Jimmy Wong
- Based in
- San Francisco
- On San Francisco permits
- Aug 2005 to May 2025
- Last 24 months
- 5 permits filed
56 permits since 2000: 49 completed, 1 in progress, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 1 is 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 6, 2025 | In progress filed May 2025, not yet issued | 855 La Playa | demo and remove a wood burned fire place in corner wall of unit. no structural change, no gas and no electrical work.Details
demo and remove a wood burned fire place in corner wall of unit. no structural change, no gas and no electrical work. | $15,000 |
| Jan 17, 2025 | Completed final sign-off Sep 2025 | 825 La Playa | #122: remodel update one bathroom, no structural change.Details
#122: remodel update one bathroom, no structural change. | $16,000 |
| Jan 17, 2025 | Completed final sign-off Apr 2025 | 855 La Playa | #259: remodel & update two bath, 1 kitchen and floor tile in the sitting room, dining room and laundry. no structural changes.Details
#259: remodel & update two bath, 1 kitchen and floor tile in the sitting room, dining room and laundry. no structural changes. | $70,000 |
| Dec 13, 2024 | Completed final sign-off Jan 2025 | 1630 Santiago St | just paint over existing flat roof w/ henry 100% silicone roof coating 887 white lifetime limited warranty. for waterproofingDetails
just paint over existing flat roof w/ henry 100% silicone roof coating 887 white lifetime limited warranty. for waterproofing | $3,500 |
| Nov 14, 2024 | Completed final sign-off Mar 2025 | 825 La Playa | remodel total 2 bathrooms only update no locationn changeDetails
remodel total 2 bathrooms only update no locationn change | $33,000 |
| Apr 18, 2024 | Completed final sign-off May 2024 | 268 11th Av | revision to bpa# 201705307831: to legalize the window in the bathroom - 1st floor.Details
revision to bpa# 201705307831: to legalize the window in the bathroom - 1st floor. | |
| Apr 18, 2024 | Completed final sign-off May 2024 | 266 11th Av | revise to 201910255572. to legalize windows at 2nd & 3rd fl. u is 0.3 maxDetails
revise to 201910255572. to legalize windows at 2nd & 3rd fl. u is 0.3 max | |
| Mar 25, 2024 | Completed final sign-off Jun 2024 | 875 La Playa | replace all floor & wall cabinets and all appliances in kitchen. update all gfic outlets in kitchen. replace kitchen sink and faucet. install new electrical fireplace (unit). replace floor & wall tiles & all accessories in bathroom. replace vanity and sink and faucet in bathroom. no removal of wallsDetails
replace all floor & wall cabinets and all appliances in kitchen. update all gfic outlets in kitchen. replace kitchen sink and faucet. install new electrical fireplace (unit). replace floor & wall tiles & all accessories in bathroom. replace vanity and sink and faucet in bathroom. no removal of walls | $20,000 |
| Feb 5, 2024 | Completed final sign-off Mar 2024 | 1443 Hyde St | add 5 more 4" recess lights in hallway revision to 202309055883. provide fire hats or gypsum boxes. patch ceiling with 5/8" type x.Details
add 5 more 4" recess lights in hallway revision to 202309055883. provide fire hats or gypsum boxes. patch ceiling with 5/8" type x. | $2,000 |
| Oct 5, 2023 | Completed final sign-off Feb 2024 | 1044 Taraval St | remodel/alteration (e) medical office. provide electrical power door, accessible ramp and stairs handrails, warning striping.Details
remodel/alteration (e) medical office. provide electrical power door, accessible ramp and stairs handrails, warning striping. | $50,000 |
| Sep 5, 2023 | Completed final sign-off Feb 2024 | 1443 Hyde St | work on 2f unit 1443 only. remodeling (e) kitchen area in-kind. change (e) bedroom closet dr to sliding dr.Details
work on 2f unit 1443 only. remodeling (e) kitchen area in-kind. change (e) bedroom closet dr to sliding dr. | $40,000 |
| Apr 11, 2023 | Completed final sign-off Mar 2025 | 855 La Playa | kitchen remodel, replace all wall and floor cabinets and countertop. add (4) recess lights in kitchen ceiling. replace laundry room drain box. replace new kitchen sink.Details
kitchen remodel, replace all wall and floor cabinets and countertop. add (4) recess lights in kitchen ceiling. replace laundry room drain box. replace new kitchen sink. | $16,000 |
