937. ordiance no. 155-13 not required. | $20,000 |
| Oct 8, 2013 | Expired or cancelled | 2130 Fulton St | 5/f- rev. to pa# 201307081302 restroom accessibility. | ||
| Sep 27, 2013 | Completed | 2495 Golden Gate Av | Turner Construction Co | interior renovation of existing rave book room within existing libaray, scope includes expanded secure storage/library stacks, new ceiling, lighting, mechanical & related partitions. new interior store front system and doors, security, fire alarm, plumbing and shelving also included. | $750,000 |
| Sep 5, 2013 | Completed | 2130 Fulton St | Red Hawk Fire & Security Ca Llc | 5th floor-addition of fire alarm tenant improvement-adding 2 duct detectors, 3 audio visual, booster power, 1 smoke detector, sync. module & 2 notification appliances. | $5,000 |
| Aug 12, 2013 | Never finaled | 2455 Golden Gate Av | street space | ||
| Aug 2, 2013 | Completed | 2345 Golden Gate Av | Paganini Electric Corp(See Signatories) | phelan hall 1st & 2nd floor:install 31 horn/strobes, 27 horns, 4 strobes, 11 smoke detectors, 2 control relays, 2 interposing relays. 1 booster supply. 1 synchronization module. all additions are tied into the extg system. | $25,000 |
| Jul 30, 2013 | Never finaled | 2130 Fulton St | street space | ||
| Jul 12, 2013 | Completed | 2495 Golden Gate Av | Turner Construction Co | interior demolition of rare book room. demo to include finishes, lighting, select millwork and walls, ro remain vacant per ab-017 | $23,808 |
| Jul 8, 2013 | Completed | 2130 Fulton St | Mai Construction Inc. | 5th floor-interior renovation to (e) partial area-5, 9 new offices, new finishes, renovation of (e) restrooms. mep under separate permit. | $350,000 |
| Jul 2, 2013 | Completed | 2345 Golden Gate Av | Rcm Fire Protection Inc. | t.i. add 14 relocate 6 sprinklers for new ceiling configurations or layout. | $7,350 |
| Jun 10, 2013 | Never finaled | 2455 Golden Gate Av | street space | ||
| Jun 10, 2013 | Completed | 2455 Golden Gate Av | R L H Fire Protection Inc | fire sprinkler - underground as built, ref pa #2010.08.06.8321-s7 | |
| Jun 6, 2013 | Completed | 2445 Golden Gate Av | Monterey Mechanical Co | removal of existing 75 kw standby generator in harney scence center mech room. new 230 kw standby diesel generator at the roof of the harney science center with piping and conduits routed to a new fuel storage tank at gr level | $230,000 |
| May 21, 2013 | Completed | 2345 Golden Gate Av | Turner Construction Co | reduce scope of work from application #201207034034. remove planter, new landscape in its place. all work on campus. | |
| Mar 1, 2013 | Never finaled | 2455 Golden Gate Av | street space | ||
| Feb 28, 2013 | Never finaled | 2130 Fulton St | street space permit | ||
| Feb 21, 2013 | Completed | 2455 Golden Gate Av | Eagle Bay Enterprises, Inc (Dba Garnett | install evacuation signs on floors b, g, l1, l2, l3. 17 total. | $4,500 |
| Jan 22, 2013 | Never finaled | 2130 Fulton St | street space | ||
| Nov 7, 2012 | Completed | 2345 Golden Gate Av | Red Hawk Fire & Security Ca Llc | update as builts, all room designations changed, floors moved up 1 level | $2,500 |
| Nov 5, 2012 | Never finaled | 2130 Fulton St | removal of existing 4" steam and 2" condensate return piping. installatin of new 8" steam and 2 1/2 " return piping | $485,000 | |
| Aug 30, 2012 | Never finaled | 2455 Golden Gate Av | street space permit | ||
| Aug 27, 2012 | Never finaled | 2305 Golden Gate Av | Red Hawk Fire & Security Ca Llc | 2nd floor fire alarm system - add 3 horn/strobes. | $6,000 |
| Aug 9, 2012 | Completed | 2345 Golden Gate Av | Red Hawk Fire & Security Ca Llc | fire alarm ti for floors 2 to 5.added 18 smoke detectors; added 40 horn/strobes; added 10 strobes; added 22 fsds | $20,000 |
| Aug 6, 2012 | Never finaled | 2455 Golden Gate Av | A & B Construction | install 95' of 6" cl250 dip fire water service from backflow @ sidewalk on golden gate avenue to 5' from face of building. excavation & installation & backfill of piping is to be carried. | $15,000 |
