| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 9, 2026 | In progress filed Apr 2026, not yet issued | 755 Stanyan St | at&t modification of an (e) wireless facility consisting of: r/r 3 antennas; 12 converters and 1 rectifier & 1 netsure 512 retrofit kit in (e) dc power plantDetails
at&t modification of an (e) wireless facility consisting of: r/r 3 antennas; 12 converters and 1 rectifier & 1 netsure 512 retrofit kit in (e) dc power plant | $46,000 | |
| Apr 3, 2026 | In progress issued Apr 2026 | 100 John F Kennedy Dr | Rainbow Waterproofing & Restor | replace wood arch showing signs of wood decay with (n) arch member. replace in kind to match (e) construction assembly, profile, aesthetics, and structrual integrityDetails
replace wood arch showing signs of wood decay with (n) arch member. replace in kind to match (e) construction assembly, profile, aesthetics, and structrual integrity | $126,800 |
| Dec 17, 2025 | In progress filed Dec 2025, not yet issued | 50 Stow Lake Dr | replacement of existing boatshed with new boatshed on driven wood piles w/wood roof & sidingDetails
replacement of existing boatshed with new boatshed on driven wood piles w/wood roof & siding | $1,300,000 | |
| Jul 31, 2025 | Completed final sign-off May 2026 | 501 Stanyan St | R & S Construction Management Inc | parks and rec. project- renovation of curb ramps and crosswalks along jfk promenade and driveways on stanyan st.Details
parks and rec. project- renovation of curb ramps and crosswalks along jfk promenade and driveways on stanyan st. | $170,340 |
| Apr 29, 2025 | Completed final sign-off Nov 2025 | 1199 09th Av | N B C Construction | barrier removal of ada asphalt pathways, barrier removal of (e) concrete ramp and metal handrail, install concrete ramps and metal handrails along pathway segments, barrier removal of pathways leading to north entrance of garden.Details
barrier removal of ada asphalt pathways, barrier removal of (e) concrete ramp and metal handrail, install concrete ramps and metal handrails along pathway segments, barrier removal of pathways leading to north entrance of garden. | $500,000 |
| Apr 28, 2025 | In progress issued Apr 2025 | 205 Conservatory Dr West Dr | per request from rec park, add address 205 conservatory dr west to apn 1700/001 for bay area young survivors memorial garden in golden gate park.Details
per request from rec park, add address 205 conservatory dr west to apn 1700/001 for bay area young survivors memorial garden in golden gate park. | ||
| Mar 26, 2025 | In progress issued Apr 2025 | 435 Martin Luther King Jr Dr | N B C Construction | mitigate ada barriers at existing restrooms serving the golden gate park botanical garden. renovate & modify (e) pathway & interior restrooms & storeroom. new sinks, toilets, stalls, lighting, gate, new plumbing finishes and electrical workDetails
mitigate ada barriers at existing restrooms serving the golden gate park botanical garden. renovate & modify (e) pathway & interior restrooms & storeroom. new sinks, toilets, stalls, lighting, gate, new plumbing finishes and electrical work | $200,000 |
| Mar 4, 2025 | Completed final sign-off Mar 2025 | 55 Music Concourse Dr | Eco Fire Sprinklers Inc | relocate 2 sprinklers in area of work for tenant improvementDetails
relocate 2 sprinklers in area of work for tenant improvement | $500 |
| Dec 12, 2024 | Completed final sign-off Apr 2026 | 1101 John F Kennedy Dr | M Hernandez Construction Inc | for san francisco police department golden gate stable improvements. demolition and excavation of existing sand within the arena and paddock areas and install new sub-grade improvements. the scope includes imported footing material, sub-drainage, wood wall and minor concrete paving.Details
for san francisco police department golden gate stable improvements. demolition and excavation of existing sand within the arena and paddock areas and install new sub-grade improvements. the scope includes imported footing material, sub-drainage, wood wall and minor concrete paving. | $775,636 |
| Dec 9, 2024 | In progress filed Dec 2024, not yet issued | 55 Hagiwara Tea Garden Dr | Treaty Construction | to obtain final inspection for work approved. under pa 202202037308 and 202204205255. all work is completeDetails
to obtain final inspection for work approved. under pa 202202037308 and 202204205255. all work is complete | |
| Nov 1, 2024 | In progress filed Nov 2024, not yet issued | 80 Hagiwara Tea Garden Dr | repair to long bridge in japanese tea garden. includes replacement of rotten deck boards, handrails, and beams as needed - replace in kind.Details
repair to long bridge in japanese tea garden. includes replacement of rotten deck boards, handrails, and beams as needed - replace in kind. | $175,000 | |
| Sep 10, 2024 | Completed final sign-off Oct 2024 | 55 Music Concourse Dr | Eco Fire Sprinklers Inc | relocation of 7 sprinklers in new soffits ref 2024f07307608Details
relocation of 7 sprinklers in new soffits ref 2024f07307608 | $7,000 |
| Sep 10, 2024 | Completed final sign-off Oct 2024 | 55 Music Concourse Dr | Eco Fire Sprinklers Inc | 3/f: install (2) new upright sprinklers in third floor area of work for tenant improvement.Details
3/f: install (2) new upright sprinklers in third floor area of work for tenant improvement. | $5,000 |
| Jul 30, 2024 | Completed final sign-off Jun 2025 | 55 Music Concourse Dr | C C I Commercial Construction & Improv | renovation of (e) cafe shop facility, removal of part of (e) ceilings. replace (e) equipment, relocation of (e) light fixtures and mechanical hvac.Details
renovation of (e) cafe shop facility, removal of part of (e) ceilings. replace (e) equipment, relocation of (e) light fixtures and mechanical hvac. | $218,191 |
| Jul 24, 2024 | In progress issued Mar 2025 | 1000 Great Hy | International Fire Inc | install 5 new duct detectors with relay modules to be tied into existing facu. ref permit 202111243134Details
install 5 new duct detectors with relay modules to be tied into existing facu. ref permit 202111243134 | $11,000 |
| Jul 16, 2024 | Completed final sign-off Sep 2024 | 55 Music Concourse Dr | Sabah International Incorporated | provide a modificatin of 2 existing fire alarm system ref pa 202311150859Details
provide a modificatin of 2 existing fire alarm system ref pa 202311150859 | $14,000 |
| Jul 16, 2024 | Completed final sign-off Sep 2024 | 55 Music Concourse Dr | Sabah International Incorporated | provide a modificatin of existing fire alarm system ref pa 202311150859; add 3 wall mount l.e.d. notification devices; add 1 control relay for av shutdownDetails
provide a modificatin of existing fire alarm system ref pa 202311150859; add 3 wall mount l.e.d. notification devices; add 1 control relay for av shutdown | $15,000 |
| Jan 23, 2024 | Completed final sign-off Feb 2024 | 970 47th Av | Aaa Restaurant Fire Control/Dba Aaa Fire | furnish and install one ansul r-102 fire system in the kitchen area. ref pa# 202106071856Details
furnish and install one ansul r-102 fire system in the kitchen area. ref pa# 202106071856 | $8,000 |
| Jan 18, 2024 | Completed final sign-off Apr 2024 | 755 Stanyan St | Electric Tech Construction Inc | at&t: mod of an (e) unmanned wireless facility pursuant to 6409. remove and replace 3 antennas. relocate 3 rrus 4426b66 on new back-to-back mounts. relocate 3 rrus 4415b30 on new back-to-back mounts. install 3 new rru back-to-back mount. install 1 new rectifier within (e) dcpp.Details
at&t: mod of an (e) unmanned wireless facility pursuant to 6409. remove and replace 3 antennas. relocate 3 rrus 4426b66 on new back-to-back mounts. relocate 3 rrus 4415b30 on new back-to-back mounts. install 3 new rru back-to-back mount. install 1 new rectifier within (e) dcpp. | $45,000 |
| Dec 27, 2023 | Completed final sign-off Feb 2024 | 55 Music Concourse Dr | Sabah International Incorporated | provide a modification of two existing fire alarm system, demo 4 existing smoke detectors, ref pa# 202311150859.Details
provide a modification of two existing fire alarm system, demo 4 existing smoke detectors, ref pa# 202311150859. | $11,947 |
| Dec 6, 2023 | Completed final sign-off Oct 2024 | 435 Martin Luther King Jr Dr | construct new raised deck with a sloped walkway for barrier free access to the existing bookstore, modify existing gate to accommodate the raised deck.Details
construct new raised deck with a sloped walkway for barrier free access to the existing bookstore, modify existing gate to accommodate the raised deck. | $75,000 | |
| Nov 21, 2023 | In progress issued Mar 2025 | 435 Martin Luther King Jr Dr | per recreation park department, and dt approval, add address 435 martin luther king jr dr at apn 1700/001.Details
per recreation park department, and dt approval, add address 435 martin luther king jr dr at apn 1700/001. | ||
| Nov 15, 2023 | Completed final sign-off Dec 2023 | 55 Music Concourse Dr | Eco Fire Sprinklers Inc | convert (e) preaction system in collections room into light hazard wet srpinkler systemDetails
convert (e) preaction system in collections room into light hazard wet srpinkler system | $8,000 |
| Jun 28, 2023 | Completed final sign-off Jan 2024 | 1199 09th Av | N B C Construction | revision to pa 2021-0216-4716 and 2021-0216-4730 to show revised accessible path of travel per mod. and gate replacement.Details
revision to pa 2021-0216-4716 and 2021-0216-4730 to show revised accessible path of travel per mod. and gate replacement. | |
| Jan 24, 2023 | Completed final sign-off Feb 2024 | 970 47th Av | Siemens Industry, Inc. | 1/f: fire only work to install a fire alarm system for the club house; ref pa# 202106071856Details
1/f: fire only work to install a fire alarm system for the club house; ref pa# 202106071856 | $22,798 |
