Permit GraphShortlistSan Francisco building permits since 2000

Clark Construction Group Ca Lp

Contractor license
839892
State license record
Based in
Bethesda
On San Francisco permits
Jun 2014 to Apr 2026
Last 24 months
5 permits filed

63 permits since 2000: 38 completed, 17 in progress, 8 never finaled.

Of the 8 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old, 1 is over 10 years old. 1 was filed but never issued.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Most recent permits

AllPergola or trellis 1Deck 1Stairs 6Kitchen remodel 1Bathroom remodel 1
FiledOutcomeAddressWork described on the permitDeclared cost
Apr 8, 2026In progress
filed Apr 2026, not yet issued
1828 Egbert Avref#: 202412317576. work consisting of contructing new 4 stop freight elevator in existing shaf. 2hr rated shaft walls plus 2 new 2 hr rated shaft walls to creat the 4 sided shaft enclosure. project scope includes cutting into the (e) mat foundation to create the elevator pit, plus new steel
Details
Permit
202604089073
Status
filed
Filed
Apr 8, 2026
Declared cost
$700,000
Address
1828 Egbert Av

ref#: 202412317576. work consisting of contructing new 4 stop freight elevator in existing shaf. 2hr rated shaft walls plus 2 new 2 hr rated shaft walls to creat the 4 sided shaft enclosure. project scope includes cutting into the (e) mat foundation to create the elevator pit, plus new steel

Open the permit page

$700,000
Mar 5, 2026In progress
filed Mar 2026, not yet issued
2000 Marin Stproj-26-2627 mou: erect new 1 story type iib & iiib fuel station.
Details
Permit
202512041033
Status
filed
Filed
Mar 5, 2026
Declared cost
$850,000
Address
2000 Marin St

proj-26-2627 mou: erect new 1 story type iib & iiib fuel station.

Open the permit page

$850,000
Apr 7, 2025In progress
issued Mar 2026
1828 Egbert Avproject will serve as temporary location for officers for donning & doffing while a(n)police station is constructed.as such,it will not serve as a police station & is thus not considered an essential services facility.
Details
Permit
202412317576
Status
issued
Filed
Apr 7, 2025
Permit issued
Mar 30, 2026
Declared cost
$7,000,000
Address
1828 Egbert Av

project will serve as temporary location for officers for donning & doffing while a(n)police station is constructed.as such,it will not serve as a police station & is thus not considered an essential services facility.

Open the permit page

$7,000,000
Feb 25, 2025In progress
filed Feb 2025, not yet issued
401 Hunters Point Blproj-25-0614:ancillary site structures for indian basin shoreline park, including shade structure, pergola, playground structures, misc. structures > 4' in height including retaining walls etc.
Details
Permit
202502251016
Status
approved
Filed
Feb 25, 2025
Declared cost
$200,000
Address
401 Hunters Point Bl

proj-25-0614:ancillary site structures for indian basin shoreline park, including shade structure, pergola, playground structures, misc. structures > 4' in height including retaining walls etc.

Open the permit page

$200,000
Nov 5, 2024In progress
filed Nov 2024, not yet issued
750 Phelps Stproj-24-0605; mou sfpuc. to erect 3 stories, no basement, type v-b, business building. (a-2,b,f,h-3)
Details
Permit
202410032285
Status
approved
Filed
Nov 5, 2024
Declared cost
$75,000,000
Address
750 Phelps St

proj-24-0605; mou sfpuc. to erect 3 stories, no basement, type v-b, business building. (a-2,b,f,h-3)

Open the permit page

$75,000,000
Dec 15, 2023In progress
filed Dec 2023, not yet issued
0 Situs To Be Assignedproj-23-0551. erect new parking garage for sfpuc water department. parking garage includes electrical room serving the garage building & fire pump room & domestic water pump room serving entire campus. parking garage is 1 of 6 bldg on new sfwd campus at 2000 marin st.
Details
Permit
202312152623
Status
approved
Filed
Dec 15, 2023
Declared cost
$38,100,000
Address
0 Situs To Be Assigned

proj-23-0551. erect new parking garage for sfpuc water department. parking garage includes electrical room serving the garage building & fire pump room & domestic water pump room serving entire campus. parking garage is 1 of 6 bldg on new sfwd campus at 2000 marin st.

Open the permit page

$38,100,000
Dec 15, 2023In progress
filed Dec 2023, not yet issued
0 Situs To Be Assignedproj-23-0554. erect new shops building for the sfpuc water department. building includes machine shop and employee support areas including lockers, break room, and office areas. shops building is 1 of 6 buildings on the new sfwd campus at 2000 marin st.
Details
Permit
202312152634
Status
approved
Filed
Dec 15, 2023
Declared cost
$18,300,000
Address
0 Situs To Be Assigned

proj-23-0554. erect new shops building for the sfpuc water department. building includes machine shop and employee support areas including lockers, break room, and office areas. shops building is 1 of 6 buildings on the new sfwd campus at 2000 marin st.

