Kin Lau
- License
- M30810
- Mechanical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up M30810 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Sf Public Work - Idc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2006 to Sep 2021
9 permits since 2000 (engineer on 9 permits): 6 completed, 3 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Alpha Bay Builders, Inc. (2), Azul Works, Inc., Chiang C M Construction Inc., S J Amoroso Construction
- Architects
- Frederic Simmons Iii, Glenn Hunt
- Engineers
- Alizabeth Cherian (2), Angelito E. Magbitang, Eric L. Bura, Farshad Khodayari, Maurice Chee, Mennor Chan, Stephen Liu
- Authorized agents
- Tony Leung
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 2
- Other or unknown 7
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 22, 2021 | Never finaled issued Nov 2022, no final | 375 Laguna Honda Bl | S J Amoroso Construction | priority. m&o wings: selective demo of int. non-struc elements on lvl3 & spine btwn. full demo of int non-struc elements on lvl4-8 & spine btwn. replace & repair windows. n access-compliant parking spaces, loading zone, canopy, entrance at east surface parking lot. n framed walls, doors, door framesDetails
priority. m&o wings: selective demo of int. non-struc elements on lvl3 & spine btwn. full demo of int non-struc elements on lvl4-8 & spine btwn. replace & repair windows. n access-compliant parking spaces, loading zone, canopy, entrance at east surface parking lot. n framed walls, doors, door frames | $33,250,000 |
| Sep 11, 2020 | Completed final sign-off Mar 2022 | 600 Arguello Bl | revision to pa# 201806121646 to replace an existing pool water draft line. existing draft line was to be reused but was found clogged during construction.Details
revision to pa# 201806121646 to replace an existing pool water draft line. existing draft line was to be reused but was found clogged during construction. | $80,000 | |
| Nov 3, 2017 | Never finaled issued Nov 2017, no final | 375 Woodside Av | Azul Works, Inc. | remove/replace in-kind (e) 6in underground fire water line. the (e) line is leaking. rev to pa#201701197506. maher n/a. all work within property line.Details
remove/replace in-kind (e) 6in underground fire water line. the (e) line is leaking. rev to pa#201701197506. maher n/a. all work within property line. | |
| Aug 25, 2017 | Never finaled issued Oct 2017, no final | 2300 Folsom St | kitchen remodel, officer bathroom plumbing and light fixtures, path of travel upgrades maher not reqDetails
kitchen remodel, officer bathroom plumbing and light fixtures, path of travel upgrades maher not req | $750,000 | |
| Dec 21, 2016 | Completed final sign-off Nov 2020 | 1899 Waller St | mechanical equipment & emergency generator replacement -generator replacement under separate application (gen.dwg for ref). new fluid applied roof,roof drains,curbs & flashing.voluntary structural alterations. n/a maher ordinanceDetails
mechanical equipment & emergency generator replacement -generator replacement under separate application (gen.dwg for ref). new fluid applied roof,roof drains,curbs & flashing.voluntary structural alterations. n/a maher ordinance | $1,000,000 | |
| Mar 26, 2015 | Completed final sign-off Oct 2017 | 1881 Post St | Alpha Bay Builders, Inc. | improvements to the hvac system & upgrade the carbon monoxide detection system. there will also be electrifdal work to power the (n) fans & controls.Details
improvements to the hvac system & upgrade the carbon monoxide detection system. there will also be electrifdal work to power the (n) fans & controls. | $300,000 |
| Mar 26, 2015 | Completed final sign-off Oct 2017 | 1610 Geary Bl | Alpha Bay Builders, Inc. | improvements to the hvac system & upgrade the carbon monoxide detection system. there will also be electrical work to power the (n) fans & controls.Details
improvements to the hvac system & upgrade the carbon monoxide detection system. there will also be electrical work to power the (n) fans & controls. | $1,200,000 |
| Jun 16, 2008 | Completed final sign-off Apr 2009 | 1351 24th Av | Chiang C M Construction Inc. | revision to application 2005021155564-r-1. exterior: add new ada ramp. interior: modify toilet layout, new counter, opening to registration, new partitions at 2nd floor. (barrier removal work).Details
revision to application 2005021155564-r-1. exterior: add new ada ramp. interior: modify toilet layout, new counter, opening to registration, new partitions at 2nd floor. (barrier removal work). | $72,250 |
| Jun 1, 2006 | Completed final sign-off Oct 2008 | 2099 Kearny St | mechanical, electrical, architecutral & structural. repair mechanical system to meet state standards. misc: electrical, architectural & structural to accommodate mech.Details
mechanical, electrical, architecutral & structural. repair mechanical system to meet state standards. misc: electrical, architectural & structural to accommodate mech. |