| Dec 15, 2022 | Completed final sign-off Mar 2025 | 1199 09th Av | landscape improvements on the north side of the intersection at 9th ave and lincoln way, including planting and irrigation, new paving, and accessibility improvements, curb ramps, lighting improvements and mta pole modifications.Details
landscape improvements on the north side of the intersection at 9th ave and lincoln way, including planting and irrigation, new paving, and accessibility improvements, curb ramps, lighting improvements and mta pole modifications. | $800,000 | |
| Jul 26, 2022 | Never finaled issued Oct 2022, no final | 1199 09th Av | Intrepid Electronic Systems Inc | new fire alarm system for new head house & greenhouse for the sf botanical gardens. manual fire alarm system with ada compliant notification devices. ref new construction 202102164730 & 202102164716Details
new fire alarm system for new head house & greenhouse for the sf botanical gardens. manual fire alarm system with ada compliant notification devices. ref new construction 202102164730 & 202102164716 | $20,000 |
| Jun 21, 2022 | Completed final sign-off Sep 2022 | 1475 John F Kennedy Dr | L.D. Strobel Co Ltd | install h frame to support a dc powered fiber equipment.Details
install h frame to support a dc powered fiber equipment. | $2,500 |
| Jun 6, 2022 | Completed final sign-off Sep 2024 | 2001 John F Kennedy Dr | middle lake rehabilitation: excavation and install of new clay liner, planting and irriation, pathways & furishings.Details
middle lake rehabilitation: excavation and install of new clay liner, planting and irriation, pathways & furishings. | $4,000,000 | |
| May 3, 2022 | Completed final sign-off Jul 2023 | 1 Overlook Dr | Liffey Electric Inc | red cloud to install san francisco compliance errcs consisting of head and equipment to convert to 2 inside antennas and one roof mounted antenna liffey electric contractor number 1023656 exp. date 9/30/22.Details
red cloud to install san francisco compliance errcs consisting of head and equipment to convert to 2 inside antennas and one roof mounted antenna liffey electric contractor number 1023656 exp. date 9/30/22. | |
| Apr 25, 2022 | Never finaled issued Jun 2022, no final | 55 Hagiwara Tea Garden Dr | Treaty Construction | rev to pa# 2022-023-7308 install nine parking lot light polesDetails
rev to pa# 2022-023-7308 install nine parking lot light poles | $30,000 |
| Mar 9, 2022 | Completed final sign-off Mar 2023 | 1199 09th Av | Roebuck Construction | install 6" fire line as required under permits 202102164716 & 202102164730.Details
install 6" fire line as required under permits 202102164716 & 202102164730. | $20,000 |
| Feb 22, 2022 | Completed final sign-off Jun 2022 | 55 Music Concourse Dr | Athena Electrical Construction Co | title 24 for new lighting for pa 2021-0412-8289.Details
title 24 for new lighting for pa 2021-0412-8289. | $6,000 |
| Feb 3, 2022 | Never finaled issued Feb 2022, no final | 55 Hagiwara Tea Garden Dr | Treaty Construction | ada barrier removal project, resurface and restrip parking lot to increase the number of ada parking stalls. install 3 new curb ramps and install signs. remove small storage shedDetails
ada barrier removal project, resurface and restrip parking lot to increase the number of ada parking stalls. install 3 new curb ramps and install signs. remove small storage shed | $50,000 |
| Nov 24, 2021 | Never finaled issued Mar 2022, no final | 1000 Great Hy | replace (e) hvac unitDetails
replace (e) hvac unit | $650,000 | |
| Nov 15, 2021 | Never finaled issued Apr 2022, no final | 50 Hagiwara Tea Garden Dr | Alamo Lighting | installation of (34) rivian level 2 chargers, all related electrical and civil activities, and installation of necessary parking signs.Details
installation of (34) rivian level 2 chargers, all related electrical and civil activities, and installation of necessary parking signs. | $142,000 |
| Nov 5, 2021 | Completed final sign-off Nov 2021 | 55 Music Concourse Dr | Eco Fire Sprinklers Inc | revision to previously approved permit #202110019614. install (1) new dry pendent sprinkler in area of work for new freezer. rev1 as-built. ref pa 202109138294.Details
revision to previously approved permit #202110019614. install (1) new dry pendent sprinkler in area of work for new freezer. rev1 as-built. ref pa 202109138294. | |
| Oct 1, 2021 | Completed final sign-off Nov 2021 | 55 Music Concourse Dr | Eco Fire Sprinklers Inc | install 2 new dry pendent fire srpinklers in area of work for new freezer box. ref pa 202109138294.Details
install 2 new dry pendent fire srpinklers in area of work for new freezer box. ref pa 202109138294. | $5,000 |
| Sep 30, 2021 | Never finaled issued Nov 2021, no final | 55 Music Concourse Dr | Jungsten Construction Inc | install 1 electric single faced wall sign on face of the building: "lift every voice"Details
install 1 electric single faced wall sign on face of the building: "lift every voice" | $10,000 |
| Sep 13, 2021 | Completed final sign-off Nov 2021 | 55 Music Concourse Dr | install (1) 116sf walk-in cooler and exterior rear service entrace of academy of science building near room b1b61 animal prep, off of nancy pelosi drive. fire sprinkler for walk in freezer required on separate permit.Details
install (1) 116sf walk-in cooler and exterior rear service entrace of academy of science building near room b1b61 animal prep, off of nancy pelosi drive. fire sprinkler for walk in freezer required on separate permit. | $50,000 | |
| Jul 20, 2021 | Completed final sign-off Apr 2022 | 55 Music Concourse Dr | Sabah International Incorporated | 1st floor: add 2 new smoke det., 2 duct smoke det, 1 control relay & 5 speaker/strobes. demo: 2 extg smoke det, 1 duct smoke det, 2 control relays & 2 interior posing relays. ref app#202104128289Details
1st floor: add 2 new smoke det., 2 duct smoke det, 1 control relay & 5 speaker/strobes. demo: 2 extg smoke det, 1 duct smoke det, 2 control relays & 2 interior posing relays. ref app#202104128289 | $12,399 |
| Jul 7, 2021 | Completed final sign-off Jun 2022 | 55 Music Concourse Dr | C C I Commercial Construction & Improv | cal academy of sciences: exterior renovation of extg east garden. new 1 story outdoor pavilion structure - type 5b, open and free-standing. ol=33. new landscape structures and features.Details
cal academy of sciences: exterior renovation of extg east garden. new 1 story outdoor pavilion structure - type 5b, open and free-standing. ol=33. new landscape structures and features. | $350,000 |
| Jun 10, 2021 | Completed final sign-off Aug 2021 | 55 Music Concourse Dr | Eco Fire Sprinklers Inc | add 30 sprinklers in area of work. for tenant improvementDetails
add 30 sprinklers in area of work. for tenant improvement | $17,000 |
| Jun 7, 2021 | Completed final sign-off Apr 2025 | 970 47th Av | Treaty Construction | erect 1-story type-v, new golf clubhouse building consisting of a pro ship, bar, kitchen, dining area, office, & restrooms. includes excavation, site work, utilities, structural steel & concrete, carpentry, plumbing, electrical, & mehcanical.Details
erect 1-story type-v, new golf clubhouse building consisting of a pro ship, bar, kitchen, dining area, office, & restrooms. includes excavation, site work, utilities, structural steel & concrete, carpentry, plumbing, electrical, & mehcanical. | $1,500,000 |
| Apr 12, 2021 | Completed final sign-off Jun 2022 | 55 Music Concourse Dr | C C I Commercial Construction & Improv | remove interior partitions, at west project research area, construction new partitions, modify the exterior and chang the interior finishes with new mep's to create 1667 sq ft of public exhibit area.Details
remove interior partitions, at west project research area, construction new partitions, modify the exterior and chang the interior finishes with new mep's to create 1667 sq ft of public exhibit area. | $592,529 |
| Mar 24, 2021 | Completed final sign-off Jul 2026 | 300 Bowling Green Dr | International Fire Inc | repair of existing fire alarm system and add radio monitoring.Details
repair of existing fire alarm system and add radio monitoring. | $6,700 |
| Feb 23, 2021 | Never finaled issued Sep 2021, no final | 1199 09th Av | Asbetos Management Group, Roebuck Construction | demolition of a type 5 1 story maintenance & plant propagation, within golden gate parkDetails
demolition of a type 5 1 story maintenance & plant propagation, within golden gate park | $15,000 |
| Feb 23, 2021 | Never finaled issued Sep 2021, no final | 1199 09th Av | Asbetos Management Group, Roebuck Construction | demolition of a type 5 1 story storage, within golden gate parkDetails
demolition of a type 5 1 story storage, within golden gate park | $3,000 |
| Feb 23, 2021 | Never finaled issued Sep 2021, no final | 1199 09th Av | Asbetos Management Group, Roebuck Construction | demolition of a type 5 1-story wood greenhouse, within golden gate parkDetails
demolition of a type 5 1-story wood greenhouse, within golden gate park | $25,000 |
| Feb 16, 2021 | Completed final sign-off Jan 2024 | 1199 09th Av | Roebuck Construction | to erect 1 story headhouse w/ office area, restrooms, clean room, agricultural maint bay, nursery storage and horticultural storageDetails
to erect 1 story headhouse w/ office area, restrooms, clean room, agricultural maint bay, nursery storage and horticultural storage | $1,500,000 |
| Feb 16, 2021 | Completed final sign-off Jan 2024 | 1199 09th Av | Roebuck Construction | to erect 1 story greenhouse, type v-nDetails
to erect 1 story greenhouse, type v-n | $1,500,000 |
| Feb 10, 2021 | Completed final sign-off Jul 2021 | 55 Music Concourse Dr | C C I Commercial Construction & Improv | non-structural interior demo (ab-017) soft demo.Details
non-structural interior demo (ab-017) soft demo. | $35,000 |
| Dec 1, 2020 | Expired or cancelled withdrawn Mar 2021 | 50 Bowling Green Dr | Azul Works, Inc. | design build retaining wall issued under pa #201805149026Details
