C B 2 Builders Incorporated
- Based in
- San Francisco
- On San Francisco permits
- Mar 2006 to Aug 2026
- Last 24 months
- 7 permits filed
223 permits since 2000: 169 completed, 4 in progress, 24 never finaled, 26 expired or cancelled.
Of the 24 never-finaled permits, 7 are 5 to 10 years old, 17 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 223.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 28, 2026 | In progress filed Aug 2026, not yet issued | 3838 California St | 1/f ti: modify interior partition walls & update finishes.Details
1/f ti: modify interior partition walls & update finishes. | $180,000 |
| Nov 26, 2025 | Completed final sign-off Aug 2026 | 405 Davis Ct | maintenance and repair-replace existing trash chute with new discharge door and chute from basement through roof. remove and replace non-structural partitions with new rated partitions. no structural improvements, no increase in building area or conditioned spaceDetails
maintenance and repair-replace existing trash chute with new discharge door and chute from basement through roof. remove and replace non-structural partitions with new rated partitions. no structural improvements, no increase in building area or conditioned space | $200,000 |
| Jun 18, 2025 | Completed final sign-off Mar 2026 | 1050 South Van Ness Av | hvac work for new shelter from layout. complete deferred meps for 202503061701 and 202506098244Details
hvac work for new shelter from layout. complete deferred meps for 202503061701 and 202506098244 | $10,000 |
| Jun 9, 2025 | Completed final sign-off Mar 2026 | 1050 South Van Ness Av | floors 1-2: deferred eps for 202503061701. mech still deferred.Details
floors 1-2: deferred eps for 202503061701. mech still deferred. | |
| May 16, 2025 | Completed final sign-off Aug 2025 | 1050 South Van Ness Av | revision to pa #202503061701 revise partition layout sheets a201, a202, a203. reduce number of bedsDetails
revision to pa #202503061701 revise partition layout sheets a201, a202, a203. reduce number of beds | |
| Mar 6, 2025 | Completed final sign-off Aug 2025 | 1050 South Van Ness Av | 1st and 2nd floor - interior conversion of existing space into overnight housing quarters with new restrooms and showers. all mep under separate permits. replace one window rm 101.Details
1st and 2nd floor - interior conversion of existing space into overnight housing quarters with new restrooms and showers. all mep under separate permits. replace one window rm 101. | $520,000 |
| Feb 19, 2025 | In progress filed Feb 2025, not yet issued | 101 Market St | replacement of (e) underground fuel storage tank and monitoring system with (n) equipment and monitoring systemsDetails
replacement of (e) underground fuel storage tank and monitoring system with (n) equipment and monitoring systems | $1,750,000 |
| May 31, 2024 | In progress issued Jun 2024 | 221 04th St | rev 202402075386: update 2 door locations due to (e) field conditions. depress slab & provide ramp at door #2 to provide clear level landing at interior exterior door.Details
rev 202402075386: update 2 door locations due to (e) field conditions. depress slab & provide ramp at door #2 to provide clear level landing at interior exterior door. | $1,200 |
| May 22, 2024 | Completed final sign-off May 2025 | 1333 Bush St | ti of existing commercial kitchen. addition of new two compartment prep sinks, relocate existing station, addition of two gfci receptacles in existing dry storage room and associated breakers in existing electrical panels. replace finishes as needed.Details
ti of existing commercial kitchen. addition of new two compartment prep sinks, relocate existing station, addition of two gfci receptacles in existing dry storage room and associated breakers in existing electrical panels. replace finishes as needed. | $20,000 |
| Apr 5, 2024 | Completed final sign-off Apr 2026 | 2445 Golden Gate Av | revision to issued pa# 2022-0105-5392: enhancement of the applicable shaft fire-resistance rated separation from 2 hours to 3 hours based on engineering analyis and judgement confirmed by ab-005.Details
revision to issued pa# 2022-0105-5392: enhancement of the applicable shaft fire-resistance rated separation from 2 hours to 3 hours based on engineering analyis and judgement confirmed by ab-005. | |
| Mar 13, 2024 | Completed final sign-off Jun 2024 | 22 Battery St | 10/f: revision to permit 202310168720 to replace drinking fountain with accessible bottle filling station due to technical infeasibility and new suspended light fixture.Details
10/f: revision to permit 202310168720 to replace drinking fountain with accessible bottle filling station due to technical infeasibility and new suspended light fixture. | |
| Feb 7, 2024 | In progress issued Apr 2024 | 221 04th St | 1st fl - replace store front, interior renovations in areas reflected by new work refinish floors restroom accesibility upgrades, replace lighting & electrical where affected by new work; install tensile fabric shade at plaza. mep/lf under separate permitDetails
