289 permits since 2000 (architect on 279 permits, authorized agent-others on 6 permits, designer on 3 permits, engineer on 3 permits): 227 completed, 22 in progress, 28 never finaled, 12 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 289.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 6, 2026 | In progress filed Oct 2026, not yet issued | 2 Harrison St | Sc Builders, Inc | 5th floor: tenant improvement is limited to the gender neutral restrooms and includes modifications to ceiling grid & tile, light fixture relocation, new restroom fixtures, and new finishes.Details
5th floor: tenant improvement is limited to the gender neutral restrooms and includes modifications to ceiling grid & tile, light fixture relocation, new restroom fixtures, and new finishes. | $22,000 |
| Sep 23, 2026 | In progress filed Sep 2026, not yet issued | 150 Spear St | suite 1400: modification of existing t.i. to include demo of non-load bearing partitions, ceiling grid and tile, light fixtures & switching, millwork , powder/data, finishes doors, frames & hardware. all work shall comply with federal, state & local codes.Details
suite 1400: modification of existing t.i. to include demo of non-load bearing partitions, ceiling grid and tile, light fixtures & switching, millwork , powder/data, finishes doors, frames & hardware. all work shall comply with federal, state & local codes. | $258,992 | |
| Aug 27, 2026 | In progress issued Sep 2026 | 222 Kearny St | Arcon Construction Corp | ste. 304-tenant improvement to include selective demo and construction of non load bearing partitions, modifications to ceiling grid and tile, new light fixtures, new office door and frames. salvage and reuse existing selected materials if possible, millwork and new finishesDetails
ste. 304-tenant improvement to include selective demo and construction of non load bearing partitions, modifications to ceiling grid and tile, new light fixtures, new office door and frames. salvage and reuse existing selected materials if possible, millwork and new finishes | $107,068 |
| Jul 21, 2026 | In progress filed Jul 2026, not yet issued | 1001 Front St | Bcci Construction Company | basement, 1st flr, 2nd floor - demo only permit per ab017Details
basement, 1st flr, 2nd floor - demo only permit per ab017 | $150,000 |
| Jul 15, 2026 | In progress filed Jul 2026, not yet issued | 150 Spear St | ste: 1500: installation of 3 phone booths, including anchoring details.Details
ste: 1500: installation of 3 phone booths, including anchoring details. | $50,000 | |
| Jul 9, 2026 | In progress filed Jul 2026, not yet issued | 114 Sansome St | suite 1400: installation of two new phone booths, including anchoring details.Details
suite 1400: installation of two new phone booths, including anchoring details. | $2,560 | |
| Jun 17, 2026 | In progress filed Jun 2026, not yet issued | 244 Jackson St | modification of (e) lobby. new flring finishes. demo (e) foundation plumbing, lighting and head. patch and repair drywall and floor below as needed. new light fixtures throughout. update door hardware and update signage for egress. exterior work include hone (e) stone at exterior walls and flrDetails
modification of (e) lobby. new flring finishes. demo (e) foundation plumbing, lighting and head. patch and repair drywall and floor below as needed. new light fixtures throughout. update door hardware and update signage for egress. exterior work include hone (e) stone at exterior walls and flr | $208,547 | |
| Jun 3, 2026 | In progress issued Jun 2026 | 150 Spear St | Peacock Construction | ste: 1200 - modification to (e) ti. to include selective demo+ construction of non load bearing partitions, new ceiling grid+ tile, new light fixtures+ switching, new break area + coffee bar millwork, new finishes new door frames. deferred mep.Details
ste: 1200 - modification to (e) ti. to include selective demo+ construction of non load bearing partitions, new ceiling grid+ tile, new light fixtures+ switching, new break area + coffee bar millwork, new finishes new door frames. deferred mep. | $1,500,000 |
| Jun 3, 2026 | Completed final sign-off Sep 2026 | 575 Market St | Field Construction Inc. | level 21:modification of (e) t.i. to include demolition & construction of new non-load bearing partitions. a new demising partition, new doors, frames, & hardware, glazing, modification of (e) ceiling tile & grid system, new light fixtures & switching, new power/data, new millwork & plumbing fixtureDetails
level 21:modification of (e) t.i. to include demolition & construction of new non-load bearing partitions. a new demising partition, new doors, frames, & hardware, glazing, modification of (e) ceiling tile & grid system, new light fixtures & switching, new power/data, new millwork & plumbing fixture | $500,000 |
| May 7, 2026 | Completed final sign-off Oct 2026 | 575 Market St | Richlen Construction | 3rd floor: this project involves modification of (e) ti to include construction of new non-load bearing partitions, new door, frames and hardware modification of (e) ceiing tile & grd system, new light fixtures & switching new power/ data and finishesDetails
3rd floor: this project involves modification of (e) ti to include construction of new non-load bearing partitions, new door, frames and hardware modification of (e) ceiing tile & grd system, new light fixtures & switching new power/ data and finishes | $200,000 |
| May 5, 2026 | In progress issued Sep 2026 | 350 Bush St | Novo Construction Inc | fl: 4 & 5: installation of 6 (e) phone boots and their associated anchoring.Details
fl: 4 & 5: installation of 6 (e) phone boots and their associated anchoring. | $6,500 |
