Block 3718, lot 037
250 Howard St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 16, 2026 | In progress issued Jan 2026 | 250 Howard St | Rapid Fire Safety&Security Llc Dba Pafa | fire alarm t.i.: add cellular communicator to existing notifier nfs2-3030 fire alarm system.Details
fire alarm t.i.: add cellular communicator to existing notifier nfs2-3030 fire alarm system. | |
| Oct 17, 2025 | Completed final sign-off Jun 2026 | 250 Howard St | B F P Fire Protection | replacement of failing jockety pump (fire sprinkler)Details
replacement of failing jockety pump (fire sprinkler) | $27,000 |
| Jan 31, 2025 | In progress issued Feb 2025 | 250 Howard St | Bobcomm Llc Dba Pacific Das Llc. | ref pa # 2015-0427-4732 replace bda in (e) emergency responder radio coverage systemDetails
ref pa # 2015-0427-4732 replace bda in (e) emergency responder radio coverage system | $20,000 |
| Mar 8, 2024 | Completed final sign-off Jun 2024 | 250 Howard St | Gci, Inc | revision to pa# 202308114264, removed exhaust duct and dryer, clarification of no special inspection is required due to no epoxy anchorage to the project, electrical disconnect is changed from 125ato 100a, change of light fixture, change of power outlet.Details
revision to pa# 202308114264, removed exhaust duct and dryer, clarification of no special inspection is required due to no epoxy anchorage to the project, electrical disconnect is changed from 125ato 100a, change of light fixture, change of power outlet. | |
| May 3, 2022 | Completed final sign-off Jun 2022 | 250 Howard St | Pacific Auxiliary Fire Alarm | level 1: fire alarm ti - adding 2 duct detectors and 2 relays to existing notifier nfs2-3030 fire alarm system. ref permit 202201135930.Details
level 1: fire alarm ti - adding 2 duct detectors and 2 relays to existing notifier nfs2-3030 fire alarm system. ref permit 202201135930. | $9,102 |
| Jan 13, 2022 | Completed final sign-off May 2022 | 250 Howard St | C B 2 Builders Incorporated | suite 3a: replace (1) existing fan coil unit with (2) new water source heat pumps. t.i. n/aDetails
suite 3a: replace (1) existing fan coil unit with (2) new water source heat pumps. t.i. n/a | $135,000 |
| May 26, 2021 | Expired or cancelled cancelled Jan 2026 | 250 Howard St | ground fl/1st fl ti includes demo of non str partitions and building new non str partitions. meps included in this permit. life safety work will be designed build and submiteed seperately. bldg is fully sprinklered (white box condition for future ti)Details
ground fl/1st fl ti includes demo of non str partitions and building new non str partitions. meps included in this permit. life safety work will be designed build and submiteed seperately. bldg is fully sprinklered (white box condition for future ti) | $380,000 | |
| Apr 7, 2021 | Never finaled issued Apr 2021, no final | 250 Howard St | Webcor Construction Lp | 4-10th flrs: t.i mep only. furnish and install new hydronic trench forced convectors to the plan south exterior for the 4-10th flrs. will not modify any (e) fsd's or add new, or vav's. modify (e) ductwork to accommodate minor changes to underfloor. air and water balance. start up and test.Details
4-10th flrs: t.i mep only. furnish and install new hydronic trench forced convectors to the plan south exterior for the 4-10th flrs. will not modify any (e) fsd's or add new, or vav's. modify (e) ductwork to accommodate minor changes to underfloor. air and water balance. start up and test. | $75,000 |
| Oct 22, 2020 | Never finaled issued Nov 2020, no final | 250 Howard St | Pacific Auxiliary Fire Alarm | building permit #2019-1009-4049. fire alarm only - full floor 40 tenant improvement to existing notifier nfs2-3030. adding 1 power supplly, 36 smoke detectors, 6 relay modules, 4 monitor modules, 2 isolator modules, and 33 speaker strobes.Details
building permit #2019-1009-4049. fire alarm only - full floor 40 tenant improvement to existing notifier nfs2-3030. adding 1 power supplly, 36 smoke detectors, 6 relay modules, 4 monitor modules, 2 isolator modules, and 33 speaker strobes. | $65,000 |
| Oct 21, 2020 | Never finaled issued Nov 2020, no final | 250 Howard St | Pacific Auxiliary Fire Alarm | building permit fire alarm only - full floor 41 tenant improvement to existing notifier nfs2-3030. adding 1 power supply, 32 smoke detectors, 3 relay modules, 1 monitor module, 1 isolator module, and 30 sprinkler/strobes.Details
building permit fire alarm only - full floor 41 tenant improvement to existing notifier nfs2-3030. adding 1 power supply, 32 smoke detectors, 3 relay modules, 1 monitor module, 1 isolator module, and 30 sprinkler/strobes. | $65,000 |
| Oct 19, 2020 | Never finaled issued Nov 2020, no final | 250 Howard St | Pacific Auxiliary Fire Alarm | ref building permit 2019-1010-4180. fire alarm only. full 38 floor tenant improvement to existing notifier nfs2-3030. adding 1 power supply, 32 smoke detectors, 3 relay modules, 1 monitor module, 1 isolator module, and 30 speaker strobes.Details
ref building permit 2019-1010-4180. fire alarm only. full 38 floor tenant improvement to existing notifier nfs2-3030. adding 1 power supply, 32 smoke detectors, 3 relay modules, 1 monitor module, 1 isolator module, and 30 speaker strobes. | $65,000 |
| Oct 19, 2020 | Never finaled issued Nov 2020, no final | 250 Howard St | Pacific Auxiliary Fire Alarm | building permit 2019-1009-3974. fire alarm only. full floor 39 tenant improvement to existing notifier nfs2-3030. adding 1 power supply, 32 smoke detectors, 3 relay modules, 1 monitor module, 1 isolator module and 30 speaker strobes.Details
building permit 2019-1009-3974. fire alarm only. full floor 39 tenant improvement to existing notifier nfs2-3030. adding 1 power supply, 32 smoke detectors, 3 relay modules, 1 monitor module, 1 isolator module and 30 speaker strobes. | $65,000 |
| Sep 29, 2020 | Completed final sign-off Dec 2020 | 250 Howard St | Allied Fire Protection | level 43. fire sprinklers - 35 added ceiling pendant sprinklers, 5 added upright sprinklers, 5 relocated upright sprinklersDetails
level 43. fire sprinklers - 35 added ceiling pendant sprinklers, 5 added upright sprinklers, 5 relocated upright sprinklers | $40,000 |
| Sep 28, 2020 | Never finaled issued Oct 2020, no final | 250 Howard St | Pacific Auxiliary Fire Alarm | 42/f: full floor t.i. on (e) notifier nfs2-3030. add 1 power supply, 38 smoke detectors, 7 relay modules, 6 monitor modules, 2 isolator modules, 34 speaker/strobes, (e) smoke control panel will be replace due to divided zones. ref t.i. pa201910104179 maher n/aDetails
42/f: full floor t.i. on (e) notifier nfs2-3030. add 1 power supply, 38 smoke detectors, 7 relay modules, 6 monitor modules, 2 isolator modules, 34 speaker/strobes, (e) smoke control panel will be replace due to divided zones. ref t.i. pa201910104179 maher n/a | $65,000 |
| Sep 28, 2020 | Never finaled issued Oct 2020, no final | 250 Howard St | Pacific Auxiliary Fire Alarm | 36/f: full floor t.i. on (e) notifier nfs2-3030. add 1 power supply, 33 smoke detectors, 3 relay modules, 1 monitor modules, 1 isolator modules, 32 speaker/strobes. ref t.i. pa201910093971. maher n/aDetails
36/f: full floor t.i. on (e) notifier nfs2-3030. add 1 power supply, 33 smoke detectors, 3 relay modules, 1 monitor modules, 1 isolator modules, 32 speaker/strobes. ref t.i. pa201910093971. maher n/a | $65,000 |
| Sep 28, 2020 | Never finaled issued Oct 2020, no final | 250 Howard St | Pacific Auxiliary Fire Alarm | 43/f: full floor t.i. on (e) notifier nfs2-3030. add 1 power supply, 38 smoke detectors, 7 relay modules, 6 monitor modules, 2 isolator modules, 34 speaker/strobes, (e) smoke control panel will be replace due to divided zones. ref t.i. pa201911207788 maher n/aDetails
43/f: full floor t.i. on (e) notifier nfs2-3030. add 1 power supply, 38 smoke detectors, 7 relay modules, 6 monitor modules, 2 isolator modules, 34 speaker/strobes, (e) smoke control panel will be replace due to divided zones. ref t.i. pa201911207788 maher n/a | $65,000 |
| Sep 28, 2020 | Never finaled issued Oct 2020, no final | 250 Howard St | Pacific Auxiliary Fire Alarm | 37/f: full floor t.i. on (e) notifier nfs2-3030. add 1 power supply, 36 smoke detectors, 6 relay modules, 4 monitor modules, 2 isolator modules, 33 speaker/strobes. ref t.i. pa201910154363. maher n/aDetails
37/f: full floor t.i. on (e) notifier nfs2-3030. add 1 power supply, 36 smoke detectors, 6 relay modules, 4 monitor modules, 2 isolator modules, 33 speaker/strobes. ref t.i. pa201910154363. maher n/a | $65,000 |
| Sep 26, 2020 | Never finaled issued Oct 2020, no final | 250 Howard St | Pacific Auxiliary Fire Alarm | 33/f: fire alarm only, full floor t.i. to (e) notifier nfs2-3030. add (1) power supply, (30) smoke detectors, (3) relay modules, (1) monitor modules, (1) isolator module, (30) speaker strobes. ref bpa#201909272894Details
33/f: fire alarm only, full floor t.i. to (e) notifier nfs2-3030. add (1) power supply, (30) smoke detectors, (3) relay modules, (1) monitor modules, (1) isolator module, (30) speaker strobes. ref bpa#201909272894 | $65,000 |
| Sep 25, 2020 | Never finaled issued Feb 2021, no final | 250 Howard St | Pacific Auxiliary Fire Alarm | 1/f: fire alarm, t.i. to (e) notifier nfs2-3030. adding voluntary nonrequired work station to fire alarm system (auxiliary maintenance support ennunciator)Details
1/f: fire alarm, t.i. to (e) notifier nfs2-3030. adding voluntary nonrequired work station to fire alarm system (auxiliary maintenance support ennunciator) | $21,400 |
| Aug 22, 2020 | Never finaled issued Aug 2020, no final | 250 Howard St | Webcor Construction Lp | add 2 new fire smoke dampers and update matrix. revision to pa# 201907236697 and pa#201904299208Details
add 2 new fire smoke dampers and update matrix. revision to pa# 201907236697 and pa#201904299208 | |
| Aug 20, 2020 | Completed final sign-off Mar 2021 | 250 Howard St | Webcor Construction Lp | evacuation signs for level 29-45Details
evacuation signs for level 29-45 | $20,000 |
| Aug 13, 2020 | Completed final sign-off Feb 2021 | 250 Howard St | Pacific Auxiliary Fire Alarm | 30th fl: fire alarm only - full floor ti to existing notifier nfs2-3030. adding power supply, 30 smoke detector, 3 relay modules, 1 monitor modules, 1 isolator modules, 30 speaker strobes. ref bpa# 201909252642Details
30th fl: fire alarm only - full floor ti to existing notifier nfs2-3030. adding power supply, 30 smoke detector, 3 relay modules, 1 monitor modules, 1 isolator modules, 30 speaker strobes. ref bpa# 201909252642 | $65,000 |
| Mar 12, 2020 | Completed final sign-off May 2021 | 250 Howard St | Webcor Construction Lp | 27th fl - revision to pa 2019-0717-6121 to document catering storageDetails
