D.F.P.F Corp Dba Fine Line Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Jul 2026
- Last 24 months
- 6 permits filed
301 permits since 2000: 244 completed, 7 in progress, 33 never finaled, 17 expired or cancelled.
Of the 33 never-finaled permits, 13 are 5 to 10 years old, 20 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
5 stairs permits: 3 completed, 2 expired or cancelled. Typically 296 days from filing to permit and 335 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 23, 2016 | Completed final sign-off Jan 2017 | 430 Turk St | evacuation signage at stairs. ref app#201603010848Details
evacuation signage at stairs. ref app#201603010848 | $200 |
| Oct 22, 2015 | Completed final sign-off Aug 2017 | 1885 Mission St | 1,2&3 fls. reloc main entrance fr corner of 15 st&mission st,to be loc on mission st.new exterior garage doors,door& window on east facade.new non-stru int partions all 3 fls-new wood int stair in(e)fl opening fr 1st-2nd fl w/rated enclosure@2/fl.new stair fr 2nd-3rd fl in(e)open.Details
1,2&3 fls. reloc main entrance fr corner of 15 st&mission st,to be loc on mission st.new exterior garage doors,door& window on east facade.new non-stru int partions all 3 fls-new wood int stair in(e)fl opening fr 1st-2nd fl w/rated enclosure@2/fl.new stair fr 2nd-3rd fl in(e)open. | $50,000 |
| Oct 22, 2015 | Expired or cancelled withdrawn May 2016 | 1885 Mission St | (2nd floor only) new wood interior stair in (e) floor opening from 2nd to 3rd floor, new non structural interior partitionsDetails
(2nd floor only) new wood interior stair in (e) floor opening from 2nd to 3rd floor, new non structural interior partitions | $50,000 |
| Sep 16, 2015 | Completed final sign-off Aug 2017 | 1885 Mission St | comply w/nov 201302222, core and shell upgrade of unoccupied bldg. 1) new accessible kitchen/bathrm construction at three floors; 2) new voluntary structural strengthening at three floors; 3) holes cut in 2nd & 3rd floors for future stairs - design build by owner/tenant improvementDetails
comply w/nov 201302222, core and shell upgrade of unoccupied bldg. 1) new accessible kitchen/bathrm construction at three floors; 2) new voluntary structural strengthening at three floors; 3) holes cut in 2nd & 3rd floors for future stairs - design build by owner/tenant improvement | $350,000 |
| Dec 20, 2012 | Expired or cancelled cancelled Nov 2024 | 42 Dore St | remodel 1st & 2nd floors. add 1 restroom on 1st fl. add 2 break rooms on 1st & 2nd flrs. full accessibility upgrade @ 1st floor & new stair rail, stripping @ stairs. new levers throughout. change of use from warehouse to officeDetails
remodel 1st & 2nd floors. add 1 restroom on 1st fl. add 2 break rooms on 1st & 2nd flrs. full accessibility upgrade @ 1st floor & new stair rail, stripping @ stairs. new levers throughout. change of use from warehouse to office | $69,500 |