Daniel Manheim Tennebaum-Manheim Engineers
- Listed as
- engineer
- Firm
- Tennebaum-Manhelm Engrs
- Based in
- San Francisco
- On San Francisco permits
- Sep 2015 to Nov 2021
28 permits since 2000 (engineer on 28 permits): 27 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 4, 2021 | Completed final sign-off Apr 2025 | 190 09th St | upgrades utilties & energy efficiency of the administration office of sf public library. the project includes: (1) replacement of hvac equipment on the roof and some interior hvac equipment; (2) addition of photovoltaics and batteries on the roof; (3) replacement of the roofing system.Details
upgrades utilties & energy efficiency of the administration office of sf public library. the project includes: (1) replacement of hvac equipment on the roof and some interior hvac equipment; (2) addition of photovoltaics and batteries on the roof; (3) replacement of the roofing system. | $5,768,600 | |
| Mar 16, 2016 | Completed final sign-off Aug 2019 | 989 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | rad priority processing. demolish 2 story, type 5-b, 6 dwelling unit building. deffered til issuance,approved by director.Details
rad priority processing. demolish 2 story, type 5-b, 6 dwelling unit building. deffered til issuance,approved by director. | $102,505 |
| Mar 16, 2016 | Never finaled issued Aug 2016, no final | 560 Alemany Bl | D.F.P.F Corp Dba Fine Line Construction | rad priority processing. demolish 2 story, type 5-b, 6 dwelling unit building. deffered til issuance,approved by director.Details
rad priority processing. demolish 2 story, type 5-b, 6 dwelling unit building. deffered til issuance,approved by director. | $102,505 |
| Mar 16, 2016 | Completed final sign-off Aug 2019 | 989 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | rad priority processing. erect 1 story, 4-dwelling, no basement, type v-b. deferred til issuance of addenda #1,approved by director.Details
rad priority processing. erect 1 story, 4-dwelling, no basement, type v-b. deferred til issuance of addenda #1,approved by director. | $1,768,000 |
| Mar 16, 2016 | Completed final sign-off Sep 2019 | 560 Alemany Bl | D.F.P.F Corp Dba Fine Line Construction | rad priority processing.erect 1 story, no basement, type v-b, community, office bldg. deferred til issuance of addenda #1,approved by director.Details
rad priority processing.erect 1 story, no basement, type v-b, community, office bldg. deferred til issuance of addenda #1,approved by director. | $2,409,000 |
| Feb 18, 2016 | Completed final sign-off Aug 2019 | 512 Alemany Bl | D.F.P.F Corp Dba Fine Line Construction | rad. bldg 20, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarging concrete stoops, new sprinkler system.Details
rad. bldg 20, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarging concrete stoops, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Aug 2019 | 861 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | rad. bldg 22, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarge concrete stoops. remove 2 level deck, replace with 1 level deck. awning over front entry doors.Details
rad. bldg 22, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarge concrete stoops. remove 2 level deck, replace with 1 level deck. awning over front entry doors. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Aug 2019 | 900 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | rad. bldg 18, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system.Details
rad. bldg 18, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Aug 2019 | 548 Alemany Bl | D.F.P.F Corp Dba Fine Line Construction | rad. bldg 14, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarging concrete stoops, new sprinkler system.Details
rad. bldg 14, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarging concrete stoops, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Aug 2019 | 801 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | rad. bldg 26, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarge concrete stoops. remove 2 level deck, replace with 1 level deck. awning over front entry doors.Details
rad. bldg 26, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarge concrete stoops. remove 2 level deck, replace with 1 level deck. awning over front entry doors. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Aug 2019 | 830 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | rad. bldg 24, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system.Details
rad. bldg 24, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Aug 2019 | 817 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | rad. bldg 25, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarge concrete stoops. remove 2 level deck, replace with 1 level deck. awning over front entry doors.Details
rad. bldg 25, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarge concrete stoops. remove 2 level deck, replace with 1 level deck. awning over front entry doors. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Aug 2019 | 901 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | rad. bldg 19, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarging concrete stoops, new sprinkler system.Details
rad. bldg 19, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarging concrete stoops, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Jul 2019 | 944 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | rad. bldg 6, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system.Details
rad. bldg 6, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Jul 2019 | 600 Alemany Bl | D.F.P.F Corp Dba Fine Line Construction | rad. bldg 1, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system.Details
rad. bldg 1, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Jul 2019 | 932 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | rad. bldg 7, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system.Details
rad. bldg 7, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Jul 2019 | 982 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | rad. bldg 2, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system.Details
rad. bldg 2, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Jul 2019 | 957 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | rad. bldg 11, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system.Details
rad. bldg 11, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Jul 2019 | 958 Ellsworth St | Tony Ng Plumbing Co, D.F.P.F Corp Dba Fine Line Construction | rad. bldg 4, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system.Details
rad. bldg 4, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Jul 2019 | 945 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | rad. bldg 12, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarging concrete stoops, new sprinkler system.Details
rad. bldg 12, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarging concrete stoops, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Aug 2019 | 845 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | rad. bldg 23, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarge concrete stoops. remove 2 level deck, replace with 1 level deck. awning over front entry doors.Details
rad. bldg 23, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarge concrete stoops. remove 2 level deck, replace with 1 level deck. awning over front entry doors. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Jul 2019 | 925 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | rad. bldg 15, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinish hardwood floors, enlarging concrete stoops. new office layouts. change community room to maintenance room. new sprinkler system.Details
rad. bldg 15, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinish hardwood floors, enlarging concrete stoops. new office layouts. change community room to maintenance room. new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Aug 2019 | 524 Alemany Bl | D.F.P.F Corp Dba Fine Line Construction | rad. bldg 17, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarging concrete stoops, new sprinkler system.Details
rad. bldg 17, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarging concrete stoops, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Jul 2019 | 500 Alemany Bl | D.F.P.F Corp Dba Fine Line Construction | rad. bldg 21, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarging concrete stoops, new sprinkler system.Details
rad. bldg 21, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarging concrete stoops, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Aug 2019 | 916 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | rad. bldg 8, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system.Details
rad. bldg 8, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Jul 2019 | 970 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | rad. bldg 3, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system.Details
rad. bldg 3, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Aug 2019 | 536 Alemany Bl | D.F.P.F Corp Dba Fine Line Construction | rad. bldg 16, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarging concrete stoops, new sprinkler system.Details
rad. bldg 16, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarging concrete stoops, new sprinkler system. | $1,982,000 |
| Sep 3, 2015 | Completed final sign-off May 2021 | 51 Havelock St | reconfiguration of (e) lockers, restrooms, and offices (n) community room. repair of (e) pool. (n) glazing in (e) window system. new entry ramp, stairs and canopy. new mechanical enclosure.Details
reconfiguration of (e) lockers, restrooms, and offices (n) community room. repair of (e) pool. (n) glazing in (e) window system. new entry ramp, stairs and canopy. new mechanical enclosure. | $3,000,000 |