Shawmut Woodworking & Supply Inc
- Based in
- Boston
- On San Francisco permits
- Dec 2006 to Apr 2026
- Last 24 months
- 3 permits filed
178 permits since 2000: 85 completed, 3 in progress, 81 never finaled, 9 expired or cancelled.
Of the 81 never-finaled permits, 3 are 3 to 5 years old, 14 are 5 to 10 years old, 64 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 178.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 7, 2026 | In progress issued Apr 2026 | 243 West Portal Av | recommencement and completion of work under pa 202501138174.Details
recommencement and completion of work under pa 202501138174. | $12,500 |
| Jun 4, 2025 | In progress issued Jun 2025 | 156 Geary St | ordinary maintenence and repair to store to restore to prior approved conditions per pa 200812299257. work includes removal and reinstallation of stone at storefront showcase window and flooring. 4 broken glass panels of showcase window, sidelights, glassdoor, rolling gate system (grille and motor).Details
ordinary maintenence and repair to store to restore to prior approved conditions per pa 200812299257. work includes removal and reinstallation of stone at storefront showcase window and flooring. 4 broken glass panels of showcase window, sidelights, glassdoor, rolling gate system (grille and motor). | $50,000 |
| Jan 13, 2025 | In progress issued Jan 2025 | 243 West Portal Av | install (n) voluntary pollution control unit on (e) roof. not visible from street.Details
install (n) voluntary pollution control unit on (e) roof. not visible from street. | $25,000 |
| Sep 20, 2022 | Never finaled issued Oct 2022, no final | 300 Post St | 2/f: remodel of existing center. work includes non structural partitions, ceiling, furniture, finishes and related hvac, electrical and plumbing work. remodel of 3/f existing tenant open work area, including voluntary ada restroom. upgrade, storage, furniture and related hvac, elec. and plumbing.Details
2/f: remodel of existing center. work includes non structural partitions, ceiling, furniture, finishes and related hvac, electrical and plumbing work. remodel of 3/f existing tenant open work area, including voluntary ada restroom. upgrade, storage, furniture and related hvac, elec. and plumbing. | $104,180 |
| Mar 24, 2022 | Never finaled issued Apr 2022, no final | 809 Montgomery St | revision to pa: 201802080722 to incorporate modified design by gfds engineers. proposed upgrades to the steel frame system.Details
revision to pa: 201802080722 to incorporate modified design by gfds engineers. proposed upgrades to the steel frame system. | |
| Jan 27, 2022 | Never finaled issued Apr 2022, no final | 809 Montgomery St | revision to pa# 201711093566 to incorporate modified foundation design by gfds engineers. proposed upgrades to (e) foundation to accommodate a voluntary steel frame upgrade to be issued under pa# 201802080722. (change of use pending issuance of 201904178238.)Details
revision to pa# 201711093566 to incorporate modified foundation design by gfds engineers. proposed upgrades to (e) foundation to accommodate a voluntary steel frame upgrade to be issued under pa# 201802080722. (change of use pending issuance of 201904178238.) | |
| Apr 26, 2021 | Completed final sign-off May 2022 | 300 Post St | revision to pa# 202102124602. to include induction loop + signage at level 2.Details
revision to pa# 202102124602. to include induction loop + signage at level 2. | |
| Feb 12, 2021 | Completed final sign-off May 2022 | 300 Post St | work on existing multi level retail store including floor finish replacement and in-ground electrical fixtures replacement.Details
work on existing multi level retail store including floor finish replacement and in-ground electrical fixtures replacement. | $400,000 |
| Feb 12, 2021 | Completed final sign-off May 2022 | 300 Post St | interior only non-structural demo of floors per ab-017. areas of demo to remain vacant until all accessibility features have been restored.Details
interior only non-structural demo of floors per ab-017. areas of demo to remain vacant until all accessibility features have been restored. | $50,000 |
| Oct 19, 2020 | Never finaled issued May 2021, no final | 1 Warriors Wy | replace (e) ceiling of (e) corridor ea. 02.27 w/ (n) metal panel ceiling. replace (e) doors 139a and 160a w/ (n) doors. provide (n) lighting fixtures for the (n) ceiling layout. reroute (e) mechanical and fire sprinkler system in (e) corridor ea.02.27 to match (n) ceiling layout.Details
