Joon Suk Choi
- Listed as
- engineer
- Firm
- Blymer Engineers
- Based in
- Alameda
- On San Francisco permits
- Nov 2021 to Jan 2024
4 permits since 2000 (engineer on 4 permits): 1 completed, 1 in progress, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 18, 2024 | In progress issued Apr 2024 | 651 Brannan St | Adams Electrical Corporation | electrical work, replacement of roof-mounted generator, replacement of ats and addition of mts in 3/f electrical room, and addtiion of portable genrator connection cabinet in basement.Details
electrical work, replacement of roof-mounted generator, replacement of ats and addition of mts in 3/f electrical room, and addtiion of portable genrator connection cabinet in basement. | $575,000 |
| Mar 7, 2023 | Never finaled issued Apr 2023, no final | 360 Spear St | Icom Mechanical Inc. | replacement of roof mounted 300 ton air cooled chiller and 2 secondary chilled water pumpsDetails
replacement of roof mounted 300 ton air cooled chiller and 2 secondary chilled water pumps | $1,036,840 |
| Feb 14, 2023 | Never finaled issued Sep 2023, no final | 375 Newhall St | A C Logix Incorporated | replacement of 9 20 ton air conditioner units, 5 dry coolers 3 water pumps, new outside air ventilation system consisting of one fan and merv 13 filters onlyDetails
replacement of 9 20 ton air conditioner units, 5 dry coolers 3 water pumps, new outside air ventilation system consisting of one fan and merv 13 filters only | $2,444,787 |
| Nov 4, 2021 | Completed final sign-off Apr 2025 | 190 09th St | upgrades utilties & energy efficiency of the administration office of sf public library. the project includes: (1) replacement of hvac equipment on the roof and some interior hvac equipment; (2) addition of photovoltaics and batteries on the roof; (3) replacement of the roofing system.Details
upgrades utilties & energy efficiency of the administration office of sf public library. the project includes: (1) replacement of hvac equipment on the roof and some interior hvac equipment; (2) addition of photovoltaics and batteries on the roof; (3) replacement of the roofing system. | $5,768,600 |