Open the permit page

$18,300,000
Dec 15, 2023In progress
filed Dec 2023, not yet issued
0 Situs To Be Assignedproj-23-0553. erect new auto shop building for the sfpuc water department. building includes vehicle repair bays, paint booths, carpentry shop, and employee areas including lockers, break room, and office areas. auto shop building is 1 of 6 buildings on the new sfwd campus at 2000 marin st.
Details
Permit
202312152632
Status
approved
Filed
Dec 15, 2023
Declared cost
$23,800,000
Address
0 Situs To Be Assigned

proj-23-0553. erect new auto shop building for the sfpuc water department. building includes vehicle repair bays, paint booths, carpentry shop, and employee areas including lockers, break room, and office areas. auto shop building is 1 of 6 buildings on the new sfwd campus at 2000 marin st.

Open the permit page

$23,800,000
Dec 15, 2023In progress
filed Dec 2023, not yet issued
0 Situs To Be Assignedproj-23-0558. erect new warehouse building for sfpuc water department. bldg includes regular height and high piled storage, meter shop, fabrication shop and employee support area including lockers, break room, and office areas. warehouse bldg is 1 of 6 bldgs on the new sfwd campus at 2000 marin st.
Details
Permit
202312152635
Status
approved
Filed
Dec 15, 2023
Declared cost
$20,900,000
Address
0 Situs To Be Assigned

proj-23-0558. erect new warehouse building for sfpuc water department. bldg includes regular height and high piled storage, meter shop, fabrication shop and employee support area including lockers, break room, and office areas. warehouse bldg is 1 of 6 bldgs on the new sfwd campus at 2000 marin st.

Open the permit page

$20,900,000
Dec 15, 2023In progress
filed Dec 2023, not yet issued
0 Situs To Be Assignedproj-23-0548. erect new administration building for sfpuc water department. building includes offices, multi-purpose spaces, locker rooms, wellness center, training room, electrical, & landscape shops. administrative building is 1 of 6 bldg on new sfwd campus at 2000 marin st.
Details
Permit
202312152620
Status
approved
Filed
Dec 15, 2023
Declared cost
$48,200,000
Address
0 Situs To Be Assigned

proj-23-0548. erect new administration building for sfpuc water department. building includes offices, multi-purpose spaces, locker rooms, wellness center, training room, electrical, & landscape shops. administrative building is 1 of 6 bldg on new sfwd campus at 2000 marin st.

Open the permit page

$48,200,000
Dec 15, 2023In progress
filed Dec 2023, not yet issued
0 Situs To Be Assignedproj-23-0550. erect new meter kiosk for sfpuc water department. building is for storing meters for distribution to the public by appointment only. meter kiosk is 1 of 6 bldg on new sfwd campus at 2000 marin st.
Details
Permit
202312152622
Status
approved
Filed
Dec 15, 2023
Declared cost
$700,000
Address
0 Situs To Be Assigned

proj-23-0550. erect new meter kiosk for sfpuc water department. building is for storing meters for distribution to the public by appointment only. meter kiosk is 1 of 6 bldg on new sfwd campus at 2000 marin st.

Open the permit page

$700,000
Oct 25, 2023In progress
filed Oct 2023, not yet issued
401 Hunters Point Blproj-25-0614:erect a one story public restroom. type vb.
Details
Permit
202310259422
Status
approved
Filed
Oct 25, 2023
Declared cost
$500,000
Address
401 Hunters Point Bl

proj-25-0614:erect a one story public restroom. type vb.

Open the permit page

$500,000
Oct 25, 2023In progress
filed Oct 2023, not yet issued
401 Hunters Point Blproj-25-0614:indian basin shoreline park project includes a series of wood terraces extending into the park along the hunter's point blvd sidewalk.a great lawn framed by 2 concrete pathways & stairs that connect the wood decks to the gravel shore @ the water's edge.
Details
Permit
202310259489
Status
approved
Filed
Oct 25, 2023
Declared cost
$29,000,000
Address
401 Hunters Point Bl

proj-25-0614:indian basin shoreline park project includes a series of wood terraces extending into the park along the hunter's point blvd sidewalk.a great lawn framed by 2 concrete pathways & stairs that connect the wood decks to the gravel shore @ the water's edge.

