Stairs contractors in San Francisco
5,764 contractors have filed stairs permits in San Francisco since 2000. By permit record, the leaders are: M & L Construction (211 of 223 completed), Lemus Construction Co (40 of 40 completed) and Regency General Contractors Inc (38 of 46 completed).
Ranked across every stairs permit filed since 2000, by the share that reached final inspection, adjusted so a long clean record outranks a short one. Of the stairs contractors, the 400 that lead on this sort were read; the rest are not in this list. Showing contractors with a stairs permit in the last 5 years. Include inactive contractors
- 1M & L ConstructionLicense 832092 223 permits: 211 completed, 7 in progress, 3 never finaled, 2 expired or cancelled. Last filed Nov 2026. Typically 28 days from permit to final inspection. Never finaled: 1 is 3 to 5 years old, 1 is 5 to 10 years old, 1 is over 10 years old.
- 2Lemus Construction CoLicense 913461 40 permits: 40 completed. Last filed Jun 2026. Typically 62 days from permit to final inspection.
- 3Regency General Contractors IncLicense 773175 46 permits: 38 completed, 8 in progress. Last filed Jun 2025. Typically 175 days from permit to final inspection.
- 4Mutual Seiko ConstructionLicense 757312 38 permits: 38 completed. Last filed Sep 2022. Typically 125 days from permit to final inspection.
- 5Gil Construction & Assoc Inc.License 703705 173 permits: 158 completed, 6 in progress, 2 never finaled, 7 expired or cancelled. Last filed Sep 2026. Typically 53 days from permit to final inspection. Never finaled: 2 are over 10 years old.
- 6Hong Shink ConstructionLicense 758888 25 permits: 24 completed, 1 in progress. Last filed Apr 2026. Typically 134 days from permit to final inspection.
- 7Bc United Construction IncLicense 995115 25 permits: 23 completed, 2 in progress. Last filed Jun 2026. Typically 322 days from permit to final inspection.
- 8Sure, Inc.License 561658 130 permits: 120 completed, 2 in progress, 3 never finaled, 5 expired or cancelled. Last filed Aug 2026. Typically 47 days from permit to final inspection. Never finaled: 1 is 5 to 10 years old, 2 are over 10 years old.
- 9Cht Properties DevelopmentLicense 812058 24 permits: 22 completed, 2 in progress. Last filed Dec 2025. Typically 222 days from permit to final inspection.
- 10Sasso Construction Inc.License 911044 20 permits: 19 completed, 1 in progress. Last filed Apr 2025. Typically 155 days from permit to final inspection.
- 11Richlen ConstructionLicense 570031 32 permits: 30 completed, 1 in progress, 1 expired or cancelled. Last filed Mar 2026. Typically 231 days from permit to final inspection.
- 12Citidev Inc.License 910730 33 permits: 28 completed, 4 in progress, 1 never finaled. Last filed Oct 2026. Typically 217 days from permit to final inspection. Never finaled: 1 is 3 to 5 years old.
- 13Chl Construction CompanyLicense 960561 17 permits: 16 completed, 1 in progress. Last filed Jun 2026. Typically 318 days from permit to final inspection.
- 14Sc Builders, IncLicense 767196 17 permits: 16 completed, 1 in progress. Last filed Jul 2026. Typically 336 days from permit to final inspection.
- 15Darc Ventures Inc Dba Spl Construction SLicense 938513 16 permits: 16 completed. Last filed Apr 2026. Typically 168 days from permit to final inspection.
- 16Nibbi Bros Assoc Inc.License 757362 16 permits: 16 completed. Last filed Aug 2024. Typically 235 days from permit to final inspection.
- 17Arnest Termite ControlLicense 8556 28 permits: 27 completed, 1 expired or cancelled. Last filed Jan 2026. Typically 12 days from permit to final inspection.
- 18Spryscapes Const Inc.License 776680 38 permits: 36 completed, 2 expired or cancelled. Last filed Jul 2022. Typically 66 days from permit to final inspection.
- 19Reliable Construction IncLicense 983658 42 permits: 35 completed, 5 in progress, 1 never finaled, 1 expired or cancelled. Last filed Oct 2026. Typically 189 days from permit to final inspection. Never finaled: 1 is 5 to 10 years old.
- 20Jason Liu Construction CompanyLicense 662067 15 permits: 15 completed. Last filed Sep 2022. Typically 266 days from permit to final inspection.
- 21Kwong AssociatesLicense 913553 15 permits: 15 completed. Last filed Dec 2023. Typically 105 days from permit to final inspection.
