Back to bathroom remodel contractors
Jimmy Wong
- Based in
- San Francisco
- On San Francisco permits
- Aug 2005 to May 2025
- Last 24 months
- 5 permits filed
56 permits since 2000: 49 completed, 1 in progress, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 1 is 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
20 bathroom remodel permits: 19 completed, 1 never finaled. Typically 0 days from filing to permit and 255 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 17, 2025 | Completed final sign-off Sep 2025 | 825 La Playa | #122: remodel update one bathroom, no structural change.Details
#122: remodel update one bathroom, no structural change. | $16,000 |
| Jan 17, 2025 | Completed final sign-off Apr 2025 | 855 La Playa | #259: remodel & update two bath, 1 kitchen and floor tile in the sitting room, dining room and laundry. no structural changes.Details
#259: remodel & update two bath, 1 kitchen and floor tile in the sitting room, dining room and laundry. no structural changes. | $70,000 |
| Nov 14, 2024 | Completed final sign-off Mar 2025 | 825 La Playa | remodel total 2 bathrooms only update no locationn changeDetails
remodel total 2 bathrooms only update no locationn change | $33,000 |
| Apr 18, 2024 | Completed final sign-off May 2024 | 268 11th Av | revision to bpa# 201705307831: to legalize the window in the bathroom - 1st floor.Details
revision to bpa# 201705307831: to legalize the window in the bathroom - 1st floor. | |
| Mar 25, 2024 | Completed final sign-off Jun 2024 | 875 La Playa | replace all floor & wall cabinets and all appliances in kitchen. update all gfic outlets in kitchen. replace kitchen sink and faucet. install new electrical fireplace (unit). replace floor & wall tiles & all accessories in bathroom. replace vanity and sink and faucet in bathroom. no removal of wallsDetails
replace all floor & wall cabinets and all appliances in kitchen. update all gfic outlets in kitchen. replace kitchen sink and faucet. install new electrical fireplace (unit). replace floor & wall tiles & all accessories in bathroom. replace vanity and sink and faucet in bathroom. no removal of walls | $20,000 |
| Jul 15, 2022 | Completed final sign-off Sep 2022 | 825 La Playa | apt 224. 1 bathroom remodel: replace vanity with sink, reverse bathtub to shower room. replace floor wall tiles. replace toilet.Details
apt 224. 1 bathroom remodel: replace vanity with sink, reverse bathtub to shower room. replace floor wall tiles. replace toilet. | $10,000 |
| Jan 17, 2020 | Never finaled issued Jan 2020, no final | 825 La Playa | replace baseboard, doors (interior), closet doors, replace kitchen cabinets, countertop, appliances, replace bathroom countertops (2 bathrooms)Details
replace baseboard, doors (interior), closet doors, replace kitchen cabinets, countertop, appliances, replace bathroom countertops (2 bathrooms) | $12,000 |
| Oct 25, 2019 | Completed final sign-off Jun 2024 | 266 11th Av | remodel 2nd, 3rd and attic. 2nd & 3rd fl - add new bathroom, relocate kitchen and convert kitchen/breakfast room to bedroom. attic - add bedroom and build 3 dormers windows. rebuilding (e) front stairs in kind with terrazzo. no work on 1st floor.Details
remodel 2nd, 3rd and attic. 2nd & 3rd fl - add new bathroom, relocate kitchen and convert kitchen/breakfast room to bedroom. attic - add bedroom and build 3 dormers windows. rebuilding (e) front stairs in kind with terrazzo. no work on 1st floor. | $28,000 |
| Apr 17, 2018 | Completed final sign-off Sep 2019 | 2450 28th Av | 1st fl add 3 bedrooms, 2 full baths, laundry and office. 2nd fl remodel kichen and bath, add 1/2 bath. add eck and patio at rearDetails
1st fl add 3 bedrooms, 2 full baths, laundry and office. 2nd fl remodel kichen and bath, add 1/2 bath. add eck and patio at rear | $90,000 |
| Mar 14, 2016 | Completed final sign-off May 2018 | 501 Junipero Serra Bl | rebuild (e) interior stairs. relocate (e) kitchen. change (e) kitchen to bedroom. add 1 bath room on 2nd floor. add 2 bedrooms, 2 bathrooms at on 1st floor. new family room with with bar on 1st floor. rebuild rear yard door gate.Details
rebuild (e) interior stairs. relocate (e) kitchen. change (e) kitchen to bedroom. add 1 bath room on 2nd floor. add 2 bedrooms, 2 bathrooms at on 1st floor. new family room with with bar on 1st floor. rebuild rear yard door gate. | $280,000 |