27th fl - revision to pa 2019-0717-6121 to document catering storage | |
| Mar 6, 2020 | Never finaled issued Dec 2020, no final | 250 Howard St | Pacific Auxiliary Fire Alarm | level 31: bpa #2019-0926-2829. fire alarm only. full floor tenant improvment to (e) notifier nfs2-3030. adding 1 power supply, 33 smoke detectors, 6 relay modules, 4 monitor modules, 1 isolator module and 32 speaker strobes.Details
level 31: bpa #2019-0926-2829. fire alarm only. full floor tenant improvment to (e) notifier nfs2-3030. adding 1 power supply, 33 smoke detectors, 6 relay modules, 4 monitor modules, 1 isolator module and 32 speaker strobes. | $65,000 |
| Mar 6, 2020 | Never finaled issued Dec 2020, no final | 250 Howard St | Pacific Auxiliary Fire Alarm | 34th floor: bpa #2019-0927-2898. fire alarm only. full floor 34 tenant improvment to (e) notifier nfs2-3030. adding 1 power supply, 33 smoke detectors, 6 relay modules, 4 monitor modules, 1 isolator module and 32 speaker strobes.Details
34th floor: bpa #2019-0927-2898. fire alarm only. full floor 34 tenant improvment to (e) notifier nfs2-3030. adding 1 power supply, 33 smoke detectors, 6 relay modules, 4 monitor modules, 1 isolator module and 32 speaker strobes. | $65,000 |
| Mar 6, 2020 | Expired or cancelled withdrawn Dec 2020 | 250 Howard St | Pacific Auxiliary Fire Alarm | bpa #2019-0927-2894. fire alarm only. full floor tenant improvment to (e) notifier nfs2-3030. adding 1 power supply, 30 smoke detectors, 3 relay modules, 1 monitor module, 1 isolator module and 30 speaker strobes.Details
bpa #2019-0927-2894. fire alarm only. full floor tenant improvment to (e) notifier nfs2-3030. adding 1 power supply, 30 smoke detectors, 3 relay modules, 1 monitor module, 1 isolator module and 30 speaker strobes. | $65,000 |
| Mar 6, 2020 | Expired or cancelled withdrawn Dec 2020 | 250 Howard St | Pacific Auxiliary Fire Alarm | bpa #2019-0925-2642. fire alarm only- full floor tenant improvement to (e) notifier nfs2-3030. adding 1 power supply, 30 smoke detectors, 3 relay modules, 1 monitor module, 1 isolator module and 30 speaker strobes.Details
bpa #2019-0925-2642. fire alarm only- full floor tenant improvement to (e) notifier nfs2-3030. adding 1 power supply, 30 smoke detectors, 3 relay modules, 1 monitor module, 1 isolator module and 30 speaker strobes. | $65,000 |
| Feb 26, 2020 | Completed final sign-off Apr 2021 | 250 Howard St | Webcor Construction Lp | revision to 201910093971 - 36/f - add (1) fire smoke damper and revise fire smoke damper matrix.Details
revision to 201910093971 - 36/f - add (1) fire smoke damper and revise fire smoke damper matrix. | $1,000 |
| Feb 21, 2020 | Never finaled issued Feb 2020, no final | 250 Howard St | Webcor Construction Lp | evac. maps for floors 4-10 and 25-28Details
evac. maps for floors 4-10 and 25-28 | $2,000 |
| Feb 13, 2020 | Completed final sign-off Oct 2020 | 250 Howard St | Allied Fire Protection | 38th flr - fire sprinklers ti 7 added uprights, 6 relocated uprights, 18 added pendants, total 31 ref 201910104180.Details
38th flr - fire sprinklers ti 7 added uprights, 6 relocated uprights, 18 added pendants, total 31 ref 201910104180. | $16,700 |
| Jan 30, 2020 | Completed final sign-off Feb 2021 | 250 Howard St | Allied Fire Protection | 40th fl - facebook ti fire sprinklers 5 added uprights, 7 relocated uprights, 44 added pendents. total 56 sprinklers. ref pa 2019-1009-4049Details
40th fl - facebook ti fire sprinklers 5 added uprights, 7 relocated uprights, 44 added pendents. total 56 sprinklers. ref pa 2019-1009-4049 | $30,300 |
| Jan 30, 2020 | Completed final sign-off Dec 2020 | 250 Howard St | Allied Fire Protection | 42nd fl - facebook ti fire sprinklers 10 added uprights, 5 relocated uprights, 20 added pendents. total 35 sprinklers. ref pa 2019-1010-4179Details
42nd fl - facebook ti fire sprinklers 10 added uprights, 5 relocated uprights, 20 added pendents. total 35 sprinklers. ref pa 2019-1010-4179 | $18,900 |
| Jan 30, 2020 | Completed final sign-off Feb 2021 | 250 Howard St | Allied Fire Protection | 41st fl - facebook ti fire sprinklers 8 added uprights, 5 relocated uprights, 18 added pendents. total 31 sprinklers. ref pa 2019-1009-4046Details
41st fl - facebook ti fire sprinklers 8 added uprights, 5 relocated uprights, 18 added pendents. total 31 sprinklers. ref pa 2019-1009-4046 | $16,800 |
| Jan 30, 2020 | Never finaled issued Jan 2020, no final | 250 Howard St | Allied Fire Protection | 43rd fl - facebook ti fire sprinklers 6 added uprights, 2 relocated uprights, 42 added pendents. total 50 sprinklers. ref pa 2019-1120-7788Details
43rd fl - facebook ti fire sprinklers 6 added uprights, 2 relocated uprights, 42 added pendents. total 50 sprinklers. ref pa 2019-1120-7788 | $27,000 |
| Jan 22, 2020 | Never finaled issued Feb 2020, no final | 250 Howard St | Pacific Auxiliary Fire Alarm | level 35. fire alarm full floor tenant improvement to (e) notifier nfs2-3030. addiing (1) power supply, (30) smoke detectors, (3) control relay, (1) monitor module, (1) isolator module, (30) speaker strobes. pa #2019-0927-2924.Details
level 35. fire alarm full floor tenant improvement to (e) notifier nfs2-3030. addiing (1) power supply, (30) smoke detectors, (3) control relay, (1) monitor module, (1) isolator module, (30) speaker strobes. pa #2019-0927-2924. | $62,000 |
| Jan 22, 2020 | Never finaled issued Feb 2020, no final | 250 Howard St | Pacific Auxiliary Fire Alarm | level 29. fire alarm full floor tenant improvement to (e) notifier nfs2-3030. addiing (1) power supply, (36) smoke detectors, (6) relay modules, (4) monitor modules, (1) isolator module, (37) speaker strobes. pa #2019-0925-2637.Details
level 29. fire alarm full floor tenant improvement to (e) notifier nfs2-3030. addiing (1) power supply, (36) smoke detectors, (6) relay modules, (4) monitor modules, (1) isolator module, (37) speaker strobes. pa #2019-0925-2637. | $65,000 |
| Jan 22, 2020 | Never finaled issued Feb 2020, no final | 250 Howard St | Pacific Auxiliary Fire Alarm | level 32. fire alarm full floor tenant improvement to (e) notifier nfs2-3030. addiing (1) power supply, (30) smoke detectors, (3) relay modules, (1) monitor module, (1) isolator module, (30) speaker strobes. pa #2019-0926-2828.Details
level 32. fire alarm full floor tenant improvement to (e) notifier nfs2-3030. addiing (1) power supply, (30) smoke detectors, (3) relay modules, (1) monitor module, (1) isolator module, (30) speaker strobes. pa #2019-0926-2828. | $65,000 |
| Jan 21, 2020 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | revision to 201907236702 addition of fan coil unit to high rise elevator lobby on 28th flDetails
revision to 201907236702 addition of fan coil unit to high rise elevator lobby on 28th fl | $1,000 |
| Jan 16, 2020 | Completed final sign-off Oct 2020 | 250 Howard St | Allied Fire Protection | 36th fl, facebook ti - fire sprinklers 6 added uprights; 7 relocated uprights; 18 added pendents. total 31 sprinklers. ref pa 2019-1009-3971.Details
36th fl, facebook ti - fire sprinklers 6 added uprights; 7 relocated uprights; 18 added pendents. total 31 sprinklers. ref pa 2019-1009-3971. | $16,800 |
| Jan 16, 2020 | Completed final sign-off Oct 2020 | 250 Howard St | Allied Fire Protection | 39th fl, facebook ti - fire sprinklers 10 added uprights; 4 relocated uprights; 18 added pendents. total 32 sprinklers. ref pa 2019-1009-3974.Details
39th fl, facebook ti - fire sprinklers 10 added uprights; 4 relocated uprights; 18 added pendents. total 32 sprinklers. ref pa 2019-1009-3974. | $17,300 |
| Jan 16, 2020 | Completed final sign-off Feb 2021 | 250 Howard St | Allied Fire Protection | 37th fl, facebook ti - fire sprinklers 5 added uprights; 6 relocated uprights; 44 added pendents. total 55 sprinklers. ref pa 2019-1015-4363.Details
37th fl, facebook ti - fire sprinklers 5 added uprights; 6 relocated uprights; 44 added pendents. total 55 sprinklers. ref pa 2019-1015-4363. | $29,700 |
| Jan 16, 2020 | Completed final sign-off Oct 2020 | 250 Howard St | Allied Fire Protection | 34th fl, facebook ti - fire sprinklers 3 added uprights; 13 relocated uprights; 44 added pendents. total 60 sprinklers. ref pa 2019-0927-2898.Details
34th fl, facebook ti - fire sprinklers 3 added uprights; 13 relocated uprights; 44 added pendents. total 60 sprinklers. ref pa 2019-0927-2898. | $32,400 |
| Jan 16, 2020 | Completed final sign-off Oct 2020 | 250 Howard St | Allied Fire Protection | 35th fl, facebook ti - fire sprinklers 4 added uprights; 5 relocated uprights; 20 added pendents. total 29 sprinklers. ref pa 2019-0927-2924.Details
35th fl, facebook ti - fire sprinklers 4 added uprights; 5 relocated uprights; 20 added pendents. total 29 sprinklers. ref pa 2019-0927-2924. | $15,700 |
| Jan 16, 2020 | Completed final sign-off Oct 2020 | 250 Howard St | Allied Fire Protection | 33rd fl, facebook ti - 6 added uprights; 7 relocated uprights; 20 added pendents. total 33 sprinklers. ref pa 2019-0927-2894.Details
33rd fl, facebook ti - 6 added uprights; 7 relocated uprights; 20 added pendents. total 33 sprinklers. ref pa 2019-0927-2894. | $17,800 |
| Jan 14, 2020 | Never finaled issued Jan 2020, no final | 250 Howard St | Allied Fire Protection | 31st fl, facebook - fire sprinklers 7 added uprights; 9 relocated uprights; 48 added pendents. total 64 sprinklers. ref pa 2019-0926-2829Details
31st fl, facebook - fire sprinklers 7 added uprights; 9 relocated uprights; 48 added pendents. total 64 sprinklers. ref pa 2019-0926-2829 | $34,600 |
| Jan 14, 2020 | Completed final sign-off Feb 2021 | 250 Howard St | Allied Fire Protection | 29th fl - facebook. fire sprinklers (5) added uprights; 14 relocated uprights; 36 added pendents. total 55 sprinklers ref pa 2019-0925-2637Details
29th fl - facebook. fire sprinklers (5) added uprights; 14 relocated uprights; 36 added pendents. total 55 sprinklers ref pa 2019-0925-2637 | $29,700 |
| Jan 14, 2020 | Completed final sign-off Feb 2021 | 250 Howard St | Allied Fire Protection | 30th fl - facebook. fire sprinkler - 4 added uprights; 11 relocated uprgiths; 21 added pendents. total 36 sprinklers. ref pa 2019-0925-2642Details
30th fl - facebook. fire sprinkler - 4 added uprights; 11 relocated uprgiths; 21 added pendents. total 36 sprinklers. ref pa 2019-0925-2642 | $19,500 |
| Jan 14, 2020 | Completed final sign-off Aug 2020 | 250 Howard St | Allied Fire Protection | 32nd fl, facebook - fire sprinklers 7 added uprights; 8 relocated uprights; 20 added pendents. total 35 sprinklers. ref pa 2019-0926-2828Details
32nd fl, facebook - fire sprinklers 7 added uprights; 8 relocated uprights; 20 added pendents. total 35 sprinklers. ref pa 2019-0926-2828 | $18,900 |