replace (e) ceiling of (e) corridor ea. 02.27 w/ (n) metal panel ceiling. replace (e) doors 139a and 160a w/ (n) doors. provide (n) lighting fixtures for the (n) ceiling layout. reroute (e) mechanical and fire sprinkler system in (e) corridor ea.02.27 to match (n) ceiling layout. | $190,000 |
| Oct 7, 2020 | Completed final sign-off May 2022 | 300 Post St | accessibility upgrade to retail store's southwest entry door on 1st flr - work incl exterior and interior addition of 2 (n) push plate totems w/ signage. add concrete stain to (e) steps.Details
accessibility upgrade to retail store's southwest entry door on 1st flr - work incl exterior and interior addition of 2 (n) push plate totems w/ signage. add concrete stain to (e) steps. | $10,000 |
| Oct 2, 2020 | Completed final sign-off Aug 2021 | 1 Warriors Wy | remodel of (e) roadie kitchen and (e) east kitchenDetails
remodel of (e) roadie kitchen and (e) east kitchen | $450,000 |
| Aug 25, 2020 | Never finaled issued Nov 2020, no final | 845 Market St | revision to bpa# 202001101683. recess storefront door, change door swing direction, addition of rolling grille, and changes to the glass specification.Details
revision to bpa# 202001101683. recess storefront door, change door swing direction, addition of rolling grille, and changes to the glass specification. | |
| Jul 6, 2020 | Completed final sign-off Jul 2021 | 300 16th St | divide existing space into 2 tenant space 4 and 6, and provide restrooms in both tenant space 4 and 6.**maher n/a**Details
divide existing space into 2 tenant space 4 and 6, and provide restrooms in both tenant space 4 and 6.**maher n/a** | $690,943 |
| Mar 5, 2020 | Never finaled issued Jul 2020, no final | 300 16th St | structural improvements:additional structural beam to support new roof opening.Details
structural improvements:additional structural beam to support new roof opening. | $125,000 |
| Jan 13, 2020 | Never finaled issued Feb 2020, no final | 300 16th St | to install new egress door with security card key access control system and to install transfer grille to balance the pressurization of egress passageway.Details
to install new egress door with security card key access control system and to install transfer grille to balance the pressurization of egress passageway. | $50,000 |
| Oct 16, 2019 | Never finaled issued Aug 2020, no final | 300 16th St | hvac, rooftop units extg heaters, misc plumb for kitch and restrooms, new elect. service throughout. t.i on seperate permit #201908138652Details
hvac, rooftop units extg heaters, misc plumb for kitch and restrooms, new elect. service throughout. t.i on seperate permit #201908138652 | $150,000 |
| Sep 30, 2019 | Never finaled issued Oct 2019, no final | 300 16th St | rev to pa# 201904087340; space 14: revise mechanincal layout. n/a maherDetails
rev to pa# 201904087340; space 14: revise mechanincal layout. n/a maher | |
| Sep 25, 2019 | Expired or cancelled expired Mar 2025 | 300 16th St | tenant improvent space 14 tenant furniture layout. hootopia ref pa #201904087340. retail amusement center with gift shop and game experiences and exhibitions. ti work will include set partitions, equip , fixtures, furnitureDetails
tenant improvent space 14 tenant furniture layout. hootopia ref pa #201904087340. retail amusement center with gift shop and game experiences and exhibitions. ti work will include set partitions, equip , fixtures, furniture | $55,000 |
| Sep 23, 2019 | Never finaled issued Sep 2019, no final | 300 16th St | revision to 201904087340 fls plans and egress pathway revised. change of use an occupancy of space 14, from m occupancy to a-3 occupancyDetails
revision to 201904087340 fls plans and egress pathway revised. change of use an occupancy of space 14, from m occupancy to a-3 occupancy | |
| Aug 21, 2019 | Completed final sign-off Oct 2019 | 300 Post St | in-kind replacement of one glazing panel. ordinary maintenance and repair so no minor permit to alter requiredDetails
in-kind replacement of one glazing panel. ordinary maintenance and repair so no minor permit to alter required | $400,000 |
| Jun 20, 2019 | Expired or cancelled cancelled Jan 2026 | 300 16th St | provide new terminal units for ti. provide new exhaust fan for restroomDetails
provide new terminal units for ti. provide new exhaust fan for restroom | $100,000 |