| Apr 27, 2026 | Completed final sign-off Jun 2026 | 350 California St | C C I Commercial Construction & Improv | 18th floor (n) gypsum ceiling in the conference room including new light fixtures.Details
18th floor (n) gypsum ceiling in the conference room including new light fixtures. | $90,000 |
| Apr 15, 2026 | Completed final sign-off Jul 2026 | 222 Kearny St | Arcon Construction Corp | modification of e tenant floor plan layout to include additional lobby vestibule off of main elevator lobby to access existing roof deck and relocation of point of entry to the following rooms: 1df, storage room and wellness roomDetails
modification of e tenant floor plan layout to include additional lobby vestibule off of main elevator lobby to access existing roof deck and relocation of point of entry to the following rooms: 1df, storage room and wellness room | $200,000 |
| Apr 2, 2026 | Completed final sign-off Sep 2026 | 1 Post St | Peacock Construction | 17/f: demolition and construction of men's restroom walls/lighting providing new toilet partition in men's room only. new power, demolition of minimal set of light fixtures, new light fixtures, new finishes, and structural attachment of 4 existing phone booths.Details
17/f: demolition and construction of men's restroom walls/lighting providing new toilet partition in men's room only. new power, demolition of minimal set of light fixtures, new light fixtures, new finishes, and structural attachment of 4 existing phone booths. | $175,000 |
| Mar 13, 2026 | In progress issued Apr 2026 | 114 Sansome St | Skyline Construction | office ti 7th fl. demo and construct non load bearing partitions, millwork, lighting, ceiling system.Details
office ti 7th fl. demo and construct non load bearing partitions, millwork, lighting, ceiling system. | $1,400,000 |
| Mar 10, 2026 | In progress issued Mar 2026 | 3838 California St | Paganini Electric Corp(See Signatories) | remove of the existing rooftop generator on the existing equipment pad per ab017Details
remove of the existing rooftop generator on the existing equipment pad per ab017 | $15,000 |
| Jan 22, 2026 | In progress filed Jan 2026, not yet issued | 180 Montgomery St | Bevilacqua & Sons | 15/f: demo & construction of non-load bearing partitions to create 2 new phone rooms and downsize of (e) serve room. new/relocazted power/data, light fixtures, exit signage, and new paint.Details
15/f: demo & construction of non-load bearing partitions to create 2 new phone rooms and downsize of (e) serve room. new/relocazted power/data, light fixtures, exit signage, and new paint. | $100,000 |
| Jan 15, 2026 | Completed final sign-off Apr 2026 | 350 California St | C C I Commercial Construction & Improv | revision to pa # 202509115093: change of layout to suite 1500, 1550, 1560.Details
revision to pa # 202509115093: change of layout to suite 1500, 1550, 1560. | |
| Jan 6, 2026 | Completed final sign-off Apr 2026 | 685 Market St | Sc Builders, Inc | 8th floor: install (5) phone booths. 9th floor: install (5) phone booths. 10th floor: install (5) phone booths. ref#: 202501138213Details
8th floor: install (5) phone booths. 9th floor: install (5) phone booths. 10th floor: install (5) phone booths. ref#: 202501138213 | $120,000 |
| Dec 23, 2025 | Completed final sign-off Sep 2026 | 345 California St | Kr Johnston Construction Inc | 23/fl- expansion and modification of (e) ti to include demo and construction of non load bearing partitions, (n) ceiling grid and tile, (n) light fixtures, office doors/frames, power/data, salvage and reuse of (e) materials, millwork and finishesDetails
23/fl- expansion and modification of (e) ti to include demo and construction of non load bearing partitions, (n) ceiling grid and tile, (n) light fixtures, office doors/frames, power/data, salvage and reuse of (e) materials, millwork and finishes | $2,700,000 |
| Dec 23, 2025 | In progress issued Feb 2026 | 345 California St | Skyline Construction | this project involves demising one large suite into two smaller suites modification of an (e) t.i. to include demolition and construction of non-load bearing partitions, modification to (e) ceiling grid system to accomodate full ht partition, new power/data and new finishes. 17th fl. suite 1750Details
this project involves demising one large suite into two smaller suites modification of an (e) t.i. to include demolition and construction of non-load bearing partitions, modification to (e) ceiling grid system to accomodate full ht partition, new power/data and new finishes. 17th fl. suite 1750 | $12,000 |
| Dec 17, 2025 | Completed final sign-off Aug 2026 | 1 Post St | Peacock Construction | 30/f ste 3000: installation of (6) new phone booths and their associated anchoring. life and safety will be submitted separately.Details
30/f ste 3000: installation of (6) new phone booths and their associated anchoring. life and safety will be submitted separately. | $5,500 |
| Dec 11, 2025 | Completed final sign-off Feb 2026 | 350 California St | San Francisco Commercial Builders Inc | ground flr. this t.i. project involves renovation of (e) entry lobby doors including retrofit of (e) stand along mag locs located in head of the door frame. (n) surface mounted mag locks held to the (e) building life safey to fail safe in an emergency.Details
ground flr. this t.i. project involves renovation of (e) entry lobby doors including retrofit of (e) stand along mag locs located in head of the door frame. (n) surface mounted mag locks held to the (e) building life safey to fail safe in an emergency. | $6,000 |
