D.F.P.F Corp Dba Fine Line Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Jul 2026
- Last 24 months
- 6 permits filed
301 permits since 2000: 244 completed, 7 in progress, 33 never finaled, 17 expired or cancelled.
Of the 33 never-finaled permits, 13 are 5 to 10 years old, 20 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 301.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 17, 2026 | In progress issued Jul 2026 | 774 Tehama St | revision to pa# 202412307532: relocate toilet room from 1st floor to 2nd floor and add bathtub. lengthen kitchenette. no change in quantity of light fixtures.Details
revision to pa# 202412307532: relocate toilet room from 1st floor to 2nd floor and add bathtub. lengthen kitchenette. no change in quantity of light fixtures. | |
| May 29, 2026 | In progress issued Aug 2026 | 150 09th St | revision to pa #202305026865-s2. revision to miscellaneous in field changed items to previous approved addendum 2 mechanical, electrical and plumbing drawings.Details
revision to pa #202305026865-s2. revision to miscellaneous in field changed items to previous approved addendum 2 mechanical, electrical and plumbing drawings. | |
| Feb 20, 2026 | In progress issued Mar 2026 | 150 09th St | rev to pa# 2023-0502-6865: revised aboo5 for emergency escape and resue 10/30/204 removal of proposed door at multipurpose room, added detail of fire rated access detail of fire rated access enclosed or smoke detector par approved fire alarm drawing (2023-0502-6865-s4)Details
rev to pa# 2023-0502-6865: revised aboo5 for emergency escape and resue 10/30/204 removal of proposed door at multipurpose room, added detail of fire rated access detail of fire rated access enclosed or smoke detector par approved fire alarm drawing (2023-0502-6865-s4) | |
| Dec 24, 2025 | In progress issued Jan 2026 | 150 09th St | revision to pa #202305026865 s2 to address 7/10/2025 correction notice: clarification to 3/25/24 ab-005 as updated 12/22/25 re: ceiling finishes at basementDetails
revision to pa #202305026865 s2 to address 7/10/2025 correction notice: clarification to 3/25/24 ab-005 as updated 12/22/25 re: ceiling finishes at basement | |
| Apr 19, 2025 | In progress issued Apr 2026 | 774 Tehama St | demo and reconstruction of second story and restrooms in response to the following notice of violations:nov#'s: 202425066, 202425811, and 202425824.scope of work is interior only.Details
demo and reconstruction of second story and restrooms in response to the following notice of violations:nov#'s: 202425066, 202425811, and 202425824.scope of work is interior only. | $90,000 |
| Jan 24, 2025 | In progress issued Feb 2025 | 150 09th St | exterior siding repairs at washburn street elevation: interior wood framing repairs for existing walls and joists from gound fl. to roof(unit stack x 20, x21, x22) and interior finishes repairs. all other gray out scope of work on plans under seperate approved permit application #202305026865.Details
exterior siding repairs at washburn street elevation: interior wood framing repairs for existing walls and joists from gound fl. to roof(unit stack x 20, x21, x22) and interior finishes repairs. all other gray out scope of work on plans under seperate approved permit application #202305026865. | $85,000 |
| May 2, 2023 | In progress issued Apr 2024 | 150 09th St | mayor dir 13-01. 100% affordable housing. comprehensive alterations, upgrades, & repairs to (e) el dorado res. hotel/(e) sro 4-story 57 units to increase to 62 residential public housing sleeping units.Details
mayor dir 13-01. 100% affordable housing. comprehensive alterations, upgrades, & repairs to (e) el dorado res. hotel/(e) sro 4-story 57 units to increase to 62 residential public housing sleeping units. | $9,000,000 |
| Jan 10, 2023 | Completed final sign-off May 2024 | 1240 Fillmore St | rev to pa# 201912270828: update toliet rm 01 and 02 layout from originally proposed two fully accessible toilet rooms to one fully accessible toilet rm and one typical toilet rm with new plumbing fixtures.Details
rev to pa# 201912270828: update toliet rm 01 and 02 layout from originally proposed two fully accessible toilet rooms to one fully accessible toilet rm and one typical toilet rm with new plumbing fixtures. | |
| Sep 16, 2022 | Completed final sign-off May 2024 | 1240 Fillmore St | revision to original permit #201912270828 approved pm 06/16/2021. new mail and package room w/ new usps mailboxes, new interior storefront system at manager and service offices; add kitchenette at (e) conference rm 2; management office re-organization.Details
revision to original permit #201912270828 approved pm 06/16/2021. new mail and package room w/ new usps mailboxes, new interior storefront system at manager and service offices; add kitchenette at (e) conference rm 2; management office re-organization. | $150,000 |
| Aug 30, 2021 | Completed final sign-off May 2024 | 1240 Fillmore St | replace existing generator with in kind at roof of penthouse.Details
replace existing generator with in kind at roof of penthouse. | $30,000 |
| Feb 4, 2021 | Completed final sign-off Feb 2021 | 1250 Sunnydale Av | to obtain final inspection for work approved under permit application #'s: 201812067575 and 201809129896. all work is completed.Details
