Block 2842, lot 007
375 Laguna Honda Blvd
- City’s use
- Commercial Misc
- Built
- 1937
- Lot
- 2,760,000 sq ft
- Zoning
- P
- Construction type
- S
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
95 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 20, 2026 | In progress issued Jul 2026 | 375 Laguna Honda Bl | S J Amoroso Construction | evacuation maps sffd bulletin 2.11Details
evacuation maps sffd bulletin 2.11 | $5,000 |
| Mar 10, 2026 | In progress issued Mar 2026 | 375 Woodside Av | revision to permit #202405061457, minor plan configuration update and replacement of janitor sink at level 1.Details
revision to permit #202405061457, minor plan configuration update and replacement of janitor sink at level 1. | ||
| Dec 3, 2025 | Completed final sign-off Jan 2026 | 375 Laguna Honda Bl | Allied Fire Protection | as-built fire sprinkler riser-control valve relocated to inside stair #22, ref pa #202109228981 (arch.), 202403046989 (fire sprinkler)Details
as-built fire sprinkler riser-control valve relocated to inside stair #22, ref pa #202109228981 (arch.), 202403046989 (fire sprinkler) | |
| Dec 2, 2025 | Completed final sign-off Jan 2026 | 375 Laguna Honda Bl | Allied Fire Protection | roof- replace (e) fire standpipe roof manifolds at m and o wings. ref 202109228981 (arch.), 202403046989 (fire sprinkler)Details
roof- replace (e) fire standpipe roof manifolds at m and o wings. ref 202109228981 (arch.), 202403046989 (fire sprinkler) | |
| Nov 12, 2025 | Completed final sign-off Sep 2026 | 598 Portola Dr | Johnson United Inc Dba United Sign Syste | replace sign cabinet on existing free standing pricing sign. "auto care"Details
replace sign cabinet on existing free standing pricing sign. "auto care" | $7,000 |
| Sep 17, 2025 | Completed final sign-off Jul 2026 | 375 Laguna Honda Bl | Metropolitan Electrical Construction | at&t modificiation of an (e) wireless facility consisting of: lower 3 & add 3 antennas; r/r 3 rrus; remove 1 power plant; 13 rectifiers; install (1) netsure power plant; (9) 58v converters, (12) 48v rectifiers; (1)g4 bbu, (a) 15a, (3) 30a dc breakers; rf safety signage stripping & barricadesDetails
at&t modificiation of an (e) wireless facility consisting of: lower 3 & add 3 antennas; r/r 3 rrus; remove 1 power plant; 13 rectifiers; install (1) netsure power plant; (9) 58v converters, (12) 48v rectifiers; (1)g4 bbu, (a) 15a, (3) 30a dc breakers; rf safety signage stripping & barricades | $83,700 |
| Jul 18, 2025 | In progress issued Jul 2025 | 375 Laguna Honda Bl | Apex Site Solutions Inc | to obtain final inspection for work approved under pa# 202207138405. all work is complete.Details
to obtain final inspection for work approved under pa# 202207138405. all work is complete. | $47,000 |
| Jun 2, 2025 | Completed final sign-off Aug 2026 | 598 Portola Dr | Able Maintenance Inc | remove two existing usts (10k & 8k), four (4) gas dispensers and all associated piping. replace with two (2) 20k split tanks (12k premium/8k diesel & 14 unleaded/6k e85) four (4) gas dispensers and all associated piping.Details
remove two existing usts (10k & 8k), four (4) gas dispensers and all associated piping. replace with two (2) 20k split tanks (12k premium/8k diesel & 14 unleaded/6k e85) four (4) gas dispensers and all associated piping. | $734,464 |
| Dec 23, 2024 | In progress issued Feb 2026 | 375 Laguna Honda Bl | Siemens Industry, Inc. | fire work only for the wing m and o remodels on floors 3 - 9; 6 power supplies added as well as initiating and notification devices on all floors. reference permit app#Details
fire work only for the wing m and o remodels on floors 3 - 9; 6 power supplies added as well as initiating and notification devices on all floors. reference permit app# | $315,000 |