| Dec 3, 2025 | Completed final sign-off May 2026 | 180 Montgomery St | Bevilacqua & Sons | 19th floor ti: to include selective demo and construction of non-load bearing partitions, light fixture relocation including re-switching, relocated and new office doors and frames, salvage adn reuse of existing selected materials if practical, and new finishes.Details
19th floor ti: to include selective demo and construction of non-load bearing partitions, light fixture relocation including re-switching, relocated and new office doors and frames, salvage adn reuse of existing selected materials if practical, and new finishes. | $110,000 |
| Dec 3, 2025 | Completed final sign-off Feb 2026 | 425 Market St | Ayoob & Peery Plumbing Co Inc | 18/f: add (47) relocate (177) fire sprinkler per t.i. job #25-678 ref pa#202508143050Details
18/f: add (47) relocate (177) fire sprinkler per t.i. job #25-678 ref pa#202508143050 | $139,126 |
| Nov 19, 2025 | Completed final sign-off Jan 2026 | 575 Market St | Richlen Construction | 39/f suite 3950: reduce size of an existing suite, creating 2 smaller suites. modification of (e) tenant improvements to include demolition of door and glazing system, minor ceiling, tile modification, construction of new full height demising partition, and new wall finishes to match existing.Details
39/f suite 3950: reduce size of an existing suite, creating 2 smaller suites. modification of (e) tenant improvements to include demolition of door and glazing system, minor ceiling, tile modification, construction of new full height demising partition, and new wall finishes to match existing. | $10,000 |
| Nov 12, 2025 | Completed final sign-off May 2026 | 1 Post St | Peacock Construction | #1200: installation of 2 (e) phone booths & 4 new phone booths & their associated anchoring. life safety & sprinklers submit separately. all work shall comply w/ federal, state, & local codes including sf building code, cal title 24, & federal ada reg.Details
#1200: installation of 2 (e) phone booths & 4 new phone booths & their associated anchoring. life safety & sprinklers submit separately. all work shall comply w/ federal, state, & local codes including sf building code, cal title 24, & federal ada reg. | $6,500 |
| Nov 7, 2025 | In progress issued Jan 2026 | 333 Pine St | Source Planning And Construction Inc | 1/f suite 100: tenant improvement. change of occupancy from b to m. interior modifications involve selective demolition and construction of new non-load bearing partitions, interior door and glazing system, installation of new light fixtures, new millwork and new finishes.Details
1/f suite 100: tenant improvement. change of occupancy from b to m. interior modifications involve selective demolition and construction of new non-load bearing partitions, interior door and glazing system, installation of new light fixtures, new millwork and new finishes. | $670,500 |
| Oct 21, 2025 | Completed final sign-off Jan 2026 | 150 Spear St | Peacock Construction | 18th fl - installation of 2 new phone booths and associated anchoring of 2 existing phone booths. life safety and sprinkler work are submitted separately. previously permitted and completed tiDetails
18th fl - installation of 2 new phone booths and associated anchoring of 2 existing phone booths. life safety and sprinkler work are submitted separately. previously permitted and completed ti | $6,000 |
| Oct 16, 2025 | Completed final sign-off Jun 2026 | 150 Spear St | Peacock Construction | non load bearing partitions, new ceiling, new lighting, and mechanical, electrical, and plumbing are deferred submittal. this project involves modification of existing t.i. to include selective demolition & construction of non-bearin partitions, lights, finishes, doors,&ceiling. ref pa #202504285343Details
non load bearing partitions, new ceiling, new lighting, and mechanical, electrical, and plumbing are deferred submittal. this project involves modification of existing t.i. to include selective demolition & construction of non-bearin partitions, lights, finishes, doors,&ceiling. ref pa #202504285343 | $5,500 |
| Oct 15, 2025 | Completed final sign-off Mar 2026 | 575 Market St | Richlen Construction | suite 2550: t.i.: demo and construction of new non-load bearing partitions, (n) doors, frames and hardware. modification of (e) ceiling and grid system. (n) relocazted light fixtures and switches. (n) power & data, (n) millwork & plumbing fixturesDetails
suite 2550: t.i.: demo and construction of new non-load bearing partitions, (n) doors, frames and hardware. modification of (e) ceiling and grid system. (n) relocazted light fixtures and switches. (n) power & data, (n) millwork & plumbing fixtures | $426,300 |
| Oct 3, 2025 | Completed final sign-off Mar 2026 | 1 Post St | Peacock Construction | suite 2550: demo and construction of copy room. millwork, demo of existing partitions, finish updates in break area, new wall finishes, new light fixtures and power. area of work is limited to these renovation.Details
suite 2550: demo and construction of copy room. millwork, demo of existing partitions, finish updates in break area, new wall finishes, new light fixtures and power. area of work is limited to these renovation. | $76,543 |
| Oct 3, 2025 | Completed final sign-off Nov 2025 | 685 Market St | Sc Builders, Inc | installation of non structural partition and security door at lower levelDetails
installation of non structural partition and security door at lower level | $19,500 |
| Oct 1, 2025 | Completed final sign-off Dec 2025 | 101 02nd St | Source Planning And Construction Inc | 15th/fl: demolition of non load bearing artitions , ceilings, light fixtures, millwork and finishes.Details
