Block 3745, lot 009
360 Spear St
- City’s use
- Commercial Office
- Built
- 1942
- Stories
- 5
- Building
- 150,000 sq ft
- Lot
- 34,375 sq ft
- Zoning
- RC4
- Construction type
- S
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
159 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 16, 2026 | In progress filed Mar 2026, not yet issued | 360 Spear St | install temp generator base tank alongside building adjacent to tapp access box. r/r 200 gallon day tank.Details
install temp generator base tank alongside building adjacent to tapp access box. r/r 200 gallon day tank. | $200,000 | |
| Jul 18, 2025 | In progress issued Oct 2025 | 360 Spear St | R L H Fire Protection Inc | replace (e) 750 gpm, 80 psi fire pump with a new 750 gpm, 80 psi fire pump.Details
replace (e) 750 gpm, 80 psi fire pump with a new 750 gpm, 80 psi fire pump. | $96,000 |
| Aug 16, 2023 | In progress issued Nov 2023 | 360 Spear St | install 11 additional lift assisted bike racks. ref pa# 201812279204. e-bikes are not permitted to charge in bike room.Details
install 11 additional lift assisted bike racks. ref pa# 201812279204. e-bikes are not permitted to charge in bike room. | ||
| Aug 1, 2023 | Never finaled filed Aug 2023, never issued | 360 Spear St | Hitt Contracting Inc. | revision to 202307263013 to obtain sffd stamp for assemble occupant load info for cafe, prep kitchen, a-3 spaces. administractive permit only. no change to scope of work approved under 202201246538Details
revision to 202307263013 to obtain sffd stamp for assemble occupant load info for cafe, prep kitchen, a-3 spaces. administractive permit only. no change to scope of work approved under 202201246538 | |
| Jul 26, 2023 | Completed final sign-off Sep 2023 | 360 Spear St | Hitt Contracting Inc. | 3/f: document assembly occupancy load shown on 202201246538 only. no other changes to previosly approved scope.Details
3/f: document assembly occupancy load shown on 202201246538 only. no other changes to previosly approved scope. | |
| Apr 21, 2023 | Completed final sign-off Dec 2023 | 360 Spear St | Hitt Contracting Inc. | 5/f: electrical work, replacement of uninterrupted power source (ups) and addition of electrical panels/transformers on lvl 5.Details
5/f: electrical work, replacement of uninterrupted power source (ups) and addition of electrical panels/transformers on lvl 5. | $180,000 |
| Mar 7, 2023 | Never finaled issued Apr 2023, no final | 360 Spear St | Icom Mechanical Inc. | replacement of roof mounted 300 ton air cooled chiller and 2 secondary chilled water pumpsDetails
replacement of roof mounted 300 ton air cooled chiller and 2 secondary chilled water pumps | $1,036,840 |
| Feb 13, 2023 | Completed final sign-off Feb 2023 | 360 Spear St | United Systems Fire And Security Llc | as-built permit to pa#202210144364Details
as-built permit to pa#202210144364 | |
| Oct 14, 2022 | Completed final sign-off Jul 2023 | 360 Spear St | United Systems Fire And Security Llc | as built permit to pa#202206226885Details
as built permit to pa#202206226885 | |
| Oct 11, 2022 | Completed final sign-off Jul 2023 | 360 Spear St | Pribuss Engineering Inc | fire sprinkler as built drawings. ref pa#202205275176 & 202209021788Details
fire sprinkler as built drawings. ref pa#202205275176 & 202209021788 | |
| Sep 13, 2022 | Completed final sign-off Sep 2023 | 360 Spear St | Hitt Contracting Inc. | revise electrical for t.i. under pa# 202208100286. ref pa3 202206096006 & 202201246538 to install 2 800a enclosed breakers for supporting equipment on the 5th fl and install associated feeders frd from switchboards on the 1st fl.Details
revise electrical for t.i. under pa# 202208100286. ref pa3 202206096006 & 202201246538 to install 2 800a enclosed breakers for supporting equipment on the 5th fl and install associated feeders frd from switchboards on the 1st fl. | |
| Sep 2, 2022 | Completed final sign-off Nov 2022 | 360 Spear St | Pribuss Engineering Inc | ref 202205275176 modify sprinkler head locations to accomodate new ceiling and partition layout for new office space on 3rd floor. total sprinklers in project; 92. revision install (3) fire hose valve cabinets (one fire rated) vi anew 4' supple line from existing wet standpipe at stair 2Details
ref 202205275176 modify sprinkler head locations to accomodate new ceiling and partition layout for new office space on 3rd floor. total sprinklers in project; 92. revision install (3) fire hose valve cabinets (one fire rated) vi anew 4' supple line from existing wet standpipe at stair 2 | $7,500 |
| Aug 10, 2022 | Completed final sign-off Aug 2023 | 360 Spear St | Hitt Contracting Inc. | 3/f: revise island layout @ catering kitchen. ref bpa#202201246538Details
3/f: revise island layout @ catering kitchen. ref bpa#202201246538 | |
| Jun 22, 2022 | Completed final sign-off Jul 2023 | 360 Spear St | United Systems Fire And Security Llc | fire alarm system t.i., installation of booster power supply with sync module. 41 control relay for hvac shutdown, 1 monitoring module for kitechen hood release, 3 smoke detectors, 38 duct detectors for hvac units, 32 ceiling mounted speaker strobes, 17 ceiing mounted strobesDetails
fire alarm system t.i., installation of booster power supply with sync module. 41 control relay for hvac shutdown, 1 monitoring module for kitechen hood release, 3 smoke detectors, 38 duct detectors for hvac units, 32 ceiling mounted speaker strobes, 17 ceiing mounted strobes | $38,461 |
| Jun 9, 2022 | Completed final sign-off Aug 2023 | 360 Spear St | Hitt Contracting Inc. | revision to pa# 202201246538. relocate all gender restroom, 2 water heaters and adjust kitchen layout. update structural detail for operable partitions, remove electical from previously proposed ups area scope; now space change to storage room.Details
