Block 0236, lot 019

150 California St

City’s use
Commercial Office
Built
2000
Stories
23
Building
249,759 sq ft
Lot
15,179 sq ft
Zoning
C3O
Construction type
NA

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

The 200 most recent permits filed for this property.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Aug 6, 2026Completed
final sign-off Sep 2026
150 California StMayco Commercial Construction Inc17th fl - replacement of light fixtures and associated circuiting & controls. add transfer fan. add/relocated diffusers and registers per new layout. relocate thermostats ref pa 202602065382
Details
Permit
202608066165
Permit issued
Aug 6, 2026
Final sign-off
Sep 3, 2026

17th fl - replacement of light fixtures and associated circuiting & controls. add transfer fan. add/relocated diffusers and registers per new layout. relocate thermostats ref pa 202602065382

Open the permit page

$110,000
Aug 5, 2026In progress
issued Sep 2026
150 California StA-1 Modular Inc8/fl- install phone booth
Details
Permit
202608056081
Permit issued
Sep 11, 2026

8/fl- install phone booth

Open the permit page

$800
Jun 24, 2026In progress
issued Jun 2026
150 California StMatrix Hg Increplace 2 existing boilers with new condensing gas fire boilers located in the roof penthouse.
Details
Permit
202606243787
Permit issued
Jun 24, 2026

replace 2 existing boilers with new condensing gas fire boilers located in the roof penthouse.

Open the permit page

$198,000
Apr 22, 2026Completed
final sign-off Jun 2026
150 California StMayco Commercial Construction Inc6th floor: relocate 1 vav box, add diffusor, registers, return grills, with associated duct work, air balancing, relocate (e) thermostat. (ref 202510016451)
Details
Permit
202604229872
Permit issued
Jun 9, 2026
Final sign-off
Jun 26, 2026

6th floor: relocate 1 vav box, add diffusor, registers, return grills, with associated duct work, air balancing, relocate (e) thermostat. (ref 202510016451)

Open the permit page

$39,186
Apr 22, 2026Completed
final sign-off Jun 2026
150 California StMayco Commercial Construction Incdeferred electrical. #650 6th floor: new office ti conference room center: lighting, fixtures, and associated circuiting/controls, power/sigmal, & signal devices w/ associated wiring. (ref 202510016451)
Details
Permit
202604229880
Permit issued
Jun 9, 2026
Final sign-off
Jun 26, 2026

deferred electrical. #650 6th floor: new office ti conference room center: lighting, fixtures, and associated circuiting/controls, power/sigmal, & signal devices w/ associated wiring. (ref 202510016451)

Open the permit page

$121,554
Apr 22, 2026Completed
final sign-off Jun 2026
150 California StMayco Commercial Construction Inc9th fl - office tenant retrofit: new and altered lighting layout, circuiting and controls. mechanical ll- add transfer fan. add diffuser and registers with associated duct work. air balance. relocated thermostats ref pa 202602175990
Details
Permit
202604229868
Permit issued
Apr 22, 2026
Final sign-off
Jun 26, 2026

9th fl - office tenant retrofit: new and altered lighting layout, circuiting and controls. mechanical ll- add transfer fan. add diffuser and registers with associated duct work. air balance. relocated thermostats ref pa 202602175990

Open the permit page

$31,700
Feb 17, 2026Completed
final sign-off Jun 2026
150 California StMayco Commercial Construction Inc9th fl, ste 900 selective demo of int'r partitions, ceiling and lighting; new non-structuarl partitions, doors, frames, hardware and sidelights; new finishes, minor ceiling rework including relocated and some new lighting
Details
Permit
202602175990
Permit issued
Feb 19, 2026
Final sign-off
Jun 26, 2026

9th fl, ste 900 selective demo of int'r partitions, ceiling and lighting; new non-structuarl partitions, doors, frames, hardware and sidelights; new finishes, minor ceiling rework including relocated and some new lighting

Open the permit page

$342,500
Feb 6, 2026Completed
final sign-off Sep 2026
150 California StMayco Commercial Construction Inc17/f: minor t.i. to make market ready: no occupancy at completion. future t.i. sep permit. renovations/upgrades to(e) restrooms.
Details
Permit
202602065382
Permit issued
Feb 19, 2026
Final sign-off
Sep 3, 2026

17/f: minor t.i. to make market ready: no occupancy at completion. future t.i. sep permit. renovations/upgrades to(e) restrooms.

Open the permit page

$450,000
Feb 4, 2026In progress
issued Feb 2026
150 California StPrima Acquire Inc Dba Lahue And Associat6th floor: 3 evacuation signs. fire only.
Details
Permit
202602045226
Permit issued
Feb 9, 2026

6th floor: 3 evacuation signs. fire only.

