Mei-Mei Chan
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Mei Architects
- Based in
- San Francisco
- On San Francisco permits
- Apr 2004 to Sep 2026
61 permits since 2000 (architect on 57 permits, engineer on 3 permits, authorized agent-others on 1 permit): 27 completed, 10 in progress, 17 never finaled, 7 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 1, 2026 | In progress issued Sep 2026 | 1970 Ocean Av | Sjk Development | interior buildout of (e) east and west building. all demo work completed under pa# 202601239927.Details
interior buildout of (e) east and west building. all demo work completed under pa# 202601239927. | $280,000 |
| Jul 7, 2026 | In progress issued Jul 2026 | 1970 Ocean Av | Sjk Development | demo & brace hallow claytiles and walls. expand bathroom doors.Details
demo & brace hallow claytiles and walls. expand bathroom doors. | $20,000 |
| May 19, 2026 | In progress issued Jul 2026 | 1 Warriors Wy | Ideal Sign Company | add interior awning with logo signage to (e) bar @ level 200. all interior work. no work visible from exterior.Details
add interior awning with logo signage to (e) bar @ level 200. all interior work. no work visible from exterior. | $4,000 |
| Apr 23, 2026 | In progress issued Apr 2026 | 1970 Ocean Av | Sjk Development | demo of interior improvement of east & west annexes. removal of non-structural interior walls, door, finishesDetails
demo of interior improvement of east & west annexes. removal of non-structural interior walls, door, finishes | $30,000 |
| Mar 31, 2026 | In progress issued Jul 2026 | 750 Kearny St | removal of kearny street pedestrian bridge that connects sf rec and park property to hilton hotel.Details
removal of kearny street pedestrian bridge that connects sf rec and park property to hilton hotel. | $950,000 | |
| Mar 12, 2026 | In progress issued Mar 2026 | 1970 Ocean Av | Sjk Development | expand bathrooms on main level. 2 new drinking fountains.Details
expand bathrooms on main level. 2 new drinking fountains. | $30,000 |
| Jul 29, 2024 | Completed final sign-off Dec 2024 | 1 Warriors Wy | Dpr Construction A | ste 102: revision to 202403208274 change in storefront design @ level 2 & 3 south tower. removal of structure scope of additional structural support for new storefront construction. removal of speccial inspection in association w/ removal of structure scopeDetails
ste 102: revision to 202403208274 change in storefront design @ level 2 & 3 south tower. removal of structure scope of additional structural support for new storefront construction. removal of speccial inspection in association w/ removal of structure scope | |
| May 14, 2024 | In progress issued Aug 2024 | 1515 Vallejo St | J M Construction Llc | interior office renovation includes removal of existing finishes; selected non-structural walls, electrical and plumbing; renovation to provide new floor; wall and ceiling finishes; new non-structural partitions and lighting fixtures. renovation include restroom and pantry no exterior workDetails
interior office renovation includes removal of existing finishes; selected non-structural walls, electrical and plumbing; renovation to provide new floor; wall and ceiling finishes; new non-structural partitions and lighting fixtures. renovation include restroom and pantry no exterior work | $220,000 |
| Mar 25, 2024 | In progress issued Apr 2024 | 1000 Market St | D & H Construction | revision 201912270786 and 202208019636 to include change of occupancy from office space (b) to storage space (s-2) for sro hotelDetails
revision 201912270786 and 202208019636 to include change of occupancy from office space (b) to storage space (s-2) for sro hotel | |
| Mar 20, 2024 | Completed final sign-off Dec 2024 | 1 Warriors Wy | Dpr Construction A | south tower level 2&3 space 11: demo of (e) storefront system and construction of (n) storefront system and supports on level 2 and 3. oc11Details
south tower level 2&3 space 11: demo of (e) storefront system and construction of (n) storefront system and supports on level 2 and 3. oc11 | $200,000 |
| Jan 29, 2024 | Completed final sign-off Oct 2024 | 1 Warriors Wy | Dpr Construction A | south tower level 2 and 3, space 11: work includes concrete topping slab at level 2, infill slab opening and new concrete slab on level 3, new steel stair frame, and improvements as shown on plans.Details
south tower level 2 and 3, space 11: work includes concrete topping slab at level 2, infill slab opening and new concrete slab on level 3, new steel stair frame, and improvements as shown on plans. | $525,000 |