revision to pa# 202201246538. relocate all gender restroom, 2 water heaters and adjust kitchen layout. update structural detail for operable partitions, remove electical from previously proposed ups area scope; now space change to storage room. | |
| May 27, 2022 | Completed final sign-off Mar 2023 | 360 Spear St | Pribuss Engineering Inc | modify sprinkler head locations to accommodate new ceiling and partition layout for new offices space on 3rd fl. total sprinklers 92Details
modify sprinkler head locations to accommodate new ceiling and partition layout for new offices space on 3rd fl. total sprinklers 92 | $47,288 |
| May 12, 2022 | Completed final sign-off Jul 2022 | 360 Spear St | United Systems Fire And Security Llc | duct detector add & relay for mau-10 roof. relay add for ahu-1 5th fl.Details
duct detector add & relay for mau-10 roof. relay add for ahu-1 5th fl. | $10,160 |
| May 6, 2022 | Completed final sign-off Jun 2022 | 360 Spear St | United Systems Fire And Security Llc | 1st & 2nd fl: fire as-build for pa# 202105130366.Details
1st & 2nd fl: fire as-build for pa# 202105130366. | |
| Apr 5, 2022 | Completed final sign-off Apr 2022 | 360 Spear St | Westates Mechanical Corporation Inc | as built drawings ref pa #202108176522Details
as built drawings ref pa #202108176522 | |
| Jan 24, 2022 | Completed final sign-off Sep 2023 | 360 Spear St | Hitt Contracting Inc. | 3rd fl: single floor tenant improvement. existing structure, egress staor enclosures to remain. non structural partitions, ceiling, wall and floor finishes only. related mechanical, electrical, plumbing workm change of use from office/internet service exchange to office /laboratory/wholesale sales.Details
3rd fl: single floor tenant improvement. existing structure, egress staor enclosures to remain. non structural partitions, ceiling, wall and floor finishes only. related mechanical, electrical, plumbing workm change of use from office/internet service exchange to office /laboratory/wholesale sales. | $5,000,000 |
| Jan 20, 2022 | Never finaled issued Jan 2022, no final | 360 Spear St | Specialized Graphics Inc | install 1 non-electric single faced wall sign "vitalant"Details
install 1 non-electric single faced wall sign "vitalant" | $1,100 |
| Oct 7, 2021 | Completed final sign-off Nov 2021 | 360 Spear St | Mcclure Electric Inc | title 24 lighting only. reference # 202010297723Details
title 24 lighting only. reference # 202010297723 | |
| Aug 31, 2021 | Completed final sign-off Jan 2023 | 360 Spear St | Rossi Builders Inc. | work consists of demolition of extg concrete ramp and guard rail and installation of new concrete loading dock and guard rail.Details
work consists of demolition of extg concrete ramp and guard rail and installation of new concrete loading dock and guard rail. | $175,000 |
| Aug 17, 2021 | Completed final sign-off Apr 2022 | 360 Spear St | Westates Mechanical Corporation Inc | tenant improvement - sprinkler relocates: 197, sprinkler adds 45Details
tenant improvement - sprinkler relocates: 197, sprinkler adds 45 | $150,000 |
| Aug 9, 2021 | Completed final sign-off Sep 2022 | 360 Spear St | Dome Construction Corp | mep for pa 2021 0112 2527Details
mep for pa 2021 0112 2527 | |
| Aug 6, 2021 | Completed final sign-off Nov 2022 | 360 Spear St | Rossi Builders Inc. | replacement of (e) fixed aluminum louver system with new aluminum storefront framing to match existing. new in-swinging doors at mechanical store front and relocation of (e) interior wallDetails
replacement of (e) fixed aluminum louver system with new aluminum storefront framing to match existing. new in-swinging doors at mechanical store front and relocation of (e) interior wall | $65,000 |
| May 13, 2021 | Completed final sign-off May 2022 | 360 Spear St | United Systems Fire And Security Llc | small t.i. on the 1st & 2nd floors. 1 smoke, 5 duct, 2 amps, 1 power supply, 23 speakers, 56 speaker strobes. 6 strobes.Details
small t.i. on the 1st & 2nd floors. 1 smoke, 5 duct, 2 amps, 1 power supply, 23 speakers, 56 speaker strobes. 6 strobes. | |
| May 4, 2021 | Completed final sign-off Jul 2023 | 360 Spear St | United Systems Fire And Security Llc | as-built for permit 2021-0114-2731Details
as-built for permit 2021-0114-2731 | |
| Mar 11, 2021 | Completed final sign-off May 2021 | 360 Spear St | United Systems Fire And Security Llc | the addition of 11 relays, 10 smoke, 1 duct detector, 8 notification devices.Details
the addition of 11 relays, 10 smoke, 1 duct detector, 8 notification devices. | $6,240 |
| Feb 4, 2021 | Completed final sign-off May 2021 | 360 Spear St | Walschon Fire Protection Inc | fire only - #2020-0915-4216; add 19 uprights & relocate 2 pendents. remove (plug - off) 31 pendents on the 1st floor garage area.Details
fire only - #2020-0915-4216; add 19 uprights & relocate 2 pendents. remove (plug - off) 31 pendents on the 1st floor garage area. | $10,500 |
| Jan 14, 2021 | Completed final sign-off Jun 2021 | 360 Spear St | United Systems Fire And Security Llc | fire alarm t.i. for voice evac system replace all horn strobes w/speaker strobes replace initiating devicesDetails
fire alarm t.i. for voice evac system replace all horn strobes w/speaker strobes replace initiating devices | $12,250 |
| Jan 12, 2021 | Completed final sign-off Sep 2022 | 360 Spear St | Dome Construction Corp | priority processing per ab-004. t.i. non-structural demo, new interior non-loading bearing partitions, new doors, and new ceilings. new elect,plumbing, mech work to be tie into existing building utilitie. new interior finishes and millwork.Details
priority processing per ab-004. t.i. non-structural demo, new interior non-loading bearing partitions, new doors, and new ceilings. new elect,plumbing, mech work to be tie into existing building utilitie. new interior finishes and millwork. | $3,131,492 |
