Jimmy Wong
- Based in
- San Francisco
- On San Francisco permits
- Aug 2005 to May 2025
- Last 24 months
- 5 permits filed
56 permits since 2000: 49 completed, 1 in progress, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 1 is 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
12 stairs permits: 12 completed. Typically 3 days from filing to permit and 470 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 5, 2023 | Completed final sign-off Feb 2024 | 1044 Taraval St | remodel/alteration (e) medical office. provide electrical power door, accessible ramp and stairs handrails, warning striping.Details
remodel/alteration (e) medical office. provide electrical power door, accessible ramp and stairs handrails, warning striping. | $50,000 |
| Oct 25, 2021 | Completed final sign-off Mar 2022 | 647 33rd Av | repair & replace of backyard (e) stair less than 50%, replair rear siding less than 50% & repair roofing with asphalt rolls (unvisitable from street) less than 50%. not a complete re-roof.Details
repair & replace of backyard (e) stair less than 50%, replair rear siding less than 50% & repair roofing with asphalt rolls (unvisitable from street) less than 50%. not a complete re-roof. | $80,000 |
| Oct 25, 2019 | Completed final sign-off Jun 2024 | 266 11th Av | remodel 2nd, 3rd and attic. 2nd & 3rd fl - add new bathroom, relocate kitchen and convert kitchen/breakfast room to bedroom. attic - add bedroom and build 3 dormers windows. rebuilding (e) front stairs in kind with terrazzo. no work on 1st floor.Details
remodel 2nd, 3rd and attic. 2nd & 3rd fl - add new bathroom, relocate kitchen and convert kitchen/breakfast room to bedroom. attic - add bedroom and build 3 dormers windows. rebuilding (e) front stairs in kind with terrazzo. no work on 1st floor. | $28,000 |
| Jun 6, 2017 | Completed final sign-off Jan 2019 | 278 11th Av | alteration and remodeling 2/f & 3/f, rebuild (e) front stairs in kind, on 3/f- relocate (e) kitchen, convert (e) kitchen to bedroom. on 2/f- new interior stairs between 1/f & 2/f. new electrical and plumbing, replace all windows.Details
alteration and remodeling 2/f & 3/f, rebuild (e) front stairs in kind, on 3/f- relocate (e) kitchen, convert (e) kitchen to bedroom. on 2/f- new interior stairs between 1/f & 2/f. new electrical and plumbing, replace all windows. | $350,000 |
| Mar 14, 2016 | Completed final sign-off May 2018 | 501 Junipero Serra Bl | rebuild (e) interior stairs. relocate (e) kitchen. change (e) kitchen to bedroom. add 1 bath room on 2nd floor. add 2 bedrooms, 2 bathrooms at on 1st floor. new family room with with bar on 1st floor. rebuild rear yard door gate.Details
rebuild (e) interior stairs. relocate (e) kitchen. change (e) kitchen to bedroom. add 1 bath room on 2nd floor. add 2 bedrooms, 2 bathrooms at on 1st floor. new family room with with bar on 1st floor. rebuild rear yard door gate. | $280,000 |
| Jun 12, 2015 | Completed final sign-off Feb 2017 | 2851 Turk Bl | alteration to existing bldg. relocate ((e) stairs, kitchens, bathrooms, change the lower roof to roof deck at rear at 3/f. new home office, family room and 2 toilets at 1/f. new electrical, plumbing, heating system and tankless water heaters. replace all windows in kind w/ solid wood.Details
alteration to existing bldg. relocate ((e) stairs, kitchens, bathrooms, change the lower roof to roof deck at rear at 3/f. new home office, family room and 2 toilets at 1/f. new electrical, plumbing, heating system and tankless water heaters. replace all windows in kind w/ solid wood. | $250,000 |
| May 3, 2013 | Completed final sign-off Jun 2013 | 1234 02nd Av | revision to pa 201111189223. 1. relocate rear stairs from 2nd floor to 1st flr. 2. change (e) 42" ht. glass panel to stud guard railDetails
revision to pa 201111189223. 1. relocate rear stairs from 2nd floor to 1st flr. 2. change (e) 42" ht. glass panel to stud guard rail | |
| Apr 2, 2013 | Completed final sign-off Nov 2014 | 355 Coleridge St | interior renovation, replace windows, new retaining wall and partial foundation upgrade, new kitchen, new powder room, new internal stair to garage level. relocate bathrooms at upper level.Details
interior renovation, replace windows, new retaining wall and partial foundation upgrade, new kitchen, new powder room, new internal stair to garage level. relocate bathrooms at upper level. | $140,000 |
| Apr 1, 2013 | Completed final sign-off Jun 2013 | 1234 02nd Av | revise permit app#201111189223 to show revised connection of deck to house and revised stair location.Details
revise permit app#201111189223 to show revised connection of deck to house and revised stair location. | |
| May 4, 2012 | Completed final sign-off Mar 2013 | 301 Holly Park Cr | remodel (e) bathroom, relocate interior stairs & closet on 2nd floor. install bedroom, bathrooms & structural retrofit on 1st floorDetails
remodel (e) bathroom, relocate interior stairs & closet on 2nd floor. install bedroom, bathrooms & structural retrofit on 1st floor | $60,000 |
| Oct 18, 2011 | Completed final sign-off Aug 2013 | 531 12th Av | proposed addition at north side building and rear stairs. enlarged (e) kitchen and toilet area @ 2/f.Details
proposed addition at north side building and rear stairs. enlarged (e) kitchen and toilet area @ 2/f. | $30,000 |
| Sep 16, 2011 | Completed final sign-off Aug 2013 | 531 12th Av | remove porch and stairs at rear. install bedroom, family room and bath room at 1st floor repair the foundation.Details
remove porch and stairs at rear. install bedroom, family room and bath room at 1st floor repair the foundation. | $60,000 |