Clark Construction Group Ca Lp
- Based in
- Bethesda
- On San Francisco permits
- Jun 2014 to Apr 2026
- Last 24 months
- 5 permits filed
63 permits since 2000: 38 completed, 17 in progress, 8 never finaled.
Of the 8 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old, 1 is over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 8, 2026 | In progress filed Apr 2026, not yet issued | 1828 Egbert Av | ref#: 202412317576. work consisting of contructing new 4 stop freight elevator in existing shaf. 2hr rated shaft walls plus 2 new 2 hr rated shaft walls to creat the 4 sided shaft enclosure. project scope includes cutting into the (e) mat foundation to create the elevator pit, plus new steelDetails
ref#: 202412317576. work consisting of contructing new 4 stop freight elevator in existing shaf. 2hr rated shaft walls plus 2 new 2 hr rated shaft walls to creat the 4 sided shaft enclosure. project scope includes cutting into the (e) mat foundation to create the elevator pit, plus new steel | $700,000 |
| Mar 5, 2026 | In progress filed Mar 2026, not yet issued | 2000 Marin St | proj-26-2627 mou: erect new 1 story type iib & iiib fuel station.Details
proj-26-2627 mou: erect new 1 story type iib & iiib fuel station. | $850,000 |
| Apr 7, 2025 | In progress issued Mar 2026 | 1828 Egbert Av | project will serve as temporary location for officers for donning & doffing while a(n)police station is constructed.as such,it will not serve as a police station & is thus not considered an essential services facility.Details
project will serve as temporary location for officers for donning & doffing while a(n)police station is constructed.as such,it will not serve as a police station & is thus not considered an essential services facility. | $7,000,000 |
| Feb 25, 2025 | In progress filed Feb 2025, not yet issued | 401 Hunters Point Bl | proj-25-0614:ancillary site structures for indian basin shoreline park, including shade structure, pergola, playground structures, misc. structures > 4' in height including retaining walls etc.Details
proj-25-0614:ancillary site structures for indian basin shoreline park, including shade structure, pergola, playground structures, misc. structures > 4' in height including retaining walls etc. | $200,000 |
| Nov 5, 2024 | In progress filed Nov 2024, not yet issued | 750 Phelps St | proj-24-0605; mou sfpuc. to erect 3 stories, no basement, type v-b, business building. (a-2,b,f,h-3)Details
proj-24-0605; mou sfpuc. to erect 3 stories, no basement, type v-b, business building. (a-2,b,f,h-3) | $75,000,000 |
| Dec 15, 2023 | In progress filed Dec 2023, not yet issued | 0 Situs To Be Assigned | proj-23-0551. erect new parking garage for sfpuc water department. parking garage includes electrical room serving the garage building & fire pump room & domestic water pump room serving entire campus. parking garage is 1 of 6 bldg on new sfwd campus at 2000 marin st.Details
proj-23-0551. erect new parking garage for sfpuc water department. parking garage includes electrical room serving the garage building & fire pump room & domestic water pump room serving entire campus. parking garage is 1 of 6 bldg on new sfwd campus at 2000 marin st. | $38,100,000 |
| Dec 15, 2023 | In progress filed Dec 2023, not yet issued | 0 Situs To Be Assigned | proj-23-0554. erect new shops building for the sfpuc water department. building includes machine shop and employee support areas including lockers, break room, and office areas. shops building is 1 of 6 buildings on the new sfwd campus at 2000 marin st.Details
proj-23-0554. erect new shops building for the sfpuc water department. building includes machine shop and employee support areas including lockers, break room, and office areas. shops building is 1 of 6 buildings on the new sfwd campus at 2000 marin st. | $18,300,000 |
| Dec 15, 2023 | In progress filed Dec 2023, not yet issued | 0 Situs To Be Assigned | proj-23-0553. erect new auto shop building for the sfpuc water department. building includes vehicle repair bays, paint booths, carpentry shop, and employee areas including lockers, break room, and office areas. auto shop building is 1 of 6 buildings on the new sfwd campus at 2000 marin st.Details