| Nov 29, 2023 | In progress issued Mar 2024 | 1000 Market St | D & H Construction | revision to pa# 201912270786: add push button accuator per da-05 due to conditions in public right-of-way grading.Details
revision to pa# 201912270786: add push button accuator per da-05 due to conditions in public right-of-way grading. | $7,000 |
| Jul 27, 2023 | Completed final sign-off Aug 2025 | 201 Van Ness Av | W E Lyons Construction Co | revision to bpa#201803274726 & 202210204766, additional drawings for elevator #1 & #2 modernizationDetails
revision to bpa#201803274726 & 202210204766, additional drawings for elevator #1 & #2 modernization | $70,000 |
| Jun 26, 2023 | Completed final sign-off Sep 2026 | 1 Warriors Wy | Dpr Construction A | t.i. furnishing all equipment, materias and labor necessary for the construction and renovation of a laundry facility in room ed.02.19 and ed.02.20 on level 000 of the arena. remove and reinstall in same location.Details
t.i. furnishing all equipment, materias and labor necessary for the construction and renovation of a laundry facility in room ed.02.19 and ed.02.20 on level 000 of the arena. remove and reinstall in same location. | $420,000 |
| Apr 11, 2023 | Never finaled issued Aug 2023, no final | 300 16th St | Hasz Construction Inc | revision to 201908138652 and 201910164647. changes to tenant space 23. includes kitchen, indoor and patio seating area, patio bar, restroom and other support spaces. mep. project includes roof equipment and roof screenDetails
revision to 201908138652 and 201910164647. changes to tenant space 23. includes kitchen, indoor and patio seating area, patio bar, restroom and other support spaces. mep. project includes roof equipment and roof screen | |
| Mar 29, 2023 | Never finaled issued Aug 2023, no final | 1000 Market St | D & H Construction | remove and replace with new store front windows on the 1st fl.Details
remove and replace with new store front windows on the 1st fl. | $50,000 |
| Aug 1, 2022 | Never finaled issued May 2023, no final | 1000 Market St | D & H Construction | revision to 201912270786. scope basement level: addition of rooms and reconfig spaces. 1st lvl: new built in bench, reconfiguration of spaces, demo of e restaurant. misc details added for repair of existing ratings, water proofing at shower pans.Details
revision to 201912270786. scope basement level: addition of rooms and reconfig spaces. 1st lvl: new built in bench, reconfiguration of spaces, demo of e restaurant. misc details added for repair of existing ratings, water proofing at shower pans. | $100,000 |
| Jul 27, 2022 | Completed final sign-off Jan 2023 | 1 Warriors Wy | Dpr Construction A | renovate (e) dock command ed 71.01 to first aid rm. add office space in (e) commissary room ec.75.01.Details
renovate (e) dock command ed 71.01 to first aid rm. add office space in (e) commissary room ec.75.01. | $350,000 |
| Apr 26, 2022 | In progress issued Jun 2026 | 733 Kearny St | Swinerton Builders | priority processing ab-004. demolition of existing facilities exposing existing garage roof structure. installation of new waterproofing over existing garage roof structure. construction of new clubhouse and landscape/playground elements. miscellaneous offsite sidewalk and crosswalk improvements.Details
priority processing ab-004. demolition of existing facilities exposing existing garage roof structure. installation of new waterproofing over existing garage roof structure. construction of new clubhouse and landscape/playground elements. miscellaneous offsite sidewalk and crosswalk improvements. | $43,000,000 |
| Apr 1, 2022 | Never finaled issued Sep 2022, no final | 220 Geary St | union square/market st station concourse level - construct 2 vendor kiosks; convert 2 (e) storage to all gender accessible restroom; kiosks & all gender will include elec and plumb for new lightings, power and (n) water use fixtures; (e) undeveloped space to be renovated to a down-time room reservDetails
union square/market st station concourse level - construct 2 vendor kiosks; convert 2 (e) storage to all gender accessible restroom; kiosks & all gender will include elec and plumb for new lightings, power and (n) water use fixtures; (e) undeveloped space to be renovated to a down-time room reserv | $1,000,000 | |
| Feb 16, 2022 | Completed final sign-off May 2023 | 1 Warriors Wy | confirm (e) requirement at the south, east and west services corridors on level 000 of the chase center. existing tape boundary for temp sotrage shall be adjusted accordingly.Details