design build retaining wall issued under pa #201805149026 | |
| Aug 12, 2020 | Never finaled issued Apr 2021, no final | 601 Stanyan St | Azul Works, Inc. | revision to pa#201811307115. the revision scope includes a request for technical infeasbility for the new windows to be installed in the concession space on the south wall. the original scope of work includes renovate an (e) restroom into a kiosk for concession and restroom, and landscape improvemenDetails
revision to pa#201811307115. the revision scope includes a request for technical infeasbility for the new windows to be installed in the concession space on the south wall. the original scope of work includes renovate an (e) restroom into a kiosk for concession and restroom, and landscape improvemen | |
| Feb 26, 2020 | Completed final sign-off Jan 2021 | 100 John F Kennedy Dr | Finnegan Construction | (aka 625 john f kennedy dr - job site is in front of the conservatory of flowers) using engineered drawings - replace temporary installation of sculpture of flowerbed into permanent install by installing concrete footing, attching new base & scupture to new footing.Details
(aka 625 john f kennedy dr - job site is in front of the conservatory of flowers) using engineered drawings - replace temporary installation of sculpture of flowerbed into permanent install by installing concrete footing, attching new base & scupture to new footing. | $3,400 |
| Feb 25, 2020 | Completed final sign-off Jul 2020 | 55 Music Concourse Dr | Jungsten Construction Inc | 2-year installation of wood stage w/in bandshell at spreckls music temple, work includes lighting & audio.Details
2-year installation of wood stage w/in bandshell at spreckls music temple, work includes lighting & audio. | $40,000 |
| Feb 25, 2020 | Never finaled issued Mar 2020, no final | 55 Music Concourse Dr | Soil Engineering Construction | placement of skystar ferris wheel in golden gate park foundation and super structure includedDetails
placement of skystar ferris wheel in golden gate park foundation and super structure included | $42,000 |
| Dec 27, 2019 | Completed final sign-off Mar 2021 | 50 Bowling Green Dr | Pyro-Comm Systems, Inc. | fire alarm 13 wall speaker strobes, 2 ceiling speaker srobes, 5 wall strobes, 1 weather proof wall strobe, 1 pull station, 1 duct detector, 1 smoke detector will be added to the new fire alarm system n/a maherDetails
fire alarm 13 wall speaker strobes, 2 ceiling speaker srobes, 5 wall strobes, 1 weather proof wall strobe, 1 pull station, 1 duct detector, 1 smoke detector will be added to the new fire alarm system n/a maher | $15,000 |
| Dec 20, 2019 | Completed final sign-off Mar 2021 | 50 Bowling Green Dr | Azul Works, Inc. | revision to hvac & electrical work issued under pa 2018-0514-9026Details
revision to hvac & electrical work issued under pa 2018-0514-9026 | |
| Dec 6, 2019 | Completed final sign-off Jan 2021 | 50 Bowling Green Dr | D & S Leong Associates | install 91 sprinklers throughout per nfpa 13 underground per nfpa 24 ref 201805149026Details
install 91 sprinklers throughout per nfpa 13 underground per nfpa 24 ref 201805149026 | $55,000 |
| Dec 3, 2019 | Completed final sign-off Feb 2020 | 55 Music Concourse Dr | Sabah International Incorporated | voluntary modify (e) fire alarm system, add (1) wall speaker/strobeDetails
voluntary modify (e) fire alarm system, add (1) wall speaker/strobe | $8,145 |
| Oct 23, 2019 | Never finaled issued Oct 2019, no final | 49 Overlook Dr | Western Water Constructors Inc. | administrative permit to change address from 21 overlook drive to 49 overlook drive and as-built to update monitoring company. ref pa#201703282501Details
administrative permit to change address from 21 overlook drive to 49 overlook drive and as-built to update monitoring company. ref pa#201703282501 | |
| Sep 17, 2019 | Completed final sign-off Nov 2020 | 1899 Waller St | revision to 2016-1221-5595: reduction of structural work scope at roof. structural work only.Details
revision to 2016-1221-5595: reduction of structural work scope at roof. structural work only. | ||
| Jul 30, 2019 | Never finaled issued Jul 2019, no final | 1750 Oak St | street spaceDetails
street space | ||
| Jul 16, 2019 | Completed final sign-off Jan 2024 | 755 Stanyan St | Advanced Wireless & Logistics Inc | installation of an att wireless telecom facility. 12 antennas, 24 rru's, 4 dc-6 surge suppressors. ground equipment for telco + power sow on cps.Details
installation of an att wireless telecom facility. 12 antennas, 24 rru's, 4 dc-6 surge suppressors. ground equipment for telco + power sow on cps. | $200,000 |
| Jun 27, 2019 | Never finaled issued Jun 2019, no final | 601 Stanyan St | street spaceDetails
street space | ||
| Apr 26, 2019 | Completed final sign-off Oct 2020 | 601 Stanyan St | ref pa 201811307115; permit request for dph review of food kiosk plan as shown in drawings and reference permitDetails
ref pa 201811307115; permit request for dph review of food kiosk plan as shown in drawings and reference permit | ||
| Apr 3, 2019 | Never finaled issued Apr 2019, no final | 601 Stanyan St | street space (1700 oak/ashbury)Details
street space (1700 oak/ashbury) | ||
| Mar 8, 2019 | Completed final sign-off Oct 2019 | 50 Bowling Green Dr | to demolish 1 story recreation building. ** maher: n/a **Details
to demolish 1 story recreation building. ** maher: n/a ** | $20,000 | |
| Feb 1, 2019 | Completed final sign-off Aug 2020 | 1899 Waller St | Johnson Controls Fire | fire alarm demolition: remove (e) 1 duct smoke detector. ref pa201806121641. maher n/a.Details
fire alarm demolition: remove (e) 1 duct smoke detector. ref pa201806121641. maher n/a. | |
| Jan 18, 2019 | Completed final sign-off Apr 2019 | 6101 Fulton St | supplemental application to permit # 2016-0617-0249. for revised and as- built light pole footing.Details
supplemental application to permit # 2016-0617-0249. for revised and as- built light pole footing. | ||
| Dec 3, 2018 | Completed final sign-off Jan 2021 | 1750 Oak St | Cf Contracting Inc | renovation of (e) childrens play areaDetails
renovation of (e) childrens play area | $802,500 |
| Nov 30, 2018 | Completed final sign-off Oct 2020 | 601 Stanyan St | stanyan st between jfk & waller st: renovate (e) restroom info kiosk / restroom, replace 2 pedestrian plazas, modify (e) irrigation and planting. install bocce courts, install park furniture incl pedestrian lights and install / replace pathways.Details
stanyan st between jfk & waller st: renovate (e) restroom info kiosk / restroom, replace 2 pedestrian plazas, modify (e) irrigation and planting. install bocce courts, install park furniture incl pedestrian lights and install / replace pathways. | $650,000 | |
| Oct 22, 2018 | Expired or cancelled cancelled Nov 2019 | 55 Music Concourse Dr | installation of (3) electric vehicle car charging station concrete pad & electrical work. (3) sae level 3 ev chargers, (1) single head light pole, (1) security camera. for public and private use. removal of (2) trees.Details
installation of (3) electric vehicle car charging station concrete pad & electrical work. (3) sae level 3 ev chargers, (1) single head light pole, (1) security camera. for public and private use. removal of (2) trees. | $36,191 | |
| Oct 22, 2018 | Completed final sign-off Oct 2020 | 120 Chain Of Lakes Dr | Point One Electrical Systems Inc | design and install (2) facu's for sprinkler monitoring of 2 pump roomsDetails
design and install (2) facu's for sprinkler monitoring of 2 pump rooms | $58,000 |
| Sep 11, 2018 | Completed final sign-off Oct 2019 | 50 Hagiwara Tea Garden Dr | Swinerton Builders | to assemble/construct bike shelter against existing concrete wall.Details
to assemble/construct bike shelter against existing concrete wall. | $15,000 |
| Jul 6, 2018 | Completed final sign-off Apr 2025 | 501 Stanyan St | Ace Drilling & Excavation | emergency demolition to clubhouse at golden gate course. order #109617-e. to demolish one story type vn constructin club house building.Details
emergency demolition to clubhouse at golden gate course. order #109617-e. to demolish one story type vn constructin club house building. | $5,000 |
| Jun 12, 2018 | Completed final sign-off Apr 2020 | 1899 Waller St | Wickman Development And Construction | replace (e) outdoor self contained generator in kind. **maher n/a**Details
replace (e) outdoor self contained generator in kind. **maher n/a** | $40,000 |
| Jun 6, 2018 | Never finaled issued Jan 2019, no final | 1000 Great Hy | repaint exterior of beach chalet building, match existing colors. replace 20 operable windows at 2nd floor. repair exterior stucco cracks prior to repainting.Details
repaint exterior of beach chalet building, match existing colors. replace 20 operable windows at 2nd floor. repair exterior stucco cracks prior to repainting. | $135,950 | |
| May 23, 2018 | Completed final sign-off Jun 2018 | 55 Music Concourse Dr | Sabah International Incorporated | f/a cal academy of science: modify existing fire alarm system. add (1) new power supply, (2) new wall strobes, (3) new wall speaker/strobe, (1) new ceiling weatherproof speaker/strobe. maher naDetails
f/a cal academy of science: modify existing fire alarm system. add (1) new power supply, (2) new wall strobes, (3) new wall speaker/strobe, (1) new ceiling weatherproof speaker/strobe. maher na | $11,262 |
| May 14, 2018 | Completed final sign-off Jun 2021 | 50 Bowling Green Dr | erect an one story type 5 construction recreation and officeDetails
erect an one story type 5 construction recreation and office | $17,013,752 | |
| May 4, 2018 | Completed final sign-off Jun 2018 | 55 Music Concourse Dr | Eco Fire Sprinklers Inc | relocation of fire sprinklersDetails
relocation of fire sprinklers | $7,000 |