1st fl - replace store front, interior renovations in areas reflected by new work refinish floors restroom accesibility upgrades, replace lighting & electrical where affected by new work; install tensile fabric shade at plaza. mep/lf under separate permit | $385,000 |
| Nov 28, 2023 | Completed final sign-off May 2024 | 1000 Montgomery St | revision to 202102044020: addition of upper casework in room 326 laundry room.Details
revision to 202102044020: addition of upper casework in room 326 laundry room. | $1,000 |
| Nov 27, 2023 | Completed final sign-off Dec 2023 | 1353 Bush St | to obtian final inspection for work approved under pa# 201412053171 & 201206273531. all work is complete.Details
to obtian final inspection for work approved under pa# 201412053171 & 201206273531. all work is complete. | |
| Nov 1, 2023 | Completed final sign-off Dec 2023 | 1353 Bush St | renew pa#200904166420 & pa#201510230696 & pa#201808137167 for final inspectionDetails
renew pa#200904166420 & pa#201510230696 & pa#201808137167 for final inspection | |
| Oct 25, 2023 | Completed final sign-off Oct 2024 | 225 Potrero Av | remodel existing kitchen @ ground floor, new diabled accessible entrance @ dining room.Details
remodel existing kitchen @ ground floor, new diabled accessible entrance @ dining room. | $126,000 |
| Oct 19, 2023 | Completed final sign-off Aug 2024 | 1000 Montgomery St | revision to 202102044020; revision of rooms 224 and 324 from accessible shower room to shower roomDetails
revision to 202102044020; revision of rooms 224 and 324 from accessible shower room to shower room | |
| Oct 16, 2023 | Completed final sign-off Jun 2024 | 22 Battery St | 10th fl - project consists of interior improvements to an (e) tenant space of approx 5000 sf space. addition of a (n) cabinet area (n) kitchen island to compliment the (e) kitchenDetails
10th fl - project consists of interior improvements to an (e) tenant space of approx 5000 sf space. addition of a (n) cabinet area (n) kitchen island to compliment the (e) kitchen | $186,000 |
| Sep 14, 2023 | Completed final sign-off Aug 2024 | 1000 Montgomery St | revision to bpa#202102044020, room 424 from "accessible shower room" to "shower room"Details
revision to bpa#202102044020, room 424 from "accessible shower room" to "shower room" | |
| Jul 25, 2023 | Expired or cancelled expired Dec 2023 | 1353 Bush St | rev bpa#202112224933, revise equipment config @ wouth wall of bar101, convert music studio 110 @ basement to dry storage room, omit ramp/platform @ rm 125, omit display cases @ rm 239/all free standing display cases @ basement-1/f-2/f, document (e)storage rm 100 @2/f/(e) phone nrm @ hallway 301, addDetails
rev bpa#202112224933, revise equipment config @ wouth wall of bar101, convert music studio 110 @ basement to dry storage room, omit ramp/platform @ rm 125, omit display cases @ rm 239/all free standing display cases @ basement-1/f-2/f, document (e)storage rm 100 @2/f/(e) phone nrm @ hallway 301, add | |
| Jan 31, 2023 | Completed final sign-off Aug 2024 | 1000 Montgomery St | revision to pa# 202102044020. deficiencies in several (e) fire barries & partitions were discovered that were approved as part of pa# 8405871 & pa# 8715181 but not installed in their entirety. scope of this project is to repair those deficiencies & bring them back up to level & detail.Details
revision to pa# 202102044020. deficiencies in several (e) fire barries & partitions were discovered that were approved as part of pa# 8405871 & pa# 8715181 but not installed in their entirety. scope of this project is to repair those deficiencies & bring them back up to level & detail. | $600,000 |
| Dec 14, 2022 | Expired or cancelled withdrawn Apr 2023 | 3417 Mission St | to comply with abe program. completed work for the installation of 2 automatic door actuators. abe# 201909256470.Details
to comply with abe program. completed work for the installation of 2 automatic door actuators. abe# 201909256470. | $18,000 |
| Dec 14, 2022 | Expired or cancelled withdrawn Apr 2023 | 3419 Mission St | to comply with abe program. completed work for the installation of 2 automatic door actuators. abe# 201909256472.Details
to comply with abe program. completed work for the installation of 2 automatic door actuators. abe# 201909256472. | $18,000 |
| Oct 7, 2022 | Completed final sign-off Jul 2023 | 200 Larkin St | work includes and repl of (e) pedestal paver system including ramps and stairs . repair (e) waterproofind system as required. install (n) concrete stairs, ramps and curbs to replace matching (e) rise and run. tread depths and heights. install (n) handrails sim to (e) attachmts. demo ref 202205194618Details
work includes and repl of (e) pedestal paver system including ramps and stairs . repair (e) waterproofind system as required. install (n) concrete stairs, ramps and curbs to replace matching (e) rise and run. tread depths and heights. install (n) handrails sim to (e) attachmts. demo ref 202205194618 | $900,000 |