to obtain final inspection for work approved under permit application #'s: 201812067575 and 201809129896. all work is completed. | $2,000,000 |
| Nov 6, 2020 | Completed final sign-off Aug 2023 | 440 Geary St | interior t.i. and change of use from r-1 to r-2 -to rehabilitate (e) tourist hotel use to congregate housing use. the scope consists of refreshing and replacing of finishes with limited required code upgrades. no exterior work. voluntary lateral force resisting system alteration.Details
interior t.i. and change of use from r-1 to r-2 -to rehabilitate (e) tourist hotel use to congregate housing use. the scope consists of refreshing and replacing of finishes with limited required code upgrades. no exterior work. voluntary lateral force resisting system alteration. | $1,500,000 |
| Dec 27, 2019 | Completed final sign-off May 2024 | 1240 Fillmore St | conversion of(8) ada units, selective seismic strengthening, replacement of exterior windows, selected roof replacement,(n)residence activity space @ (e) bldg envelope, finishes upgrade @ lobby, office, common community spaces & restrom upgrades, fire sprinkler upgrade, generator replacement.Details
conversion of(8) ada units, selective seismic strengthening, replacement of exterior windows, selected roof replacement,(n)residence activity space @ (e) bldg envelope, finishes upgrade @ lobby, office, common community spaces & restrom upgrades, fire sprinkler upgrade, generator replacement. | $15,000,000 |
| Oct 16, 2019 | Completed final sign-off Feb 2021 | 1250 Sunnydale Av | replace sport cout w/ picnic area and play structure for resident use onlyDetails
replace sport cout w/ picnic area and play structure for resident use only | $60,000 |
| Sep 6, 2019 | Completed final sign-off Jan 2021 | 1250 Sunnydale Av | (building i ): in kind replacement of one damaged glulam beam and exterior bridge deck hall due to wood rot at bldg i units 195 e-f on tag 3rd floor.Details
(building i ): in kind replacement of one damaged glulam beam and exterior bridge deck hall due to wood rot at bldg i units 195 e-f on tag 3rd floor. | $30,000 |
| Aug 26, 2019 | Completed final sign-off Oct 2021 | 1250 Sunnydale Av | replace in-kind of (1) damaged glulam beam and exterior bridge deck wall due to wood rot located in building "k" at units 185e and 185f. not visible from streetDetails
replace in-kind of (1) damaged glulam beam and exterior bridge deck wall due to wood rot located in building "k" at units 185e and 185f. not visible from street | $30,000 |
| May 7, 2019 | Completed final sign-off May 2019 | 330 Clementina St | to obtain final inspection for work approved under pa# 2017-0503-5573. all work is complete.Details
to obtain final inspection for work approved under pa# 2017-0503-5573. all work is complete. | |
| Mar 15, 2019 | Completed final sign-off Jul 2019 | 801 Ellsworth St | bldg 26: moh rad priority permit #201809241179 to be modified by deleting 4 awnings above second fl entrance doors due to safety concerns.Details
bldg 26: moh rad priority permit #201809241179 to be modified by deleting 4 awnings above second fl entrance doors due to safety concerns. | |
| Mar 15, 2019 | Completed final sign-off May 2019 | 320 Clementina St | rev to pa# 201510301361; delete the previously approved trash compactor enclosure and continue to use the existing trash rooms. install two new trash compactors in the existing trash rooms.Details
rev to pa# 201510301361; delete the previously approved trash compactor enclosure and continue to use the existing trash rooms. install two new trash compactors in the existing trash rooms. | |
| Mar 15, 2019 | Completed final sign-off Jul 2019 | 817 Ellsworth St | bldg 25: moh rad priority permit #201809241174 to be modified by deleting 4 awnings above second fl entrance doors due to safety concerns.Details
bldg 25: moh rad priority permit #201809241174 to be modified by deleting 4 awnings above second fl entrance doors due to safety concerns. | |
| Mar 15, 2019 | Completed final sign-off Jul 2019 | 861 Ellsworth St | bldg 22: moh rad priority permit #201809241175 to be modified by deleting 4 awnings above second fl entrance doors due to safety concerns.Details
bldg 22: moh rad priority permit #201809241175 to be modified by deleting 4 awnings above second fl entrance doors due to safety concerns. | |
| Mar 15, 2019 | Completed final sign-off Jul 2019 | 900 Ellsworth St | bldg 18: moh rad priority permit #201809271668 to be modified by deleting 4 awnings above second fl entrance doors due to safety concerns.Details
bldg 18: moh rad priority permit #201809271668 to be modified by deleting 4 awnings above second fl entrance doors due to safety concerns. | |
| Mar 15, 2019 | Completed final sign-off Jul 2019 | 845 Ellsworth St | bldg 23: moh rad priority permit #20189241173 to be modified by deleting 4 awnings above second fl entrance doors due to safety concerns.Details
bldg 23: moh rad priority permit #20189241173 to be modified by deleting 4 awnings above second fl entrance doors due to safety concerns. | |
| Mar 15, 2019 | Completed final sign-off Jul 2019 | 916 Ellsworth St | bldg 8: moh rad priority permit #201809271670 to be modified by deleting 4 awnings above second fl entrance doors due to safety concerns.Details