proj-23-0553. erect new auto shop building for the sfpuc water department. building includes vehicle repair bays, paint booths, carpentry shop, and employee areas including lockers, break room, and office areas. auto shop building is 1 of 6 buildings on the new sfwd campus at 2000 marin st. | $23,800,000 |
| Dec 15, 2023 | In progress filed Dec 2023, not yet issued | 0 Situs To Be Assigned | proj-23-0558. erect new warehouse building for sfpuc water department. bldg includes regular height and high piled storage, meter shop, fabrication shop and employee support area including lockers, break room, and office areas. warehouse bldg is 1 of 6 bldgs on the new sfwd campus at 2000 marin st.Details
proj-23-0558. erect new warehouse building for sfpuc water department. bldg includes regular height and high piled storage, meter shop, fabrication shop and employee support area including lockers, break room, and office areas. warehouse bldg is 1 of 6 bldgs on the new sfwd campus at 2000 marin st. | $20,900,000 |
| Dec 15, 2023 | In progress filed Dec 2023, not yet issued | 0 Situs To Be Assigned | proj-23-0548. erect new administration building for sfpuc water department. building includes offices, multi-purpose spaces, locker rooms, wellness center, training room, electrical, & landscape shops. administrative building is 1 of 6 bldg on new sfwd campus at 2000 marin st.Details
proj-23-0548. erect new administration building for sfpuc water department. building includes offices, multi-purpose spaces, locker rooms, wellness center, training room, electrical, & landscape shops. administrative building is 1 of 6 bldg on new sfwd campus at 2000 marin st. | $48,200,000 |
| Dec 15, 2023 | In progress filed Dec 2023, not yet issued | 0 Situs To Be Assigned | proj-23-0550. erect new meter kiosk for sfpuc water department. building is for storing meters for distribution to the public by appointment only. meter kiosk is 1 of 6 bldg on new sfwd campus at 2000 marin st.Details
proj-23-0550. erect new meter kiosk for sfpuc water department. building is for storing meters for distribution to the public by appointment only. meter kiosk is 1 of 6 bldg on new sfwd campus at 2000 marin st. | $700,000 |
| Oct 25, 2023 | In progress filed Oct 2023, not yet issued | 401 Hunters Point Bl | proj-25-0614:erect a one story public restroom. type vb.Details
proj-25-0614:erect a one story public restroom. type vb. | $500,000 |
| Oct 25, 2023 | In progress filed Oct 2023, not yet issued | 401 Hunters Point Bl | proj-25-0614:indian basin shoreline park project includes a series of wood terraces extending into the park along the hunter's point blvd sidewalk.a great lawn framed by 2 concrete pathways & stairs that connect the wood decks to the gravel shore @ the water's edge.Details
proj-25-0614:indian basin shoreline park project includes a series of wood terraces extending into the park along the hunter's point blvd sidewalk.a great lawn framed by 2 concrete pathways & stairs that connect the wood decks to the gravel shore @ the water's edge. | $29,000,000 |
| Oct 25, 2023 | In progress filed Oct 2023, not yet issued | 401 Hunters Point Bl | proj-25-0614:erect a one story storage and recreation building (boat house)- type vb.Details
proj-25-0614:erect a one story storage and recreation building (boat house)- type vb. | $2,000,000 |
| Dec 29, 2022 | In progress issued Mar 2026 | 1 Sgt John V Young St | to erect a 2-story, type 2a, office building.Details
to erect a 2-story, type 2a, office building. | $15,000,000 |
| Dec 29, 2022 | In progress issued Jun 2026 | 1 Sgt John V Young St | existing two story building to be rehabilitated and renovated. work includes upgrades to building structure and replacement of plumbing, electrical and mechanical systems, and interior finishes and fixtures.Details
existing two story building to be rehabilitated and renovated. work includes upgrades to building structure and replacement of plumbing, electrical and mechanical systems, and interior finishes and fixtures. | $14,000,000 |