| Jan 7, 2021 | Completed final sign-off Apr 2021 | 360 Spear St | Bay City Mechanical Service Llc | installation of air spring isolators for 2 electrical transformers.Details
installation of air spring isolators for 2 electrical transformers. | $100,000 |
| Dec 3, 2020 | Completed final sign-off May 2021 | 360 Spear St | Rossi Builders Inc. | 4th fl: modifications to base building mechanical system at tenant space.Details
4th fl: modifications to base building mechanical system at tenant space. | $175,000 |
| Oct 29, 2020 | Completed final sign-off Nov 2021 | 360 Spear St | Rossi Builders Inc. | permit to memorialize planning commision motion 20588 authorizing the conversion of portions of internet service exchange use & accessory parking area on 1/f & south half of 2/f to laboratory use greater than 25000gsf. additional restrm/bathrm work w/ lockers & bicycle parking features. maher n/aDetails
permit to memorialize planning commision motion 20588 authorizing the conversion of portions of internet service exchange use & accessory parking area on 1/f & south half of 2/f to laboratory use greater than 25000gsf. additional restrm/bathrm work w/ lockers & bicycle parking features. maher n/a | |
| Oct 26, 2020 | Completed final sign-off Jan 2021 | 360 Spear St | Rossi Builders Inc. | 4th floor fire alarm voice evacuation system. deferred permit from bpa 2020-0803-1183.Details
4th floor fire alarm voice evacuation system. deferred permit from bpa 2020-0803-1183. | $50,000 |
| Oct 26, 2020 | Completed final sign-off May 2021 | 360 Spear St | United Systems Fire And Security Llc | fire alarm system for 4th floor. deferred permit from bpa 2020-0805-1183.Details
fire alarm system for 4th floor. deferred permit from bpa 2020-0805-1183. | $20,766 |
| Oct 22, 2020 | Completed final sign-off Nov 2021 | 360 Spear St | Rossi Builders Inc. | 4/f: work includes modifications to base building electrical and mechanical systems, new finishes and lighting in stairs, and implementation of base building utility sub metering, no work is proposed in spaces occupied by internet service exchange uses on the 2nd and 5th floors. no exterior workDetails
4/f: work includes modifications to base building electrical and mechanical systems, new finishes and lighting in stairs, and implementation of base building utility sub metering, no work is proposed in spaces occupied by internet service exchange uses on the 2nd and 5th floors. no exterior work | $75,000 |
| Oct 16, 2020 | Completed final sign-off Dec 2020 | 360 Spear St | Walschon Fire Protection Inc | revision to 2020-0820-2267.Details
revision to 2020-0820-2267. | $85,000 |
| Oct 1, 2020 | Expired or cancelled withdrawn Dec 2020 | 360 Spear St | Rossi Builders Inc. | revision to pa 202008051183. per aprvd minutes of sffd pre-app meeting and plan of action: reduce occupancy of 4th flr prior to voice alarm install. once speakers are provided throughout 4th flr, tenant to revert to speaker egress factors aproved under bpa 202008051183.Details
revision to pa 202008051183. per aprvd minutes of sffd pre-app meeting and plan of action: reduce occupancy of 4th flr prior to voice alarm install. once speakers are provided throughout 4th flr, tenant to revert to speaker egress factors aproved under bpa 202008051183. | |
| Sep 15, 2020 | Completed final sign-off Nov 2021 | 360 Spear St | Rossi Builders Inc. | revision to pa 201907246806. work consists of future tenant shell space, construct portions of 1st & 2nd flrs. work incl (n) secondary entrance, demising walls, trash rm, upgrades to mech & electr. t.i under separate permit. no work proposed in space occupied by internet exchange use on 2nd flr.Details
revision to pa 201907246806. work consists of future tenant shell space, construct portions of 1st & 2nd flrs. work incl (n) secondary entrance, demising walls, trash rm, upgrades to mech & electr. t.i under separate permit. no work proposed in space occupied by internet exchange use on 2nd flr. | $750,000 |
| Sep 11, 2020 | Completed final sign-off May 2021 | 360 Spear St | Rossi Builders Inc. | 1st, 2nd & 4th fl - install 8 emon dmons on 3 floors to moniotr energy usageDetails
1st, 2nd & 4th fl - install 8 emon dmons on 3 floors to moniotr energy usage | $25,000 |
| Aug 20, 2020 | Completed final sign-off Dec 2020 | 360 Spear St | Walschon Fire Protection Inc | 4th flr: add/relocate 67 hard drop pendants in office, conference rooms and huddle rooms. add 20 upright for new full height wall. no seismic upgrade in area of work. 87 total heads.Details
4th flr: add/relocate 67 hard drop pendants in office, conference rooms and huddle rooms. add 20 upright for new full height wall. no seismic upgrade in area of work. 87 total heads. | $33,833 |
| Aug 5, 2020 | Completed final sign-off Dec 2020 | 360 Spear St | Rossi Builders Inc. | suite 400 on 4th fl ti: new non-structural partitions, lighting 7 finishes. fire alarm & fire sprinkler under separate permit. maher naDetails
suite 400 on 4th fl ti: new non-structural partitions, lighting 7 finishes. fire alarm & fire sprinkler under separate permit. maher na | $3,678,903 |
| Jul 6, 2020 | Completed final sign-off Nov 2020 | 360 Spear St | Rossi Builders Inc. | revision to app#201812279189 to reflect installation of exterior gas meter enclosure following approved pg&e design.Details
revision to app#201812279189 to reflect installation of exterior gas meter enclosure following approved pg&e design. | |
| Mar 13, 2020 | Completed final sign-off May 2021 | 360 Spear St | administrative permit for pa #201812279204 & 201906264490, to confirm that 360 spear st is a "full sprinklered building" as defined by the san francisco building code, no work is proposed.Details
administrative permit for pa #201812279204 & 201906264490, to confirm that 360 spear st is a "full sprinklered building" as defined by the san francisco building code, no work is proposed. | ||