bldg 8: moh rad priority permit #201809271670 to be modified by deleting 4 awnings above second fl entrance doors due to safety concerns. | |
| Mar 15, 2019 | Completed final sign-off Jul 2019 | 830 Ellsworth St | bldg 24: moh rad priority permit #201809271669 to be modified by deleting 4 awnings above second fl entrance doors due to safety concerns.Details
bldg 24: moh rad priority permit #201809271669 to be modified by deleting 4 awnings above second fl entrance doors due to safety concerns. | |
| Mar 13, 2019 | Never finaled issued Apr 2019, no final | 2079 15th Av | revision to pa# 201404113071. revising title 24 report & energy inspection requirement.Details
revision to pa# 201404113071. revising title 24 report & energy inspection requirement. | |
| Jan 25, 2019 | Completed final sign-off Jul 2019 | 320 Clementina St | install retaining wall and steps for sffd access.Details
install retaining wall and steps for sffd access. | $100,000 |
| Jan 16, 2019 | Completed final sign-off Feb 2019 | 320 Clementina St | replace valves at wsp in both towers. 26 locationsDetails
replace valves at wsp in both towers. 26 locations | |
| Dec 18, 2018 | Completed final sign-off Jul 2019 | 441 Ellis St | provide repair to the balcony repair over the main entrance to a 6 story multi story nit residential bldgDetails
provide repair to the balcony repair over the main entrance to a 6 story multi story nit residential bldg | $10,000 |
| Dec 6, 2018 | Completed final sign-off Feb 2021 | 1250 Sunnydale Av | revision to pa 201705186936. modifiy sw corner along sunnydale ave to keep (e) electrical panels & fire riser in place. minor interior redesign to accomodate exterior changeDetails
revision to pa 201705186936. modifiy sw corner along sunnydale ave to keep (e) electrical panels & fire riser in place. minor interior redesign to accomodate exterior change | $50,000 |
| Nov 27, 2018 | Never finaled issued Dec 2018, no final | 500 Alemany Bl | moh rad priority mod permits (20160218) 9895, 9894, 9892, 9891, 9879, 9881, 9880, 9897, 9896, 9893, 9890, 9878, 9871, rev to approved permits (repeat) to clarity full scope of accessibility by the mayors office of disability in the enforcement of 2010 ada standards & the calif bldg codesDetails
moh rad priority mod permits (20160218) 9895, 9894, 9892, 9891, 9879, 9881, 9880, 9897, 9896, 9893, 9890, 9878, 9871, rev to approved permits (repeat) to clarity full scope of accessibility by the mayors office of disability in the enforcement of 2010 ada standards & the calif bldg codes | |
| Nov 27, 2018 | Never finaled issued Dec 2018, no final | 600 Alemany Bl | moh rad priority mod permits (20160218) 9882,9898,9889,9888,9887,9886,9885,9884,9883, rev to approved permits (*repeat) to clarify full scope of accessibility by the mayors office of disability on the enforcement of the 2010 ada standards and the calif. bldg codesDetails
moh rad priority mod permits (20160218) 9882,9898,9889,9888,9887,9886,9885,9884,9883, rev to approved permits (*repeat) to clarify full scope of accessibility by the mayors office of disability on the enforcement of the 2010 ada standards and the calif. bldg codes | |
| Nov 7, 2018 | Completed final sign-off May 2019 | 320 Clementina St | to obtain final inspection for work approved under pa# 200211201886Details
to obtain final inspection for work approved under pa# 200211201886 | |
| Nov 7, 2018 | Expired or cancelled expired Feb 2026 | 328 Tehama St | to obtain final inspection for work approved under pa# 200309185179Details
to obtain final inspection for work approved under pa# 200309185179 | |
| Nov 7, 2018 | Completed final sign-off May 2019 | 320 Clementina St | to obtain final inspection for work approved under pa# 8707120 & 8707121. two permitsDetails
to obtain final inspection for work approved under pa# 8707120 & 8707121. two permits | |
| Nov 2, 2018 | Never finaled issued Nov 2018, no final | 300 Franklin St | opening hole in sidewalk to repair sewer ventDetails
opening hole in sidewalk to repair sewer vent | $14,349 |
| Oct 17, 2018 | Completed final sign-off Feb 2019 | 1750 Mcallister St | as built revisions to permit #201509025870-s5 errcs; move bpa equipment to roof.Details
as built revisions to permit #201509025870-s5 errcs; move bpa equipment to roof. | |
| Oct 17, 2018 | Never finaled issued Feb 2019, no final | 255 Woodside Av | emergency responder radio coverage systemDetails
emergency responder radio coverage system | $50,000 |
| Oct 10, 2018 | Completed final sign-off Jan 2019 | 1139 Turk St | revision to pa #201804105922. move frame locations.Details
revision to pa #201804105922. move frame locations. | |
| Oct 10, 2018 | Completed final sign-off Jan 2019 | 1030 Golden Gate Av | revision to pa #201804105921. move frame locations.Details
revision to pa #201804105921. move frame locations. | |
| Sep 27, 2018 | Completed final sign-off Jul 2019 | 982 Ellsworth St | bldg 2 mohrad priority mod permit per pa 2016-0218-9883 revision to approved permit2016-0218-9883 to clarify full scope of accessibility by the mayor's office of disabililty in the enforcement of the 2010 ada standards and ca bldg codeDetails
bldg 2 mohrad priority mod permit per pa 2016-0218-9883 revision to approved permit2016-0218-9883 to clarify full scope of accessibility by the mayor's office of disabililty in the enforcement of the 2010 ada standards and ca bldg code | |