confirm (e) requirement at the south, east and west services corridors on level 000 of the chase center. existing tape boundary for temp sotrage shall be adjusted accordingly. | ||
| Feb 8, 2022 | Completed final sign-off Sep 2024 | 1000 Market St | D & H Construction | basement: demolition of existing switchboard. provide new switchboard for electrical service. provide new splice box for intercept of existing panelboards.Details
basement: demolition of existing switchboard. provide new switchboard for electrical service. provide new splice box for intercept of existing panelboards. | $75,000 |
| May 28, 2021 | Never finaled issued Oct 2021, no final | 1 Warriors Wy | Pan-Pacific Mechanical Llc | change existing main janitorial storage ea.61.01 and existing storage ea.09.04 to janitor offices. change existing site storage ek.01.01 to court storage and install service rolling door at existing cmu wall. fire alarm and sprinkler (if applic) under sep permits.Details
change existing main janitorial storage ea.61.01 and existing storage ea.09.04 to janitor offices. change existing site storage ek.01.01 to court storage and install service rolling door at existing cmu wall. fire alarm and sprinkler (if applic) under sep permits. | $100,000 |
| Apr 20, 2021 | Expired or cancelled cancelled Feb 2025 | 99 Castenada Av | K A Lau Construction | add 2nd story, expand (e) partial basement, rebuild the rear retaining wall, and landscape front & rear yards. the new residence will include living room, fam room, dining room, three bedrooms, three full bathrooms, powder room, laundry room and storage spaces. full permit.Details
add 2nd story, expand (e) partial basement, rebuild the rear retaining wall, and landscape front & rear yards. the new residence will include living room, fam room, dining room, three bedrooms, three full bathrooms, powder room, laundry room and storage spaces. full permit. | $650,000 |
| Mar 1, 2021 | Completed final sign-off Nov 2021 | 54 Rockaway Av | 1st fl: remodel (e) master bathroom and closet, 2nd fl: remodel (e) dining area, kitchen, and bathroom, install new closet in (e) bedroom at (e) exterior east elevation, remove (e) exterior windows on 2nd fl. and replace with new windows for new layout( windows not visible from the street) n/a maherDetails
1st fl: remodel (e) master bathroom and closet, 2nd fl: remodel (e) dining area, kitchen, and bathroom, install new closet in (e) bedroom at (e) exterior east elevation, remove (e) exterior windows on 2nd fl. and replace with new windows for new layout( windows not visible from the street) n/a maher | $100,000 | |
| Jan 4, 2021 | Expired or cancelled cancelled Jan 2026 | 949 Grant Av | change of use from commercial to institutional. addition of partial height screen wall at 2nd floor and addition of sliding gate at top of basement stairs (ground level).Details
change of use from commercial to institutional. addition of partial height screen wall at 2nd floor and addition of sliding gate at top of basement stairs (ground level). | $5,000 | |
| Dec 17, 2020 | Completed final sign-off Sep 2022 | 1 Warriors Wy | Dpr Construction | ti work for community service center includes open work space, conference room, restrooms & other support spaces. work is located in tenant space 20 & 21 on level 200Details
ti work for community service center includes open work space, conference room, restrooms & other support spaces. work is located in tenant space 20 & 21 on level 200 | $320,000 |
| Nov 23, 2020 | Never finaled issued Jan 2021, no final | 1 Warriors Wy | Rudolph Commercial Interiors Inc, Rci | replace (e) door 254 a.4 with new doorDetails
replace (e) door 254 a.4 with new door | $5,000 |
| Oct 19, 2020 | Never finaled issued May 2021, no final | 1 Warriors Wy | Shawmut Woodworking & Supply Inc | replace (e) ceiling of (e) corridor ea. 02.27 w/ (n) metal panel ceiling. replace (e) doors 139a and 160a w/ (n) doors. provide (n) lighting fixtures for the (n) ceiling layout. reroute (e) mechanical and fire sprinkler system in (e) corridor ea.02.27 to match (n) ceiling layout.Details
replace (e) ceiling of (e) corridor ea. 02.27 w/ (n) metal panel ceiling. replace (e) doors 139a and 160a w/ (n) doors. provide (n) lighting fixtures for the (n) ceiling layout. reroute (e) mechanical and fire sprinkler system in (e) corridor ea.02.27 to match (n) ceiling layout. | $190,000 |
