Block 5843, lot 008
840 Ellsworth St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
42 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 11, 2019 | Never finaled issued Sep 2019, no final | 938 Ellsworth St | street spaceDetails
street space | ||
| Jul 26, 2019 | Never finaled issued Jul 2019, no final | 938 Ellsworth St | street spaceDetails
street space | ||
| Mar 15, 2019 | Completed final sign-off Jul 2019 | 916 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | bldg 8: moh rad priority permit #201809271670 to be modified by deleting 4 awnings above second fl entrance doors due to safety concerns.Details
bldg 8: moh rad priority permit #201809271670 to be modified by deleting 4 awnings above second fl entrance doors due to safety concerns. | |
| Mar 15, 2019 | Completed final sign-off Jul 2019 | 900 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | bldg 18: moh rad priority permit #201809271668 to be modified by deleting 4 awnings above second fl entrance doors due to safety concerns.Details
bldg 18: moh rad priority permit #201809271668 to be modified by deleting 4 awnings above second fl entrance doors due to safety concerns. | |
| Mar 15, 2019 | Completed final sign-off Jul 2019 | 830 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | bldg 24: moh rad priority permit #201809271669 to be modified by deleting 4 awnings above second fl entrance doors due to safety concerns.Details
bldg 24: moh rad priority permit #201809271669 to be modified by deleting 4 awnings above second fl entrance doors due to safety concerns. | |
| Jan 10, 2019 | Never finaled issued Jan 2019, no final | 954 Ellsworth St | street spaceDetails
street space | ||
| Nov 27, 2018 | Never finaled issued Dec 2018, no final | 600 Alemany Bl | D.F.P.F Corp Dba Fine Line Construction | moh rad priority mod permits (20160218) 9882,9898,9889,9888,9887,9886,9885,9884,9883, rev to approved permits (*repeat) to clarify full scope of accessibility by the mayors office of disability on the enforcement of the 2010 ada standards and the calif. bldg codesDetails
moh rad priority mod permits (20160218) 9882,9898,9889,9888,9887,9886,9885,9884,9883, rev to approved permits (*repeat) to clarify full scope of accessibility by the mayors office of disability on the enforcement of the 2010 ada standards and the calif. bldg codes | |
| Nov 19, 2018 | Never finaled issued Nov 2018, no final | 954 Ellsworth St | street spaceDetails
street space | ||
| Oct 1, 2018 | Never finaled issued Oct 2018, no final | 960 Ellsworth St | street spaceDetails
street space | ||
| Sep 27, 2018 | Completed final sign-off Jul 2019 | 982 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | bldg 2 mohrad priority mod permit per pa 2016-0218-9883 revision to approved permit2016-0218-9883 to clarify full scope of accessibility by the mayor's office of disabililty in the enforcement of the 2010 ada standards and ca bldg codeDetails
bldg 2 mohrad priority mod permit per pa 2016-0218-9883 revision to approved permit2016-0218-9883 to clarify full scope of accessibility by the mayor's office of disabililty in the enforcement of the 2010 ada standards and ca bldg code | |
| Sep 27, 2018 | Completed final sign-off Aug 2019 | 900 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | bldg 18 modrad priority mod permit per pa 2016-0218-9889 revision to approved permit 2016-0218-9889 to clarify full scope of accessibility by the mayor's office of disabililty in the enforcement of the 2010 ada standards and ca bldg codeDetails
bldg 18 modrad priority mod permit per pa 2016-0218-9889 revision to approved permit 2016-0218-9889 to clarify full scope of accessibility by the mayor's office of disabililty in the enforcement of the 2010 ada standards and ca bldg code | |
| Sep 27, 2018 | Completed final sign-off Aug 2019 | 830 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | bldg 24 mohrad priority mod permit per pa 2016-0218-9898 revision to approved permit 2016-0218-9898 to clarify full scope of accessibility by the mayor's office of disabililty in the enforcement of the 2010 ada standards and ca bldg codeDetails
bldg 24 mohrad priority mod permit per pa 2016-0218-9898 revision to approved permit 2016-0218-9898 to clarify full scope of accessibility by the mayor's office of disabililty in the enforcement of the 2010 ada standards and ca bldg code | |
| Sep 27, 2018 | Completed final sign-off Jul 2019 | 600 Alemany Bl | D.F.P.F Corp Dba Fine Line Construction | bldg 1 mohrad priority mod permit per pa 2016-0218-9882 revision to approved permit 2016-0218-9882 to clarify full scope of accessibility by the mayor's office of disabililty in the enforcement of the 2010 ada standards and ca bldg codeDetails
bldg 1 mohrad priority mod permit per pa 2016-0218-9882 revision to approved permit 2016-0218-9882 to clarify full scope of accessibility by the mayor's office of disabililty in the enforcement of the 2010 ada standards and ca bldg code | |
| Sep 27, 2018 | Completed final sign-off Jul 2019 | 944 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | bldg 6 modrad priority mod permit per pa 2016-0218-9886 revision to approved permit 2016-0218-9886 to clarify full scope of accessibility by the mayor's office of disabililty in the enforcement of the 2010 ada standards and ca bldg codeDetails
