From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
187 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 7, 2026 | Completed final sign-off Feb 2026 | 901 Market St | Kershaw Construction Inc | ground floor- adding steel safety bars in (e) light well floor openings. no mep , no exterior scopeDetails
ground floor- adding steel safety bars in (e) light well floor openings. no mep , no exterior scope | $25,000 |
| Oct 10, 2025 | In progress issued Dec 2025 | 901 Market St | Rodriguez Electrical Inc | (n) electrical outlets at lower level fitting roomsDetails
(n) electrical outlets at lower level fitting rooms | $50,000 |
| Jun 10, 2025 | Completed final sign-off Jul 2025 | 901 Market St | Sequoia Pacific Builders Inc | revision to permit #2022-1118-6816 to remove proposed turnstile gates and delayed egress hardwar at sales floor exits.Details
revision to permit #2022-1118-6816 to remove proposed turnstile gates and delayed egress hardwar at sales floor exits. | |
| Feb 26, 2025 | Completed final sign-off Jul 2025 | 901 Market St | Sabah International Incorporated | 1st floor; ref to t.i. 202211186816. provide a modification of e) fire alarm system. the new speaker strobe will be tied to e) notification circuit fed from the e) power supply as shown on the drawing. add 7 speaker strobes ceiling mounted.Details
1st floor; ref to t.i. 202211186816. provide a modification of e) fire alarm system. the new speaker strobe will be tied to e) notification circuit fed from the e) power supply as shown on the drawing. add 7 speaker strobes ceiling mounted. | $23,936 |
| Feb 5, 2025 | Completed final sign-off Apr 2025 | 901 Market St | Pioneer Fire Inc. | relocate (19 uprights) gc th# 2022-1118-6816Details
relocate (19 uprights) gc th# 2022-1118-6816 | $2,850 |
| Jan 21, 2025 | In progress issued Mar 2025 | 901 Market St | Sequoia Pacific Builders Inc | revision to architecutral, plumbing, electrical and mechanical tenant improvement. ref t.i permit 202211186816.Details
revision to architecutral, plumbing, electrical and mechanical tenant improvement. ref t.i permit 202211186816. | $50,000 |
| Nov 12, 2024 | Completed final sign-off Jul 2025 | 901 Market St | Bill Moore & Associates Graphics Inc | install 2 non-illuminated, identical banners ("ross") onto e) supports.Details
install 2 non-illuminated, identical banners ("ross") onto e) supports. | $6,000 |
| Apr 27, 2023 | Completed final sign-off Jun 2025 | 901 Market St | A2z Builders Inc | lower lvl/ground flr: interior remodel of existing ross store-work area approx 29,131 sf, install merchndise racks, register counters and fitting rooms. no mep work.Details
lower lvl/ground flr: interior remodel of existing ross store-work area approx 29,131 sf, install merchndise racks, register counters and fitting rooms. no mep work. | $45,000 |
| Dec 6, 2022 | Never finaled issued Dec 2022, no final | 901 Market St | Sabah International Incorporated | 4th fl restroom remodel. add (4) multicandela speaker stobes.Details
4th fl restroom remodel. add (4) multicandela speaker stobes. | $12,820 |
| Nov 21, 2022 | Completed final sign-off Jan 2023 | 901 Market St | Golden Gate Fire Protection Inc | fire sprinklers, relocate 6 concealed pendents on the 4th fl.ref ti pa# 202207188691Details
fire sprinklers, relocate 6 concealed pendents on the 4th fl.ref ti pa# 202207188691 | $3,150 |
| Nov 18, 2022 | In progress issued Oct 2024 | 901 Market St | Sequoia Pacific Builders Inc | lower level & street level - commercial t.i. of 39,743 sq. ft., minor exterior modifications, new storefront w entry doors, ross dress for less. fire sprinkler/fire alarm deferred.Details
lower level & street level - commercial t.i. of 39,743 sq. ft., minor exterior modifications, new storefront w entry doors, ross dress for less. fire sprinkler/fire alarm deferred. | $1,200,000 |
| Sep 27, 2022 | Completed final sign-off Nov 2022 | 901 Market St | Sabah International Incorporated | fire alarm minimal notification appliances approved in spec ste 350,400m,470 & 550 add 9 speaker/strobes, elec installer to demo (e) notification devices as shown on plansDetails
fire alarm minimal notification appliances approved in spec ste 350,400m,470 & 550 add 9 speaker/strobes, elec installer to demo (e) notification devices as shown on plans | $22,350 |
| Sep 7, 2022 | Completed final sign-off Sep 2022 | 901 Market St | Golden Gate Fire Protection Inc | 4/f: relocate 9 uprights in suite 480 & relocate (4) uprights in suite 490. ref t.i. bpa#202208190880Details
4/f: relocate 9 uprights in suite 480 & relocate (4) uprights in suite 490. ref t.i. bpa#202208190880 | $6,825 |
| Aug 19, 2022 | Completed final sign-off Dec 2022 | 901 Market St | Source Planning And Construction Inc | suite 400: rev to pa202207088003 - demo of non-bearing partitions, ceiling grib & light fixtures. new light fixtures / switches and finished. mep deffered.Details
suite 400: rev to pa202207088003 - demo of non-bearing partitions, ceiling grib & light fixtures. new light fixtures / switches and finished. mep deffered. | $20,000 |
| Aug 16, 2022 | Completed final sign-off Jun 2025 | 901 Market St | Johnson United Inc Dba United Sign Syste | install a illuminated projecting sign " ross" double faced 16" x 34"Details
install a illuminated projecting sign " ross" double faced 16" x 34" | $4,000 |
| Aug 16, 2022 | Completed final sign-off Jun 2025 | 901 Market St | Johnson United Inc Dba United Sign Syste | install a illuminated wall sign " ross dress for less" single facedDetails
install a illuminated wall sign " ross dress for less" single faced | $6,000 |
| Jul 19, 2022 | Completed final sign-off Sep 2022 | 901 Market St | Golden Gate Fire Protection Inc | fire sprinklers, relocate 26 uprights 3rd fl. relocate 107 on the 4th fl, relocate 66 uprights on 5th flDetails
fire sprinklers, relocate 26 uprights 3rd fl. relocate 107 on the 4th fl, relocate 66 uprights on 5th fl | $104,475 |
| Jul 18, 2022 | Completed final sign-off Mar 2023 | 901 Market St | Skyline Construction | 4/flr restroom, corridor and elevator lobby renovation on approx 3018 sqft includes floor and wall finishes, power, lighting. etc.Details
4/flr restroom, corridor and elevator lobby renovation on approx 3018 sqft includes floor and wall finishes, power, lighting. etc. | $22,000 |
| Jul 8, 2022 | Completed final sign-off Dec 2022 | 901 Market St | Source Planning And Construction Inc | ste 400 & 470 - 4/f: selective demolition of non-bearing partitions, ceiling grid and light fixtures, new light fixtures/switching and new finish. mep deferral.Details
ste 400 & 470 - 4/f: selective demolition of non-bearing partitions, ceiling grid and light fixtures, new light fixtures/switching and new finish. mep deferral. | $338,809 |
| Jul 1, 2022 | Completed final sign-off Dec 2022 | 901 Market St | Source Planning And Construction Inc | work includes: modification of existing tenant-selective demolition of non-baering walls. new light fixtures/switches and new finishes per plans. no structural work under this permit.Details
work includes: modification of existing tenant-selective demolition of non-baering walls. new light fixtures/switches and new finishes per plans. no structural work under this permit. | $211,000 |
| Jul 1, 2022 | Completed final sign-off Dec 2022 | 901 Market St | Source Planning And Construction Inc | ste 350 - selective demo (non bearing); new light fixtures/switching and new finishesDetails
ste 350 - selective demo (non bearing); new light fixtures/switching and new finishes | $104,000 |