| May 19, 2022 | Completed final sign-off Apr 2023 | 200 Larkin St | removal of existing concrete paver and pedestal system installed as part of gallery expansion, in preparation for a new pedestal paver system per ab-017Details
removal of existing concrete paver and pedestal system installed as part of gallery expansion, in preparation for a new pedestal paver system per ab-017 | $10,000 |
| Mar 21, 2022 | Completed final sign-off Jun 2022 | 200 Larkin St | removal of temp exhibition improvements including partition walls, floor finishses, light fixtures and air conditioning.Details
removal of temp exhibition improvements including partition walls, floor finishses, light fixtures and air conditioning. | $180,000 |
| Mar 21, 2022 | Completed final sign-off Apr 2022 | 649 Front St | revision to previously approved permit 202111222919. combine 2 phone rooms to 1 by removing on structural partition. revise hvac duct to reflect change of the areaDetails
revision to previously approved permit 202111222919. combine 2 phone rooms to 1 by removing on structural partition. revise hvac duct to reflect change of the area | $1,000 |
| Mar 10, 2022 | Completed final sign-off Mar 2022 | 98 Battery St | suite 302: furniture/ module workstation plan only. ref pa# 202105190608.Details
suite 302: furniture/ module workstation plan only. ref pa# 202105190608. | |
| Jan 13, 2022 | Completed final sign-off May 2022 | 250 Howard St | suite 3a: replace (1) existing fan coil unit with (2) new water source heat pumps. t.i. n/aDetails
suite 3a: replace (1) existing fan coil unit with (2) new water source heat pumps. t.i. n/a | $135,000 |
| Dec 22, 2021 | Expired or cancelled expired Dec 2023 | 1353 Bush St | revision to 201808137167, relocate kitchen to basement level food prep area. add bar @ basement w/sidewalk service windows. reconfigure basement rooms. reconfifure offce #231 into a dry storage rm. storage rm #205 into a beer cooler glass rm. rm #211 into an employee changing rm (all on 1st fl)Details
revision to 201808137167, relocate kitchen to basement level food prep area. add bar @ basement w/sidewalk service windows. reconfigure basement rooms. reconfifure offce #231 into a dry storage rm. storage rm #205 into a beer cooler glass rm. rm #211 into an employee changing rm (all on 1st fl) | |
| May 19, 2021 | Completed final sign-off Mar 2022 | 98 Battery St | 3rd fl, ste 302 office ti. demo breakroom ktichen and partial wall demo at breakroom for new interior window. provide new countertops, cabinets and fixtures at breakroom. provide new finishes throughout. no exterior of site workDetails
3rd fl, ste 302 office ti. demo breakroom ktichen and partial wall demo at breakroom for new interior window. provide new countertops, cabinets and fixtures at breakroom. provide new finishes throughout. no exterior of site work | $122,475 |
| Jul 16, 2020 | Never finaled issued Dec 2020, no final | 1 Market St | add coding tower and centrifugal seperator to existing condenser water system work on steuart tower roof.Details
add coding tower and centrifugal seperator to existing condenser water system work on steuart tower roof. | $500,000 |
| Mar 2, 2020 | Completed final sign-off Sep 2020 | 75 Hawthorne St | revise (e) 7th fl roof tie back to conform with cal osha.Details
revise (e) 7th fl roof tie back to conform with cal osha. | $50,000 |
| Feb 25, 2020 | Completed final sign-off Sep 2021 | 1 Market St | project scope includes installation of mechanical cooling tower at the 28th level roof at 1 market plaza, steuart towerDetails
project scope includes installation of mechanical cooling tower at the 28th level roof at 1 market plaza, steuart tower | $25,000 |
| Jan 24, 2020 | Completed final sign-off Jul 2021 | 200 Larkin St | construction of a temporary art installation w/in an (e) gallery space. work include temporary partitions, floor & ceiling finishes and modifications to (e) air conditioning and lighting systemsDetails
construction of a temporary art installation w/in an (e) gallery space. work include temporary partitions, floor & ceiling finishes and modifications to (e) air conditioning and lighting systems | $1,000,000 |
| Dec 18, 2019 | Never finaled issued Mar 2021, no final | 143 Clayton St | add (1) adu per ordinance #162-16 to basement of building expanded under appln #201912098978Details
add (1) adu per ordinance #162-16 to basement of building expanded under appln #201912098978 | $100,000 |
| Dec 9, 2019 | Never finaled issued Mar 2021, no final | 137 Clayton St | vertical and horizontal addition to (e) single family dwelling for two new units per planning commision motion# 20350.Details
vertical and horizontal addition to (e) single family dwelling for two new units per planning commision motion# 20350. | $500,000 |
| Nov 5, 2019 | Completed final sign-off Dec 2019 | 101 California St | 39th fl, ste 3910 - ti of approx 3650 sf of (e) office space. new metal stud feature wall w/rope infill, largely openDetails
39th fl, ste 3910 - ti of approx 3650 sf of (e) office space. new metal stud feature wall w/rope infill, largely open | $140,000 |