Open the permit page

$29,000,000
Oct 25, 2023In progress
filed Oct 2023, not yet issued
401 Hunters Point Blproj-25-0614:erect a one story storage and recreation building (boat house)- type vb.
Details
Permit
202310259421
Status
approved
Filed
Oct 25, 2023
Declared cost
$2,000,000
Address
401 Hunters Point Bl

proj-25-0614:erect a one story storage and recreation building (boat house)- type vb.

Open the permit page

$2,000,000
Dec 29, 2022In progress
issued Mar 2026
1 Sgt John V Young Stto erect a 2-story, type 2a, office building.
Details
Permit
202212299456
Status
issued
Filed
Dec 29, 2022
Permit issued
Mar 31, 2026
Declared cost
$15,000,000
Address
1 Sgt John V Young St

to erect a 2-story, type 2a, office building.

Open the permit page

$15,000,000
Dec 29, 2022In progress
issued Jun 2026
1 Sgt John V Young Stexisting two story building to be rehabilitated and renovated. work includes upgrades to building structure and replacement of plumbing, electrical and mechanical systems, and interior finishes and fixtures.
Details
Permit
202212299451
Status
issued
Filed
Dec 29, 2022
Permit issued
Jun 11, 2026
Declared cost
$14,000,000
Address
1 Sgt John V Young St

existing two story building to be rehabilitated and renovated. work includes upgrades to building structure and replacement of plumbing, electrical and mechanical systems, and interior finishes and fixtures.

Open the permit page

$14,000,000
May 13, 2022Never finaled
issued Aug 2022, no final
1180 Evans Avside grading associated with pa# 202108065970.
Details
Permit
202205134182
Status
issued
Filed
May 13, 2022
Permit issued
Aug 12, 2022
Declared cost
$280,000
Address
1180 Evans Av

side grading associated with pa# 202108065970.

Open the permit page

$280,000
Mar 8, 2022In progress
issued Feb 2025
1200 15th Strenovate, rehab & seisimically retrofit (e) 2-story, 29500 sf building to provide office and operational space for sfmta parking & traffic enforcement division. install a standard office trailer @ adjacent vacant parcel under pa 202401234496 to house the division's emergency related operations.
Details
Permit
202203089442
Status
issued
Filed
Mar 8, 2022
Permit issued
Feb 11, 2025
Declared cost
$28,900,000
Address
1200 15th St

renovate, rehab & seisimically retrofit (e) 2-story, 29500 sf building to provide office and operational space for sfmta parking & traffic enforcement division. install a standard office trailer @ adjacent vacant parcel under pa 202401234496 to house the division's emergency related operations.

Open the permit page

$28,900,000
Aug 6, 2021Never finaled
filed Aug 2021, never issued
1180 Evans Averect a new 3 stories with no basement electrical switchgear/storage. type 2-a
Details
Permit
202108065970
Status
approved
Filed
Aug 6, 2021
Declared cost
$16,000,000
Address
1180 Evans Av

erect a new 3 stories with no basement electrical switchgear/storage. type 2-a

Open the permit page

$16,000,000
Jun 15, 2021Completed
final sign-off Dec 2021
1995 Evans Avspread footing for sculpture to be located at entry plaza - reference to pa #201712217090
Details
Permit
202106152476
Status
complete
Filed
Jun 15, 2021
Permit issued
Jul 21, 2021
Final sign-off
Dec 13, 2021
Declared cost
$75,000
Address
1995 Evans Av

spread footing for sculpture to be located at entry plaza - reference to pa #201712217090

Open the permit page

$75,000
May 20, 2021Completed
final sign-off Nov 2021
1995 Evans Avpipe and tube railings designed by sgh engineers. reference sheets from pa 2017-1221-7090-s2 for structural design criteria and sheets from pa 2017-1221-7090-s3 vol 4 for architectural location and general details.
Details
Permit
202105200755
Status
complete
Filed
May 20, 2021
Permit issued
Aug 10, 2021
Final sign-off
Nov 4, 2021
Declared cost
$30,000
Address
1995 Evans Av

pipe and tube railings designed by sgh engineers. reference sheets from pa 2017-1221-7090-s2 for structural design criteria and sheets from pa 2017-1221-7090-s3 vol 4 for architectural location and general details.

