Block 5231, lot 004
1995 Evans Ave
- City’s use
- Commercial Misc
- Built
- 1954
- Stories
- 1
- Rooms
- 5 bathrooms
- Building
- 32,860 sq ft
- Lot
- 33,449 sq ft
- Zoning
- M2
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
17 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 17, 2022 | Never finaled issued Aug 2022, no final | 1995 Evans Av | Atthowe Transportation Cooperative Corp | installation of city owned public art work, entry plaza sfpd building ref 201712217096 for reference onlyDetails
installation of city owned public art work, entry plaza sfpd building ref 201712217096 for reference only | $50,000 |
| Aug 19, 2021 | Completed final sign-off Nov 2021 | 1995 Evans Av | Building Electronic Controls Inc. | errcs as-builts ref pa# 2017-1221-7090 s6Details
errcs as-builts ref pa# 2017-1221-7090 s6 | |
| Aug 19, 2021 | Completed final sign-off Sep 2021 | 1995 Evans Av | Building Electronic Controls Inc. | fire alarm system as-builts ref pa# 2017-1221-7090Details
fire alarm system as-builts ref pa# 2017-1221-7090 | |
| Jun 15, 2021 | Completed final sign-off Dec 2021 | 1995 Evans Av | Clark Construction Group Ca Lp | spread footing for sculpture to be located at entry plaza - reference to pa #201712217090Details
spread footing for sculpture to be located at entry plaza - reference to pa #201712217090 | $75,000 |
| May 20, 2021 | Completed final sign-off Nov 2021 | 1995 Evans Av | Clark Construction Group Ca Lp | pipe and tube railings designed by sgh engineers. reference sheets from pa 2017-1221-7090-s2 for structural design criteria and sheets from pa 2017-1221-7090-s3 vol 4 for architectural location and general details.Details
pipe and tube railings designed by sgh engineers. reference sheets from pa 2017-1221-7090-s2 for structural design criteria and sheets from pa 2017-1221-7090-s3 vol 4 for architectural location and general details. | $30,000 |
| Apr 14, 2021 | Completed final sign-off Nov 2021 | 1995 Evans Av | Clark Construction Group Ca Lp | scope is lab fixed louvers (lvr01). reference to pa #201712217090-s7 for cold formed metal framing criteria & reference to pa #201712217090-s3 volume 4 for architectural locationDetails
scope is lab fixed louvers (lvr01). reference to pa #201712217090-s7 for cold formed metal framing criteria & reference to pa #201712217090-s3 volume 4 for architectural location | $50,000 |
| Mar 25, 2021 | Completed final sign-off Nov 2021 | 1995 Evans Av | Rosendin Electric, Inc. | installation of a 7000 gallon diesel generator fuel tank with fuel sensors,complete assembly. this is an outdoor generator and generator tank surrounded by a protection wall, no roof. this is a belly tank that the generator sits on.1000kw/1250kva,480y/277w,3-phase,4-wire generator.Details
installation of a 7000 gallon diesel generator fuel tank with fuel sensors,complete assembly. this is an outdoor generator and generator tank surrounded by a protection wall, no roof. this is a belly tank that the generator sits on.1000kw/1250kva,480y/277w,3-phase,4-wire generator. | $88,750 |
| Mar 16, 2021 | Completed final sign-off Nov 2021 | 1995 Evans Av | Clark Construction Group Ca Lp | reference to pa #201712217090 s2&s3 - scope is lab casework, fume hood, and lab equipment seismic restraint designed by vta engineers, teodor francu, and force support services respectivelyDetails
reference to pa #201712217090 s2&s3 - scope is lab casework, fume hood, and lab equipment seismic restraint designed by vta engineers, teodor francu, and force support services respectively | $900,000 |
| Mar 16, 2021 | Completed final sign-off Nov 2021 | 1995 Evans Av | Clark Construction Group Ca Lp | reference to pa #201712217090/s2&s3 - scope is metal fabrications including ladder and vehicular barrier systems anchorage designed by sghDetails
reference to pa #201712217090/s2&s3 - scope is metal fabrications including ladder and vehicular barrier systems anchorage designed by sgh | $52,000 |
| Mar 11, 2021 | Completed final sign-off Sep 2021 | 1995 Evans Av | Priority Architectural Graphics Dba Prio | 7 evacuation plan maps floors 1, 2, 3, roof to be reviewed by fire onlyDetails
7 evacuation plan maps floors 1, 2, 3, roof to be reviewed by fire only | $2,100 |
| Aug 25, 2020 | Completed final sign-off Nov 2021 | 1995 Evans Av | Clark Construction Group Ca Lp | scope is metal stairs (stair #1) only, deferred submittal of metal stairs designed by sgh, reference to pa #201712217070 addendum 2.Details
scope is metal stairs (stair #1) only, deferred submittal of metal stairs designed by sgh, reference to pa #201712217070 addendum 2. | $180,000 |
| Jan 16, 2020 | Completed final sign-off Dec 2021 | 1995 Evans Av | Clark Construction Group Ca Lp | scope is metal stairs(stair# 2) only. deferred submittal of metal stairs(stairs# 2) designed by pacific stair. reference pa# 2017-1221-7090 s2: foundation & superstructure.Details
scope is metal stairs(stair# 2) only. deferred submittal of metal stairs(stairs# 2) designed by pacific stair. reference pa# 2017-1221-7090 s2: foundation & superstructure. | $85,000 |
| Oct 25, 2019 | Completed final sign-off Nov 2021 | 1995 Evans Av | Clark Construction Group Ca Lp | scope is brace frames only. deferred submittal of brace frames designed by corebrace. reference documents permit app #2017-1221-7090 s2: foundations, superstructure & metal stairs.Details
scope is brace frames only. deferred submittal of brace frames designed by corebrace. reference documents permit app #2017-1221-7090 s2: foundations, superstructure & metal stairs. | $1,500,000 |
| Jan 16, 2018 | Completed final sign-off May 2019 | 1995 Evans Av | Azul Works, Inc. | demolish 1-story storageDetails
demolish 1-story storage | $100,000 |
| Dec 21, 2017 | Completed final sign-off Jan 2022 | 1995 Evans Av | Clark Construction Group Ca Lp | to erect 3 stories, no basement, type ii-a full sprinkler, office, lab, assembly, parking garabe, storage building. (b,a-3,f-1,s-1,s-2)Details
to erect 3 stories, no basement, type ii-a full sprinkler, office, lab, assembly, parking garabe, storage building. (b,a-3,f-1,s-1,s-2) | $76,500,000 |
| Sep 6, 2006 | Expired or cancelled expired Aug 2007 | 1995 Evans Av | William Spencer Company | new concrete pad on pilesDetails
new concrete pad on piles | $50,000 |
| Mar 15, 2000 | Expired or cancelled expired Jul 2000 | 1995 Evans Av | revision to 9907120Details
revision to 9907120 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Clark Construction Group Ca Lp (9), Building Electronic Controls Inc. (2), Atthowe Transportation Cooperative Corp, Azul Works, Inc., Priority Architectural Graphics Dba Prio, Rosendin Electric, Inc., William Spencer Company
- Architects
- Hok Kyle Prenzlow (3)
- Engineers
- Gerard Madden, Kevin O'connel, Menor Chan, Nicolas Ancel, Selinda A Martinez