Open the permit page

Jan 23, 2026Completed
final sign-off Jun 2026
150 California StMayco Commercial Construction Inc6th, 9th, & 16th floors:office building common restroom lighting remodel: lighting fixtures and associated circuiting/controls. ref. arch permit: 202505055757
Details
Permit
202601234437
Permit issued
Jan 23, 2026
Final sign-off
Jun 26, 2026

6th, 9th, & 16th floors:office building common restroom lighting remodel: lighting fixtures and associated circuiting/controls. ref. arch permit: 202505055757

Open the permit page

$89,000
Dec 12, 2025Completed
final sign-off May 2026
150 California StRapid Fire Safety&Security Llc Dba Pafa6th fl: fire alarm ti.: adding 2 speakers strobes, 1 smoke detector and 1 relay module to (e) notifer nfs2-3030 fire alarm system. ref bpa: 202510016451
Details
Permit
202512121695
Permit issued
Dec 12, 2025
Final sign-off
May 28, 2026

6th fl: fire alarm ti.: adding 2 speakers strobes, 1 smoke detector and 1 relay module to (e) notifer nfs2-3030 fire alarm system. ref bpa: 202510016451

Open the permit page

$8,268
Dec 8, 2025Completed
final sign-off Feb 2026
150 California StPioneer Fire Inc.ste 650. relocate (4) pendents, (4) concelaed pendnets, add (1) concealed pendent, convert (2) pendents to uprights. gfti # 202510016451
Details
Permit
202512081174
Permit issued
Dec 8, 2025
Final sign-off
Feb 10, 2026

ste 650. relocate (4) pendents, (4) concelaed pendnets, add (1) concealed pendent, convert (2) pendents to uprights. gfti # 202510016451

Open the permit page

$2,750
Oct 1, 2025Completed
final sign-off Jun 2026
150 California StMayco Commercial Construction Inc6/fl- ti of (e) suite 650 to include interior non structural demo , non structural partitions, doors, frames, hardware, sidelights, finishes and millwork, ceiling and lighting
Details
Permit
202510016451
Permit issued
Oct 14, 2025
Final sign-off
Jun 26, 2026

6/fl- ti of (e) suite 650 to include interior non structural demo , non structural partitions, doors, frames, hardware, sidelights, finishes and millwork, ceiling and lighting

Open the permit page

$199,018
Aug 20, 2025Completed
final sign-off Oct 2025
150 California StPioneer Fire Inc.6th, 9th & 16th fl ref pa # 2025-0505-5757. relocate 12 concealed sprinklers
Details
Permit
202508203462
Permit issued
Aug 20, 2025
Final sign-off
Oct 21, 2025

6th, 9th & 16th fl ref pa # 2025-0505-5757. relocate 12 concealed sprinklers

Open the permit page

$3,000
May 7, 2025Completed
final sign-off Jul 2025
150 California StMayco Commercial Construction Inc8th fl- office tenant retrofit: lighting fixtures and associated circuiting/controls, power and signal devices and associated wiring. deffered elec for arch #2025-0110-8086
Details
Permit
202505075943
Permit issued
May 29, 2025
Final sign-off
Jul 25, 2025

8th fl- office tenant retrofit: lighting fixtures and associated circuiting/controls, power and signal devices and associated wiring. deffered elec for arch #2025-0110-8086

Open the permit page

$87,222
May 7, 2025Completed
final sign-off Sep 2025
150 California StMayco Commercial Construction Inc8th fl- add diffusers, registers and transfer grilles. add 1 vav and 3 transfer fans. modify duct work. air balance deffered mech for arch #2025-0110-8086
Details
Permit
202505075944
Permit issued
May 29, 2025
Final sign-off
Sep 15, 2025

8th fl- add diffusers, registers and transfer grilles. add 1 vav and 3 transfer fans. modify duct work. air balance deffered mech for arch #2025-0110-8086

Open the permit page

$83,680
May 5, 2025Completed
final sign-off Jul 2026
150 California StMayco Commercial Construction Inc6th, 9th, & 16th floors: remodel of existing restrooms.
Details
Permit
202505055757
Permit issued
Aug 13, 2025
Final sign-off
Jul 17, 2026

6th, 9th, & 16th floors: remodel of existing restrooms.