15th/fl: demolition of non load bearing artitions , ceilings, light fixtures, millwork and finishes. | $250,000 |
| Sep 11, 2025 | Completed final sign-off Apr 2026 | 350 California St | C C I Commercial Construction & Improv | 15th fl: construction of non-load bearing partitions, doors, glazing and frames, new ceiling tile & grid, new light fixtures, and new finishes.Details
15th fl: construction of non-load bearing partitions, doors, glazing and frames, new ceiling tile & grid, new light fixtures, and new finishes. | $1,500,000 |
| Aug 22, 2025 | In progress filed Aug 2025, not yet issued | 531 Bryant St | 2/fl- ti (n) partitions, suspended ceilings, lighting, power and break rooms. mep deferred submittal.Details
2/fl- ti (n) partitions, suspended ceilings, lighting, power and break rooms. mep deferred submittal. | $816,000 | |
| Aug 21, 2025 | Completed final sign-off Dec 2025 | 101 02nd St | Source Planning And Construction Inc | 3rd, 4th & 8th fl- modification of adding a new door to an (e) storage room at public elevator lobbyDetails
3rd, 4th & 8th fl- modification of adding a new door to an (e) storage room at public elevator lobby | $15,000 |
| Aug 8, 2025 | Completed final sign-off Sep 2026 | 180 Montgomery St | Bevilacqua & Sons | #2150: modification of an existing t.i. & common area to include selective demolition & construction of non-load bearing partition, existing modifications to cieling grid & tile , light fixture relocation & new including re-switching, new office dooors & frames, salvage & reuse of exist. mep deferDetails
#2150: modification of an existing t.i. & common area to include selective demolition & construction of non-load bearing partition, existing modifications to cieling grid & tile , light fixture relocation & new including re-switching, new office dooors & frames, salvage & reuse of exist. mep defer | $245,577 |
| Jul 22, 2025 | Completed final sign-off Nov 2025 | 345 California St | Peacock Construction | 28th/f: office t.i. demo & construction of non load bearing partitions, e) modifications to ceiling grid & tile, new light fixtures, new office doors & frames & mech & electrical. no plumbing fixture change.Details
28th/f: office t.i. demo & construction of non load bearing partitions, e) modifications to ceiling grid & tile, new light fixtures, new office doors & frames & mech & electrical. no plumbing fixture change. | $320,000 |
| Jul 16, 2025 | Completed final sign-off May 2026 | 1 Post St | Peacock Construction | demo and construction of 6 new rooms to include (n) partitions, (n) door, frames, hardware & sidelits; (n) power/data, (n) light fixtures/switches and (n) finishes; demo of partial break area millwork & reupholstering of (e) booths; areas of work is limited to these rooms. mep under separate permitDetails
demo and construction of 6 new rooms to include (n) partitions, (n) door, frames, hardware & sidelits; (n) power/data, (n) light fixtures/switches and (n) finishes; demo of partial break area millwork & reupholstering of (e) booths; areas of work is limited to these rooms. mep under separate permit | $76,543 |
| Jun 26, 2025 | Completed final sign-off Jan 2026 | 345 California St | Clune Construction Company L P | 17th fl- restroom upgrade-new partitions, millwork, finishes, add 2 floor drains, upgrade lighting fixtures. plumbing, electrical & fire life safety are deferred submittalsDetails
17th fl- restroom upgrade-new partitions, millwork, finishes, add 2 floor drains, upgrade lighting fixtures. plumbing, electrical & fire life safety are deferred submittals | $210,000 |
| Jun 24, 2025 | Completed final sign-off Oct 2025 | 350 California St | Field Construction Inc. | 14th floor, suite 1400. demolition of non-bearing partiions. new light fixtures, new millwork and finishes at break area and new office glazing and frame. mep/life safety deferred.Details
14th floor, suite 1400. demolition of non-bearing partiions. new light fixtures, new millwork and finishes at break area and new office glazing and frame. mep/life safety deferred. | $60,000 |
| Jun 24, 2025 | Completed final sign-off May 2026 | 114 Sansome St | Hitt Contracting Inc. | suite 1400; installation of 2 phone booths.Details
suite 1400; installation of 2 phone booths. | $2,560 |
| Jun 3, 2025 | In progress filed Jun 2025, not yet issued | 531 Bryant St | 3/fl front of floor ti includes construction of non load bearing partitions, celing and tile, light fixtues, including switching new office doors and frames, breakroom sink , millwork and new finishes, phase 2 will be on separte permit. mep deferred.Details
3/fl front of floor ti includes construction of non load bearing partitions, celing and tile, light fixtues, including switching new office doors and frames, breakroom sink , millwork and new finishes, phase 2 will be on separte permit. mep deferred. | $850,000 | |
| May 23, 2025 | Completed final sign-off Oct 2025 | 180 Montgomery St | Bevilacqua & Sons | revision to 202504023549 for construction of new gyp board soffit at the break areaDetails
revision to 202504023549 for construction of new gyp board soffit at the break area | $3,500 |
| May 22, 2025 | Completed final sign-off Sep 2025 | 1 Post St | Clune Construction Company L P | (ste 105- basement level) this project involves minor renovations inlcuding combining 2 existing suites. light demolition and new light fixtures, and new finishes in suite 105. deferred electrical.Details
(ste 105- basement level) this project involves minor renovations inlcuding combining 2 existing suites. light demolition and new light fixtures, and new finishes in suite 105. deferred electrical. | $150,000 |