| Nov 22, 2024 | Completed final sign-off Mar 2025 | 375 Laguna Honda Bl | Siemens Industry, Inc. | acquisition of an as-built permit for the fire alarm work done under pa 202312142492. 79 additional horn replacements were doneDetails
acquisition of an as-built permit for the fire alarm work done under pa 202312142492. 79 additional horn replacements were done | $40,430 |
| Aug 7, 2024 | Completed final sign-off Jan 2026 | 375 Laguna Honda Bl | Rodan Builders Inc | revision to pa #2021-0923-9018 replacement of the water tank no.2 at laguna honda hospital in order to clarify and resolve current jurisdiction ovelap between hcai & sfdbi. includes minor revisions for construction coordinationDetails
revision to pa #2021-0923-9018 replacement of the water tank no.2 at laguna honda hospital in order to clarify and resolve current jurisdiction ovelap between hcai & sfdbi. includes minor revisions for construction coordination | |
| Jul 8, 2024 | In progress filed Jul 2024, not yet issued | 375 Laguna Honda Bl | install of shoring in soil for new water storage tank foundation, part of laguna honda hospital water storage tank project ref 2021-0923-9018Details
install of shoring in soil for new water storage tank foundation, part of laguna honda hospital water storage tank project ref 2021-0923-9018 | ||
| Jun 4, 2024 | Completed final sign-off Aug 2024 | 375 Laguna Honda Bl | Siemens Industry, Inc. | fire only work to remove 36 pull stations from former nurse's station also being removed. ref pa 202109228981Details
fire only work to remove 36 pull stations from former nurse's station also being removed. ref pa 202109228981 | |
| May 17, 2024 | In progress issued Mar 2025 | 375 Woodside Av | modernize (e)elevator & provide(n)machine room access.remodel two (e) restroom on level 1 for ada accessibility. alternate 1: remodel two (e) restrooms on level 2 for ada accesiblity.Details
modernize (e)elevator & provide(n)machine room access.remodel two (e) restroom on level 1 for ada accessibility. alternate 1: remodel two (e) restrooms on level 2 for ada accesiblity. | $1,552,259 | |
| Apr 5, 2024 | Completed final sign-off Apr 2024 | 375 Laguna Honda Bl | revision to pa #201804095854. windows replacement work. replace windows at 3rd & 4th floors only for total of 88 windows. install 10 fire rated steel windows at (e) openings.Details
revision to pa #201804095854. windows replacement work. replace windows at 3rd & 4th floors only for total of 88 windows. install 10 fire rated steel windows at (e) openings. | ||
| Mar 4, 2024 | In progress issued Jun 2024 | 375 Laguna Honda Bl | Allied Fire Protection | modify (e) fire sprinkler system. ref t.i. pa 202109228981.Details
modify (e) fire sprinkler system. ref t.i. pa 202109228981. | $225,000 |
| Dec 14, 2023 | Completed final sign-off Mar 2025 | 375 Laguna Honda Bl | Siemens Industry, Inc. | fire alarmwork only to upgrade system: 7 panels are being replaced and 179 horns will replace chimes at (e) locations. f/a work only.Details
fire alarmwork only to upgrade system: 7 panels are being replaced and 179 horns will replace chimes at (e) locations. f/a work only. | $120,000 |
| Aug 21, 2023 | Completed final sign-off Mar 2024 | 375 Laguna Honda Bl | S J Amoroso Construction | install temporary shoring system in order to saw cut (e) slabs for structural retrofit per note n.4 on s0.3.. ref pa# 202109228981.Details
install temporary shoring system in order to saw cut (e) slabs for structural retrofit per note n.4 on s0.3.. ref pa# 202109228981. | $5,000 |
| May 16, 2023 | Completed final sign-off Oct 2023 | 375 Laguna Honda Bl | K L W Construction Inc | omnicell medication dispenser replacement with associated wall anchor; install, administrative building 400 training roomDetails