| Dec 11, 2019 | Never finaled issued Feb 2020, no final | 250 Howard St | Webcor Construction Lp | update smoke control report. add smoke damper (fsds) to floor 4-10 per updated smoke control report maher not reqDetails
update smoke control report. add smoke damper (fsds) to floor 4-10 per updated smoke control report maher not req | $2,000 |
| Nov 20, 2019 | Completed final sign-off Nov 2021 | 250 Howard St | Webcor Construction Lp | 43/f: new non-structural partions, acoustical gride & tile and gyp board ceilings, light fixtures, millwork and finishes. no change in use, exit stairs, egress pat, elevator. maher n/a.Details
43/f: new non-structural partions, acoustical gride & tile and gyp board ceilings, light fixtures, millwork and finishes. no change in use, exit stairs, egress pat, elevator. maher n/a. | $1,500,000 |
| Nov 12, 2019 | Never finaled issued Nov 2019, no final | 250 Howard St | Webcor Construction Lp | suite 2-b:add new 200af/200as fuse on the existing retail switchboard 'rbm-1a' to feed a new pp-2b which is a 225a panelboard, 277/480v 3ph, 4w with a 200a mcb (200at/225af).Details
suite 2-b:add new 200af/200as fuse on the existing retail switchboard 'rbm-1a' to feed a new pp-2b which is a 225a panelboard, 277/480v 3ph, 4w with a 200a mcb (200at/225af). | $500 |
| Oct 24, 2019 | Never finaled issued Nov 2020, no final | 250 Howard St | Webcor Construction Lp | 28/f: rev to pa201904299214 to replace (e) landscaping with new landscaping. install new free standing trellis. maher n/a.Details
28/f: rev to pa201904299214 to replace (e) landscaping with new landscaping. install new free standing trellis. maher n/a. | $10,000 |
| Oct 22, 2019 | Completed final sign-off Nov 2021 | 250 Howard St | Webcor Construction Lp | replace (e) card readers with (n) card readers, add new card readers n/a maherDetails
replace (e) card readers with (n) card readers, add new card readers n/a maher | $5,000 |
| Oct 22, 2019 | Completed final sign-off Nov 2021 | 250 Howard St | Webcor Construction Lp | replace (e) card readers with (n) card readers, add new card readers n/a maherDetails
replace (e) card readers with (n) card readers, add new card readers n/a maher | $5,000 |
| Oct 15, 2019 | Completed final sign-off Aug 2020 | 250 Howard St | Pacific Auxiliary Fire Alarm | level 26. fire alarm full flr ti on(e)nsf2-3030. adding 1 power supply,22 smoke detectors,5 heat detectors,3 relay modules,5 monitor modules,6 relay/monitor modules,1 isolato&34 speaker strobes.this level is part of a 4 lvl interior connecting stairwell.ref pa #2019-0429-9211&2019-0723-6703.Details
level 26. fire alarm full flr ti on(e)nsf2-3030. adding 1 power supply,22 smoke detectors,5 heat detectors,3 relay modules,5 monitor modules,6 relay/monitor modules,1 isolato&34 speaker strobes.this level is part of a 4 lvl interior connecting stairwell.ref pa #2019-0429-9211&2019-0723-6703. | $65,000 |
| Oct 15, 2019 | Completed final sign-off Sep 2020 | 250 Howard St | Pacific Auxiliary Fire Alarm | fire alarm full flr ti to (e) nfs2-3300. adding 1 power supply, 46 smoke detectors, 6 relay module, 11 monitor module, 2 relay/monitor modules, isoloator module, 41 speaker strobes. this lvl is part of a 4 lvl interior connecting stairwell. ref pa #2019-0717-6121.Details
fire alarm full flr ti to (e) nfs2-3300. adding 1 power supply, 46 smoke detectors, 6 relay module, 11 monitor module, 2 relay/monitor modules, isoloator module, 41 speaker strobes. this lvl is part of a 4 lvl interior connecting stairwell. ref pa #2019-0717-6121. | $65,000 |
| Oct 15, 2019 | Completed final sign-off Sep 2020 | 250 Howard St | Pacific Auxiliary Fire Alarm | 28/fl. fire alarm full flr ti on (e) nsf2-3030. adding 1 power supply, 15 smoke detectors, 6 heat detectors, 3 relay modules, 2 monitor modules, 2 relay/monitor modules & 24 speaker strobes. this level is part of a 4 lvl interior connecting stairwell. ref pa #2019-0429-9214 & 2019-0723-6202.Details
28/fl. fire alarm full flr ti on (e) nsf2-3030. adding 1 power supply, 15 smoke detectors, 6 heat detectors, 3 relay modules, 2 monitor modules, 2 relay/monitor modules & 24 speaker strobes. this level is part of a 4 lvl interior connecting stairwell. ref pa #2019-0429-9214 & 2019-0723-6202. | $65,000 |
| Oct 15, 2019 | Completed final sign-off Aug 2020 | 250 Howard St | Pacific Auxiliary Fire Alarm | 25/fl. fire alarm full flr ti on(e) nsf2-3030. adding 1 power supply, 15 smoke detectors, 12 heat detectors,3 relay modules, 7 monitor modules,10 relay/monitor/isolator modules & 29 speaker strobes. this level is part of a 4 lvl interior connecting stairwell. ref pa #2019-0429-9208 & 2019-0723-6697.Details
25/fl. fire alarm full flr ti on(e) nsf2-3030. adding 1 power supply, 15 smoke detectors, 12 heat detectors,3 relay modules, 7 monitor modules,10 relay/monitor/isolator modules & 29 speaker strobes. this level is part of a 4 lvl interior connecting stairwell. ref pa #2019-0429-9208 & 2019-0723-6697. | $65,000 |
| Oct 15, 2019 | Never finaled issued Dec 2019, no final | 250 Howard St | Webcor Construction Lp | 37/f: construction new non structural partitions, acoustical grid tile and gyp bd ceilings, light fixtures, millwork, finishesDetails
37/f: construction new non structural partitions, acoustical grid tile and gyp bd ceilings, light fixtures, millwork, finishes | $1,500,000 |
| Oct 10, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | 38th flr - construction of new non structural partitions, acoustical grid and tile gyp board ceiling, lighting, fixtures, millwork and finishes. maher not req.Details
38th flr - construction of new non structural partitions, acoustical grid and tile gyp board ceiling, lighting, fixtures, millwork and finishes. maher not req. | $1,500,000 |
| Oct 10, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | 42nd flr - construction of new non structural partitions, acoutstical grid and tile and gyp board ceilings, lighting fixtures, millwork and finishes.Details
42nd flr - construction of new non structural partitions, acoutstical grid and tile and gyp board ceilings, lighting fixtures, millwork and finishes. | $1,500,000 |
| Oct 9, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | 36th fl - construction of new non structural partitions, acoustical grid & tile and gyp board ceilings, light fixtures, millwork and finishesDetails
36th fl - construction of new non structural partitions, acoustical grid & tile and gyp board ceilings, light fixtures, millwork and finishes | $1,500,000 |
| Oct 9, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | 39th fl - construction of new non structural partitions, acoustical grid & tile and gyp board ceilings, light fixtures, millwork and finishesDetails
39th fl - construction of new non structural partitions, acoustical grid & tile and gyp board ceilings, light fixtures, millwork and finishes | $1,500,000 |
| Oct 9, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | 41st floor: construction of new non structural partitions, acoustical grid tile and gyp board ceilings, light fixtures, millwork, and finishes. n/a for maherDetails
41st floor: construction of new non structural partitions, acoustical grid tile and gyp board ceilings, light fixtures, millwork, and finishes. n/a for maher | $1,500,000 |
| Oct 9, 2019 | Completed final sign-off Dec 2021 | 250 Howard St | Webcor Construction Lp | 40th floor: construction of new non structural partitions, acoustical grid tile and gyp board ceilings, light fixtures, millwork, and finishes. n/a for maherDetails
40th floor: construction of new non structural partitions, acoustical grid tile and gyp board ceilings, light fixtures, millwork, and finishes. n/a for maher | $1,500,000 |
| Oct 3, 2019 | Completed final sign-off May 2021 | 250 Howard St | Webcor Construction Lp | revision to pa #201904299211 & 201907236703 for 2-hr fire rated grease duct weap in lieu of 2-hr gyp rated enclosure. 26th fl.Details
revision to pa #201904299211 & 201907236703 for 2-hr fire rated grease duct weap in lieu of 2-hr gyp rated enclosure. 26th fl. | |
| Oct 3, 2019 | Completed final sign-off May 2021 | 250 Howard St | Webcor Construction Lp | revision to pa #201904299208 & 201907236697 for 2-hr fire rated grease duct weap in lieu of 2-hr gyp rated enclosure. 25th fl.Details
revision to pa #201904299208 & 201907236697 for 2-hr fire rated grease duct weap in lieu of 2-hr gyp rated enclosure. 25th fl. | |
| Sep 27, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | 34th fl - construction of new non structural partitions, acoustical grid and tile & gyp board ceilings, light fixture, millwork and finishesDetails
34th fl - construction of new non structural partitions, acoustical grid and tile & gyp board ceilings, light fixture, millwork and finishes | $1,500,000 |
| Sep 27, 2019 | Completed final sign-off Nov 2021 | 250 Howard St | Webcor Construction Lp | 33rd fl - construction of new non structural partitions, acoustical grid and tile & gyp board ceilings, light fixture, millwork and finishesDetails
33rd fl - construction of new non structural partitions, acoustical grid and tile & gyp board ceilings, light fixture, millwork and finishes | $1,500,000 |
| Sep 27, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | 35th fl: consturction of new non-structural partitions, acoustical grid & tile and gyp. board ceilings, light fixtures, millwork & finishes. maher naDetails
35th fl: consturction of new non-structural partitions, acoustical grid & tile and gyp. board ceilings, light fixtures, millwork & finishes. maher na | $1,500,000 |
| Sep 26, 2019 | Never finaled issued Sep 2019, no final | 250 Howard St | Allied Fire Protection | fire sprinklers: (9) added exp pendents; (22) relocated exp. pendent (42) added ceilng pendents totals (73) sprinklers ref pa# 201906173643Details
fire sprinklers: (9) added exp pendents; (22) relocated exp. pendent (42) added ceilng pendents totals (73) sprinklers ref pa# 201906173643 | $39,500 |
| Sep 26, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | construction of new non structural partitions, accoustical grid & tile and gyp board ceiling, light fixtures, millwork and finishesDetails
construction of new non structural partitions, accoustical grid & tile and gyp board ceiling, light fixtures, millwork and finishes | $1,500,000 |
| Sep 26, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | 31st fl - construction of new non structural partitions, accoustical grid & tile and gyp board ceiling, light fixtures, millwork and finishesDetails
31st fl - construction of new non structural partitions, accoustical grid & tile and gyp board ceiling, light fixtures, millwork and finishes | $1,500,000 |
