Hitt Contracting Inc.
- Based in
- San Jose
- On San Francisco permits
- Feb 2004 to May 2026
- Last 24 months
- 3 permits filed
42 permits since 2000: 33 completed, 3 in progress, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 3 are 3 to 5 years old, 2 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 19, 2026 | Completed final sign-off May 2026 | 114 Sansome St | to obtain final inspection for work approved under pa#202407227025. all work is complete.Details
to obtain final inspection for work approved under pa#202407227025. all work is complete. | |
| Jun 24, 2025 | Completed final sign-off May 2026 | 114 Sansome St | suite 1400; installation of 2 phone booths.Details
suite 1400; installation of 2 phone booths. | $2,560 |
| Jan 17, 2025 | Completed final sign-off Jul 2026 | 1700 Pine St | revision to 202311080474. adjust entry vestibule grading.Details
revision to 202311080474. adjust entry vestibule grading. | $6,000 |
| Aug 7, 2024 | In progress issued Aug 2024 | 445 Bush St | two new phone booths. life safety system are design build under separate permit. convert exist 2 office to ada access. phone booth ref 2023-0703-1379 r1Details
two new phone booths. life safety system are design build under separate permit. convert exist 2 office to ada access. phone booth ref 2023-0703-1379 r1 | $2,500 |
| Jul 22, 2024 | Expired or cancelled expired May 2026 | 114 Sansome St | 14th fl: permitting two (e) furniture phone rooms & anchoring details on the 14th floor.Details
14th fl: permitting two (e) furniture phone rooms & anchoring details on the 14th floor. | $2,560 |
| Apr 24, 2024 | In progress issued Jun 2024 | 633 Beach St | deferred mep drawings for pa# 2024-0311-7515 ti construction of existing spaceDetails
deferred mep drawings for pa# 2024-0311-7515 ti construction of existing space | $125,000 |
| Apr 15, 2024 | Completed final sign-off Aug 2024 | 1700 Pine St | fire sprinkler only deferred submittal for fire sprinkler assocaited with pa 202311080474 & 202401184195. underground was on a separate pa 202309207002.Details
fire sprinkler only deferred submittal for fire sprinkler assocaited with pa 202311080474 & 202401184195. underground was on a separate pa 202309207002. | $72,000 |
| Apr 10, 2024 | Completed final sign-off Jun 2024 | 1 California St | deferred submittal for pa# 2023-0824-5103 for electrical only. reference ew202404027733Details
deferred submittal for pa# 2023-0824-5103 for electrical only. reference ew202404027733 | $20,000 |
| Mar 11, 2024 | Completed final sign-off Feb 2025 | 633 Beach St | interior t.i. construction of new load bearning walls, ceiling, millwork, lighting and furnitureDetails
interior t.i. construction of new load bearning walls, ceiling, millwork, lighting and furniture | $1,125,000 |
| Feb 29, 2024 | Completed final sign-off May 2024 | 1 Market St | 35/f: interior demo to existinng office space. demo space to include demo of non load bearing partitions, ceiings, millwork and finishes, fire and life safety to remain operational during course of construction. modification to mech and plumbing systems shall allow existing base bldg infrasturre toDetails
35/f: interior demo to existinng office space. demo space to include demo of non load bearing partitions, ceiings, millwork and finishes, fire and life safety to remain operational during course of construction. modification to mech and plumbing systems shall allow existing base bldg infrasturre to | $50,000 |
| Feb 21, 2024 | In progress issued Oct 2024 | 350 Mission St | 25th fl ti. enlargement of existing flex office room to provide a conference room. construction of a reception desk. conversion of an existing storage room into a meeting room. convert existing locker area into an enclosed meeting room which will include branch mep.Details
25th fl ti. enlargement of existing flex office room to provide a conference room. construction of a reception desk. conversion of an existing storage room into a meeting room. convert existing locker area into an enclosed meeting room which will include branch mep. | $335,000 |