| Oct 2, 2020 | Completed final sign-off Aug 2021 | 1 Warriors Wy | Shawmut Woodworking & Supply Inc | remodel of (e) roadie kitchen and (e) east kitchenDetails
remodel of (e) roadie kitchen and (e) east kitchen | $450,000 |
| Jul 6, 2020 | Completed final sign-off Feb 2021 | 300 16th St | demolition of existing float tank, existing cyro trreatment room, and existing storage, and remodel into new recovery room.Details
demolition of existing float tank, existing cyro trreatment room, and existing storage, and remodel into new recovery room. | $320,076 | |
| Apr 20, 2020 | Completed final sign-off Jun 2021 | 2241 Jerrold Av | S J Amoroso Construction | installation of propose 6" underground fire water. tie in of 6" fw in jerrold street water main. tie in to fire sprinkler system. sprinkler service in building was inspected and approved by dbi under app#2019-11-25-8129.Details
installation of propose 6" underground fire water. tie in of 6" fw in jerrold street water main. tie in to fire sprinkler system. sprinkler service in building was inspected and approved by dbi under app#2019-11-25-8129. | $2,977,000 |
| Mar 11, 2020 | Expired or cancelled cancelled Jan 2026 | 617 Mission St | revision to pa #201912230401. 2nd fl alteration of all-gender restroom (adding urinal)Details
revision to pa #201912230401. 2nd fl alteration of all-gender restroom (adding urinal) | ||
| Jan 24, 2020 | Never finaled issued Feb 2020, no final | 300 16th St | Dome Construction Corp | to construct (n) ocncrete slab infill at (e) slab opening at 3rd level. and to change (e) assembly a-2 occupancy to (n) b- occupancy. maher naDetails
to construct (n) ocncrete slab infill at (e) slab opening at 3rd level. and to change (e) assembly a-2 occupancy to (n) b- occupancy. maher na | $190,000 |
| Jan 13, 2020 | Never finaled issued Feb 2020, no final | 300 16th St | Shawmut Woodworking & Supply Inc | to install new egress door with security card key access control system and to install transfer grille to balance the pressurization of egress passageway.Details
to install new egress door with security card key access control system and to install transfer grille to balance the pressurization of egress passageway. | $50,000 |
| Dec 27, 2019 | Completed final sign-off Jul 2024 | 1010 Market St | D & H Construction | exterior: renovate entrance. repair windows. interior: upgrade entrance and common area. on residential floors remodel (e) units, bathrooms & replae entry doors; provide code required mobility & communication rooms. mep included. life-safety under a seperate permit.Details
exterior: renovate entrance. repair windows. interior: upgrade entrance and common area. on residential floors remodel (e) units, bathrooms & replae entry doors; provide code required mobility & communication rooms. mep included. life-safety under a seperate permit. | $10,700,000 |
| Sep 25, 2019 | Expired or cancelled expired Mar 2025 | 300 16th St | Shawmut Woodworking & Supply Inc | tenant improvent space 14 tenant furniture layout. hootopia ref pa #201904087340. retail amusement center with gift shop and game experiences and exhibitions. ti work will include set partitions, equip , fixtures, furnitureDetails
tenant improvent space 14 tenant furniture layout. hootopia ref pa #201904087340. retail amusement center with gift shop and game experiences and exhibitions. ti work will include set partitions, equip , fixtures, furniture | $55,000 |
| Sep 23, 2019 | Never finaled filed Sep 2019, never issued | 750 Phelps St | priority processing for sfpuc/dpw mod project, erect a two stories type ii-b construction maintenance shops buildingDetails
priority processing for sfpuc/dpw mod project, erect a two stories type ii-b construction maintenance shops building | $25,000,000 | |
| Sep 23, 2019 | Never finaled filed Sep 2019, never issued | 750 Phelps St | priority processing for sfpuc/dpw mod project, erect a one story type v construction maintenance shops buildingDetails
priority processing for sfpuc/dpw mod project, erect a one story type v construction maintenance shops building | $14,000,000 | |
| May 1, 2019 | Completed final sign-off Jun 2019 | 1010 Market St | Troyer's Door Control Inc | revision to pa 2017-1018-1538 automatic door power opener in lieu of level landing at door per no da-04 sfdbiDetails
revision to pa 2017-1018-1538 automatic door power opener in lieu of level landing at door per no da-04 sfdbi | $5,000 |
| Apr 15, 2019 | Completed final sign-off Nov 2022 | 3850 17th St | partial interior renovations. exterior building seismic upgrade & landscape improvement.Details