| Sep 27, 2018 | Completed final sign-off Aug 2019 | 830 Ellsworth St | bldg 24 mohrad priority mod permit per pa 2016-0218-9898 revision to approved permit 2016-0218-9898 to clarify full scope of accessibility by the mayor's office of disabililty in the enforcement of the 2010 ada standards and ca bldg codeDetails
bldg 24 mohrad priority mod permit per pa 2016-0218-9898 revision to approved permit 2016-0218-9898 to clarify full scope of accessibility by the mayor's office of disabililty in the enforcement of the 2010 ada standards and ca bldg code | |
| Sep 27, 2018 | Completed final sign-off Aug 2019 | 900 Ellsworth St | bldg 18 modrad priority mod permit per pa 2016-0218-9889 revision to approved permit 2016-0218-9889 to clarify full scope of accessibility by the mayor's office of disabililty in the enforcement of the 2010 ada standards and ca bldg codeDetails
bldg 18 modrad priority mod permit per pa 2016-0218-9889 revision to approved permit 2016-0218-9889 to clarify full scope of accessibility by the mayor's office of disabililty in the enforcement of the 2010 ada standards and ca bldg code | |
| Sep 27, 2018 | Completed final sign-off Jul 2019 | 944 Ellsworth St | bldg 6 modrad priority mod permit per pa 2016-0218-9886 revision to approved permit 2016-0218-9886 to clarify full scope of accessibility by the mayor's office of disabililty in the enforcement of the 2010 ada standards and ca bldg codeDetails
bldg 6 modrad priority mod permit per pa 2016-0218-9886 revision to approved permit 2016-0218-9886 to clarify full scope of accessibility by the mayor's office of disabililty in the enforcement of the 2010 ada standards and ca bldg code | |
| Sep 27, 2018 | Completed final sign-off Jul 2019 | 600 Alemany Bl | bldg 1 mohrad priority mod permit per pa 2016-0218-9882 revision to approved permit 2016-0218-9882 to clarify full scope of accessibility by the mayor's office of disabililty in the enforcement of the 2010 ada standards and ca bldg codeDetails
bldg 1 mohrad priority mod permit per pa 2016-0218-9882 revision to approved permit 2016-0218-9882 to clarify full scope of accessibility by the mayor's office of disabililty in the enforcement of the 2010 ada standards and ca bldg code | |
| Sep 27, 2018 | Completed final sign-off Jul 2019 | 932 Ellsworth St | bldg 7 mohrad priority mod permit per pa 2016-0218-9887 revision to approved permit 2016-0218-9887 to clarify full scope of accessibility by the mayor's office of disabililty in the enforcement of the 2010 ada standards and ca bldg codeDetails
bldg 7 mohrad priority mod permit per pa 2016-0218-9887 revision to approved permit 2016-0218-9887 to clarify full scope of accessibility by the mayor's office of disabililty in the enforcement of the 2010 ada standards and ca bldg code | |
| Sep 27, 2018 | Completed final sign-off Jul 2019 | 958 Ellsworth St | bldg 4 mohrad priority mod permit per pa 2016-0218-9885 revision to approved permit 2016-0218-9885 to clarify full scope of accessibility by the mayor's office of disabililty in the enforcement of the 2010 ada standards and ca bldg codeDetails
bldg 4 mohrad priority mod permit per pa 2016-0218-9885 revision to approved permit 2016-0218-9885 to clarify full scope of accessibility by the mayor's office of disabililty in the enforcement of the 2010 ada standards and ca bldg code | |
| Sep 27, 2018 | Completed final sign-off Jul 2019 | 970 Ellsworth St | bldg 3 mohrad priority mod permit per pa 2016-0218-9884 revision to approved permit 2016-0218-9884 to clarify full scope of accessibility by the mayor's office of disabililty in the enforcement of the 2010 ada standards and ca bldg codeDetails
bldg 3 mohrad priority mod permit per pa 2016-0218-9884 revision to approved permit 2016-0218-9884 to clarify full scope of accessibility by the mayor's office of disabililty in the enforcement of the 2010 ada standards and ca bldg code | |
| Sep 27, 2018 | Completed final sign-off Aug 2019 | 916 Ellsworth St | bldg 8 modrad priority mod permit per pa 2016-0218-9888 revision to approved permit 2016-0218-9888 to clarify full scope of accessibility by the mayor's office of disabililty in the enforcement of the 2010 ada standards and ca bldg codeDetails
bldg 8 modrad priority mod permit per pa 2016-0218-9888 revision to approved permit 2016-0218-9888 to clarify full scope of accessibility by the mayor's office of disabililty in the enforcement of the 2010 ada standards and ca bldg code | |
| Sep 24, 2018 | Completed final sign-off Aug 2019 | 548 Alemany Bl | bldg 14 - moh rad priority mod permit per 2016-0218-9879 revision to approver permit 2016-0218-9879 to clarify full scope of accessibility by the mayor's office of disability in the enforcement of the 2010 ada standards and the ca bldg codeDetails
bldg 14 - moh rad priority mod permit per 2016-0218-9879 revision to approver permit 2016-0218-9879 to clarify full scope of accessibility by the mayor's office of disability in the enforcement of the 2010 ada standards and the ca bldg code | |
| Sep 24, 2018 | Completed final sign-off Aug 2019 | 845 Ellsworth St | moh rad priority-mod permit per permit 201602189897 rev to approved permit 201602189897 to clarify full scope of accessibility by the mayors office of disability in the enforcement to the 2010 ada standards and the cbcDetails