| Feb 25, 2020 | Completed final sign-off Apr 2020 | 360 Spear St | Golden Gate Fire Protection Inc | fire sprinklers: relocate 3 pendents on ground fl. ref ti #201908138662Details
fire sprinklers: relocate 3 pendents on ground fl. ref ti #201908138662 | $1,500 |
| Jan 24, 2020 | Never finaled issued Jan 2020, no final | 360 Spear St | street spaceDetails
street space | ||
| Oct 15, 2019 | Never finaled issued Oct 2019, no final | 360 Spear St | street spaceDetails
street space | ||
| Aug 26, 2019 | Never finaled issued Aug 2019, no final | 360 Spear St | street spaceDetails
street space | ||
| Aug 13, 2019 | Completed final sign-off Dec 2020 | 360 Spear St | Rossi Builders Inc. | new panel board on roof to serve new rooftop mech equipment, new lighting on floor 1-5, new power signal on floor 1Details
new panel board on roof to serve new rooftop mech equipment, new lighting on floor 1-5, new power signal on floor 1 | $150,000 |
| Aug 7, 2019 | Completed final sign-off Dec 2020 | 360 Spear St | Rossi Builders Inc. | hvac - mechanical improvements including new heating & cooling condensing units, makeup air furnace and exhaust fans. additions of new makeup and exhaust air risers, refrigrant piping riser, two fan coils.Details
hvac - mechanical improvements including new heating & cooling condensing units, makeup air furnace and exhaust fans. additions of new makeup and exhaust air risers, refrigrant piping riser, two fan coils. | $575,000 |
| Aug 1, 2019 | Completed final sign-off Dec 2020 | 360 Spear St | United Systems Fire And Security Llc | new fire alarm system for core and shell building t.i. system to provide detection and shut down of core fsd's and restroom and common area notification. ref pa 201812279204Details
new fire alarm system for core and shell building t.i. system to provide detection and shut down of core fsd's and restroom and common area notification. ref pa 201812279204 | $25,000 |
| Jul 30, 2019 | Never finaled issued Jul 2019, no final | 360 Spear St | street spaceDetails
street space | ||
| Jul 24, 2019 | Completed final sign-off Nov 2021 | 360 Spear St | Rossi Builders Inc. | base building improvements on a portion of the ground floor as a revision to base building improvements on approved pa 2018-1212-8090 & 2018-1227-9204. remodeling of 2 restrooms, installation of (n) partitions in prep of vacant spaceDetails
base building improvements on a portion of the ground floor as a revision to base building improvements on approved pa 2018-1212-8090 & 2018-1227-9204. remodeling of 2 restrooms, installation of (n) partitions in prep of vacant space | $500,000 |
| Jun 26, 2019 | Never finaled issued Jun 2019, no final | 360 Spear St | street spaceDetails
street space | ||
| Jun 26, 2019 | Completed final sign-off Nov 2019 | 360 Spear St | Ayoob & Peery Plumbing Co Inc | fire sprinklers, flr 1-4. 1st flr -relocate 26 and plug 8. 2nd flr -add 19, relocate 15. 3rd flr -add 11, relocate 14. 4th flr -add 11, relocate 14.Details
fire sprinklers, flr 1-4. 1st flr -relocate 26 and plug 8. 2nd flr -add 19, relocate 15. 3rd flr -add 11, relocate 14. 4th flr -add 11, relocate 14. | $37,050 |
| Jun 20, 2019 | Never finaled issued Jun 2019, no final | 360 Spear St | street spaceDetails
street space | ||
| Jun 3, 2019 | Never finaled issued Jun 2019, no final | 360 Spear St | street spaceDetails
street space | ||
| May 24, 2019 | Never finaled issued May 2019, no final | 360 Spear St | street spaceDetails
street space | ||
| May 15, 2019 | Never finaled issued May 2019, no final | 360 Spear St | street spaceDetails
street space | ||
| Apr 11, 2019 | Never finaled issued Apr 2019, no final | 360 Spear St | street spaceDetails
street space | ||
| Feb 6, 2019 | Never finaled issued Feb 2019, no final | 360 Spear St | street space onlyDetails
street space only | ||
| Dec 27, 2018 | Completed final sign-off Nov 2021 | 360 Spear St | Rossi Builders Inc. | floors 1-4: core & shell work only; ti under separate permit. removal of non-structural partitions, bike parking,showers and lockers serving the office use. n/a for maherDetails
floors 1-4: core & shell work only; ti under separate permit. removal of non-structural partitions, bike parking,showers and lockers serving the office use. n/a for maher | $1,500,000 |
| Dec 27, 2018 | Completed final sign-off Aug 2020 | 360 Spear St | Rossi Builders Inc. | replace existing storefront entrance and garage doors in approx 35% of the ground floor openings along spear street. install new canopy meeting sf planning code section 136.1(c)(2)(c).Details
replace existing storefront entrance and garage doors in approx 35% of the ground floor openings along spear street. install new canopy meeting sf planning code section 136.1(c)(2)(c). | $500,000 |
| Dec 12, 2018 | Completed final sign-off Aug 2019 | 360 Spear St | Fisher Development Inc | replacement of metal panels in e window frames with safety glass to match adjacent glass panels in color and overall appearance.Details
replacement of metal panels in e window frames with safety glass to match adjacent glass panels in color and overall appearance. | $250,000 |
| Dec 12, 2018 | Completed final sign-off May 2020 | 360 Spear St | Rossi Builders Inc., Fisher Development Inc | cut new window openings in the existing perimeter shearwalls and strengthening the piers and spandrels around these openings by installation of carbon fiber wrap.Details
cut new window openings in the existing perimeter shearwalls and strengthening the piers and spandrels around these openings by installation of carbon fiber wrap. | $500,000 |
| Oct 23, 2018 | Completed final sign-off Apr 2019 | 360 Spear St | Fisher Development Inc | selective non structural demo on floors 1-4. removal of (e) non operational mep systems, partitions, fixtures & finishes, no exterior demo is proposed maher naDetails