| Oct 7, 2019 | Completed final sign-off Oct 2020 | 200 Larkin St | installation of art work @ sw alcove of room# 201. work also includes an art light & structural provisions. lighting for temporary exitibits. ** maher: n/a **Details
installation of art work @ sw alcove of room# 201. work also includes an art light & structural provisions. lighting for temporary exitibits. ** maher: n/a ** | $25,000 |
| Oct 2, 2019 | Completed final sign-off Oct 2019 | 101 02nd St | mep only . ref 201909111311 arch.Details
mep only . ref 201909111311 arch. | $5,000 |
| Sep 11, 2019 | Never finaled issued Sep 2019, no final | 101 02nd St | this project involves modification to include selective demolition & construction of non-load bearing partition, new door & frame, & new finishesDetails
this project involves modification to include selective demolition & construction of non-load bearing partition, new door & frame, & new finishes | $150,000 |
| Jan 24, 2019 | Completed final sign-off Nov 2019 | 550 Battery St | maintenance repair - replace (e)trash chute with new discharge door and chute from 1st thru 22nd fls. remove (e) non-structural partitions as reqiured, construct new partition, replace in kind. maher n/a.Details
maintenance repair - replace (e)trash chute with new discharge door and chute from 1st thru 22nd fls. remove (e) non-structural partitions as reqiured, construct new partition, replace in kind. maher n/a. | $65,000 |
| Dec 7, 2018 | Expired or cancelled cancelled Jan 2026 | 77 Beale St | 15th and 16th floor: smoke management report for record only. no scope associated with this permit. ref app#201810314616Details
15th and 16th floor: smoke management report for record only. no scope associated with this permit. ref app#201810314616 | |
| Nov 19, 2018 | Completed final sign-off Jan 2019 | 55 02nd St | 25-26/f:upgrade restrooms to ada compliance: demo partitons and replace with floor-to-ceiling toilet, partitions, relocate accesssories. ada barrier removal. n/a maherDetails
25-26/f:upgrade restrooms to ada compliance: demo partitons and replace with floor-to-ceiling toilet, partitions, relocate accesssories. ada barrier removal. n/a maher | $27,800 |
| Oct 31, 2018 | Completed final sign-off Apr 2019 | 77 Beale St | replace existing fsd's and install core vav's on the 11th floor. hvac upgrade.Details
replace existing fsd's and install core vav's on the 11th floor. hvac upgrade. | $750,000 |
| Oct 31, 2018 | Completed final sign-off Apr 2020 | 77 Beale St | replace existing fsd's and install core vav's. upgrade on the 15th floor . install new fan coil units on the 15th and 16th floors. upgrade existing vav's downstream of ahu on 15th and 16th floor. replace existing ahu on the 16th floor.Details
replace existing fsd's and install core vav's. upgrade on the 15th floor . install new fan coil units on the 15th and 16th floors. upgrade existing vav's downstream of ahu on 15th and 16th floor. replace existing ahu on the 16th floor. | $1,800,000 |
| Sep 19, 2018 | Completed final sign-off Apr 2019 | 1000 Montgomery St | revision to app#2018-0405-5560. general renovation of interior adult nursing home renovation to back of house, preparation(warming) kitchen, quiet room, staff lounge.Details
revision to app#2018-0405-5560. general renovation of interior adult nursing home renovation to back of house, preparation(warming) kitchen, quiet room, staff lounge. | $100,000 |
| Aug 13, 2018 | Expired or cancelled expired Dec 2023 | 1353 Bush St | revision to app#200904166420 and 201510230696 to include a-2 occupancy at 1st floor cafe, modify 1st floor storefront and install clerestory windows, bsmnt remodel, install dumbwaiter, structural upgrades. life safety deferred.Details
revision to app#200904166420 and 201510230696 to include a-2 occupancy at 1st floor cafe, modify 1st floor storefront and install clerestory windows, bsmnt remodel, install dumbwaiter, structural upgrades. life safety deferred. | |
| Jul 16, 2018 | Completed final sign-off Nov 2018 | 55 02nd St | spec suite 1925 on 19th fl: ti includes building new non-structural partitions. all new or revised hvac, electrical, plumbing, and life safety work will be design build under separate permit. building is "fully sprinklered". maher naDetails
spec suite 1925 on 19th fl: ti includes building new non-structural partitions. all new or revised hvac, electrical, plumbing, and life safety work will be design build under separate permit. building is "fully sprinklered". maher na | $384,692 |
| Jun 21, 2018 | Completed final sign-off Nov 2018 | 55 02nd St | ada restroom upgrades on 22nd and 23rd floors. installation of new accessories, niche in partition, widening of stall doors. n/a for maherDetails
ada restroom upgrades on 22nd and 23rd floors. installation of new accessories, niche in partition, widening of stall doors. n/a for maher | $6,200 |
| Apr 6, 2018 | Completed final sign-off Apr 2018 | 55 02nd St | 5/f -bathroom - ada upgrades, niche in wall, replace grab barsDetails