moh rad priority-mod permit per permit 201602189897 rev to approved permit 201602189897 to clarify full scope of accessibility by the mayors office of disability in the enforcement to the 2010 ada standards and the cbc | |
| Sep 24, 2018 | Never finaled issued Oct 2018, no final | 512 Alemany Bl | revision to pa 201602189894 mohrad. building 20, clarify full cope of accessibility by mayor's office of disability enforcement of 2010 ada standards and cal build codeDetails
revision to pa 201602189894 mohrad. building 20, clarify full cope of accessibility by mayor's office of disability enforcement of 2010 ada standards and cal build code | |
| Sep 24, 2018 | Completed final sign-off Aug 2019 | 861 Ellsworth St | moh rad priority-mod permit per permit 201602189896 rev to approved permit 201602189896 to clarify full scope of accessibility by the mayors office of disability in the enforcement to the 2010 ada standards and the cbcDetails
moh rad priority-mod permit per permit 201602189896 rev to approved permit 201602189896 to clarify full scope of accessibility by the mayors office of disability in the enforcement to the 2010 ada standards and the cbc | |
| Sep 24, 2018 | Completed final sign-off Aug 2019 | 536 Alemany Bl | bldg 16 - moh rad priority mod permit per 2016-0218-9891 revision to approver permit 2016-0218-9891 to clarify full scope of accessibility by the mayor's office of disability in the enforcement of the 2010 ada standards and the ca bldg codeDetails
bldg 16 - moh rad priority mod permit per 2016-0218-9891 revision to approver permit 2016-0218-9891 to clarify full scope of accessibility by the mayor's office of disability in the enforcement of the 2010 ada standards and the ca bldg code | |
| Sep 24, 2018 | Completed final sign-off Aug 2019 | 817 Ellsworth St | moh rad priority-mod permit per permit 201602189880 rev to approved permit 2011602189880 to clarify full scope of accessibility by the mayors office of disability in the enforcement to the 2010 ada standards and the cbcDetails
moh rad priority-mod permit per permit 201602189880 rev to approved permit 2011602189880 to clarify full scope of accessibility by the mayors office of disability in the enforcement to the 2010 ada standards and the cbc | |
| Sep 24, 2018 | Completed final sign-off Jul 2019 | 925 Ellsworth St | bldg 15 - moh rad priority mod permit per 2016-0218-9890 revision to approver permit 2016-0218-9890 to clarify full scope of accessibility by the mayor's office of disability in the enforcement of the 2010 ada standards and the ca bldg codeDetails
bldg 15 - moh rad priority mod permit per 2016-0218-9890 revision to approver permit 2016-0218-9890 to clarify full scope of accessibility by the mayor's office of disability in the enforcement of the 2010 ada standards and the ca bldg code | |
| Sep 24, 2018 | Completed final sign-off Jul 2019 | 500 Alemany Bl | moh rad priority-mod permit per permit 201602189895 rev to approved permit 201602189895 to clarify full scope of accessibility by the mayors office of disability in the enforcement to the 2010 ada standards and the cbcDetails
moh rad priority-mod permit per permit 201602189895 rev to approved permit 201602189895 to clarify full scope of accessibility by the mayors office of disability in the enforcement to the 2010 ada standards and the cbc | |
| Sep 24, 2018 | Completed final sign-off Aug 2019 | 901 Ellsworth St | revision to pa 201602189893 mohrad. building 19, clarify full cope of accessibility by mayor's office of disability enforcement of 2010 ada standards and cal build codeDetails
revision to pa 201602189893 mohrad. building 19, clarify full cope of accessibility by mayor's office of disability enforcement of 2010 ada standards and cal build code | |
| Sep 24, 2018 | Completed final sign-off Jul 2019 | 957 Ellsworth St | revision to pa 201602189871 mohrad. building 11, clarify full cope of accessibility by mayor's office of disability enforcement of 2010 ada standards and cal build codeDetails
revision to pa 201602189871 mohrad. building 11, clarify full cope of accessibility by mayor's office of disability enforcement of 2010 ada standards and cal build code | |
| Sep 24, 2018 | Completed final sign-off Aug 2019 | 801 Ellsworth St | bldg 26 - moh rad priority mod permit per 2016-0218-9881 revision to approver permit 2016-0218-9890 to clarify full scope of accessibility by the mayor's office of disability in the enforcement of the 2010 ada standards and the ca bldg codeDetails
bldg 26 - moh rad priority mod permit per 2016-0218-9881 revision to approver permit 2016-0218-9890 to clarify full scope of accessibility by the mayor's office of disability in the enforcement of the 2010 ada standards and the ca bldg code | |
| Sep 24, 2018 | Completed final sign-off Aug 2019 | 524 Alemany Bl | revision to pa 201602189892 mohrad. building 17, clarify full cope of accessibility by mayor's office of disability enforcement of 2010 ada standards and cal build codeDetails
revision to pa 201602189892 mohrad. building 17, clarify full cope of accessibility by mayor's office of disability enforcement of 2010 ada standards and cal build code | |