| Jan 11, 2022 | Completed final sign-off Nov 2022 | 901 Market St | Metropolitan Electrical Construction | roof - cell site: mod to unmanned telecomm: r/r 3 panel antennas; remove 24-155ah batts & replace with 20(n) 190ah batts; 1(n) rectifer in (e) dc power plant. install 1 (n) 6448 baseband unit in (e) purcell cabinet.Details
roof - cell site: mod to unmanned telecomm: r/r 3 panel antennas; remove 24-155ah batts & replace with 20(n) 190ah batts; 1(n) rectifer in (e) dc power plant. install 1 (n) 6448 baseband unit in (e) purcell cabinet. | $85,000 |
| Nov 10, 2021 | Completed final sign-off Jan 2022 | 901 Market St | Sabah International Incorporated | 5th floor: t.i. # 202106011377. modify extg fire alarm system. replace 4 ceiling speakers, 4 wall strobes.Details
5th floor: t.i. # 202106011377. modify extg fire alarm system. replace 4 ceiling speakers, 4 wall strobes. | $8,498 |
| Oct 14, 2021 | Completed final sign-off Jun 2025 | 901 Market St | Anderson, Rowe & Buckley, Inc. | 5/f: fire only. tenant improvements, existing fire sprinkler system. relocate 6 sprinklers. ref. pa 202106011377.Details
5/f: fire only. tenant improvements, existing fire sprinkler system. relocate 6 sprinklers. ref. pa 202106011377. | $3,000 |
| Jun 1, 2021 | Completed final sign-off Jan 2023 | 901 Market St | Marchetti Group | 5th fl restroom - includes floor, sink area, plumbing fixtures, toilet partitions, lighting.Details
5th fl restroom - includes floor, sink area, plumbing fixtures, toilet partitions, lighting. | $226,000 |
| Feb 11, 2021 | Never finaled filed Feb 2021, never issued | 901 Market St | Convergint Technologies Llc | fire alarm as-builts - as-builts for fire alarm permit # 2020-1106-8444 - removed smokes that are not needed due to existing smokes already installed.Details
fire alarm as-builts - as-builts for fire alarm permit # 2020-1106-8444 - removed smokes that are not needed due to existing smokes already installed. | |
| Nov 6, 2020 | Completed final sign-off Jul 2022 | 901 Market St | Convergint Technologies Llc | fire alarm ti: new control modules for firefighters flashing helmet in the existing emr located on the roof. new smoke detectors at top of hoistway within 2 hour enclosure.Details
fire alarm ti: new control modules for firefighters flashing helmet in the existing emr located on the roof. new smoke detectors at top of hoistway within 2 hour enclosure. | $13,975 |
| Mar 13, 2020 | Expired or cancelled cancelled Jan 2026 | 901 Market St | Discount Signs & Neon Inc | install 7 light bars on window interior for "nordstrom rack"Details
install 7 light bars on window interior for "nordstrom rack" | $4,000 |
| Mar 13, 2020 | Never finaled filed Mar 2020, never issued | 901 Market St | Discount Signs & Neon Inc | install (3) illuminated interior window signs for "nordstrom rack" (sign c, sign d1, sign d2).Details
install (3) illuminated interior window signs for "nordstrom rack" (sign c, sign d1, sign d2). | $11,000 |
| Mar 9, 2020 | Completed final sign-off Feb 2021 | 901 Market St | Metropolitan Electrical Construction | att modication: r&r (3)(e) antenna w/(3)(n) antennas; r&r(3)(e)rrus w/(9)(n)rrus' no change to (e) batteries.Details
att modication: r&r (3)(e) antenna w/(3)(n) antennas; r&r(3)(e)rrus w/(9)(n)rrus' no change to (e) batteries. | $27,000 |
| Dec 3, 2019 | Never finaled filed Dec 2019, never issued | 901 Market St | Discount Signs & Neon Inc | install 2 illuminated wall signs for "nordstrom rack" to replace existing signs (sign a, sign b)Details
install 2 illuminated wall signs for "nordstrom rack" to replace existing signs (sign a, sign b) | $9,000 |
| Jul 12, 2019 | Completed final sign-off Nov 2019 | 901 Market St | Merchco Services Inc | installation of shoe display shelving in (e) six story retail space. consists of erecting tube steel frames and anchoring to floor with approved concrete anchors. shelves are supported by intergrated slotted standards.Details
installation of shoe display shelving in (e) six story retail space. consists of erecting tube steel frames and anchoring to floor with approved concrete anchors. shelves are supported by intergrated slotted standards. | $21,280 |
| Aug 24, 2018 | Completed final sign-off Nov 2018 | 901 Market St | Ayoob & Peery Plumbing Co Inc | 3rd floor. relocate fire sprinkler per tenant improvements, 4 relocates. ref pa # 201804257318. maher n/aDetails
3rd floor. relocate fire sprinkler per tenant improvements, 4 relocates. ref pa # 201804257318. maher n/a | $900 |
| Jun 19, 2018 | Completed final sign-off Dec 2018 | 901 Market St | Pioneer Fire Inc. | replace extg diesel fire pump with the same of 145 psi@750 gpm.Details
replace extg diesel fire pump with the same of 145 psi@750 gpm. | $15,000 |
| May 11, 2018 | Completed final sign-off May 2018 | 901 Market St | Golden Gate Fire Protection Inc | 4/f: relocate 1 pendent f/s on 4/f corridor ner new door entry. ref pa201805027935; n/a maherDetails
4/f: relocate 1 pendent f/s on 4/f corridor ner new door entry. ref pa201805027935; n/a maher | $500 |
| May 4, 2018 | Completed final sign-off May 2018 | 901 Market St | Pyro-Comm Systems, Inc. | 4th - fa ti - 2 new audio visual devices to be hooked up to the (e) faa system, for corridor area and new storage room. ref 201801299725 maher naDetails
4th - fa ti - 2 new audio visual devices to be hooked up to the (e) faa system, for corridor area and new storage room. ref 201801299725 maher na | $1,200 |
| May 2, 2018 | Completed final sign-off Oct 2018 | 901 Market St | Commercial Interior Builders Inc | 4th flr - installation of low pressure ductwork and installation of led 2x4 fixtures and title 24 controls in corridor per t-24. ref 201801299725 no new smk dampers maher naDetails
4th flr - installation of low pressure ductwork and installation of led 2x4 fixtures and title 24 controls in corridor per t-24. ref 201801299725 no new smk dampers maher na | $21,565 |
| Apr 25, 2018 | Completed final sign-off Mar 2019 | 901 Market St | Commercial Interior Builders Inc | 3rd floor: renovation of restroom approx. 393 sq ft. n/a for maherDetails
3rd floor: renovation of restroom approx. 393 sq ft. n/a for maher | $100,000 |
| Mar 9, 2018 | Expired or cancelled cancelled Nov 2024 | 901 Market St | fabrication & installation of catwalk system on roof for washing skylight windows; & installation of roof anchors for unscheduled maintenance of exterior facade. none of the improvments will be visible from street since the catwalk is lower than the skylight & the roof anchors are 12" highDetails
fabrication & installation of catwalk system on roof for washing skylight windows; & installation of roof anchors for unscheduled maintenance of exterior facade. none of the improvments will be visible from street since the catwalk is lower than the skylight & the roof anchors are 12" high | $45,000 | |
| Feb 22, 2018 | Completed final sign-off May 2025 | 901 Market St | Golden Gate Fire Protection Inc | fire sprinkler relocate 2 pendents for the 3rd fl restroom, 201712126288 n/a for maherDetails
fire sprinkler relocate 2 pendents for the 3rd fl restroom, 201712126288 n/a for maher | $1,000 |
| Feb 7, 2018 | Completed final sign-off Apr 2018 | 901 Market St | Pyro-Comm Systems, Inc. | fa ti 3rd fl - add 17 notification appliances in suite. connect to (e) fa system pa 2017-1220-7020Details
fa ti 3rd fl - add 17 notification appliances in suite. connect to (e) fa system pa 2017-1220-7020 | $7,500 |
| Jan 29, 2018 | Completed final sign-off May 2018 | 901 Market St | Commercial Interior Builders Inc | 4th flr -move doorway frames and install new doors maher naDetails