| Sep 26, 2019 | Completed final sign-off Sep 2020 | 250 Howard St | Allied Fire Protection | fire sprinklers: (4) added uprights; (12) relocated uprightst (31) added pendents totals: (47) sprinklers ref pa# 201904299214Details
fire sprinklers: (4) added uprights; (12) relocated uprightst (31) added pendents totals: (47) sprinklers ref pa# 201904299214 | $25,400 |
| Sep 26, 2019 | Completed final sign-off Aug 2020 | 250 Howard St | Allied Fire Protection | fire sprinklers: (11) added exp pendents; (26) relocated exp. pendent (42) added ceilng pendents totals (79) sprinklers ref pa# 201906173633Details
fire sprinklers: (11) added exp pendents; (26) relocated exp. pendent (42) added ceilng pendents totals (79) sprinklers ref pa# 201906173633 | $42,700 |
| Sep 25, 2019 | Never finaled issued Oct 2019, no final | 250 Howard St | Pacific Auxiliary Fire Alarm | fire alarm on 7th fl - full floor ti to existing nfs2-3030. adding 1 power supply, 73 smoke detectors, 19 relay modules, 1 isolator module, & 71 speaker strobes. 4 existing speaker strobes are being removed. ref bpa #201906173636. maher naDetails
fire alarm on 7th fl - full floor ti to existing nfs2-3030. adding 1 power supply, 73 smoke detectors, 19 relay modules, 1 isolator module, & 71 speaker strobes. 4 existing speaker strobes are being removed. ref bpa #201906173636. maher na | $65,000 |
| Sep 25, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | 29th floor: construction of new non-structural partitions, acoustical grid and tile and gyp board ceiling, light fixtures, mill work.Details
29th floor: construction of new non-structural partitions, acoustical grid and tile and gyp board ceiling, light fixtures, mill work. | $1,500,000 |
| Sep 25, 2019 | Completed final sign-off Sep 2020 | 250 Howard St | Pacific Auxiliary Fire Alarm | fire alarm on 5th fl - full floor ti to existing nfs2-3030. adding 1 power supply, 73 smoke detectors, 19 relay modules, 1 isolator module, & 71 speaker strobes. 4 existing speaker strobes are being removed. ref bpa #201906052599. maher naDetails
fire alarm on 5th fl - full floor ti to existing nfs2-3030. adding 1 power supply, 73 smoke detectors, 19 relay modules, 1 isolator module, & 71 speaker strobes. 4 existing speaker strobes are being removed. ref bpa #201906052599. maher na | $65,000 |
| Sep 25, 2019 | Never finaled issued Oct 2019, no final | 250 Howard St | Pacific Auxiliary Fire Alarm | fire alarm on 8th fl - full floor ti to existing nfs2-3030. adding 1 power supply, 75 smoke detectors, 20 relay modules, 1 isolator module, & 73 speaker strobes. 4 existing speaker strobes are being removed. ref bpa #201906173639. maher naDetails
fire alarm on 8th fl - full floor ti to existing nfs2-3030. adding 1 power supply, 75 smoke detectors, 20 relay modules, 1 isolator module, & 73 speaker strobes. 4 existing speaker strobes are being removed. ref bpa #201906173639. maher na | $65,000 |
| Sep 25, 2019 | Never finaled issued Oct 2019, no final | 250 Howard St | Pacific Auxiliary Fire Alarm | fire alarm on 9th fl - full floor t.i .to existing nfs2-3030. adding 1 power supply, 73 smoke detectors, 19 relay modules, 1 isolator module, & 71 speaker strobes. 4 existing speaker strobes are being removed. ref bpa #201906173643. **maher n/a**Details
fire alarm on 9th fl - full floor t.i .to existing nfs2-3030. adding 1 power supply, 73 smoke detectors, 19 relay modules, 1 isolator module, & 71 speaker strobes. 4 existing speaker strobes are being removed. ref bpa #201906173643. **maher n/a** | $65,000 |
| Sep 25, 2019 | Never finaled issued Sep 2019, no final | 250 Howard St | Pacific Auxiliary Fire Alarm | fire alarm on 10th fl - full floor ti to existing nfs2-3030. adding 1 power supply, 75 smoke detectors, 20 relay modules, 1 isolator module, & 73 speaker strobes. 4 existing speaker strobes are being removed. ref bpa #201906173633. maher naDetails
fire alarm on 10th fl - full floor ti to existing nfs2-3030. adding 1 power supply, 75 smoke detectors, 20 relay modules, 1 isolator module, & 73 speaker strobes. 4 existing speaker strobes are being removed. ref bpa #201906173633. maher na | $65,000 |
| Sep 25, 2019 | Completed final sign-off Sep 2020 | 250 Howard St | Pacific Auxiliary Fire Alarm | fire alarm on 4th fl - full floor ti to existing nfs2-3030. adding 1 power supply, 74 smoke detectors, 20 relay modules, 1 isolator module, & 72 speaker strobes. 4 existing speaker strobes are being removed. ref bpa #201906052612. maher naDetails
fire alarm on 4th fl - full floor ti to existing nfs2-3030. adding 1 power supply, 74 smoke detectors, 20 relay modules, 1 isolator module, & 72 speaker strobes. 4 existing speaker strobes are being removed. ref bpa #201906052612. maher na | $65,000 |
| Sep 25, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | 30th floor: construction of new non-structural partitions, acoustical grid and tile + gyp board ceiling, light fixtures, mill work and finishes. n/a for maherDetails
30th floor: construction of new non-structural partitions, acoustical grid and tile + gyp board ceiling, light fixtures, mill work and finishes. n/a for maher | $1,500,000 |
| Sep 25, 2019 | Completed final sign-off Sep 2020 | 250 Howard St | Pacific Auxiliary Fire Alarm | fire alarm on 6th fl - full floor ti to existing nfs2-3030. adding 1 power supply, 75 smoke detectors, 20 relay modules, 1 isolator module, & 73 speaker strobes. 4 existing speaker strobes are being removed. ref bpa #201906052613. maher naDetails
fire alarm on 6th fl - full floor ti to existing nfs2-3030. adding 1 power supply, 75 smoke detectors, 20 relay modules, 1 isolator module, & 73 speaker strobes. 4 existing speaker strobes are being removed. ref bpa #201906052613. maher na | $65,000 |
| Sep 24, 2019 | Completed final sign-off Jul 2020 | 250 Howard St | Allied Fire Protection | 27th fl facebook ti - 25 added uprights; 14 relocated uprights; 59 added pendents. total 98 sprinklers. ref pa 2019-0717-6121Details
27th fl facebook ti - 25 added uprights; 14 relocated uprights; 59 added pendents. total 98 sprinklers. ref pa 2019-0717-6121 | $52,900 |
| Sep 23, 2019 | Completed final sign-off Mar 2021 | 250 Howard St | Webcor Construction Lp | replacement evac signs for t.i. buildout. n/a for maherDetails
replacement evac signs for t.i. buildout. n/a for maher | $5,000 |
| Sep 19, 2019 | Completed final sign-off Feb 2021 | 250 Howard St | Allied Fire Protection | ref pa 201906173636; fire sprinklers (9) added exp. pendents, (18) relocated exp. pendents; (45) added cleiling pendents totals (72) sprnklers n/a maherDetails
ref pa 201906173636; fire sprinklers (9) added exp. pendents, (18) relocated exp. pendents; (45) added cleiling pendents totals (72) sprnklers n/a maher | $38,900 |
| Sep 19, 2019 | Completed final sign-off Feb 2021 | 250 Howard St | Allied Fire Protection | ref pa 201906173639: fire sprinklers (9) added exp. pendents, (24) relocated exp. pendents; 42 added cleiling pendents totals 75 sprnklers n/a maherDetails
ref pa 201906173639: fire sprinklers (9) added exp. pendents, (24) relocated exp. pendents; 42 added cleiling pendents totals 75 sprnklers n/a maher | $40,500 |
| Sep 18, 2019 | Completed final sign-off Apr 2021 | 250 Howard St | Webcor Construction Lp | revision to 201903226063 current stamped approved smoke control report and revision to stair detailDetails
revision to 201903226063 current stamped approved smoke control report and revision to stair detail | |
| Sep 18, 2019 | Completed final sign-off Jun 2021 | 250 Howard St | Webcor Construction Lp | revision to 201903226019 update layout and graphically visibility of furniture layout on occupancy and egress planDetails
revision to 201903226019 update layout and graphically visibility of furniture layout on occupancy and egress plan | |
| Sep 11, 2019 | Never finaled issued Sep 2019, no final | 250 Howard St | Allied Fire Protection | 5th fl - facebook ti fire sprinklers - 9 added uprights, 18 relocated uprights, 41 added pendents. 68 total sprinklers. ref pa 2019-0605-2599Details
5th fl - facebook ti fire sprinklers - 9 added uprights, 18 relocated uprights, 41 added pendents. 68 total sprinklers. ref pa 2019-0605-2599 | $36,800 |
| Sep 11, 2019 | Never finaled issued Sep 2019, no final | 250 Howard St | Allied Fire Protection | 6th fl - facebook ti fire sprinklers - 9 added uprights, 20 relocated uprights, 45 added pendents. 74 total sprinklers. ref pa 2019-0605-2613Details
6th fl - facebook ti fire sprinklers - 9 added uprights, 20 relocated uprights, 45 added pendents. 74 total sprinklers. ref pa 2019-0605-2613 | $40,000 |
| Sep 11, 2019 | Completed final sign-off Sep 2020 | 250 Howard St | Allied Fire Protection | 4th fl - facebook ti fire sprinklers - 10 added uprights, 26 relocated uprights, 42 added pendents. 78 total sprinklers. ref pa 2019-0605-2612Details
4th fl - facebook ti fire sprinklers - 10 added uprights, 26 relocated uprights, 42 added pendents. 78 total sprinklers. ref pa 2019-0605-2612 | $42,200 |
| Aug 29, 2019 | Completed final sign-off Feb 2021 | 250 Howard St | Allied Fire Protection | fire sprinklers for facebook ti level 26: 3 added uprights, 11 relocated uprights, 67 added pendents. total 81 sprinklers. ref pa #201904299211.Details
fire sprinklers for facebook ti level 26: 3 added uprights, 11 relocated uprights, 67 added pendents. total 81 sprinklers. ref pa #201904299211. | $43,800 |
| Aug 29, 2019 | Never finaled issued Aug 2019, no final | 250 Howard St | Allied Fire Protection | fire sprinklers for facebook ti level 25: 7 added uprights, 14 rleocated uprights, 71 added pendents. total 92 sprinklers. ref pa #201904299208.Details
fire sprinklers for facebook ti level 25: 7 added uprights, 14 rleocated uprights, 71 added pendents. total 92 sprinklers. ref pa #201904299208. | $49,700 |
| Aug 19, 2019 | Completed final sign-off Jun 2021 | 250 Howard St | Webcor Construction Lp | 11th floor defered structural . reference app#201903226017. n/a for maherDetails
11th floor defered structural . reference app#201903226017. n/a for maher | |
| Aug 19, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | 12th floor defered structural . reference app#201903226019. n/a for maherDetails
12th floor defered structural . reference app#201903226019. n/a for maher | |
| Aug 16, 2019 | Never finaled issued Aug 2019, no final | 250 Howard St | Pacific Auxiliary Fire Alarm | 2nd floor: pa# 2019-0327-6422; fire alarm- full flor tenant improvemnent to existing notifier nfs2-3030. adding 1 power supply, 29 smoke detector. 4 relay modules,3 monition module, 1 relay, 1 monitor module, 1 isolation module 28 spealker strobes.Details