| Jan 18, 2024 | Completed final sign-off Jul 2026 | 1700 Pine St | deferred electrical work under 202311080474Details
deferred electrical work under 202311080474 | $40,000 |
| Nov 8, 2023 | Completed final sign-off Jul 2026 | 1700 Pine St | renovating (e) building to support 36 ev charging parking stalls and provide pedestrain accessDetails
renovating (e) building to support 36 ev charging parking stalls and provide pedestrain access | $100,000 |
| Oct 5, 2023 | Completed final sign-off Feb 2024 | 445 Bush St | 5th flr. deferred mep for 202307031379Details
5th flr. deferred mep for 202307031379 | $100,000 |
| Sep 20, 2023 | Completed final sign-off Aug 2024 | 1700 Pine St | new sprinkler system to (e) garage under separate permit. new 8" sprinkler underground from poc @ city main to new bfp per planDetails
new sprinkler system to (e) garage under separate permit. new 8" sprinkler underground from poc @ city main to new bfp per plan | $30,000 |
| Sep 15, 2023 | Completed final sign-off Jul 2026 | 1700 Pine St | barrier removal, upgrade (e) stair from basement to level 1 and 2 to meet accessibility requirements per 11b-504Details
barrier removal, upgrade (e) stair from basement to level 1 and 2 to meet accessibility requirements per 11b-504 | $125,000 |
| Sep 5, 2023 | Completed final sign-off Oct 2023 | 88 Kearny St | revision to application #202210245023: d.a. checklist update.Details
revision to application #202210245023: d.a. checklist update. | |
| Aug 24, 2023 | Completed final sign-off Jun 2024 | 1 California St | 8/f: interior demo of partitions, ceilings, light fixtures, millwork and finishes, new finishes in existing elevator lobby.cDetails
8/f: interior demo of partitions, ceilings, light fixtures, millwork and finishes, new finishes in existing elevator lobby.c | $127,035 |
| Aug 1, 2023 | Never finaled filed Aug 2023, never issued | 360 Spear St | revision to 202307263013 to obtain sffd stamp for assemble occupant load info for cafe, prep kitchen, a-3 spaces. administractive permit only. no change to scope of work approved under 202201246538Details
revision to 202307263013 to obtain sffd stamp for assemble occupant load info for cafe, prep kitchen, a-3 spaces. administractive permit only. no change to scope of work approved under 202201246538 | |
| Jul 26, 2023 | Completed final sign-off Sep 2023 | 360 Spear St | 3/f: document assembly occupancy load shown on 202201246538 only. no other changes to previosly approved scope.Details
3/f: document assembly occupancy load shown on 202201246538 only. no other changes to previosly approved scope. | |
| Jul 3, 2023 | Completed final sign-off Feb 2024 | 445 Bush St | 5/f: interior commercial ti of existing tenant space, includes non-structural demolition of existing ti and build-out of new including non-structural partitions, doors, and sidelites, suspended ceilings, casework and finishes. mep & life safety systems are design-build under separate permit.Details
5/f: interior commercial ti of existing tenant space, includes non-structural demolition of existing ti and build-out of new including non-structural partitions, doors, and sidelites, suspended ceilings, casework and finishes. mep & life safety systems are design-build under separate permit. | $330,330 |
| Apr 21, 2023 | Completed final sign-off Dec 2023 | 360 Spear St | 5/f: electrical work, replacement of uninterrupted power source (ups) and addition of electrical panels/transformers on lvl 5.Details
5/f: electrical work, replacement of uninterrupted power source (ups) and addition of electrical panels/transformers on lvl 5. | $180,000 |
| Dec 14, 2022 | Never finaled issued Feb 2023, no final | 88 Kearny St | 19/f: t.i. limited to the demotion of an (e) hold open doorway at lobby. replace in-kind with a fire rated glass door. no change of square feet or building height. interior onlyDetails
19/f: t.i. limited to the demotion of an (e) hold open doorway at lobby. replace in-kind with a fire rated glass door. no change of square feet or building height. interior only | $10,759 |
