Richlen Construction
- Based in
- Pacheco
- On San Francisco permits
- Jan 2000 to Sep 2026
- Last 24 months
- 62 permits filed
1,283 permits since 2000: 1,103 completed, 34 in progress, 62 never finaled, 84 expired or cancelled.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
Stairs permits
32 stairs permits: 29 completed, 2 in progress, 1 expired or cancelled. Typically 21 days from filing to permit and 231 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 12, 2026 | In progress | 631 Howard St | basement to ground floor - new interconnecting staircase that connects the basement to the ground floor. ref permit 202512192339, and 202512222436. no slab demolition under this permit, opening is existing | $155,000 |
| Oct 30, 2025 | Completed | 201 Mission St | 23 floor: interior alteration work to restrooms, elev. lobby & common corridor. scope does not affect existing tenant suites, exit access, path of egress or exit stairs. existing exiting to remain as-is. new finishes & plumbing fixtures at existing mens & womens rrs to be ada compliant. | $657,000 |
| Aug 12, 2024 | In progress | 998 Sansome St | abe upgrade including providing level landing at top and bottom of existing stair, new level accessible van loading zone and modified curb cuts at existing sidewalk. abe 202306157591 | $126,000 |
| Feb 28, 2024 | Completed | 201 Mission St | interior alteration work to (2) elevator lobby ceilings on the 18th fl. (n) ceiling & lighting. scope does not affect (e) tenant suites, exit access, paths of egress or exit stairs. (e) exiting is to remain as is. no exterior work. sprinkler system & l/s mod under separate permit. | $158,000 |
| Feb 28, 2024 | Completed | 201 Mission St | interior alteration work to elevator lobby ceiling on the 5th fl. new ceiling and lighting scope does not affect e tenant suites, exit access, paths of egress or exit stairs. e exiting remains as is. no exterior work. sprinkler, lw mod under sep permit. | $60,000 |
| Jun 15, 2023 | Completed | 50 California St | 35/f: demo of partitions, ceilings, finishes and millwork. demo of interior stair that connects the 35th and 34th floor. new structural floor infill on 35th floor. restroom remodel | $289,880 |
| Jun 2, 2022 | Completed | 50 California St | demo of non struc partitions, millwk, power/data, plumbing, ceiling systems incl abatement of haz materials. removal of (e) interconnect stair and slab infill. build back of accessible restrooms and mep to warm sheel condition space will remain unoccupied. add 11 fsds & 127 upright sprinkler heads. | $160,000 |
| Mar 5, 2021 | Completed | 401 Mason St | nightclub was forced to close due to sanitary sewer leak from tenant above. removed all of the interiror fiinshes and furningings, including bar and kitchen equipment, gyp board from walls and ceilings, flooring, lighting and ductwork, upgrades to the bathroom, stairs, elevator, and | $200,000 |
| Apr 11, 2019 | Completed | 45 Fremont St | selective demo within the (e) bsmt & ground fl lobby. demo non-egress communication stair (level 2 - bsmt) plus slab infill @ level 1 & 2 (where removed). expansion of ground fl lobby include new exterior landscape in southern plaza. new store front entry, bicycle entry & basement bicycle amenity. | $16,500,000 |
| May 18, 2018 | Completed | 201 Mission St | project consists of interior alteration to the restrooms, elevator lobby, and corridor on the 19th fl. this scope does not affect existing tenant suites, exit access, paths of egress or exit stairs. existing exiting to remain as is. existing sprinkler system, life safety modification to be under sep | $420,000 |
| May 18, 2018 | Completed | 201 Mission St | 21/f: interior alteration to the restrooms, elevator lobby and corridor. scope does not affect (e) tneant suites, exit access, paths of egress or exit stairs. existing exiting to remain as is. existing sprinkler system, life safety modification to be under sep permit | $420,000 |
| Mar 23, 2018 | Completed | 901 Battery St | structural slab infill where (e) stair has been removed. no change in occupancy, use, or area. revision to 201702031863 | $75,000 |
| Aug 23, 2016 | Completed | 201 Mission St | 17th floor - project consists of interior alteration work to restroom upgrades. scope of work does not affect exisitng tenant suites, exit accesses, paths of egress or exit stairs. existing exiting is to remain, sprinkler, mep, life safety under separate permit. n/a maher ordinance | $146,000 |