Open the permit page

$30,000
Apr 14, 2021Completed
final sign-off Nov 2021
1995 Evans Avscope is lab fixed louvers (lvr01). reference to pa #201712217090-s7 for cold formed metal framing criteria & reference to pa #201712217090-s3 volume 4 for architectural location
Details
Permit
202104148492
Status
complete
Filed
Apr 14, 2021
Permit issued
Jul 19, 2021
Final sign-off
Nov 4, 2021
Declared cost
$50,000
Address
1995 Evans Av

scope is lab fixed louvers (lvr01). reference to pa #201712217090-s7 for cold formed metal framing criteria & reference to pa #201712217090-s3 volume 4 for architectural location

Open the permit page

$50,000
Mar 16, 2021Completed
final sign-off Nov 2021
1995 Evans Avreference to pa #201712217090 s2&s3 - scope is lab casework, fume hood, and lab equipment seismic restraint designed by vta engineers, teodor francu, and force support services respectively
Details
Permit
202103166689
Status
complete
Filed
Mar 16, 2021
Permit issued
Jul 19, 2021
Final sign-off
Nov 9, 2021
Declared cost
$900,000
Address
1995 Evans Av

reference to pa #201712217090 s2&s3 - scope is lab casework, fume hood, and lab equipment seismic restraint designed by vta engineers, teodor francu, and force support services respectively

Open the permit page

$900,000
Mar 16, 2021Completed
final sign-off Nov 2021
1995 Evans Avreference to pa #201712217090/s2&s3 - scope is metal fabrications including ladder and vehicular barrier systems anchorage designed by sgh
Details
Permit
202103166691
Status
complete
Filed
Mar 16, 2021
Permit issued
Jul 14, 2021
Final sign-off
Nov 4, 2021
Declared cost
$52,000
Address
1995 Evans Av

reference to pa #201712217090/s2&s3 - scope is metal fabrications including ladder and vehicular barrier systems anchorage designed by sgh

Open the permit page

$52,000
Nov 17, 2020Completed
final sign-off Mar 2021
1419 Bryant Stthis is a minor revision to (e) permit. changing occupancy of 1 room from a-3 to b. see sheet a0.22 (revision to 201512034127)
Details
Permit
202011179066
Status
complete
Filed
Nov 17, 2020
Permit issued
Dec 10, 2020
Final sign-off
Mar 18, 2021
Address
1419 Bryant St

this is a minor revision to (e) permit. changing occupancy of 1 room from a-3 to b. see sheet a0.22 (revision to 201512034127)

Open the permit page

Aug 25, 2020Completed
final sign-off Nov 2021
1995 Evans Avscope is metal stairs (stair #1) only, deferred submittal of metal stairs designed by sgh, reference to pa #201712217070 addendum 2.
Details
Permit
202008252576
Status
complete
Filed
Aug 25, 2020
Permit issued
Apr 21, 2021
Final sign-off
Nov 9, 2021
Declared cost
$180,000
Address
1995 Evans Av

scope is metal stairs (stair #1) only, deferred submittal of metal stairs designed by sgh, reference to pa #201712217070 addendum 2.

Open the permit page

$180,000
Jan 16, 2020Completed
final sign-off Dec 2021
1995 Evans Avscope is metal stairs(stair# 2) only. deferred submittal of metal stairs(stairs# 2) designed by pacific stair. reference pa# 2017-1221-7090 s2: foundation & superstructure.
Details
Permit
202001162129
Status
complete
Filed
Jan 16, 2020
Permit issued
Jun 27, 2020
Final sign-off
Dec 13, 2021
Declared cost
$85,000
Address
1995 Evans Av

scope is metal stairs(stair# 2) only. deferred submittal of metal stairs(stairs# 2) designed by pacific stair. reference pa# 2017-1221-7090 s2: foundation & superstructure.

Open the permit page

$85,000
Nov 5, 2019Completed
final sign-off Apr 2020
1399 Mcallister Streplace rear stairs in kind
Details
Permit
201911056536
Status
complete
Filed
Nov 5, 2019
Permit issued
Nov 8, 2019
Final sign-off
Apr 16, 2020
Declared cost
$12,000
Address
1399 Mcallister St

replace rear stairs in kind

Open the permit page

$12,000
Oct 25, 2019Completed
final sign-off Nov 2021
1995 Evans Avscope is brace frames only. deferred submittal of brace frames designed by corebrace. reference documents permit app #2017-1221-7090 s2: foundations, superstructure & metal stairs.
Details
Permit
201910255602
Status
complete
Filed
Oct 25, 2019
Permit issued
Feb 25, 2020
Final sign-off
Nov 4, 2021
Declared cost
$1,500,000
Address
1995 Evans Av

scope is brace frames only. deferred submittal of brace frames designed by corebrace. reference documents permit app #2017-1221-7090 s2: foundations, superstructure & metal stairs.