4th flr -move doorway frames and install new doors maher na | $10,000 |
| Jan 17, 2018 | Completed final sign-off May 2025 | 901 Market St | Golden Gate Fire Protection Inc | 3rd floor (hudson pacific) fire sprinkler only - relocate 9 pendents, add 4 pendents, relocate 11 uprights. rer pa #201712207020 n/a maher ordinanceDetails
3rd floor (hudson pacific) fire sprinkler only - relocate 9 pendents, add 4 pendents, relocate 11 uprights. rer pa #201712207020 n/a maher ordinance | $6,000 |
| Dec 20, 2017 | Completed final sign-off Apr 2018 | 901 Market St | Commercial Interior Builders Inc | 3rd fl: adding partitions to create conference rooms on the 3rd fl. ti to include walls, power, ceiling, lighting, new finishes, doors and millwork.Details
3rd fl: adding partitions to create conference rooms on the 3rd fl. ti to include walls, power, ceiling, lighting, new finishes, doors and millwork. | $100,000 |
| Dec 12, 2017 | Never finaled issued Jan 2018, no final | 901 Market St | Commercial Interior Builders Inc | 3/f- remodel existing bathroom for ada compliances. n/a ordinance #155-13Details
3/f- remodel existing bathroom for ada compliances. n/a ordinance #155-13 | $5,000 |
| Sep 23, 2016 | Completed final sign-off Jan 2018 | 901 Market St | Metropolitan Electrical Construction | at&t wireless facility - installation of unmanned wireless faciity on rooftop. fully screened on the north and north west corner of the bldg. screen wall painted to match. support equipment and (4) antennas per (3) sectors behind screen wall. no height increase is proposed.(maher ord. 155-13 n/a)Details
at&t wireless facility - installation of unmanned wireless faciity on rooftop. fully screened on the north and north west corner of the bldg. screen wall painted to match. support equipment and (4) antennas per (3) sectors behind screen wall. no height increase is proposed.(maher ord. 155-13 n/a) | $400,000 |
| Sep 23, 2016 | Never finaled issued Aug 2017, no final | 901 Market St | Integrated Sign Installations Inc | to erect electric, projecting, double faced sign. ** maher: n/a **Details
to erect electric, projecting, double faced sign. ** maher: n/a ** | $1,500 |
| May 12, 2015 | Expired or cancelled withdrawn May 2015 | 901 Market St | Shrader Mechanical Inc | new control panel for existing conveyor. ref 201411060877Details
new control panel for existing conveyor. ref 201411060877 | $4,633 |
| Apr 13, 2015 | Completed final sign-off Jun 2016 | 901 Market St | Novo Construction Inc | alteration to (e) roof deck with addition of fences & ada upgrades in 4 areas. mep & fire protectionunder seperate permits. maher - not req'dDetails
alteration to (e) roof deck with addition of fences & ada upgrades in 4 areas. mep & fire protectionunder seperate permits. maher - not req'd | $30,000 |
| Apr 1, 2015 | Never finaled issued Apr 2015, no final | 901 Market St | umbrella permit: compliance with high rise sprinkler ord. #377-93. maher - not req'dDetails
umbrella permit: compliance with high rise sprinkler ord. #377-93. maher - not req'd | ||
| Mar 20, 2015 | Completed final sign-off Jan 2016 | 901 Market St | Marini Construction Inc | 1st floor: revision to pa# 2014 1106 0877 - adding television screens, minor changes to millwork,electrical and lighting. maher - not req'dDetails
1st floor: revision to pa# 2014 1106 0877 - adding television screens, minor changes to millwork,electrical and lighting. maher - not req'd | |
| Mar 11, 2015 | Completed final sign-off May 2015 | 901 Market St | Pyro-Comm Systems, Inc. | in basment and on 1st floor - new fire alarm devices for a tenant buildout in an existing building to include 8 control relays, 7 duct detectors, 36 speaker strobes, 5 strobes. pa # 201411060877. n/a maher ord # 155-13Details
in basment and on 1st floor - new fire alarm devices for a tenant buildout in an existing building to include 8 control relays, 7 duct detectors, 36 speaker strobes, 5 strobes. pa # 201411060877. n/a maher ord # 155-13 | $12,400 |
| Mar 5, 2015 | Never finaled issued Jun 2015, no final | 901 Market St | Marini Construction Inc, Integrated Sign Installations Inc | install (2) non-illuminated banners onto existing supports.non electric double faced sign - maher ordinance - extended #155-13 not requiredDetails
install (2) non-illuminated banners onto existing supports.non electric double faced sign - maher ordinance - extended #155-13 not required | $2,000 |
| Mar 5, 2015 | Never finaled issued Jun 2015, no final | 901 Market St | Integrated Sign Installations Inc | install (1) illuminated wall sign. single faced electrical sign - maher ordinance - extended no.155-13 not required.Details
install (1) illuminated wall sign. single faced electrical sign - maher ordinance - extended no.155-13 not required. | $2,500 |
| Mar 5, 2015 | Expired or cancelled withdrawn Jul 2015 | 901 Market St | Integrated Sign Installations Inc | install (1) indirectly illuminated projecting sign.double faced electric sign. maher ordinance - extended no.155-13 not requiredDetails
install (1) indirectly illuminated projecting sign.double faced electric sign. maher ordinance - extended no.155-13 not required | $2,000 |
| Mar 4, 2015 | Never finaled issued Mar 2015, no final | 901 Market St | street spaceDetails
street space | ||
| Mar 3, 2015 | Completed final sign-off May 2015 | 901 Market St | Pribuss Engineering Inc | basement and 1st floors: fire sprinkler t.i. relocate 224 and add 4 total 228. ref app#201411060877. n/a for the maher ordinanceDetails
basement and 1st floors: fire sprinkler t.i. relocate 224 and add 4 total 228. ref app#201411060877. n/a for the maher ordinance | $117,333 |
| Feb 13, 2015 | Completed final sign-off May 2015 | 901 Market St | Pyro-Comm Systems, Inc. | new 2 way emergency communciation system to be located on the basement and 1st floors of an existing building to include: 1 master station, 1 battery back up, 1 call station. maher not reqDetails
new 2 way emergency communciation system to be located on the basement and 1st floors of an existing building to include: 1 master station, 1 battery back up, 1 call station. maher not req | $6,400 |
| Feb 10, 2015 | Never finaled issued Feb 2015, no final | 901 Market St | Marini Construction Inc | 1st floor & basement remodel of existing retail space to include new floor openings & structural strengthening. work for structural strengthening only. n/a maher ordinanceDetails
1st floor & basement remodel of existing retail space to include new floor openings & structural strengthening. work for structural strengthening only. n/a maher ordinance | $450,000 |
| Feb 9, 2015 | Never finaled issued Feb 2015, no final | 901 Market St | street space permitDetails
street space permit | ||
| Jan 26, 2015 | Expired or cancelled withdrawn Jul 2015 | 901 Market St | provide 2 roll-up grilles at front entires. provide enclosures for grille can and tracks.Details
provide 2 roll-up grilles at front entires. provide enclosures for grille can and tracks. | $27,000 | |
| Dec 26, 2014 | Completed final sign-off Jan 2015 | 901 Market St | G P Fire Protection | move 6" fire main out of new escalator pit area. install new escalator fire curtain w/spklrs on 6' spacing. n/a for the maher.Details
move 6" fire main out of new escalator pit area. install new escalator fire curtain w/spklrs on 6' spacing. n/a for the maher. | $5,000 |
| Nov 24, 2014 | Completed final sign-off Jan 2015 | 901 Market St | Fisher Development Inc | revision to pa 201405236667 to modify escalator location and opening around escalator at ground floor and minor work at mezzanine level to incorporate remaining deck to building storage area.n/a for maherDetails