omnicell medication dispenser replacement with associated wall anchor; install, administrative building 400 training room | $34,300 |
| Dec 14, 2022 | In progress issued Dec 2023 | 375 Woodside Av | replace an existing boiler to two modular boilers in the mechanical room.Details
replace an existing boiler to two modular boilers in the mechanical room. | $1,000,000 | |
| Jul 13, 2022 | Completed final sign-off Aug 2025 | 375 Laguna Honda Bl | Electric Tech Construction Inc | att: remove (5) (e) antennas ; install (6) (n) rrus; install (4) (n) antennas; no change to batteries.Details
att: remove (5) (e) antennas ; install (6) (n) rrus; install (4) (n) antennas; no change to batteries. | $47,000 |
| Sep 23, 2021 | In progress issued Feb 2024 | 375 Laguna Honda Bl | Rodan Builders Inc | replacement of water tank #2. including new security(fencing,lighting) & access road improvements.(1)new site lighting & security camera power under emergency life-safety branch power at the water tank area to enchanced hospital security & site egress sytem,(2)no fire supression scope is includedDetails
replacement of water tank #2. including new security(fencing,lighting) & access road improvements.(1)new site lighting & security camera power under emergency life-safety branch power at the water tank area to enchanced hospital security & site egress sytem,(2)no fire supression scope is included | $2,303,000 |
| Sep 22, 2021 | Never finaled issued Nov 2022, no final | 375 Laguna Honda Bl | S J Amoroso Construction | priority. m&o wings: selective demo of int. non-struc elements on lvl3 & spine btwn. full demo of int non-struc elements on lvl4-8 & spine btwn. replace & repair windows. n access-compliant parking spaces, loading zone, canopy, entrance at east surface parking lot. n framed walls, doors, door framesDetails
priority. m&o wings: selective demo of int. non-struc elements on lvl3 & spine btwn. full demo of int non-struc elements on lvl4-8 & spine btwn. replace & repair windows. n access-compliant parking spaces, loading zone, canopy, entrance at east surface parking lot. n framed walls, doors, door frames | $33,250,000 |
| Aug 29, 2020 | Completed final sign-off Nov 2020 | 375 Woodside Av | Siemens Industry, Inc. | fire only as-built permit to reflect no work was done on floor 1. only for floor 3 restrooms; no new devices were added, only 2 chime/strobe relocations. original fire alarm done under pa# 202001292974Details
fire only as-built permit to reflect no work was done on floor 1. only for floor 3 restrooms; no new devices were added, only 2 chime/strobe relocations. original fire alarm done under pa# 202001292974 | |
| Jun 11, 2020 | Completed final sign-off Nov 2020 | 375 Woodside Av | revision to 201805028037 to remove all work to restrooms 180 and 182 from project scope.Details
revision to 201805028037 to remove all work to restrooms 180 and 182 from project scope. | ||
| Jun 2, 2020 | Completed final sign-off Aug 2022 | 375 Laguna Honda Bl | Electric Tech Construction Inc | at&t proposes to modify exisiting facility: remove & replace 3 antennas and 3 rru's. install 3 surge suppressors, 6 new dc power trucks, install 3 new fiber trunk @ shelter. remove 1 e100a sub panel, install dc-12 surge suppressor in e fif rack. install 1 new 6630, 120/2008vac 3-ph-4-wre sub panel.Details
at&t proposes to modify exisiting facility: remove & replace 3 antennas and 3 rru's. install 3 surge suppressors, 6 new dc power trucks, install 3 new fiber trunk @ shelter. remove 1 e100a sub panel, install dc-12 surge suppressor in e fif rack. install 1 new 6630, 120/2008vac 3-ph-4-wre sub panel. | $32,000 |
| Jan 29, 2020 | Completed final sign-off Nov 2020 | 375 Woodside Av | Siemens Industry, Inc. | fire alarm work to relocate 2 chime/strobes each on fls 1 & 3 for the administration bldg restrooms. no new devices are added. ref pa #201805028037.Details