| May 7, 2019 | Never finaled issued Jun 2019, no final | 300 16th St | ste 8 - new store "fanatics" in gsw arena - interior only ti w/interior finishes, walls, doors, frames, restroom, lighting, new electrical unitsDetails
ste 8 - new store "fanatics" in gsw arena - interior only ti w/interior finishes, walls, doors, frames, restroom, lighting, new electrical units | $475,000 |
| Apr 8, 2019 | Never finaled issued Sep 2019, no final | 300 16th St | building new electrical closets, janitor closets, 2 all-gender restrooms and 4 food prep areas. each space will be installed w/ plumbing fixtures, electrical equipment, electrical outlets, lighting fixtures, mechanical equipment and registers. (1st time tenant improvement)Details
building new electrical closets, janitor closets, 2 all-gender restrooms and 4 food prep areas. each space will be installed w/ plumbing fixtures, electrical equipment, electrical outlets, lighting fixtures, mechanical equipment and registers. (1st time tenant improvement) | $3,150,000 |
| Apr 16, 2018 | Completed final sign-off Aug 2018 | 77 Ofarrell St | deferred steeke storage racks for 6th flr ref 201607182600Details
deferred steeke storage racks for 6th flr ref 201607182600 | $20,000 |
| Mar 28, 2018 | Completed final sign-off Aug 2018 | 77 Ofarrell St | revision to app#201611142636 for minor as built modifications for piping,gas riser, equipment locations, electrical power, lighting, riser, panels, single line.Details
revision to app#201611142636 for minor as built modifications for piping,gas riser, equipment locations, electrical power, lighting, riser, panels, single line. | |
| Nov 7, 2017 | Completed final sign-off Jan 2018 | 865 Market St | revision to pa #201703232211 - install storage racks for tenant space. n/a maher ordinance 2nd floorDetails
revision to pa #201703232211 - install storage racks for tenant space. n/a maher ordinance 2nd floor | $5,000 |
| Oct 10, 2017 | Completed final sign-off Aug 2018 | 77 Ofarrell St | revision to pa # 201607182600 for revised layout and reduce scope of work at ceilingDetails
revision to pa # 201607182600 for revised layout and reduce scope of work at ceiling | |
| Aug 11, 2017 | Never finaled issued Sep 2017, no final | 845 Market St | revision to pa 2017-0510-6206 addition to storage room on 2nd floorDetails
revision to pa 2017-0510-6206 addition to storage room on 2nd floor | $8,000 |
| Aug 8, 2017 | Never finaled issued Sep 2017, no final | 77 Ofarrell St | barrier removal only. scope is limitted t moving a single door to allow proper wheelchair accessibility clearances.Details
barrier removal only. scope is limitted t moving a single door to allow proper wheelchair accessibility clearances. | $3,500 |
| Jun 6, 2017 | Completed final sign-off Sep 2017 | 2142 Fillmore St | interior tenant improvement to change finishes and fixtures. no change of use, occupancy, egress. no structural workDetails
interior tenant improvement to change finishes and fixtures. no change of use, occupancy, egress. no structural work | $110,000 |
| May 19, 2017 | Completed final sign-off Jul 2017 | 2 Stockton St | add two securtiy grilles nad related soffit at entry doors & open display windows maher naDetails
add two securtiy grilles nad related soffit at entry doors & open display windows maher na | $20,000 |
| May 10, 2017 | Never finaled issued Jul 2017, no final | 845 Market St | adidas, 1st & 2nd floor - tenant improvement to 1st fl existing retail space. demo (e) non-bearing partition, display furniture, lighting. install new non bearing wall. fitting rooms storage shelves. n/a maherDetails
adidas, 1st & 2nd floor - tenant improvement to 1st fl existing retail space. demo (e) non-bearing partition, display furniture, lighting. install new non bearing wall. fitting rooms storage shelves. n/a maher | $1,200,000 |
| Mar 23, 2017 | Completed final sign-off Jan 2018 | 865 Market St | ti existing retail space - new finishes, ceiling, non-bearing partitions, mep included. elevator pit under permit# 2017-0209-9055. escalator under separate permit. maher n/a.Details
ti existing retail space - new finishes, ceiling, non-bearing partitions, mep included. elevator pit under permit# 2017-0209-9055. escalator under separate permit. maher n/a. | $1,310,000 |
| Nov 15, 2016 | Never finaled issued Nov 2016, no final | 335 Powell St | review of evacuaton signs. n/a for maher.Details