selective non structural demo on floors 1-4. removal of (e) non operational mep systems, partitions, fixtures & finishes, no exterior demo is proposed maher na | $5,000 |
| Sep 11, 2018 | Never finaled issued Sep 2018, no final | 360 Spear St | admin permit to memorialize pc motions 19515 and 19516,authorizing 49,992 gsf of office use to be flexibly configured at 3rd/4th fl.land use occup apprvd as internet exchange for reminder of bldg remains unchanged. permit to finalize planning approval of land use category and endable payment of assoDetails
admin permit to memorialize pc motions 19515 and 19516,authorizing 49,992 gsf of office use to be flexibly configured at 3rd/4th fl.land use occup apprvd as internet exchange for reminder of bldg remains unchanged. permit to finalize planning approval of land use category and endable payment of asso | ||
| Sep 5, 2018 | Never finaled issued Sep 2018, no final | 360 Spear St | Unger Construction Co | re-route existing chilled water piping from 5th fl to 1st fl. move & or relocate electrical cabeling & generator annuciators. work include disconnect of several electrical panels. maher naDetails
re-route existing chilled water piping from 5th fl to 1st fl. move & or relocate electrical cabeling & generator annuciators. work include disconnect of several electrical panels. maher na | $199,000 |
| Feb 9, 2017 | Never finaled filed Feb 2017, never issued | 360 Spear St | core drill form 5th floor to penthouse/install 4"emt/install j-box at 4 new locations; provide 2 hour fire sealant at all penetrations; install 4 gps antennas on penthouse via unistrut/install 4 new 1/2" coax in tray/conduit from conduit from c-ran to new gps locations. n/a for maher ordinance.Details
core drill form 5th floor to penthouse/install 4"emt/install j-box at 4 new locations; provide 2 hour fire sealant at all penetrations; install 4 gps antennas on penthouse via unistrut/install 4 new 1/2" coax in tray/conduit from conduit from c-ran to new gps locations. n/a for maher ordinance. | $5,000 | |
| Jun 8, 2016 | Completed final sign-off Apr 2017 | 360 Spear St | A C Logix Incorporated | replace (1) york air cooled chiller due to age and degradation scope of work restricted to roof only.Details
replace (1) york air cooled chiller due to age and degradation scope of work restricted to roof only. | $107,680 |
| Aug 27, 2015 | Completed final sign-off Sep 2015 | 360 Spear St | Orr Protection Systems Inc | relocate (1) existing horn/strobe, t.i. pa# 201506169112. n/a ordinance #155-13Details
relocate (1) existing horn/strobe, t.i. pa# 201506169112. n/a ordinance #155-13 | $2,000 |
| Jul 8, 2015 | Never finaled issued Jul 2015, no final | 360 Spear St | street spaceDetails
street space | ||
| Jun 16, 2015 | Never finaled issued Jun 2015, no final | 360 Spear St | street space permitDetails
street space permit | ||
| Jun 16, 2015 | Completed final sign-off Sep 2015 | 360 Spear St | Unger Construction Co | rev. to 201503312335 - install new door at 5th floor, add elevated platforms, adjust elevator stops at 3rd & 4th floor. fire alarm separte permit to move devices n/a for maher.Details
rev. to 201503312335 - install new door at 5th floor, add elevated platforms, adjust elevator stops at 3rd & 4th floor. fire alarm separte permit to move devices n/a for maher. | $80,000 |
| Mar 31, 2015 | Completed final sign-off Sep 2015 | 360 Spear St | Unger Construction Co | this is a permit for demo of t.i.space only.360 spear street is currently a verizon wireless office and server storage facility.unger will be safeoff bldg power, removing lighting,walls,raised floors,mech.units on the 3rd and 4th floors.provide new elec conduit on 3&4 flr. remain vacancy under ab017Details
this is a permit for demo of t.i.space only.360 spear street is currently a verizon wireless office and server storage facility.unger will be safeoff bldg power, removing lighting,walls,raised floors,mech.units on the 3rd and 4th floors.provide new elec conduit on 3&4 flr. remain vacancy under ab017 | $495,000 |
| Sep 10, 2010 | Never finaled issued Sep 2010, no final | 360 Spear St | street spaceDetails
street space | ||
| May 25, 2010 | Never finaled issued May 2010, no final | 360 Spear St | street spaceDetails
street space | ||
| Apr 16, 2010 | Never finaled issued Apr 2010, no final | 360 Spear St | street spaceDetails
street space | ||
| Mar 15, 2010 | Never finaled issued Mar 2010, no final | 360 Spear St | street spaceDetails
street space | ||
| Feb 16, 2010 | Never finaled issued Feb 2010, no final | 360 Spear St | street spaceDetails
street space | ||
| Jan 21, 2010 | Never finaled issued Jan 2010, no final | 360 Spear St | street spaceDetails
street space | ||
| Dec 18, 2009 | Never finaled issued Dec 2009, no final | 360 Spear St | street space permitDetails
street space permit | ||
| Nov 16, 2009 | Never finaled issued Nov 2009, no final | 360 Spear St | street spaceDetails
street space | ||
| Oct 16, 2009 | Never finaled issued Oct 2009, no final | 360 Spear St | street space onlyDetails
street space only | ||
| Oct 1, 2009 | Never finaled issued Oct 2009, no final | 360 Spear St | street space permitDetails
street space permit | ||
| Sep 16, 2009 | Completed final sign-off Mar 2010 | 360 Spear St | Webcor Construction Lp | volunteer repair of cracks in ground bearing slab. install small grade beam to surround switch gear padDetails
volunteer repair of cracks in ground bearing slab. install small grade beam to surround switch gear pad | $20,000 |
| Sep 15, 2009 | Completed final sign-off Jun 2010 | 360 Spear St | Gettler-Ryan Inc | remove (e)400 gal generator base fuel tank from roof,replace w/ (n) 200 gal.dw steel day tank, dw piping from day tank to (e)generator within (e) 15ft high metal enclosure. (n)veeder root tls-350 tank monitoring panel/sensors for all (e) & (n)at&t owned fuel sys sensors/probes. sffd permit requiredDetails