revision to pa 201405236667 to modify escalator location and opening around escalator at ground floor and minor work at mezzanine level to incorporate remaining deck to building storage area.n/a for maher | $5,000 |
| Nov 20, 2014 | Never finaled issued Nov 2014, no final | 901 Market St | street space permitDetails
street space permit | ||
| Nov 6, 2014 | Completed final sign-off Jan 2016 | 901 Market St | Marini Construction Inc | interior alteration to include architectural, mechanical, structural, electrical, and plumbing works. interium control & maher n/a.Details
interior alteration to include architectural, mechanical, structural, electrical, and plumbing works. interium control & maher n/a. | $600,000 |
| Nov 3, 2014 | Never finaled issued Nov 2014, no final | 901 Market St | street space permitDetails
street space permit | ||
| Nov 3, 2014 | Never finaled filed Nov 2014, never issued | 901 Market St | street space | ||
| Oct 29, 2014 | Never finaled issued Oct 2014, no final | 901 Market St | street spaceDetails
street space | ||
| Oct 21, 2014 | Completed final sign-off May 2015 | 901 Market St | Pyro-Comm Systems, Inc. | basement & 1/f: new fire alarm devices for tenant improvement to an existing building to include. 3 smoke detectors, 1 heat detector, 4 relay modules, 2 speaker/strobes. basement & 1st floor. pa #201409055544. compliance with maher ordinance no. 155-13 not required.Details
basement & 1/f: new fire alarm devices for tenant improvement to an existing building to include. 3 smoke detectors, 1 heat detector, 4 relay modules, 2 speaker/strobes. basement & 1st floor. pa #201409055544. compliance with maher ordinance no. 155-13 not required. | $3,100 |
| Oct 3, 2014 | Never finaled issued Oct 2014, no final | 901 Market St | street spaceDetails
street space | ||
| Sep 5, 2014 | Completed final sign-off Oct 2014 | 901 Market St | Fisher Development Inc | non structural interior selective demo of ti improvements of lower levels. scope restricted removing suspended ceiling and furring around columns. ara of work to remain unoccupied. separate permits for fire protection sprinkler system & arch, structural, mep for landlord work. n/a ordinance #155-13Details
non structural interior selective demo of ti improvements of lower levels. scope restricted removing suspended ceiling and furring around columns. ara of work to remain unoccupied. separate permits for fire protection sprinkler system & arch, structural, mep for landlord work. n/a ordinance #155-13 | $10,000 |
| Aug 20, 2014 | Completed final sign-off Sep 2014 | 901 Market St | Golden Gate Fire Protection Inc | relocate 31 pendent sprinklers heads on the 5/f and 87 uprights, relocate 40 pendent sprinkler heads on 6/f and 112 uprights. t.i. pa#201406249220 (5/f) & 201406249224 (6/f). n/a ordinance #155-13Details
relocate 31 pendent sprinklers heads on the 5/f and 87 uprights, relocate 40 pendent sprinkler heads on 6/f and 112 uprights. t.i. pa#201406249220 (5/f) & 201406249224 (6/f). n/a ordinance #155-13 | $140,080 |
| Aug 8, 2014 | Completed final sign-off Nov 2014 | 901 Market St | Pyro-Comm Systems, Inc. | new fire alarm devices added to new tenant improvement to an existing building to include: 1 relay medule, 48 speaker/strobes, 8 strobes. reference pa#2014-0624-9220 (5th fl) and pa#2014-0624-9224 (6th fl). n/a for maher ordinance.Details
new fire alarm devices added to new tenant improvement to an existing building to include: 1 relay medule, 48 speaker/strobes, 8 strobes. reference pa#2014-0624-9220 (5th fl) and pa#2014-0624-9224 (6th fl). n/a for maher ordinance. | $14,770 |
| Jul 11, 2014 | Completed final sign-off Feb 2016 | 901 Market St | Shawmut Woodworking & Supply Inc | erect an electrical double faced interior door/window sign. compliance w/ mahner oridance no. 155-13 not required.Details
erect an electrical double faced interior door/window sign. compliance w/ mahner oridance no. 155-13 not required. | $4,000 |
| Jul 11, 2014 | Completed final sign-off Feb 2016 | 901 Market St | Shawmut Woodworking & Supply Inc | erect two identical non-electric double faced interior door/window signs. compliance w/mahner oridance no. 155-13 not required.Details
erect two identical non-electric double faced interior door/window signs. compliance w/mahner oridance no. 155-13 not required. | $4,000 |
| Jul 11, 2014 | Completed final sign-off Feb 2016 | 901 Market St | Shawmut Woodworking & Supply Inc | erect an electrical double faced interior door/window sign. compliance w/ mahner oridance no. 155-13 not required.Details
erect an electrical double faced interior door/window sign. compliance w/ mahner oridance no. 155-13 not required. | $5,000 |
| Jul 1, 2014 | Completed final sign-off Oct 2014 | 901 Market St | Westower Communications | removal of shelter, antennas, mounts, coax & radio equipment (nextel). n/a maher ordinance. remove all associated cell-site signage and battery.Details
removal of shelter, antennas, mounts, coax & radio equipment (nextel). n/a maher ordinance. remove all associated cell-site signage and battery. | $10,000 |
| Jun 27, 2014 | Never finaled issued Jul 2014, no final | 901 Market St | Novo Construction Inc | 5th and 6th floor: mechanical work for t.i. to include water source heat pumps vav boxes. new air diffusers. 5th floor: arch app#201406249220 and 6th floor: ref arch #201406249224. n/a for the maher ordinance #155-13Details
5th and 6th floor: mechanical work for t.i. to include water source heat pumps vav boxes. new air diffusers. 5th floor: arch app#201406249220 and 6th floor: ref arch #201406249224. n/a for the maher ordinance #155-13 | $531,000 |
| Jun 27, 2014 | Never finaled issued Jun 2014, no final | 901 Market St | Novo Construction Inc | 5th floor: electrical for t.i. consisting of floor lighting and power systems. ref arch #201406249220. n/a for the maher ordinanace #155-13Details
5th floor: electrical for t.i. consisting of floor lighting and power systems. ref arch #201406249220. n/a for the maher ordinanace #155-13 | $200,000 |
| Jun 27, 2014 | Never finaled issued Jun 2014, no final | 901 Market St | Novo Construction Inc | 6th floor: electrical work for t.i. floor lighting, new and relocated lighting fixture. ref arch #201406249224. n/a for the maher ordinance #155-13Details
6th floor: electrical work for t.i. floor lighting, new and relocated lighting fixture. ref arch #201406249224. n/a for the maher ordinance #155-13 | $250,000 |
| Jun 24, 2014 | Never finaled issued Jun 2014, no final | 901 Market St | Novo Construction Inc | 6th flr: full floor tenant improvement including non-bearing partitions, glazing doors, millwork- associated mep under separate permit- fire life safety under deffered submittal, no structural work to be completed; maher n/aDetails
6th flr: full floor tenant improvement including non-bearing partitions, glazing doors, millwork- associated mep under separate permit- fire life safety under deffered submittal, no structural work to be completed; maher n/a | $900,000 |
| Jun 24, 2014 | Completed final sign-off Apr 2015 | 901 Market St | Novo Construction Inc | 5th flr: tenant improvement including non load bearing partitions, glazing, doors mill work, mep, fire, life safety and structural under separatge permit; maher n/aDetails
5th flr: tenant improvement including non load bearing partitions, glazing, doors mill work, mep, fire, life safety and structural under separatge permit; maher n/a | $750,000 |