| Feb 22, 2016 | Completed final sign-off Aug 2016 | 2200 Sacramento St | apt 901: remodel kitchenand two baths, replace appliances, sink & cabinets in kitchen. install lighting, shower pan, washer and dryer, toilet & bath tub.Details
apt 901: remodel kitchenand two baths, replace appliances, sink & cabinets in kitchen. install lighting, shower pan, washer and dryer, toilet & bath tub. | $45,000 |
| Jun 12, 2015 | Completed final sign-off Feb 2017 | 2851 Turk Bl | alteration to existing bldg. relocate ((e) stairs, kitchens, bathrooms, change the lower roof to roof deck at rear at 3/f. new home office, family room and 2 toilets at 1/f. new electrical, plumbing, heating system and tankless water heaters. replace all windows in kind w/ solid wood.Details
alteration to existing bldg. relocate ((e) stairs, kitchens, bathrooms, change the lower roof to roof deck at rear at 3/f. new home office, family room and 2 toilets at 1/f. new electrical, plumbing, heating system and tankless water heaters. replace all windows in kind w/ solid wood. | $250,000 |
| Aug 26, 2014 | Completed final sign-off Oct 2015 | 788 32nd Av | remodel duplex, rewire elec for unit 788. provide elevator for unit 788. remodel bath at 1st floor & 2nd floor. provide new heater for (e) radiant heat. replace (e) windows at rear on 1st floor. remodel (e) kitchen 2nd floor. replace (e) concr slab at garage.Details
remodel duplex, rewire elec for unit 788. provide elevator for unit 788. remodel bath at 1st floor & 2nd floor. provide new heater for (e) radiant heat. replace (e) windows at rear on 1st floor. remodel (e) kitchen 2nd floor. replace (e) concr slab at garage. | $60,000 |
| Apr 2, 2013 | Completed final sign-off Nov 2014 | 355 Coleridge St | interior renovation, replace windows, new retaining wall and partial foundation upgrade, new kitchen, new powder room, new internal stair to garage level. relocate bathrooms at upper level.Details
interior renovation, replace windows, new retaining wall and partial foundation upgrade, new kitchen, new powder room, new internal stair to garage level. relocate bathrooms at upper level. | $140,000 |
| May 4, 2012 | Completed final sign-off Mar 2013 | 301 Holly Park Cr | remodel (e) bathroom, relocate interior stairs & closet on 2nd floor. install bedroom, bathrooms & structural retrofit on 1st floorDetails
remodel (e) bathroom, relocate interior stairs & closet on 2nd floor. install bedroom, bathrooms & structural retrofit on 1st floor | $60,000 |
| Apr 26, 2012 | Completed final sign-off Sep 2012 | 652 Oak St | renovate existing bathroom, upgrade electrical throughout unit, add insulation to exterior walls and in attic space, all work in #652 only, add forced air heating in attic.Details
renovate existing bathroom, upgrade electrical throughout unit, add insulation to exterior walls and in attic space, all work in #652 only, add forced air heating in attic. | $30,000 |
| Nov 18, 2011 | Completed final sign-off Jun 2013 | 1234 02nd Av | remove & replace (e) rear yard addition in same footprint. infill under addition to create habitable space. renovate kitchen, creat (n) powder room. renovate upper bath, create (n) bath, provide steel beam @ garage and level garage slab.Details
remove & replace (e) rear yard addition in same footprint. infill under addition to create habitable space. renovate kitchen, creat (n) powder room. renovate upper bath, create (n) bath, provide steel beam @ garage and level garage slab. | $95,000 |
| Sep 16, 2011 | Completed final sign-off Aug 2013 | 531 12th Av | remove porch and stairs at rear. install bedroom, family room and bath room at 1st floor repair the foundation.Details
remove porch and stairs at rear. install bedroom, family room and bath room at 1st floor repair the foundation. | $60,000 |
| Nov 4, 2008 | Completed final sign-off Dec 2008 | 50 Melba Av | replace toilet and lavatory in bathroom. add one circuit with 4 outlets in kitchen. upgrade electrical service to 100 amps.Details
replace toilet and lavatory in bathroom. add one circuit with 4 outlets in kitchen. upgrade electrical service to 100 amps. | $900 |
| Aug 21, 2008 | Completed final sign-off Oct 2008 | 3300 Ocean Av | remove/re-configeration existing bath rm.Details
remove/re-configeration existing bath rm. | $12,000 |