remove (e)400 gal generator base fuel tank from roof,replace w/ (n) 200 gal.dw steel day tank, dw piping from day tank to (e)generator within (e) 15ft high metal enclosure. (n)veeder root tls-350 tank monitoring panel/sensors for all (e) & (n)at&t owned fuel sys sensors/probes. sffd permit required | $100,000 |
| Apr 27, 2007 | Completed final sign-off Jun 2007 | 360 Spear St | colo serve- oti-1 2nd floor, el, ls, me, spDetails
colo serve- oti-1 2nd floor, el, ls, me, sp | $20,000 | |
| Apr 28, 2006 | Expired or cancelled expired May 2007 | 360 Spear St | remove door, demo (e) office partitions, install (n) raised floor to match (e), relocate electrical/data signage as requiredDetails
remove door, demo (e) office partitions, install (n) raised floor to match (e), relocate electrical/data signage as required | $18,000 | |
| Jun 10, 2005 | Completed final sign-off Jan 2007 | 100 Harrison St | provide soil nail, tieback per plan.Details
provide soil nail, tieback per plan. | $25,000 | |
| May 12, 2005 | Completed final sign-off May 2005 | 360 Spear St | renew pa#2004/03/17/8836, 2004/03/17/8831 for final inspectionDetails
renew pa#2004/03/17/8836, 2004/03/17/8831 for final inspection | ||
| May 12, 2005 | Completed final sign-off May 2005 | 360 Spear St | Team Commercial Construction Inc. | renew pa#2003/12/04/1626, 2004/02/12/6228, 2003/12/22/2766 for final inspectionDetails
renew pa#2003/12/04/1626, 2004/02/12/6228, 2003/12/22/2766 for final inspection | |
| Mar 23, 2005 | Completed final sign-off May 2005 | 360 Spear St | Capitol Electric Const | fire alarm device installation on 2rd fl (eleven).Details
fire alarm device installation on 2rd fl (eleven). | $7,500 |
| Mar 17, 2004 | Completed final sign-off May 2005 | 360 Spear St | Team Commercial Construction Inc. | oti-2 2nd floor el meDetails
oti-2 2nd floor el me | $20,000 |
| Mar 17, 2004 | Completed final sign-off May 2005 | 360 Spear St | Team Commercial Construction Inc. | oti-2 2nd floor el meDetails
oti-2 2nd floor el me | $22,000 |
| Feb 12, 2004 | Expired or cancelled expired Jan 2005 | 360 Spear St | Mcm & Associates Inc. | renovations to existing sprinkler system for tenant improvement, relocate 2 sprinklers, add 1 sprinkDetails
renovations to existing sprinkler system for tenant improvement, relocate 2 sprinklers, add 1 sprink | $2,360 |
| Feb 6, 2004 | Expired or cancelled cancelled Jul 2005 | 360 Spear St | Sabah International Incorporated | furnish and test fire alarm systemDetails
furnish and test fire alarm system | $16,477 |
| Dec 22, 2003 | Never finaled issued Jan 2004, no final | 360 Spear St | Team Commercial Construction Inc. | oti-1 2nd fl. el, me, ls, spDetails
oti-1 2nd fl. el, me, ls, sp | $78,000 |
| Dec 19, 2003 | Never finaled issued Dec 2003, no final | 360 Spear St | Mcm & Associates Inc. | renovating to existing sprinkler system due to tenant improvements, relocate 8 sprinklers (for 2nd fDetails
renovating to existing sprinkler system due to tenant improvements, relocate 8 sprinklers (for 2nd f | $2,250 |
| Dec 4, 2003 | Expired or cancelled expired Jan 2005 | 360 Spear St | Team Commercial Construction Inc. | oti-1 2nd floor, el, me, ls, spDetails
oti-1 2nd floor, el, me, ls, sp | $28,000 |
| Oct 21, 2003 | Expired or cancelled expired Jan 2005 | 360 Spear St | California Suppresion Dba Calif. Protect | currently 10(10) panels are networked together remove all panels from network of the 10 panels theDetails
currently 10(10) panels are networked together remove all panels from network of the 10 panels the | $36,840 |
| Sep 25, 2003 | Completed final sign-off Mar 2004 | 360 Spear St | Unger Construction Co | rerouting of elec/plumbing/piping to isolate 2/f. (currently mci space to be turned over to bldg.)Details
rerouting of elec/plumbing/piping to isolate 2/f. (currently mci space to be turned over to bldg.) | $313,000 |
| Mar 14, 2002 | Completed final sign-off Jun 2002 | 360 Spear St | Aeco Systems, Inc | add one strobe light in new conf rm, relocate existing horn/strobe, reduce candela rating, 1st flr oDetails
add one strobe light in new conf rm, relocate existing horn/strobe, reduce candela rating, 1st flr o | $1,800 |
| Mar 12, 2002 | Completed final sign-off Jun 2002 | 360 Spear St | Design Build Develp. Stru | oti-2, 1st flr, el,me,spDetails
oti-2, 1st flr, el,me,sp | $8,000 |
| Mar 4, 2002 | Completed final sign-off Jun 2002 | 360 Spear St | R L H Fire Protection Inc | oti-2 1st floor spDetails
oti-2 1st floor sp | $1,000 |
| Feb 28, 2002 | Completed final sign-off Jun 2002 | 360 Spear St | Design Build Develp. Stru | oti-1 1st floor el me ls spDetails
oti-1 1st floor el me ls sp | $40,000 |
| Feb 14, 2002 | Completed final sign-off May 2002 | 350 Spear St | Skyline Construction | renew 2000/10/24/3901,chg from 100 harrison. chg 31 storiesto 5, 1 bsmt to 0 bsmt.add telecom equip.Details
renew 2000/10/24/3901,chg from 100 harrison. chg 31 storiesto 5, 1 bsmt to 0 bsmt.add telecom equip. | $100 |
| Feb 14, 2002 | Completed final sign-off May 2002 | 100 Harrison St | Skyline Construction | renew appl#200006011499, 200009130345 & 200102232803 for final inspection, add telcom equipDetails
renew appl#200006011499, 200009130345 & 200102232803 for final inspection, add telcom equip | $100 |
| Feb 14, 2002 | Completed final sign-off May 2002 | 100 Harrison St | Skyline Construction | renew for final inspection of pa#200007064444 & 200009190891. add telecomm. equip to bldg. descriptiDetails
renew for final inspection of pa#200007064444 & 200009190891. add telecomm. equip to bldg. descripti | $100 |
| Feb 14, 2002 | Expired or cancelled expired Jun 2002 | 100 Harrison St | Skyline Construction | renew for final inspection #200003013222,200008087251 change construction type from 5 to 1Details