| May 23, 2014 | Completed final sign-off Mar 2017 | 901 Market St | Fisher Development Inc | basement, 1st floor - structural & architectural upgrades a basement & 1st floor. installation of an elevator & pair of escalators between basement & 1st floor. area to remain unoccupied during work. n/a maher ordinanceDetails
basement, 1st floor - structural & architectural upgrades a basement & 1st floor. installation of an elevator & pair of escalators between basement & 1st floor. area to remain unoccupied during work. n/a maher ordinance | $900,000 |
| Apr 23, 2014 | Completed final sign-off May 2014 | 901 Market St | Pioneer Fire Inc. | sprinkler tennat improement 4th- #480- relocate 1 pendent and add 1 pendent, t.i. pa#201404102962. n/a ordinance #155-13.Details
sprinkler tennat improement 4th- #480- relocate 1 pendent and add 1 pendent, t.i. pa#201404102962. n/a ordinance #155-13. | $3,978 |
| Apr 16, 2014 | Completed final sign-off May 2014 | 901 Market St | Pyro-Comm Systems, Inc. | suite 480 - new fire alarm devices for tenant build out to include: (4) speaker/strobes, (1) strobe. ref pa #2014.0410.2962. compliance with ordinance #155-13 not requiredDetails
suite 480 - new fire alarm devices for tenant build out to include: (4) speaker/strobes, (1) strobe. ref pa #2014.0410.2962. compliance with ordinance #155-13 not required | $2,000 |
| Apr 10, 2014 | Completed final sign-off Jun 2014 | 901 Market St | Field Construction Inc. | demo of select partitions to join 2 existing offices. elec, mech, life safety and sprinkler modifications not included under this permit. 155-13 maher not requiredDetails
demo of select partitions to join 2 existing offices. elec, mech, life safety and sprinkler modifications not included under this permit. 155-13 maher not required | $105,000 |
| Feb 4, 2014 | Completed final sign-off Mar 2014 | 901 Market St | S D I Industries | revision to app#201312043284 to attach 3 fixtures to extg walls.n/a for the maher ordinance #155-13Details
revision to app#201312043284 to attach 3 fixtures to extg walls.n/a for the maher ordinance #155-13 | |
| Jan 14, 2014 | Never finaled issued Jan 2014, no final | 901 Market St | street spaceDetails
street space | ||
| Dec 4, 2013 | Completed final sign-off Mar 2014 | 901 Market St | S D I Industries | installation of ten foot high racks/shelving per plans. compliance with ordinance no. 155-13 not required.Details
installation of ten foot high racks/shelving per plans. compliance with ordinance no. 155-13 not required. | $15,000 |
| Dec 2, 2013 | Completed final sign-off Mar 2014 | 901 Market St | Shawmut Woodworking & Supply Inc | revision to permit #201306260510. the rcp as is has been changed to show the demo of extg shaft walls and dampers below 3rd flr slab & instl 2 hr ratd shaft wall at bottom of3rd fl slab.Details
revision to permit #201306260510. the rcp as is has been changed to show the demo of extg shaft walls and dampers below 3rd flr slab & instl 2 hr ratd shaft wall at bottom of3rd fl slab. | $5,000 |
| Dec 2, 2013 | Completed final sign-off Dec 2013 | 901 Market St | G P Fire Protection | as built fire sprinkler 201307192208. additional work in basement. add 12 uprightsDetails
as built fire sprinkler 201307192208. additional work in basement. add 12 uprights | |
| Nov 26, 2013 | Completed final sign-off Mar 2014 | 901 Market St | Pyro-Comm Systems, Inc. | new fire alarm devices for new tenant build-out. (46) relay modules, (18)monitor modules, (2) control modules, (2) power supplies, (27 duct detectors, (44) speaker/strobes, (3) strobes.Details
new fire alarm devices for new tenant build-out. (46) relay modules, (18)monitor modules, (2) control modules, (2) power supplies, (27 duct detectors, (44) speaker/strobes, (3) strobes. | $54,000 |
| Nov 14, 2013 | Completed final sign-off Jan 2014 | 901 Market St | R L H Fire Protection Inc | modify fire sprinklers for new retail store spaces total 447 heads. ref pa #2013.06.26.0510Details
modify fire sprinklers for new retail store spaces total 447 heads. ref pa #2013.06.26.0510 | $229,758 |
| Nov 5, 2013 | Expired or cancelled cancelled Mar 2020 | 901 Market St | exterior stone cladding system installation & anchorage. refer to pa# 2009-0709-2282Details
exterior stone cladding system installation & anchorage. refer to pa# 2009-0709-2282 | ||
| Oct 30, 2013 | Completed final sign-off Mar 2014 | 901 Market St | K & M Installation | installation of new clothing racks. n/a for maher ordinance 155-13Details
installation of new clothing racks. n/a for maher ordinance 155-13 | $15,000 |
| Oct 9, 2013 | Completed final sign-off Mar 2014 | 901 Market St | Pyro-Comm Systems, Inc. | 1st & 2nd floor - install new fire alarm devices on the tenant area shell project. new elevator connecitons for recalls & shunt trip, 3-smoke detectors, 1 heat detector, 3 relays, 6 speaker/strobes. ref pa #2013.03.26.3069Details
1st & 2nd floor - install new fire alarm devices on the tenant area shell project. new elevator connecitons for recalls & shunt trip, 3-smoke detectors, 1 heat detector, 3 relays, 6 speaker/strobes. ref pa #2013.03.26.3069 | $7,000 |
| Oct 9, 2013 | Completed final sign-off Mar 2014 | 901 Market St | Fisher Development Inc | mech. revision to the core and shell, pa# 201303263069 at 2/f & 3/fDetails
mech. revision to the core and shell, pa# 201303263069 at 2/f & 3/f | $5,000 |
| Sep 24, 2013 | Completed final sign-off Jun 2014 | 901 Market St | Pyro-Comm Systems, Inc. | new smoke control panel installed to replace (e) smoke control panel for future tenant project on teh 1st and 2nd floor. ref. appl. 2013.03.26.3069.Details
new smoke control panel installed to replace (e) smoke control panel for future tenant project on teh 1st and 2nd floor. ref. appl. 2013.03.26.3069. | $18,000 |
| Sep 12, 2013 | Completed final sign-off Nov 2013 | 901 Market St | Fisher Development Inc | revision to appl #2013.03.26.3069 - delete composite beam from project.Details
revision to appl #2013.03.26.3069 - delete composite beam from project. | |
| Aug 29, 2013 | Completed final sign-off Nov 2013 | 901 Market St | Fisher Development Inc | shop drawings for storefront system, exterior storefront approved under pa #200907092282.Details
shop drawings for storefront system, exterior storefront approved under pa #200907092282. | |
| Aug 29, 2013 | Completed final sign-off Nov 2013 | 901 Market St | Fisher Development Inc | revision to pa #201303263069 - new supply air ducts at the 3rd floor atrium.Details
revision to pa #201303263069 - new supply air ducts at the 3rd floor atrium. | $50,000 |
| Aug 27, 2013 | Completed final sign-off Nov 2013 | 901 Market St | Fisher Development Inc | defered submittal for the stairs going from 1st to the 2nd floor. permit #2013.0326.3069Details
defered submittal for the stairs going from 1st to the 2nd floor. permit #2013.0326.3069 | |
| Jul 19, 2013 | Completed final sign-off Dec 2013 | 901 Market St | G P Fire Protection | remove all (e) drops & install uprights for a shell systemDetails
remove all (e) drops & install uprights for a shell system | $78,000 |
| Jun 26, 2013 | Completed final sign-off Mar 2014 | 901 Market St | Shawmut Woodworking & Supply Inc | interior tenant improvements for retail store including non-structural partions and associated plumbing, electrical and mechanical systems. new restrooms. sprinkler and fire alarm revisions under separate applicationsDetails
interior tenant improvements for retail store including non-structural partions and associated plumbing, electrical and mechanical systems. new restrooms. sprinkler and fire alarm revisions under separate applications | $1,800,000 |