5/f -bathroom - ada upgrades, niche in wall, replace grab bars | $3,018 |
| Apr 5, 2018 | Completed final sign-off Apr 2019 | 1000 Montgomery St | interior renov of exstg convalescent facility and assoc service and admin rooms. all changes to inside exstg bldg reconfig of toilet partitions for ada floor clearances. change sfdbi occupancy of ground floor from i-2 to i-4. no change to planning dept use/classification.Details
interior renov of exstg convalescent facility and assoc service and admin rooms. all changes to inside exstg bldg reconfig of toilet partitions for ada floor clearances. change sfdbi occupancy of ground floor from i-2 to i-4. no change to planning dept use/classification. | $700,000 |
| Mar 12, 2018 | Completed final sign-off Apr 2018 | 55 02nd St | 2/f: bathroom ada upgrades: niche in wall, replace grab bars. maher naDetails
2/f: bathroom ada upgrades: niche in wall, replace grab bars. maher na | $3,018 |
| Mar 9, 2018 | Completed final sign-off Aug 2018 | 114 Sansome St | demolition of a swithc-back communicating stair between 13 & 14th fl. abnd infill of 14th fl. slab at stair openingDetails
demolition of a swithc-back communicating stair between 13 & 14th fl. abnd infill of 14th fl. slab at stair opening | $50,000 |
| Mar 1, 2018 | Completed final sign-off Sep 2018 | 114 Sansome St | 14th floor: scope of work for t.i. will include the selective removal of non-load bearing walls, new millwork and finishes, new partitions, new hardware and finishes. n/a for maherDetails
14th floor: scope of work for t.i. will include the selective removal of non-load bearing walls, new millwork and finishes, new partitions, new hardware and finishes. n/a for maher | $400,000 |
| Feb 1, 2018 | Expired or cancelled withdrawn Oct 2018 | 77 Beale St | fsd and vav upgrade at 11th and 15th floor only. n/a for maherDetails
fsd and vav upgrade at 11th and 15th floor only. n/a for maher | $1,500,000 |
| Jan 26, 2018 | Completed final sign-off Mar 2018 | 155 Jackson St | apt 2504: to comply with complaint 201833171: remove (e) door between bed 2 & living room,in-fill door opening with gyp board partition,construct new partition in bedroom 2 to create 3rd bedroom.replace (e) toilets with h.e, new shower finishes & water proofing. maher n/a.Details
apt 2504: to comply with complaint 201833171: remove (e) door between bed 2 & living room,in-fill door opening with gyp board partition,construct new partition in bedroom 2 to create 3rd bedroom.replace (e) toilets with h.e, new shower finishes & water proofing. maher n/a. | $10,000 |
| Jan 9, 2018 | Completed final sign-off Feb 2020 | 200 Larkin St | tenant improvement to 1st, 2nd & ground floor galleries. light demo. (n) partitions, finishes & millwork. (n) electricalDetails
tenant improvement to 1st, 2nd & ground floor galleries. light demo. (n) partitions, finishes & millwork. (n) electrical | $20,000 |
| Dec 15, 2017 | Completed final sign-off Feb 2018 | 55 02nd St | 3rd fl, ste 325 ti including demo of non-structural partitions and build (n) non structural partitions. meps, life safety and sprinklers under separate permit if neededDetails
3rd fl, ste 325 ti including demo of non-structural partitions and build (n) non structural partitions. meps, life safety and sprinklers under separate permit if needed | $34,815 |
| Dec 4, 2017 | Completed final sign-off May 2018 | 95 Hawthorne St | 5/f -removal of door and bridge to 75 hawthorne. not ti work. no change in occupancyDetails
5/f -removal of door and bridge to 75 hawthorne. not ti work. no change in occupancy | $4,000 |
| Nov 29, 2017 | Completed final sign-off Apr 2018 | 75 Hawthorne St | mechanical systems hvac on the 5th fl together with t.i. permit #201710242128Details
mechanical systems hvac on the 5th fl together with t.i. permit #201710242128 | $113,000 |
| Oct 24, 2017 | Completed final sign-off Jun 2018 | 75 Hawthorne St | ti on 5th fl suite (partial floor), includes demolition, construction of non-structural partitions, doors, interior glazing, ceiling lighting, millwork & finishes. no change in occupancy. mep under sep. permit.Details
ti on 5th fl suite (partial floor), includes demolition, construction of non-structural partitions, doors, interior glazing, ceiling lighting, millwork & finishes. no change in occupancy. mep under sep. permit. | $645,645 |
| Sep 15, 2017 | Completed final sign-off Dec 2017 | 140 Ellis St | to obtain final inspection for work approved under pa#201212126025, 201407242045 & 201505065519. all work is complete. n/a for maher.Details
to obtain final inspection for work approved under pa#201212126025, 201407242045 & 201505065519. all work is complete. n/a for maher. | |
| Jun 27, 2017 | Completed final sign-off Jul 2017 | 550 Battery St | maintenance & repair, responding to nov #201780471, item #4. remove (e) non-structural partition for maintenance & repair of trash chute, construct new partitions, replace in kind.Details