bldg 6 modrad priority mod permit per pa 2016-0218-9886 revision to approved permit 2016-0218-9886 to clarify full scope of accessibility by the mayor's office of disabililty in the enforcement of the 2010 ada standards and ca bldg code | |
| Sep 27, 2018 | Completed final sign-off Jul 2019 | 970 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | bldg 3 mohrad priority mod permit per pa 2016-0218-9884 revision to approved permit 2016-0218-9884 to clarify full scope of accessibility by the mayor's office of disabililty in the enforcement of the 2010 ada standards and ca bldg codeDetails
bldg 3 mohrad priority mod permit per pa 2016-0218-9884 revision to approved permit 2016-0218-9884 to clarify full scope of accessibility by the mayor's office of disabililty in the enforcement of the 2010 ada standards and ca bldg code | |
| Sep 27, 2018 | Completed final sign-off Aug 2019 | 916 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | bldg 8 modrad priority mod permit per pa 2016-0218-9888 revision to approved permit 2016-0218-9888 to clarify full scope of accessibility by the mayor's office of disabililty in the enforcement of the 2010 ada standards and ca bldg codeDetails
bldg 8 modrad priority mod permit per pa 2016-0218-9888 revision to approved permit 2016-0218-9888 to clarify full scope of accessibility by the mayor's office of disabililty in the enforcement of the 2010 ada standards and ca bldg code | |
| Sep 27, 2018 | Completed final sign-off Jul 2019 | 932 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | bldg 7 mohrad priority mod permit per pa 2016-0218-9887 revision to approved permit 2016-0218-9887 to clarify full scope of accessibility by the mayor's office of disabililty in the enforcement of the 2010 ada standards and ca bldg codeDetails
bldg 7 mohrad priority mod permit per pa 2016-0218-9887 revision to approved permit 2016-0218-9887 to clarify full scope of accessibility by the mayor's office of disabililty in the enforcement of the 2010 ada standards and ca bldg code | |
| Sep 27, 2018 | Completed final sign-off Jul 2019 | 958 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | bldg 4 mohrad priority mod permit per pa 2016-0218-9885 revision to approved permit 2016-0218-9885 to clarify full scope of accessibility by the mayor's office of disabililty in the enforcement of the 2010 ada standards and ca bldg codeDetails
bldg 4 mohrad priority mod permit per pa 2016-0218-9885 revision to approved permit 2016-0218-9885 to clarify full scope of accessibility by the mayor's office of disabililty in the enforcement of the 2010 ada standards and ca bldg code | |
| Sep 7, 2018 | Never finaled issued Oct 2018, no final | 932 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | storm water (site), sanitary sewer (site). ref bp#201602189887 & pp20180524694.Details
storm water (site), sanitary sewer (site). ref bp#201602189887 & pp20180524694. | |
| Jun 27, 2018 | Completed final sign-off Jul 2019 | 958 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | revision to 201602189855-s5. revised plans fp-8 and fp-9 nfpa 13r. applicable codes 2013 nfpa13r. changes are the removal of sprinkler heads in the bathrooms and closets. hydraulic calculations and pipe sizes were not changed from the original nfpa13 desgin woth tthe elimination of those sprinklersDetails
revision to 201602189855-s5. revised plans fp-8 and fp-9 nfpa 13r. applicable codes 2013 nfpa13r. changes are the removal of sprinkler heads in the bathrooms and closets. hydraulic calculations and pipe sizes were not changed from the original nfpa13 desgin woth tthe elimination of those sprinklers | |
| Jun 7, 2018 | Completed final sign-off Jul 2019 | 958 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | revised fire sprinkler 201602189885-s5 per nfpa 13 to be approved per nfpa 13r. removal of sp heads in baths, closets. hydraulic calcs and pipe sized not changed from orig design. plan sheets fp1 thru fp7 and fp10Details
revised fire sprinkler 201602189885-s5 per nfpa 13 to be approved per nfpa 13r. removal of sp heads in baths, closets. hydraulic calcs and pipe sized not changed from orig design. plan sheets fp1 thru fp7 and fp10 | $1,982 |
| May 12, 2017 | Never finaled issued May 2017, no final | 960 Ellsworth St | street spaceDetails
street space | ||
| May 13, 2016 | Never finaled issued May 2016, no final | 956 Ellsworth St | Cesar Garcia General Contractor Inc | propose canopy over playground. n/a ordinance #155-13Details
propose canopy over playground. n/a ordinance #155-13 | $20,000 |
| Feb 18, 2016 | Completed final sign-off Aug 2019 | 900 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | rad. bldg 18, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system.Details
rad. bldg 18, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Jul 2019 | 982 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | rad. bldg 2, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system.Details
rad. bldg 2, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Aug 2019 | 830 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | rad. bldg 24, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system.Details
rad. bldg 24, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Jul 2019 | 600 Alemany Bl | D.F.P.F Corp Dba Fine Line Construction | rad. bldg 1, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system.Details