Open the permit page

$1,500,000
May 1, 2019Completed
final sign-off Aug 2020
1570 Burke Avemergency generator installation into newly remodeled warehouse under pa# 2016/12/19/5336. ** maher: n/a **
Details
Permit
201905019467
Status
complete
Filed
May 1, 2019
Permit issued
Aug 29, 2019
Final sign-off
Aug 4, 2020
Declared cost
$100,000
Address
1570 Burke Av

emergency generator installation into newly remodeled warehouse under pa# 2016/12/19/5336. ** maher: n/a **

Open the permit page

$100,000
Dec 18, 2018Completed
final sign-off Feb 2019
100 Van Ness Avprovide electrical, hook-up power to 2 new overhead rolling doors, relocate 3 (e) light fixtures
Details
Permit
201812188668
Status
complete
Filed
Dec 18, 2018
Permit issued
Dec 18, 2018
Final sign-off
Feb 15, 2019
Declared cost
$5,000
Address
100 Van Ness Av

provide electrical, hook-up power to 2 new overhead rolling doors, relocate 3 (e) light fixtures

Open the permit page

$5,000
Dec 10, 2018Never finaled
issued Dec 2018, no final
333 Golden Gate Avstreet space
Details
Permit
M1014887
Status
issued
Filed
Dec 10, 2018
Permit issued
Dec 10, 2018
Address
333 Golden Gate Av

street space

Open the permit page

Oct 25, 2018Completed
final sign-off May 2021
250 Howard Strevision to 201804274732 s3 for 4 new elevator stops at level 12, (4) new elevator stop at level 25, new elevator lobbies at levels 12 & 25, relocation of restroooms at levels 12 & 25 and additional new unisex toilet room at leverls 12 & 25 maher na
Details
Permit
201810254106
Status
complete
Filed
Oct 25, 2018
Permit issued
Feb 4, 2019
Final sign-off
May 27, 2021
Declared cost
$250,000
Address
250 Howard St

revision to 201804274732 s3 for 4 new elevator stops at level 12, (4) new elevator stop at level 25, new elevator lobbies at levels 12 & 25, relocation of restroooms at levels 12 & 25 and additional new unisex toilet room at leverls 12 & 25 maher na

Open the permit page

$250,000
Sep 17, 2018Completed
final sign-off Apr 2019
250 Howard Strevision to 201604274732 for use of 2 hours rated wrap in selected areas on level 1,44, 45 where gypsum board soffit enclosures cannot be constructed to fully enclose fuel oil lines
Details
Permit
201809170529
Status
complete
Filed
Sep 17, 2018
Permit issued
Sep 20, 2018
Final sign-off
Apr 16, 2019
Declared cost
$10,000
Address
250 Howard St

revision to 201604274732 for use of 2 hours rated wrap in selected areas on level 1,44, 45 where gypsum board soffit enclosures cannot be constructed to fully enclose fuel oil lines

Open the permit page

$10,000
Jul 31, 2018Never finaled
issued Aug 2018, no final
250 Howard Stemergency evacuation signs for 45 story bldg per sffd ab2.11. **maher n/a**
Details
Permit
201807315999
Status
issued
Filed
Jul 31, 2018
Permit issued
Aug 23, 2018
Declared cost
$25,000
Address
250 Howard St

emergency evacuation signs for 45 story bldg per sffd ab2.11. **maher n/a**

Open the permit page

$25,000
Jul 19, 2018Never finaled
issued Apr 2019, no final
452 Larkin Stremodeling of all units only kitchens (14) and bathrooms (14). no structural.
Details
Permit
201807195002
Status
issued
Filed
Jul 19, 2018
Permit issued
Apr 18, 2019
Declared cost
$280,000
Address
452 Larkin St

remodeling of all units only kitchens (14) and bathrooms (14). no structural.

Open the permit page

$280,000
Jun 26, 2018Completed
final sign-off Aug 2020
1570 Burke Avelectrical tap into the line side of existing main switch board for the new elec fire pump. ref pa# 2016/12/19/5336. ** maher: n/a **
Details
Permit
201806262965
Status
complete
Filed
Jun 26, 2018
Permit issued
Jul 27, 2018
Final sign-off
Aug 4, 2020
Declared cost
$25,000
Address
1570 Burke Av

electrical tap into the line side of existing main switch board for the new elec fire pump. ref pa# 2016/12/19/5336. ** maher: n/a **

Open the permit page

$25,000
Apr 25, 2018Completed
final sign-off Oct 2019
250 Howard Strevision to pa 2015-04-27-4732 s3 of new 45 stories high rise office building per drawings.
Details
Permit
201804257383
Status
complete
Filed
Apr 25, 2018
Permit issued
Oct 17, 2018
Final sign-off
Oct 17, 2019
Address
250 Howard St

revision to pa 2015-04-27-4732 s3 of new 45 stories high rise office building per drawings.