| Oct 24, 2022 | Completed final sign-off Oct 2023 | 88 Kearny St | 19th fl: tenant improvement of an existin building. limited to the installation and anchoring of (6) new prefabricated pramery phone booths.Details
19th fl: tenant improvement of an existin building. limited to the installation and anchoring of (6) new prefabricated pramery phone booths. | $15,000 |
| Sep 22, 2022 | Completed final sign-off May 2023 | 4 Embarcadero Center | 37/f partial interior t.i. new partitions, privacy door, mep, relocating portion of (e) millwork. life safety deferred.Details
37/f partial interior t.i. new partitions, privacy door, mep, relocating portion of (e) millwork. life safety deferred. | $100,000 |
| Sep 13, 2022 | Completed final sign-off Sep 2023 | 360 Spear St | revise electrical for t.i. under pa# 202208100286. ref pa3 202206096006 & 202201246538 to install 2 800a enclosed breakers for supporting equipment on the 5th fl and install associated feeders frd from switchboards on the 1st fl.Details
revise electrical for t.i. under pa# 202208100286. ref pa3 202206096006 & 202201246538 to install 2 800a enclosed breakers for supporting equipment on the 5th fl and install associated feeders frd from switchboards on the 1st fl. | |
| Aug 10, 2022 | Completed final sign-off Aug 2023 | 360 Spear St | 3/f: revise island layout @ catering kitchen. ref bpa#202201246538Details
3/f: revise island layout @ catering kitchen. ref bpa#202201246538 | |
| Jun 9, 2022 | Completed final sign-off Aug 2023 | 360 Spear St | revision to pa# 202201246538. relocate all gender restroom, 2 water heaters and adjust kitchen layout. update structural detail for operable partitions, remove electical from previously proposed ups area scope; now space change to storage room.Details
revision to pa# 202201246538. relocate all gender restroom, 2 water heaters and adjust kitchen layout. update structural detail for operable partitions, remove electical from previously proposed ups area scope; now space change to storage room. | |
| Jun 7, 2022 | Completed final sign-off Jun 2023 | 120 Kearny St | interior ti: (n) non-structural partitions, light fixtures, finishes, millwork, plumbing fixtures. remodel elevator lobby & common corridor. upgrades to restrooms accessability. mep & structural included. fire, life safety & sprinkler under separate permits.Details
interior ti: (n) non-structural partitions, light fixtures, finishes, millwork, plumbing fixtures. remodel elevator lobby & common corridor. upgrades to restrooms accessability. mep & structural included. fire, life safety & sprinkler under separate permits. | $5,068,061 |
| May 27, 2022 | Never finaled issued Jun 2022, no final | 436 Bryant St | construction of new idf room in existing space. adjustment of branch mechanical and new fan to serve the new room. new branch electrical for a single rack. no change in occupancy, use, or area.Details
construction of new idf room in existing space. adjustment of branch mechanical and new fan to serve the new room. new branch electrical for a single rack. no change in occupancy, use, or area. | $7,866 |
| Jan 24, 2022 | Completed final sign-off Sep 2023 | 360 Spear St | 3rd fl: single floor tenant improvement. existing structure, egress staor enclosures to remain. non structural partitions, ceiling, wall and floor finishes only. related mechanical, electrical, plumbing workm change of use from office/internet service exchange to office /laboratory/wholesale sales.Details
3rd fl: single floor tenant improvement. existing structure, egress staor enclosures to remain. non structural partitions, ceiling, wall and floor finishes only. related mechanical, electrical, plumbing workm change of use from office/internet service exchange to office /laboratory/wholesale sales. | $5,000,000 |
| Dec 3, 2021 | Completed final sign-off Jun 2022 | 33 Falmouth St | new private office including non load bearing partitions, branch mech & lighting, accessibility upgrae to an (e) restroom and new finishes.Details