renew for final inspection #200003013222,200008087251 change construction type from 5 to 1 | $100 |
| Feb 14, 2002 | Completed final sign-off May 2002 | 100 Harrison St | Skyline Construction | renew appl#200011155736 add telecom equipDetails
renew appl#200011155736 add telecom equip | $100 |
| Dec 26, 2001 | Completed final sign-off Mar 2002 | 360 Spear St | Aeco Systems, Inc | modification to sequence of operations per instr. of fire insp. (work on 1st flr only)Details
modification to sequence of operations per instr. of fire insp. (work on 1st flr only) | $100 |
| Oct 9, 2001 | Expired or cancelled expired Oct 2002 | 350 Spear St | street space permitDetails
street space permit | ||
| Aug 27, 2001 | Expired or cancelled expired Nov 2003 | 360 Spear St | add 5 somke detectors an 1 uv/1r detector to (e) fun2000 detection system @ at&t on 2nd flDetails
add 5 somke detectors an 1 uv/1r detector to (e) fun2000 detection system @ at&t on 2nd fl | $14,800 | |
| Aug 2, 2001 | Expired or cancelled cancelled Sep 2007 | 350 Spear St | construction of 4 residewntial units on a small portion of an existing building roofDetails
construction of 4 residewntial units on a small portion of an existing building roof | $304,000 | |
| Jul 6, 2001 | Completed final sign-off Mar 2002 | 360 Spear St | Allied Fire Protection | new preaction fire sprinkler system 1/f t/i exposed const sprinkler plan only under this @ 1/fDetails
new preaction fire sprinkler system 1/f t/i exposed const sprinkler plan only under this @ 1/f | $15,000 |
| Jul 5, 2001 | Completed final sign-off Mar 2002 | 360 Spear St | Aeco Systems, Inc | new facp to provide input to pre-action system(f.b.o.)new panel interface into bldg wide facpDetails
new facp to provide input to pre-action system(f.b.o.)new panel interface into bldg wide facp | $20,000 |
| Jun 16, 2001 | Completed final sign-off Jun 2002 | 360 Spear St | install battery archit under app #200105118901Details
install battery archit under app #200105118901 | ||
| Jun 7, 2001 | Expired or cancelled expired Jun 2002 | 350 Spear St | street spaceDetails
street space | ||
| Jun 5, 2001 | Expired or cancelled cancelled Aug 2002 | 360 Spear St | Bay City Mechanical Inc | oti-2 2nd floor (mech, sp)Details
oti-2 2nd floor (mech, sp) | $22,000 |
| May 31, 2001 | Completed final sign-off Jun 2002 | 360 Spear St | mechanical electrical only install of generator and batteries under separate permitDetails
mechanical electrical only install of generator and batteries under separate permit | $50,000 | |
| May 31, 2001 | Completed final sign-off Jun 2002 | 360 Spear St | install generatorDetails
install generator | $75,000 | |
| May 11, 2001 | Completed final sign-off Jun 2002 | 360 Spear St | provide equipment for ground equipment rm which include mech & electricalDetails
provide equipment for ground equipment rm which include mech & electrical | $250,000 | |
| May 8, 2001 | Expired or cancelled expired Sep 2001 | 360 Spear St | street spaceDetails
street space | ||
| Apr 20, 2001 | Expired or cancelled expired Nov 2003 | 360 Spear St | Sabah International Incorporated | add new airhandler units w/a-1 (alarm input module) shown at each for monitoring 3rd party duct deteDetails
add new airhandler units w/a-1 (alarm input module) shown at each for monitoring 3rd party duct dete | $400 |
| Mar 28, 2001 | Expired or cancelled expired Nov 2003 | 360 Spear St | Howard S Wright Construction Co. | oti-1 2nd flr- el,me,ls,sp,Details
oti-1 2nd flr- el,me,ls,sp, | $19,014 |
| Mar 19, 2001 | Completed final sign-off Mar 2002 | 360 Spear St | provide tenant improvement per plans for cooling systems only sep for mech sym battery rm & generatoDetails
provide tenant improvement per plans for cooling systems only sep for mech sym battery rm & generato | $200,000 | |
| Feb 23, 2001 | Expired or cancelled expired May 2002 | 350 Spear St | Skyline Construction | deleting duct over battaries in suite 200 that was permitted under p.a#200009130345Details
deleting duct over battaries in suite 200 that was permitted under p.a#200009130345 | |
| Feb 14, 2001 | Expired or cancelled expired May 2002 | 350 Spear St | provide mechanical systems in battery roomDetails
provide mechanical systems in battery room | ||
| Dec 12, 2000 | Expired or cancelled cancelled Aug 2001 | 360 Spear St | Security Technologies Group Inc. | installation of cctv surveillance, access control system, and alarm systemDetails
installation of cctv surveillance, access control system, and alarm system | $100,000 |
| Nov 15, 2000 | Expired or cancelled expired May 2002 | 350 Spear St | Skyline Construction | running fuel lines from roof to generator under separate permit-no increase in spaceDetails
running fuel lines from roof to generator under separate permit-no increase in space | $10,000 |
| Oct 24, 2000 | Expired or cancelled expired May 2002 | 350 Spear St | Skyline Construction | revise showing installation of only 1 4000 gallon fuel tank in lieu of two installationDetails
revise showing installation of only 1 4000 gallon fuel tank in lieu of two installation | |
| Oct 17, 2000 | Expired or cancelled withdrawn Aug 2001 | 350 Spear St | revision to app #200008087251 include ventilation sym of the battery rm and hydrogen sensor monitoriDetails
revision to app #200008087251 include ventilation sym of the battery rm and hydrogen sensor monitori | ||
| Sep 26, 2000 | Completed final sign-off Dec 2000 | 100 Harrison St | revise app #200008107480 to reflect as builtDetails
revise app #200008107480 to reflect as built | ||
| Sep 19, 2000 | Expired or cancelled expired May 2002 | 350 Spear St | new beam for general supportDetails
new beam for general support | ||
| Sep 13, 2000 | Expired or cancelled expired May 2002 | 350 Spear St | tenant improvement battery room remainder of mep on app #20008087251Details