2nd floor: pa# 2019-0327-6422; fire alarm- full flor tenant improvemnent to existing notifier nfs2-3030. adding 1 power supply, 29 smoke detector. 4 relay modules,3 monition module, 1 relay, 1 monitor module, 1 isolation module 28 spealker strobes. | $35,000 |
| Aug 16, 2019 | Never finaled issued Aug 2019, no final | 250 Howard St | Pacific Auxiliary Fire Alarm | 44th fl: pa# 201905039667; fire alarm - full flor tenant improvemnent to existing notifier nfs2-3030. adding 3 dual monitor modules and 1 led annunicator module. maher n/a.Details
44th fl: pa# 201905039667; fire alarm - full flor tenant improvemnent to existing notifier nfs2-3030. adding 3 dual monitor modules and 1 led annunicator module. maher n/a. | $10,000 |
| Aug 16, 2019 | Never finaled issued Aug 2019, no final | 250 Howard St | Pacific Auxiliary Fire Alarm | 3rd floor: pa# 2019-0327-6424; fire alarm- full flor tenant improvemnent to existing notifier nfs2-3030. adding 1 power supply, 44 smoke detector. 11 relay modules,4 monition module, 1 isolation module 45 spealker strobes. 1 speaker strob being relocated.Details
3rd floor: pa# 2019-0327-6424; fire alarm- full flor tenant improvemnent to existing notifier nfs2-3030. adding 1 power supply, 44 smoke detector. 11 relay modules,4 monition module, 1 isolation module 45 spealker strobes. 1 speaker strob being relocated. | $35,000 |
| Aug 15, 2019 | Completed final sign-off Aug 2019 | 250 Howard St | Allied Fire Protection | facebook ti level 2 fire sprinklers 10 added uprights, 27 relocated uprights. 9 added pendents 46 total ref 201903276422Details
facebook ti level 2 fire sprinklers 10 added uprights, 27 relocated uprights. 9 added pendents 46 total ref 201903276422 | $25,100 |
| Aug 9, 2019 | Completed final sign-off Sep 2019 | 250 Howard St | fire alarm full fl tenant improv to (e) notifier nfs23030. adding 1 power supply, 15 smoke detectors, 9 heat detectors, 3 relay modules, 7 monitor modules, 3 relay/monitor modules, 1 isolator module, 24 speaker strobe, 1 (e) speaker strobe being relocated level 11/12 interconnecting stairsDetails
fire alarm full fl tenant improv to (e) notifier nfs23030. adding 1 power supply, 15 smoke detectors, 9 heat detectors, 3 relay modules, 7 monitor modules, 3 relay/monitor modules, 1 isolator module, 24 speaker strobe, 1 (e) speaker strobe being relocated level 11/12 interconnecting stairs | $45,751 | |
| Aug 9, 2019 | Completed final sign-off Sep 2019 | 250 Howard St | fire alarm full fl tenant improv to notifier nfs23030. adding power supply, 16 smoke & 18 heat detectors, 2 relay modules, 8 monitor modules, 7 relay/monitor modules, 1 isolation modules, 3 duct detector & 43 speaker strobes, 5 (e) speaker strobes being relocated. level 11/12 interconnecting stairs.Details
fire alarm full fl tenant improv to notifier nfs23030. adding power supply, 16 smoke & 18 heat detectors, 2 relay modules, 8 monitor modules, 7 relay/monitor modules, 1 isolation modules, 3 duct detector & 43 speaker strobes, 5 (e) speaker strobes being relocated. level 11/12 interconnecting stairs. | $42,139 | |
| Aug 9, 2019 | Completed final sign-off Sep 2019 | 250 Howard St | Pacific Auxiliary Fire Alarm | level 1 : fire alarm partial t.i. to extg notifier nfs2-3030. adding 6 relay modules. bldg ref app#201903276414. n/a for maherDetails
level 1 : fire alarm partial t.i. to extg notifier nfs2-3030. adding 6 relay modules. bldg ref app#201903276414. n/a for maher | $9,850 |
| Aug 9, 2019 | Never finaled issued Aug 2019, no final | 250 Howard St | Pacific Auxiliary Fire Alarm | level -1 (b1): fire alarm partial t.i. to extg notifier nfs2-3030. adding 3 smoke detectors, 3 relay modules and one speaker strobe. 1 speaker strobe and 1 smoke detector is being relocated. bldg ref app#201903276418. n/a for maherDetails
level -1 (b1): fire alarm partial t.i. to extg notifier nfs2-3030. adding 3 smoke detectors, 3 relay modules and one speaker strobe. 1 speaker strobe and 1 smoke detector is being relocated. bldg ref app#201903276418. n/a for maher | $10,522 |
| Aug 9, 2019 | Completed final sign-off Oct 2019 | 250 Howard St | Pacific Auxiliary Fire Alarm | level -2 (b2) : fire alarm partial t.i. to extg notifier nfs2-3030. adding 1 smoke detector, 1 speaker strobe. 2 extg speader strobe are being relocated. ref app#201903276415. n/a for maherDetails
level -2 (b2) : fire alarm partial t.i. to extg notifier nfs2-3030. adding 1 smoke detector, 1 speaker strobe. 2 extg speader strobe are being relocated. ref app#201903276415. n/a for maher | $10,475 |
| Aug 6, 2019 | Completed final sign-off Aug 2019 | 250 Howard St | Allied Fire Protection | facebook ti level 24 fire sprinklers 6 added, 21 relocated uprights, 41 added pendents. tpotal 68 ref 201904248820Details
facebook ti level 24 fire sprinklers 6 added, 21 relocated uprights, 41 added pendents. tpotal 68 ref 201904248820 | $36,700 |
| Aug 2, 2019 | Completed final sign-off May 2021 | 250 Howard St | Webcor Construction Lp | administrative permit to correct scope of work to include "generator & fuel oil" reference pa 201905039667Details
administrative permit to correct scope of work to include "generator & fuel oil" reference pa 201905039667 | |
| Aug 1, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | health review only previously approve ti ref 201903276415Details
health review only previously approve ti ref 201903276415 | |
| Aug 1, 2019 | Completed final sign-off Aug 2019 | 250 Howard St | Allied Fire Protection | 23rd fl, facebook ti - 7 added uprights, 16 relocated uprights, 41 added pendents. total 64 sprinklers. ref pa 2019-0424-8818Details
23rd fl, facebook ti - 7 added uprights, 16 relocated uprights, 41 added pendents. total 64 sprinklers. ref pa 2019-0424-8818 | $34,600 |
| Aug 1, 2019 | Completed final sign-off Aug 2019 | 250 Howard St | Allied Fire Protection | 11th fl - facebook ti - 11 relocated pendent, 104 added pendents. total 115 sprinklers. ref pa 2019-0322-6017 and 2019-0322-6063Details
11th fl - facebook ti - 11 relocated pendent, 104 added pendents. total 115 sprinklers. ref pa 2019-0322-6017 and 2019-0322-6063 | $62,100 |
| Aug 1, 2019 | Completed final sign-off Aug 2019 | 250 Howard St | Allied Fire Protection | 12th fl - facebook ti - 11 added uprights, 5 relocated uprights, 26 added pendents. total 42 sprinklers. ref pa 2019-0322-6019Details
12th fl - facebook ti - 11 added uprights, 5 relocated uprights, 26 added pendents. total 42 sprinklers. ref pa 2019-0322-6019 | $22,700 |
| Aug 1, 2019 | Completed final sign-off Sep 2019 | 250 Howard St | Pacific Auxiliary Fire Alarm | level 21 - fire alarm, ti to (e) nfs2-3030 adding 1 power supply, 49 smk det, 1 relay module. 2 monitor modules, 1" isolator module, 48 speaker/strobes 4 (e) speaker/strobes removed ref 201904248786Details
level 21 - fire alarm, ti to (e) nfs2-3030 adding 1 power supply, 49 smk det, 1 relay module. 2 monitor modules, 1" isolator module, 48 speaker/strobes 4 (e) speaker/strobes removed ref 201904248786 | $62,000 |
| Aug 1, 2019 | Completed final sign-off Sep 2019 | 250 Howard St | Pacific Auxiliary Fire Alarm | level 23 - fire alarm, ti to (e) nfs2-3030 adding 1 power supply, 49 smk det, 1 relay module. 2 monitor modules, 1 isolator module, 48 speaker/strobes 4 (e) speaker/strobes removed ref 201904248818Details
level 23 - fire alarm, ti to (e) nfs2-3030 adding 1 power supply, 49 smk det, 1 relay module. 2 monitor modules, 1 isolator module, 48 speaker/strobes 4 (e) speaker/strobes removed ref 201904248818 | $62,000 |
| Aug 1, 2019 | Completed final sign-off Sep 2019 | 250 Howard St | Pacific Auxiliary Fire Alarm | level 24 - fire alarm, ti to (e) nfs2-3030 adding 1 power supply, 49 smk det, 2 relay module. 2 monitor modules, 1" isolator module, 48 speaker/strobes 4 (e) speaker/strobes removed ref 201904248820Details
level 24 - fire alarm, ti to (e) nfs2-3030 adding 1 power supply, 49 smk det, 2 relay module. 2 monitor modules, 1" isolator module, 48 speaker/strobes 4 (e) speaker/strobes removed ref 201904248820 | $62,000 |
| Aug 1, 2019 | Completed final sign-off Sep 2019 | 250 Howard St | Pacific Auxiliary Fire Alarm | level 22 - fire alarm, ti to (e) nfs2-3030 adding 1 power supply, 49 smk det, 2 relay module. 2 monitor modules, 1 isolator module, 48 speaker/strobes 4 (e) speaker/strobes removed ref 201904248788Details
level 22 - fire alarm, ti to (e) nfs2-3030 adding 1 power supply, 49 smk det, 2 relay module. 2 monitor modules, 1 isolator module, 48 speaker/strobes 4 (e) speaker/strobes removed ref 201904248788 | $62,000 |
| Aug 1, 2019 | Completed final sign-off Aug 2019 | 250 Howard St | Allied Fire Protection | 22nd fl, facebook ti - 6 added uprights, 24 relocated uprights, 44 added pendents. total 74 sprinklers. ref pa 2019-0424-8788Details
22nd fl, facebook ti - 6 added uprights, 24 relocated uprights, 44 added pendents. total 74 sprinklers. ref pa 2019-0424-8788 | $40,000 |
| Jul 31, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | permit only for health dept review for 2nd flr. 2nd flr tu ref pa 201903276422 was previously approved but health was not in the routingDetails
permit only for health dept review for 2nd flr. 2nd flr tu ref pa 201903276422 was previously approved but health was not in the routing | |
| Jul 30, 2019 | Completed final sign-off Sep 2019 | 250 Howard St | Pacific Auxiliary Fire Alarm | 18th fl - ref pa 2019-0410-7649, fire alarm floor ti to existing notifier nfs2-3030. adding 1 power supply, 49 smoke detcotr, 1 relay module, 2 monitor module, 1 isolator module, 48 speaker strobe, 4 existing speaker strobe are being removedDetails
18th fl - ref pa 2019-0410-7649, fire alarm floor ti to existing notifier nfs2-3030. adding 1 power supply, 49 smoke detcotr, 1 relay module, 2 monitor module, 1 isolator module, 48 speaker strobe, 4 existing speaker strobe are being removed | $62,000 |
| Jul 30, 2019 | Completed final sign-off Sep 2019 | 250 Howard St | Pacific Auxiliary Fire Alarm | 19th fl - ref pa 2019-0410-7659, fire alarm floor ti to existing notifier nfs2-3030. adding 1 power supply, 49 smoke detector, 2 relay module, 2 monitor module, 1 isolator module, 48 speaker strobe, 4 existing speaker strobe are being removedDetails
19th fl - ref pa 2019-0410-7659, fire alarm floor ti to existing notifier nfs2-3030. adding 1 power supply, 49 smoke detector, 2 relay module, 2 monitor module, 1 isolator module, 48 speaker strobe, 4 existing speaker strobe are being removed | $62,000 |
| Jul 30, 2019 | Completed final sign-off Sep 2019 | 250 Howard St | Pacific Auxiliary Fire Alarm | 17th fl - ref pa 2019-0410-7648, fire alarm floor ti to existing notifier nfs2-3030. adding 1 power supply, 49 smoke detcotr, 1 relay module, 2 monitor module, 1 isolator module, 48 speaker strobe, 4 existing speaker strobe are being removedDetails
