29 permits since 2000 (contractor on 29 permits, designer on 1 permit): 18 completed, 2 in progress, 6 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 20, 2026 | In progress issued Jul 2026 | 375 Laguna Honda Bl | S J Amoroso Construction | evacuation maps sffd bulletin 2.11Details
evacuation maps sffd bulletin 2.11 | $5,000 |
| Nov 4, 2025 | In progress issued Nov 2025 | 3359 24th St | S J Amoroso Construction | ug fire waterline ref# 202406285460. all work outside of bldg. no interior workDetails
ug fire waterline ref# 202406285460. all work outside of bldg. no interior work | $30,000 |
| Aug 21, 2023 | Completed final sign-off Mar 2024 | 375 Laguna Honda Bl | S J Amoroso Construction | install temporary shoring system in order to saw cut (e) slabs for structural retrofit per note n.4 on s0.3.. ref pa# 202109228981.Details
install temporary shoring system in order to saw cut (e) slabs for structural retrofit per note n.4 on s0.3.. ref pa# 202109228981. | $5,000 |
| Sep 22, 2021 | Never finaled issued Nov 2022, no final | 375 Laguna Honda Bl | S J Amoroso Construction | priority. m&o wings: selective demo of int. non-struc elements on lvl3 & spine btwn. full demo of int non-struc elements on lvl4-8 & spine btwn. replace & repair windows. n access-compliant parking spaces, loading zone, canopy, entrance at east surface parking lot. n framed walls, doors, door framesDetails
priority. m&o wings: selective demo of int. non-struc elements on lvl3 & spine btwn. full demo of int non-struc elements on lvl4-8 & spine btwn. replace & repair windows. n access-compliant parking spaces, loading zone, canopy, entrance at east surface parking lot. n framed walls, doors, door frames | $33,250,000 |
| Apr 19, 2021 | Never finaled issued Feb 2023, no final | 3359 24th St | S J Amoroso Construction | priority process: renovation & addition & selective demo of library. update reading spaces, bookstacks, (n) community rm & children's library, add'l restrms, staff spaces & landscaped patio. (n) mech, electr & fire protection systems. basement, penthouse & attic updates.Details
priority process: renovation & addition & selective demo of library. update reading spaces, bookstacks, (n) community rm & children's library, add'l restrms, staff spaces & landscaped patio. (n) mech, electr & fire protection systems. basement, penthouse & attic updates. | $13,011,337 |
| Mar 26, 2021 | Completed final sign-off Jun 2026 | 160 Hahn St | S J Amoroso Construction | to erect a one story, no dwelling, no basement, type v-b building. new recreation center and herz playground improvements. interior gymnasium and multipurpose room, supporting office space, storage, kitchen. exterior fitness plaza, outdoor recreation spaces. small maintenance shed/yard.Details
to erect a one story, no dwelling, no basement, type v-b building. new recreation center and herz playground improvements. interior gymnasium and multipurpose room, supporting office space, storage, kitchen. exterior fitness plaza, outdoor recreation spaces. small maintenance shed/yard. | $10,000,000 |
| Dec 3, 2020 | Completed final sign-off May 2021 | 2241 Jerrold Av | S J Amoroso Construction | evacuation maps per sffd bulletin 2.11.Details
evacuation maps per sffd bulletin 2.11. | |
| Apr 20, 2020 | Completed final sign-off Jun 2021 | 2241 Jerrold Av | S J Amoroso Construction | installation of propose 6" underground fire water. tie in of 6" fw in jerrold street water main. tie in to fire sprinkler system. sprinkler service in building was inspected and approved by dbi under app#2019-11-25-8129.Details
installation of propose 6" underground fire water. tie in of 6" fw in jerrold street water main. tie in to fire sprinkler system. sprinkler service in building was inspected and approved by dbi under app#2019-11-25-8129. | $2,977,000 |
| Mar 19, 2018 | Completed final sign-off May 2018 | 1301 Cesar Chavez St | S J Amoroso Construction | revision to app#201703080935. record document for errcs test results. n/a for maherDetails
revision to app#201703080935. record document for errcs test results. n/a for maher | |
| Jun 12, 2017 | Completed final sign-off Apr 2018 | 1301 Cesar Chavez St | S J Amoroso Construction | revision to 200710155436 to delete 1 fire hydrant from proposed plan. n/a for maher.Details
revision to 200710155436 to delete 1 fire hydrant from proposed plan. n/a for maher. | |
| Dec 1, 2016 | Completed final sign-off Jun 2021 | 2241 Jerrold Av | S J Amoroso Construction | priority processing. to erect 4 story type 2b, ambulance deployment facility, building sit on both lot 004 & 006. arch/mep/life safety deferred to addenda.Details