| Oct 23, 2015 | Completed | 595 Market St | demo existing escalator between gr fl and 2nd fl. construction of new stair and glazed enclosure at gr fl. mech, elec, life safety and sprinkler under sep permit. no work visible from street. no change of use. | $200,000 |
| Apr 10, 2015 | Completed | 500 Beach St | new steel stair fabrication, build back as close to possible as was inccorp new codes were possible and safety measures. bldg pa #2014.10.24.9824. n/a maher ordinance | $400,000 |
| Oct 24, 2014 | Completed | 500 Beach St | barrier removal of existing garage stairs to be replaced with new. interior stairs not visible from street. metal stair fabrication dwgs & calls under separate permit. | $757,126 |
| Jun 30, 2014 | Completed | 201 Mission St | interior alterations to existing common corridor, elevator lobby and restrooms on the 22nd floor. scope does not affect existing tenant suites, exit access, path of egress travel or exit stairs. new finishes and plumbing fixtures to replace existing. minor modifications to existing sprinklers. | $286,000 |
| Jun 30, 2014 | Completed | 201 Mission St | interior alteration to existing common corridor, elevator lobby and restrooms on the 13th floor. scope does not affect existing tenant suites, exit access, path of egress travel, or exit stairs. new finishes and plumbing fixtures to replace existing. minor modifications to lighting and switching | $286,000 |
| Sep 26, 2013 | Completed | 201 Mission St | 14th flr int alteration work to (e) common corridor, elevator lobby & restroom upgrades. no affect (e) tenant suites, exit access, path of egress or exit stairs. new finishes & plumbing fixtures, revise (e) toilets turinals, adjustments to lighting, switching,mep under separate permit,no ext work | $286,000 |
| Sep 26, 2013 | Completed | 201 Mission St | 20th flr int alteration work to (e) common corridor, elevator lobby & restroom upgrades. no affect (e) tenant suites, exit access, path of egress or exit stairs. new finishes & plumbing fixtures, revise (e) toilet & urinals, adjustments to lighting, switching, mep under separate permit,no ext work | $286,000 |
| Apr 2, 2013 | Completed | 888 Brannan St | demolish existing inter-connecting staircase between the 2nd & 3rd floor. provide new structural slab infill & fire proofing. | $10,000 |
| Dec 11, 2012 | Completed | 1725 Montgomery St | minor construction at internal stair to enclose landing and separate it from adj sute 201 including walls, door, frame and relocation of lighting. | $13,000 |
| Dec 14, 2011 | Completed | 888 Brannan St | const of a new lobby and entrance on the 1st fl. new basement lobby, new exits, new fire rated roll down door at existing ramp. 2nd fl reconfiguration of the exit stair to the 1st fl. new elevator , mep. fire/life safety under separate permit. | $1,300,000 |
| Oct 3, 2011 | Completed | 2800 Leavenworth St | new exterior ramp from plaza level to lower level plaza. new stairs from plaza to 2nd floor. new enclosed 12' vertical lift for access to 2nd and 3rd level including platform extension to 2nd fl. mep and fire sprinkler separate permit | $250,000 |
| Jan 3, 2008 | Completed | 150 California St | 18th & 19th floor - revision to appl #200709132618 demolishing (e) office & build new connecting stair from their(e) 19th fl down to the 18th fl. expansion space. convert 18th fl. lounge & office into a conf. room. no increase in office sp, sep permits for life safety/fire sprinkle. | $60,000 |
| Nov 19, 2007 | Completed | 1 Sansome St | floor 29 - demolition of interior stair walls. see appl # 200711198565 for the 30th floor. | $8,000 |
| Nov 19, 2007 | Completed | 1 Sansome St | internal stair demolition between 29th & 30th floors. structural floor slab infill. | $47,000 |
| Oct 12, 2005 | Completed | 650 California St | new opening in (e) hoistway for new elevator stop at basement level. new elevator lobby at elevator extension. new corridor donnecting lobby to (e) stairs. (basement). remove and replace (e) toilet rm fixtures for accessibility upgrades (basement) mech/elec/spr under defered permit. | $790,000 |
| Sep 8, 2004 | Completed | 425 Market St | rev#200403239355. to elimate plan check requirement to reverse door swing @ stair#2. firemains vesti | |
| Jan 13, 2004 | Expired or cancelled | 555 California St | demo interior stairs&infill opening w/decking on 27th fl.new hvac on 26th fl.no increase in office.. | |
| Aug 13, 2003 | Completed | 555 California St | new ceiling grid & ceiling tiles, light fixtures, & hvac at area where stairs will be demolished & i | $6,000 |
| Aug 13, 2003 | Completed | 555 California St | new ceiling grid & ceiling tiles.light fixtures at area where stairs will be demolished & infilled w | $5,000 |