review of evacuaton signs. n/a for maher. | $5,000 |
| Nov 14, 2016 | Completed final sign-off Aug 2018 | 77 Ofarrell St | deferred mep work. ref #201607182600. scope includes (n) roof top mechanical equipment.Details
deferred mep work. ref #201607182600. scope includes (n) roof top mechanical equipment. | $500,000 |
| Oct 17, 2016 | Never finaled issued Oct 2016, no final | 77 Ofarrell St | deferred structural work for retail storefront; ref. pa 201512215653.Details
deferred structural work for retail storefront; ref. pa 201512215653. | |
| Jun 13, 2016 | Never finaled issued Jul 2016, no final | 2 Stockton St | revision to pa 2015-0407-3020 to add 2 lights to store front facade and remove 1 light added in pa 2016-0307-1382. maher naDetails
revision to pa 2015-0407-3020 to add 2 lights to store front facade and remove 1 light added in pa 2016-0307-1382. maher na | $500 |
| Apr 18, 2016 | Never finaled issued Apr 2016, no final | 77 Ofarrell St | stock shelving for back of house retailon first floor of barneys ny department store. t.i. pa#201601217666Details
stock shelving for back of house retailon first floor of barneys ny department store. t.i. pa#201601217666 | $20,000 |
| Mar 7, 2016 | Never finaled issued Mar 2016, no final | 2 Stockton St | facade minor modification set to app 1 facade downlight. ref 201601046306, 201504073020Details
facade minor modification set to app 1 facade downlight. ref 201601046306, 201504073020 | $500 |
| Feb 12, 2016 | Never finaled issued Feb 2016, no final | 335 Powell St | installation of temporary barricade n/a maher ordinanceDetails
installation of temporary barricade n/a maher ordinance | $1,000 |
| Jan 22, 2016 | Never finaled issued Jan 2016, no final | 722 Montgomery St | revision to 201510220541 - minor light fixture revisions from previously approved permit. addition of power & signal plans & basement lighting plan n/a maher ord. # 155-13Details
revision to 201510220541 - minor light fixture revisions from previously approved permit. addition of power & signal plans & basement lighting plan n/a maher ord. # 155-13 | $2,000 |
| Jan 21, 2016 | Completed final sign-off Feb 2017 | 77 Ofarrell St | 1st floor: ti- to expand ground floor retail space into adjacent suite; w/in the bld/ work includes demo of non load bearing partitions, doors, millwork, furnishing & finishes; and construction of (n) partitions and millwork and finishes.Details
1st floor: ti- to expand ground floor retail space into adjacent suite; w/in the bld/ work includes demo of non load bearing partitions, doors, millwork, furnishing & finishes; and construction of (n) partitions and millwork and finishes. | $2,000,000 |
| Jan 7, 2016 | Never finaled issued Jan 2016, no final | 2 Stockton St | deferred structural submittals for glass handrails, glass guard rails & lavatory supports. reference pa 201504173986. maher n/aDetails
deferred structural submittals for glass handrails, glass guard rails & lavatory supports. reference pa 201504173986. maher n/a | |
| Jan 4, 2016 | Never finaled issued Jan 2016, no final | 2 Stockton St | deferred outdoor lighting for storefront work @ 2 stockton st. ref pa #201504073020. n/a maher ordinanceDetails
deferred outdoor lighting for storefront work @ 2 stockton st. ref pa #201504073020. n/a maher ordinance | |
| Dec 21, 2015 | Never finaled issued Jul 2016, no final | 77 Ofarrell St | exterior storefront renovations including removing a portion of storefront & constructing a storefront in opening. removing a canopy & patching the storefront where it is removed. adding awings.Details
exterior storefront renovations including removing a portion of storefront & constructing a storefront in opening. removing a canopy & patching the storefront where it is removed. adding awings. | $200,000 |
| Dec 18, 2015 | Never finaled issued Mar 2016, no final | 384 Post St | shop.in. shop fragrance store within extg retail building, work includes architectural finishes, new lighting, relocate hvac diffuser, cabinets, and fixtures. fire sprinklers under separate permit. relocate extg fire sprinklers. n/a for maher.Details
shop.in. shop fragrance store within extg retail building, work includes architectural finishes, new lighting, relocate hvac diffuser, cabinets, and fixtures. fire sprinklers under separate permit. relocate extg fire sprinklers. n/a for maher. | $40,000 |