| May 13, 2022 | Never finaled issued Aug 2022, no final | 1180 Evans Av | side grading associated with pa# 202108065970.Details
side grading associated with pa# 202108065970. | $280,000 |
| Mar 8, 2022 | In progress issued Feb 2025 | 1200 15th St | renovate, rehab & seisimically retrofit (e) 2-story, 29500 sf building to provide office and operational space for sfmta parking & traffic enforcement division. install a standard office trailer @ adjacent vacant parcel under pa 202401234496 to house the division's emergency related operations.Details
renovate, rehab & seisimically retrofit (e) 2-story, 29500 sf building to provide office and operational space for sfmta parking & traffic enforcement division. install a standard office trailer @ adjacent vacant parcel under pa 202401234496 to house the division's emergency related operations. | $28,900,000 |
| Aug 6, 2021 | Never finaled filed Aug 2021, never issued | 1180 Evans Av | erect a new 3 stories with no basement electrical switchgear/storage. type 2-aDetails
erect a new 3 stories with no basement electrical switchgear/storage. type 2-a | $16,000,000 |
| Jun 15, 2021 | Completed final sign-off Dec 2021 | 1995 Evans Av | spread footing for sculpture to be located at entry plaza - reference to pa #201712217090Details
spread footing for sculpture to be located at entry plaza - reference to pa #201712217090 | $75,000 |
| May 20, 2021 | Completed final sign-off Nov 2021 | 1995 Evans Av | pipe and tube railings designed by sgh engineers. reference sheets from pa 2017-1221-7090-s2 for structural design criteria and sheets from pa 2017-1221-7090-s3 vol 4 for architectural location and general details.Details
pipe and tube railings designed by sgh engineers. reference sheets from pa 2017-1221-7090-s2 for structural design criteria and sheets from pa 2017-1221-7090-s3 vol 4 for architectural location and general details. | $30,000 |
| Apr 14, 2021 | Completed final sign-off Nov 2021 | 1995 Evans Av | scope is lab fixed louvers (lvr01). reference to pa #201712217090-s7 for cold formed metal framing criteria & reference to pa #201712217090-s3 volume 4 for architectural locationDetails
scope is lab fixed louvers (lvr01). reference to pa #201712217090-s7 for cold formed metal framing criteria & reference to pa #201712217090-s3 volume 4 for architectural location | $50,000 |
| Mar 16, 2021 | Completed final sign-off Nov 2021 | 1995 Evans Av | reference to pa #201712217090 s2&s3 - scope is lab casework, fume hood, and lab equipment seismic restraint designed by vta engineers, teodor francu, and force support services respectivelyDetails
reference to pa #201712217090 s2&s3 - scope is lab casework, fume hood, and lab equipment seismic restraint designed by vta engineers, teodor francu, and force support services respectively | $900,000 |
| Mar 16, 2021 | Completed final sign-off Nov 2021 | 1995 Evans Av | reference to pa #201712217090/s2&s3 - scope is metal fabrications including ladder and vehicular barrier systems anchorage designed by sghDetails
reference to pa #201712217090/s2&s3 - scope is metal fabrications including ladder and vehicular barrier systems anchorage designed by sgh | $52,000 |
| Nov 17, 2020 | Completed final sign-off Mar 2021 | 1419 Bryant St | this is a minor revision to (e) permit. changing occupancy of 1 room from a-3 to b. see sheet a0.22 (revision to 201512034127)Details
this is a minor revision to (e) permit. changing occupancy of 1 room from a-3 to b. see sheet a0.22 (revision to 201512034127) | |
| Aug 25, 2020 | Completed final sign-off Nov 2021 | 1995 Evans Av | scope is metal stairs (stair #1) only, deferred submittal of metal stairs designed by sgh, reference to pa #201712217070 addendum 2.Details
scope is metal stairs (stair #1) only, deferred submittal of metal stairs designed by sgh, reference to pa #201712217070 addendum 2. | $180,000 |
| Jan 16, 2020 | Completed final sign-off Dec 2021 | 1995 Evans Av | scope is metal stairs(stair# 2) only. deferred submittal of metal stairs(stairs# 2) designed by pacific stair. reference pa# 2017-1221-7090 s2: foundation & superstructure.Details