| May 15, 2025 | Completed final sign-off Aug 2025 | 101 02nd St | C C I Commercial Construction & Improv | 16th fl suite 1625: selective demolition of non load bearing partitions. new office glazing, frames and new finishesDetails
16th fl suite 1625: selective demolition of non load bearing partitions. new office glazing, frames and new finishes | $19,369 |
| May 13, 2025 | Completed final sign-off Oct 2025 | 350 California St | Field Construction Inc. | 14th fl suite 1450 & 1460: ti project involves modification of (e) suites to include selective demolition & construction of non load bearing partitions, new and relocated light fixtures, new doors & frames and glazing system and new finishesDetails
14th fl suite 1450 & 1460: ti project involves modification of (e) suites to include selective demolition & construction of non load bearing partitions, new and relocated light fixtures, new doors & frames and glazing system and new finishes | $478,000 |
| May 13, 2025 | Completed final sign-off Aug 2025 | 1 Post St | Peacock Construction, Clune Construction Company L P | 30th fl suite 3000: renovation including demolition and construction of new partitions. new door frames, ceiling grid, relocated light fixtures and power/data. mechanical, electrical under separate permitDetails
30th fl suite 3000: renovation including demolition and construction of new partitions. new door frames, ceiling grid, relocated light fixtures and power/data. mechanical, electrical under separate permit | $180,000 |
| Apr 28, 2025 | In progress issued Apr 2025 | 101 California St | Source Planning And Construction Inc | 28th fl suite 2800: construction of non-load bearing partitions new under grid glazing partition, new power and signal, minor paint and base upgrades.Details
28th fl suite 2800: construction of non-load bearing partitions new under grid glazing partition, new power and signal, minor paint and base upgrades. | $50,000 |
| Apr 28, 2025 | Completed final sign-off Nov 2025 | 101 02nd St | Source Planning And Construction Inc | 8th fl suite 825 & 850: revision to pa 2025-0210-0012 scope includes change location of the proposed drinking fountainsDetails
8th fl suite 825 & 850: revision to pa 2025-0210-0012 scope includes change location of the proposed drinking fountains | |
| Apr 28, 2025 | Completed final sign-off Jun 2026 | 150 Spear St | Peacock Construction | 18/f (ste 1800): ti - selective demo, new non load bearing partitions, lighting/switching finishes, door and frames. mech/electrical under seperate permit.Details
18/f (ste 1800): ti - selective demo, new non load bearing partitions, lighting/switching finishes, door and frames. mech/electrical under seperate permit. | $260,000 |
| Apr 23, 2025 | In progress issued Jul 2025 | 114 Sansome St | 4th fl suite 400: permitting 5 new phone booths and anchoring detailsDetails
4th fl suite 400: permitting 5 new phone booths and anchoring details | $6,400 | |
| Apr 7, 2025 | Completed final sign-off Apr 2026 | 685 Market St | Sc Builders, Inc | 9th fl- structural attachments for phone booths. ref pa 2025-0113-8214Details
9th fl- structural attachments for phone booths. ref pa 2025-0113-8214 | $5,000 |
| Apr 7, 2025 | Completed final sign-off Apr 2026 | 685 Market St | Sc Builders, Inc | 8th fl- structural attachments for phone booths. ref p.a. 2025-0113-8213Details
8th fl- structural attachments for phone booths. ref p.a. 2025-0113-8213 | $5,000 |
| Apr 7, 2025 | Completed final sign-off Apr 2026 | 685 Market St | Sc Builders, Inc | 10th fl- structural attachments for phone boothsDetails
10th fl- structural attachments for phone booths | $5,000 |
| Apr 2, 2025 | Completed final sign-off May 2025 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | suite 700 & 800: anchoring existing furniture phone boothsDetails
suite 700 & 800: anchoring existing furniture phone booths | $34,560 |
| Apr 2, 2025 | Completed final sign-off Oct 2025 | 180 Montgomery St | Bevilacqua & Sons | suite 2300: selective demolition and construction of non load bearing partitions, modifications to ceiling grid to tile, light fixtures, new office doors, frames and new finishes (mep deferred)Details
suite 2300: selective demolition and construction of non load bearing partitions, modifications to ceiling grid to tile, light fixtures, new office doors, frames and new finishes (mep deferred) | $600,000 |
| Apr 1, 2025 | Completed final sign-off Nov 2025 | 188 The Embarcadero | Novo Construction Inc | convert one gender neutral restroom and one mothers room into new accessible shower room. mep included.Details
convert one gender neutral restroom and one mothers room into new accessible shower room. mep included. | $300,000 |
| Mar 25, 2025 | Completed final sign-off Nov 2025 | 101 02nd St | Source Planning And Construction Inc | 4/f: modification of an existing elevator lobby and restrooms, including demolition and new soffit ceiling, new light fixtures, new flooring and finished. mep deferred.Details
4/f: modification of an existing elevator lobby and restrooms, including demolition and new soffit ceiling, new light fixtures, new flooring and finished. mep deferred. | $224,550 |
| Feb 27, 2025 | Completed final sign-off Oct 2025 | 1 Post St | Peacock Construction | 11/f suite 1100: light demolition and construction of 3 new rooms to include new partitions, new door frame, hardware and side light. new power/data, new light fixtures/switches and finishes. area of work limitedto these new rooms. mep deferred.Details
