Frederic Simmons Iii
- Listed as
- architect
- Firm
- Sfdpw
- Based in
- San Frnacisco
- On San Francisco permits
- Nov 2017 to Sep 2021
7 permits since 2000 (architect on 7 permits): 4 completed, 3 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 22, 2021 | Never finaled issued Nov 2022, no final | 375 Laguna Honda Bl | S J Amoroso Construction | priority. m&o wings: selective demo of int. non-struc elements on lvl3 & spine btwn. full demo of int non-struc elements on lvl4-8 & spine btwn. replace & repair windows. n access-compliant parking spaces, loading zone, canopy, entrance at east surface parking lot. n framed walls, doors, door framesDetails
priority. m&o wings: selective demo of int. non-struc elements on lvl3 & spine btwn. full demo of int non-struc elements on lvl4-8 & spine btwn. replace & repair windows. n access-compliant parking spaces, loading zone, canopy, entrance at east surface parking lot. n framed walls, doors, door frames | $33,250,000 |
| Jan 6, 2020 | Completed final sign-off Jul 2021 | 190 09th St | revision to pa#2019-0311-4929: consisting of replacement of 15 additional aluminum windows on 1/f,2/f, 3f on washburn street between adj building (170 9th st) and closets pilaster to adj. build. original permit valuation remains unchanged.paint (e) window frames to remain to match (n).Details
revision to pa#2019-0311-4929: consisting of replacement of 15 additional aluminum windows on 1/f,2/f, 3f on washburn street between adj building (170 9th st) and closets pilaster to adj. build. original permit valuation remains unchanged.paint (e) window frames to remain to match (n). | ||
| Sep 23, 2019 | Never finaled filed Sep 2019, never issued | 750 Phelps St | priority processing for sfpuc/dpw mod project, erect a two stories type ii-b construction maintenance shops buildingDetails
priority processing for sfpuc/dpw mod project, erect a two stories type ii-b construction maintenance shops building | $25,000,000 | |
| Sep 23, 2019 | Never finaled filed Sep 2019, never issued | 750 Phelps St | priority processing for sfpuc/dpw mod project, erect a one story type v construction maintenance shops buildingDetails
priority processing for sfpuc/dpw mod project, erect a one story type v construction maintenance shops building | $14,000,000 | |
| Jun 19, 2019 | Completed final sign-off Mar 2022 | 2868 Mission St | Svala Construction Inc | priority project - voluntary interior toilet rooms, barrier removal and finishes replacement, minor barrier removal and finishes replacement, passenger elevator modernization, freight elevator replacement with service elevator. provide bottle filling station.Details
priority project - voluntary interior toilet rooms, barrier removal and finishes replacement, minor barrier removal and finishes replacement, passenger elevator modernization, freight elevator replacement with service elevator. provide bottle filling station. | $950,000 |
| Mar 11, 2019 | Completed final sign-off Jul 2021 | 190 09th St | replace all (e) aluminum windows on the 2nd and 3rd floors except for the five banks of windows along washburn st between adjacent building (170 9th st) and closet pilaster to adjacent buildingDetails
replace all (e) aluminum windows on the 2nd and 3rd floors except for the five banks of windows along washburn st between adjacent building (170 9th st) and closet pilaster to adjacent building | $1,200,000 | |
| Nov 9, 2017 | Completed final sign-off Sep 2020 | 301 Eddy St | provide new cooling system @select(e)rooms, replace ac units, condensing units,(e)cosensors to remain and select exhaust fans; replace (e) generator, fuel pump, belly tank, and associated appurtenances; replace (e) concrete drive ramp & overhead coiling door. provide new supply fan & elec sub-panel,Details
provide new cooling system @select(e)rooms, replace ac units, condensing units,(e)cosensors to remain and select exhaust fans; replace (e) generator, fuel pump, belly tank, and associated appurtenances; replace (e) concrete drive ramp & overhead coiling door. provide new supply fan & elec sub-panel, | $700,000 |