- 22Level 10 Construction LpLicense 967797 26 permits: 25 completed, 1 expired or cancelled. Last filed Jul 2022. Typically 1087 days from permit to final inspection.
- 23Aurora BuildersLicense 759578 15 permits: 14 completed, 1 in progress. Last filed Jan 2023. Typically 68 days from permit to final inspection.
- 24R P Construction Inc.License 804086 14 permits: 14 completed. Last filed Nov 2021. Typically 208 days from permit to final inspection.
- 25T T General ConstructionLicense 927524 14 permits: 14 completed. Last filed May 2026. Typically 216 days from permit to final inspection.
- 26Bryce C B Construction IncLicense 886936 13 permits: 13 completed. Last filed Jan 2025. Typically 370 days from permit to final inspection.
- 27He & Kuang IncLicense 892144 13 permits: 13 completed. Last filed Jun 2025. Typically 262 days from permit to final inspection.
- 28O'pro Construction Inc.License 1029997 13 permits: 13 completed. Last filed Feb 2026. Typically 361 days from permit to final inspection.
- 29J & T Diodati ConstructionLicense 811255 39 permits: 36 completed, 3 never finaled. Last filed May 2024. Typically 148 days from permit to final inspection. Never finaled: 2 are 5 to 10 years old, 1 is over 10 years old.
- 30R & D Construction Co IncLicense 825438 79 permits: 67 completed, 4 in progress, 4 never finaled, 4 expired or cancelled. Last filed Jun 2026. Typically 230 days from permit to final inspection. Never finaled: 3 are 5 to 10 years old, 1 is over 10 years old.
- 31O'shea Co. Home Grown ConstructionLicense 890253 15 permits: 12 completed, 3 in progress. Last filed Aug 2026. Typically 233 days from permit to final inspection.
- 32Benjamin ShawLicense 646136 13 permits: 12 completed, 1 in progress. Last filed Jun 2025. Typically 176 days from permit to final inspection.
- 33Mark Scott Construction IncLicense 682814 13 permits: 12 completed, 1 in progress. Last filed Nov 2025. Typically 144 days from permit to final inspection.
- 34Jimmy WongLicense 884883 12 permits: 12 completed. Last filed Oct 2023. Typically 470 days from permit to final inspection.
- 35Rua Woods Construction IncLicense 995753 12 permits: 12 completed. Last filed Mar 2026. Typically 254 days from permit to final inspection.
- 36Hargens Inc.License 592325 21 permits: 20 completed, 1 expired or cancelled. Last filed Aug 2024. Typically 122 days from permit to final inspection.
- 37Traube Construction CompanyLicense 974146 21 permits: 20 completed, 1 expired or cancelled. Last filed Nov 2023. Typically 182 days from permit to final inspection.
- 38Upscale Construction Inc.License 707506 46 permits: 40 completed, 2 in progress, 1 never finaled, 3 expired or cancelled. Last filed Jun 2026. Typically 352 days from permit to final inspection. Never finaled: 1 is over 10 years old.
- 39Keegan Contruction Inc.License 792673 29 permits: 27 completed, 1 never finaled, 1 expired or cancelled. Last filed Feb 2025. Typically 242 days from permit to final inspection. Never finaled: 1 is 5 to 10 years old.
- 40Zhou's International Inc.License 752768 22 permits: 19 completed, 2 in progress, 1 never finaled. Last filed Dec 2025. Typically 415 days from permit to final inspection. Never finaled: 1 is over 10 years old.