new private office including non load bearing partitions, branch mech & lighting, accessibility upgrae to an (e) restroom and new finishes. | $350,000 |
| May 17, 2021 | Completed final sign-off Apr 2022 | 33 New Montgomery St | floors 15 & 17 t.i.: minor demo, new wall, door, finishes, millwork, lighting, unconcentrated furniture with mnor electric work.Details
floors 15 & 17 t.i.: minor demo, new wall, door, finishes, millwork, lighting, unconcentrated furniture with mnor electric work. | $640,000 |
| Sep 19, 2020 | Never finaled issued Feb 2021, no final | 200 Paul Av | 4/f suite f402 & f403: mech & electrical design for additional cooling requested to backup the (e) system on 4/f.Details
4/f suite f402 & f403: mech & electrical design for additional cooling requested to backup the (e) system on 4/f. | $3,000,000 |
| Sep 25, 2019 | Completed final sign-off Feb 2020 | 560 Mission St | ste #2100: 21/f: replace glass, carpet, and millwork architectural finishes. limited demolition of extg door and wall between office suites. n/a for maherDetails
ste #2100: 21/f: replace glass, carpet, and millwork architectural finishes. limited demolition of extg door and wall between office suites. n/a for maher | $94,500 |
| Jun 14, 2018 | Never finaled issued Oct 2018, no final | 532 Market St | interior tenant improvements including demo, building non-structural partitions & (n) elevator shaftDetails
interior tenant improvements including demo, building non-structural partitions & (n) elevator shaft | $250,000 |
| Feb 21, 2018 | Completed final sign-off Jul 2018 | 600 Harrison St | modify e ti. revision to pa# 2017-1109-3620 & 2017-1122-4679. add storage rm to server rm. rev to 201711093620 & 201711224679Details
modify e ti. revision to pa# 2017-1109-3620 & 2017-1122-4679. add storage rm to server rm. rev to 201711093620 & 201711224679 | $7,500 |
| Nov 22, 2017 | Completed final sign-off Feb 2018 | 600 Harrison St | rev to 201711093620: modify (e) ti to include demising a full floor tenant, 2 suites, scope of work include selective demo & const of non load bearing partitions, modify (e) ceiling grid & tiles new light fixtures, include re-switching new office codes and frames, salvage & reuse of (e).n/a maherDetails
rev to 201711093620: modify (e) ti to include demising a full floor tenant, 2 suites, scope of work include selective demo & const of non load bearing partitions, modify (e) ceiling grid & tiles new light fixtures, include re-switching new office codes and frames, salvage & reuse of (e).n/a maher | |
| Nov 9, 2017 | Completed final sign-off Feb 2018 | 600 Harrison St | #600-t.i. to include demising full floor tenant into 2 suites, selective demo & construct non load bearing partitions, modify (e) ceiling grid, tile, new light fixtures, new office doors & frames, salvage & reuse of (e) selected materials, new millwork, sink & new finishes. na maherDetails
#600-t.i. to include demising full floor tenant into 2 suites, selective demo & construct non load bearing partitions, modify (e) ceiling grid, tile, new light fixtures, new office doors & frames, salvage & reuse of (e) selected materials, new millwork, sink & new finishes. na maher | $398,000 |
| May 14, 2014 | Completed final sign-off Apr 2015 | 555 California St | 21st floor - revision to appl #2013.0626.0561: raise transformer to meet nec clearance, relocate existing switch to clear struct steel. not structural revision; compliance with ordinance #155-13 not requiredDetails
21st floor - revision to appl #2013.0626.0561: raise transformer to meet nec clearance, relocate existing switch to clear struct steel. not structural revision; compliance with ordinance #155-13 not required | $2,500 |
| Jun 26, 2013 | Completed final sign-off Jul 2015 | 555 California St | replace existing ups unit with new ups. like for likeDetails
replace existing ups unit with new ups. like for like | $30,080 |
| Feb 13, 2004 | Completed final sign-off Jun 2004 | 3222 Geary Bl | interior tenant improvement/alterationDetails
interior tenant improvement/alteration | $74,000 |