Open the permit page

$410,400
Apr 21, 2025Completed
final sign-off Apr 2025
150 California StRapid Fire Safety&Security Llc Dba Pafa8/f: fire alarm t.i - adding 15 speaker-strobes, 3 speakers, 4 smoke detectors and 3 relays to (e) notifier nfs2-3030 fire alarm system. relocating 1 smoke detector. ref permit 202501108086.
Details
Permit
202504214841
Permit issued
Apr 21, 2025
Final sign-off
Apr 29, 2025

8/f: fire alarm t.i - adding 15 speaker-strobes, 3 speakers, 4 smoke detectors and 3 relays to (e) notifier nfs2-3030 fire alarm system. relocating 1 smoke detector. ref permit 202501108086.

Open the permit page

$15,895
Mar 20, 2025In progress
filed Mar 2025, not yet issued
150 California StAmerican Builders Company Incinstall ada signage, evacuation maps and logo at reception area
Details
Permit
202503202627

install ada signage, evacuation maps and logo at reception area

Open the permit page

$1,500
Feb 12, 2025Completed
final sign-off Feb 2025
150 California StRapid Fire Safety&Security Llc Dba Pafafire alarm permit pa#: 202307313327. air sampling system is being provided in two transformers. vaults instead of smoke detector.
Details
Permit
202502120218
Permit issued
Feb 12, 2025
Final sign-off
Feb 19, 2025

fire alarm permit pa#: 202307313327. air sampling system is being provided in two transformers. vaults instead of smoke detector.

Open the permit page

Feb 4, 2025Completed
final sign-off Apr 2025
150 California StPioneer Fire Inc.8th/fl: add (2) uprights, relocate (48) pendents gc#2025-0110-8086.
Details
Permit
202502049623
Permit issued
Feb 4, 2025
Final sign-off
Apr 29, 2025

8th/fl: add (2) uprights, relocate (48) pendents gc#2025-0110-8086.

Open the permit page

$100
Feb 3, 2025Completed
final sign-off Mar 2025
150 California StMayco Commercial Construction Inc5/f: remodel common corridor, pel (public elevator lobby) and restroom lighting, circuiting and assicated controls. ref architectural permit 202410293929.
Details
Permit
202502039536
Permit issued
Feb 3, 2025
Final sign-off
Mar 19, 2025

5/f: remodel common corridor, pel (public elevator lobby) and restroom lighting, circuiting and assicated controls. ref architectural permit 202410293929.

Open the permit page

$65,850
Jan 10, 2025Completed
final sign-off Jul 2025
150 California StMayco Commercial Construction Inc8/fl-interior ti altering 2 suites into 3 suites. work includes demo and construct of partitions, doors, ceilings, lighting and finishes. mep deferred.
Details
Permit
202501108086
Permit issued
Feb 3, 2025
Final sign-off
Jul 25, 2025

8/fl-interior ti altering 2 suites into 3 suites. work includes demo and construct of partitions, doors, ceilings, lighting and finishes. mep deferred.

Open the permit page

$1,233,496
Dec 10, 2024Completed
final sign-off Jan 2025
150 California StMayco Commercial Construction Increstroom lighting remodel and open office update control. ref pa #202408309800 and revision to pa #202410163090
Details
Permit
202412106472
Permit issued
Dec 10, 2024
Final sign-off
Jan 17, 2025

restroom lighting remodel and open office update control. ref pa #202408309800 and revision to pa #202410163090

Open the permit page

$85,000
Nov 20, 2024Completed
final sign-off Dec 2024
150 California StPioneer Fire Inc.5th fl- ref pa #2024-1029-3929 relocate (13) pendents
Details
Permit
202411205409
Permit issued
Nov 27, 2024
Final sign-off
Dec 11, 2024

5th fl- ref pa #2024-1029-3929 relocate (13) pendents

Open the permit page

$3,250
Nov 1, 2024Completed
final sign-off Dec 2024
150 California StPribuss Engineering Inc23/f: gc pa# 202408158808 - fire sprinkler ti for renovated office space - modify 47 heads.
Details
Permit
202411014253
Permit issued
Nov 1, 2024
Final sign-off
Dec 4, 2024

23/f: gc pa# 202408158808 - fire sprinkler ti for renovated office space - modify 47 heads.