Open the permit page

Feb 27, 2018Completed
final sign-off Dec 2018
250 Howard Strevision to 201504274732 s3 for updates to mech fire smoke damper schedule & fan damper matrix. updated mech plan maher na
Details
Permit
201802272391
Status
complete
Filed
Feb 27, 2018
Permit issued
Mar 26, 2018
Final sign-off
Dec 19, 2018
Address
250 Howard St

revision to 201504274732 s3 for updates to mech fire smoke damper schedule & fan damper matrix. updated mech plan maher na

Open the permit page

Jan 9, 2018Completed
final sign-off Aug 2019
175 Beale Stnew park on beale and mission st
Details
Permit
201801098177
Status
complete
Filed
Jan 9, 2018
Permit issued
Mar 6, 2018
Final sign-off
Aug 29, 2019
Declared cost
$250,000
Address
175 Beale St

new park on beale and mission st

Open the permit page

$250,000
Dec 21, 2017Completed
final sign-off Jan 2022
1995 Evans Avto erect 3 stories, no basement, type ii-a full sprinkler, office, lab, assembly, parking garabe, storage building. (b,a-3,f-1,s-1,s-2)
Details
Permit
201712217090
Status
complete
Filed
Dec 21, 2017
Permit issued
Dec 5, 2018
Final sign-off
Jan 6, 2022
Declared cost
$76,500,000
Address
1995 Evans Av

to erect 3 stories, no basement, type ii-a full sprinkler, office, lab, assembly, parking garabe, storage building. (b,a-3,f-1,s-1,s-2)

Open the permit page

$76,500,000
Dec 18, 2017Completed
final sign-off Aug 2019
110 Main Stnew park on corner of howard & main
Details
Permit
201712186775
Status
complete
Filed
Dec 18, 2017
Permit issued
Mar 6, 2018
Final sign-off
Aug 29, 2019
Declared cost
$600,000
Address
110 Main St

new park on corner of howard & main

Open the permit page

$600,000
Nov 3, 2017Never finaled
issued Nov 2017, no final
250 Howard Ststreet space
Details
Permit
M851607
Status
issued
Filed
Nov 3, 2017
Permit issued
Nov 3, 2017
Address
250 Howard St

street space

Open the permit page

Oct 10, 2017Completed
final sign-off Dec 2018
250 Howard Strevision to app#201504274732 s3 for mase flashing ( interior water proofing) details for fsae lobbies .
Details
Permit
201710100828
Status
complete
Filed
Oct 10, 2017
Permit issued
Oct 18, 2017
Final sign-off
Dec 19, 2018
Address
250 Howard St

revision to app#201504274732 s3 for mase flashing ( interior water proofing) details for fsae lobbies .

Open the permit page

Aug 8, 2017Completed
final sign-off Mar 2018
1 Newhall Strevision to permit #201406269545 s3. to facilitate fire alarm system review and show locations of fire rated shafts and shaft bottoms, and reflect options exercised from s5 - elevators and elevator shafts. maher na
Details
Permit
201708084134
Status
complete
Filed
Aug 8, 2017
Permit issued
Aug 23, 2017
Final sign-off
Mar 30, 2018
Address
1 Newhall St

revision to permit #201406269545 s3. to facilitate fire alarm system review and show locations of fire rated shafts and shaft bottoms, and reflect options exercised from s5 - elevators and elevator shafts. maher na

Open the permit page

Aug 8, 2017Completed
final sign-off Mar 2018
1 Newhall Strevision to permit #2014-0626-9545 s7. to facilitate emergency generator/fuel oil system review & fire alarm system review. update accurate locations of fsd's in electrical drawings, and provide load calcs for emergency generator. maher na
Details
Permit
201708084141
Status
complete
Filed
Aug 8, 2017
Permit issued
Aug 23, 2017
Final sign-off
Mar 30, 2018
Address
1 Newhall St

revision to permit #2014-0626-9545 s7. to facilitate emergency generator/fuel oil system review & fire alarm system review. update accurate locations of fsd's in electrical drawings, and provide load calcs for emergency generator. maher na

Open the permit page

Mar 13, 2017Never finaled
issued Apr 2017, no final
1 Newhall Stnfpa 24 underground fire water - install 113' feet of 6" ductile iron mortar lined pipe. ref app#201609137617. n/a for maher.
Details
Permit
201703131308
Status
issued
Filed
Mar 13, 2017
Permit issued
Apr 25, 2017
Declared cost
$45,000
Address
1 Newhall St

nfpa 24 underground fire water - install 113' feet of 6" ductile iron mortar lined pipe. ref app#201609137617. n/a for maher.