maintenance & repair, responding to nov #201780471, item #4. remove (e) non-structural partition for maintenance & repair of trash chute, construct new partitions, replace in kind. | $8,500 |
| Jun 14, 2017 | Completed final sign-off Nov 2017 | 55 02nd St | tenant improvement of office space on the 20th floor.Details
tenant improvement of office space on the 20th floor. | $500,000 |
| May 5, 2017 | Never finaled issued May 2017, no final | 75 Hawthorne St | 4/f, 5/f- non-structural demolition only, no build back, no change in occupancy, use or area, remain vacant per ab-017 deferring accessibility compliance until tenant improvement permit application.Details
4/f, 5/f- non-structural demolition only, no build back, no change in occupancy, use or area, remain vacant per ab-017 deferring accessibility compliance until tenant improvement permit application. | $195,000 |
| Apr 19, 2017 | Expired or cancelled cancelled Oct 2022 | 140 Ellis St | demolish portion of storefront sytem and fabric awning. new work: install new aluminum storefront system within existing openingDetails
demolish portion of storefront sytem and fabric awning. new work: install new aluminum storefront system within existing opening | $30,000 |
| Jan 30, 2017 | Completed final sign-off Apr 2017 | 200 Kansas St | demolition of interior finishes for new tenant. change of use and ti separate permitDetails
demolition of interior finishes for new tenant. change of use and ti separate permit | $15,000 |
| Oct 27, 2016 | Never finaled issued Oct 2016, no final | 55 02nd St | 1st floor - title 24 lighting, ref 20160906850Details
1st floor - title 24 lighting, ref 20160906850 | |
| Oct 20, 2016 | Completed final sign-off Oct 2017 | 140 Ellis St | install 2-hr rated enclosure around steam pipe in gas meter room; maher n/aDetails
install 2-hr rated enclosure around steam pipe in gas meter room; maher n/a | $5,000 |
| Oct 14, 2016 | Completed final sign-off Aug 2017 | 200 Kansas St | tenant improvements to construct 11,065 sq ft expansion of a childcare facility capable of accomodating up to 84 additional children & construction of associated 2,058 sq ft expanded exterior play area. expanded childcare center will accomodate up to 210 children. non-structural partitions, caseworkDetails
tenant improvements to construct 11,065 sq ft expansion of a childcare facility capable of accomodating up to 84 additional children & construction of associated 2,058 sq ft expanded exterior play area. expanded childcare center will accomodate up to 210 children. non-structural partitions, casework | $1,380,000 |
| Sep 19, 2016 | Completed final sign-off Nov 2017 | 140 Ellis St | create new opening at existing brick wall inside lobby (first basement). ** maher: n/a **Details
create new opening at existing brick wall inside lobby (first basement). ** maher: n/a ** | $50,000 |
| Sep 13, 2016 | Completed final sign-off Aug 2017 | 200 Kansas St | site permit for change of use from retail (pc sec 102/210.3) to child care facility (pc sec 102/210.3) of 11,065 sf child care facility and associated 867 sf of expanded exterior play area. no construction under this site permit. mep and const. set to be submitted as addenda. n/a for maher ordinanceDetails
site permit for change of use from retail (pc sec 102/210.3) to child care facility (pc sec 102/210.3) of 11,065 sf child care facility and associated 867 sf of expanded exterior play area. no construction under this site permit. mep and const. set to be submitted as addenda. n/a for maher ordinance | $2,294,148 |
| Sep 8, 2016 | Completed final sign-off Aug 2018 | 800 Chestnut St | new sound enclosure for extg dust-collector in n.w. parking lot of art institute. enclosure is fully detached from bldg and shall be fully sprinklered under seperate permit.Details
new sound enclosure for extg dust-collector in n.w. parking lot of art institute. enclosure is fully detached from bldg and shall be fully sprinklered under seperate permit. | $5,000 |
| Sep 6, 2016 | Completed final sign-off Apr 2017 | 200 Larkin St | installation of dust collector in existing woodshopDetails
installation of dust collector in existing woodshop | $50,000 |
| Sep 6, 2016 | Never finaled issued Sep 2016, no final | 55 02nd St | 1st floor t.i. - (n) non-structural partitions, all new or revised meps, ls & sp will be design build & submitted separately. (bldg fully sprinklered). n/a maher ordinanceDetails
1st floor t.i. - (n) non-structural partitions, all new or revised meps, ls & sp will be design build & submitted separately. (bldg fully sprinklered). n/a maher ordinance | $89,950 |
| Aug 26, 2016 | Never finaled issued Jan 2017, no final | 2270 Folsom St | install 6 evip stations in parking lot. install 1 evip station in parking garage for handicap access. n/a for maherDetails
install 6 evip stations in parking lot. install 1 evip station in parking garage for handicap access. n/a for maher | $200,000 |
| Aug 3, 2016 | Never finaled issued Aug 2016, no final | 800 Chestnut St | mechanical slab only in accessory parking lot, in advance of construction of new sound enclosure under future permitDetails