11/f suite 1100: light demolition and construction of 3 new rooms to include new partitions, new door frame, hardware and side light. new power/data, new light fixtures/switches and finishes. area of work limitedto these new rooms. mep deferred. | $76,543 |
| Feb 26, 2025 | Completed final sign-off Nov 2025 | 345 California St | Source Planning And Construction Inc | 24th floor/suite 2400: (e) t.i.: demo and construction of non-loading bearing partitions; (n) partitions (n) ceiling title and grid system; open ceiling condition, led light fixtures and switches, power and signal; (n) doors/frames/hardware, millwork and finishes. include mep. all other requiredDetails
24th floor/suite 2400: (e) t.i.: demo and construction of non-loading bearing partitions; (n) partitions (n) ceiling title and grid system; open ceiling condition, led light fixtures and switches, power and signal; (n) doors/frames/hardware, millwork and finishes. include mep. all other required | $891,675 |
| Feb 14, 2025 | Completed final sign-off Jul 2025 | 1 Post St | Peacock Construction | suite 400; minor renovation to existing tenant improvement, new non load bearing partitions, relocated light. fixtures, relocated sink,. mep under separate permit.Details
suite 400; minor renovation to existing tenant improvement, new non load bearing partitions, relocated light. fixtures, relocated sink,. mep under separate permit. | $319,000 |
| Feb 13, 2025 | Completed final sign-off Jul 2026 | 1188 Franklin St | Novo Construction Inc | suite 201- revised scope of work to permit#2024-1118-5224 1) include rated ceiling at entry vestibule 2) confirmation of compliant accessible elevator call button.Details
suite 201- revised scope of work to permit#2024-1118-5224 1) include rated ceiling at entry vestibule 2) confirmation of compliant accessible elevator call button. | |
| Feb 10, 2025 | Completed final sign-off Nov 2025 | 101 02nd St | Source Planning And Construction Inc | 8/fl- suite 825 and 850- involves modification of (e) ti to include selective construction and demo of non load bearing partitions. modification to (e) ceiling grid and tile, light fixtures, relocation and (n) inlcuding re switching, (n) office doors, and grames, salvage and reuse of (e) selectedDetails
8/fl- suite 825 and 850- involves modification of (e) ti to include selective construction and demo of non load bearing partitions. modification to (e) ceiling grid and tile, light fixtures, relocation and (n) inlcuding re switching, (n) office doors, and grames, salvage and reuse of (e) selected | $225,000 |
| Feb 7, 2025 | In progress issued Feb 2025 | 600 Montgomery St | Skyline Construction | 5th floor: selective demolition of abandoned mechanical unit, duct work associated infracture and concrete pad.Details
5th floor: selective demolition of abandoned mechanical unit, duct work associated infracture and concrete pad. | $20,000 |
| Jan 13, 2025 | Completed final sign-off Apr 2026 | 685 Market St | Sc Builders, Inc | 8th floor: ref demo pa# 202412237315. t.i. const. of non-load bearing partitions. new doors glazing. & hardwhere, new ceilings and lights fixtures. new power data receptacles, new millwork & finishes. modification of existing restrooms. additional of an accessible gender neutral restroom.Details
8th floor: ref demo pa# 202412237315. t.i. const. of non-load bearing partitions. new doors glazing. & hardwhere, new ceilings and lights fixtures. new power data receptacles, new millwork & finishes. modification of existing restrooms. additional of an accessible gender neutral restroom. | $2,288,400 |
| Jan 13, 2025 | Completed final sign-off Apr 2026 | 685 Market St | Sc Builders, Inc | 10th floor: ref demo pa# 202412237315. t.i. const. of non-load bearing partitions. new doors glazing. & hardwhere, new ceilings and lights fixtures. new power data receptacles, new millwork & finishes. modification of existing restrooms. additional of an accessible gender neutral restroom.Details
10th floor: ref demo pa# 202412237315. t.i. const. of non-load bearing partitions. new doors glazing. & hardwhere, new ceilings and lights fixtures. new power data receptacles, new millwork & finishes. modification of existing restrooms. additional of an accessible gender neutral restroom. | $2,288,400 |
| Jan 13, 2025 | Completed final sign-off Apr 2026 | 685 Market St | Sc Builders, Inc | 9th floor: ref demo pa# 202412237315. t.i. const. of non-load bearing partitions. new doors glazing. & hardwhere, new ceilings and lights fixtures. new power data receptacles, new millwork & finishes. modification of existing restrooms. additional of an accessible gender neutral restroom.Details
9th floor: ref demo pa# 202412237315. t.i. const. of non-load bearing partitions. new doors glazing. & hardwhere, new ceilings and lights fixtures. new power data receptacles, new millwork & finishes. modification of existing restrooms. additional of an accessible gender neutral restroom. | $2,288,400 |
| Dec 23, 2024 | Completed final sign-off Apr 2026 | 685 Market St | Sc Builders, Inc | 8-10/fl- soft demo plan for (e) mep infrastructure, ceilings, floor and walls only. ti will be on separte permit.Details
8-10/fl- soft demo plan for (e) mep infrastructure, ceilings, floor and walls only. ti will be on separte permit. | $274,608 |
| Dec 18, 2024 | Completed final sign-off Dec 2024 | 114 Sansome St | Rossi Builders Inc. | ste 1000 & 1100 work include permitting existing phone booths with anchorageDetails
ste 1000 & 1100 work include permitting existing phone booths with anchorage | $8,500 |
| Dec 12, 2024 | Completed final sign-off Mar 2025 | 101 02nd St | Source Planning And Construction Inc | 3rd/f revision to 202410314097: modification of drinking fountain locationDetails