scope is metal stairs(stair# 2) only. deferred submittal of metal stairs(stairs# 2) designed by pacific stair. reference pa# 2017-1221-7090 s2: foundation & superstructure. | $85,000 |
| Nov 5, 2019 | Completed final sign-off Apr 2020 | 1399 Mcallister St | replace rear stairs in kindDetails
replace rear stairs in kind | $12,000 |
| Oct 25, 2019 | Completed final sign-off Nov 2021 | 1995 Evans Av | scope is brace frames only. deferred submittal of brace frames designed by corebrace. reference documents permit app #2017-1221-7090 s2: foundations, superstructure & metal stairs.Details
scope is brace frames only. deferred submittal of brace frames designed by corebrace. reference documents permit app #2017-1221-7090 s2: foundations, superstructure & metal stairs. | $1,500,000 |
| May 1, 2019 | Completed final sign-off Aug 2020 | 1570 Burke Av | emergency generator installation into newly remodeled warehouse under pa# 2016/12/19/5336. ** maher: n/a **Details
emergency generator installation into newly remodeled warehouse under pa# 2016/12/19/5336. ** maher: n/a ** | $100,000 |
| Dec 18, 2018 | Completed final sign-off Feb 2019 | 100 Van Ness Av | provide electrical, hook-up power to 2 new overhead rolling doors, relocate 3 (e) light fixturesDetails
provide electrical, hook-up power to 2 new overhead rolling doors, relocate 3 (e) light fixtures | $5,000 |
| Dec 10, 2018 | Never finaled issued Dec 2018, no final | 333 Golden Gate Av | street spaceDetails
street space | |
| Oct 25, 2018 | Completed final sign-off May 2021 | 250 Howard St | revision to 201804274732 s3 for 4 new elevator stops at level 12, (4) new elevator stop at level 25, new elevator lobbies at levels 12 & 25, relocation of restroooms at levels 12 & 25 and additional new unisex toilet room at leverls 12 & 25 maher naDetails
revision to 201804274732 s3 for 4 new elevator stops at level 12, (4) new elevator stop at level 25, new elevator lobbies at levels 12 & 25, relocation of restroooms at levels 12 & 25 and additional new unisex toilet room at leverls 12 & 25 maher na | $250,000 |
| Sep 17, 2018 | Completed final sign-off Apr 2019 | 250 Howard St | revision to 201604274732 for use of 2 hours rated wrap in selected areas on level 1,44, 45 where gypsum board soffit enclosures cannot be constructed to fully enclose fuel oil linesDetails
revision to 201604274732 for use of 2 hours rated wrap in selected areas on level 1,44, 45 where gypsum board soffit enclosures cannot be constructed to fully enclose fuel oil lines | $10,000 |
| Jul 31, 2018 | Never finaled issued Aug 2018, no final | 250 Howard St | emergency evacuation signs for 45 story bldg per sffd ab2.11. **maher n/a**Details
emergency evacuation signs for 45 story bldg per sffd ab2.11. **maher n/a** | $25,000 |
| Jul 19, 2018 | Never finaled issued Apr 2019, no final | 452 Larkin St | remodeling of all units only kitchens (14) and bathrooms (14). no structural.Details
remodeling of all units only kitchens (14) and bathrooms (14). no structural. | $280,000 |
| Jun 26, 2018 | Completed final sign-off Aug 2020 | 1570 Burke Av | electrical tap into the line side of existing main switch board for the new elec fire pump. ref pa# 2016/12/19/5336. ** maher: n/a **Details
electrical tap into the line side of existing main switch board for the new elec fire pump. ref pa# 2016/12/19/5336. ** maher: n/a ** | $25,000 |
| Apr 25, 2018 | Completed final sign-off Oct 2019 | 250 Howard St | revision to pa 2015-04-27-4732 s3 of new 45 stories high rise office building per drawings.Details
revision to pa 2015-04-27-4732 s3 of new 45 stories high rise office building per drawings. | |
| Feb 27, 2018 | Completed final sign-off Dec 2018 | 250 Howard St | revision to 201504274732 s3 for updates to mech fire smoke damper schedule & fan damper matrix. updated mech plan maher naDetails
revision to 201504274732 s3 for updates to mech fire smoke damper schedule & fan damper matrix. updated mech plan maher na | |
| Jan 9, 2018 | Completed final sign-off Aug 2019 | 175 Beale St | new park on beale and mission stDetails
new park on beale and mission st | $250,000 |