rad. bldg 1, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Jul 2019 | 932 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | rad. bldg 7, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system.Details
rad. bldg 7, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Jul 2019 | 944 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | rad. bldg 6, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system.Details
rad. bldg 6, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Aug 2019 | 916 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | rad. bldg 8, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system.Details
rad. bldg 8, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Jul 2019 | 970 Ellsworth St | D.F.P.F Corp Dba Fine Line Construction | rad. bldg 3, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system.Details
rad. bldg 3, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Jul 2019 | 958 Ellsworth St | Tony Ng Plumbing Co, D.F.P.F Corp Dba Fine Line Construction | rad. bldg 4, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system.Details
rad. bldg 4, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system. | $1,982,000 |
| Mar 31, 2015 | Completed final sign-off Dec 2015 | 956 Ellsworth St | Cesar Garcia General Contractor Inc | add a small laundry closet to a head start program day care facility. laundry room will require a sump pump intalled. new 220 v wil be installed along with gas line for dryer. moisture sensor fan will be installed in laundry closet. no changes to exterior.Details
add a small laundry closet to a head start program day care facility. laundry room will require a sump pump intalled. new 220 v wil be installed along with gas line for dryer. moisture sensor fan will be installed in laundry closet. no changes to exterior. | $3,500 |
| Feb 23, 2015 | Completed final sign-off Mar 2015 | 956 Ellsworth St | change of occupancy. no work proposed to extg bldg per section 3408.4. no seismic improvements required. n/a for the maherDetails
change of occupancy. no work proposed to extg bldg per section 3408.4. no seismic improvements required. n/a for the maher | ||
| Jun 10, 2014 | Never finaled issued Jun 2014, no final | 956 Ellsworth St | Diamond Fence Company Inc | replace existing 8'-0" tall iron fence with 8' tall chain link fence, incl. 2 gates w/panic hardware. maher n/a.Details
replace existing 8'-0" tall iron fence with 8' tall chain link fence, incl. 2 gates w/panic hardware. maher n/a. | $21,000 |
| Sep 17, 2013 | Completed final sign-off Jun 2014 | 600 Alemany Bl | San Francisco Landscapes Corporation | construction of outdoor cooking equipment/kitchen in (e) yard. work includes minor paving & path of travel improvements, food prep, heat wash, & cooking facilities plus built in seating/benches & landscaping.Details
construction of outdoor cooking equipment/kitchen in (e) yard. work includes minor paving & path of travel improvements, food prep, heat wash, & cooking facilities plus built in seating/benches & landscaping. | $8,000 |
| Mar 1, 2011 | Completed final sign-off Mar 2012 | 956 Ellsworth St | Empire Engineering & Construction Inc | remove & replace handrail at entry & rear of bldg. add handrails & striping at entry stairs. add panic device at entry door. provide accessibliity signage. revise hardward & landing at door to play yard.Details
remove & replace handrail at entry & rear of bldg. add handrails & striping at entry stairs. add panic device at entry door. provide accessibliity signage. revise hardward & landing at door to play yard. | $14,000 |
| Apr 25, 2007 | Never finaled issued Apr 2007, no final | 916 Ellsworth St | exterior balcony stair improvements. replace in kind wood trim and treads. shares plans with 900 ellsworth st.Details
exterior balcony stair improvements. replace in kind wood trim and treads. shares plans with 900 ellsworth st. | $2,000 | |
| Apr 25, 2007 | Never finaled issued Apr 2007, no final | 900 Ellsworth St | exterior balcony stair improvement. replace in kind wood trim and stair treads.Details
exterior balcony stair improvement. replace in kind wood trim and stair treads. | $2,000 | |
| Aug 9, 2004 | Completed final sign-off Oct 2005 | 992 Ellsworth St | ada compliance work of an (e)computer learning center/office work includes minor mechanical andDetails
ada compliance work of an (e)computer learning center/office work includes minor mechanical and | $100,000 | |
| Jul 12, 2002 | Completed final sign-off Jul 2002 | 1000 Ellsworth St | renew:20012198525/9824743 for final inspection onlyDetails
renew:20012198525/9824743 for final inspection only | ||
| Dec 19, 2000 | Expired or cancelled expired May 2001 | 1000 Ellsworth St | submit structural calculation for the green house struct as part of (e)app #9824743Details
submit structural calculation for the green house struct as part of (e)app #9824743 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- D.F.P.F Corp Dba Fine Line Construction (25), Cesar Garcia General Contractor Inc (2), Diamond Fence Company Inc, Empire Engineering & Construction Inc, San Francisco Landscapes Corporation, Tony Ng Plumbing Co
- Architects
- Karl Smith (19), Deborah Klein, Henry Kwong, James D. Fagler
- Engineers
- Daniel Manheim Tennebaum-Manheim Engineers (9), Meng Chen (9), Robert Henry
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.