Open the permit page

$45,000
Feb 7, 2017Completed
final sign-off Dec 2018
250 Howard Strevision to 2015-04-27-4737 s2 (substructure & superstructure) for temp openings at levels b2-12 & level 14 & 27 elevator machine room framing.
Details
Permit
201702078853
Status
complete
Filed
Feb 7, 2017
Permit issued
Jul 6, 2017
Final sign-off
Dec 19, 2018
Address
250 Howard St

revision to 2015-04-27-4737 s2 (substructure & superstructure) for temp openings at levels b2-12 & level 14 & 27 elevator machine room framing.

Open the permit page

Oct 20, 2016Completed
final sign-off Aug 2018
150 Van Ness Avtemporary construction. erection & operation of tower crane.
Details
Permit
201610200809
Status
complete
Filed
Oct 20, 2016
Permit issued
Nov 1, 2016
Final sign-off
Aug 14, 2018
Declared cost
$50,000
Address
150 Van Ness Av

temporary construction. erection & operation of tower crane.

Open the permit page

$50,000
Oct 18, 2016Completed
final sign-off Aug 2018
150 Van Ness Avtemporary construction. erection & operation of tower crane
Details
Permit
201610180539
Status
complete
Filed
Oct 18, 2016
Permit issued
Nov 1, 2016
Final sign-off
Aug 14, 2018
Declared cost
$50,000
Address
150 Van Ness Av

temporary construction. erection & operation of tower crane

Open the permit page

$50,000
Sep 13, 2016Completed
final sign-off Dec 2017
1 Newhall Stsprinkler plans for wet system and preaction system. install to oh2 density design based on storage and lab uses
Details
Permit
201609137617
Status
complete
Filed
Sep 13, 2016
Permit issued
Feb 1, 2017
Final sign-off
Dec 20, 2017
Declared cost
$500,000
Address
1 Newhall St

sprinkler plans for wet system and preaction system. install to oh2 density design based on storage and lab uses

Open the permit page

$500,000
Aug 18, 2016Never finaled
issued Aug 2016, no final
150 Van Ness Avrevision to ref pa 201604185012 - soil mix toe of soldier beam change f'c to 150psi to 2500psi maher na
Details
Permit
201608185443
Status
issued
Filed
Aug 18, 2016
Permit issued
Aug 22, 2016
Address
150 Van Ness Av

revision to ref pa 201604185012 - soil mix toe of soldier beam change f'c to 150psi to 2500psi maher na

Open the permit page

Aug 11, 2016Completed
final sign-off Dec 2018
250 Howard Sterect and install a luffing jib tower crane to construct 43 story office building. n/a for maher. ref #2015-0427-4732.
Details
Permit
201608114757
Status
complete
Filed
Aug 11, 2016
Permit issued
Dec 28, 2016
Final sign-off
Dec 19, 2018
Declared cost
$200,000
Address
250 Howard St

erect and install a luffing jib tower crane to construct 43 story office building. n/a for maher. ref #2015-0427-4732.

Open the permit page

$200,000
Jul 29, 2016Completed
final sign-off Mar 2018
1 Newhall Stdeferred shop drawing submittal to ref pa 201406269545-s2 - fabricate and install stair no.1 and stair no.2 & cross over stair on the roof maher
Details
Permit
201607293773
Status
complete
Filed
Jul 29, 2016
Permit issued
Aug 10, 2016
Final sign-off
Mar 30, 2018
Address
1 Newhall St

deferred shop drawing submittal to ref pa 201406269545-s2 - fabricate and install stair no.1 and stair no.2 & cross over stair on the roof maher

Open the permit page

Apr 18, 2016Completed
final sign-off Jul 2017
150 Van Ness Avtemporary lateral support of excavation for new consturction by means of soldier beams, wood lagging, tieback & rakers. refer to new construction pa# 2014/06/13/8394. ** maher: n/a **
Details
Permit
201604185012
Status
complete
Filed
Apr 18, 2016
Permit issued
Jul 21, 2016
Final sign-off
Jul 28, 2017
Declared cost
$750,000
Address
150 Van Ness Av

temporary lateral support of excavation for new consturction by means of soldier beams, wood lagging, tieback & rakers. refer to new construction pa# 2014/06/13/8394. ** maher: n/a **

Open the permit page

$750,000
Apr 18, 2016Completed
final sign-off Jul 2017
55 Polk Sttemporary lateral support of excavation for new consturction & long-term vertical support of (e) structure by means of solant drilled beams, wood lagging, tieback. (related to new construction pa# 2014/06/13/8394 for 150 van ness avenue). ** maher: n/a **
Details
Permit
201604185016
Status
complete
Filed
Apr 18, 2016
Permit issued
Jul 21, 2016
Final sign-off
Jul 28, 2017
Declared cost
$190,000
Address
55 Polk St

temporary lateral support of excavation for new consturction & long-term vertical support of (e) structure by means of solant drilled beams, wood lagging, tieback. (related to new construction pa# 2014/06/13/8394 for 150 van ness avenue). ** maher: n/a **