| Nov 22, 2022 | Completed final sign-off Mar 2023 | 825 La Playa | apt# 227: kitchen remodel- remove all kitchen cabinet, replace w/ new pre-fab units.remove bar,countertop,new fixtures and appliances. m/w & otr hood. demo portion of upoper cabinet sofit. r/r lighting remove furnace/ enclosure-terminate elec & plumb. all work is at the interior of the unit.Details
apt# 227: kitchen remodel- remove all kitchen cabinet, replace w/ new pre-fab units.remove bar,countertop,new fixtures and appliances. m/w & otr hood. demo portion of upoper cabinet sofit. r/r lighting remove furnace/ enclosure-terminate elec & plumb. all work is at the interior of the unit. | $30,000 |
| Aug 26, 2022 | Completed final sign-off Dec 2022 | 875 La Playa | kitchen remodel, wall removal (non load bearing) that seperates door and kitchen iwndow opening to living room (photos) remove plastic drop down ceiling; install recessed lights. remove bulkheads; replace thermostat with programmable energy efficient thermostat repace cabinets and countertops, kitchDetails
kitchen remodel, wall removal (non load bearing) that seperates door and kitchen iwndow opening to living room (photos) remove plastic drop down ceiling; install recessed lights. remove bulkheads; replace thermostat with programmable energy efficient thermostat repace cabinets and countertops, kitch | $15,000 |
| Jul 15, 2022 | Completed final sign-off Sep 2022 | 825 La Playa | apt 224. 1 bathroom remodel: replace vanity with sink, reverse bathtub to shower room. replace floor wall tiles. replace toilet.Details
apt 224. 1 bathroom remodel: replace vanity with sink, reverse bathtub to shower room. replace floor wall tiles. replace toilet. | $10,000 |
| Apr 8, 2022 | Completed final sign-off Jun 2024 | 266 11th Av | to obtian final inspection for work approved under pa# 201912200891 for final inspection.Details
to obtian final inspection for work approved under pa# 201912200891 for final inspection. | $8,000 |
| Mar 11, 2022 | Completed final sign-off Mar 2022 | 2110 32nd Av | repaired water damaged of front house, stucco, balcony and windowDetails
repaired water damaged of front house, stucco, balcony and window | $10,000 |
| Oct 25, 2021 | Completed final sign-off Mar 2022 | 647 33rd Av | repair & replace of backyard (e) stair less than 50%, replair rear siding less than 50% & repair roofing with asphalt rolls (unvisitable from street) less than 50%. not a complete re-roof.Details
repair & replace of backyard (e) stair less than 50%, replair rear siding less than 50% & repair roofing with asphalt rolls (unvisitable from street) less than 50%. not a complete re-roof. | $80,000 |
| Mar 9, 2020 | Completed final sign-off Feb 2021 | 531 12th Av | replace rear sidingDetails
replace rear siding | $29,500 |
| Jan 17, 2020 | Never finaled issued Jan 2020, no final | 825 La Playa | replace baseboard, doors (interior), closet doors, replace kitchen cabinets, countertop, appliances, replace bathroom countertops (2 bathrooms)Details
replace baseboard, doors (interior), closet doors, replace kitchen cabinets, countertop, appliances, replace bathroom countertops (2 bathrooms) | $12,000 |
| Dec 30, 2019 | Expired or cancelled expired Jun 2024 | 266 11th Av | rev to pa# 201910255572; move bearing wall at 3rd fl. installing a new steel beamDetails
rev to pa# 201910255572; move bearing wall at 3rd fl. installing a new steel beam | $8,000 |
| Oct 25, 2019 | Completed final sign-off Jun 2024 | 266 11th Av | remodel 2nd, 3rd and attic. 2nd & 3rd fl - add new bathroom, relocate kitchen and convert kitchen/breakfast room to bedroom. attic - add bedroom and build 3 dormers windows. rebuilding (e) front stairs in kind with terrazzo. no work on 1st floor.Details
remodel 2nd, 3rd and attic. 2nd & 3rd fl - add new bathroom, relocate kitchen and convert kitchen/breakfast room to bedroom. attic - add bedroom and build 3 dormers windows. rebuilding (e) front stairs in kind with terrazzo. no work on 1st floor. | $28,000 |
| Sep 6, 2018 | Completed final sign-off Dec 2018 | 247 11th Av | remove the dry rot balcony at 2nd floor apt #2. 3rd floor apt #3 replace the sliding doors to sliding windows at rear bldg. n/a for maher.Details