partial interior renovations. exterior building seismic upgrade & landscape improvement. | $5,000,000 | |
| Apr 8, 2019 | Never finaled issued Sep 2019, no final | 300 16th St | Shawmut Woodworking & Supply Inc | building new electrical closets, janitor closets, 2 all-gender restrooms and 4 food prep areas. each space will be installed w/ plumbing fixtures, electrical equipment, electrical outlets, lighting fixtures, mechanical equipment and registers. (1st time tenant improvement)Details
building new electrical closets, janitor closets, 2 all-gender restrooms and 4 food prep areas. each space will be installed w/ plumbing fixtures, electrical equipment, electrical outlets, lighting fixtures, mechanical equipment and registers. (1st time tenant improvement) | $3,150,000 |
| May 15, 2018 | Completed final sign-off Jul 2019 | 125 Bay Shore Bl | Clw Builders Inc | change extg warehouse into homeless shelter with laundry room. addition of modular trailers for toilet & bathing. new deck. minor site work for security & accessebility. minor renovation to first floor of extg office bldg. n/a for maherDetails
change extg warehouse into homeless shelter with laundry room. addition of modular trailers for toilet & bathing. new deck. minor site work for security & accessebility. minor renovation to first floor of extg office bldg. n/a for maher | $2,000,000 |
| Oct 18, 2017 | Completed final sign-off Jun 2019 | 1010 Market St | W. Wong Construction Co. Inc. | change of use from retail to office, g/f- interior t.i. to convert retail space into public facility business office at ground floor. work includes non-structural work, new non-load bearing partitions, doors, windows, floor and wall finishes and ceiling repairs.Details
change of use from retail to office, g/f- interior t.i. to convert retail space into public facility business office at ground floor. work includes non-structural work, new non-load bearing partitions, doors, windows, floor and wall finishes and ceiling repairs. | $27,000 |
| Aug 29, 2017 | Completed final sign-off Dec 2017 | 5160 Geary Bl | J & J South West Construction Inc | ti to existing building; all work are restricted to 1st floor interior office area. re-finish and update current interior paint, carpet & caseworkDetails
ti to existing building; all work are restricted to 1st floor interior office area. re-finish and update current interior paint, carpet & casework | $108,000 |
| Nov 16, 2016 | Never finaled issued Nov 2016, no final | 237 09th St | J M Lighting Design Inc | revised electrical scope for pa 2016-0629-1147, to include it wiring and outlet relocationDetails
revised electrical scope for pa 2016-0629-1147, to include it wiring and outlet relocation | $12,000 |
| Nov 10, 2016 | Never finaled issued Nov 2016, no final | 235 09th St | to obtain final inspection for renewal under pa #200801112359, #200807116511, #200808199546. all work is complete.Details
to obtain final inspection for renewal under pa #200801112359, #200807116511, #200808199546. all work is complete. | ||
| Jun 29, 2016 | Never finaled issued Jul 2016, no final | 237 09th St | 2nd floor inteior alterations, non-structural, tenant improvements, lighting. n/a maher ordinanceDetails
2nd floor inteior alterations, non-structural, tenant improvements, lighting. n/a maher ordinance | $197,000 | |
| Apr 1, 2015 | Completed final sign-off Feb 2018 | 990 Pacific Av | mohcd rad program. seismic upgrade, replace windows, systems and finish upgrades 5% accessible upgrades, 1% hvi units. general scope of work. defered submittals: automatic fire sprinkler system, standpipe, fire alarm system, ext. building maintenance.Details
mohcd rad program. seismic upgrade, replace windows, systems and finish upgrades 5% accessible upgrades, 1% hvi units. general scope of work. defered submittals: automatic fire sprinkler system, standpipe, fire alarm system, ext. building maintenance. | $27,676,322 | |
| Oct 28, 2014 | Never finaled issued Jun 2015, no final | 835 Jackson St | Dpr Construction | ref pa #201303111902. installation of diesel fuel oil system for the hospital's emergency generators sytem consists of (2) 5,000 gallon underground fuel oil tanks, fuel oil pumps, leak detection system, (2) 660 roof top sub-base day tanks, valves, piping & related appurtenances. maher-n/a.Details