| Dec 14, 2015 | Completed final sign-off Apr 2016 | 77 Ofarrell St | 2nd floor: t.i. to convert retail department. work includes non-structural demo and construction of new partitions millwork and finishes.Details
2nd floor: t.i. to convert retail department. work includes non-structural demo and construction of new partitions millwork and finishes. | $600,000 |
| Dec 14, 2015 | Completed final sign-off Aug 2016 | 77 Ofarrell St | 5th floor: t.i. to convert retail department. work includes non-structural demo and construction of new partitions millwork and finishes.Details
5th floor: t.i. to convert retail department. work includes non-structural demo and construction of new partitions millwork and finishes. | $700,000 |
| Nov 19, 2015 | Never finaled issued Nov 2015, no final | 2 Stockton St | revision to app#201504173986. scope includes revised design, finishes, structural, and mep due to infield conditions and design evolution. n/a for maher.Details
revision to app#201504173986. scope includes revised design, finishes, structural, and mep due to infield conditions and design evolution. n/a for maher. | |
| Oct 29, 2015 | Completed final sign-off Nov 2015 | 335 Powell St | revision to app#201506249727 and 201503302298 due to field conditions. n/a for maherDetails
revision to app#201506249727 and 201503302298 due to field conditions. n/a for maher | |
| Oct 22, 2015 | Completed final sign-off Feb 2016 | 722 Montgomery St | non-structural interior t.i. new ceiling, new mechanical system, new lighting, new finishes. fire alarm and sprinkler modification under separate permits. n/a for maher.Details
non-structural interior t.i. new ceiling, new mechanical system, new lighting, new finishes. fire alarm and sprinkler modification under separate permits. n/a for maher. | $240,000 |
| Sep 17, 2015 | Completed final sign-off Dec 2015 | 335 Powell St | 2nd floor - revision to pa 2015-0416-3827. alteration to egress door; (n) ceilings and rated walls in basement. maher na. sprinkler deferred (if required)Details
2nd floor - revision to pa 2015-0416-3827. alteration to egress door; (n) ceilings and rated walls in basement. maher na. sprinkler deferred (if required) | |
| Aug 24, 2015 | Never finaled issued Nov 2015, no final | 335 Powell St | non-structural sign n/a for maher ordinance.Details
non-structural sign n/a for maher ordinance. | $5,000 |
| Aug 24, 2015 | Never finaled issued Nov 2015, no final | 335 Powell St | erect non-electric, projecting, single-faced, non-illuminated (n) sign. n/a for maher ordinanceDetails
erect non-electric, projecting, single-faced, non-illuminated (n) sign. n/a for maher ordinance | $5,000 |
| Aug 24, 2015 | Never finaled issued Nov 2015, no final | 335 Powell St | erect electric, projecting, single-faced, indirect, (n) sign. n/a for maher ordinance.Details
erect electric, projecting, single-faced, indirect, (n) sign. n/a for maher ordinance. | $5,000 |
| Jul 29, 2015 | Never finaled issued Aug 2015, no final | 2 Stockton St | stock shelving for basement retail space in back of house. ref app#201504173986. n/a for maher.Details
stock shelving for basement retail space in back of house. ref app#201504173986. n/a for maher. | $50,000 |
| Jul 27, 2015 | Never finaled issued Mar 2016, no final | 77 Maiden Ln | revision to approved mep permit pa 201504224357; minor changes for mech and elec.Details
revision to approved mep permit pa 201504224357; minor changes for mech and elec. | $10,000 |
| Jul 17, 2015 | Never finaled issued Jul 2015, no final | 77 Ofarrell St | revision to pa#201504174004 for updated ab-010 documentation for communicating opening @ 77 o'farrell & 2 stockton.Details
revision to pa#201504174004 for updated ab-010 documentation for communicating opening @ 77 o'farrell & 2 stockton. | |
| Jul 7, 2015 | Never finaled issued Jul 2015, no final | 77 Maiden Ln | installation of lockers and shelving associated with 201503201484Details
installation of lockers and shelving associated with 201503201484 | $15,000 |
| Jun 24, 2015 | Never finaled issued Jul 2015, no final | 77 Ofarrell St | revision to app#201506027845 for 3rd floor t.i. work on partial floor to modify partitions and finishes. n/a for maher.Details
revision to app#201506027845 for 3rd floor t.i. work on partial floor to modify partitions and finishes. n/a for maher. | $10,000 |