How long stairs permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent stairs permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 20, 2026 | In progress filed Nov 2026, not yet issued | 121 Yukon St | Mission Home Remodeling Inc | convert garage to studio (unit 3) w/ new kitch & bath. 2nd/f remodel #1 create new bedrm & laundry. new interior stair to 3rd flr, remodel #2 into a studio. 3rd flr: convert unit 3 into part of unit 1, (n) master bedroom w/ bath, (n) addition with bed & bath & stair. (n) roof deck.Details
convert garage to studio (unit 3) w/ new kitch & bath. 2nd/f remodel #1 create new bedrm & laundry. new interior stair to 3rd flr, remodel #2 into a studio. 3rd flr: convert unit 3 into part of unit 1, (n) master bedroom w/ bath, (n) addition with bed & bath & stair. (n) roof deck. | |
| Nov 20, 2026 | In progress filed Nov 2026, not yet issued | 100 Parque Dr | revision to pa #202510097080.rear yard to construct 2 wood maintaenance staircase for access to the existing landscap platforms, these staircases are intended stictly for landscape maintanence access and use only. the staircases are not intended for public access or general occupancy.Details
revision to pa #202510097080.rear yard to construct 2 wood maintaenance staircase for access to the existing landscap platforms, these staircases are intended stictly for landscape maintanence access and use only. the staircases are not intended for public access or general occupancy. | ||
| Nov 20, 2026 | In progress filed Nov 2026, not yet issued | 2001 Pacific Av | Barrett Karber Built Llc | revision to pa# 202608136518: revisions limited to 1/f stair & 2/f ceiling framing.Details
revision to pa# 202608136518: revisions limited to 1/f stair & 2/f ceiling framing. | $40,000 |
| Nov 20, 2026 | In progress filed Nov 2026, not yet issued | 101 02nd St | 17/f: tenant improvement minimal demolition of non-structural load bearing walls/finishes; (n) work - new walls & ceilings. lighting millwork operable wall system, relocate door and overall finishes limited to area of work. no change of use (e) stairs egress path elevators. fire sprinklers + life...Details
17/f: tenant improvement minimal demolition of non-structural load bearing walls/finishes; (n) work - new walls & ceilings. lighting millwork operable wall system, relocate door and overall finishes limited to area of work. no change of use (e) stairs egress path elevators. fire sprinklers + life... | $618,000 | |
| Nov 20, 2026 | In progress filed Nov 2026, not yet issued | 1962 43rd Av | to abate nov#: 202664492, to legalize unpermitted work. no work to be done. built concrete retaing wall and stairs. new build pergola.Details
to abate nov#: 202664492, to legalize unpermitted work. no work to be done. built concrete retaing wall and stairs. new build pergola. | $8,000 | |
| Nov 20, 2026 | In progress filed Nov 2026, not yet issued | 353 Sacramento St | Bcci Construction Company | 3/f: guardrail relocation structural scope to support architectural permit pa# 202604149358. ramp and stairs lead to private terrace 309.Details
3/f: guardrail relocation structural scope to support architectural permit pa# 202604149358. ramp and stairs lead to private terrace 309. | $25,000 |
| Nov 20, 2026 | In progress filed Nov 2026, not yet issued | 555 Mission St | 30th & 31st floor demolition of existing offices: ceilings, lighting, furniture, inteconnecting stair, store front glass partition & all interior finishes. this demolition permit is subject to ab-017 exception to requirement for disabled access to vacant spaces.Details
30th & 31st floor demolition of existing offices: ceilings, lighting, furniture, inteconnecting stair, store front glass partition & all interior finishes. this demolition permit is subject to ab-017 exception to requirement for disabled access to vacant spaces. | $256,554 | |
| Nov 19, 2026 | In progress filed Nov 2026, not yet issued | 2235 Fillmore St | renovation of the existing ground floor space at 2235 fillmore st. one of 2 side by side tenant spaces in the building. project includes a new exit passageway to address existing non-conforming exit access travel distance, a new mezzanine incuding a stair & lift in addition of new exterior doorsDetails
renovation of the existing ground floor space at 2235 fillmore st. one of 2 side by side tenant spaces in the building. project includes a new exit passageway to address existing non-conforming exit access travel distance, a new mezzanine incuding a stair & lift in addition of new exterior doors | $318,748 | |
| Nov 19, 2026 | In progress filed Nov 2026, not yet issued | 2459 Francisco St | Ams Construction | revision to pa#202304266535: add stairs from (e) 3/f up to rooftop deck. add decking and railing, no penthouse.Details
revision to pa#202304266535: add stairs from (e) 3/f up to rooftop deck. add decking and railing, no penthouse. | $16,400 |