ref pa #201303111902. installation of diesel fuel oil system for the hospital's emergency generators sytem consists of (2) 5,000 gallon underground fuel oil tanks, fuel oil pumps, leak detection system, (2) 660 roof top sub-base day tanks, valves, piping & related appurtenances. maher-n/a. | $800,000 |
| Feb 21, 2014 | Completed final sign-off Jun 2014 | 821 Jackson St | Bel Builders Inc | #2- 2/f interior non-structural alterations of an existing apartment dwelling unit. alterations include demo of all interior partitions, enlarging bathroom for improved accessibility, new layout of kitchen, living and bedrooms, new lighting and elec outlets.Details
#2- 2/f interior non-structural alterations of an existing apartment dwelling unit. alterations include demo of all interior partitions, enlarging bathroom for improved accessibility, new layout of kitchen, living and bedrooms, new lighting and elec outlets. | $40,000 |
| Jan 17, 2014 | Expired or cancelled cancelled Jul 2015 | 1524 Powell St | Bel Builders Inc | new t-bar ceiling in ground floor, 4 bathroom remodel, new interior staircase from ground floor to basement, interior partitions, remove fixtures in basement kitchen.Details
new t-bar ceiling in ground floor, 4 bathroom remodel, new interior staircase from ground floor to basement, interior partitions, remove fixtures in basement kitchen. | $52,000 |
| Nov 13, 2013 | Completed final sign-off Mar 2014 | 2415 Noriega St | Arthulia Inc | replace front door & store front with glass. all work in-kindDetails
replace front door & store front with glass. all work in-kind | $5,000 |
| Aug 21, 2008 | Expired or cancelled cancelled Feb 2014 | 2775 San Bruno Av | vertical and horizontal extensions of the existing building. work includes raising the existing building vertically and adding a new ground level beneath. project will provide 3 condominiums (2 residential w/ 3 bdrm/2 ba, 1 commercial w/ 2 retail spaces)Details
vertical and horizontal extensions of the existing building. work includes raising the existing building vertically and adding a new ground level beneath. project will provide 3 condominiums (2 residential w/ 3 bdrm/2 ba, 1 commercial w/ 2 retail spaces) | $350,000 | |
| Jan 18, 2008 | Completed final sign-off Nov 2008 | 2106 41st Av | Ha's Construction | 2 story horizontal addition in the rear of bldg. demolition of ex. walls and finishes, fixtures, windows and utilities and construct new walls, finishes, fixtures, doors and windows. remodel ex. bath on 2nd flr. extend and modify ex. plumbing, heating and electrical system.Details
2 story horizontal addition in the rear of bldg. demolition of ex. walls and finishes, fixtures, windows and utilities and construct new walls, finishes, fixtures, doors and windows. remodel ex. bath on 2nd flr. extend and modify ex. plumbing, heating and electrical system. | $80,000 |
| Jul 21, 2006 | Expired or cancelled cancelled Aug 2011 | 2919 Clement St | removing existing fireplace, add a new penthouse to the existing 3 story building, add a front and rear deck on the penthouse floorDetails
removing existing fireplace, add a new penthouse to the existing 3 story building, add a front and rear deck on the penthouse floor | $70,000 | |
| May 5, 2006 | Completed final sign-off Oct 2006 | 481 Princeton St | add new bath & family room at ground level, scale back deck at 2/f to 7'. add new window in front & enlarge existing window in back..Details
add new bath & family room at ground level, scale back deck at 2/f to 7'. add new window in front & enlarge existing window in back.. | $10,000 | |
| May 24, 2005 | Completed final sign-off Jan 2006 | 1501 Funston Av | add family rm and 1/2 bath at ground fl behind garageDetails
add family rm and 1/2 bath at ground fl behind garage | $20,000 | |
| Dec 17, 2004 | Completed final sign-off Dec 2006 | 2817 San Bruno Av | horizontal extension in the rear & side. add one residential uint with one parking space.Details
horizontal extension in the rear & side. add one residential uint with one parking space. | $150,000 | |
| Jun 30, 2004 | Never finaled issued Aug 2005, no final | 2035 15th Av | horizontallly extend building envelopen in the rear of the building at the basement entry and **Details
horizontallly extend building envelopen in the rear of the building at the basement entry and ** | $100,000 | |
| Apr 20, 2004 | Completed final sign-off Sep 2004 | 227 Lakeshore Dr | convert (e)storage in garage to bath & (e)storage in back of garage to new bedroom,remove kitchennetDetails
convert (e)storage in garage to bath & (e)storage in back of garage to new bedroom,remove kitchennet | $15,000 |