| Jun 24, 2015 | Completed final sign-off Nov 2015 | 335 Powell St | revision to pa#201503171114, revision to lateral system design. n/a ordinance #155-13Details
revision to pa#201503171114, revision to lateral system design. n/a ordinance #155-13 | |
| Jun 2, 2015 | Never finaled issued Jun 2015, no final | 77 Ofarrell St | ti portion of 3rd fl only. will include partital non structural demo and minor renovation to retail and stock areas where indicatedDetails
ti portion of 3rd fl only. will include partital non structural demo and minor renovation to retail and stock areas where indicated | $250,000 |
| May 13, 2015 | Never finaled issued Jan 2016, no final | 2 Stockton St | erect non-electric, single-faced, existing awningDetails
erect non-electric, single-faced, existing awning | |
| May 13, 2015 | Never finaled issued Jan 2016, no final | 2 Stockton St | erect non-electric, single-faced, existing awningDetails
erect non-electric, single-faced, existing awning | $3,000 |
| May 13, 2015 | Never finaled issued Jan 2016, no final | 77 Ofarrell St | painted/non-structural electric sign, single-faced, existing awningDetails
painted/non-structural electric sign, single-faced, existing awning | $6,000 |
| May 13, 2015 | Never finaled issued Jan 2016, no final | 2 Stockton St | erect non-electric, projecting, double-faced signDetails
erect non-electric, projecting, double-faced sign | $5,000 |
| May 13, 2015 | Never finaled issued Jan 2016, no final | 77 Ofarrell St | non-electric, projecting, double-faced, existing awningDetails
non-electric, projecting, double-faced, existing awning | $4,000 |
| May 13, 2015 | Never finaled issued Jan 2016, no final | 2 Stockton St | erect non-electric, single-faced, existing awningDetails
erect non-electric, single-faced, existing awning | |
| May 13, 2015 | Never finaled issued Jan 2016, no final | 2 Stockton St | 2 (n) black fabric awning w/ painted logo. awning size 11'8" x 6' & 11'6" x 6 refer to drawing for details.Details
2 (n) black fabric awning w/ painted logo. awning size 11'8" x 6' & 11'6" x 6 refer to drawing for details. | $6,000 |
| May 8, 2015 | Never finaled issued Jul 2015, no final | 77 Maiden Ln | erect non electrical signDetails
erect non electrical sign | $2,000 |
| May 7, 2015 | Expired or cancelled cancelled Jan 2026 | 845 Market St | replacement of (e) t.mobile kiosk with a new t.mobile kiosk with same dimensions/patch & repair (e) flooring. all electrical will remain the sameDetails
replacement of (e) t.mobile kiosk with a new t.mobile kiosk with same dimensions/patch & repair (e) flooring. all electrical will remain the same | $20,000 |
| Apr 22, 2015 | Never finaled issued Apr 2015, no final | 77 Maiden Ln | basement & ground: electrical portion of pa# 2015 0320 1484. mechanical & plumbing under separate permit.Details
basement & ground: electrical portion of pa# 2015 0320 1484. mechanical & plumbing under separate permit. | $35,000 |
| Apr 22, 2015 | Never finaled issued Jul 2015, no final | 77 Maiden Ln | mechanical & plumbing (defferal) to ref pa 2015 0320 1484. elect under sep permitDetails
mechanical & plumbing (defferal) to ref pa 2015 0320 1484. elect under sep permit | $55,000 |
| Apr 17, 2015 | Never finaled issued Jul 2015, no final | 2 Stockton St | t.i of portion of g/f; full basement to serve as retail; stock rms & offices. work also includes communicating openings btw (e) lower level retail space @ 48 stockton & (n) retail area @ 2 stockton. structural and mep work included.Details
t.i of portion of g/f; full basement to serve as retail; stock rms & offices. work also includes communicating openings btw (e) lower level retail space @ 48 stockton & (n) retail area @ 2 stockton. structural and mep work included. | $3,500,000 |
| Apr 17, 2015 | Never finaled issued Jun 2015, no final | 77 Ofarrell St | basement - ti @ portion of basement only. work woll nclude a communicating opening b/w (n) retail area @ 2 stockton & (e) retail are @ 48 stockton (77 o'farrelll)Details
basement - ti @ portion of basement only. work woll nclude a communicating opening b/w (n) retail area @ 2 stockton & (e) retail are @ 48 stockton (77 o'farrelll) | $50,000 |
| Apr 16, 2015 | Completed final sign-off Dec 2015 | 335 Powell St | interior t.i. for (n) victoria secret retail work in westin st francis on union square. work includes (n) floors, walls, ceiling, millwork, finishes, mep & structural int fitout work. structural core & shell filed separately. n/a for maher ordinance.Details