| Mar 23, 2018 | Never finaled issued Mar 2018, no final | 55 Music Concourse Dr | establish occupancy load per fire special event for permanent use per capt. tse. prior permit. ref app#200807257660; n/a maherDetails
establish occupancy load per fire special event for permanent use per capt. tse. prior permit. ref app#200807257660; n/a maher | ||
| Mar 5, 2018 | Never finaled issued Mar 2018, no final | 1691 Martin Luther King Jr Dr | per sfpuc groundwater program, create address for pump station in golden gate park block 1700, lot 001 as; 1691 martin luther king dr.Details
per sfpuc groundwater program, create address for pump station in golden gate park block 1700, lot 001 as; 1691 martin luther king dr. | ||
| Feb 8, 2018 | Never finaled issued Feb 2018, no final | 120 Chain Of Lakes Dr | per request from sfpuc, create new address at golden gate park well station at block 1700, lot 001 as: 120 chain of lakes dr.Details
per request from sfpuc, create new address at golden gate park well station at block 1700, lot 001 as: 120 chain of lakes dr. | ||
| Jan 9, 2018 | Never finaled issued Jan 2018, no final | 49 Overlook Dr | at golden gate park, add address to sffd pump station at block 1700, lot 001 as; 49 overlook dr.Details
at golden gate park, add address to sffd pump station at block 1700, lot 001 as; 49 overlook dr. | ||
| Dec 15, 2017 | Completed final sign-off Jun 2018 | 55 Music Concourse Dr | Gci, Inc | mechanical work only - remove (e) enthalply wheel, cooling coil & humidifer. install new coils chiller & strage tanks to provide dehumidifer **maher n/a**Details
mechanical work only - remove (e) enthalply wheel, cooling coil & humidifer. install new coils chiller & strage tanks to provide dehumidifer **maher n/a** | $851,000 |
| Dec 12, 2017 | Completed final sign-off Oct 2018 | 320 Bowling Green Dr | N B C Construction | work on bowling greens adjacent to the sf lawn bowling club house. work includes: replace extg wood retaining wall with concrete wall. repave nearby path and repair irrigation. n/a maherDetails
work on bowling greens adjacent to the sf lawn bowling club house. work includes: replace extg wood retaining wall with concrete wall. repave nearby path and repair irrigation. n/a maher | $120,000 |
| Oct 19, 2017 | Expired or cancelled cancelled Jan 2026 | 55 Music Concourse Dr | increase occupant load; mount additional sprinkler heads, update egress components, sprinklers and electrical under seperate permit. maher naDetails
increase occupant load; mount additional sprinkler heads, update egress components, sprinklers and electrical under seperate permit. maher na | $2,500 | |
| Sep 12, 2017 | Completed final sign-off Oct 2017 | 55 Music Concourse Dr | Sabah International Incorporated | relocate (2) wall mount strobes. n/a ordinance #155-13Details
relocate (2) wall mount strobes. n/a ordinance #155-13 | $7,349 |
| Sep 8, 2017 | Never finaled issued Sep 2017, no final | 501 Stanyan St | opera in the park concert, stage sam575, stage floor on trailer with roof and canopy (mable stage platform) with dimension 50'x40', stage all structures shall be feree standing, stage floor shall be accessible with accessible chair life and ada portable toilets. one day event only.Details
opera in the park concert, stage sam575, stage floor on trailer with roof and canopy (mable stage platform) with dimension 50'x40', stage all structures shall be feree standing, stage floor shall be accessible with accessible chair life and ada portable toilets. one day event only. | $6,000 | |
| Sep 6, 2017 | Expired or cancelled cancelled Jan 2026 | 1101 John F Kennedy Dr | 1 a-demolish (e) chain link fence & gates approx 550 lf,1- b, demolish (e) wood retaining wall ; approx 210 lf 2-a contruct (n) segmental modular unit retaining wall replacement 2-b construct (n) steel pipe 4 rail, ranch fencing to replace (e)Details
1 a-demolish (e) chain link fence & gates approx 550 lf,1- b, demolish (e) wood retaining wall ; approx 210 lf 2-a contruct (n) segmental modular unit retaining wall replacement 2-b construct (n) steel pipe 4 rail, ranch fencing to replace (e) | $7,000 | |
| Jun 13, 2017 | Completed final sign-off Jun 2017 | 1000 Great Hy | Aaa Restaurant Fire Control/Dba Aaa Fire | rework and repair 1 pyro chem fire suppression system in the basement kitchen area. n/a maherDetails
rework and repair 1 pyro chem fire suppression system in the basement kitchen area. n/a maher | $3,500 |
| Jun 12, 2017 | Never finaled issued Jun 2017, no final | 501 Stanyan St | street spaceDetails
street space | ||
| May 23, 2017 | Never finaled issued May 2017, no final | 501 Stanyan St | Arg Conservation Services | seismic upgrade to existing monument and maintenance to existing masonry and bronze statueDetails
seismic upgrade to existing monument and maintenance to existing masonry and bronze statue | $328,156 |
| May 3, 2017 | Never finaled issued May 2017, no final | 811 Stanyan St | street spaceDetails
street space | ||
| Apr 21, 2017 | Completed final sign-off Jul 2017 | 300 Bowling Green Dr | Fisher Design + Build | remove existing windows and screens and set aside. remove stucco. repair damaged studs and sill plate. install windows and screens, new stucco, prime and paintDetails
remove existing windows and screens and set aside. remove stucco. repair damaged studs and sill plate. install windows and screens, new stucco, prime and paint | $100,000 |
| Apr 5, 2017 | Completed final sign-off Jul 2017 | 1000 Great Hy | Integrity Air Systems Corporation | demo & dispose of (e) type 2 hood/duct and fan & make up air fan. provide and install: type i hood in place of type 2., grease duct from hood to fan on roof, fire wrap, new type 1 fan, (n) untempered make up air fan and new dish duct & rooftop upblast fan for (e) dish hood. n/a ordinance #155-13Details
demo & dispose of (e) type 2 hood/duct and fan & make up air fan. provide and install: type i hood in place of type 2., grease duct from hood to fan on roof, fire wrap, new type 1 fan, (n) untempered make up air fan and new dish duct & rooftop upblast fan for (e) dish hood. n/a ordinance #155-13 | $34,500 |
| Mar 28, 2017 | Never finaled issued Apr 2017, no final | 50 Bowling Green Dr | repair concrete abutement wall @ alvord lake tunnel in golden gate park. (wall location close to sharon art studio). n/a maher ordinanceDetails
repair concrete abutement wall @ alvord lake tunnel in golden gate park. (wall location close to sharon art studio). n/a maher ordinance | $200,000 | |
| Mar 28, 2017 | Completed final sign-off Jan 2020 | 1 Overlook Dr | Western Water Constructors Inc. | install new fire alarm system for golden gate pump station per nfpa 72Details
install new fire alarm system for golden gate pump station per nfpa 72 | $20,000 |
| Jan 17, 2017 | Never finaled issued Jan 2017, no final | 780 Frederick St | working at kezar stadium, occupoant load analysis egress analysis, no construction will be conducted. (total occup. 9691)Details
working at kezar stadium, occupoant load analysis egress analysis, no construction will be conducted. (total occup. 9691) | ||
| Dec 21, 2016 | Completed final sign-off Nov 2020 | 1899 Waller St | mechanical equipment & emergency generator replacement -generator replacement under separate application (gen.dwg for ref). new fluid applied roof,roof drains,curbs & flashing.voluntary structural alterations. n/a maher ordinanceDetails
mechanical equipment & emergency generator replacement -generator replacement under separate application (gen.dwg for ref). new fluid applied roof,roof drains,curbs & flashing.voluntary structural alterations. n/a maher ordinance | $1,000,000 | |
| Nov 16, 2016 | Completed final sign-off Jan 2019 | 2100 Martin Luther King Jr Dr | one story new restroom in golden gate parkDetails
one story new restroom in golden gate park | $505,000 | |
| Jun 17, 2016 | Completed final sign-off Apr 2019 | 6101 Fulton St | barrier removal project- new pathway, stairs, door operator paving, light pole re-installationDetails
barrier removal project- new pathway, stairs, door operator paving, light pole re-installation | $200,000 | |
| Apr 8, 2016 | Never finaled issued Apr 2016, no final | 55 Music Concourse Dr | Sabah International Incorporated | to obtain final inspection for work approved under pa#201406198906. all work is complete.Details
to obtain final inspection for work approved under pa#201406198906. all work is complete. | |
| Apr 6, 2016 | Completed final sign-off Aug 2017 | 1899 Waller St | barrier removal: provide tactile signage as req. new door closers, new pedestrian path with new parking stripes, bollards, and raised curbs, new concrete parking peds & stall with signage. new power door operators & required hardware, repair damaged door at public lobby. maher naDetails
barrier removal: provide tactile signage as req. new door closers, new pedestrian path with new parking stripes, bollards, and raised curbs, new concrete parking peds & stall with signage. new power door operators & required hardware, repair damaged door at public lobby. maher na | $75,000 | |
| May 14, 2015 | Never finaled issued Jul 2015, no final | 4551 John F Kennedy Dr | Robert A. Bothman, Inc. | erect 1-story, type 3, maintenance shed building.Details
erect 1-story, type 3, maintenance shed building. | $200,000 |
| May 12, 2015 | Completed final sign-off Jul 2015 | 55 Music Concourse Dr | Sabah International Incorporated | relocate 1 existing wall mounted speaker/strobe, add 1 new wall mount strobe. t.i. pa#201501216204, n/a ordinance #155-13Details
relocate 1 existing wall mounted speaker/strobe, add 1 new wall mount strobe. t.i. pa#201501216204, n/a ordinance #155-13 | $4,500 |
| Mar 19, 2015 | Expired or cancelled cancelled Sep 2023 | 50 Stow Lake Dr | Protection One Alarm Monitoring Inc | sprinkler alarm monitoring systemDetails