Open the permit page

$23,500
Oct 29, 2024Completed
final sign-off Mar 2025
150 California StMayco Commercial Construction Inc5/fl- remodel of (e) common corridor, elevator lobby and restrooms
Details
Permit
202410293929
Permit issued
Nov 12, 2024
Final sign-off
Mar 19, 2025

5/fl- remodel of (e) common corridor, elevator lobby and restrooms

Open the permit page

$211,864
Oct 21, 2024Completed
final sign-off Jan 2025
150 California StRapid Fire Safety&Security Llc Dba Pafa22nd floor: fire alarm t.i. as built submittal per sffd inspection request, record drawings update bill of materials installed. delete 1 speaker strobes and 1 speaker. ref pa#202410072434
Details
Permit
202410213356
Permit issued
Oct 21, 2024
Final sign-off
Jan 24, 2025

22nd floor: fire alarm t.i. as built submittal per sffd inspection request, record drawings update bill of materials installed. delete 1 speaker strobes and 1 speaker. ref pa#202410072434

Open the permit page

Oct 16, 2024Completed
final sign-off Nov 2024
150 California StAcco Engineered Systems Inc. Dba Acco En3rd floor:revision to pa #202407267360. nrca-mch-03 initially checked off but test is not required.
Details
Permit
202410163078
Permit issued
Oct 16, 2024
Final sign-off
Nov 26, 2024

3rd floor:revision to pa #202407267360. nrca-mch-03 initially checked off but test is not required.

Open the permit page

Oct 16, 2024Completed
final sign-off Jan 2025
150 California StMayco Commercial Construction Incwork on 22nd flr. permit revisions for 202408309800; relocating detectable warming strips and removal of railing in garage. finish and fixtures changes in restrooms. no mechanical work. electrical deferred
Details
Permit
202410163090
Permit issued
Nov 13, 2024
Final sign-off
Jan 17, 2025

work on 22nd flr. permit revisions for 202408309800; relocating detectable warming strips and removal of railing in garage. finish and fixtures changes in restrooms. no mechanical work. electrical deferred

Open the permit page

Oct 7, 2024Completed
final sign-off Jan 2025
150 California StRapid Fire Safety&Security Llc Dba Pafa22/f: fire alarm t.i.: adding 8 speaker-strobes and 1 speaker to (e) notified nfs2-3030 fire alarm system. ref pa 202408309800.
Details
Permit
202410072434
Permit issued
Oct 7, 2024
Final sign-off
Jan 22, 2025

22/f: fire alarm t.i.: adding 8 speaker-strobes and 1 speaker to (e) notified nfs2-3030 fire alarm system. ref pa 202408309800.

Open the permit page

$8,970
Sep 18, 2024Completed
final sign-off Dec 2024
150 California StRapid Fire Safety&Security Llc Dba Pafafire alarm ti. relocating 1 s/d, adding 15 speaker strobes to existing notifier nfs2-3030 fire alarm system. adding 1 call station to jeron 2 way communication system. ref 202408158808
Details
Permit
202409181053
Permit issued
Sep 18, 2024
Final sign-off
Dec 24, 2024

fire alarm ti. relocating 1 s/d, adding 15 speaker strobes to existing notifier nfs2-3030 fire alarm system. adding 1 call station to jeron 2 way communication system. ref 202408158808

Open the permit page

$14,870
Aug 30, 2024Completed
final sign-off Jan 2025
150 California StMayco Commercial Construction Inc22/fl-ti to include soft demo of select non structural partitions and patching of finish and ceiling tile restroom. upgrade include relocating plumbing fixtures and accessories mep deferred.
Details
Permit
202408309800
Permit issued
Sep 26, 2024
Final sign-off
Jan 28, 2025

22/fl-ti to include soft demo of select non structural partitions and patching of finish and ceiling tile restroom. upgrade include relocating plumbing fixtures and accessories mep deferred.

Open the permit page

$190,275
Aug 15, 2024Completed
final sign-off Feb 2025
150 California StPrincipal Builders Inc.23rd/f: demo of non-structural interior partitions & new contruction of interior partitions, break room millwork, mep & lighting. no structural work inclued in scope, no imcrease in area. no change in occupancy or use
Details
Permit
202408158808
Permit issued
Sep 11, 2024
Final sign-off
Feb 12, 2025

23rd/f: demo of non-structural interior partitions & new contruction of interior partitions, break room millwork, mep & lighting. no structural work inclued in scope, no imcrease in area. no change in occupancy or use

Open the permit page

$1,031,140
Jul 29, 2024In progress
issued Jul 2024
150 California StRapid Fire Safety&Security Llc Dba Pafa3/f suite 300: ref to t.i. 202405313389. fire alarm adding 5 speakers & 11 speaker strobes to e) notifier nfs2-3030 fire alarm system, adding 1 call station to e) jeron 2-way comm. system
Details
Permit
202407297448
Permit issued
Jul 29, 2024

3/f suite 300: ref to t.i. 202405313389. fire alarm adding 5 speakers & 11 speaker strobes to e) notifier nfs2-3030 fire alarm system, adding 1 call station to e) jeron 2-way comm. system