priority processing. to erect 4 story type 2b, ambulance deployment facility, building sit on both lot 004 & 006. arch/mep/life safety deferred to addenda. | $28,000,000 |
| Jan 28, 2014 | Completed final sign-off Mar 2014 | 1301 Cesar Chavez St | S J Amoroso Construction | revision to pa#2012-03-16-6216 for fire marshal approval of above ground fueling, piping system. fire inspector requested "as-built" drawings to be submitted for file. compliance with ordinance #155-13 not requiredDetails
revision to pa#2012-03-16-6216 for fire marshal approval of above ground fueling, piping system. fire inspector requested "as-built" drawings to be submitted for file. compliance with ordinance #155-13 not required | |
| Mar 21, 2013 | Completed final sign-off Apr 2013 | 1301 Cesar Chavez St | S J Amoroso Construction | to obtain a final inspection for work approved under pa# 200404080866, all work is complete.Details
to obtain a final inspection for work approved under pa# 200404080866, all work is complete. | |
| Mar 21, 2013 | Completed final sign-off Apr 2013 | 1301 Cesar Chavez St | S J Amoroso Construction | to obtain a final inspection for work approved under pa# 200404080865, all work is complete.Details
to obtain a final inspection for work approved under pa# 200404080865, all work is complete. | |
| Sep 21, 2012 | Completed final sign-off May 2013 | 1301 Cesar Chavez St | S J Amoroso Construction | installation of one exterior emergency generator, located on muni bus yard reference permit app# 2004.0408.0859Details
installation of one exterior emergency generator, located on muni bus yard reference permit app# 2004.0408.0859 | |
| Mar 16, 2012 | Completed final sign-off Mar 2014 | 1301 Cesar Chavez St | S J Amoroso Construction | revision to app#201110187022 for fire marshal approval of above ground fuel piping and fueling system.Details
revision to app#201110187022 for fire marshal approval of above ground fuel piping and fueling system. | |
| Mar 5, 2012 | Never finaled issued Mar 2012, no final | 1301 Cesar Chavez St | S J Amoroso Construction | provide a manual fire alarm systemDetails
provide a manual fire alarm system | $22,000 |
| Oct 18, 2011 | Never finaled issued Nov 2011, no final | 1301 Cesar Chavez St | S J Amoroso Construction | installing two (2) diesel fuel tanks (25,000 gallon each) and fuel piping system up to building only. interior fuel oil piping under separate permit.Details
installing two (2) diesel fuel tanks (25,000 gallon each) and fuel piping system up to building only. interior fuel oil piping under separate permit. | $565,000 |
| Dec 15, 2006 | Completed final sign-off Mar 2007 | 375 Woodside Av | S J Amoroso Construction | renew pa# 2001/03/22/4984 for final inspection.Details
renew pa# 2001/03/22/4984 for final inspection. | |
| Apr 8, 2004 | Completed final sign-off May 2013 | 1301 Cesar Chavez St | S J Amoroso Construction | erect a new art structure.Details
erect a new art structure. | |
| Apr 8, 2004 | Completed final sign-off Mar 2013 | 1301 Cesar Chavez St | S J Amoroso Construction | erect a new 1 story annex office buildingDetails
erect a new 1 story annex office building | |
| Apr 8, 2004 | Expired or cancelled expired Apr 2013 | 1301 Cesar Chavez St | S J Amoroso Construction | to demolish fire pump house.Details
to demolish fire pump house. | $1,000 |
| Apr 8, 2004 | Completed final sign-off Apr 2013 | 1301 Cesar Chavez St | S J Amoroso Construction | erect a new 1 story office buildingDetails
erect a new 1 story office building | |
| Apr 8, 2004 | Expired or cancelled expired Apr 2013 | 1301 Cesar Chavez St | S J Amoroso Construction | to demolish office/storage.Details
to demolish office/storage. | |
| Apr 8, 2004 | Expired or cancelled expired Apr 2013 | 1301 Cesar Chavez St | S J Amoroso Construction | to demolish canopy (parts storage muni)Details
to demolish canopy (parts storage muni) | $8,000 |
| Apr 8, 2004 | Completed final sign-off Mar 2013 | 1301 Cesar Chavez St | S J Amoroso Construction | gradingDetails
grading | |
| Aug 28, 2003 | Never finaled issued Oct 2003, no final | 375 Woodside Av | S J Amoroso Construction | revise to scope of work under app #200103224976 as noted: archit & struct: exit stair and roofDetails
revise to scope of work under app #200103224976 as noted: archit & struct: exit stair and roof | |
| Mar 22, 2001 | Completed final sign-off Oct 2003 | 375 Woodside Av | S J Amoroso Construction | demolish one story chapel at detention facilityDetails
demolish one story chapel at detention facility | |
| Mar 22, 2001 | Never finaled issued Jul 2003, no final | 375 Woodside Av | S J Amoroso Construction | demolish one story detention facility bldgDetails
demolish one story detention facility bldg |