| Nov 19, 2026 | In progress filed Nov 2026, not yet issued | 4168 26th St | basement: bathroom remodel, 1-story horizontal addition to rear. (n) deck and stairs to replce (e) 1st floor: kitchen remodel. relocate 1/2 bath. relocate interior stair from 1st floor to basement. (n) door to roof deck to replace (e) 2nd fl: remodel 2 bathrooms. 2(n) windows. (n) laundry closet.Details
basement: bathroom remodel, 1-story horizontal addition to rear. (n) deck and stairs to replce (e) 1st floor: kitchen remodel. relocate 1/2 bath. relocate interior stair from 1st floor to basement. (n) door to roof deck to replace (e) 2nd fl: remodel 2 bathrooms. 2(n) windows. (n) laundry closet. | $330,000 | |
| Nov 18, 2026 | In progress issued Nov 2026 | 677 Huron Av | Lift & Transfer Specialists Inc | remove non-functioning, non-permitted residential incline platform lift & install new residential ipl by savaria. handicap lift will allow veteran to enter/exit home via stairway in front. secure lift to concrete stairs w/ factory posts & concrete anchors. dedicated 15 amp breaker to (e) panel.Details
remove non-functioning, non-permitted residential incline platform lift & install new residential ipl by savaria. handicap lift will allow veteran to enter/exit home via stairway in front. secure lift to concrete stairs w/ factory posts & concrete anchors. dedicated 15 amp breaker to (e) panel. | $88,000 |
| Nov 18, 2026 | In progress filed Nov 2026, not yet issued | 345 Spear St | Novo Construction Inc | 1st floor: construction of a communication open convenience stair connecting 1st and 2nd floor.Details
1st floor: construction of a communication open convenience stair connecting 1st and 2nd floor. | $800,000 |
| Nov 18, 2026 | In progress issued Nov 2026 | 430 Monterey Bl | M & L Construction | exterior stair repair, less than 50% with new wood in-kind. visible from street.Details
exterior stair repair, less than 50% with new wood in-kind. visible from street. | $7,500 |
| Nov 18, 2026 | In progress filed Nov 2026, not yet issued | 474 Mangels Av | Dcs Plumbing Llc | exterior: replace 3 windows & doors and install 1 new windows @ side and rear. new stair @ rear yard.Details
exterior: replace 3 windows & doors and install 1 new windows @ side and rear. new stair @ rear yard. | $25,000 |
| Nov 18, 2026 | In progress issued Nov 2026 | 668 29th St | M & L Construction | exterior stair repair, 50% or less, replace with new wood, in-kind. not visible from the street.Details
exterior stair repair, 50% or less, replace with new wood, in-kind. not visible from the street. | $9,000 |
| Nov 18, 2026 | In progress issued Nov 2026 | 715 Brazil Av | M & L Construction | exterior stair repair, less than 50% with new wood in-kind. not visible from street.Details
exterior stair repair, less than 50% with new wood in-kind. not visible from street. | $7,800 |
| Nov 18, 2026 | In progress issued Nov 2026 | 2074 Union St | Byington Electric Corp | revision to pa#: 202509155285. add (2) smoke detectors in stairs and (1) heat in boiler room.Details
revision to pa#: 202509155285. add (2) smoke detectors in stairs and (1) heat in boiler room. | $1,000 |
| Nov 17, 2026 | In progress issued Nov 2026 | 388 Beale St | Shalom N Home Inc | drywall repair (in-kind) double layer drywall, texture and paint. 8 locations, approx. 4 sq ft each. - south tower (stairway); 14th,6th,7th floor.Details
drywall repair (in-kind) double layer drywall, texture and paint. 8 locations, approx. 4 sq ft each. - south tower (stairway); 14th,6th,7th floor. | $4,360 |
| Nov 17, 2026 | In progress filed Nov 2026, not yet issued | 1821 21st Av | Momentum Construction & Development Llc | front stair replacement: reconstruction (e) damaged front staircase in kind w/ timber framing, maintain (e) location, configuration, overall dimensions, riser/tread arrangement, and finished elevations. provide new stone exterior stone tile finish similar to (e) in general appearance...Details
front stair replacement: reconstruction (e) damaged front staircase in kind w/ timber framing, maintain (e) location, configuration, overall dimensions, riser/tread arrangement, and finished elevations. provide new stone exterior stone tile finish similar to (e) in general appearance... | $15,000 |
| Nov 17, 2026 | In progress filed Nov 2026, not yet issued | 1750 Noriega St | Amone Corp | rev to pa# 2025-1224-2639: exterior building: paint, stair/railing replacement, paving, fencing, window. interior work: to relocate shear wall and install roof access door/ships ladder.Details
rev to pa# 2025-1224-2639: exterior building: paint, stair/railing replacement, paving, fencing, window. interior work: to relocate shear wall and install roof access door/ships ladder. | $2,800,000 |
| Nov 17, 2026 | In progress issued Nov 2026 | 228 Hyde St | Wikiup Design& Const | to comply with nov 202296448 - items 1-42. fix existing violations on plumbing, electrical, stairs, smoke detectors, broken windows and damaged walls.Details