interior t.i. for (n) victoria secret retail work in westin st francis on union square. work includes (n) floors, walls, ceiling, millwork, finishes, mep & structural int fitout work. structural core & shell filed separately. n/a for maher ordinance. | $3,019,846 |
| Apr 7, 2015 | Never finaled issued Jun 2015, no final | 2 Stockton St | basement / ground floor: interior non-structural demo of partitions, ceiling finishes, convenience stairs, elevator; equip,emt & duct work. ti to be filed under seperate permit. area of work to remain unoccupied per ab-017. maher - not req'dDetails
basement / ground floor: interior non-structural demo of partitions, ceiling finishes, convenience stairs, elevator; equip,emt & duct work. ti to be filed under seperate permit. area of work to remain unoccupied per ab-017. maher - not req'd | $15,000 |
| Apr 7, 2015 | Never finaled issued Dec 2015, no final | 2 Stockton St | minor facade improvements to 3 bays on stockton st. remove panels & replace w/ (n) metal panels. removing (e) projecting sign & repair terra cotta where sign removed. sep bldg permit for elect/t24. ref. pa# 201504173986 ** maher: compliance with ordinance no# 155-13 not required **Details
minor facade improvements to 3 bays on stockton st. remove panels & replace w/ (n) metal panels. removing (e) projecting sign & repair terra cotta where sign removed. sep bldg permit for elect/t24. ref. pa# 201504173986 ** maher: compliance with ordinance no# 155-13 not required ** | $30,000 |
| Mar 30, 2015 | Never finaled issued Oct 2015, no final | 335 Powell St | exterior renovation of existing tenant. new store front windows & door in (e) openings. new dome awnings and canopies entry; ** maher: compliance with ordinance no# 155-13 not required **Details
exterior renovation of existing tenant. new store front windows & door in (e) openings. new dome awnings and canopies entry; ** maher: compliance with ordinance no# 155-13 not required ** | $600,000 |
| Mar 20, 2015 | Never finaled issued Apr 2015, no final | 77 Maiden Ln | int ti of (e) retail space, work includes: (n) partitions, fixtures, finishes, mep. no change of use, no ext. work. fire protection under sep permit. meets cbc 7.12.1.8 for vertical openings. new convenience stair - 1/f & basement.Details
int ti of (e) retail space, work includes: (n) partitions, fixtures, finishes, mep. no change of use, no ext. work. fire protection under sep permit. meets cbc 7.12.1.8 for vertical openings. new convenience stair - 1/f & basement. | $650,000 |
| Mar 17, 2015 | Completed final sign-off Dec 2015 | 335 Powell St | structural demo & core & shell work only. new stairs from basement to 1st floor. new elevator from basement to 2nd floor. new "ground" stairs from 1st floor to 2nd floor. t.i. on separate permit. ** maher: compliance with ordinance no# 155-13 not required **Details
structural demo & core & shell work only. new stairs from basement to 1st floor. new elevator from basement to 2nd floor. new "ground" stairs from 1st floor to 2nd floor. t.i. on separate permit. ** maher: compliance with ordinance no# 155-13 not required ** | $1,019,846 |
| Feb 25, 2015 | Completed final sign-off Nov 2015 | 335 Powell St | interior non-structural demo of basement, first and second floor per plan for ab-017. t.i. under separate permit. maher n/a.Details
interior non-structural demo of basement, first and second floor per plan for ab-017. t.i. under separate permit. maher n/a. | $50,000 |
| Nov 17, 2014 | Never finaled issued Jul 2015, no final | 77 Maiden Ln | an non-electric door/window sign.Details
an non-electric door/window sign. | $2,000 |
| Nov 17, 2014 | Never finaled issued Jul 2015, no final | 77 Maiden Ln | facade work only. new entry doors in existing location, new glazing for existing windows.Details
facade work only. new entry doors in existing location, new glazing for existing windows. | $15,000 |
| Nov 12, 2014 | Never finaled issued Apr 2015, no final | 77 Maiden Ln | alteration in advance of t.i. per ab-017.Details
alteration in advance of t.i. per ab-017. | $5,000 |
| Nov 10, 2014 | Never finaled issued Dec 2014, no final | 225 Post St | electric wall signDetails
electric wall sign | $4,000 |
| Nov 10, 2014 | Never finaled issued Dec 2014, no final | 225 Post St | signage on awningDetails
signage on awning | $4,000 |