sprinkler alarm monitoring system | $5,200 |
| Mar 3, 2015 | Completed final sign-off Apr 2015 | 55 Music Concourse Dr | Sabah International Incorporated | provide a modification of the (e) fire alarm system for the california academy of science. remove(1) e wall mounted strobe, relocate (2) e wall mounted speaker/strobes, add (1) new wall mount speaker/strobe. all work to be done in basement 1. maher - not req'dDetails
provide a modification of the (e) fire alarm system for the california academy of science. remove(1) e wall mounted strobe, relocate (2) e wall mounted speaker/strobes, add (1) new wall mount speaker/strobe. all work to be done in basement 1. maher - not req'd | $6,375 |
| Mar 2, 2015 | Completed final sign-off Oct 2015 | 300 Bowling Green Dr | The Lawson Roofing Co Inc. | remove existing slate roofing. furnish and install new 30# felt underlayment and new slate roofing to match in kind of existing slate roofing. furnish and install new copper flashings.Details
remove existing slate roofing. furnish and install new 30# felt underlayment and new slate roofing to match in kind of existing slate roofing. furnish and install new copper flashings. | $317,888 |
| Feb 25, 2015 | Completed final sign-off Mar 2015 | 55 Music Concourse Dr | Cisco Fire Sprinklers, Inc. | fire sprinkler work first floor-add 4 and relocate 2 sprinklers in area of work for tenant improvements. t.i. pa#201501216204. n/a ordinance #155-13Details
fire sprinkler work first floor-add 4 and relocate 2 sprinklers in area of work for tenant improvements. t.i. pa#201501216204. n/a ordinance #155-13 | $2,000 |
| Feb 25, 2015 | Completed final sign-off Mar 2015 | 55 Music Concourse Dr | Cisco Fire Sprinklers, Inc. | sprinkler ti b1- relocate 4 sprinlers in area of work for tenant improvements; basement. t.i. pa#201501145698. n/a ordinance #155-13Details
sprinkler ti b1- relocate 4 sprinlers in area of work for tenant improvements; basement. t.i. pa#201501145698. n/a ordinance #155-13 | $2,000 |
| Jan 21, 2015 | Never finaled issued Feb 2015, no final | 55 Music Concourse Dr | C C I Commercial Construction & Improv | remodel (e) level l-1 food preparation & serving areas inlcuding mechanical & electrical modification. new non-structural partitions, lighting, ceiling & finishes. fire life safety work shall be provided as design build services. demo work under pa#201412294567 n/a ordinance #155-13Details
remodel (e) level l-1 food preparation & serving areas inlcuding mechanical & electrical modification. new non-structural partitions, lighting, ceiling & finishes. fire life safety work shall be provided as design build services. demo work under pa#201412294567 n/a ordinance #155-13 | $336,000 |
| Jan 15, 2015 | Completed final sign-off Mar 2015 | 1899 Waller St | Joseph Murphy Construction Inc | reroofingDetails
reroofing | $95,000 |
| Jan 14, 2015 | Completed final sign-off Oct 2016 | 55 Music Concourse Dr | Cci Com'l Constr & Improv**See 985808*** | level b1: remodel of (e) kitchen and dining room, non structural demolition. new non-structural partitions, lighting, ceiling and finishes; maher n/aDetails
level b1: remodel of (e) kitchen and dining room, non structural demolition. new non-structural partitions, lighting, ceiling and finishes; maher n/a | $165,000 |
| Dec 29, 2014 | Expired or cancelled cancelled Jan 2026 | 55 Music Concourse Dr | Cci Com'l Constr & Improv**See 985808*** | scope is limited to demolition only, remove (e) food service equipment & related electrical and plumbing. partial demolition of suspended ceiling & flooring, accessibility will be provided as part of construction drawing sht see sfbc ab-017; space to remain vacant; maher n/aDetails
scope is limited to demolition only, remove (e) food service equipment & related electrical and plumbing. partial demolition of suspended ceiling & flooring, accessibility will be provided as part of construction drawing sht see sfbc ab-017; space to remain vacant; maher n/a | $20,000 |
| Aug 8, 2014 | Completed final sign-off Sep 2014 | 55 Music Concourse Dr | International Fire Equip | install ul300 fire system: ref 2014-0408-2736. ground level = fire alarm connection separate permit.Details
install ul300 fire system: ref 2014-0408-2736. ground level = fire alarm connection separate permit. | $2,500 |
| Jul 29, 2014 | Never finaled issued Jul 2014, no final | 55 Music Concourse Dr | Sabah International Incorporated | resubmittal of revised drawings for 201404082736 fire alarm. maher not required. n/a maher ordinanceDetails
resubmittal of revised drawings for 201404082736 fire alarm. maher not required. n/a maher ordinance | |
| Jun 19, 2014 | Never finaled issued Jun 2014, no final | 55 Music Concourse Dr | Sabah International Incorporated | modification fire alarm system. remove 2 smoke detectors with duct mount plates for associated fsd. relocate 1 smoke detector with ductmount plates. add 2 smoke detectors with duct mounting plates for associated fsd. new fsd's to be connected to (e) power circuit. ref 201212266849 maher n/aDetails
modification fire alarm system. remove 2 smoke detectors with duct mount plates for associated fsd. relocate 1 smoke detector with ductmount plates. add 2 smoke detectors with duct mounting plates for associated fsd. new fsd's to be connected to (e) power circuit. ref 201212266849 maher n/a | $6,270 |
| Jun 2, 2014 | Never finaled issued Jul 2014, no final | 1101 John F Kennedy Dr | slab-on-grade with wall footings at 3 sides of building, trench drain on rear side of building, pre-fabricated building on this slab on grade, 36x24. -maher- compliance with ordinance no. 155-13.not required.Details
slab-on-grade with wall footings at 3 sides of building, trench drain on rear side of building, pre-fabricated building on this slab on grade, 36x24. -maher- compliance with ordinance no. 155-13.not required. | $70,000 | |
| May 30, 2014 | Completed final sign-off Jun 2014 | 50 Hagiwara Tea Garden Dr | Red Hawk Fire & Security Ca Llc | as built drawings. removed 1 smoke detector from original drawings. changed address of 3 existing smoke detectors ref 201405095318. n/a for maher ordinance no.155-13Details
as built drawings. removed 1 smoke detector from original drawings. changed address of 3 existing smoke detectors ref 201405095318. n/a for maher ordinance no.155-13 | |
| May 19, 2014 | Completed final sign-off Aug 2014 | 55 Music Concourse Dr | Acco Engineered Systems Inc. Dba Acco En | 1st floor- install n2 purge exhaust line. n/a maher ordinance 155-13Details
1st floor- install n2 purge exhaust line. n/a maher ordinance 155-13 | $7,000 |
| May 9, 2014 | Completed final sign-off Jun 2014 | 50 Hagiwara Tea Garden Dr | Red Hawk Fire & Security Ca Llc | relocate 7 existing smoke detectors from a beam pocket ceiling to a drop ceiling, relocate 2 existing speaker strobes from a beam pocket ceiling to a drop ceiling, replace 7 existing smoke detector heads with new detectors. t.i.pa# 201402128365. n/a ordinance #155-13Details
relocate 7 existing smoke detectors from a beam pocket ceiling to a drop ceiling, relocate 2 existing speaker strobes from a beam pocket ceiling to a drop ceiling, replace 7 existing smoke detector heads with new detectors. t.i.pa# 201402128365. n/a ordinance #155-13 | $6,000 |
| Apr 8, 2014 | Completed final sign-off Sep 2014 | 55 Music Concourse Dr | Sabah International Incorporated | provide modification of existing fire alarm system. add new 4 duct detectors and 4 control relays to shut down new ac uits servicing west garden cafe. 1 new smoke det, 1 heat detector,1 monitor module for ansul kitchen hood supression systm. 2 new input signal modules for speaker interface in elecDetails
provide modification of existing fire alarm system. add new 4 duct detectors and 4 control relays to shut down new ac uits servicing west garden cafe. 1 new smoke det, 1 heat detector,1 monitor module for ansul kitchen hood supression systm. 2 new input signal modules for speaker interface in elec | $13,556 |
| Feb 26, 2014 | Completed final sign-off May 2025 | 50 Hagiwara Tea Garden Dr | Ayoob & Peery Plumbing Co Inc | lower level:relocate fire sprinkler heads per t.i. (7 relocate lower level) ref app#201402128365. n/a for the maher ordinance #155-13Details
lower level:relocate fire sprinkler heads per t.i. (7 relocate lower level) ref app#201402128365. n/a for the maher ordinance #155-13 | $3,598 |
| Feb 12, 2014 | Completed final sign-off May 2014 | 50 Hagiwara Tea Garden Dr | Swinerton Builders | g/f -remodel of an interior office space, work includes addition of approx. 2,000 sq.ft. office, new painting, flooring and millwork. compliance with ordinance #155-13 not required.mep under seperate permit.Details
g/f -remodel of an interior office space, work includes addition of approx. 2,000 sq.ft. office, new painting, flooring and millwork. compliance with ordinance #155-13 not required.mep under seperate permit. | $180,000 |
| Jan 27, 2014 | Completed final sign-off Sep 2014 | 55 Music Concourse Dr | Plant Construction Company Lp | soft demo, guardrail, weathering yard, partitions & rails, windows slats for future tenant. compliance with ordinance #155-13 not required. excavation <50 cu.yd.Details
soft demo, guardrail, weathering yard, partitions & rails, windows slats for future tenant. compliance with ordinance #155-13 not required. excavation <50 cu.yd. | $6,000 |
| Dec 17, 2013 | Never finaled issued Jan 2014, no final | 4551 John F Kennedy Dr | compliance with ordinance no.155-13 required. route to dph. renovation of stand along public restroom bldg. renovation of (e) athletic fields including lighting, fencing, paving, landscape, irrigation & site furniture.Details
compliance with ordinance no.155-13 required. route to dph. renovation of stand along public restroom bldg. renovation of (e) athletic fields including lighting, fencing, paving, landscape, irrigation & site furniture. | $2,200,000 | |