| Sep 24, 2018 | Completed final sign-off Jul 2019 | 945 Ellsworth St | bldg 12 moh rad priority mod permit per 2016-0218-9878 revision to approver permit 2016-0218-9878 to clarify full scope of accessibility by the mayor's office of disability in the enforcement of the 2010 ada standards and the ca bldg codeDetails
bldg 12 moh rad priority mod permit per 2016-0218-9878 revision to approver permit 2016-0218-9878 to clarify full scope of accessibility by the mayor's office of disability in the enforcement of the 2010 ada standards and the ca bldg code | |
| Sep 12, 2018 | Completed final sign-off Feb 2021 | 1250 Sunnydale Av | rev to pa#201704063370; removal of (e) wood retaining wall & construction of (n) cip conc site retaining wall in same locationDetails
rev to pa#201704063370; removal of (e) wood retaining wall & construction of (n) cip conc site retaining wall in same location | $17,500 |
| Sep 12, 2018 | Never finaled issued Feb 2019, no final | 462 Duboce Av | instalation of emergency responder radio coverage system. ref 201504012572.Details
instalation of emergency responder radio coverage system. ref 201504012572. | $49,999 |
| Sep 7, 2018 | Never finaled issued Oct 2018, no final | 932 Ellsworth St | storm water (site), sanitary sewer (site). ref bp#201602189887 & pp20180524694.Details
storm water (site), sanitary sewer (site). ref bp#201602189887 & pp20180524694. | |
| Aug 17, 2018 | Completed final sign-off Feb 2019 | 1250 Sunnydale Av | revision to pa # 201704063370. change of ramp slope from 1:12 to 1:10 due to (e) conditions preventing ada ramp. ramp to be removed from site accessbile path of travelDetails
revision to pa # 201704063370. change of ramp slope from 1:12 to 1:10 due to (e) conditions preventing ada ramp. ramp to be removed from site accessbile path of travel | |
| Aug 8, 2018 | Completed final sign-off Sep 2018 | 1855 15th St | revisions to pa # 201510301342. revise ramp at parking lot to meet code requirementsDetails
revisions to pa # 201510301342. revise ramp at parking lot to meet code requirements | $10,000 |
| Jul 5, 2018 | Completed final sign-off Sep 2018 | 1855 15th St | rev. to #201510301342. tech infeasibility (4) doors; maint. room-recess ext door & add 2nd accessible entry/exit door thru community rm; remove ext hardware @ gate g2 & door str 1a; provide occup load & exiting diagram; add mailbox canopy; change window 4a @ office to storefront door & sidelite.Details
rev. to #201510301342. tech infeasibility (4) doors; maint. room-recess ext door & add 2nd accessible entry/exit door thru community rm; remove ext hardware @ gate g2 & door str 1a; provide occup load & exiting diagram; add mailbox canopy; change window 4a @ office to storefront door & sidelite. | $32,500 |
| Jun 27, 2018 | Completed final sign-off Jul 2019 | 958 Ellsworth St | revision to 201602189855-s5. revised plans fp-8 and fp-9 nfpa 13r. applicable codes 2013 nfpa13r. changes are the removal of sprinkler heads in the bathrooms and closets. hydraulic calculations and pipe sizes were not changed from the original nfpa13 desgin woth tthe elimination of those sprinklersDetails
revision to 201602189855-s5. revised plans fp-8 and fp-9 nfpa 13r. applicable codes 2013 nfpa13r. changes are the removal of sprinkler heads in the bathrooms and closets. hydraulic calculations and pipe sizes were not changed from the original nfpa13 desgin woth tthe elimination of those sprinklers | |
| Jun 21, 2018 | Completed final sign-off Apr 2019 | 401 Van Ness Av | office ti 2 e suites on the 3rd fl war memorial veterans building. total 7525 gross sq ft suite 313 2940 sq ft add sidelites, build 3 interior walls new paint new carpet in 2 offices. suite 310 4585 sq ft new fl finish, new offices, storage rooms, podcast room, storage closed meeting rm per plan,Details
office ti 2 e suites on the 3rd fl war memorial veterans building. total 7525 gross sq ft suite 313 2940 sq ft add sidelites, build 3 interior walls new paint new carpet in 2 offices. suite 310 4585 sq ft new fl finish, new offices, storage rooms, podcast room, storage closed meeting rm per plan, | $853,000 |
| Jun 7, 2018 | Completed final sign-off Jul 2019 | 958 Ellsworth St | revised fire sprinkler 201602189885-s5 per nfpa 13 to be approved per nfpa 13r. removal of sp heads in baths, closets. hydraulic calcs and pipe sized not changed from orig design. plan sheets fp1 thru fp7 and fp10Details
revised fire sprinkler 201602189885-s5 per nfpa 13 to be approved per nfpa 13r. removal of sp heads in baths, closets. hydraulic calcs and pipe sized not changed from orig design. plan sheets fp1 thru fp7 and fp10 | $1,982 |
| Apr 25, 2018 | Completed final sign-off Sep 2018 | 1855 15th St | obtain a permit for existing generator (ref pa 9312123)Details
obtain a permit for existing generator (ref pa 9312123) | $15,000 |
| Mar 22, 2018 | Completed final sign-off May 2019 | 320 Clementina St | revision to 201510301361. replace doors (4) to 90 min rated and add intumescent paint to elec rooms as agreed by sffdDetails
revision to 201510301361. replace doors (4) to 90 min rated and add intumescent paint to elec rooms as agreed by sffd | |
| Feb 14, 2018 | Expired or cancelled withdrawn Apr 2018 | 15 Brush Pl | additional work to previously approved pa #201706255077. create new 2nd fl from (e) mezzanine. all bathrooms to be updated to ada compliance. correct pa #200706255077 to classify structure as 1-story and mezzanine instead of 2-story.Details