Open the permit page

$13,190
Jul 26, 2024Completed
final sign-off Nov 2024
150 California StSource Planning And Construction Incste: 300 ref pa # 2024-0531-3389 deferred mechanical & electrical
Details
Permit
202407267360
Permit issued
Aug 15, 2024
Final sign-off
Nov 20, 2024

ste: 300 ref pa # 2024-0531-3389 deferred mechanical & electrical

Open the permit page

$175,000
Jul 24, 2024Completed
final sign-off Aug 2024
150 California StPioneer Fire Inc.3rd fl: ref pa # 2024-0531-3389 add (1) pendent & relocate (10) pendents
Details
Permit
202407247161
Permit issued
Jul 24, 2024
Final sign-off
Aug 23, 2024

3rd fl: ref pa # 2024-0531-3389 add (1) pendent & relocate (10) pendents

Open the permit page

$2,200
May 31, 2024Completed
final sign-off Nov 2024
150 California StSource Planning And Construction Incste. 300- office ti for minor renovation to include demo of non load bearing interior partitions and celiing tiles, (n) partitions and finsishes will be added for open office with a few conference rooms and offices. no exterior work or change of use,occupancy or egress.
Details
Permit
202405313389
Permit issued
Jun 14, 2024
Final sign-off
Nov 26, 2024

ste. 300- office ti for minor renovation to include demo of non load bearing interior partitions and celiing tiles, (n) partitions and finsishes will be added for open office with a few conference rooms and offices. no exterior work or change of use,occupancy or egress.

Open the permit page

$375,000
Aug 16, 2023Completed
final sign-off Sep 2023
150 California StCapitol Electric Const11th fl - modification of (e) life safety system ref pa 2022-1222-8926. install 16 new speakers and 19 new strobes; install 1 new smoke detector
Details
Permit
202308164529
Permit issued
Aug 16, 2023
Final sign-off
Sep 13, 2023

11th fl - modification of (e) life safety system ref pa 2022-1222-8926. install 16 new speakers and 19 new strobes; install 1 new smoke detector

Open the permit page

$46,526
Jul 31, 2023In progress
issued Dec 2023
150 California StPacific Auxiliary Fire Alarmfire alarm system voluntary replace one to one with notifier nfs2-3030. adding 2-way communication system.
Details
Permit
202307313327
Permit issued
Dec 6, 2023

fire alarm system voluntary replace one to one with notifier nfs2-3030. adding 2-way communication system.

Open the permit page

$244,440
Jun 29, 2023Completed
final sign-off Oct 2023
150 California StTeam Commercial Construction Inc.11/f: t.i. lighting fixtures, power & signal devices, ref pa# 202212228926.
Details
Permit
202306291137
Permit issued
Jul 6, 2023
Final sign-off
Oct 20, 2023

11/f: t.i. lighting fixtures, power & signal devices, ref pa# 202212228926.

Open the permit page

$226,000
Jun 29, 2023Completed
final sign-off Oct 2023
150 California StTeam Commercial Construction Inc.11/f: add 2-vav box & 3-transfer fans, modify & add new duct work, relocate thermostats, ref pa# 202212228926.
Details
Permit
202306291139
Permit issued
Jul 6, 2023
Final sign-off
Oct 20, 2023

11/f: add 2-vav box & 3-transfer fans, modify & add new duct work, relocate thermostats, ref pa# 202212228926.

Open the permit page

$175,000
Apr 6, 2023Completed
final sign-off Dec 2023
150 California StGci, Inc20/f: revision to pa# 2022-1013-4259 for revised lighting design
Details
Permit
202304065230
Permit issued
Apr 25, 2023
Final sign-off
Dec 7, 2023

20/f: revision to pa# 2022-1013-4259 for revised lighting design

Open the permit page

Mar 23, 2023Completed
final sign-off Aug 2023
150 California StPioneer Fire Inc.11/f: relocate 78 pendents, convert 7 pendents to uprights, remove 4 pendents.t.i. pa 202212228926
Details
Permit
202303234239
Permit issued
Mar 23, 2023
Final sign-off
Aug 28, 2023

11/f: relocate 78 pendents, convert 7 pendents to uprights, remove 4 pendents.t.i. pa 202212228926

Open the permit page

$11,700
Mar 9, 2023Never finaled
issued Mar 2023, no final
150 California StCapitol Electric Const20/f ste# 2000: modification of existing life safety system, ref pa# 202210134259, install new 2-speakers and 8-strobes, install new 3-fire smoke dampers, 3-addressible output module and 1-duct mounting plate, relocation of existing speakers and strobes.
Details
Permit
202303093360
Permit issued
Mar 9, 2023

20/f ste# 2000: modification of existing life safety system, ref pa# 202210134259, install new 2-speakers and 8-strobes, install new 3-fire smoke dampers, 3-addressible output module and 1-duct mounting plate, relocation of existing speakers and strobes.