| Dec 13, 2013 | Never finaled issued Jan 2014, no final | 55 Music Concourse Dr | Cci Com'l Constr & Improv**See 985808*** | renovation of basement bi level storage room - installation of walls + glass walls for animal display.Details
renovation of basement bi level storage room - installation of walls + glass walls for animal display. | $50,000 |
| Nov 5, 2013 | Completed final sign-off Mar 2016 | 1199 09th Av | International Fire Equip | install ul 300 fire systemDetails
install ul 300 fire system | $3,500 |
| Sep 6, 2013 | Never finaled issued Sep 2013, no final | 1801 John F Kennedy Dr | add 1801 john f kennedy dr & 1901 john f kennedy dr to block 1700 lot 001.Details
add 1801 john f kennedy dr & 1901 john f kennedy dr to block 1700 lot 001. | ||
| Aug 23, 2013 | Completed final sign-off Sep 2014 | 55 Music Concourse Dr | Plant Construction Company Lp | erect 1 story, no basement, type 5, garden cafe building.Details
erect 1 story, no basement, type 5, garden cafe building. | $200,000 |
| Jun 24, 2013 | Completed final sign-off May 2016 | 50 Hagiwara Tea Garden Dr | Ayoob & Peery Plumbing Co Inc | tenant improvement: add 2 sprinkler heads at ground level ref permit 201306200050Details
tenant improvement: add 2 sprinkler heads at ground level ref permit 201306200050 | $1,028 |
| Jun 20, 2013 | Completed final sign-off Aug 2013 | 50 Hagiwara Tea Garden Dr | Swinerton Builders | remodel of an interior office space. the work includes the addition of a 10'x13' office, new painting, flooring and millwork.Details
remodel of an interior office space. the work includes the addition of a 10'x13' office, new painting, flooring and millwork. | $45,000 |
| Jun 7, 2013 | Never finaled issued Jun 2013, no final | 50 Stow Lake Dr | Protection One Alarm Monitoring Inc | as built, please ref to approved plans pa# 201303283300Details
as built, please ref to approved plans pa# 201303283300 | $4,200 |
| May 31, 2013 | Completed final sign-off Jul 2016 | 55 Music Concourse Dr | Cisco Fire Sprinklers, Inc. | relocate 18 extg pendent fire spirnkler heads for new walls added. add 9 new pendent fire sprinkler heads for new walls added.Details
relocate 18 extg pendent fire spirnkler heads for new walls added. add 9 new pendent fire sprinkler heads for new walls added. | $15,000 |
| May 24, 2013 | Never finaled issued May 2013, no final | 55 Music Concourse Dr | Cci Com'l Constr & Improv**See 985808*** | remodel of display area at existing lower floor including 7'-0" high wood panel sliding security partition. millwork by others.Details
remodel of display area at existing lower floor including 7'-0" high wood panel sliding security partition. millwork by others. | $10,000 |
| Mar 28, 2013 | Never finaled issued Mar 2013, no final | 50 Stow Lake Dr | Protection One Alarm Monitoring Inc | install fire alarm monitoring system including: (1) fire pnael, (1) annunciator keypad, (1) pull station, (1) conventional smoke detector, (2) horn strobes, (1) strobe, no exterior work done.Details
install fire alarm monitoring system including: (1) fire pnael, (1) annunciator keypad, (1) pull station, (1) conventional smoke detector, (2) horn strobes, (1) strobe, no exterior work done. | $4,200 |
| Feb 4, 2013 | Expired or cancelled cancelled May 2024 | 1199 09th Av | Oliver & Company Inc. | to erect 1 story nursery w/ green house and a3 assembly area in golden gate park.Details
to erect 1 story nursery w/ green house and a3 assembly area in golden gate park. | $5,500,000 |
| Jan 29, 2013 | Completed final sign-off Feb 2013 | 50 Stow Lake Dr | International Fire Equip | install ul300 fire systemDetails
install ul300 fire system | $1,500 |
| Jan 14, 2013 | Completed final sign-off May 2016 | 55 Music Concourse Dr | minor demolition of extg wallsDetails
minor demolition of extg walls | $5,000 | |
| Jan 14, 2013 | Never finaled issued Jan 2013, no final | 55 Music Concourse Dr | Sabah International Incorporated | replace extg smk det on 1st floor. add inter posing relay to extg relay #02190190Details
replace extg smk det on 1st floor. add inter posing relay to extg relay #02190190 | $4,747 |
| Jan 14, 2013 | Completed final sign-off Mar 2014 | 55 Music Concourse Dr | Sabah International Incorporated | basement:9 new devices. provide a modification of the extg fire alarm system for the california academy of science at 55 music concourse drive golden gate park california. the addition shall consist of providing the following. add 4 new smoke det. with duct mounting plates,add 4 new strobes,Details
basement:9 new devices. provide a modification of the extg fire alarm system for the california academy of science at 55 music concourse drive golden gate park california. the addition shall consist of providing the following. add 4 new smoke det. with duct mounting plates,add 4 new strobes, | $17,500 |
| Dec 26, 2012 | Completed final sign-off Jul 2016 | 55 Music Concourse Dr | Cci Com'l Constr & Improv**See 985808*** | t.i renovation of basement b1 level support areas. converting office spaces to storage. removal and construction of drywall partitions. mech, plumbing & electrical work. open in existing concrete wall. sprinklers, fire alarm under sep permitsDetails
t.i renovation of basement b1 level support areas. converting office spaces to storage. removal and construction of drywall partitions. mech, plumbing & electrical work. open in existing concrete wall. sprinklers, fire alarm under sep permits | $2,000,000 |
| Sep 14, 2012 | Completed final sign-off Feb 2013 | 50 Stow Lake Dr | upgrade concession counter and kitchen, renovate boat repair area into dining, storage, ada restroom. new lighting, electrical, plumbing.Details
upgrade concession counter and kitchen, renovate boat repair area into dining, storage, ada restroom. new lighting, electrical, plumbing. | $180,000 | |
| Sep 14, 2012 | Completed final sign-off Sep 2012 | 55 Music Concourse Dr | Ayoob & Peery Plumbing Co Inc | 3rd floor-automatic fire sprinkler-relocate 1 & add 1 sprinkler to office tenant improvement. ti pa# 2012-0904-8821.Details
3rd floor-automatic fire sprinkler-relocate 1 & add 1 sprinkler to office tenant improvement. ti pa# 2012-0904-8821. | $1,000 |
| Sep 4, 2012 | Completed final sign-off Oct 2012 | 55 Music Concourse Dr | Hathaway Dinwiddie Co. | construct small office. new partitions, door, finishes- sprinklers under separate permit-Details
construct small office. new partitions, door, finishes- sprinklers under separate permit- | $10,000 |
| May 11, 2012 | Never finaled issued May 2012, no final | 10 Bowling Green Dr | currently a service window 6'x6' behind a security gate that does not open will be replaced by a metal sliding gate that does openDetails
currently a service window 6'x6' behind a security gate that does not open will be replaced by a metal sliding gate that does open | $2,000 | |
| May 9, 2012 | Completed final sign-off Sep 2012 | 55 Music Concourse Dr | Sabah International Incorporated | 2nd floor:provide a modification of the extg system. add 8 new smart device duct smoke detectors. add 8 new high humidity enclosures for deck smk.det.Details
2nd floor:provide a modification of the extg system. add 8 new smart device duct smoke detectors. add 8 new high humidity enclosures for deck smk.det. | $12,580 |
| Apr 27, 2012 | Completed final sign-off Jun 2012 | 55 Concourse Dr | Cci Com'l Constr & Improv**See 985808*** | extend north concrete site wall & south concrete curb. extend bicycle parking pad. install new bicycle parking racks embedded into new bicycle parking pad. add concrete ramp from sidewalk to new bicycle pad.Details
extend north concrete site wall & south concrete curb. extend bicycle parking pad. install new bicycle parking racks embedded into new bicycle parking pad. add concrete ramp from sidewalk to new bicycle pad. | $35,000 |
| Apr 13, 2012 | Completed final sign-off Jun 2012 | 55 Concourse Dr | Cisco Fire Sprinklers, Inc. | add 14 sprinkler in temp exhibit, to exist sprinkler system.Details
add 14 sprinkler in temp exhibit, to exist sprinkler system. | $10,000 |
| Apr 9, 2012 | Expired or cancelled cancelled Jan 2020 | 100 John F. Kennedy Dr | Grand Industries Inc | to erect 1 story, special events building.Details
to erect 1 story, special events building. | $50,000 |
| Apr 6, 2012 | Never finaled issued Apr 2012, no final | 10 Bowling Green Dr | add new address 10 bowling green drive to block 1700 lot 001.Details
add new address 10 bowling green drive to block 1700 lot 001. | ||
| Apr 4, 2012 | Expired or cancelled cancelled Nov 2024 | 55 Concourse Dr | replacement of existing exhibit. construct new partion walls and sprinkler system alteration.Details
replacement of existing exhibit. construct new partion walls and sprinkler system alteration. | $110,000 | |
| Mar 19, 2012 | Never finaled issued Mar 2012, no final | 811 Stanyan St | street space permitDetails
street space permit | ||
| Mar 16, 2012 | Never finaled issued Mar 2012, no final | 100 Martin Luther King Dr | Ron Breckenridge Entrprses/Rb Petroleum | replace fuel piping between dispensing pump & fuel storage tank (in-kind) no concrete cutting required.Details
replace fuel piping between dispensing pump & fuel storage tank (in-kind) no concrete cutting required. | $3,000 |
| Mar 15, 2012 | Completed final sign-off Jun 2013 | 55 Concourse Dr | Sabah International Incorporated | remove a section of (e) hi-fog system & re-install to clear hvac ducting being installed. no other changes to the (e) system is to occur.Details
remove a section of (e) hi-fog system & re-install to clear hvac ducting being installed. no other changes to the (e) system is to occur. | $39,000 |
| Feb 23, 2012 | Completed final sign-off Jun 2012 | 55 Concourse Dr | Sabah International Incorporated | basement #2-add 1 photo smoke detectorDetails