remove the dry rot balcony at 2nd floor apt #2. 3rd floor apt #3 replace the sliding doors to sliding windows at rear bldg. n/a for maher. | $8,000 |
| Apr 17, 2018 | Completed final sign-off Sep 2019 | 2450 28th Av | 1st fl add 3 bedrooms, 2 full baths, laundry and office. 2nd fl remodel kichen and bath, add 1/2 bath. add eck and patio at rearDetails
1st fl add 3 bedrooms, 2 full baths, laundry and office. 2nd fl remodel kichen and bath, add 1/2 bath. add eck and patio at rear | $90,000 |
| Jun 6, 2017 | Completed final sign-off Jan 2019 | 278 11th Av | alteration and remodeling 2/f & 3/f, rebuild (e) front stairs in kind, on 3/f- relocate (e) kitchen, convert (e) kitchen to bedroom. on 2/f- new interior stairs between 1/f & 2/f. new electrical and plumbing, replace all windows.Details
alteration and remodeling 2/f & 3/f, rebuild (e) front stairs in kind, on 3/f- relocate (e) kitchen, convert (e) kitchen to bedroom. on 2/f- new interior stairs between 1/f & 2/f. new electrical and plumbing, replace all windows. | $350,000 |
| May 30, 2017 | Completed final sign-off Jun 2024 | 268 11th Av | proposed a new unit @ existing 1/f under ord# 162-16.Details
proposed a new unit @ existing 1/f under ord# 162-16. | $128,000 |
| Jul 5, 2016 | Completed final sign-off Jan 2019 | 280 11th Av | unit legalization ordinance no. 43-14. change of occupancy from r-3 to r-2. excavation of the ground floor for floor to ceiling height requirement. complete new foundation for the excavation.Details
unit legalization ordinance no. 43-14. change of occupancy from r-3 to r-2. excavation of the ground floor for floor to ceiling height requirement. complete new foundation for the excavation. | $61,000 |
| Mar 14, 2016 | Completed final sign-off May 2018 | 501 Junipero Serra Bl | rebuild (e) interior stairs. relocate (e) kitchen. change (e) kitchen to bedroom. add 1 bath room on 2nd floor. add 2 bedrooms, 2 bathrooms at on 1st floor. new family room with with bar on 1st floor. rebuild rear yard door gate.Details
rebuild (e) interior stairs. relocate (e) kitchen. change (e) kitchen to bedroom. add 1 bath room on 2nd floor. add 2 bedrooms, 2 bathrooms at on 1st floor. new family room with with bar on 1st floor. rebuild rear yard door gate. | $280,000 |
| Feb 22, 2016 | Completed final sign-off Aug 2016 | 2200 Sacramento St | apt 901: remodel kitchenand two baths, replace appliances, sink & cabinets in kitchen. install lighting, shower pan, washer and dryer, toilet & bath tub.Details
apt 901: remodel kitchenand two baths, replace appliances, sink & cabinets in kitchen. install lighting, shower pan, washer and dryer, toilet & bath tub. | $45,000 |
| Sep 4, 2015 | Completed final sign-off Oct 2015 | 531 12th Av | all work in sun room @ rear only. replace leaking roof - not visible from street. replace 8 (e) windows not visible from street. remove dryrot not visible from street - replace t&g siding. replace (e) ceiling light and outlets.Details
all work in sun room @ rear only. replace leaking roof - not visible from street. replace 8 (e) windows not visible from street. remove dryrot not visible from street - replace t&g siding. replace (e) ceiling light and outlets. | $15,000 |
| Aug 27, 2015 | Completed final sign-off Feb 2017 | 2851 Turk Bl | building under construction by apn: 2015.0612.8837. this permit include: ab-094 to the existing building - voluntary seismic upgrage of soft story.Details
building under construction by apn: 2015.0612.8837. this permit include: ab-094 to the existing building - voluntary seismic upgrage of soft story. | $8,000 |
| Jun 30, 2015 | Never finaled issued Jun 2015, no final | 3131 Quintara St | 2/f: remove the dividing wall (built w/o bldg permit) @(e)rear room, add wall & door between bedrm & study rm. 1/f: create 2 bedrms at (e) rear 1/f , family room (comply with complaint 201523111).Details
2/f: remove the dividing wall (built w/o bldg permit) @(e)rear room, add wall & door between bedrm & study rm. 1/f: create 2 bedrms at (e) rear 1/f , family room (comply with complaint 201523111). | $1,000 |
| Jun 12, 2015 | Completed final sign-off Feb 2017 | 2851 Turk Bl | alteration to existing bldg. relocate ((e) stairs, kitchens, bathrooms, change the lower roof to roof deck at rear at 3/f. new home office, family room and 2 toilets at 1/f. new electrical, plumbing, heating system and tankless water heaters. replace all windows in kind w/ solid wood.Details