fire alarm work to relocate 2 chime/strobes each on fls 1 & 3 for the administration bldg restrooms. no new devices are added. ref pa #201805028037. | $1,270 |
| Sep 27, 2019 | Expired or cancelled cancelled Jan 2026 | 375 Laguna Honda Bl | addition of an audiovisual system, acoustical panels on walls & ceilings, nd mechanical system renovaiton to imrpove simon theater & moran hall acoustically. the scope also includes accessibility improvements in restrooms serving moran hall & simon theater. maher naDetails
addition of an audiovisual system, acoustical panels on walls & ceilings, nd mechanical system renovaiton to imrpove simon theater & moran hall acoustically. the scope also includes accessibility improvements in restrooms serving moran hall & simon theater. maher na | $1,400,000 | |
| Jun 24, 2019 | Completed final sign-off Jul 2019 | 375 Woodside Av | Battalion One Fire Protection | repipe ansul system to cover new appliances and add detection. n/a for maher.Details
repipe ansul system to cover new appliances and add detection. n/a for maher. | $2,500 |
| Jun 12, 2019 | Completed final sign-off Jun 2019 | 375 Woodside Av | Siemens Industry, Inc. | "as built" fire alarm for the voluntary upgrade of the fire alarm @ juvenile hall center per requirement of the sffd district inspector. ref pa 2018-0202-0197Details
"as built" fire alarm for the voluntary upgrade of the fire alarm @ juvenile hall center per requirement of the sffd district inspector. ref pa 2018-0202-0197 | |
| May 3, 2019 | Completed final sign-off Sep 2019 | 375 Laguna Honda Bl | Siemens Industry, Inc. | fire alarm work to add a fire fighter's hat module on floor 6 due to an upgrade at the elevator machine room. n/a for maher.Details
fire alarm work to add a fire fighter's hat module on floor 6 due to an upgrade at the elevator machine room. n/a for maher. | $530 |
| Apr 19, 2019 | Never finaled issued Feb 2020, no final | 375 Woodside Av | installation of new surveillance cameras plus accompanying electrical work. new cooling equipment for the mdf room.Details
installation of new surveillance cameras plus accompanying electrical work. new cooling equipment for the mdf room. | $1,500,000 | |
| Jan 3, 2019 | Never finaled issued Jan 2019, no final | 375 Laguna Honda Bl | street spaceDetails
street space | ||
| Dec 26, 2018 | Completed final sign-off Jul 2019 | 375 Laguna Honda Bl | Rubecon General Contracting Inc | revision to bpa#201609087093Details
revision to bpa#201609087093 | $423,000 |
| Nov 6, 2018 | Completed final sign-off Oct 2019 | 375 Laguna Honda Bl | Shah & Associates Inc Dba P D C Corporat | at&t modification: remove and replace 9 (e) antennas w/ 9 (n) antennas; install 12 (n) rrus and other small equipment; no change to batteriesDetails
at&t modification: remove and replace 9 (e) antennas w/ 9 (n) antennas; install 12 (n) rrus and other small equipment; no change to batteries | $42,000 |
| Aug 13, 2018 | Never finaled issued Aug 2018, no final | 375 Laguna Honda Bl | Siemens Industry, Inc. | 2nd fl - fire alarm work for the "ward c" restroom & breakroom on floor 2; additions are 2 strobes and 1 horn/strobe, as well as the relocation of 3 strobes. ref pa 2016-0908-7093Details
2nd fl - fire alarm work for the "ward c" restroom & breakroom on floor 2; additions are 2 strobes and 1 horn/strobe, as well as the relocation of 3 strobes. ref pa 2016-0908-7093 | $1,735 |
| May 2, 2018 | Completed final sign-off Nov 2020 | 375 Woodside Av | city job: ygc administration bldg - demo inside restrooms ground, 2nd, 3rd - including inside walls, fixtures, toilet, partitions & lt. fixtures. ground fl - removal of (e) men's & womens restroom, (n) ada drinking fountain and janitor's room; 2nd fl - remodel of (e) men's women's restroom,Details
