Permit GraphShortlistSan Francisco building permits since 2000

Joon Suk Choi

License
E24039
Look the license up with the state
Listed as
engineer
Firm
Blymer Engineers
Based in
Alameda
On San Francisco permits
Nov 2021 to Jan 2024

4 permits since 2000 (engineer on 4 permits): 1 completed, 1 in progress, 2 never finaled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jan 18, 2024In progress
issued Apr 2024
651 Brannan StAdams Electrical Corporationelectrical work, replacement of roof-mounted generator, replacement of ats and addition of mts in 3/f electrical room, and addtiion of portable genrator connection cabinet in basement.
Details
Permit
202401184198
Status
issued
Filed
Jan 18, 2024
Permit issued
Apr 25, 2024
Declared cost
$575,000
Address
651 Brannan St

electrical work, replacement of roof-mounted generator, replacement of ats and addition of mts in 3/f electrical room, and addtiion of portable genrator connection cabinet in basement.

Open the permit page

$575,000
Mar 7, 2023Never finaled
issued Apr 2023, no final
360 Spear StIcom Mechanical Inc.replacement of roof mounted 300 ton air cooled chiller and 2 secondary chilled water pumps
Details
Permit
202303073191
Status
issued
Filed
Mar 7, 2023
Permit issued
Apr 28, 2023
Declared cost
$1,036,840
Address
360 Spear St

replacement of roof mounted 300 ton air cooled chiller and 2 secondary chilled water pumps

Open the permit page

$1,036,840
Feb 14, 2023Never finaled
issued Sep 2023, no final
375 Newhall StA C Logix Incorporatedreplacement of 9 20 ton air conditioner units, 5 dry coolers 3 water pumps, new outside air ventilation system consisting of one fan and merv 13 filters only
Details
Permit
202302141970
Status
issued
Filed
Feb 14, 2023
Permit issued
Sep 20, 2023
Declared cost
$2,444,787
Address
375 Newhall St

replacement of 9 20 ton air conditioner units, 5 dry coolers 3 water pumps, new outside air ventilation system consisting of one fan and merv 13 filters only

Open the permit page

$2,444,787
Nov 4, 2021Completed
final sign-off Apr 2025
190 09th Stupgrades utilties & energy efficiency of the administration office of sf public library. the project includes: (1) replacement of hvac equipment on the roof and some interior hvac equipment; (2) addition of photovoltaics and batteries on the roof; (3) replacement of the roofing system.
Details
Permit
202111041798
Status
complete
Filed
Nov 4, 2021
Permit issued
Jul 20, 2022
Final sign-off
Apr 17, 2025
Declared cost
$5,768,600
Address
190 09th St

upgrades utilties & energy efficiency of the administration office of sf public library. the project includes: (1) replacement of hvac equipment on the roof and some interior hvac equipment; (2) addition of photovoltaics and batteries on the roof; (3) replacement of the roofing system.

Open the permit page

$5,768,600