alteration to existing bldg. relocate ((e) stairs, kitchens, bathrooms, change the lower roof to roof deck at rear at 3/f. new home office, family room and 2 toilets at 1/f. new electrical, plumbing, heating system and tankless water heaters. replace all windows in kind w/ solid wood. | $250,000 |
| Mar 3, 2015 | Never finaled issued Mar 2015, no final | 525 Clement St | administrative permit (dcp). no construction. to legalize a use size that exceeds 2,500 sq ft of the floor area as per city planning required. the construction was completed by app#200404080843. resubmit for approval as requested.Details
administrative permit (dcp). no construction. to legalize a use size that exceeds 2,500 sq ft of the floor area as per city planning required. the construction was completed by app#200404080843. resubmit for approval as requested. | |
| Dec 16, 2014 | Completed final sign-off Oct 2015 | 788 32nd Av | revision to apn. 201408264702; remove (e) bearing walls & posts replace with steel beams, posts & post ftgs @ 1/f & 2/f, add island counter in (e) kitchen & remodeling (eo toilet rm 2/f.Details
revision to apn. 201408264702; remove (e) bearing walls & posts replace with steel beams, posts & post ftgs @ 1/f & 2/f, add island counter in (e) kitchen & remodeling (eo toilet rm 2/f. | $15,000 |
| Aug 26, 2014 | Completed final sign-off Oct 2015 | 788 32nd Av | remodel duplex, rewire elec for unit 788. provide elevator for unit 788. remodel bath at 1st floor & 2nd floor. provide new heater for (e) radiant heat. replace (e) windows at rear on 1st floor. remodel (e) kitchen 2nd floor. replace (e) concr slab at garage.Details
remodel duplex, rewire elec for unit 788. provide elevator for unit 788. remodel bath at 1st floor & 2nd floor. provide new heater for (e) radiant heat. replace (e) windows at rear on 1st floor. remodel (e) kitchen 2nd floor. replace (e) concr slab at garage. | $60,000 |
| May 2, 2014 | Completed final sign-off Nov 2014 | 355 Coleridge St | add 1 storage room 7x8 at 1st story. infill under 2nd flDetails
add 1 storage room 7x8 at 1st story. infill under 2nd fl | $10,000 |
| Dec 16, 2013 | Completed final sign-off Apr 2014 | 2940 22nd Av | add one new glass skylights (2'x4') above extg nook area.Details
add one new glass skylights (2'x4') above extg nook area. | $4,000 |
| May 3, 2013 | Completed final sign-off Jun 2013 | 1234 02nd Av | revision to pa 201111189223. 1. relocate rear stairs from 2nd floor to 1st flr. 2. change (e) 42" ht. glass panel to stud guard railDetails
revision to pa 201111189223. 1. relocate rear stairs from 2nd floor to 1st flr. 2. change (e) 42" ht. glass panel to stud guard rail | |
| Apr 2, 2013 | Completed final sign-off Nov 2014 | 355 Coleridge St | interior renovation, replace windows, new retaining wall and partial foundation upgrade, new kitchen, new powder room, new internal stair to garage level. relocate bathrooms at upper level.Details
interior renovation, replace windows, new retaining wall and partial foundation upgrade, new kitchen, new powder room, new internal stair to garage level. relocate bathrooms at upper level. | $140,000 |
| Apr 1, 2013 | Completed final sign-off Jun 2013 | 1234 02nd Av | revise permit app#201111189223 to show revised connection of deck to house and revised stair location.Details
revise permit app#201111189223 to show revised connection of deck to house and revised stair location. | |
| Mar 21, 2013 | Completed final sign-off Aug 2013 | 531 12th Av | revision to approved pa# 201110187000. structural changes at 2nd floor. change/enlarge existing windows at rear, not visible from street. change existing toilet room at 2nd floor.Details
revision to approved pa# 201110187000. structural changes at 2nd floor. change/enlarge existing windows at rear, not visible from street. change existing toilet room at 2nd floor. | |
| Nov 15, 2012 | Completed final sign-off May 2013 | 562 10th Av | remodel top floor: 2 bathrms, insulation and sheetrock, upgrade elec top floor, insulation & sheetrock upgrade 100 amps to 200 amps service panel (sheetrock 5/8" with 5 cooler nails @ 4" on center or equivalent screws)Details