city job: ygc administration bldg - demo inside restrooms ground, 2nd, 3rd - including inside walls, fixtures, toilet, partitions & lt. fixtures. ground fl - removal of (e) men's & womens restroom, (n) ada drinking fountain and janitor's room; 2nd fl - remodel of (e) men's women's restroom, | $935,000 | |
| Apr 9, 2018 | Completed final sign-off Apr 2024 | 375 Laguna Honda Bl | window replacement - in kind, 177 windowsDetails
window replacement - in kind, 177 windows | $1,561,102 | |
| Feb 23, 2018 | Never finaled issued Feb 2018, no final | 375 Woodside Av | Azul Works, Inc. | remove/replace (e)_ 6" underground fire line for private hydrant system. the (e) line is leaking. all work within property line ref 201701197506 & 201711033060 maher naDetails
remove/replace (e)_ 6" underground fire line for private hydrant system. the (e) line is leaking. all work within property line ref 201701197506 & 201711033060 maher na | $40,000 |
| Feb 2, 2018 | Completed final sign-off Jun 2019 | 375 Woodside Av | Siemens Industry, Inc. | voluntary upgrade of thr fire alarm system for this building(juvenile hall center). **maher n/a** for admin, youth guidence center and service buildingDetails
voluntary upgrade of thr fire alarm system for this building(juvenile hall center). **maher n/a** for admin, youth guidence center and service building | $115,000 |
| Jan 24, 2018 | Never finaled issued Jan 2018, no final | 598 Portola Dr | Krb Construction Inc. | remove (e) gas dispensers and install new gilbarco encore 700 dospenses. connect to (e) product, vapor and electrical. n/a for maherDetails
remove (e) gas dispensers and install new gilbarco encore 700 dospenses. connect to (e) product, vapor and electrical. n/a for maher | $8,100 |
| Nov 3, 2017 | Never finaled issued Nov 2017, no final | 375 Woodside Av | Azul Works, Inc. | remove/replace in-kind (e) 6in underground fire water line. the (e) line is leaking. rev to pa#201701197506. maher n/a. all work within property line.Details
remove/replace in-kind (e) 6in underground fire water line. the (e) line is leaking. rev to pa#201701197506. maher n/a. all work within property line. | |
| Jun 22, 2017 | Completed final sign-off Sep 2020 | 375 Laguna Honda Bl | elevators #3 and #4 modernization. oshpd released jurisdictional authority - treat as b occupancy office building.Details
elevators #3 and #4 modernization. oshpd released jurisdictional authority - treat as b occupancy office building. | $650,000 | |
| Jan 19, 2017 | Completed final sign-off Mar 2019 | 375 Woodside Av | voluntary barrier removal. construction concrete walkway rampDetails
voluntary barrier removal. construction concrete walkway ramp | $800,000 | |
| Sep 14, 2016 | Completed final sign-off Nov 2016 | 375 Woodside Av | International Fire Equip | installation of ul300 fire system; maher n/aDetails
installation of ul300 fire system; maher n/a | $8,200 |
| Sep 8, 2016 | Completed final sign-off Jun 2019 | 375 Laguna Honda Bl | removal of old plumbing, doors & door frames, new accessibility compliant men's and women's restrooms,new breakroom, new accessibility compliant entry, new office, paint and flooring. maher n/aDetails
removal of old plumbing, doors & door frames, new accessibility compliant men's and women's restrooms,new breakroom, new accessibility compliant entry, new office, paint and flooring. maher n/a | $423,000 | |
| Mar 10, 2016 | Never finaled issued Apr 2016, no final | 375 Laguna Honda Bl | Ron Breckenridge Entrprses/Rb Petroleum | fuel supply line replacement in kind for back up generator. n/a for maherDetails
fuel supply line replacement in kind for back up generator. n/a for maher | $8,000 |