tenant improvement battery room remainder of mep on app #20008087251 | ||
| Sep 5, 2000 | Expired or cancelled expired Aug 2003 | 360 Spear St | Dpr Construction Inc | addition of power distribution units to existing facility. this is all electrical scope of work yetDetails
addition of power distribution units to existing facility. this is all electrical scope of work yet | $100,000 |
| Aug 30, 2000 | Completed final sign-off Jan 2001 | 360 Spear St | revison to 2000/01/15/220 struct calcs/details for unistru and cable ladder at floors 1-5Details
revison to 2000/01/15/220 struct calcs/details for unistru and cable ladder at floors 1-5 | ||
| Aug 19, 2000 | Completed final sign-off Dec 2000 | 100 Harrison St | provide mechanical per plansDetails
provide mechanical per plans | ||
| Aug 16, 2000 | Expired or cancelled expired Nov 2003 | 360 Spear St | Sabah International Incorporated | provide one smoke detection system on the 2nd flDetails
provide one smoke detection system on the 2nd fl | $55,054 |
| Aug 10, 2000 | Completed final sign-off Dec 2000 | 100 Harrison St | revise app #200007316475 record as built conditionDetails
revise app #200007316475 record as built condition | ||
| Aug 8, 2000 | Expired or cancelled expired Oct 2001 | 350 Spear St | mech elect and plumbingfor t/idone under app #200003013222Details
mech elect and plumbingfor t/idone under app #200003013222 | $280,000 | |
| Jul 31, 2000 | Completed final sign-off Dec 2000 | 100 Harrison St | record as built for wrk done under app #9916374s4Details
record as built for wrk done under app #9916374s4 | $500 | |
| Jul 27, 2000 | Completed final sign-off Dec 2000 | 100 Harrison St | record details as built related to app #9916374/s2Details
record details as built related to app #9916374/s2 | ||
| Jul 27, 2000 | Completed final sign-off Jan 2001 | 100 Harrison St | revise to app #9916374s separate approved exterior facade fr app #9916374sDetails
revise to app #9916374s separate approved exterior facade fr app #9916374s | ||
| Jul 27, 2000 | Completed final sign-off Dec 2000 | 100 Harrison St | record detail and corrections of work approved by app #9919299Details
record detail and corrections of work approved by app #9919299 | ||
| Jul 26, 2000 | Completed final sign-off Jan 2001 | 360 Spear St | revision to pa#9924876Details
revision to pa#9924876 | ||
| Jul 26, 2000 | Completed final sign-off Jan 2001 | 360 Spear St | Cosco Fire Protection Inc. | installation of new fire sprkler system at hvac on (e) bldng (roof)Details
installation of new fire sprkler system at hvac on (e) bldng (roof) | $4,811 |
| Jul 6, 2000 | Expired or cancelled expired May 2002 | 350 Spear St | Skyline Construction | structural framing work per app #9914068Details
structural framing work per app #9914068 | $35,000 |
| Jun 8, 2000 | Completed final sign-off Jan 2001 | 360 Spear St | Dpr Construction Inc | amendtoappln#200002031017&200003245295newmatrix for system operationDetails
amendtoappln#200002031017&200003245295newmatrix for system operation | |
| Jun 1, 2000 | Expired or cancelled expired May 2002 | 360 Spear St | Skyline Construction | fire sprinkler work to be performed.Details
fire sprinkler work to be performed. | $9,000 |
| Mar 24, 2000 | Completed final sign-off Jan 2001 | 360 Spear St | Sabah International Incorporated | preaction detection systemDetails
preaction detection system | $54,800 |
| Mar 1, 2000 | Expired or cancelled expired Oct 2003 | 350 Spear St | tenant improvementsDetails
tenant improvements | $500,000 | |
| Feb 3, 2000 | Completed final sign-off Jan 2001 | 360 Spear St | Sabah International Incorporated | fn2000 pre-action detection systemDetails
fn2000 pre-action detection system | $54,800 |
| Jan 19, 2000 | Completed final sign-off Jan 2001 | 360 Spear St | Dpr Construction Inc | battery supportsDetails
battery supports | $5,000 |
| Jan 18, 2000 | Completed final sign-off Jan 2001 | 360 Spear St | fire protection revise 2000/0115/220Details
fire protection revise 2000/0115/220 | ||
| Jan 15, 2000 | Completed final sign-off Jan 2001 | 360 Spear St | t/i new partitions new raised floor doors electric hvac plumb. fire alarm fuel storage rms fire spriDetails
t/i new partitions new raised floor doors electric hvac plumb. fire alarm fuel storage rms fire spri | $7,500,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Rossi Builders Inc. (17), United Systems Fire And Security Llc (11), Skyline Construction (10), Hitt Contracting Inc. (7), Sabah International Incorporated (5), Team Commercial Construction Inc. (5), Unger Construction Co (4), Aeco Systems, Inc (3), Dpr Construction Inc (3), Fisher Development Inc (3), Pribuss Engineering Inc (3), Walschon Fire Protection Inc (3), Design Build Develp. Stru (2), Dome Construction Corp (2), Mcm & Associates Inc. (2), R L H Fire Protection Inc (2), Westates Mechanical Corporation Inc (2), A C Logix Incorporated, Allied Fire Protection, Ayoob & Peery Plumbing Co Inc, Bay City Mechanical Inc, Bay City Mechanical Service Llc, California Suppresion Dba Calif. Protect, Capitol Electric Const, Cosco Fire Protection Inc., Gettler-Ryan Inc, Golden Gate Fire Protection Inc, Howard S Wright Construction Co., Icom Mechanical Inc., Mcclure Electric Inc, Orr Protection Systems Inc, Security Technologies Group Inc., Specialized Graphics Inc, Webcor Construction Lp
- Architects
- Charles Bloszies (13), Bert Deviterbo (6), Bruce F. Unger (2), Lauren Jordan (2), Charles Bloszies, Dan Huntsman, Gary Semling, John W. Johnson, Stanley H Lew
- Engineers
- Gladys Yang (2), Ronald M Blue (2), Blake Dilsworth, Brian Featherston, Dennis P.S. Cheung, Ehab H Omar, Galway O'mahony, Gummadi Dhama Reddy, Joon Suk Choi, Kevin Kinoshita, Prabhjeet Grewal, Ronald Laurence, Stephen Shafeer
- Authorized agent-otherss
- Doris Duong, Patrick Quach
- Designers
- Patrick Quach (2), Terrence Olson