Weston Mccann
- Listed as
- engineer
- On San Francisco permits
- Nov 2022 to May 2024
2 permits since 2000 (engineer on 2 permits): 1 completed, 1 in progress.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 6, 2024 | Completed final sign-off Apr 2025 | 555 Bryant St | Swinerton Builders | revision to metal stair addendum #6 due to design changes tracked by rev3 and rev4. reference pa# 2021.02.12.4635 s6Details
revision to metal stair addendum #6 due to design changes tracked by rev3 and rev4. reference pa# 2021.02.12.4635 s6 | |
| Nov 18, 2022 | In progress issued Nov 2023 | 200 Folsom St | Swinerton Rubecon Joint Venture | priority project-mayor dir 17-02(100% affordable): erect a 17-story, type 1-a, mixed use building with 184 units.Details
priority project-mayor dir 17-02(100% affordable): erect a 17-story, type 1-a, mixed use building with 184 units. | $74,471,078 |