| Dec 21, 2017 | Completed final sign-off Jan 2022 | 1995 Evans Av | to erect 3 stories, no basement, type ii-a full sprinkler, office, lab, assembly, parking garabe, storage building. (b,a-3,f-1,s-1,s-2)Details
to erect 3 stories, no basement, type ii-a full sprinkler, office, lab, assembly, parking garabe, storage building. (b,a-3,f-1,s-1,s-2) | $76,500,000 |
| Dec 18, 2017 | Completed final sign-off Aug 2019 | 110 Main St | new park on corner of howard & mainDetails
new park on corner of howard & main | $600,000 |
| Nov 3, 2017 | Never finaled issued Nov 2017, no final | 250 Howard St | street spaceDetails
street space | |
| Oct 10, 2017 | Completed final sign-off Dec 2018 | 250 Howard St | revision to app#201504274732 s3 for mase flashing ( interior water proofing) details for fsae lobbies .Details
revision to app#201504274732 s3 for mase flashing ( interior water proofing) details for fsae lobbies . | |
| Aug 8, 2017 | Completed final sign-off Mar 2018 | 1 Newhall St | revision to permit #201406269545 s3. to facilitate fire alarm system review and show locations of fire rated shafts and shaft bottoms, and reflect options exercised from s5 - elevators and elevator shafts. maher naDetails
revision to permit #201406269545 s3. to facilitate fire alarm system review and show locations of fire rated shafts and shaft bottoms, and reflect options exercised from s5 - elevators and elevator shafts. maher na | |
| Aug 8, 2017 | Completed final sign-off Mar 2018 | 1 Newhall St | revision to permit #2014-0626-9545 s7. to facilitate emergency generator/fuel oil system review & fire alarm system review. update accurate locations of fsd's in electrical drawings, and provide load calcs for emergency generator. maher naDetails
revision to permit #2014-0626-9545 s7. to facilitate emergency generator/fuel oil system review & fire alarm system review. update accurate locations of fsd's in electrical drawings, and provide load calcs for emergency generator. maher na | |
| Mar 13, 2017 | Never finaled issued Apr 2017, no final | 1 Newhall St | nfpa 24 underground fire water - install 113' feet of 6" ductile iron mortar lined pipe. ref app#201609137617. n/a for maher.Details
nfpa 24 underground fire water - install 113' feet of 6" ductile iron mortar lined pipe. ref app#201609137617. n/a for maher. | $45,000 |
| Feb 7, 2017 | Completed final sign-off Dec 2018 | 250 Howard St | revision to 2015-04-27-4737 s2 (substructure & superstructure) for temp openings at levels b2-12 & level 14 & 27 elevator machine room framing.Details
revision to 2015-04-27-4737 s2 (substructure & superstructure) for temp openings at levels b2-12 & level 14 & 27 elevator machine room framing. | |
| Oct 20, 2016 | Completed final sign-off Aug 2018 | 150 Van Ness Av | temporary construction. erection & operation of tower crane.Details
temporary construction. erection & operation of tower crane. | $50,000 |
| Oct 18, 2016 | Completed final sign-off Aug 2018 | 150 Van Ness Av | temporary construction. erection & operation of tower craneDetails
temporary construction. erection & operation of tower crane | $50,000 |
| Sep 13, 2016 | Completed final sign-off Dec 2017 | 1 Newhall St | sprinkler plans for wet system and preaction system. install to oh2 density design based on storage and lab usesDetails
sprinkler plans for wet system and preaction system. install to oh2 density design based on storage and lab uses | $500,000 |
| Aug 18, 2016 | Never finaled issued Aug 2016, no final | 150 Van Ness Av | revision to ref pa 201604185012 - soil mix toe of soldier beam change f'c to 150psi to 2500psi maher naDetails
revision to ref pa 201604185012 - soil mix toe of soldier beam change f'c to 150psi to 2500psi maher na | |
| Aug 11, 2016 | Completed final sign-off Dec 2018 | 250 Howard St | erect and install a luffing jib tower crane to construct 43 story office building. n/a for maher. ref #2015-0427-4732.Details
erect and install a luffing jib tower crane to construct 43 story office building. n/a for maher. ref #2015-0427-4732. | $200,000 |
| Jul 29, 2016 | Completed final sign-off Mar 2018 | 1 Newhall St | deferred shop drawing submittal to ref pa 201406269545-s2 - fabricate and install stair no.1 and stair no.2 & cross over stair on the roof maherDetails
