Zhou's International Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Dec 2025
- Last 24 months
- 3 permits filed
67 permits since 2000: 55 completed, 2 in progress, 7 never finaled, 3 expired or cancelled.
Of the 7 never-finaled permits, 1 is 3 to 5 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
22 stairs permits: 19 completed, 2 in progress, 1 never finaled. Typically 1 days from filing to permit and 415 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 30, 2025 | In progress issued Feb 2026 | 467 38th Av | remodel bedroom & bath.add 2 full bath on top floor.remodel living,dining,kitchen & 1/2 bath.add deck & stairs on mid floor.remodel bathroom,family, w/ kitchenette,remove wall,w/ 2 burners,stove.add bed on 1/f.replace wdws w/ alumn at front,wdws/doors at rear.replace w/h & furn.upgrade meps. roof.Details
remodel bedroom & bath.add 2 full bath on top floor.remodel living,dining,kitchen & 1/2 bath.add deck & stairs on mid floor.remodel bathroom,family, w/ kitchenette,remove wall,w/ 2 burners,stove.add bed on 1/f.replace wdws w/ alumn at front,wdws/doors at rear.replace w/h & furn.upgrade meps. roof. | $250,000 |
| Dec 30, 2025 | In progress issued Feb 2026 | 1447 29th Av | remodel living, dining, kitchen, baths & bedrooms. relocate lightwell,stairs. add bedroom & baths, family & laundry.replace windows/doors.replace water heater, furnace.upgrade electrical/plumbing systems.repair roof.Details
remodel living, dining, kitchen, baths & bedrooms. relocate lightwell,stairs. add bedroom & baths, family & laundry.replace windows/doors.replace water heater, furnace.upgrade electrical/plumbing systems.repair roof. | $150,000 |
| Jul 17, 2024 | Completed final sign-off Sep 2025 | 2363 31st Av | remodel/rearrange living,dining,kitchen,bedrooms,bathroom,stairs & lightwell.add bed & bath.remove walls;add flat skylights on 2/f.add 2 bedrooms,2baths, laundry & family room w/ wet bar sink on 1/f.replace wdws w/ alum clad wood in-kind at front,add wdws/doors rear.replace w/h+furn.replace roof/gd.Details
remodel/rearrange living,dining,kitchen,bedrooms,bathroom,stairs & lightwell.add bed & bath.remove walls;add flat skylights on 2/f.add 2 bedrooms,2baths, laundry & family room w/ wet bar sink on 1/f.replace wdws w/ alum clad wood in-kind at front,add wdws/doors rear.replace w/h+furn.replace roof/gd. | $150,000 |
| Jul 17, 2024 | Completed final sign-off Feb 2026 | 1354 29th Av | remodel/rearrange kitchen,bath,rooms.stairs,infill lightwell;add a full bath;add flat skylights.add 2 beds,2 baths,media on 1/f.add deck & doors at rear.replace wdws w/ alum wood-clad in-kind at front;wdws & doors at rear;garage dr,wh &furn;elec & plumb upgrades.replace roof.Details
remodel/rearrange kitchen,bath,rooms.stairs,infill lightwell;add a full bath;add flat skylights.add 2 beds,2 baths,media on 1/f.add deck & doors at rear.replace wdws w/ alum wood-clad in-kind at front;wdws & doors at rear;garage dr,wh &furn;elec & plumb upgrades.replace roof. | $160,000 |
| Nov 22, 2023 | Completed final sign-off Dec 2023 | 115 Idora Av | amend approved pa# 202210174451. change bathroom layout. remove window, relocate doors. add storage. repair stairs at front.Details
amend approved pa# 202210174451. change bathroom layout. remove window, relocate doors. add storage. repair stairs at front. | $1,000 |
| Oct 17, 2022 | Completed final sign-off Dec 2023 | 115 Idora Av | remodel rearange living dining, kitchen, bedrooms, bath & stairs, add full bath & study add sky ligts on 2nd fl. add 2 bedroom, 2 bath & media, add kitchenett w/2 burner stove no oven, hood, sink on 1st fl. replace windows/doors, n/ aluminum clad wood windows/doors, replace water heater furnance,Details
remodel rearange living dining, kitchen, bedrooms, bath & stairs, add full bath & study add sky ligts on 2nd fl. add 2 bedroom, 2 bath & media, add kitchenett w/2 burner stove no oven, hood, sink on 1st fl. replace windows/doors, n/ aluminum clad wood windows/doors, replace water heater furnance, | $120,000 |