| May 22, 2013 | Completed final sign-off Nov 2013 | 901 Market St | Fisher Development Inc | exterior window replacement with (n) louvers to match (e) louvers along stevenson st. all work will comply with ab-017.Details
exterior window replacement with (n) louvers to match (e) louvers along stevenson st. all work will comply with ab-017. | $1,500 |
| May 2, 2013 | Never finaled issued May 2013, no final | 901 Market St | street spaceDetails
street space | ||
| Mar 26, 2013 | Completed final sign-off Mar 2014 | 901 Market St | Fisher Development Inc | struc,arch,mech upgrades on the grd thru 3rd flr. demo of mezzanine, install elevator & a pair of escalators between flrs 1 & 2. infill areas at grd flr where (e) level changes occur & (e) retail entry to basement. add 3rd exit stair from 2nd flr.change use base of atrium from 2nd to 3rd flr.Details
struc,arch,mech upgrades on the grd thru 3rd flr. demo of mezzanine, install elevator & a pair of escalators between flrs 1 & 2. infill areas at grd flr where (e) level changes occur & (e) retail entry to basement. add 3rd exit stair from 2nd flr.change use base of atrium from 2nd to 3rd flr. | $1,500,000 |
| Feb 12, 2013 | Completed final sign-off Mar 2013 | 901 Market St | Pyro-Comm Systems, Inc. | add 9 speaker/strobes & 2 strobe only devices to new tenent build out. t. i #201212035348 and 5346Details
add 9 speaker/strobes & 2 strobe only devices to new tenent build out. t. i #201212035348 and 5346 | $6,000 |
| Jan 31, 2013 | Completed final sign-off Feb 2013 | 901 Market St | Ayoob & Peery Plumbing Co Inc | 4th floor-add & relocate fire sprinkler heads per ti-4 added & 10 relocated. ti pa's# 2012-1203-5346 & 2012-1203-5348Details
4th floor-add & relocate fire sprinkler heads per ti-4 added & 10 relocated. ti pa's# 2012-1203-5346 & 2012-1203-5348 | $7,196 |
| Jan 18, 2013 | Completed final sign-off Nov 2013 | 901 Market St | Fisher Development Inc | non-structural interior demolition of (e) tenant spaces on 1st & 2nd fls. area to remain unoccupied. all work to be performed under sf bldg. inspections ab-017.Details
non-structural interior demolition of (e) tenant spaces on 1st & 2nd fls. area to remain unoccupied. all work to be performed under sf bldg. inspections ab-017. | $60,000 |
| Dec 3, 2012 | Completed final sign-off Mar 2013 | 901 Market St | Commercial Interior Builders Inc | 4th floor suite 460 - interior non-structural tenant improvement to existing office space, demolitoin of some interior partitions, carpet & reconfigure offices within space.Details
4th floor suite 460 - interior non-structural tenant improvement to existing office space, demolitoin of some interior partitions, carpet & reconfigure offices within space. | $100,000 |
| Dec 3, 2012 | Completed final sign-off Mar 2013 | 901 Market St | Commercial Interior Builders Inc | 4th floor suite 470 - interior non-structural tenant improvement to existing office space, demolitoin of partitions, carpet & reconfigure offices within tanant space.Details
4th floor suite 470 - interior non-structural tenant improvement to existing office space, demolitoin of partitions, carpet & reconfigure offices within tanant space. | $250,000 |
| Nov 28, 2012 | Never finaled issued Nov 2012, no final | 901 Market St | renewal of app#200907092284 to complete work and obtain final inspection.Details
renewal of app#200907092284 to complete work and obtain final inspection. | ||
| Nov 28, 2012 | Never finaled issued Nov 2012, no final | 901 Market St | renewal of app#200907092286 to complete work and obtain final inspection.Details
renewal of app#200907092286 to complete work and obtain final inspection. | ||
| Nov 26, 2012 | Completed final sign-off Dec 2012 | 901 Market St | Pyro-Comm Systems, Inc. | 3rd floor: add new speaker/strobes to open office and conference rooms. relocate smoke detector to it closet. t.i. #201211053549Details
3rd floor: add new speaker/strobes to open office and conference rooms. relocate smoke detector to it closet. t.i. #201211053549 | $6,000 |
| Nov 7, 2012 | Completed final sign-off Jan 2013 | 901 Market St | Commercial Interior Builders Inc | mep work at extg office space on the 3rd floor. ti appoved under app#201211053549Details
mep work at extg office space on the 3rd floor. ti appoved under app#201211053549 | $200,000 |
| Nov 6, 2012 | Completed final sign-off Jan 2013 | 901 Market St | Golden Gate Fire Protection Inc | 3rd floor-fire sprinker system upgrade-relocate 69 upright sprinkler heads, relocate 24 pendent sprinkler heads. new branch line restraints. delete 7 pendent sprinklers & add 4 pendent sprinklers. ti pa# 2012-0725-5704Details
3rd floor-fire sprinker system upgrade-relocate 69 upright sprinkler heads, relocate 24 pendent sprinkler heads. new branch line restraints. delete 7 pendent sprinklers & add 4 pendent sprinklers. ti pa# 2012-0725-5704 | $48,000 |
| Nov 5, 2012 | Completed final sign-off Dec 2012 | 901 Market St | Commercial Interior Builders Inc | interior non structural tenant improvement on the existing office space on the 3rd floor. mep and fire safety under separate permitDetails
interior non structural tenant improvement on the existing office space on the 3rd floor. mep and fire safety under separate permit | $425,000 |
| Aug 13, 2012 | Never finaled issued Aug 2012, no final | 901 Market St | Pyro-Comm Systems, Inc. | relocate (e) fire alarm device (2) strobe device (3) speakersDetails
relocate (e) fire alarm device (2) strobe device (3) speakers | $5,000 |
| Aug 7, 2012 | Completed final sign-off Dec 2012 | 901 Market St | Golden Gate Fire Protection Inc | 5th floor fire sprinkler system upgrade, relcoate 7 pendent sprinkler heads.Details
5th floor fire sprinkler system upgrade, relcoate 7 pendent sprinkler heads. | $3,605 |
| Jul 25, 2012 | Completed final sign-off Nov 2012 | 901 Market St | Bluewater Environmentl Svc Inc | 3rd floor interior non-structural demolitoin. all work to comply with sfbc ab-017.Details
3rd floor interior non-structural demolitoin. all work to comply with sfbc ab-017. | $17,000 |
| Jul 12, 2012 | Completed final sign-off Sep 2012 | 901 Market St | Commercial Interior Builders Inc | 5th floor - demo of select partitions to join two existing suites & construction of three new offices. elec, mech , life safety & sprinkler modifications under separte permitDetails
5th floor - demo of select partitions to join two existing suites & construction of three new offices. elec, mech , life safety & sprinkler modifications under separte permit | $100,000 |
| Mar 19, 2012 | Completed final sign-off Apr 2012 | 901 Market St | Pyro-Comm Systems, Inc. | 3rd floor suite 380 & 390 - add new speaker/strobe and strobe to multiperson officesDetails
3rd floor suite 380 & 390 - add new speaker/strobe and strobe to multiperson offices | $5,000 |
| Mar 14, 2012 | Completed final sign-off Mar 2012 | 901 Market St | Potter Fire Protection | relocate 3 fire sprinklers on the 3rd floor only.Details
relocate 3 fire sprinklers on the 3rd floor only. | $1,500 |
| Mar 5, 2012 | Completed final sign-off May 2012 | 901 Market St | Bevilacqua & Sons | demolition of partitions, doors, power tel/data rerceptacles & finishes. construction of new partitions, doors, power & tele/data recetacles & finishes. the tenant space is currently un-occupied. all work is on 3rd floor.Details
demolition of partitions, doors, power tel/data rerceptacles & finishes. construction of new partitions, doors, power & tele/data recetacles & finishes. the tenant space is currently un-occupied. all work is on 3rd floor. | $35,000 |
