Nicolas Ancel
- License
- 4330
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- architect, engineer
- On San Francisco permits
- Dec 2017 to Dec 2022
2 permits since 2000 (architect on 1 permit, engineer on 1 permit): 2 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Clark Construction Group Ca Lp
- Architects
- Kyle Brenzlow
- Engineers
- Chung Linh, Jenny Chan, Menor Chan
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 1
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 15, 2022 | Completed final sign-off Mar 2025 | 1199 09th Av | landscape improvements on the north side of the intersection at 9th ave and lincoln way, including planting and irrigation, new paving, and accessibility improvements, curb ramps, lighting improvements and mta pole modifications.Details
landscape improvements on the north side of the intersection at 9th ave and lincoln way, including planting and irrigation, new paving, and accessibility improvements, curb ramps, lighting improvements and mta pole modifications. | $800,000 | |
| Dec 21, 2017 | Completed final sign-off Jan 2022 | 1995 Evans Av | Clark Construction Group Ca Lp | to erect 3 stories, no basement, type ii-a full sprinkler, office, lab, assembly, parking garabe, storage building. (b,a-3,f-1,s-1,s-2)Details
to erect 3 stories, no basement, type ii-a full sprinkler, office, lab, assembly, parking garabe, storage building. (b,a-3,f-1,s-1,s-2) | $76,500,000 |