A C Logix Incorporated
- Based in
- Pleasanton
- On San Francisco permits
- Sep 2013 to Feb 2023
- Last 24 months
- 0 permits filed
6 permits since 2000: 3 completed, 3 never finaled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 14, 2023 | Never finaled issued Sep 2023, no final | 375 Newhall St | replacement of 9 20 ton air conditioner units, 5 dry coolers 3 water pumps, new outside air ventilation system consisting of one fan and merv 13 filters onlyDetails
replacement of 9 20 ton air conditioner units, 5 dry coolers 3 water pumps, new outside air ventilation system consisting of one fan and merv 13 filters only | $2,444,787 |
| Dec 11, 2019 | Never finaled issued Dec 2019, no final | 651 Brannan St | install mechanical cooling equipment and provide seismic anchorageDetails
install mechanical cooling equipment and provide seismic anchorage | $132,000 |
| Jun 8, 2016 | Completed final sign-off Apr 2017 | 360 Spear St | replace (1) york air cooled chiller due to age and degradation scope of work restricted to roof only.Details
replace (1) york air cooled chiller due to age and degradation scope of work restricted to roof only. | $107,680 |
| May 9, 2016 | Never finaled issued May 2016, no final | 274 Brannan St | relocate the existing make up air system due to newly constructed adjoining building that impeded air flow per code compliance requirements; maher n/aDetails
relocate the existing make up air system due to newly constructed adjoining building that impeded air flow per code compliance requirements; maher n/a | $16,824 |
| Jun 16, 2015 | Completed final sign-off May 2016 | 274 Brannan St | basement level - install (1) liebert dry cooler at manifold tie-ins & (3) liebert in-row crv units. n/a maher ordinanceDetails
basement level - install (1) liebert dry cooler at manifold tie-ins & (3) liebert in-row crv units. n/a maher ordinance | $112,000 |
| Sep 6, 2013 | Completed final sign-off Jun 2014 | 274 Brannan St | replace (3) b.a.c. fluid coolers due to age and degradation. disconnect & reconnect existing piping connections. install seismic isolation (replace) for each fluid cooler on existing column steel platform supports.Details
replace (3) b.a.c. fluid coolers due to age and degradation. disconnect & reconnect existing piping connections. install seismic isolation (replace) for each fluid cooler on existing column steel platform supports. | $87,000 |