to comply with nov 202296448 - items 1-42. fix existing violations on plumbing, electrical, stairs, smoke detectors, broken windows and damaged walls. | $20,000 |
| Nov 17, 2026 | In progress filed Nov 2026, not yet issued | 1610 Armstrong Av | Dasom Builder | to comply with nov#202649275. legalize: 1.two mezzanines with stairs 2.windows installed @ front facade. 3.metal bars @ skylights. 4.security barricade inside of rollup door 5.security doors installed @ entrance. 6.vestibule installed with security door. 7.1/2 bath installed.Details
to comply with nov#202649275. legalize: 1.two mezzanines with stairs 2.windows installed @ front facade. 3.metal bars @ skylights. 4.security barricade inside of rollup door 5.security doors installed @ entrance. 6.vestibule installed with security door. 7.1/2 bath installed. | $100,000 |
| Nov 16, 2026 | In progress filed Nov 2026, not yet issued | 2254 30th Av | 1/f: remodel (e) floor space tomedia, bedrooms,b athrooms, wetbar and laundry. replace interior stair. 2/f: remodel (e) kitchen, bathroom and dining. replace all windows. infill lightwells, new skylights. ab112Details
1/f: remodel (e) floor space tomedia, bedrooms,b athrooms, wetbar and laundry. replace interior stair. 2/f: remodel (e) kitchen, bathroom and dining. replace all windows. infill lightwells, new skylights. ab112 | $215,700 | |
| Nov 16, 2026 | In progress filed Nov 2026, not yet issued | 1233 Ingalls St | Lindquist Custom Construction Inc | install stairlift for four exterior steps to unit. stair only serve one unit 1233 ingalls. not streetfacing, descending down from sidewalk to front of building.Details
install stairlift for four exterior steps to unit. stair only serve one unit 1233 ingalls. not streetfacing, descending down from sidewalk to front of building. | $3,000 |
| Nov 16, 2026 | In progress issued Nov 2026 | 1762 25th Av | Sunset Remodeling And Design Inc | revision to 202608317441 (revise scope of work on 1st/f & add scope on 2nd/f) 1st/f: e) bathroom remodel, relocate laundry room, water heater, and furnace, new staircase to 2nd/f. 2nd/f: new full bathroom, kitchen remodel, sunroom dry rot and roof patch repair as necessaryDetails
revision to 202608317441 (revise scope of work on 1st/f & add scope on 2nd/f) 1st/f: e) bathroom remodel, relocate laundry room, water heater, and furnace, new staircase to 2nd/f. 2nd/f: new full bathroom, kitchen remodel, sunroom dry rot and roof patch repair as necessary | $50,000 |
| Nov 16, 2026 | In progress filed Nov 2026, not yet issued | 2590 Great Hy | rear & side addition at 3/f and relocate (e) bathroom; remove (e) partition wall between (e) kitchen and living room per plan; repair (e) front stairs; replace (e) front siding with new veritical cedar siding.Details
rear & side addition at 3/f and relocate (e) bathroom; remove (e) partition wall between (e) kitchen and living room per plan; repair (e) front stairs; replace (e) front siding with new veritical cedar siding. | $260,000 | |
| Nov 16, 2026 | In progress filed Nov 2026, not yet issued | 3047 Alemany Bl | to comply with nov 202664854. repair (e) stair railing of front: install post and rails. replace 4x4 post of fence, post visible from street.Details
to comply with nov 202664854. repair (e) stair railing of front: install post and rails. replace 4x4 post of fence, post visible from street. | $5,000 | |
| Nov 13, 2026 | In progress issued Nov 2026 | 567 Mississippi St | Twin Pinnacles Construction | 603 sq ft fill in addition at rear ground floor below existing bedroom & deck, does not increase exterior dimenions of bldg. convert (e) storage @ ground floor to 1223 sq ft of habitable space. replace (e) rear deck and stairs in kind due to dry rot. no work at facade.Details
603 sq ft fill in addition at rear ground floor below existing bedroom & deck, does not increase exterior dimenions of bldg. convert (e) storage @ ground floor to 1223 sq ft of habitable space. replace (e) rear deck and stairs in kind due to dry rot. no work at facade. | $95,000 |
| Nov 13, 2026 | In progress filed Nov 2026, not yet issued | 349 03rd Av | Fornari Inc Dba Bold Construction | remove existing stairs on floor 1 and floor 2. replace stairs. in kind kitchen and bathroom remodel floor 2. bathroom relocate on 3rd fl. add bedroom, bath, wic on floor 1 basement.Details
remove existing stairs on floor 1 and floor 2. replace stairs. in kind kitchen and bathroom remodel floor 2. bathroom relocate on 3rd fl. add bedroom, bath, wic on floor 1 basement. | $42,000 |
| Nov 12, 2026 | In progress filed Nov 2026, not yet issued | 340 Bryant St | Urban West Construction Inc | revision to pa# 202606082785: removal of proposed staircase scope of work from project. cancel associated special inspection 5ai and 18a. stair was never installed.Details
revision to pa# 202606082785: removal of proposed staircase scope of work from project. cancel associated special inspection 5ai and 18a. stair was never installed. |