| Oct 29, 2013 | Completed final sign-off Nov 2014 | 375 Woodside Av | to comply with complaint #201261128- provide one accessible vertical wheel chair platform lift. replace storefront unit & entrance doors.Details
to comply with complaint #201261128- provide one accessible vertical wheel chair platform lift. replace storefront unit & entrance doors. | $75,000 | |
| May 26, 2010 | Never finaled issued Jun 2010, no final | 375 Woodside Av | Siemens Industry, Inc. | juvenile hall. upgrade fire alarm at 2 story from auto call to siemens. replace (e) devices with newDetails
juvenile hall. upgrade fire alarm at 2 story from auto call to siemens. replace (e) devices with new | $10,000 |
| May 7, 2010 | Completed final sign-off May 2010 | 375 Laguna Honda Bl | Alpha Restoration & Wateproof | repair damaged main entrance. river rock. pier/columnDetails
repair damaged main entrance. river rock. pier/column | $9,590 |
| Apr 2, 2010 | Never finaled issued Apr 2010, no final | 375 Laguna Honda Bl | street spaceDetails
street space | ||
| Mar 3, 2010 | Never finaled issued Mar 2010, no final | 375 Laguna Honda Bl | street spaceDetails
street space | ||
| Jan 4, 2010 | Never finaled issued Jan 2010, no final | 375 Laguna Honda Bl | street spaceDetails
street space | ||
| Nov 5, 2009 | Never finaled issued Nov 2009, no final | 375 Laguna Honda Bl | street space permitDetails
street space permit | ||
| Oct 1, 2009 | Never finaled issued Oct 2009, no final | 375 Laguna Honda Bl | street space permitDetails
street space permit | ||
| Aug 13, 2009 | Never finaled issued Aug 2009, no final | 375 Laguna Honda Bl | Ron Breckenridge Entrprses/Rb Petroleum | installation of air separation tank & concrete pad at existing re-fueling station.Details
installation of air separation tank & concrete pad at existing re-fueling station. | $10,000 |
| Jul 13, 2009 | Never finaled issued Jul 2009, no final | 375 Laguna Honda Bl | street space permitDetails
street space permit | ||
| May 19, 2009 | Never finaled issued Jun 2009, no final | 375 Laguna Honda Bl | Turner Construction Co | renew pa# 2002/12/20/4004 to complete work & obtain final inspection.Details
renew pa# 2002/12/20/4004 to complete work & obtain final inspection. | $3,000,000 |
| Jan 27, 2009 | Completed final sign-off Aug 2009 | 598 Portola Dr | Ron Breckenridge Entrprses/Rb Petroleum | installation of baaqmd phase 2 veeder root carbon canister. attached at west side of bldg. venting system for underground tanks.Details
installation of baaqmd phase 2 veeder root carbon canister. attached at west side of bldg. venting system for underground tanks. | $10,000 |
| Oct 23, 2007 | Never finaled issued Dec 2007, no final | 375 Laguna Honda Bl | trailer #3 - install 2-15000 gal underground fuel storgage, fuel lines, generator bldg & day tanks in hospital bldgs.Details
trailer #3 - install 2-15000 gal underground fuel storgage, fuel lines, generator bldg & day tanks in hospital bldgs. | ||
| Dec 15, 2006 | Completed final sign-off Mar 2007 | 375 Woodside Av | S J Amoroso Construction | renew pa# 2001/03/22/4984 for final inspection.Details
renew pa# 2001/03/22/4984 for final inspection. | |
| Jul 24, 2006 | Expired or cancelled expired Mar 2008 | 375 Laguna Honda Bl | to erect a smoking shelter.Details
to erect a smoking shelter. | ||
| Jul 24, 2006 | Expired or cancelled expired Mar 2008 | 375 Laguna Honda Bl | to erect a smoking shelter.Details
to erect a smoking shelter. | ||
| Apr 5, 2005 | Never finaled issued Apr 2005, no final | 1001 Clarendon Av | Simplex Grinnell | renew appl#200103053434 for final inspectionDetails
renew appl#200103053434 for final inspection | |
| Mar 11, 2005 | Completed final sign-off Sep 2005 | 375 Laguna Honda Bl | Mitchell Engineering | renew app #9919993/200103053434Details