17th fl - ref pa 2019-0410-7648, fire alarm floor ti to existing notifier nfs2-3030. adding 1 power supply, 49 smoke detcotr, 1 relay module, 2 monitor module, 1 isolator module, 48 speaker strobe, 4 existing speaker strobe are being removed | $62,000 |
| Jul 30, 2019 | Completed final sign-off Sep 2019 | 250 Howard St | Pacific Auxiliary Fire Alarm | 20th fl - ref pa 2019-0410-7660, fire alarm floor ti to existing notifier nfs2-3030. adding 1 power supply, 49 smoke detcotr, 1 relay module, 2 monitor module, 1 isolator module, 48 speaker strobe, 4 existing speaker strobe are being removedDetails
20th fl - ref pa 2019-0410-7660, fire alarm floor ti to existing notifier nfs2-3030. adding 1 power supply, 49 smoke detcotr, 1 relay module, 2 monitor module, 1 isolator module, 48 speaker strobe, 4 existing speaker strobe are being removed | $62,000 |
| Jul 29, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | permit for health dept review for 3rd flr. t.i ref t.i pa 201903276424Details
permit for health dept review for 3rd flr. t.i ref t.i pa 201903276424 | |
| Jul 29, 2019 | Completed final sign-off Sep 2019 | 250 Howard St | Pacific Auxiliary Fire Alarm | ref pa# 201903064517: fire alarm full fl. t.i. to (e) nfs2-3030 adding 1 power supply, 49 smoke detectors, 2 relay module,2 mointor modules. 1 isolator module, 48 speaker strobes, 4 (e) speaker/strobes are being removedDetails
ref pa# 201903064517: fire alarm full fl. t.i. to (e) nfs2-3030 adding 1 power supply, 49 smoke detectors, 2 relay module,2 mointor modules. 1 isolator module, 48 speaker strobes, 4 (e) speaker/strobes are being removed | $49,000 |
| Jul 29, 2019 | Completed final sign-off May 2021 | 250 Howard St | Webcor Construction Lp | new kitchn exhaust and intake louvers on north, south & west fracade at levels 11,12,25 & 26. facade shop drawing deferred arch tenant fit-outs & mech under sep permitDetails
new kitchn exhaust and intake louvers on north, south & west fracade at levels 11,12,25 & 26. facade shop drawing deferred arch tenant fit-outs & mech under sep permit | $20,000 |
| Jul 29, 2019 | Completed final sign-off Sep 2019 | 250 Howard St | Pacific Auxiliary Fire Alarm | ref pa# 201903064508: fire alarm full fl. t.i. to (e) nfs2-3030 adding 1 power supply, 48 smoke detectors, 1 relay module,2 mointor modules. 1 isolator module, 47 speaker strobes, 4 (e) speaker/strobes are being removedDetails
ref pa# 201903064508: fire alarm full fl. t.i. to (e) nfs2-3030 adding 1 power supply, 48 smoke detectors, 1 relay module,2 mointor modules. 1 isolator module, 47 speaker strobes, 4 (e) speaker/strobes are being removed | $49,000 |
| Jul 29, 2019 | Completed final sign-off Sep 2019 | 250 Howard St | Pacific Auxiliary Fire Alarm | ref pa# 201903064517: fire alarm full fl. t.i. to (e) nfs2-3030 adding 1 power supply, 49 smoke detectors, 1 relay module,2 mointor modules. 1 isolator module, 48 speaker strobes, 4 (e) speaker/strobes are being removedDetails
ref pa# 201903064517: fire alarm full fl. t.i. to (e) nfs2-3030 adding 1 power supply, 49 smoke detectors, 1 relay module,2 mointor modules. 1 isolator module, 48 speaker strobes, 4 (e) speaker/strobes are being removed | $49,000 |
| Jul 25, 2019 | Completed final sign-off Jul 2019 | 250 Howard St | Allied Fire Protection | fire sprinklers 6 added uprightd, 16 relocated uprights. 41 added pendents total 64 ref 201904107660Details
fire sprinklers 6 added uprightd, 16 relocated uprights. 41 added pendents total 64 ref 201904107660 | $34,000 |
| Jul 25, 2019 | Completed final sign-off Aug 2019 | 250 Howard St | Allied Fire Protection | fire sprinklers 7 added uprightd, 15 relocated uprights. 43 added pendents total 65 ref 201904248786Details
fire sprinklers 7 added uprightd, 15 relocated uprights. 43 added pendents total 65 ref 201904248786 | $35,100 |
| Jul 23, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | mep for new pantry dining area on 28th floor. arch app#201904269214. n/a for maherDetails
mep for new pantry dining area on 28th floor. arch app#201904269214. n/a for maher | $800,000 |
| Jul 23, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | mep for new kitchen and dining area on 25th floor. arch app#201904269208. n/a for maher. revision to arch for 2-hr rated horizontal enclosure around grease duct. type 1 kitchen hoods to be submitted under separate permit.Details
mep for new kitchen and dining area on 25th floor. arch app#201904269208. n/a for maher. revision to arch for 2-hr rated horizontal enclosure around grease duct. type 1 kitchen hoods to be submitted under separate permit. | $800,000 |
| Jul 23, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | mep for new pantry dining area on 26th floor. arch app#201904269211. n/a for maher. 08/22/19 - revision to arch for 2-hr rated horizontal enclosure around type ii duct.Details
mep for new pantry dining area on 26th floor. arch app#201904269211. n/a for maher. 08/22/19 - revision to arch for 2-hr rated horizontal enclosure around type ii duct. | $800,000 |
| Jul 18, 2019 | Never finaled issued Jul 2019, no final | 250 Howard St | Pacific Auxiliary Fire Alarm | fire alarm full floor tenant imprv add 1 strobe power supply, 42 smoke det,2 relay mod, 1 isolator module, 46 speaker strobe to e notifier nsfs-3030. new smoke control panel. new outside air supply fans and fsd added.fixture ti kitchen fans and exhast fsd incld. 13th and 45th floors.Details
fire alarm full floor tenant imprv add 1 strobe power supply, 42 smoke det,2 relay mod, 1 isolator module, 46 speaker strobe to e notifier nsfs-3030. new smoke control panel. new outside air supply fans and fsd added.fixture ti kitchen fans and exhast fsd incld. 13th and 45th floors. | $58,400 |
| Jul 17, 2019 | Completed final sign-off May 2021 | 250 Howard St | Webcor Construction Lp | construction of new non structural partitions, acounstical grid and tile ceiling, light fixtures, millwork and finishes. for training rooms, conferencing, touch down suite & break room, no change in use, exit stairs, egress path, elevaonsDetails
construction of new non structural partitions, acounstical grid and tile ceiling, light fixtures, millwork and finishes. for training rooms, conferencing, touch down suite & break room, no change in use, exit stairs, egress path, elevaons | $1,200,000 |
| Jul 16, 2019 | Completed final sign-off May 2021 | 250 Howard St | Eric F Anderson Incorporated | coffee bar - millwork partitions. ceilings & mep modifications. no structure or exterior work. ** maher: n/a **Details
coffee bar - millwork partitions. ceilings & mep modifications. no structure or exterior work. ** maher: n/a ** | $189,675 |
| Jul 15, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | 22nd floor: revision to app#201904248788 for added exterior lighting and power at balcony, updated panel schedules, and updated title 24. n/a for maherDetails
22nd floor: revision to app#201904248788 for added exterior lighting and power at balcony, updated panel schedules, and updated title 24. n/a for maher | $10,000 |
| Jul 15, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | 16th floor: revision to app#201903064517 for added exterior lighting and power at balcony, updated panel schedules, and updated title 24. n/a for maherDetails
16th floor: revision to app#201903064517 for added exterior lighting and power at balcony, updated panel schedules, and updated title 24. n/a for maher | $10,000 |
| Jul 15, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | 19th floor: revision to app#201904107659 for added exterior lighting and power at balcony, updated panel schedules, and updated title 24. n/a for maherDetails
19th floor: revision to app#201904107659 for added exterior lighting and power at balcony, updated panel schedules, and updated title 24. n/a for maher | $10,000 |
| Jul 15, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | 13th floor: revision to app#201903064514 for added exterior lighting and power at balcony, updated panel schedules, and updated title 24. n/a for maherDetails
13th floor: revision to app#201903064514 for added exterior lighting and power at balcony, updated panel schedules, and updated title 24. n/a for maher | $10,000 |
| Jul 9, 2019 | Completed final sign-off Jul 2019 | 250 Howard St | Allied Fire Protection | ref pa# 201904107659; fire sprinklers (5) added uprights, (19) relocate uprights, (44) added pendents, totals (68) sprinklersDetails
ref pa# 201904107659; fire sprinklers (5) added uprights, (19) relocate uprights, (44) added pendents, totals (68) sprinklers | $36,700 |
| Jul 2, 2019 | Completed final sign-off Jul 2019 | 250 Howard St | Allied Fire Protection | 17th fl - t.i fire sprinklers 7 added uprights; 100 relocated uprights; 41 added pendents. total 58 sprinklers ref pa 2019-0410-7648. maher n/a.Details
17th fl - t.i fire sprinklers 7 added uprights; 100 relocated uprights; 41 added pendents. total 58 sprinklers ref pa 2019-0410-7648. maher n/a. | $31,400 |
| Jul 2, 2019 | Completed final sign-off Jul 2019 | 250 Howard St | Allied Fire Protection | 18th fl - facebook ti fire sprinklers 7 added uprights; 20 relocated uprights; 41 added pendents. total 68 sprinklers ref pa 2019-0410-7649Details
18th fl - facebook ti fire sprinklers 7 added uprights; 20 relocated uprights; 41 added pendents. total 68 sprinklers ref pa 2019-0410-7649 | $36,700 |
| Jun 27, 2019 | Never finaled issued Aug 2019, no final | 250 Howard St | Webcor Construction Lp | 44th fl - installation of a new gas water heaters & assoc equipmentDetails
44th fl - installation of a new gas water heaters & assoc equipment | $50,000 |
| Jun 17, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | 7th fl - new non structural parititons. acoustical grid & tile and gyp board ceilings, light fixtures, millwork & finishesDetails
7th fl - new non structural parititons. acoustical grid & tile and gyp board ceilings, light fixtures, millwork & finishes | $2,100,000 |
| Jun 17, 2019 | Completed final sign-off Jun 2021 | 250 Howard St | Webcor Construction Lp | 10th flr. (n) non-structural partitions. acoustical grid and tile and gyp board ceiling, lightfixtures, millwork and finishes.Details
10th flr. (n) non-structural partitions. acoustical grid and tile and gyp board ceiling, lightfixtures, millwork and finishes. | $2,000,000 |
| Jun 17, 2019 | Completed final sign-off Jun 2021 | 250 Howard St | Webcor Construction Lp | 9th flr. (n) non-structural partitions. acoustical grid and tile and gyp board ceiling, lightfixtures, millwork and finishes.Details
9th flr. (n) non-structural partitions. acoustical grid and tile and gyp board ceiling, lightfixtures, millwork and finishes. | $2,000,000 |
