Synergy Project Mgmt Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2007 to Sep 2011
- Last 24 months
- 0 permits filed
11 permits since 2000: 2 completed, 6 never finaled, 3 expired or cancelled.
Of the 6 never-finaled permits, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 15, 2011 | Never finaled issued Oct 2011, no final | 444 Stockton St | installation of eyebolts on side of building.Details
installation of eyebolts on side of building. | $8,000 |
| Sep 15, 2011 | Never finaled issued Oct 2011, no final | 899 Howard St | installation of eyebolts on side of buildingDetails
installation of eyebolts on side of building | $8,000 |
| Sep 15, 2011 | Expired or cancelled cancelled Jan 2026 | 562 Sutter St | installation of eyebolts on front of building for sfmta muni power linesDetails
installation of eyebolts on front of building for sfmta muni power lines | $8,000 |
| Sep 15, 2011 | Expired or cancelled cancelled Jan 2026 | 901 Market St | installation of eyebolts on front of building for sfmta muni power linesDetails
installation of eyebolts on front of building for sfmta muni power lines | $8,000 |
| Jul 21, 2011 | Completed final sign-off Jul 2012 | 2366 Leavenworth St | barrier removal for fay park restroom-install (n) partition walls, doors, (n) toilet fixtures, lighting.Details
barrier removal for fay park restroom-install (n) partition walls, doors, (n) toilet fixtures, lighting. | $35,000 |
| May 18, 2010 | Never finaled issued Sep 2010, no final | 150 Marina Bl | accessible barrier removal: (n) plumbing fixtures, painting, electrical & associated work, (n) floor finish, accessible path of travel & paving work in parking lot & new accessible drinking fountain.Details
accessible barrier removal: (n) plumbing fixtures, painting, electrical & associated work, (n) floor finish, accessible path of travel & paving work in parking lot & new accessible drinking fountain. | $200,000 |
| May 18, 2010 | Never finaled issued Sep 2010, no final | 5701 03rd St | accessible barrier removal: remodel of (e) accessible stalls, interior finish, painting & (n) drinking fountains, plumbing & electrical work replacement of (e) roof.Details
accessible barrier removal: remodel of (e) accessible stalls, interior finish, painting & (n) drinking fountains, plumbing & electrical work replacement of (e) roof. | $75,000 |
| Mar 2, 2010 | Never finaled issued Mar 2010, no final | 425 04th St | underpinning building along fouth street property line to allow installation of relocated utilities in preparation for construction of tunnel boring machine launch box for mta central subway.Details
underpinning building along fouth street property line to allow installation of relocated utilities in preparation for construction of tunnel boring machine launch box for mta central subway. | $464,000 |
| Mar 1, 2010 | Expired or cancelled expired Dec 2013 | 475 04th St | sfmta central subway. closure walls to be constructed at existing subside wall vaults to isolate building from utilities to be intalled in public right of way in preparation for central subway.Details
sfmta central subway. closure walls to be constructed at existing subside wall vaults to isolate building from utilities to be intalled in public right of way in preparation for central subway. | $25,000 |
| Jan 25, 2010 | Never finaled issued Mar 2010, no final | 230 04th St | underpinning ofthe existing 9 story structure lovated at the corner of 4th and howard streets along the property line of 4th st to allow intallation of relocated utilities in preparation for construction of moscone station for sfmta central subway projectDetails
underpinning ofthe existing 9 story structure lovated at the corner of 4th and howard streets along the property line of 4th st to allow intallation of relocated utilities in preparation for construction of moscone station for sfmta central subway project | $200,000 |
| Jul 19, 2007 | Completed final sign-off Sep 2008 | 130 Tucker Av | landscape clearing and demo, landscape const incl paving, low walls, retain walls, trellis, fencing, irrigation, planting, grading plus retaining wall & park structures.Details
landscape clearing and demo, landscape const incl paving, low walls, retain walls, trellis, fencing, irrigation, planting, grading plus retaining wall & park structures. |