| Aug 3, 2012 | Completed | 2375 Golden Gate Av | Rcm Fire Protection Inc. | install new fire protection system for the pre-occupied area. renovation of phelan residential hall at 1st floor. | $19,600 |
| Jul 27, 2012 | Completed | 2345 Golden Gate Av | Paganini Electric Corp(See Signatories) | install 2 strobes, 17 horn/strobes, 3 horns,10 interposing relays, 3 duct detectors, 1 heat detector, 23 smoke detectors, 2 pull stations, and 19 control relays. relocate facp. | $29,000 |
| Jul 24, 2012 | Completed | 2375 Golden Gate Av | Rcm Fire Protection Inc. | add and relocate heads to fit new ceiling configuration. for t.i. work in second floor faculty lounge. new cross main and eq bracing w/end of line restraints. 17 adds, 10 relocates | $8,200 |
| Jul 17, 2012 | Completed | 2375 Golden Gate Av | Paganini Electric Corp(See Signatories) | 3rd floor-add 5 pull stations, 5 control relays, 2 smoke detectors, 2 duct detectors, 5 interposing relays, 15 speaker/strobes, 3 strobes & 2 door holders to (e) system | $9,500 |
| Jul 17, 2012 | Completed | 2375 Golden Gate Av | Rcm Fire Protection Inc. | revision to appl #2012.06.28.3667 - relocate standpipe for new fire sprinkler system.connect (e) 5-inch dsp to (n) 6-inch combination standpipe. | $3,200 |
| Jul 3, 2012 | Completed | 2345 Golden Gate Av | Turner Construction Co | accessiblity entry upgrade with elevation & internal renovations. mep under separate permit. include new entry steps to (e) exterior & new curtain wall system & 1st floor north side. demo (e) office & restroom & install new replacement accessible restroom & relocated. | $2,000,000 |
| Jul 2, 2012 | Completed | 2375 Golden Gate Av | Turner Construction Co | m.e.p. work only for t.i. on 3rd floor approved under pa $2012.06.13.2519. fire protection under separate permit. | $324,000 |
| Jul 2, 2012 | Expired or cancelled | 2455 Golden Gate Av | Sabah International Incorporated | provide a new automatic and manual fa system. shall include selective coverage of automatic smk detector throughout bldg.except in areas indicated to have combination smk/heat det or heat only det shall be used. manual pull stations exists. water flow and valve tamper monitoring. duct smk detecor | $75,600 |
| Jul 2, 2012 | Completed | 2375 Golden Gate Av | Turner Construction Co | 3rd floor-install modular wall system, interior renovation under 201206132519. install locking system for sliding doors that are part of wall system above. comply with cbc-2010 section 1008.1.9.8 | $125,000 |
| Jun 29, 2012 | Never finaled | 2130 Fulton St | street space for work done at usf:malloy hall | ||
| Jun 28, 2012 | Completed | 2375 Golden Gate Av | Rcm Fire Protection Inc. | install new fire protection system for the renovated areas of the basement and ground floor of phelan residence hall. total 85 heads; installl 30-feet +/- of 6-inch underground; fire service w/ dac; and new fire hydrant. | $44,625 |
| Jun 21, 2012 | Never finaled | 2130 Fulton St | street space | ||
| Jun 13, 2012 | Completed | 2375 Golden Gate Av | Turner Construction Co | 3rd floor:t.i. for 3rd floor of university center bldg. work includes new partitions, ceiling, fixtures, finishes. mep and fire protection under seperate permit. | $40,000 |
| Jun 13, 2012 | Completed | 2375 Golden Gate Av | Rcm Fire Protection Inc. | sprinklers tenant improvement for renovated areas of 3rd floor of university cener bldg. connecting to exisiting sprinkler riser, new bracing calculations- | $61,950 |
| Jun 7, 2012 | Completed | 2375 Golden Gate Av | Turner Construction Co | new fireplace & new entry door along with new ceiling & interior finiahes. m.e.p under seperate permit | $200,000 |
| May 25, 2012 | Completed | 2375 Golden Gate Av | Turner Construction Co | 3rd floor tenant improvement to (e) building, full floor tenant suite demolition work to remove (e) walls, ceilings (per ab-017). | $105,000 |
| May 11, 2012 | Never finaled | 2455 Golden Gate Av | streetspace | ||