| Jun 17, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | 8th flr. (n) non-structural partitions. acoustical grid and tile and gyp board ceiling, lightfixtures, millwork and finishes.Details
8th flr. (n) non-structural partitions. acoustical grid and tile and gyp board ceiling, lightfixtures, millwork and finishes. | $2,000,000 |
| Jun 13, 2019 | Completed final sign-off Sep 2019 | 250 Howard St | Allied Fire Protection | 3rd fl preaction - t.i fire sprinklers 8 added upright. ref t.i. pa201903276424. maher n/a.Details
3rd fl preaction - t.i fire sprinklers 8 added upright. ref t.i. pa201903276424. maher n/a. | $4,300 |
| Jun 13, 2019 | Completed final sign-off Aug 2019 | 250 Howard St | Allied Fire Protection | 3rd fl - t.i. 30 added pendent. totals 48 sprinklers. reference t.i. pa201903276424. maher n/a.Details
3rd fl - t.i. 30 added pendent. totals 48 sprinklers. reference t.i. pa201903276424. maher n/a. | $26,000 |
| Jun 5, 2019 | Completed final sign-off May 2021 | 250 Howard St | Webcor Construction Lp | 5th fl - construction of new non-structural partitions, acoustical grid & tile & gyp board ceilings, light fixtures, millwork & finishesDetails
5th fl - construction of new non-structural partitions, acoustical grid & tile & gyp board ceilings, light fixtures, millwork & finishes | $2,000,000 |
| Jun 5, 2019 | Completed final sign-off May 2021 | 250 Howard St | Webcor Construction Lp | 6th flr - construction of new non structural partitions acoustical grid & tile & gypboard ceiling, light fixtures,millwork finishes maher naDetails
6th flr - construction of new non structural partitions acoustical grid & tile & gypboard ceiling, light fixtures,millwork finishes maher na | $2,000,000 |
| Jun 5, 2019 | Completed final sign-off May 2021 | 250 Howard St | Webcor Construction Lp | 4th flr - construction of new non structural partitions acoustical grid & tile & gypboard ceiling, light fixtures,millwork finishes maher naDetails
4th flr - construction of new non structural partitions acoustical grid & tile & gypboard ceiling, light fixtures,millwork finishes maher na | $2,000,000 |
| May 30, 2019 | Completed final sign-off Jul 2019 | 250 Howard St | Allied Fire Protection | 16th fl - facebook ti fire sprinklers 4 added uprights; 14 relocated uprights; 43 added pendents; total 61 sprinklers ref pa 2019-0306-4517Details
16th fl - facebook ti fire sprinklers 4 added uprights; 14 relocated uprights; 43 added pendents; total 61 sprinklers ref pa 2019-0306-4517 | $33,000 |
| May 28, 2019 | Completed final sign-off Jul 2019 | 250 Howard St | Allied Fire Protection | 14th fl - facebook ti fire sprinklers - 6 added uprights; 16 relocated uprights & 39 added pendents; 61 total sprinklers. ref pa 2019-0306-4508Details
14th fl - facebook ti fire sprinklers - 6 added uprights; 16 relocated uprights & 39 added pendents; 61 total sprinklers. ref pa 2019-0306-4508 | $33,000 |
| May 28, 2019 | Completed final sign-off Jul 2019 | 250 Howard St | Allied Fire Protection | 15th fl - facebook ti fire sprinklers - 6 added uprights; 10 relocated uprights & 40 added pendents; 56 total sprinklers. ref pa 2019-0306-4516Details
15th fl - facebook ti fire sprinklers - 6 added uprights; 10 relocated uprights & 40 added pendents; 56 total sprinklers. ref pa 2019-0306-4516 | $30,300 |
| May 28, 2019 | Completed final sign-off Jun 2019 | 250 Howard St | Allied Fire Protection | 13th fl - facebook ti fire sprinklers - 13 added uprights; 16 relocated uprights & 37 added pendents; 67 total sprinklers. ref pa 2019-0306-4514Details
13th fl - facebook ti fire sprinklers - 13 added uprights; 16 relocated uprights & 37 added pendents; 67 total sprinklers. ref pa 2019-0306-4514 | $36,200 |
| May 10, 2019 | Completed final sign-off Nov 2021 | 250 Howard St | Webcor Construction Lp | remove ev charging station to match approved arch on levels b1 & b2. ref 201903276415 & 201903276418. n/a for maher.Details
remove ev charging station to match approved arch on levels b1 & b2. ref 201903276415 & 201903276418. n/a for maher. | |
| May 10, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | create seperate ats room on 44th flr ref 201903014193. n/a for maher.Details
create seperate ats room on 44th flr ref 201903014193. n/a for maher. | |
| May 3, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | new tenant generator with belly tank on level 44. ** maher: n/a **Details
new tenant generator with belly tank on level 44. ** maher: n/a ** | $65,000 |
| May 2, 2019 | Completed final sign-off Nov 2021 | 250 Howard St | Webcor Construction Lp | b2 - revision to 201903276415 to update card reader matrix, proviced card readers & emergency/door relaese buttons, panic hardware will be removed and replaced with doorsDetails
b2 - revision to 201903276415 to update card reader matrix, proviced card readers & emergency/door relaese buttons, panic hardware will be removed and replaced with doors | $1,000 |
| May 2, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | b1 - revision to 201903276418 to update card reader matrix, proviced card readers & emergency/door relaese buttons, panic hardware will be removed and replaced with doorsDetails
b1 - revision to 201903276418 to update card reader matrix, proviced card readers & emergency/door relaese buttons, panic hardware will be removed and replaced with doors | $1,000 |
| Apr 30, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | new air handling units and mech ducts for floors 13-45. shaft enclosire approved uner 201903014193Details
new air handling units and mech ducts for floors 13-45. shaft enclosire approved uner 201903014193 | $100,000 |
| Apr 29, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | 28th fl - arch only. new kitchen and dining areas. construction of new non-structural partition, acoustical grid & tile gyp board ceiings, millwork finishes, fire alarm, sprinklers, ansul & mep on separate permitDetails
28th fl - arch only. new kitchen and dining areas. construction of new non-structural partition, acoustical grid & tile gyp board ceiings, millwork finishes, fire alarm, sprinklers, ansul & mep on separate permit | $1,315,440 |
| Apr 29, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | 25th fl - arch only. new kitchen and dining areas. construction of new non-structural partition, acoustical grid & tile gyp board ceiings, millwork finishes, fire alarm, sprinklers, ansul & mep on separate permitDetails
25th fl - arch only. new kitchen and dining areas. construction of new non-structural partition, acoustical grid & tile gyp board ceiings, millwork finishes, fire alarm, sprinklers, ansul & mep on separate permit | $1,315,440 |
| Apr 29, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | 26th fl - arch only. new kitchen and dining areas. construction of new non-structural partition, acoustical grid & tile gyp board ceiings, millwork finishes, fire alarm, sprinklers, ansul & mep on separate permitDetails
26th fl - arch only. new kitchen and dining areas. construction of new non-structural partition, acoustical grid & tile gyp board ceiings, millwork finishes, fire alarm, sprinklers, ansul & mep on separate permit | $1,315,440 |
| Apr 24, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | 24th fl fl: construction of new non structural partitions aloustical grid tile, & gyp board and ceilings, light fixture, millwork and finishes n/a maherDetails
24th fl fl: construction of new non structural partitions aloustical grid tile, & gyp board and ceilings, light fixture, millwork and finishes n/a maher | $1,800,000 |
| Apr 24, 2019 | Completed final sign-off Jun 2021 | 250 Howard St | Webcor Construction Lp | 22nd floor: construction of new non structural partitions, acoustical grid, tile & gyp board ceiling, light fixtures & millwork and finishesDetails
22nd floor: construction of new non structural partitions, acoustical grid, tile & gyp board ceiling, light fixtures & millwork and finishes | $1,800,000 |
| Apr 24, 2019 | Completed final sign-off Jun 2021 | 250 Howard St | Webcor Construction Lp | 21st floor: construction of new non structural partitions, acoustical grid, tile & gyp board ceiling, light fixtures & millwork and finishesDetails
21st floor: construction of new non structural partitions, acoustical grid, tile & gyp board ceiling, light fixtures & millwork and finishes | $1,800,000 |
| Apr 24, 2019 | Completed final sign-off Jun 2021 | 250 Howard St | Webcor Construction Lp | 23rd fl: construction of new non structural partitions aloustical grid tile, & gyp board and ceilings, light fixture, millwork and finishesDetails
23rd fl: construction of new non structural partitions aloustical grid tile, & gyp board and ceilings, light fixture, millwork and finishes | $1,800,000 |
| Apr 18, 2019 | Never finaled issued Apr 2019, no final | 250 Howard St | Webcor Construction Lp | revision to 201810254106 for door types & swings on levels 12 & 25 and added floor drainsDetails
revision to 201810254106 for door types & swings on levels 12 & 25 and added floor drains | |
| Apr 15, 2019 | Never finaled issued Apr 2019, no final | 250 Howard St | Acco Engineered Systems Inc. Dba Acco En | 44th fl - add new condenser water pump and heat exchange to central plant for waterside economization. add new condenser water piping and valvingDetails
44th fl - add new condenser water pump and heat exchange to central plant for waterside economization. add new condenser water piping and valving | $75,000 |
| Apr 10, 2019 | Completed final sign-off Jun 2021 | 250 Howard St | Webcor Construction Lp | 17th flr - construction of new non structural partition, acoustical gride & tile & gyp board veilings,., light fixtures, millwork and finishes. maher naDetails
17th flr - construction of new non structural partition, acoustical gride & tile & gyp board veilings,., light fixtures, millwork and finishes. maher na | $1,800,000 |
| Apr 10, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | 19th flr - construction of new non structural partition, acoustical gride & tile & gyp board veilings,., light fixtures, millwork and finishes. maher naDetails
19th flr - construction of new non structural partition, acoustical gride & tile & gyp board veilings,., light fixtures, millwork and finishes. maher na | $1,800,000 |
| Apr 10, 2019 | Completed final sign-off Jun 2021 | 250 Howard St | Webcor Construction Lp | 18th flr - construction of new non structural partitions, acoustical grid & tile & gyp board ceilings, light fixtures, millwork and finishes. maher naDetails
18th flr - construction of new non structural partitions, acoustical grid & tile & gyp board ceilings, light fixtures, millwork and finishes. maher na | $1,800,000 |