| Aug 13, 2014 | Never finaled issued Aug 2014, no final | 116 Grant Av | group j- revision application #2014.05.02.4810. install shelving per plan.Details
group j- revision application #2014.05.02.4810. install shelving per plan. | $1,000 |
| Jul 25, 2014 | Never finaled issued Jul 2014, no final | 1 Maritime Pz | 19th floor. new glazed partition and door in an (e) office space. no structural work to be performed. mep and sprinkler under separate permit. maher n/a.Details
19th floor. new glazed partition and door in an (e) office space. no structural work to be performed. mep and sprinkler under separate permit. maher n/a. | $6,000 |
| Jul 11, 2014 | Completed final sign-off Feb 2016 | 901 Market St | erect two identical non-electric double faced interior door/window signs. compliance w/mahner oridance no. 155-13 not required.Details
erect two identical non-electric double faced interior door/window signs. compliance w/mahner oridance no. 155-13 not required. | $4,000 |
| Jul 11, 2014 | Completed final sign-off Feb 2016 | 901 Market St | erect an electrical double faced interior door/window sign. compliance w/ mahner oridance no. 155-13 not required.Details
erect an electrical double faced interior door/window sign. compliance w/ mahner oridance no. 155-13 not required. | $4,000 |
| Jul 11, 2014 | Completed final sign-off Feb 2016 | 901 Market St | erect an electrical double faced interior door/window sign. compliance w/ mahner oridance no. 155-13 not required.Details
erect an electrical double faced interior door/window sign. compliance w/ mahner oridance no. 155-13 not required. | $5,000 |
| Jun 24, 2014 | Completed final sign-off Nov 2015 | 225 Post St | revision to 201309267859. revise reflected ceiling plan to accommodate new lighting layout. mechanical, electrical, lighting modifications on all levelsDetails
revision to 201309267859. revise reflected ceiling plan to accommodate new lighting layout. mechanical, electrical, lighting modifications on all levels | $25,000 |
| May 2, 2014 | Never finaled issued Jul 2014, no final | 116 Grant Av | ground floor new retail - selective demo & construction of non-load bearing partitions.modifications to ceiling, new lighting & new finsihes. signage under separate permit.Details
ground floor new retail - selective demo & construction of non-load bearing partitions.modifications to ceiling, new lighting & new finsihes. signage under separate permit. | $345,000 |
| Mar 11, 2014 | Never finaled issued Jul 2014, no final | 225 Post St | exterior facade remodel work to include new windows, canopy, plaster and finishes. signage under separate permit.Details
exterior facade remodel work to include new windows, canopy, plaster and finishes. signage under separate permit. | $40,000 |
| Dec 31, 2013 | Completed final sign-off Sep 2014 | 100 Grant Av | exterior work only. storefront repair, signage. (tenant improvement under 201311131778)Details
exterior work only. storefront repair, signage. (tenant improvement under 201311131778) | $8,000 |
| Dec 2, 2013 | Completed final sign-off Mar 2014 | 901 Market St | revision to permit #201306260510. the rcp as is has been changed to show the demo of extg shaft walls and dampers below 3rd flr slab & instl 2 hr ratd shaft wall at bottom of3rd fl slab.Details
revision to permit #201306260510. the rcp as is has been changed to show the demo of extg shaft walls and dampers below 3rd flr slab & instl 2 hr ratd shaft wall at bottom of3rd fl slab. | $5,000 |
| Nov 13, 2013 | Completed final sign-off Apr 2014 | 100 Grant Av | tenant improvement -fixtures, lighting (interior door). all exterior work under separate permit. no fsds on this permit. f/a, sprinklers under separate permit. this is a high-rise.Details
tenant improvement -fixtures, lighting (interior door). all exterior work under separate permit. no fsds on this permit. f/a, sprinklers under separate permit. this is a high-rise. | $125,000 |
| Sep 26, 2013 | Completed final sign-off Nov 2015 | 225 Post St | interior renovation of all floors, work to include new equipment, finishes, hvac, electric, plumbing, fire sprinkler, alarm, stock shelving,, signs and new decorative stairs under separate permit.Details
interior renovation of all floors, work to include new equipment, finishes, hvac, electric, plumbing, fire sprinkler, alarm, stock shelving,, signs and new decorative stairs under separate permit. | $2,050,000 |