renew app #9919993/200103053434 | |
| Jan 11, 2005 | Expired or cancelled cancelled Jun 2009 | 375 Laguna Honda Bl | to erect 1 story of a greenhouseDetails
to erect 1 story of a greenhouse | ||
| Feb 19, 2004 | Expired or cancelled cancelled Jul 2006 | 375 Woodside Av | Cosco Fire Protection Inc. | new fire sprinkler systems @ 82,000 sq. ft detention facility (3) systems to cover light/oprd.Details
new fire sprinkler systems @ 82,000 sq. ft detention facility (3) systems to cover light/oprd. | $310,000 |
| Nov 20, 2003 | Never finaled issued Nov 2003, no final | 375 Woodside Av | street spaceDetails
street space | ||
| Aug 28, 2003 | Never finaled issued Oct 2003, no final | 375 Woodside Av | S J Amoroso Construction | revise to scope of work under app #200103224976 as noted: archit & struct: exit stair and roofDetails
revise to scope of work under app #200103224976 as noted: archit & struct: exit stair and roof | |
| Jun 10, 2003 | Completed final sign-off May 2004 | 375 Laguna Honda Bl | Proven Management Inc. | construction trailer officeDetails
construction trailer office | |
| Dec 31, 2002 | Completed final sign-off Jul 2004 | 375 Laguna Honda Bl | demolition of material shed/storageDetails
demolition of material shed/storage | ||
| Dec 31, 2002 | Completed final sign-off Jul 2004 | 375 Laguna Honda Bl | demolition of farm buildingDetails
demolition of farm building | ||
| Dec 31, 2002 | Completed final sign-off Mar 2005 | 375 Laguna Honda Bl | demolition of fueling/tank storageDetails
demolition of fueling/tank storage | ||
| Dec 31, 2002 | Expired or cancelled withdrawn Aug 2008 | 375 Laguna Honda Bl | demolition of ward and dining roomsDetails
demolition of ward and dining rooms | ||
| Dec 31, 2002 | Completed final sign-off Jul 2004 | 375 Laguna Honda Bl | demolition of shopDetails
demolition of shop | ||
| Dec 31, 2002 | Completed final sign-off Jul 2004 | 375 Laguna Honda Bl | demolition of greenhouseDetails
demolition of greenhouse | ||
| Dec 31, 2002 | Completed final sign-off Apr 2004 | 375 Laguna Honda Bl | demolition of garageDetails
demolition of garage | ||
| Dec 31, 2002 | Completed final sign-off Jun 2009 | 375 Laguna Honda Bl | Ferma Corporation, Bluewater Environmentl Svc Inc | demolition of clarendon hallDetails
demolition of clarendon hall | |
| Dec 31, 2002 | Completed final sign-off Mar 2005 | 375 Laguna Honda Bl | Proven Management Inc. | demolition of power plant, office and laundryDetails
demolition of power plant, office and laundry | |
| Dec 20, 2002 | Expired or cancelled cancelled Feb 2013 | 375 Laguna Honda Bl | existing hospital site improvementDetails
existing hospital site improvement | $6,581,000 | |
| Dec 20, 2002 | Never finaled issued Jul 2005, no final | 375 Laguna Honda Bl | new hospital site improvements (farm & greenhouse)Details
new hospital site improvements (farm & greenhouse) | ||
| Dec 11, 2002 | Expired or cancelled expired Jul 2006 | 375 Laguna Honda Bl | Proven Management Inc. | temp. farm and garden equipment yardDetails
temp. farm and garden equipment yard | |
| Dec 11, 2002 | Completed final sign-off Sep 2005 | 375 Laguna Honda Bl | Proven Management Inc. | erect refueling stationDetails
erect refueling station | |
| Sep 6, 2002 | Never finaled issued Sep 2002, no final | 375 Woodside Av | Simplex Grinnell | modify fire alarm system, relocate (e) annunciators for demolition phase of siteDetails
modify fire alarm system, relocate (e) annunciators for demolition phase of site | $7,600 |
| Mar 5, 2002 | Completed final sign-off Sep 2002 | 375 Woodside Av | revision to 200111092884Details
revision to 200111092884 | $100 | |