Open the permit page

$16,500
Feb 28, 2023Completed
final sign-off Mar 2023
150 California StGolden Gate Fire Protection Inc20th fl - fire sprinklers relocate 14 concealed pendents and 2 pendents. ref pa 2022-1013-4259
Details
Permit
202302282719
Permit issued
Feb 28, 2023
Final sign-off
Mar 3, 2023

20th fl - fire sprinklers relocate 14 concealed pendents and 2 pendents. ref pa 2022-1013-4259

Open the permit page

$9,920
Dec 22, 2022Completed
final sign-off Oct 2023
150 California StTeam Commercial Construction Inc.11/flr (suites 1100, 1125 & 1150): ti including demo & construction of partitions, doors, ceilings, lighting, millwork, retrooms and finishes.
Details
Permit
202212228926
Permit issued
Apr 27, 2023
Final sign-off
Oct 20, 2023

11/flr (suites 1100, 1125 & 1150): ti including demo & construction of partitions, doors, ceilings, lighting, millwork, retrooms and finishes.

Open the permit page

$657,716
Oct 13, 2022Completed
final sign-off Dec 2023
150 California StGci, Inc20th fl tenent improvement including new rooms, elevator lobby, reception, conference rooms, amenity space, mep, fixtures, finishes & equipment, and offices.
Details
Permit
202210134259
Permit issued
Nov 22, 2022
Final sign-off
Dec 7, 2023

20th fl tenent improvement including new rooms, elevator lobby, reception, conference rooms, amenity space, mep, fixtures, finishes & equipment, and offices.

Open the permit page

$920,000
Aug 23, 2022Never finaled
issued Oct 2022, no final
150 California StTeam Commercial Construction Inc.10/f: relocate 1 vav box and add 3 transfer fans. add idffusers, registeres & transfer grilles. modifty and add a new dutwork, relocate (e) thermostats, add fsd. ref ti 202106243169, 202204071782, 202205204677, 202201145998.
Details
Permit
202208231096
Permit issued
Oct 6, 2022

10/f: relocate 1 vav box and add 3 transfer fans. add idffusers, registeres & transfer grilles. modifty and add a new dutwork, relocate (e) thermostats, add fsd. ref ti 202106243169, 202204071782, 202205204677, 202201145998.

Open the permit page

$57,401
Aug 23, 2022Never finaled
issued Oct 2022, no final
150 California StTeam Commercial Construction Inc.provide lighting ti to 8035 sq feet office area. ref 202106243169/202204071782/202205204677/202201145998
Details
Permit
202208231091
Permit issued
Oct 6, 2022

provide lighting ti to 8035 sq feet office area. ref 202106243169/202204071782/202205204677/202201145998

Open the permit page

$63,420
May 20, 2022Completed
final sign-off Dec 2022
150 California StTeam Commercial Construction Inc.10/f: rev to pa202106243169: interior t.i. to include demo and construction of partitions, dloors, ceilings, lighting, millwork and finishes. mep deferred. maher n/a.
Details
Permit
202205204677
Permit issued
May 27, 2022
Final sign-off
Dec 23, 2022

10/f: rev to pa202106243169: interior t.i. to include demo and construction of partitions, dloors, ceilings, lighting, millwork and finishes. mep deferred. maher n/a.

Open the permit page

$4,000
Apr 7, 2022Completed
final sign-off Dec 2022
150 California StTeam Commercial Construction Inc.ste 1025: revision to pa# 202106243169. interior t.i. adding 1 new private office and extending conference room. fire alarm and sprinkler under sep permit, if applic.
Details
Permit
202204071782
Permit issued
Apr 18, 2022
Final sign-off
Dec 23, 2022

ste 1025: revision to pa# 202106243169. interior t.i. adding 1 new private office and extending conference room. fire alarm and sprinkler under sep permit, if applic.

Open the permit page

$7,000
Mar 9, 2022Completed
final sign-off Dec 2022
150 California StCapitol Electric Const10th floor:modification of extg life safety system. install 16 new speakers and 22 new strobes.install 1 new dual sync module. ref pa#202201145998.
Details
Permit
202203099616
Permit issued
Mar 10, 2022
Final sign-off
Dec 2, 2022

10th floor:modification of extg life safety system. install 16 new speakers and 22 new strobes.install 1 new dual sync module. ref pa#202201145998.