| Apr 5, 2012 | Completed | 2455 Golden Gate Av | Cahill Const Service Inc | clarification of fdc locations and fire alarm monitoring to approved app#201008068321 s5r-1 | |
| Feb 24, 2012 | Never finaled | 2455 Golden Gate Av | street space | ||
| Feb 13, 2012 | Completed | 2345 Golden Gate Av | Turner Construction Co | interior remodel of basement, ground floor and 1st floor. work to include restroom upgrades, new finishes and dorm room remodel. existing residential dorms on the basement level, ground floor and 1st floor. no change of use. | $6,000,000 |
| Feb 8, 2012 | Completed | 2130 Fulton St | Paragon Mechanical Inc | installation of replacment chiller on roof of harney science center. removal of existing chiller and cooling tower in 1st floor of harney science center | $250,000 |
| Feb 3, 2012 | Completed | 2455 Golden Gate Av | Cahill Contractors Inc | clarification of occupant load to approved app#201008068321 for purposes of meeting requirements for area of refuge. no construction work under this permit.revision to app#201008068321 | |
| Jan 27, 2012 | Completed | 2345 Golden Gate Av | Turner Construction Co | interior remodel of ground floor entry area and floors 2-6 dorm rooms and bathrooms | $2,000,000 |
| Jan 10, 2012 | Never finaled | 2130 Fulton St | street space permit. | ||
| Dec 22, 2011 | Completed | 2130 Fulton St | Turner Construction Co | new exterior fountain to be constructed in e south east corner of kalmanovitz hall courtyard. work is unrelated to any bldg. structure-landing only | $25,000 |
| Nov 29, 2011 | Completed | 2305 Golden Gate Av | demolition of (e) fence & installation of new 8' fence on property line & trees | $20,000 | |
| Nov 22, 2011 | Expired or cancelled | 2345 Golden Gate Av | Red Hawk Fire & Security Ca Llc | fire alarm t.i at 2345 golden gate, phelan hall. 1-monitor module 5-synch module 6-control relays 6 - smoke detectors 1- duct detector 1- booster power supply 40 - hornstrobes - wall 10 strobes - wall | $23,000 |
| Oct 24, 2011 | Never finaled | 2455 Golden Gate Av | street space | ||
| Sep 1, 2011 | Completed | 2305 Golden Gate Av | Red Hawk Fire & Security Ca Llc | fire alarm t.i. at usf, student center.1 dual monitor module for sprinkler for 3rd floor restroom | $7,238 |
| Aug 19, 2011 | Completed | 2345 Golden Gate Av | Red Hawk Fire & Security Ca Llc | f/a upgrade at usf phelan hall. permit is to allow insp of existing devices refitted in "phase 1" and existg areas. phase 2 is pending completion and will have both phases incorporated. 5-new smoke detectrs' 5-new switching modules & 5 new horn/strobes for ada. plans req before final. | |
| Aug 5, 2011 | Never finaled | 2335 Golden Gate Av | Mai Construction Inc. | univ. of sf gymmnasium. install a new atm pad and kiosk at the rear of memorial gym. work includes (n) con.pad and 3 sided kios enclosure. work is free standing outside of bldg. atm to be installed and reviewed for accessibilty compliance under separate permit. | $82,000 |
| Jul 21, 2011 | Never finaled | 2130 Fulton St | street space & sidewalk | ||
| Jul 11, 2011 | Completed | 2455 Golden Gate Av | Cahill Contractors Inc | revision to pa# 2011-0516-6098-tower crane foundation, revised cost per dbi request-from $7500 to $30k | $22,500 |
| Jul 6, 2011 | Expired or cancelled | 2345 Golden Gate Av | Allied Heating & Air Conditioning | 2nd, 3rd, 4th, 5th & 6th flrs-revision to pa# 2011-0627-8978-change exhaust fsd's to subducts with exhaust at roof on emergency power | |
| Jun 30, 2011 | Completed | 2375 Golden Gate Av | Ayoob & Peery Plumbing Co Inc | 2nd & 3rd floors-add 7 sprinkler in restrooms, add 5 sprinklers in restrooms | $6,574 |
| Jun 27, 2011 | Never finaled | 2130 Fulton St | re-build 2 (e) ramps on ground floor to meet code requirements. no other work | $30,000 | |
| Jun 27, 2011 | Never finaled | 2495 Golden Gate Av | re-build (e) ramp on ground floor to meet code requirements. | $15,000 | |
| Jun 27, 2011 | Completed | 2345 Golden Gate Av | Allied Heating & Air Conditioning | refer to arch pa# 2011-0127-9178-replace shower room exhaust fan, install new exhaust fan & air handling unit on roof. new supply & exhaust ductwork for 5 floors. | $321,000 |