basement #2-add 1 photo smoke detector | $4,409 |
| Feb 9, 2012 | Completed final sign-off Mar 2012 | 55 Concourse Dr | Ayoob & Peery Plumbing Co Inc | level b2-relocate fire sprinkler heads per tenant improvement. 1 relocate.Details
level b2-relocate fire sprinkler heads per tenant improvement. 1 relocate. | $700 |
| Feb 2, 2012 | Completed final sign-off Apr 2012 | 55 Concourse Dr | Hathaway Dinwiddie Co. | construction of a new lab space on b2 level. new sink,millwork, and ceiling. 1 new vav zone to serve this area. plumbing, fire sprinkler, electrical under separate permitDetails
construction of a new lab space on b2 level. new sink,millwork, and ceiling. 1 new vav zone to serve this area. plumbing, fire sprinkler, electrical under separate permit | $66,573 |
| Dec 6, 2011 | Never finaled issued Mar 2012, no final | 55 Concourse Dr | Acco Engineered Systems Inc. Dba Acco En | mechanical alteration of existing air handler system to redirect exhaust paths of collection spaces. new ducting and exhaust fans to be installedDetails
mechanical alteration of existing air handler system to redirect exhaust paths of collection spaces. new ducting and exhaust fans to be installed | $130,000 |
| Nov 14, 2011 | Completed final sign-off Apr 2016 | 55 Concourse Dr | Ayoob & Peery Plumbing Co Inc | add, drop fire sprinkler heads per tenant impv. level b1: east (13 add) central lowering branch lines only) west (9 add) level b2: east (9 add) central (12 add) west (13 add) level 1 west (23 add) level 2 east (20 add) west (19 add) level 3 lower existing drops (42 total)Details
add, drop fire sprinkler heads per tenant impv. level b1: east (13 add) central lowering branch lines only) west (9 add) level b2: east (9 add) central (12 add) west (13 add) level 1 west (23 add) level 2 east (20 add) west (19 add) level 3 lower existing drops (42 total) | $82,000 |
| Oct 11, 2011 | Never finaled issued Oct 2011, no final | 811 Stanyan St | street spaceDetails
street space | ||
| Aug 29, 2011 | Never finaled issued Aug 2011, no final | 55 Concourse Dr | Caldwell Roland Roofing | remove & reinstall gutters, replace in kind.Details
remove & reinstall gutters, replace in kind. | $27,980 |
| Aug 11, 2011 | Never finaled issued Oct 2011, no final | 55 Concourse Dr | Uni-Systems West Inc | the (e) fibric panel operable skylight roof structure over the piazza atrium is to be replaced with a new supporting frame & poly-carbonate covering.Details
the (e) fibric panel operable skylight roof structure over the piazza atrium is to be replaced with a new supporting frame & poly-carbonate covering. | $919,441 |
| Jul 25, 2011 | Completed final sign-off Aug 2011 | 55 Concourse Dr | Sabah International Incorporated | basement #1-replace (e) 1 strobe with speaker/strobe, add 1 smoke detector, add 2 control relays for won/sliding door, re-assign (e) relay for curtain door to fan shutdown. all new devices will be connected to (e) fire alarm system as shown on the drawingsDetails
basement #1-replace (e) 1 strobe with speaker/strobe, add 1 smoke detector, add 2 control relays for won/sliding door, re-assign (e) relay for curtain door to fan shutdown. all new devices will be connected to (e) fire alarm system as shown on the drawings | $6,021 |
| Jul 20, 2011 | Completed final sign-off Aug 2011 | 55 Concourse Dr | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system, 1 added sprinkler @ 1st floor.Details
existing fire sprinkler system, 1 added sprinkler @ 1st floor. | $1,000 |
| Jul 11, 2011 | Never finaled issued Jul 2011, no final | 811 Stanyan St | street spaceDetails
street space | ||
| Jun 21, 2011 | Never finaled issued Jun 2011, no final | 55 Concourse Dr | Gci, Inc | changes to existing rainforest exit elevator lobby to create airlock. replacment of existing rated door. assembly with articulating rated won door assembly.Details
changes to existing rainforest exit elevator lobby to create airlock. replacment of existing rated door. assembly with articulating rated won door assembly. | $80,000 |
| Apr 28, 2011 | Completed final sign-off Apr 2012 | 811 Stanyan St | Gallieria, Inc/Trico Cons | ref to permit #201008068288. revised work:structural work changes.Details
ref to permit #201008068288. revised work:structural work changes. | |
| Mar 30, 2011 | Completed final sign-off Apr 2012 | 811 Stanyan St | Intrepid Electronic Systems Inc | new central station monitored manual & automatic fire alarm system including manual pull stations at exits, partial area smoke detection for exit corridor, laundry, kitchenette, storage & tel data rooms, audible/visual notification throughout.Details
new central station monitored manual & automatic fire alarm system including manual pull stations at exits, partial area smoke detection for exit corridor, laundry, kitchenette, storage & tel data rooms, audible/visual notification throughout. | $12,000 |
| Mar 21, 2011 | Never finaled issued Mar 2011, no final | 811 Stanyan St | street space permitDetails
street space permit | ||
| Oct 4, 2010 | Expired or cancelled cancelled Aug 2022 | 50 Hagiwara Tea Garden Dr | interior alteration of ground floor including new flooring, electrical, new energy efficient lighting, replacing (e) sliding doorsDetails
interior alteration of ground floor including new flooring, electrical, new energy efficient lighting, replacing (e) sliding doors | $120,000 | |
| Aug 20, 2010 | Completed final sign-off Oct 2010 | 55 Concourse Dr | Sabah International Incorporated | rchange out 97 ionization somke detectors part# siga-is located in wet collections rooms with 97 photo electric smoke detectors part #siga-ps. there is no change to the sequence of operations of the f/a system.Details
rchange out 97 ionization somke detectors part# siga-is located in wet collections rooms with 97 photo electric smoke detectors part #siga-ps. there is no change to the sequence of operations of the f/a system. | $3,200 |
| Aug 6, 2010 | Completed final sign-off Apr 2012 | 811 Stanyan St | geneal renovation to bldg. including structural upgrade, ada compliances, toilet rooms & offices remodel parking resurface, sidewalk recontruction/repair, exterior siding & roof overhang repair. (building classified as historic landmark no. 201).Details
geneal renovation to bldg. including structural upgrade, ada compliances, toilet rooms & offices remodel parking resurface, sidewalk recontruction/repair, exterior siding & roof overhang repair. (building classified as historic landmark no. 201). | $965,000 | |
| Apr 27, 2010 | Expired or cancelled cancelled Jan 2026 | 100 John F. Kennedy Dr | (e) greenhouse structure: occupancy load permit, onlyDetails
(e) greenhouse structure: occupancy load permit, only | ||
| Apr 27, 2010 | Never finaled issued Apr 2010, no final | 55 Concourse Dr | Sabah International Incorporated | relocate strobe and speaker strob. adding 3 speaker strobes. one of the speaker strobes is weather proof. install test and final.Details
relocate strobe and speaker strob. adding 3 speaker strobes. one of the speaker strobes is weather proof. install test and final. | $3,423 |
| Feb 5, 2010 | Never finaled issued Mar 2011, no final | 4750 Martin Luther King Dr | Roebuck Construction | seismic improvements, ada code upgrades, electrical & hvac upgrades, window replacement & re-roofingDetails
seismic improvements, ada code upgrades, electrical & hvac upgrades, window replacement & re-roofing | $500,000 |
| Feb 1, 2010 | Completed final sign-off Jul 2010 | 100 Martin Luther King Dr | T L M Petro Labor Force Inc | evr phase 2 upgrade- fueling station . evaporative vapor recovery system intallationDetails
evr phase 2 upgrade- fueling station . evaporative vapor recovery system intallation | $20,000 |
| Jan 5, 2010 | Never finaled issued Jan 2010, no final | 55 Concourse Dr | Acco Engineered Systems Inc. Dba Acco En | installation of new 60 ton chiller and assocaited piping, pumps and new chilled water coil. new system replaces existing cw coil in ahv-10, service the forum. concrete work includes a housekeeping pad for the chiller. all work per plans.Details
installation of new 60 ton chiller and assocaited piping, pumps and new chilled water coil. new system replaces existing cw coil in ahv-10, service the forum. concrete work includes a housekeeping pad for the chiller. all work per plans. | $400,000 |
| Dec 8, 2009 | Completed final sign-off Aug 2011 | 50 Hagiwara Tea Garden Dr | Murata Construction & Landscape Design | rehabuilitation of tea house pavilion finishes, new energy efficient lights, move existing door and new window in tea preparation area, no structural, mechanical or plumbing workDetails
rehabuilitation of tea house pavilion finishes, new energy efficient lights, move existing door and new window in tea preparation area, no structural, mechanical or plumbing work | $75,000 |
| Dec 2, 2009 | Never finaled issued Apr 2010, no final | 2999 John F. Kennedy Dr | Marcor Environmental West Inc. | demolition of grandstand (stables) at golden gate park.Details
demolition of grandstand (stables) at golden gate park. | $177,000 |
| Nov 30, 2009 | Never finaled issued Dec 2009, no final | 55 Concourse Dr | Acco Engineered Systems Inc. Dba Acco En | install 90 ton. chiller unit and chill water piping, connect to existing electrical system panels for aquatic life support tanks.Details
install 90 ton. chiller unit and chill water piping, connect to existing electrical system panels for aquatic life support tanks. | $400,000 |
| Sep 11, 2009 | Expired or cancelled cancelled Jan 2026 | 55 Concourse Dr | add one 3303 cabinet in existing equipment room in basement.Details
add one 3303 cabinet in existing equipment room in basement. | $2,000 | |