remodel top floor: 2 bathrms, insulation and sheetrock, upgrade elec top floor, insulation & sheetrock upgrade 100 amps to 200 amps service panel (sheetrock 5/8" with 5 cooler nails @ 4" on center or equivalent screws) | $35,000 |
| Jul 23, 2012 | Completed final sign-off Mar 2013 | 301 Holly Park Cr | structural revised to pa 201205049800Details
structural revised to pa 201205049800 | $8,000 |
| May 4, 2012 | Completed final sign-off Mar 2013 | 301 Holly Park Cr | remodel (e) bathroom, relocate interior stairs & closet on 2nd floor. install bedroom, bathrooms & structural retrofit on 1st floorDetails
remodel (e) bathroom, relocate interior stairs & closet on 2nd floor. install bedroom, bathrooms & structural retrofit on 1st floor | $60,000 |
| Apr 26, 2012 | Completed final sign-off Sep 2012 | 652 Oak St | renovate existing bathroom, upgrade electrical throughout unit, add insulation to exterior walls and in attic space, all work in #652 only, add forced air heating in attic.Details
renovate existing bathroom, upgrade electrical throughout unit, add insulation to exterior walls and in attic space, all work in #652 only, add forced air heating in attic. | $30,000 |
| Nov 18, 2011 | Completed final sign-off Jun 2013 | 1234 02nd Av | remove & replace (e) rear yard addition in same footprint. infill under addition to create habitable space. renovate kitchen, creat (n) powder room. renovate upper bath, create (n) bath, provide steel beam @ garage and level garage slab.Details
remove & replace (e) rear yard addition in same footprint. infill under addition to create habitable space. renovate kitchen, creat (n) powder room. renovate upper bath, create (n) bath, provide steel beam @ garage and level garage slab. | $95,000 |
| Oct 18, 2011 | Completed final sign-off Aug 2013 | 531 12th Av | proposed addition at north side building and rear stairs. enlarged (e) kitchen and toilet area @ 2/f.Details
proposed addition at north side building and rear stairs. enlarged (e) kitchen and toilet area @ 2/f. | $30,000 |
| Sep 16, 2011 | Completed final sign-off Aug 2013 | 531 12th Av | remove porch and stairs at rear. install bedroom, family room and bath room at 1st floor repair the foundation.Details
remove porch and stairs at rear. install bedroom, family room and bath room at 1st floor repair the foundation. | $60,000 |
| Mar 28, 2011 | Never finaled issued Mar 2011, no final | 645 Clement St | remodeling existing grocery market store, change equipments, shelves, cashier counter, walk-in cooler new walls, structural change, remove posts and beams including change from (e)2-compartment sink to (n) 3 compartment sinksDetails
remodeling existing grocery market store, change equipments, shelves, cashier counter, walk-in cooler new walls, structural change, remove posts and beams including change from (e)2-compartment sink to (n) 3 compartment sinks | $85,000 |
| Aug 6, 2009 | Completed final sign-off Sep 2009 | 1630 Santiago St | repair dry rot in front of garage.Details
repair dry rot in front of garage. | $3,000 |
| May 1, 2009 | Never finaled issued Nov 2009, no final | 434 Bright St | two story extension at rear of bldg, approx 700 sq st.Details
two story extension at rear of bldg, approx 700 sq st. | $62,000 |
| Nov 4, 2008 | Completed final sign-off Dec 2008 | 50 Melba Av | replace toilet and lavatory in bathroom. add one circuit with 4 outlets in kitchen. upgrade electrical service to 100 amps.Details
replace toilet and lavatory in bathroom. add one circuit with 4 outlets in kitchen. upgrade electrical service to 100 amps. | $900 |
| Oct 9, 2008 | Completed final sign-off Nov 2008 | 3300 Ocean Av | revision under permit# 2008/08/21/9693. replace (e) fire rated door as shownDetails
revision under permit# 2008/08/21/9693. replace (e) fire rated door as shown | $300 |
| Aug 21, 2008 | Completed final sign-off Oct 2008 | 3300 Ocean Av | remove/re-configeration existing bath rm.Details
remove/re-configeration existing bath rm. | $12,000 |
| Aug 8, 2005 | Completed final sign-off May 2008 | 1727 Ulloa St | remodel & horizontal extension @rear of bldg.(repair fire damage in portion of (e)bldg.)Details
remodel & horizontal extension @rear of bldg.(repair fire damage in portion of (e)bldg.) | $150,000 |