| Jun 21, 2011 | Completed | 2130 Fulton St | Bcci Construction Company | 2nd & 3rd floors-refer to arch pa# 2011-0524-6692 & 2011-0523-6617-electrical & title-24 | $35,500 |
| Jun 3, 2011 | Completed | 2345 Golden Gate Av | Rcm Fire Protection Inc. | install piping system in core area of 2nd thur 6th flrs which compries the common bathrm area, accessible bedrm area. the i.t room, reading rom & the prefect aptment & elevator lobby. piping in corridors shall not be installed until the commencement of phase #2 construction | $120,000 |
| May 24, 2011 | Completed | 2130 Fulton St | Bcci Construction Company | barrier removal at restrooms on floor 2 | $150,000 |
| May 23, 2011 | Completed | 2130 Fulton St | Bcci Construction Company | barrier removal at restroom on the 3rd floor. | $150,000 |
| May 20, 2011 | Never finaled | 2455 Golden Gate Av | street space | ||
| May 17, 2011 | Completed | 2375 Golden Gate Av | Ayoob & Peery Plumbing Co Inc | add 16 sprinklers @ new patio on ground floor. | $8,000 |
| May 16, 2011 | Never finaled | 2455 Golden Gate Av | Cahill Contractors Inc | tower crane foundation permit in accordance w/ ab-023 | $5,000 |
| May 6, 2011 | Completed | 2345 Golden Gate Av | Turner Construction Co | usf voluntary seismic upgrade of (e) bldg (mcclarren hall), no change of occupancy. in tandem permit with phelan hall pa# 2011/03/02/1231. for same scope of work. both bldgs share same address/ block/lot. this pa is for mclaren hall (per general portion of asce 41 procedure with certain exception | $150,000 |
| May 5, 2011 | Completed | 2345 Golden Gate Av | Turner Construction Co | window replacement to 180 windows. partially visible from street. u </= 0.47 for all replacement window. existing alum & steel wndows replaced to alum. no change in opening size. | $65,000 |
| Apr 19, 2011 | Completed | 2375 Golden Gate Av | Cahill Const Service Inc | revision to approved pa# 201103142016 (adjacent 2011-0311-1941 for minor changes in shoring & underpinning related to bldg pa# 2010-0806-8321 | $4,500 |
| Apr 15, 2011 | Completed | 2345 Golden Gate Av | Turner Construction Co | revision to pa# 2011-0127-9178-install carbon fiber reinforcement at new mechanical, plumbing openings in (e) concrete slab on 5 floors (2-6). infill openings with new concrete. no exterior work no change of use | $30,000 |
| Mar 30, 2011 | Completed | 2375 Golden Gate Av | Diversified Fire Products | fire alarm ti at usf media center. 1 new horn/strobes,1 relocate pull station,1 relocate annunciator. | $2,300 |
| Mar 17, 2011 | Completed | 2375 Golden Gate Av | Ayoob & Peery Plumbing Co Inc | 1st floor-relocate 16 pendent/upright 16, replace 2 sprinklers at media room (viewing) | $15,000 |
| Mar 14, 2011 | Completed | 2375 Golden Gate Av | Cahill Const Service Inc | shoring & underpinning dor work related to (n) construction on neighboring site in conjunction with (n) bldg permit approved under site appl #201008068321. | $25,000 |
| Mar 11, 2011 | Completed | 2375 Golden Gate Av | Swinerton Builders | remove non structural partitions,(e) lights, flooring, fixts. extend (e) ceiling and flooring from adjacent lounge into space. (n) lighting with less total wattage than (e) lighting so no title 24 reqd. no change to e mech system. changes to sprinklers or alarm on sep permit revision to 201007166852 | $16,500 |
| Mar 11, 2011 | Never finaled | 2445 Golden Gate Av | Cahill Const Service Inc | shoring and underpinning for harney science bldg in prep for future construction. no other work.bldg permit approved under app#201008068321 | $10,000 |
| Mar 2, 2011 | Completed | 2345 Golden Gate Av | Turner Construction Co | usf phelan hall. for limited voluntary seismic upgrade to existing basement thru the sixth floor of the 7-story bldg. local structural member strengthening. no change of occupancy (per general portion of asce-41 procedure with certain exceptions). see engineer's statement dated 4-18-11 attached. | $890,000 |