Open the permit page

$16,500
Feb 25, 2022Completed
final sign-off Mar 2022
150 California StCapitol Electric Const3rd fl: modification of existing life safety system to 3rd floor ti work in reference to ti permit 202106172696. install new (6) speakers and (10) strobes. relocation of an (e) smoke detector to new idf room.
Details
Permit
202202258735
Permit issued
Mar 4, 2022
Final sign-off
Mar 30, 2022

3rd fl: modification of existing life safety system to 3rd floor ti work in reference to ti permit 202106172696. install new (6) speakers and (10) strobes. relocation of an (e) smoke detector to new idf room.

Open the permit page

$16,500
Jan 28, 2022Never finaled
issued Jan 2022, no final
150 California StCapitol Electric Constsuite 200: as-built rev to pa202201075586: install 5 wall strobes & 6 ceiling speaker. remove scope of work where says "relocate of an existing smoke detector to a new idf room."
Details
Permit
202201286943
Permit issued
Jan 28, 2022

suite 200: as-built rev to pa202201075586: install 5 wall strobes & 6 ceiling speaker. remove scope of work where says "relocate of an existing smoke detector to a new idf room."

Open the permit page

Jan 14, 2022Completed
final sign-off Dec 2022
150 California StTeam Commercial Construction Inc.revision to pa# 202106243169. interior t.i. including construction of partitions, lighting & finishes for 4 additional offices. mep deferred.
Details
Permit
202201145998
Permit issued
Jan 20, 2022
Final sign-off
Dec 23, 2022

revision to pa# 202106243169. interior t.i. including construction of partitions, lighting & finishes for 4 additional offices. mep deferred.

Open the permit page

$10,500
Jan 12, 2022Completed
final sign-off Apr 2022
150 California StM C S Construction Servicesdemo of non-structural partition & misc built in millwork. construct new partition to patch opening. patch & replace adjacent finishes/ceilings as needed. no impact to mep system or life/fire safety/sprinkler systems.
Details
Permit
202201125845
Permit issued
Jan 12, 2022
Final sign-off
Apr 15, 2022

demo of non-structural partition & misc built in millwork. construct new partition to patch opening. patch & replace adjacent finishes/ceilings as needed. no impact to mep system or life/fire safety/sprinkler systems.

Open the permit page

$24,000
Jan 7, 2022Completed
final sign-off Feb 2022
150 California StCapitol Electric Constsuite #200: install (5) wall strobes and (6) ceilling speakers to pa# 2021-0916-8520
Details
Permit
202201075586
Permit issued
Jan 7, 2022
Final sign-off
Feb 9, 2022

suite #200: install (5) wall strobes and (6) ceilling speakers to pa# 2021-0916-8520

Open the permit page

$2,500
Dec 23, 2021Completed
final sign-off Feb 2022
150 California StGolden Gate Fire Protection Inc2/f: fire sprinklers: relocate 13 pendent sprinklers and relocate 7 uprights. ref ti permit 202109168520.
Details
Permit
202112234950
Permit issued
Dec 23, 2021
Final sign-off
Feb 9, 2022

2/f: fire sprinklers: relocate 13 pendent sprinklers and relocate 7 uprights. ref ti permit 202109168520.

Open the permit page

$4,500
Dec 7, 2021Completed
final sign-off Mar 2022
150 California StTeam Commercial Construction Inc.3/f: title 24: provide lighting tenant improvements to 5,883 sq ft of office area. pa 202106172696.
Details
Permit
202112073839
Permit issued
Dec 7, 2021
Final sign-off
Mar 31, 2022

3/f: title 24: provide lighting tenant improvements to 5,883 sq ft of office area. pa 202106172696.

Open the permit page

$172,420
Dec 7, 2021Completed
final sign-off Mar 2022
150 California StTeam Commercial Construction Inc.3rd floor: add (1) vav box, relocate (1) vav box and relocate 1 transfer fan. add diffuser, register, return grilles, add new ductwork, relocate existing thermostats and add (1) thermostat ref pa# 202106172696.
Details
Permit
202112073884
Permit issued
Dec 7, 2021
Final sign-off
Mar 30, 2022

3rd floor: add (1) vav box, relocate (1) vav box and relocate 1 transfer fan. add diffuser, register, return grilles, add new ductwork, relocate existing thermostats and add (1) thermostat ref pa# 202106172696.