| Apr 10, 2019 | Completed final sign-off Jun 2021 | 250 Howard St | Webcor Construction Lp | 20th flr - construction of new non structural partition, acoustical gride & tile & gyp board veilings,light fixtures, millwork and finishes. maher n/a.Details
20th flr - construction of new non structural partition, acoustical gride & tile & gyp board veilings,light fixtures, millwork and finishes. maher n/a. | $1,800,000 |
| Apr 5, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | new connecting stair between levels 25 & 28. consturction of new metal stair, handrails, guards, stair opening guards, and associated structurl work at slabs.Details
new connecting stair between levels 25 & 28. consturction of new metal stair, handrails, guards, stair opening guards, and associated structurl work at slabs. | $300,000 | |
| Mar 27, 2019 | Completed final sign-off May 2021 | 250 Howard St | Webcor Construction Lp | 2/f: construction of new structural partitions, acoustical grid & tile and gypsum board ceilings, light fixturs & millwork and finishes for conference rooms & meeting rooms.Details
2/f: construction of new structural partitions, acoustical grid & tile and gypsum board ceilings, light fixturs & millwork and finishes for conference rooms & meeting rooms. | $3,496,000 |
| Mar 27, 2019 | Completed final sign-off Nov 2021 | 250 Howard St | Webcor Construction Lp | b-1: construction of new nonstructural partitions, acoustical grid & tile & gyp board ceilings, light fixture and fixtures and millwork fan.new idf room, add house keeping pad for hval condensing units, add card readers. n/a for maherDetails
b-1: construction of new nonstructural partitions, acoustical grid & tile & gyp board ceilings, light fixture and fixtures and millwork fan.new idf room, add house keeping pad for hval condensing units, add card readers. n/a for maher | $825,000 |
| Mar 27, 2019 | Completed final sign-off Nov 2021 | 250 Howard St | Webcor Construction Lp | b-2: construction of new nonstructural partitions, light fixture and finishes for culinary storage and freezer rooms, t.i. ara 1880 sq f. n/a for maherDetails
b-2: construction of new nonstructural partitions, light fixture and finishes for culinary storage and freezer rooms, t.i. ara 1880 sq f. n/a for maher | $670,000 |
| Mar 27, 2019 | Completed final sign-off Jun 2021 | 250 Howard St | Webcor Construction Lp | lobby: construction of new structural partitions, security gate, light fixtures, millwork & finishes. maher n/a.Details
lobby: construction of new structural partitions, security gate, light fixtures, millwork & finishes. maher n/a. | $3,000,000 |
| Mar 27, 2019 | Completed final sign-off May 2021 | 250 Howard St | Webcor Construction Lp | 3/f: construction of new structural partitions, acoustical grid & tile and gypsum board ceilings, light fixturs & millwork and finishes for conference rooms & meeting rooms. maher n/a.Details
3/f: construction of new structural partitions, acoustical grid & tile and gypsum board ceilings, light fixturs & millwork and finishes for conference rooms & meeting rooms. maher n/a. | $1,800,000 |
| Mar 22, 2019 | Completed final sign-off Jun 2021 | 250 Howard St | Webcor Construction Lp | new connecting feature stair between levels 11 & 12. ref t.i pa's 201903226017-11/f & 201903226019-12/fDetails
new connecting feature stair between levels 11 & 12. ref t.i pa's 201903226017-11/f & 201903226019-12/f | $619,000 |
| Mar 22, 2019 | Completed final sign-off Jun 2021 | 250 Howard St | Webcor Construction Lp | 11th fl - ti with new kitchen and mechanical rooms. convenience stair; fire alarm & sprinklers on separate permitDetails
11th fl - ti with new kitchen and mechanical rooms. convenience stair; fire alarm & sprinklers on separate permit | $3,800,000 |
| Mar 22, 2019 | Completed final sign-off Jun 2021 | 250 Howard St | Webcor Construction Lp | 12th fl - ti with new kitchen and servery. new bearing partitions, horizontal exiting, patio seating, fire alarm, sprinklers & convenience stairs on separate permitDetails
12th fl - ti with new kitchen and servery. new bearing partitions, horizontal exiting, patio seating, fire alarm, sprinklers & convenience stairs on separate permit | $3,800,000 |
| Mar 12, 2019 | Never finaled issued Mar 2019, no final | 250 Howard St | Pacific Auxiliary Fire Alarm | ref pa #2018-10254106. fire alarm ti ot levels 12 & 25 on (e) notifer nfs2-3030. adding (15) smoke detectors, (2) monitor modules, (2) temp sensors, (2) input modules & (11) speaker strobes, (10) speaker strobes are being relocated. (2) call station to emergency com system is being added.Details
ref pa #2018-10254106. fire alarm ti ot levels 12 & 25 on (e) notifer nfs2-3030. adding (15) smoke detectors, (2) monitor modules, (2) temp sensors, (2) input modules & (11) speaker strobes, (10) speaker strobes are being relocated. (2) call station to emergency com system is being added. | $39,200 |
| Mar 11, 2019 | Never finaled issued Mar 2019, no final | 250 Howard St | Acco Engineered Systems Inc. Dba Acco En | 1st fl - install (n) heating hot water supply and return and chilled water supply and return loops to retail spacesDetails
1st fl - install (n) heating hot water supply and return and chilled water supply and return loops to retail spaces | $40,000 |
| Mar 6, 2019 | Completed final sign-off Jun 2021 | 250 Howard St | 13th flr - construction of new non structural partitioms acoustical grid tiles & gyp board, ceiling, lights fixtures, millwork and finishesDetails
13th flr - construction of new non structural partitioms acoustical grid tiles & gyp board, ceiling, lights fixtures, millwork and finishes | $1,800,000 | |
| Mar 6, 2019 | Completed final sign-off Jun 2021 | 250 Howard St | Webcor Construction Lp | 15th flr - construction of new non structural partitioms acoustical grid tiles & gyp board, ceiling, lights fixtures, millwork and finishesDetails
15th flr - construction of new non structural partitioms acoustical grid tiles & gyp board, ceiling, lights fixtures, millwork and finishes | $1,800,000 |
| Mar 6, 2019 | Completed final sign-off Jun 2021 | 250 Howard St | Webcor Construction Lp | 14th floor: construction of new non-structural partitions, acoustical grid, and tile, gyb board ceiling, light fixtures, mill work and finishes.Details
14th floor: construction of new non-structural partitions, acoustical grid, and tile, gyb board ceiling, light fixtures, mill work and finishes. | $1,800,000 |
| Mar 6, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | 16th flr - construction of new non structural partitioms acoustical grid tiles & gyp board, ceiling, lights fixtures, millwork and finishesDetails
16th flr - construction of new non structural partitioms acoustical grid tiles & gyp board, ceiling, lights fixtures, millwork and finishes | $1,800,000 |
| Mar 5, 2019 | Completed final sign-off Apr 2019 | 250 Howard St | Allied Fire Protection | add/relocate sprinklers on levels 12 and 25 for relocation of bathrooms out of core areas, for new elevator stops, bathrooms will be located outside of core. 39 sprinklers ref pa 2018-0125-4106Details
add/relocate sprinklers on levels 12 and 25 for relocation of bathrooms out of core areas, for new elevator stops, bathrooms will be located outside of core. 39 sprinklers ref pa 2018-0125-4106 | $35,000 |
| Mar 1, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | construction of mechanical shaft - demo 60 sf per level 13 through 45; future stair opening level 26-28 350 sf per level structural reinforcement levels 13, 25, 26, 27, 28 and 29. structural reinforcement level 44 & 45 future air handling units & generatorDetails
construction of mechanical shaft - demo 60 sf per level 13 through 45; future stair opening level 26-28 350 sf per level structural reinforcement levels 13, 25, 26, 27, 28 and 29. structural reinforcement level 44 & 45 future air handling units & generator | $1,623,938 |
| Dec 12, 2018 | Completed final sign-off Jun 2021 | 250 Howard St | new ground floor retail demising wall. no exterior wall. wall will split one retail space into two retail spaces. n/a for maherDetails
new ground floor retail demising wall. no exterior wall. wall will split one retail space into two retail spaces. n/a for maher | $1,000 | |
| Oct 25, 2018 | Completed final sign-off May 2021 | 250 Howard St | Clark Construction Group Ca Lp | revision to 201804274732 s3 for 4 new elevator stops at level 12, (4) new elevator stop at level 25, new elevator lobbies at levels 12 & 25, relocation of restroooms at levels 12 & 25 and additional new unisex toilet room at leverls 12 & 25 maher naDetails
revision to 201804274732 s3 for 4 new elevator stops at level 12, (4) new elevator stop at level 25, new elevator lobbies at levels 12 & 25, relocation of restroooms at levels 12 & 25 and additional new unisex toilet room at leverls 12 & 25 maher na | $250,000 |
| Oct 12, 2018 | Never finaled filed Oct 2018, never issued | 250 Howard St | street spaceDetails
street space | ||
| Oct 4, 2018 | Never finaled issued Nov 2018, no final | 250 Howard St | street spaceDetails
street space | ||
| Jul 31, 2018 | Never finaled issued Aug 2018, no final | 250 Howard St | Clark Construction Group Ca Lp | emergency evacuation signs for 45 story bldg per sffd ab2.11. **maher n/a**Details
emergency evacuation signs for 45 story bldg per sffd ab2.11. **maher n/a** | $25,000 |
| Jun 15, 2018 | Expired or cancelled cancelled Jan 2026 | 250 Howard St | install freestanding monument sigh with stone clad base & stainless steel letters. illuminated with concealed led strip fixture.Details
install freestanding monument sigh with stone clad base & stainless steel letters. illuminated with concealed led strip fixture. | $7,000 | |
| Apr 25, 2018 | Completed final sign-off Oct 2019 | 250 Howard St | Clark Construction Group Ca Lp | revision to pa 2015-04-27-4732 s3 of new 45 stories high rise office building per drawings.Details
revision to pa 2015-04-27-4732 s3 of new 45 stories high rise office building per drawings. | |
| Apr 3, 2018 | Completed final sign-off Dec 2021 | 250 Howard St | Metropolitan Electrical Construction | installation of a das (distribute antenna system) for cellular service on all levels of the park plaza tower. this will include a head end room w/ remote radios & antennas on the various levels of the tower. **maher n/a**Details
installation of a das (distribute antenna system) for cellular service on all levels of the park plaza tower. this will include a head end room w/ remote radios & antennas on the various levels of the tower. **maher n/a** | $30,000 |