3rd/f revision to 202410314097: modification of drinking fountain location | |
| Dec 11, 2024 | Completed final sign-off Apr 2025 | 350 California St | Field Construction Inc. | 19th fl- ti involves modification of (e) tenant suite to include selective demo & construction of non load bearing partitions, new & relocated light fixtures, new doors/frames & glazing system. new & relocated millwork & new finishes. mep submittal deferred.(e) ste 1900 to be divided into 2 offices.Details
19th fl- ti involves modification of (e) tenant suite to include selective demo & construction of non load bearing partitions, new & relocated light fixtures, new doors/frames & glazing system. new & relocated millwork & new finishes. mep submittal deferred.(e) ste 1900 to be divided into 2 offices. | $620,000 |
| Nov 22, 2024 | Completed final sign-off Jul 2025 | 150 Spear St | Peacock Construction | 16th floor: phone booths with structural support.four (4)new phone booths. life safety &sprinkler work submitted separately. prefabricated phone boothsDetails
16th floor: phone booths with structural support.four (4)new phone booths. life safety &sprinkler work submitted separately. prefabricated phone booths | $98,576 |
| Nov 18, 2024 | Completed final sign-off Jul 2026 | 1188 Franklin St | Novo Construction Inc | suite 201; expansion of existing suite including new non-bearing portiions, lighting, suspended ceiling electrical and finishes. mech and electrical work under separate permit.Details
suite 201; expansion of existing suite including new non-bearing portiions, lighting, suspended ceiling electrical and finishes. mech and electrical work under separate permit. | $320,000 |
| Nov 7, 2024 | Completed final sign-off Mar 2025 | 475 Sansome St | Principal Builders Inc. | 16/f: removal of (e) tenant stairs and slab infill. salvage of (e) selected materials if possible.Details
16/f: removal of (e) tenant stairs and slab infill. salvage of (e) selected materials if possible. | $50,000 |
| Oct 31, 2024 | Completed final sign-off Mar 2025 | 101 02nd St | Source Planning And Construction Inc | 3rd fl ti: construction of non load bearing partitions. modification of (e) ceiling grid & tile, new light fixtures & relocation. new office doors & frames, millwork, finishes & sinks. life safety sep permits. mep deferred. ref demo permit 202410152909Details
3rd fl ti: construction of non load bearing partitions. modification of (e) ceiling grid & tile, new light fixtures & relocation. new office doors & frames, millwork, finishes & sinks. life safety sep permits. mep deferred. ref demo permit 202410152909 | $750,000 |
| Oct 7, 2024 | Completed final sign-off Jan 2025 | 350 California St | Field Construction Inc. | revision to 202408229227: removal of 1 exit door of the e) suiteDetails
revision to 202408229227: removal of 1 exit door of the e) suite | |
| Oct 3, 2024 | Completed final sign-off Jun 2025 | 1 Post St | M C S Construction Services | 21st/f: minor renavation of e) tenant ste 2100 included new rooms, suspended ceiling, lighting, & mech. mep under separate permitDetails
21st/f: minor renavation of e) tenant ste 2100 included new rooms, suspended ceiling, lighting, & mech. mep under separate permit | $387,000 |
| Sep 17, 2024 | Completed final sign-off Jan 2025 | 475 Sansome St | Principal Builders Inc. | 11/fl- demo (e) gyp board celing, fixtures, finishe in lobby elevator. restroom upgrades. removal of (e) stair and slab infill.Details
11/fl- demo (e) gyp board celing, fixtures, finishe in lobby elevator. restroom upgrades. removal of (e) stair and slab infill. | $221,074 |
| Sep 5, 2024 | Completed final sign-off Dec 2024 | 114 Sansome St | Peacock Construction | suite 500: installing 9 (e) furniture phone booths and anchoring on the 5th floor.Details
suite 500: installing 9 (e) furniture phone booths and anchoring on the 5th floor. | $11,520 |
| Sep 5, 2024 | Expired or cancelled expired Jul 2026 | 1188 Franklin St | Novo Construction Inc | 2nd fl - expansion of existing office including new suite entry, non bearing partitions, new doors & exit signsDetails
2nd fl - expansion of existing office including new suite entry, non bearing partitions, new doors & exit signs | $98,000 |
| Jul 22, 2024 | Expired or cancelled expired May 2026 | 114 Sansome St | Hitt Contracting Inc. | 14th fl: permitting two (e) furniture phone rooms & anchoring details on the 14th floor.Details
14th fl: permitting two (e) furniture phone rooms & anchoring details on the 14th floor. | $2,560 |
| Jun 12, 2024 | In progress filed Jun 2024, not yet issued | 150 Post St | at gr floor: modification of existing tenant space to health spa. to include selective demo, construction of non load bearing partitions. new office door, frames, millwork, new sinks, finishes. mep deferredDetails
at gr floor: modification of existing tenant space to health spa. to include selective demo, construction of non load bearing partitions. new office door, frames, millwork, new sinks, finishes. mep deferred | $210,000 | |
| Jun 12, 2024 | Completed final sign-off Aug 2024 | 150 Post St | to comply with complaint: 202424527. 7th floor ste 740. replace ceiling tile, new countertops. replace led lighting in kind.Details
to comply with complaint: 202424527. 7th floor ste 740. replace ceiling tile, new countertops. replace led lighting in kind. | $25,000 | |
| Jun 10, 2024 | Completed final sign-off Dec 2024 | 55 Green St | elevator vestiblles for floor 2, 3, and 4. small drop soffits, new doors, relocate exist signs.Details