| Sep 15, 2011 | Expired or cancelled cancelled Jan 2026 | 901 Market St | Synergy Project Mgmt Inc | installation of eyebolts on front of building for sfmta muni power linesDetails
installation of eyebolts on front of building for sfmta muni power lines | $8,000 |
| Jan 11, 2010 | Completed final sign-off Feb 2010 | 901 Market St | Diversified Fire Products | to obtain final inspection for work approved under pa # 200707318221. all work is complete.Details
to obtain final inspection for work approved under pa # 200707318221. all work is complete. | |
| Jan 11, 2010 | Completed final sign-off Feb 2010 | 901 Market St | Bevilacqua & Sons | to obtain final inspection for work approved under pa # 200704168839 all work is complete.Details
to obtain final inspection for work approved under pa # 200704168839 all work is complete. | |
| Jan 11, 2010 | Completed final sign-off Feb 2010 | 901 Market St | Pribuss Engineering Inc | to obtain final inspection for work approved under pa # 200706285351. all work is complete.Details
to obtain final inspection for work approved under pa # 200706285351. all work is complete. | |
| Jan 11, 2010 | Completed final sign-off Feb 2010 | 901 Market St | Capitol Electric Const | to obtain final inspection for work approved under pa # 200708028543. all work is complete.Details
to obtain final inspection for work approved under pa # 200708028543. all work is complete. | |
| Dec 16, 2009 | Completed final sign-off Feb 2010 | 901 Market St | Pribuss Engineering Inc | fire sprinkler ti on the 5th floor. relocated 14 sprinklker headsDetails
fire sprinkler ti on the 5th floor. relocated 14 sprinklker heads | $3,500 |
| Nov 18, 2009 | Completed final sign-off Feb 2010 | 901 Market St | Ward Alan Emery Construction Inc. | install new lay in acoustical ceiling with (e) light fixtures, relocate (e) sprinkler (replace as required), construct small niche for file cabinets & install floor mounted junction boxes. revision to pa# 2007-0413-8691Details
install new lay in acoustical ceiling with (e) light fixtures, relocate (e) sprinkler (replace as required), construct small niche for file cabinets & install floor mounted junction boxes. revision to pa# 2007-0413-8691 | $10,000 |
| Jul 9, 2009 | Completed final sign-off Dec 2013 | 901 Market St | Fisher Development Inc, Plant Construction Co, Lp | first floor storefront improvements on market st. & 5th. st.Details
first floor storefront improvements on market st. & 5th. st. | $1,500,000 |
| Jul 9, 2009 | Never finaled issued Aug 2010, no final | 901 Market St | Fisher Development Inc, Plant Construction Co, Lp | erect signs 3'x29' @ corners of market st. & 5th. st. total of (4). electric, projecting, double faced.Details
erect signs 3'x29' @ corners of market st. & 5th. st. total of (4). electric, projecting, double faced. | $10,000 |
| Jul 9, 2009 | Never finaled issued Aug 2010, no final | 901 Market St | Fisher Development Inc, Plant Construction Co, Lp | install 3'x7' signs on market st. & 5th. st. total of (2). electric, wall, single faced.Details
install 3'x7' signs on market st. & 5th. st. total of (2). electric, wall, single faced. | $5,000 |
| Jun 24, 2009 | Completed final sign-off Feb 2010 | 901 Market St | Red Hawk Fire & Security Ca Llc | add new fire alarm devices to monitor for fuel tank leak detection, high and low fuel tank supervision. smoke detector and control relay added for damper control. one strobe added to room. work on 1st floor and roof.Details
add new fire alarm devices to monitor for fuel tank leak detection, high and low fuel tank supervision. smoke detector and control relay added for damper control. one strobe added to room. work on 1st floor and roof. | $5,000 |
| Dec 11, 2008 | Completed final sign-off Feb 2010 | 901 Market St | basement: remove existing single wall 500 gal fuel tank. replace with 2 350 gal double wall diesel tank. roof: remove existing 50 gal day tank serving generator with 100 gal double wall day tankDetails
basement: remove existing single wall 500 gal fuel tank. replace with 2 350 gal double wall diesel tank. roof: remove existing 50 gal day tank serving generator with 100 gal double wall day tank | $35,000 | |
| Dec 4, 2008 | Completed final sign-off Jun 2009 | 901 Market St | disabled access compliance status documentation ab-056. building entrance, path of travel, ground floor elevator lobby/elevationsDetails
disabled access compliance status documentation ab-056. building entrance, path of travel, ground floor elevator lobby/elevations | ||
| Nov 7, 2008 | Completed final sign-off Feb 2010 | 901 Market St | Bevilacqua & Sons | to obtain final inspection for work approved under ap#200807156725. all work has been completed.Details
to obtain final inspection for work approved under ap#200807156725. all work has been completed. | |
| Jul 15, 2008 | Never finaled issued Jul 2008, no final | 901 Market St | Bevilacqua & Sons | renew pa#200704138691 for final inspection.Details
renew pa#200704138691 for final inspection. | |
| Dec 5, 2007 | Completed final sign-off Jan 2008 | 901 Market St | Capitol Electric Const | relocate 3 wall mounted strobe lightsDetails
relocate 3 wall mounted strobe lights | $2,600 |
| Oct 12, 2007 | Never finaled issued Oct 2007, no final | 901 Market St | street spaceDetails
street space | ||
| Sep 18, 2007 | Expired or cancelled cancelled Jan 2026 | 901 Market St | 3rd floor - revision to appl. #200708160023. add door to connect two existing occupied suites of same tenant.Details
3rd floor - revision to appl. #200708160023. add door to connect two existing occupied suites of same tenant. | $2,000 | |
| Aug 16, 2007 | Completed final sign-off Jan 2008 | 901 Market St | non structural partition renoval, new partitions & new finishes.Details
non structural partition renoval, new partitions & new finishes. | $31,500 | |
| Aug 8, 2007 | Never finaled issued Aug 2007, no final | 901 Market St | 'starbucks coffee' black vinyl lettersDetails
'starbucks coffee' black vinyl letters | ||
| Aug 8, 2007 | Never finaled issued Aug 2007, no final | 901 Market St | "site for sore eyes" black vinyl lettersDetails
"site for sore eyes" black vinyl letters | ||
| Aug 8, 2007 | Never finaled issued Aug 2007, no final | 901 Market St | "marshalls" black vinyl letters.Details
"marshalls" black vinyl letters. | ||
| Aug 8, 2007 | Never finaled issued Aug 2007, no final | 901 Market St | 'marshalls' black vinyl lettersDetails
'marshalls' black vinyl letters | ||
| Aug 2, 2007 | Never finaled issued Aug 2007, no final | 901 Market St | Capitol Electric Const | lighting work per title 24 engineered drawings: install 63 new fluorescent light fixtures, connected to energy mgmt system with 2 override switches. lighting control panel existing in elect closet. this is a revision to 200704168839.Details
lighting work per title 24 engineered drawings: install 63 new fluorescent light fixtures, connected to energy mgmt system with 2 override switches. lighting control panel existing in elect closet. this is a revision to 200704168839. | $25,550 |
| Jul 31, 2007 | Expired or cancelled expired Jun 2009 | 901 Market St | Diversified Fire Products | fire alarm t.i. for the 5th floor, ashen & allen. 1 smoke detector, 5 ceiling strobes,2 controle relay, 1 duct detector, 9 speaker strobes and 2 controle moduleDetails
fire alarm t.i. for the 5th floor, ashen & allen. 1 smoke detector, 5 ceiling strobes,2 controle relay, 1 duct detector, 9 speaker strobes and 2 controle module | $13,803 |
| Jun 28, 2007 | Expired or cancelled expired Jun 2009 | 901 Market St | Pribuss Engineering Inc | 5th floor-install fire sprinkler system in tenant improvement area. 14 adds, 62 relocates, 6 (e) to remain.Details