| Feb 27, 2002 | Completed final sign-off Sep 2002 | 375 Woodside Av | revision to 2001/12/09/2884. modular structure per mh98-10. city of sf project footing size.Details
revision to 2001/12/09/2884. modular structure per mh98-10. city of sf project footing size. | $100 | |
| Feb 27, 2002 | Completed final sign-off Sep 2002 | 375 Woodside Av | revise to 2001/11/09/2884. work-revise deck column size. city of sf project.Details
revise to 2001/11/09/2884. work-revise deck column size. city of sf project. | $100 | |
| Nov 9, 2001 | Completed final sign-off Sep 2002 | 375 Woodside Av | (bldg #2) to erect a new 2-story office buildingDetails
(bldg #2) to erect a new 2-story office building | $120,000 | |
| Sep 4, 2001 | Completed final sign-off May 2004 | 375 Laguna Honda Bl | Valentine Corporation | construct joint-use,2-story rd for youth guidance center & laguna honda hosplconstruct ret. wallDetails
construct joint-use,2-story rd for youth guidance center & laguna honda hosplconstruct ret. wall | $510,000 |
| Mar 22, 2001 | Completed final sign-off Oct 2007 | 375 Woodside Av | erect a 2-story detention facility buildingDetails
erect a 2-story detention facility building | ||
| Mar 22, 2001 | Completed final sign-off Oct 2003 | 375 Woodside Av | S J Amoroso Construction | demolish one story chapel at detention facilityDetails
demolish one story chapel at detention facility | |
| Mar 22, 2001 | Never finaled issued Jul 2003, no final | 375 Woodside Av | S J Amoroso Construction | demolish one story detention facility bldgDetails
demolish one story detention facility bldg | |
| Mar 5, 2001 | Expired or cancelled expired Mar 2002 | 1001 Clarendon Av | Master Protection Corp. | installation of sprinkler system and fm 200 gas suppression systemDetails
installation of sprinkler system and fm 200 gas suppression system | $35,000 |
| Mar 14, 2000 | Expired or cancelled expired Sep 2000 | 375 Woodside Av | Simplex Grinnell*** See 802591**** | replace fire sprinkler initiating devices @ cottage b1Details
replace fire sprinkler initiating devices @ cottage b1 | $22,500 |
| Feb 15, 2000 | Expired or cancelled expired Sep 2002 | 375 Laguna Honda Bl | erect a pump stationDetails
erect a pump station | $1,493,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Siemens Industry, Inc. (11), S J Amoroso Construction (7), Proven Management Inc. (4), Allied Fire Protection (3), Ron Breckenridge Entrprses/Rb Petroleum (3), Azul Works, Inc. (2), Electric Tech Construction Inc (2), Rodan Builders Inc (2), Simplex Grinnell (2), Able Maintenance Inc, Alpha Restoration & Wateproof, Apex Site Solutions Inc, Battalion One Fire Protection, Bluewater Environmentl Svc Inc, Cosco Fire Protection Inc., Ferma Corporation, International Fire Equip, Johnson United Inc Dba United Sign Syste, K L W Construction Inc, Krb Construction Inc., Master Protection Corp., Metropolitan Electrical Construction, Mitchell Engineering, Rubecon General Contracting Inc, Shah & Associates Inc Dba P D C Corporat, Simplex Grinnell*** See 802591****, Turner Construction Co, Valentine Corporation
- Architects
- Gary Hoy (2), Marilyn Thompson (2), Anshen & Allen Architects, Frederic Simmons Iii, Glenn Hunt, Ignatius Tsang, Karen Mar, Kyle Brunel, Paul Cooper, Thomas S. Lee, Tony Leung, Zigmund Rubel
- Engineers
- Jeffrey J Tarantino (2), Adam Amortnont, Angelito E. Magbitang, Anthony Winston Iii, Carl Milsum, Chris S. Lee, Earl John Gaffud, Edward Rivera, Eric L. Bura, Farshad Khodayari, Jose Herrera, Kenneth Graven, Kin Lau, Kin Lau, Laura Weyl, Mennor Chan, Neil Joson, Ramid Arbabaraghi, Raymond Lui, Ricky Choi, Siemens Building Technologies
- Authorized agent-otherss
- Benito Olguin, Karen Mar
- Designers
- Allied Fire Protection (2), Gilbert Amoroso, Ronald Demartini, Victor Stendardo
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.