| Apr 15, 2021 | Completed final sign-off Sep 2022 | 1431 15th Av | remod/replace kitchen & bath, stairway & infill lightwell, remove wall, add fullbath, desk at rearat 2nd fl, add two bedrm & media, infill below sunrm, replace/relocate garagedoor, entrace door at 1st fl, replace alumium clad wood window at fron & vinyl at rear, replace waer & furnace, replace roof.Details
remod/replace kitchen & bath, stairway & infill lightwell, remove wall, add fullbath, desk at rearat 2nd fl, add two bedrm & media, infill below sunrm, replace/relocate garagedoor, entrace door at 1st fl, replace alumium clad wood window at fron & vinyl at rear, replace waer & furnace, replace roof. | $120,000 |
| Mar 30, 2021 | Completed final sign-off Mar 2023 | 48 Sylvan Dr | remodel/replace kitchen, bath & stairs. add full bath, bedroom, enclose central patio, lightwell, & skylight on 2nd floor. add media, bedroom, 2 full bath on 1st floor. replace door & window at front w/ aluminum clad wood windows. replace water heater, furnace, & roof. upgrade electrical & plumbing.Details
remodel/replace kitchen, bath & stairs. add full bath, bedroom, enclose central patio, lightwell, & skylight on 2nd floor. add media, bedroom, 2 full bath on 1st floor. replace door & window at front w/ aluminum clad wood windows. replace water heater, furnace, & roof. upgrade electrical & plumbing. | $200,000 |
| Oct 22, 2020 | Completed final sign-off Oct 2022 | 3043 20th Av | relocate kitchen & stairs, remodel bath, add a full and a half bath and a study on 2nd flr. remodel bath, add 2 bedrooms, fam rm and a full bath on 1st flr. replace all windos w/ alum-clad wood windows. replace water heater, & furnace. upgrade electrical & plumb. replace roof.Details
relocate kitchen & stairs, remodel bath, add a full and a half bath and a study on 2nd flr. remodel bath, add 2 bedrooms, fam rm and a full bath on 1st flr. replace all windos w/ alum-clad wood windows. replace water heater, & furnace. upgrade electrical & plumb. replace roof. | $150,000 |
| Oct 31, 2019 | Completed final sign-off Aug 2020 | 290 16th Av | repair rear stairs less than 50%. all repair work in kindDetails
repair rear stairs less than 50%. all repair work in kind | $5,000 |
| Feb 5, 2019 | Completed final sign-off Jan 2021 | 866 39th Av | remodel/relocate (e) kitchen, bathrm & stairs, add a full bathrm. enclose (e) lightwell; add skylights on 2/f. add 2 bedrms, media room, full bathroom. relocate dervice door, add deck on 1/f. replace alum clad wood win on front. replace garage door. replace vinyl windows/door at rear. replace roof.Details
remodel/relocate (e) kitchen, bathrm & stairs, add a full bathrm. enclose (e) lightwell; add skylights on 2/f. add 2 bedrms, media room, full bathroom. relocate dervice door, add deck on 1/f. replace alum clad wood win on front. replace garage door. replace vinyl windows/door at rear. replace roof. | $100,000 |
| Dec 7, 2018 | Completed final sign-off Jan 2020 | 1390 41st Av | remodel & relocate kitch & bath, add 2 full baths & 1 bedrm, relocate stairs, enclose patio & litewell, add 5 skylights at 2nd flr. convert fam to bedrm, relocate full bath, add media & storage at 1st flr. replace door w/ wndw, relocate grge door, add srvc door at front. replc rear wndw & door, roofDetails
remodel & relocate kitch & bath, add 2 full baths & 1 bedrm, relocate stairs, enclose patio & litewell, add 5 skylights at 2nd flr. convert fam to bedrm, relocate full bath, add media & storage at 1st flr. replace door w/ wndw, relocate grge door, add srvc door at front. replc rear wndw & door, roof | $120,000 |
| Oct 11, 2018 | Completed final sign-off Jan 2020 | 1371 41st Av | remodel/relocate kitchen and bath, relocate stairs, enclose central patio & skylight on second floor. add 2 bedrooms, 2 full baths, media and storage on 1st floor. replace windows with aluminum clad. relocate/replace garage door and service door at the front. replace vinyl windows at the rear.Details