additional work to previously approved pa #201706255077. create new 2nd fl from (e) mezzanine. all bathrooms to be updated to ada compliance. correct pa #200706255077 to classify structure as 1-story and mezzanine instead of 2-story. | $45,000 |
| Feb 8, 2018 | Completed final sign-off Sep 2018 | 1855 15th St | revision to 201510301342: change 1 covered unit to mobility - unit 201, remove (e) bathrun & replace with roll in shower @ covered unit #107. revise showers at covered units #106 & 107 ti request #1. convert covered units #808 to fully adaptable units. revise lobby ceiling & lighting. update...Details
revision to 201510301342: change 1 covered unit to mobility - unit 201, remove (e) bathrun & replace with roll in shower @ covered unit #107. revise showers at covered units #106 & 107 ti request #1. convert covered units #808 to fully adaptable units. revise lobby ceiling & lighting. update... | $500,000 |
| Dec 21, 2017 | Completed final sign-off Jun 2018 | 3850 18th St | revision to pa #201510301343-s1 (arch/structural/mep): revise unit 108 to communications unit. fire alarm under separate unit. n/a maherDetails
revision to pa #201510301343-s1 (arch/structural/mep): revise unit 108 to communications unit. fire alarm under separate unit. n/a maher | $5,000 |
| Dec 19, 2017 | Completed final sign-off May 2019 | 320 Clementina St | relocation of fire pump room. ref pa 2015-1030-1361 for residential 13 story bldg (north and south tower)Details
relocation of fire pump room. ref pa 2015-1030-1361 for residential 13 story bldg (north and south tower) | |
| Dec 12, 2017 | Completed final sign-off Nov 2018 | 1855 15th St | revision to 201510301342 replace sewer lateral out to street, cut & patch. ground floor struct slab as needed. cut and replace sidewalk as needed cut & patch street as needed.Details
revision to 201510301342 replace sewer lateral out to street, cut & patch. ground floor struct slab as needed. cut and replace sidewalk as needed cut & patch street as needed. | $40,000 |
| Dec 1, 2017 | Completed final sign-off Sep 2018 | 1855 15th St | revision to pa 201510301342 revise front courtyard to include: demo of (e) cmu wall and roof around mailboxes, relocate new mailboxes, replace and add conc paving, relocate entry gate, add metal permieter fencing, revise landsc ape and irrigationDetails
revision to pa 201510301342 revise front courtyard to include: demo of (e) cmu wall and roof around mailboxes, relocate new mailboxes, replace and add conc paving, relocate entry gate, add metal permieter fencing, revise landsc ape and irrigation | $79,000 |
| Nov 29, 2017 | Completed final sign-off Jun 2018 | 3850 18th St | revision to (e) pa#201510301343, remove and replace 830 sf of hardscape, prefab bbq island site furnishings maher not reqDetails
revision to (e) pa#201510301343, remove and replace 830 sf of hardscape, prefab bbq island site furnishings maher not req | $60,612 |
| Nov 9, 2017 | Completed final sign-off Jun 2018 | 3850 18th St | revision to app# 201510301343. revise showers at 3 covered units: 2012,508, & 510. request for approval of technical infeasibility due to extg site constraints. n/a for maherDetails
revision to app# 201510301343. revise showers at 3 covered units: 2012,508, & 510. request for approval of technical infeasibility due to extg site constraints. n/a for maher | $600 |
| Sep 29, 2017 | Completed final sign-off Nov 2019 | 2079 15th Av | revision 201404110371, s1/r1 modiffy front porch steps, modify exterior steps on south side leading to rear yardDetails
revision 201404110371, s1/r1 modiffy front porch steps, modify exterior steps on south side leading to rear yard | |
| Aug 24, 2017 | Completed final sign-off Oct 2017 | 345 Hermann St | revision to pa #201504012572. revised items include change to accessible patio doors, add communication features to units. add handrails, change in exit only gate. eliminate automatic door push pad, key pad, & intercom. add level landing at door & add accessible trash chute & fire rated enclosureDetails
revision to pa #201504012572. revised items include change to accessible patio doors, add communication features to units. add handrails, change in exit only gate. eliminate automatic door push pad, key pad, & intercom. add level landing at door & add accessible trash chute & fire rated enclosure | $5,000 |
| Aug 21, 2017 | Completed final sign-off Aug 2017 | 255 Woodside Av | revision to 201701318273. reduce scope of work. eliminate previously proposed wall and door in mech/boiler rmDetails
revision to 201701318273. reduce scope of work. eliminate previously proposed wall and door in mech/boiler rm | |
| Jul 21, 2017 | Completed final sign-off Jun 2018 | 3850 18th St | revision to app#201510301343. revision of 2 extg units to communication units #509, #510. separate life-safty permit required. n/a for maherDetails
revision to app#201510301343. revision of 2 extg units to communication units #509, #510. separate life-safty permit required. n/a for maher | $25,000 |
| Jul 21, 2017 | Completed final sign-off Sep 2018 | 1855 15th St | revision to app#201510301342. 1)revise extg bathtub to roll in shower at 2 units: #201 and #403. 2)revise extg unit to communication unit #503. seperate life safety permit required.Details
