Neil Joson
- License
- M21379
- Mechanical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up M21379 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Sj Engineers, Inc.
- Based in
- Sf
- On San Francisco permits
- May 2012 to May 2025
3 permits since 2000 (engineer on 3 permits): 2 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Hathaway Dinwiddie Co., Swinerton Rubecon Joint Venture, Tutor Perini Corporation
- Architects
- Owen Kennerly
- Engineers
- Chris Hawkins, Christopher Jordan Malabed, Dan Yavorsky, Ed Wong, Fadi Walieddine, Ken Johnson, Lang Huey, Michael I. Vickery, Robin Chiang, Stephen Shaffer, Timothy Lee, Weston Mccann, Writhea Sing
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 1
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 5, 2025 | Completed final sign-off Nov 2025 | 615 Battery St | Hathaway Dinwiddie Co. | 6/f: deferred mep submittal for building permit 202503212723 includes mechanical, electrical, and plumbing.Details
6/f: deferred mep submittal for building permit 202503212723 includes mechanical, electrical, and plumbing. | $384,260 |
| Nov 18, 2022 | Never finaled issued Nov 2023, no final | 200 Folsom St | Swinerton Rubecon Joint Venture | priority project-mayor dir 17-02(100% affordable): erect a 17-story, type 1-a, mixed use building with 184 units.Details
priority project-mayor dir 17-02(100% affordable): erect a 17-story, type 1-a, mixed use building with 184 units. | $74,471,078 |
| May 10, 2012 | Completed final sign-off Jul 2025 | 220 Geary St | Tutor Perini Corporation | partial demolition of union square plaza and garage, construction of new central subway union square/market street station entrance.Details
partial demolition of union square plaza and garage, construction of new central subway union square/market street station entrance. | $16,126,562 |