remodel/relocate kitchen and bath, relocate stairs, enclose central patio & skylight on second floor. add 2 bedrooms, 2 full baths, media and storage on 1st floor. replace windows with aluminum clad. relocate/replace garage door and service door at the front. replace vinyl windows at the rear. | $14,000 |
| Sep 27, 2018 | Completed final sign-off Apr 2021 | 57 Nebraska St | remodel kitchen/bath add a bath, remove walls on 2nd fl. remodel bath add stairs to basemetn, add deck & stairs to yard on 1st fl. replace windows & doors at rear, replace water heater, furnace, upgrade electrical plumbing system, replace roofDetails
remodel kitchen/bath add a bath, remove walls on 2nd fl. remodel bath add stairs to basemetn, add deck & stairs to yard on 1st fl. replace windows & doors at rear, replace water heater, furnace, upgrade electrical plumbing system, replace roof | $180,000 |
| Aug 8, 2018 | Completed final sign-off Jul 2019 | 2345 Divisadero St | revision to 201709279695 rearrange kitchen, replace deck and stairs on 2nd fl. switch laundry and closet, add windows at rear on 3rd fl add skylights and roof deck at rear on 4th flDetails
revision to 201709279695 rearrange kitchen, replace deck and stairs on 2nd fl. switch laundry and closet, add windows at rear on 3rd fl add skylights and roof deck at rear on 4th fl | $40,000 |
| Dec 28, 2017 | Completed final sign-off Jul 2019 | 2345 Divisadero St | revision to pa #201709279695 - rearrange bath on 3rd floor. add interior stairs, 2 bedrooms, 2 full baths, a family room on 1st floor. infill partial lightwell. relocate water heaters, furnaces, wash/dryer. replace foundation.Details
revision to pa #201709279695 - rearrange bath on 3rd floor. add interior stairs, 2 bedrooms, 2 full baths, a family room on 1st floor. infill partial lightwell. relocate water heaters, furnaces, wash/dryer. replace foundation. | $100,000 |
| Nov 28, 2017 | Completed final sign-off Jun 2018 | 1686 32nd Av | in-fill (e) lightwell, remodel (e) kitchen, remove (e) interior second staircase from 2/f down to g/f and install one 3x3 skylight at 2/f. (no change to bldg. envlope)Details
in-fill (e) lightwell, remodel (e) kitchen, remove (e) interior second staircase from 2/f down to g/f and install one 3x3 skylight at 2/f. (no change to bldg. envlope) | $28,000 |
| Jun 19, 2017 | Completed final sign-off May 2018 | 2010 23rd Av | remodel kitchen & bath, add full bath, replace stairs, infill patio, add lightwell on 2nd fl. add bath & deck at penthouse. convert rms to bedrms, add media & storage, relocate full bath on garage & 1st fl. replace front windows w/aluminum clad wood windows. other windows w/vinyl. replace plumbing,Details
remodel kitchen & bath, add full bath, replace stairs, infill patio, add lightwell on 2nd fl. add bath & deck at penthouse. convert rms to bedrms, add media & storage, relocate full bath on garage & 1st fl. replace front windows w/aluminum clad wood windows. other windows w/vinyl. replace plumbing, | $90,000 |
| Jun 12, 2017 | Completed final sign-off Jul 2017 | 1484 22nd Av | repair front stair less than 50% in kind replacementDetails
repair front stair less than 50% in kind replacement | $5,000 |
| Aug 19, 2015 | Completed final sign-off Sep 2015 | 360 Utah St | repair rear stair less than 50%.Details
repair rear stair less than 50%. | $3,500 |
| Jun 6, 2014 | Never finaled issued Jun 2014, no final | 1742 23rd Av | second floor add rear dec and stair. add one bath room replace all windows in kind at rear. remodel kitchen and bath. new electrical and gyp. bd. through out entire house. addition of 2 bathrooms and 3 bedrooms.Details
second floor add rear dec and stair. add one bath room replace all windows in kind at rear. remodel kitchen and bath. new electrical and gyp. bd. through out entire house. addition of 2 bathrooms and 3 bedrooms. | $80,000 |
| Oct 11, 2013 | Completed final sign-off Nov 2013 | 1359 Oak St | handrail for stairs in rear of house at both sides. handrail located 34" to 38" above stair nosing.Details
handrail for stairs in rear of house at both sides. handrail located 34" to 38" above stair nosing. | $1,200 |