Edward Wong
- License
- E10436
- Electrical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up E10436 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- F.W. Associates, Inc.
- On San Francisco permits
- Jul 2005 to Mar 2025
4 permits since 2000 (engineer on 4 permits): 3 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- D & H Construction, Plant Construction Co, Lp, Tutor Perini Corporation
- Architects
- Irvin Gonsales, Meimei Chan
- Engineers
- Carl Milsum, Chris Hawkins, Dan Yavorsky, Fadi Walieddine, Ken Johnson, Lang Huey, Levi Malabuyo, Neil Joson, Robin Chiang, Timothy Heffernan, Timothy Lee, Writhea Sing
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 2
- Commercial 1
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 5, 2025 | Completed final sign-off Oct 2025 | 2230 Jerrold Av | Plant Construction Co, Lp | construction of an emergency generator to support the meals on wheels, sf production and support center. site work includes structural slab, electrical conduits to and from the building and an emergency generator. the emergency generator will be enclosed by a pre-fabricated enclosure.Details
construction of an emergency generator to support the meals on wheels, sf production and support center. site work includes structural slab, electrical conduits to and from the building and an emergency generator. the emergency generator will be enclosed by a pre-fabricated enclosure. | $1,400,000 |
| Feb 8, 2022 | Completed final sign-off Sep 2024 | 1000 Market St | D & H Construction | basement: demolition of existing switchboard. provide new switchboard for electrical service. provide new splice box for intercept of existing panelboards.Details
basement: demolition of existing switchboard. provide new switchboard for electrical service. provide new splice box for intercept of existing panelboards. | $75,000 |
| May 10, 2012 | Completed final sign-off Jul 2025 | 220 Geary St | Tutor Perini Corporation | partial demolition of union square plaza and garage, construction of new central subway union square/market street station entrance.Details
partial demolition of union square plaza and garage, construction of new central subway union square/market street station entrance. | $16,126,562 |
| Jul 15, 2005 | Never finaled issued Oct 2005, no final | 1760 Bush St | 1 hour enclosure for stand by generator. standby generator installation.Details
1 hour enclosure for stand by generator. standby generator installation. | $150,000 |