| Jun 29, 2009 | Completed final sign-off Sep 2009 | 55 Concourse Dr | Metropolitan Electrical Construction | at&t proposes to add 1-2308 cabinet to existing das system.Details
at&t proposes to add 1-2308 cabinet to existing das system. | $5,000 |
| Mar 30, 2009 | Completed final sign-off Apr 2009 | 55 Concourse Dr | Sabah International Incorporated | fire alarm system 2nd floor area "a" service room & office area , add one speaker/storbe in call center, move one speaker/strobe indside the server room, delete 6 smoke detector next to the server room, move & decrease candela as shown in lab & move speaker/strobe & add one.Details
fire alarm system 2nd floor area "a" service room & office area , add one speaker/storbe in call center, move one speaker/strobe indside the server room, delete 6 smoke detector next to the server room, move & decrease candela as shown in lab & move speaker/strobe & add one. | $7,800 |
| Mar 2, 2009 | Completed final sign-off Apr 2009 | 55 Concourse Dr | Cisco Fire Sprinklers, Inc. | add 7 new fire sprinklers and relcoate +/- 10 for new t-bar ceiling's changed or added.Details
add 7 new fire sprinklers and relcoate +/- 10 for new t-bar ceiling's changed or added. | $10,000 |
| Feb 25, 2009 | Completed final sign-off Apr 2009 | 55 Concourse Dr | Cci Com'l Constr & Improv**See 985808*** | modification of partition at server room conversion of extg spaces to call center. new file room. new it room. level 2 conversion of extg storage rooms to offices. level 3 west: add 4 new work stations.mep on seperate permit.Details
modification of partition at server room conversion of extg spaces to call center. new file room. new it room. level 2 conversion of extg storage rooms to offices. level 3 west: add 4 new work stations.mep on seperate permit. | $100,000 |
| Feb 23, 2009 | Completed final sign-off Aug 2009 | 55 Concourse Dr | Sabah International Incorporated | project is to provide changes for basement 1 areas b, c & d level3 area c locations & additions as shown for the cas in golden gate park sf, ca. f.a. system includes: add 1 siga-cr w/mr101 @ basement 1 area c for door holders at level 3. add 1 siga-cr w/mr101 at basement d, add 3 smoke detectors atDetails
project is to provide changes for basement 1 areas b, c & d level3 area c locations & additions as shown for the cas in golden gate park sf, ca. f.a. system includes: add 1 siga-cr w/mr101 @ basement 1 area c for door holders at level 3. add 1 siga-cr w/mr101 at basement d, add 3 smoke detectors at | $9,200 |
| Dec 3, 2008 | Completed final sign-off Mar 2009 | 55 Concourse Dr | Webcor Construction Lp | tenant improvement work is a conversion of existing rooms into a display room located on ground floor. mechanical, electrical & sprinkler work are under separate permit.Details
tenant improvement work is a conversion of existing rooms into a display room located on ground floor. mechanical, electrical & sprinkler work are under separate permit. | $120,000 |
| Nov 25, 2008 | Never finaled issued Nov 2008, no final | 55 Concourse Dr | Cisco Fire Sprinklers, Inc. | install 7 new fire sprinklers for new ceiling in vault storage area.Details
install 7 new fire sprinklers for new ceiling in vault storage area. | $4,000 |
| Aug 19, 2008 | Never finaled issued Aug 2008, no final | 55 Concourse Dr | Sabah International Incorporated | final & test alarm system, area d: 4 speaker strobes, 4 strobes, 2 demo speaker strobes. area a: 2 strobes, 2 speaker/strobe, 2 smoke detector. area b: 1 speaker/strobe, 1 strobe, 1 smoke detector, 2 demo speaker/strobe.Details
final & test alarm system, area d: 4 speaker strobes, 4 strobes, 2 demo speaker strobes. area a: 2 strobes, 2 speaker/strobe, 2 smoke detector. area b: 1 speaker/strobe, 1 strobe, 1 smoke detector, 2 demo speaker/strobe. | $9,389 |
| Aug 13, 2008 | Never finaled issued Aug 2008, no final | 55 Concourse Dr | Certified Fire & Safety Co | complete installation of hood & duct fire suppression system.Details
complete installation of hood & duct fire suppression system. | $3,000 |
| Jul 25, 2008 | Never finaled issued Aug 2008, no final | 55 Concourse Dr | Webcor Construction Lp | revision to appl #200403249505 - new garden work w/fencing & small structure for birds.addition (detached structure) no building use code for bird cage for natural science museum.Details
revision to appl #200403249505 - new garden work w/fencing & small structure for birds.addition (detached structure) no building use code for bird cage for natural science museum. | $103,000 |
| Jul 24, 2008 | Expired or cancelled cancelled Jan 2026 | 55 Concourse Dr | install 1 emergency generator for non- life safety (aquarium only) add 2hr rated wall. electrical & plumbing on separate permit.Details
install 1 emergency generator for non- life safety (aquarium only) add 2hr rated wall. electrical & plumbing on separate permit. | $300,000 | |
| Jun 27, 2008 | Never finaled issued Sep 2008, no final | 55 Concourse Dr | Acco Engineered Systems Inc. Dba Acco En | addition of 1 new diesel generator, addition of fuel oil piping from existing fuel oil day tank to new generator. new generator to support aquatic systems, not life safety systems. new non-bearing partitions to separate rooms & exhaust enclosure. new wall/ ac separate permitDetails
addition of 1 new diesel generator, addition of fuel oil piping from existing fuel oil day tank to new generator. new generator to support aquatic systems, not life safety systems. new non-bearing partitions to separate rooms & exhaust enclosure. new wall/ ac separate permit | $379,000 |
| May 14, 2008 | Never finaled issued May 2008, no final | 55 Concourse Dr | Sabah International Incorporated | basement 1, 1st, 2nd, 3rd floors: fire alarm system - test and final- (1) speaker strobe, (5) siga dmp, (1) heat detector, (1) strobe and relocate speaker strobes.Details
basement 1, 1st, 2nd, 3rd floors: fire alarm system - test and final- (1) speaker strobe, (5) siga dmp, (1) heat detector, (1) strobe and relocate speaker strobes. | $6,500 |
| May 9, 2008 | Never finaled issued May 2008, no final | 55 Concourse Dr | Sabah International Incorporated | 1st & 3rd floor: fire alarm system - final & test, 3 strobes, 1 speaker/strobe.Details
1st & 3rd floor: fire alarm system - final & test, 3 strobes, 1 speaker/strobe. | $4,375 |
| May 8, 2008 | Never finaled issued May 2008, no final | 55 Concourse Dr | Sabah International Incorporated | 7 speakers, 1 strobe, 2 speaker/strobe, 1 booster powers apply, 4 exiting speaker/strobes. panel test.Details
7 speakers, 1 strobe, 2 speaker/strobe, 1 booster powers apply, 4 exiting speaker/strobes. panel test. | $8,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Sabah International Incorporated (27), Eco Fire Sprinklers Inc (8), Cci Com'l Constr & Improv**See 985808*** (7), Roebuck Construction (7), Cisco Fire Sprinklers, Inc. (6), Acco Engineered Systems Inc. Dba Acco En (5), Ayoob & Peery Plumbing Co Inc (5), C C I Commercial Construction & Improv (5), N B C Construction (4), Treaty Construction (4), Asbetos Management Group (3), Azul Works, Inc. (3), International Fire Equip (3), Protection One Alarm Monitoring Inc (3), Swinerton Builders (3), Aaa Restaurant Fire Control/Dba Aaa Fire (2), Gci, Inc (2), Hathaway Dinwiddie Co. (2), International Fire Inc (2), Intrepid Electronic Systems Inc (2), Jungsten Construction Inc (2), Plant Construction Company Lp (2), Red Hawk Fire & Security Ca Llc (2), Webcor Construction Lp (2), Western Water Constructors Inc. (2), Ace Drilling & Excavation, Advanced Wireless & Logistics Inc, Alamo Lighting, Anderson, Rowe & Buckley, Inc., Arg Conservation Services, Athena Electrical Construction Co, Caldwell Roland Roofing, Certified Fire & Safety Co, Cf Contracting Inc, D & S Leong Associates, Electric Tech Construction Inc, Finnegan Construction, Fisher Design + Build, Gallieria, Inc/Trico Cons, Grand Industries Inc, Integrity Air Systems Corporation, Johnson Controls Fire, Joseph Murphy Construction Inc, L.D. Strobel Co Ltd, Liffey Electric Inc, M Hernandez Construction Inc, Marcor Environmental West Inc., Metropolitan Electrical Construction, Murata Construction & Landscape Design, Oliver & Company Inc., Point One Electrical Systems Inc, Pyro-Comm Systems, Inc., R & S Construction Management Inc, Rainbow Waterproofing & Restor, Robert A. Bothman, Inc., Ron Breckenridge Entrprses/Rb Petroleum, Siemens Industry, Inc., Soil Engineering Construction, T L M Petro Labor Force Inc, The Lawson Roofing Co Inc., Uni-Systems West Inc, Wickman Development And Construction
- Architects
- Mark Cavagnero (7), George S Soskin (3), Carrie Byles (2), Eunjoo Cho (2), Gordon Hoy (2), Jane Chan (2), Jennifer Devlin (2), Mark Biginski (2), Aaron Hyland, Anthony Esterbrooks, Cort Eidem, Daniel E Huntsman, Edward Chin, Jonathan Feldman, Laura Hartman, Lisa Yergovich, Michelle Jones, Naomi Miroglio, Nelson Szeto, Nestor Popowych, Nicolas Ancel, Paul De Freitas, Scott Brady, Vito Vanoni
- Engineers
- Brendan Kolts (2), Doug Zuuring (2), Jenny Chan (2), John C Sprinkle (2), Jose Faz (2), Justin Schultz (2), William E. Tremayne (2), Alan Burr, Arthur Johnson, Chau Tang, Chung Linh, Craig Lewis, Craig Ristow, Daniel N. Manheim, David A. Topete, Se, David Mar, Earl John Gaffud, Elizabeth Hirsch, Eric Yiu Kan Ko, Erik C Kneer, Eugene Tuan, James Ng, Janey Chan, Jillian Mcleod, John Kabak, Joseph Elek, Joseph J Fitzsimons, Kin Lau, Lindsay Marion, Mark Moore, Michael Bryson, Michael Ladd Oglesby, Michael Wilson, Pablo Orozco, Paul J. Villotti, Rafael Sabelli, Raoul Wood, Ricky Choi, Roland Haga, Selinda A Martinez, Shauna Dunton, Sidhu Harjot Singh, Stephen Liu, Steven B. Brown, Steven Schaub
- Attorneys
- Sidho Harjot Singh
- Authorized agent-otherss
- Basil Rudnick, Charles Smith, Richard Rhee, Steven Wolf
- Designers
- Cassandra Ruport, International Fire Inc
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.