5th floor-install fire sprinkler system in tenant improvement area. 14 adds, 62 relocates, 6 (e) to remain. | $14,500 |
| Jun 5, 2007 | Never finaled issued Jun 2007, no final | 901 Market St | remove existing canopy, no other work under this permit. remove canopy only. no other work.Details
remove existing canopy, no other work under this permit. remove canopy only. no other work. | $69,500 | |
| May 3, 2007 | Completed final sign-off Feb 2010 | 901 Market St | Pribuss Engineering Inc | oti-2 5th floor spDetails
oti-2 5th floor sp | $3,000 |
| Apr 16, 2007 | Expired or cancelled expired Jun 2009 | 901 Market St | Bevilacqua & Sons | oti-1, anshel & allen, 5th floor el, me, ls, sp.Details
oti-1, anshel & allen, 5th floor el, me, ls, sp. | $575,000 |
| Apr 13, 2007 | Never finaled issued Apr 2007, no final | 901 Market St | Bevilacqua & Sons | or ashen/allen: el,me,ls,spDetails
or ashen/allen: el,me,ls,sp | $60,000 |
| Mar 30, 2007 | Never finaled issued Mar 2007, no final | 901 Market St | oti-1, arup, 4th floor, el, ls.Details
oti-1, arup, 4th floor, el, ls. | $20,000 | |
| Jan 23, 2007 | Expired or cancelled expired Jan 2008 | 901 Market St | Diversified Fire Products | fire aalrm t.i. upgrade for 3rd floor conference room: addition of 1 spkr/strobeDetails
fire aalrm t.i. upgrade for 3rd floor conference room: addition of 1 spkr/strobe | $4,770 |
| Dec 1, 2006 | Never finaled issued Dec 2006, no final | 901 Market St | street spaceDetails
street space | ||
| Nov 6, 2006 | Expired or cancelled expired Apr 2009 | 901 Market St | Bevilacqua & Sons | construct wall, install (n) door, relocate (e) lighting, tape, paint, relocate strobe, (3rd floor only) fire alarm change to be done under separate permitDetails
construct wall, install (n) door, relocate (e) lighting, tape, paint, relocate strobe, (3rd floor only) fire alarm change to be done under separate permit | $10,000 |
| Oct 18, 2005 | Completed final sign-off Dec 2005 | 901 Market St | Bevilacqua & Sons | oti-2 4th floor elDetails
oti-2 4th floor el | $9,000 |
| Oct 18, 2005 | Completed final sign-off Dec 2005 | 901 Market St | Bevilacqua & Sons | oti-2 3rd floor elDetails
oti-2 3rd floor el | $20,000 |
| Sep 29, 2005 | Never finaled issued Sep 2005, no final | 901 Market St | Pribuss Engineering Inc | 3rd floor - fire sprinkler t.i. 8 relocates, 5 adds.Details
3rd floor - fire sprinkler t.i. 8 relocates, 5 adds. | $1,600 |
| Sep 27, 2005 | Completed final sign-off Dec 2005 | 901 Market St | Bevilacqua & Sons | oti-3, 3rd floor, me.Details
oti-3, 3rd floor, me. | $25,000 |
| Sep 27, 2005 | Completed final sign-off Jan 2006 | 901 Market St | Capitol Electric Const | replacement of speakers & strobes in tenant area on 3rd flfoorDetails
replacement of speakers & strobes in tenant area on 3rd flfoor | $16,150 |
| Aug 9, 2005 | Completed final sign-off Dec 2005 | 901 Market St | Bevilacqua & Sons | oti-1, 3rd floor, el, me, ls, sp.Details
oti-1, 3rd floor, el, me, ls, sp. | $100,000 |
| Aug 9, 2005 | Completed final sign-off Dec 2005 | 901 Market St | Bevilacqua & Sons | oti-1,4th/fl -el.Details
oti-1,4th/fl -el. | $30,000 |
| Feb 24, 2005 | Completed final sign-off Jun 2005 | 901 Market St | Bevilacqua & Sons | oti 2, 5th floor, sp, ls, el.Details
oti 2, 5th floor, sp, ls, el. | $10,000 |
| Jan 31, 2005 | Completed final sign-off Jun 2005 | 901 Market St | Bevilacqua & Sons | oti-1 5th floor el ls spDetails
oti-1 5th floor el ls sp | $58,000 |
| Sep 21, 2004 | Completed final sign-off Dec 2004 | 901 Market St | Capitol Electric Const | replacement of speakers & strobes in tenant area on the 4th floorDetails
replacement of speakers & strobes in tenant area on the 4th floor | $15,240 |
| Apr 15, 2004 | Completed final sign-off Jun 2004 | 901 Market St | Bevilacqua & Sons | oti-1 5/f el me ls spDetails
oti-1 5/f el me ls sp | $200 |
| Feb 24, 2004 | Completed final sign-off Jun 2004 | 901 Market St | Bevilacqua & Sons | rev#200311049318. oti-1. revise disabled access upgrades assoicated w/ oti-1 . request unreasonableDetails
rev#200311049318. oti-1. revise disabled access upgrades assoicated w/ oti-1 . request unreasonable | $4,000 |
| Feb 9, 2004 | Completed final sign-off Jun 2004 | 901 Market St | Atlantis Fire Protection | extg sprnklr system/relocation, addition, deletion of sprnklr heads for proper spacing and coverageDetails
extg sprnklr system/relocation, addition, deletion of sprnklr heads for proper spacing and coverage | $5,500 |
| Nov 4, 2003 | Completed final sign-off Jun 2004 | 901 Market St | Bevilacqua & Sons | oti-2, 5th fl,el,me,lsDetails
oti-2, 5th fl,el,me,ls | $190,000 |
| Nov 4, 2003 | Completed final sign-off Jun 2004 | 901 Market St | Bevilacqua & Sons | oti-1 5th fl,el,me,ls,spDetails
oti-1 5th fl,el,me,ls,sp | $80,000 |
| Sep 30, 2003 | Completed final sign-off Aug 2004 | 901 Market St | Bevilacqua & Sons | structural demo, structural steel, concrete/fireproofing/rebar/stairs & rails, mech./plumb. seperateDetails
structural demo, structural steel, concrete/fireproofing/rebar/stairs & rails, mech./plumb. seperate | $136,000 |
| Sep 11, 2003 | Completed final sign-off May 2004 | 901 Market St | Bevilacqua & Sons | soft interior demo of walls, carpet & ceiling as shown on plans, builk of demo on 5th flr, small amtDetails
soft interior demo of walls, carpet & ceiling as shown on plans, builk of demo on 5th flr, small amt | $15,000 |
| Aug 6, 2003 | Never finaled issued Aug 2003, no final | 901 Market St | street spaceDetails
street space | ||
| Mar 25, 2003 | Expired or cancelled expired Mar 2004 | 901 Market St | Capitol Electric Const | submission of as builts drawings to include work on 6th flr,fire alarm work re: 200105028188Details
submission of as builts drawings to include work on 6th flr,fire alarm work re: 200105028188 | |
| Feb 21, 2002 | Completed final sign-off Feb 2002 | 901 Market St | Metropolitan Electrical Construction | to renew app#2000/05/19/0523 for final inspection.Details
to renew app#2000/05/19/0523 for final inspection. | |
| Jan 9, 2002 | Expired or cancelled expired Jul 2002 | 901 Market St | Bevilacqua & Sons | oti-2, 6th floor, ltg,lsDetails
oti-2, 6th floor, ltg,ls | $12,000 |
| Nov 13, 2001 | Completed final sign-off Mar 2002 | 901 Market St | Bevilacqua & Sons | 6th fl., oti-1 ltg., lsDetails
6th fl., oti-1 ltg., ls | $160,000 |
| May 2, 2001 | Expired or cancelled expired Jul 2003 | 901 Market St | Capitol Electric Const | new life safety system, with new devices at building code. graphic gan control panel, remote uniciatDetails
new life safety system, with new devices at building code. graphic gan control panel, remote uniciat | $350,000 |
| Jul 26, 2000 | Expired or cancelled expired Nov 2000 | 901 Market St | street spaceDetails
street space | ||
| May 19, 2000 | Expired or cancelled expired Feb 2002 | 901 Market St | one-stop,8" nextel antennaDetails
one-stop,8" nextel antenna | $90,000 | |
| May 19, 2000 | Expired or cancelled cancelled Oct 2024 | 901 Market St | nextel 18" whip antenna on 3rd floor ledge on corner of missions and fifth and build equipment sheltDetails
nextel 18" whip antenna on 3rd floor ledge on corner of missions and fifth and build equipment shelt | $90,000 | |
| Apr 20, 2000 | Completed final sign-off Jan 2001 | 901 Market St | Peninsula Air Condition | install a/c unit, condinsation unit & registerDetails
install a/c unit, condinsation unit & register | $16,300 |
| Apr 3, 2000 | Completed final sign-off Jul 2000 | 901 Market St | Bevilacqua & Sons | oti-1, el ls, 6th floorDetails
oti-1, el ls, 6th floor | $25,000 |