Open the permit page

$190,000
Dec 3, 2015Completed
final sign-off Mar 2021
1419 Bryant St2 new stories within (e) envelope. no change in building height. renovate (e) bldg to accomodate change of use from mta facility to animal care & control. (e) brick envelop to remain with new struct support. new 2nd fl over half the ground fl w/ new interior walls &(n)struct sys to support (e) roof,
Details
Permit
201512034127
Status
complete
Filed
Dec 3, 2015
Permit issued
Mar 16, 2018
Final sign-off
Mar 8, 2021
Declared cost
$26,500,000
Address
1419 Bryant St

2 new stories within (e) envelope. no change in building height. renovate (e) bldg to accomodate change of use from mta facility to animal care & control. (e) brick envelop to remain with new struct support. new 2nd fl over half the ground fl w/ new interior walls &(n)struct sys to support (e) roof,

Open the permit page

$26,500,000
Nov 12, 2015Completed
final sign-off Dec 2018
250 Howard Sttemporary shoring for subsurface construction ref pa 2015-0427-4732s. maher na
Details
Permit
201511122414
Status
complete
Filed
Nov 12, 2015
Permit issued
Nov 25, 2015
Final sign-off
Dec 19, 2018
Declared cost
$200,000
Address
250 Howard St

temporary shoring for subsurface construction ref pa 2015-0427-4732s. maher na

Open the permit page

$200,000
Nov 4, 2015Completed
final sign-off Mar 2018
1 Newhall Stshop drawings submittal of 18" pre-cast piles for deep foundation system of proposed new building under permit application #201406269545 s.
Details
Permit
201511041742
Status
complete
Filed
Nov 4, 2015
Permit issued
Dec 8, 2015
Final sign-off
Mar 30, 2018
Address
1 Newhall St

shop drawings submittal of 18" pre-cast piles for deep foundation system of proposed new building under permit application #201406269545 s.

Open the permit page

Aug 31, 2015Completed
final sign-off Dec 2018
250 Howard Stinstallation of test pile drill shaft. reference to new building permit application #201504274732. maher na
Details
Permit
201508315621
Status
complete
Filed
Aug 31, 2015
Permit issued
Sep 22, 2015
Final sign-off
Dec 19, 2018
Declared cost
$35,000
Address
250 Howard St

installation of test pile drill shaft. reference to new building permit application #201504274732. maher na

Open the permit page

$35,000
Aug 28, 2015Completed
final sign-off Mar 2019
195 Beale Sttemporary relocate 1 story concrete building to off site facility. temporary off-side location sheedy yard on sf prot property and supports at off-site location on separate permit. n/a maher ord. 155-13
Details
Permit
201508285592
Status
complete
Filed
Aug 28, 2015
Permit issued
Oct 16, 2015
Final sign-off
Mar 7, 2019
Declared cost
$35,000
Address
195 Beale St

temporary relocate 1 story concrete building to off site facility. temporary off-side location sheedy yard on sf prot property and supports at off-site location on separate permit. n/a maher ord. 155-13

Open the permit page

$35,000
Apr 27, 2015Completed
final sign-off Oct 2019
250 Howard Stconstruct (n) 45-story office building
Details
Permit
201504274732
Status
complete
Filed
Apr 27, 2015
Permit issued
Oct 28, 2015
Final sign-off
Oct 17, 2019
Declared cost
$239,000,000
Address
250 Howard St

construct (n) 45-story office building

Open the permit page

$239,000,000
Jun 26, 2014Completed
final sign-off Mar 2018
1 Newhall Stinterior expansion, exterior renovation of (e) 2 story warehouse (circa 1986). new 2nd floor, new roof, renovated & upgraded building & site. change of use from city storage facility to sf office of chief med exam. ** maher: compliance with ordinance no# 155-13 required; route to dph **
Details
Permit
201406269545
Status
complete
Filed
Jun 26, 2014
Permit issued
Aug 6, 2015
Final sign-off
Mar 30, 2018
Declared cost
$28,000,000
Address
1 Newhall St

interior expansion, exterior renovation of (e) 2 story warehouse (circa 1986). new 2nd floor, new roof, renovated & upgraded building & site. change of use from city storage facility to sf office of chief med exam. ** maher: compliance with ordinance no# 155-13 required; route to dph **

Open the permit page

$28,000,000