elevator vestiblles for floor 2, 3, and 4. small drop soffits, new doors, relocate exist signs. | $43,500 | |
| Jun 5, 2024 | Completed final sign-off Jul 2025 | 101 California St | Clune Construction Company L P | 21st fl full floor ti mep upgrades includedDetails
21st fl full floor ti mep upgrades included | $8,789,816 |
| May 29, 2024 | Completed final sign-off Nov 2024 | 345 California St | Richlen Construction | 11th floor: demo and construction of toilet partitions, new plumbing, and new finishes salvage and reuse of existing selected materials. core restrooms 11th floorDetails
11th floor: demo and construction of toilet partitions, new plumbing, and new finishes salvage and reuse of existing selected materials. core restrooms 11th floor | $300,000 |
| May 23, 2024 | Completed final sign-off Sep 2024 | 1 Post St | Peacock Construction | minor remodel to existing tenant improvement, new partitions, doors/frames, lighting and elec. mech/elec deferred. all 16/f: work on the 16th floor.Details
minor remodel to existing tenant improvement, new partitions, doors/frames, lighting and elec. mech/elec deferred. all 16/f: work on the 16th floor. | $49,000 |
| May 15, 2024 | Completed final sign-off Sep 2024 | 685 Market St | C C I Commercial Construction & Improv | to document furniture clearance for previously completed teant improvement permit 2022-0405-1561Details
to document furniture clearance for previously completed teant improvement permit 2022-0405-1561 | |
| May 2, 2024 | Completed final sign-off Jun 2024 | 101 California St | Clune Construction Company L P | 21/f- soft demo to remove partitions, fixtures and finishesDetails
21/f- soft demo to remove partitions, fixtures and finishes | $125,000 |
| Apr 25, 2024 | Completed final sign-off Sep 2024 | 1 Post St | Peacock Construction | 27/f suite 2700: revision to permit 202312223036, deletion of card reader in elevator lobby and revised door swing.Details
27/f suite 2700: revision to permit 202312223036, deletion of card reader in elevator lobby and revised door swing. | |
| Apr 16, 2024 | In progress issued Apr 2024 | 578 Jackson St | addition of new roll-up security door at one of the entrances. all inteior ti scope of work is performed under permit. rev to 202301190407Details
addition of new roll-up security door at one of the entrances. all inteior ti scope of work is performed under permit. rev to 202301190407 | $12,000 | |
| Apr 11, 2024 | Completed final sign-off Sep 2024 | 180 Montgomery St | Bevilacqua & Sons | 19/f suite 1950: modification of existing tenant with selective demolition and construction of non-load bearing partitions. relocate office doors and frames, relocation of light fixture, and new finishes. mep deferred.Details
19/f suite 1950: modification of existing tenant with selective demolition and construction of non-load bearing partitions. relocate office doors and frames, relocation of light fixture, and new finishes. mep deferred. | $100,238 |
| Apr 11, 2024 | Completed final sign-off Jun 2024 | 350 California St | C C I Commercial Construction & Improv | 19th fl: selective demolition and construction of non loading bearing partitions. new and relocated light fixtures, new doors, frames and glazing system. new light fixtures mep defferedDetails
19th fl: selective demolition and construction of non loading bearing partitions. new and relocated light fixtures, new doors, frames and glazing system. new light fixtures mep deffered | $300,168 |
| Apr 11, 2024 | Completed final sign-off Jun 2024 | 350 California St | Field Construction Inc. | 16/f: rev 202401113782 - application for infeasibility request to the existing ada stall in women's restroom.Details
16/f: rev 202401113782 - application for infeasibility request to the existing ada stall in women's restroom. | |
| Apr 4, 2024 | Completed final sign-off Dec 2024 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | 17th/f, ste 1700: demo & construct non load bearing partitions, new ceiling grids & tile. mew light fixtures, office doors & frames, millworks & sinks. new finishes. mep deferredDetails
17th/f, ste 1700: demo & construct non load bearing partitions, new ceiling grids & tile. mew light fixtures, office doors & frames, millworks & sinks. new finishes. mep deferred | $1,085,600 |
| Mar 15, 2024 | Completed final sign-off Sep 2024 | 345 California St | Gci, Inc | 28th fl, ste 2875 project involves modification of (e) ti to include selective demo & construction of non-load bearing partitions, existing modifications to ceiling grid & tile, new light fixtures, new office doors, frmaes, salvage & reuse of (e) selectied materials if practiceable, millwork and newDetails
28th fl, ste 2875 project involves modification of (e) ti to include selective demo & construction of non-load bearing partitions, existing modifications to ceiling grid & tile, new light fixtures, new office doors, frmaes, salvage & reuse of (e) selectied materials if practiceable, millwork and new | $593,000 |
| Mar 7, 2024 | Completed final sign-off May 2024 | 350 California St | Field Construction Inc. | revision to pa 202401194261 application of infeasibility to ada compliance of accessible toilet stall in wonmen's restroom. added card reader @ suite entry doorsDetails
revision to pa 202401194261 application of infeasibility to ada compliance of accessible toilet stall in wonmen's restroom. added card reader @ suite entry doors | |
| Mar 7, 2024 | Completed final sign-off Nov 2024 | 101 02nd St | Source Planning And Construction Inc | 5th fl tenant improvement. mep defferredDetails
5th fl tenant improvement. mep defferred | $758,000 |