mechanical slab only in accessory parking lot, in advance of construction of new sound enclosure under future permit | $3,000 |
| Feb 25, 2016 | Completed final sign-off Aug 2016 | 121 Spear St | interior tenant improvement only. new restrooms, floor, wall, ceiling finishes to meet peets coffee brandingDetails
interior tenant improvement only. new restrooms, floor, wall, ceiling finishes to meet peets coffee branding | $185,000 |
| Feb 25, 2016 | Expired or cancelled withdrawn Oct 2016 | 140 Ellis St | revision to permit 201407242045 (orig permit 201212126025) (n) opening in (e) brick wall over (4) stories & demolition & reframing of load bearing wood stud wall; maher n/aDetails
revision to permit 201407242045 (orig permit 201212126025) (n) opening in (e) brick wall over (4) stories & demolition & reframing of load bearing wood stud wall; maher n/a | $20,000 |
| Nov 10, 2015 | Completed final sign-off May 2016 | 77 Beale St | will modify the existing rench drain near the 77 beale entrance. project has non occupied spaces and does not inhibit the access to our usability of existing occupied spaces. n/a for maher.Details
will modify the existing rench drain near the 77 beale entrance. project has non occupied spaces and does not inhibit the access to our usability of existing occupied spaces. n/a for maher. | $150,000 |
| Aug 26, 2015 | Completed final sign-off Oct 2015 | 800 Chestnut St | installation of new paint spray booth to replace (e). duct tie in to (e)Details
installation of new paint spray booth to replace (e). duct tie in to (e) | $35,000 |
| Jun 30, 2015 | Completed final sign-off Nov 2015 | 800 Chestnut St | construct plans duct layout to enable interconnection of central duct collector with the work shop equipment and assist in compliance with applicable regulation. industrial ventilation. fire alarm, life safety, and fire sprinklers on seperate permits.Details
construct plans duct layout to enable interconnection of central duct collector with the work shop equipment and assist in compliance with applicable regulation. industrial ventilation. fire alarm, life safety, and fire sprinklers on seperate permits. | $120,000 |
| May 6, 2015 | Expired or cancelled expired Dec 2017 | 140 Ellis St | ground fl facade: to erect illuminated, electric, wall, single faced sign. n/a for maher ordinance 155-13.Details
ground fl facade: to erect illuminated, electric, wall, single faced sign. n/a for maher ordinance 155-13. | $4,000 |
| Apr 10, 2015 | Completed final sign-off Jun 2015 | 200 Larkin St | 4th, grnd, & lower level:interior alterations - divide 4th flr office into office & wellness room. convert (e) lower level storage into (n) office and expand ground floor office.Details
4th, grnd, & lower level:interior alterations - divide 4th flr office into office & wellness room. convert (e) lower level storage into (n) office and expand ground floor office. | $55,000 |
| Feb 24, 2015 | Never finaled issued Mar 2015, no final | 101 California St | 46th floor - selective demo on non load bearing partitions, existing ceiling tile and grid, light fixtures, doors, frames sidelights. suite is facand and complies with ab017. n/a for maher ordinance.Details
46th floor - selective demo on non load bearing partitions, existing ceiling tile and grid, light fixtures, doors, frames sidelights. suite is facand and complies with ab017. n/a for maher ordinance. | $104,235 |
| Feb 24, 2015 | Never finaled issued Mar 2015, no final | 101 California St | 37th floor - this project involves selective demolition of non-load bearing partitions, (e) ceiling grid & tile, light fixts, doors, frames & sidelights. this suite is currently vacant & complies with ab-017. exception to requirements for disabled access to vacant space. n/a for maher.Details
37th floor - this project involves selective demolition of non-load bearing partitions, (e) ceiling grid & tile, light fixts, doors, frames & sidelights. this suite is currently vacant & complies with ab-017. exception to requirements for disabled access to vacant space. n/a for maher. | $55,575 |
| Feb 24, 2015 | Never finaled issued Mar 2015, no final | 101 California St | 40th floor - this project involves selective demolition of non-load bearing partitions, extg ceiling grid and tile, light fixtures, doors, frames, and sidelights. this suite is currently vacant and complies with ab-017, exception to requirements for disabled access to vacant space. n/a for maher.Details
40th floor - this project involves selective demolition of non-load bearing partitions, extg ceiling grid and tile, light fixtures, doors, frames, and sidelights. this suite is currently vacant and complies with ab-017, exception to requirements for disabled access to vacant space. n/a for maher. | $107,215 |
| Feb 24, 2015 | Never finaled issued Mar 2015, no final | 101 California St | 30th floor - this project involves selective demolition of non-load bearing partitions, (e) ceiling grid & tile, light fixts, doors, frames & sidelights. this suite is currently vacant & complies with ab-017. exception to requirements for disabled access to vacant space. n/a for maher.Details