revision to app#201510301342. 1)revise extg bathtub to roll in shower at 2 units: #201 and #403. 2)revise extg unit to communication unit #503. seperate life safety permit required. | |
| Jun 19, 2017 | Completed final sign-off Jun 2018 | 3850 18th St | reasonable accomodation requests, remove e bathtub and replace with rollin in showers, at 3 units, #303, #508, #510. install devices for hearing/vision impaired communication at 4 units,#203, #206, #221, #3156. revision to 201510301343. maher n/aDetails
reasonable accomodation requests, remove e bathtub and replace with rollin in showers, at 3 units, #303, #508, #510. install devices for hearing/vision impaired communication at 4 units,#203, #206, #221, #3156. revision to 201510301343. maher n/a | $20,000 |
| Jun 19, 2017 | Completed final sign-off Nov 2018 | 1855 15th St | revision to pa# 2015-1030-1342: remove tub and replace with roll in shower at unit #110. revise location of kitchen at unit #400. add closet and tv cabinet at community rm.Details
revision to pa# 2015-1030-1342: remove tub and replace with roll in shower at unit #110. revise location of kitchen at unit #400. add closet and tv cabinet at community rm. | $60,000 |
| May 24, 2017 | Completed final sign-off May 2019 | 320 Clementina St | revision to pa 2015-1030-1361 for laundry gas line extensionDetails
revision to pa 2015-1030-1361 for laundry gas line extension | $26,723 |
| May 18, 2017 | Completed final sign-off Feb 2021 | 1250 Sunnydale Av | addition & renovation of commons area in an exiting multi family development, including a community room, management office, and other associated spaces.Details
addition & renovation of commons area in an exiting multi family development, including a community room, management office, and other associated spaces. | $433,000 |
| May 18, 2017 | Completed final sign-off Sep 2017 | 25 Sanchez St | permit revision, revision to pa 2017-0130-8215 - revised rear patio area, leave existing fenceDetails
permit revision, revision to pa 2017-0130-8215 - revised rear patio area, leave existing fence | |
| May 18, 2017 | Completed final sign-off Sep 2017 | 462 Duboce Av | landscape plan revision. revision to pa 2017-0130-8218, revised courtyardDetails
landscape plan revision. revision to pa 2017-0130-8218, revised courtyard | |
| May 18, 2017 | Never finaled issued Jun 2017, no final | 255 Woodside Av | permit revision to pa 2017-0130-8219 - revised main courtyardDetails
permit revision to pa 2017-0130-8219 - revised main courtyard | |
| May 3, 2017 | Never finaled issued May 2017, no final | 320 Clementina St | revision to 201510301361 to revise typical unit balcony door threshold detailDetails
revision to 201510301361 to revise typical unit balcony door threshold detail | |
| Apr 24, 2017 | Completed final sign-off May 2019 | 100 Appleton Av | replacement of 5 playstructure equipment in common areas and addition of concrete paving. new plantingDetails
replacement of 5 playstructure equipment in common areas and addition of concrete paving. new planting | $175,000 |
| Mar 29, 2017 | Completed final sign-off Sep 2018 | 1855 15th St | revision to 201510301342: remove/replace bathtubs with roll-in showers, at 3 units revise sill detail at sliding glass doors, at 5 units: 106-110 revisew window to 36" wide door & sidelight at 1 office: 1120 add shower threshold detail at roll-in showersDetails
revision to 201510301342: remove/replace bathtubs with roll-in showers, at 3 units revise sill detail at sliding glass doors, at 5 units: 106-110 revisew window to 36" wide door & sidelight at 1 office: 1120 add shower threshold detail at roll-in showers | |
| Mar 29, 2017 | Completed final sign-off Sep 2018 | 3850 18th St | revision to 201510301343: remove bathtubs & replace with roll-in showers, at 2 units 212 & 518 . change location & layout of community kitchen & revise electrical, cabinets, door & finishes. revise 1 door & sidelight. add shower threshold detail at roll-in showersDetails
revision to 201510301343: remove bathtubs & replace with roll-in showers, at 2 units 212 & 518 . change location & layout of community kitchen & revise electrical, cabinets, door & finishes. revise 1 door & sidelight. add shower threshold detail at roll-in showers | $120,000 |
| Mar 17, 2017 | Never finaled issued Apr 2017, no final | 320 Clementina St | revision to 201510301361 to revise breezeway between the two towers, (320 & 330 clementina)Details
revision to 201510301361 to revise breezeway between the two towers, (320 & 330 clementina) | |
| Feb 13, 2017 | Completed final sign-off Aug 2017 | 255 Woodside Av | revision to pa#201503201474, revise full scope of work in #501 to remain, revise total unit count from 110 to 109 due to #224 has been converted from a dwelling to an office for management at the bldg.Details
revision to pa#201503201474, revise full scope of work in #501 to remain, revise total unit count from 110 to 109 due to #224 has been converted from a dwelling to an office for management at the bldg. | |
| Jan 31, 2017 | Never finaled issued Mar 2017, no final | 255 Woodside Av | revision to pa #201503201474 - new electrical room for switch gear replacement.Details
revision to pa #201503201474 - new electrical room for switch gear replacement. |