deferred shop drawing submittal to ref pa 201406269545-s2 - fabricate and install stair no.1 and stair no.2 & cross over stair on the roof maher | |
| Apr 18, 2016 | Completed final sign-off Jul 2017 | 150 Van Ness Av | temporary lateral support of excavation for new consturction by means of soldier beams, wood lagging, tieback & rakers. refer to new construction pa# 2014/06/13/8394. ** maher: n/a **Details
temporary lateral support of excavation for new consturction by means of soldier beams, wood lagging, tieback & rakers. refer to new construction pa# 2014/06/13/8394. ** maher: n/a ** | $750,000 |
| Apr 18, 2016 | Completed final sign-off Jul 2017 | 55 Polk St | temporary lateral support of excavation for new consturction & long-term vertical support of (e) structure by means of solant drilled beams, wood lagging, tieback. (related to new construction pa# 2014/06/13/8394 for 150 van ness avenue). ** maher: n/a **Details
temporary lateral support of excavation for new consturction & long-term vertical support of (e) structure by means of solant drilled beams, wood lagging, tieback. (related to new construction pa# 2014/06/13/8394 for 150 van ness avenue). ** maher: n/a ** | $190,000 |
| Dec 3, 2015 | Completed final sign-off Mar 2021 | 1419 Bryant St | 2 new stories within (e) envelope. no change in building height. renovate (e) bldg to accomodate change of use from mta facility to animal care & control. (e) brick envelop to remain with new struct support. new 2nd fl over half the ground fl w/ new interior walls &(n)struct sys to support (e) roof,Details
2 new stories within (e) envelope. no change in building height. renovate (e) bldg to accomodate change of use from mta facility to animal care & control. (e) brick envelop to remain with new struct support. new 2nd fl over half the ground fl w/ new interior walls &(n)struct sys to support (e) roof, | $26,500,000 |
| Nov 12, 2015 | Completed final sign-off Dec 2018 | 250 Howard St | temporary shoring for subsurface construction ref pa 2015-0427-4732s. maher naDetails
temporary shoring for subsurface construction ref pa 2015-0427-4732s. maher na | $200,000 |
| Nov 4, 2015 | Completed final sign-off Mar 2018 | 1 Newhall St | shop drawings submittal of 18" pre-cast piles for deep foundation system of proposed new building under permit application #201406269545 s.Details
shop drawings submittal of 18" pre-cast piles for deep foundation system of proposed new building under permit application #201406269545 s. | |
| Aug 31, 2015 | Completed final sign-off Dec 2018 | 250 Howard St | installation of test pile drill shaft. reference to new building permit application #201504274732. maher naDetails
installation of test pile drill shaft. reference to new building permit application #201504274732. maher na | $35,000 |
| Aug 28, 2015 | Completed final sign-off Mar 2019 | 195 Beale St | temporary relocate 1 story concrete building to off site facility. temporary off-side location sheedy yard on sf prot property and supports at off-site location on separate permit. n/a maher ord. 155-13Details
temporary relocate 1 story concrete building to off site facility. temporary off-side location sheedy yard on sf prot property and supports at off-site location on separate permit. n/a maher ord. 155-13 | $35,000 |
| Apr 27, 2015 | Completed final sign-off Oct 2019 | 250 Howard St | construct (n) 45-story office buildingDetails
construct (n) 45-story office building | $239,000,000 |
| Jun 26, 2014 | Completed final sign-off Mar 2018 | 1 Newhall St | interior expansion, exterior renovation of (e) 2 story warehouse (circa 1986). new 2nd floor, new roof, renovated & upgraded building & site. change of use from city storage facility to sf office of chief med exam. ** maher: compliance with ordinance no# 155-13 required; route to dph **Details
interior expansion, exterior renovation of (e) 2 story warehouse (circa 1986). new 2nd floor, new roof, renovated & upgraded building & site. change of use from city storage facility to sf office of chief med exam. ** maher: compliance with ordinance no# 155-13 required; route to dph ** | $28,000,000 |