30th floor - this project involves selective demolition of non-load bearing partitions, (e) ceiling grid & tile, light fixts, doors, frames & sidelights. this suite is currently vacant & complies with ab-017. exception to requirements for disabled access to vacant space. n/a for maher. | $14,315 |
| Feb 9, 2015 | Completed final sign-off Oct 2016 | 45 Beale St | revision to pa #2014.1118.1733 - install new electrical equipment & relocate existing mechanical equipment provide new concrete pad for all equipment. n/a maher ordinanceDetails
revision to pa #2014.1118.1733 - install new electrical equipment & relocate existing mechanical equipment provide new concrete pad for all equipment. n/a maher ordinance | $1,500,000 |
| Jan 22, 2015 | Completed final sign-off Mar 2015 | 851 Howard St | re-slope concrete walk at building entrance.Details
re-slope concrete walk at building entrance. | $30,000 |
| Dec 3, 2014 | Completed final sign-off Feb 2015 | 544 Golden Gate Av | basement: revision to permit appn. 201409257293; adjust opening @ elevation door (framing).Details
basement: revision to permit appn. 201409257293; adjust opening @ elevation door (framing). | $3,500 |
| Nov 19, 2014 | Completed final sign-off May 2015 | 55 02nd St | 3rd floor: interior demo of extg ceiling grid and tile , extg flex hvac ducting, extg lighting fixtures, carpet, vct etc (ab--017)Details
3rd floor: interior demo of extg ceiling grid and tile , extg flex hvac ducting, extg lighting fixtures, carpet, vct etc (ab--017) | $15,000 |
| Nov 18, 2014 | Completed final sign-off Oct 2016 | 45 Beale St | replace outdated, non serviceable elec gear and remove single point of failure locations through the distribution. n2 existing ups systems and respective batteries reused and switch gear will be replaced. 2 existing elec rooms, 1 batter rm and adjacent corridor will be combined into 1 elec roomDetails
replace outdated, non serviceable elec gear and remove single point of failure locations through the distribution. n2 existing ups systems and respective batteries reused and switch gear will be replaced. 2 existing elec rooms, 1 batter rm and adjacent corridor will be combined into 1 elec room | $85,000 |
| Nov 10, 2014 | Completed final sign-off Mar 2015 | 1 Post St | floor 8: see architectural permit 201409267455; the extent of mechanical work for project: add 1 vav box including duct work & controsl, adjust mech system to match new architectural layout, air balanceDetails
floor 8: see architectural permit 201409267455; the extent of mechanical work for project: add 1 vav box including duct work & controsl, adjust mech system to match new architectural layout, air balance | $15,000 |
| Oct 27, 2014 | Completed final sign-off Sep 2015 | 1 Post St | hvac reference arch permit # 201409247166. suite 2250 (22nd fl): install 1 vav zone w/thermostat; relo 4 grills & 3 thermostatsDetails
hvac reference arch permit # 201409247166. suite 2250 (22nd fl): install 1 vav zone w/thermostat; relo 4 grills & 3 thermostats | $5,000 |
| Sep 26, 2014 | Completed final sign-off Feb 2015 | 1 Post St | removal of non-structural ceiling height partitions, infill a door opening, minor restroom modifications. mep's on separate permits.Details
removal of non-structural ceiling height partitions, infill a door opening, minor restroom modifications. mep's on separate permits. | $16,000 |
| Sep 25, 2014 | Completed final sign-off Feb 2015 | 544 Golden Gate Av | basement: t.i. construct new elevator machine room (18 lt of gyp. board partitions. demo extg elevator machine room. upgrade extg elevator with new control hall call buttons, finishes, emergency communications voluntary upgrade. fire/lifesafty/ mep on seperate permit.Details
basement: t.i. construct new elevator machine room (18 lt of gyp. board partitions. demo extg elevator machine room. upgrade extg elevator with new control hall call buttons, finishes, emergency communications voluntary upgrade. fire/lifesafty/ mep on seperate permit. | $23,000 |
| Sep 24, 2014 | Completed final sign-off Jul 2015 | 1 Post St | 22nd flr, ste 2250: partial tenant improvement to the 22nd flr, no structural. includes: ceiling height partitions, millwork & finishes, some electrical & data wiring.Details
22nd flr, ste 2250: partial tenant improvement to the 22nd flr, no structural. includes: ceiling height partitions, millwork & finishes, some electrical & data wiring. | $75,000 |
| Sep 11, 2014 | Completed final sign-off Nov 2017 | 140 Ellis St | new aluminum storefront system to replace existing. new steel/glass canopy above lobby entrance. sprinklers under separate permit for canopy. n/a for maher ordinance155-13.Details
new aluminum storefront system to replace existing. new steel/glass canopy above lobby entrance. sprinklers under separate permit for canopy. n/a for maher ordinance155-13. | $128,000 |