Open the permit page

$63,801
Oct 26, 2021Completed
final sign-off Mar 2022
150 California StPioneer Fire Inc.10th floor: relocate(67)pendent heads,convert (6)to upright(6)to concealed,remove (1) add (3).
Details
Permit
202110261199
Permit issued
Oct 26, 2021
Final sign-off
Mar 24, 2022

10th floor: relocate(67)pendent heads,convert (6)to upright(6)to concealed,remove (1) add (3).

Open the permit page

$1,000
Sep 16, 2021Completed
final sign-off Jul 2022
150 California StClune Construction Company L P2nd fl ste 200: (e) tenant space. modifying (e) partitions, doors, ceilings, and finishes, as well as lighting, power and mechanical systems.
Details
Permit
202109168520
Permit issued
Oct 28, 2021
Final sign-off
Jul 1, 2022

2nd fl ste 200: (e) tenant space. modifying (e) partitions, doors, ceilings, and finishes, as well as lighting, power and mechanical systems.

Open the permit page

$888,000
Sep 9, 2021Completed
final sign-off Dec 2021
150 California StPioneer Fire Inc.3/f: relocate (13) pendent heads, (3) uprights, convert (13) pendent sprinkler heads to upright, remove (3) upright, add (3) pendents, (3) uprights. ref bpa# 202106172696
Details
Permit
202109098030
Permit issued
Sep 10, 2021
Final sign-off
Dec 16, 2021

3/f: relocate (13) pendent heads, (3) uprights, convert (13) pendent sprinkler heads to upright, remove (3) upright, add (3) pendents, (3) uprights. ref bpa# 202106172696

Open the permit page

Jun 24, 2021Completed
final sign-off Dec 2022
150 California StTeam Commercial Construction Inc.10/f: interior t.i. including demo and construction of partitions, doors, ceilings, lighting millwork and finishes. no changes in occupancy, use, or area. mep is deffered.
Details
Permit
202106243169
Permit issued
Jul 1, 2021
Final sign-off
Dec 23, 2022

10/f: interior t.i. including demo and construction of partitions, doors, ceilings, lighting millwork and finishes. no changes in occupancy, use, or area. mep is deffered.

Open the permit page

$657,716
Jun 24, 2021Never finaled
issued Jun 2021, no final
150 California StCapitol Electric Const1st fl: install (1) new duct smoke detector and relay module for activation of new fire smoke damper to pa 202101213050
Details
Permit
202106243127
Permit issued
Jun 24, 2021

1st fl: install (1) new duct smoke detector and relay module for activation of new fire smoke damper to pa 202101213050

Open the permit page

$2,500
Jun 17, 2021Completed
final sign-off Mar 2022
150 California StTeam Commercial Construction Inc.3rd fl: interior tenant improvement including demo and construction of partitions, doors, ceilings, lighting, millwork and finishes, no structural, no change in area or occupancy, mep and fire, life safety is deferred
Details
Permit
202106172696
Permit issued
Jun 22, 2021
Final sign-off
Mar 31, 2022

3rd fl: interior tenant improvement including demo and construction of partitions, doors, ceilings, lighting, millwork and finishes, no structural, no change in area or occupancy, mep and fire, life safety is deferred

Open the permit page

$955,510
Jan 21, 2021Completed
final sign-off Aug 2021
150 California StTeam Commercial Construction Inc.tenant improvements: provide lighting to 400 sq. ft. of office breakroom/kitchen area. ref pa 202010015683.
Details
Permit
202101213052
Permit issued
Feb 22, 2021
Final sign-off
Aug 16, 2021

tenant improvements: provide lighting to 400 sq. ft. of office breakroom/kitchen area. ref pa 202010015683.

Open the permit page

$20,742
Jan 21, 2021Completed
final sign-off Aug 2021
150 California StTeam Commercial Construction Inc.install split system heat pump. install new ductwork and fan coil unit, new fire smoke damper, new cpi control panel, new duct smoke detector for fsd. ref pa 202010015683.
Details
Permit
202101213050
Permit issued
Feb 22, 2021
Final sign-off
Aug 16, 2021

install split system heat pump. install new ductwork and fan coil unit, new fire smoke damper, new cpi control panel, new duct smoke detector for fsd. ref pa 202010015683.

Open the permit page

$28,404
Jan 14, 2021Completed
final sign-off May 2021
150 California StTeam Commercial Construction Inc.18/f: provide lighting tenant improvements to 5,222 sqft of office area. ref pa# 202010025731.
Details
Permit
202101142709
Permit issued
Feb 22, 2021
Final sign-off
May 24, 2021

18/f: provide lighting tenant improvements to 5,222 sqft of office area. ref pa# 202010025731.

Open the permit page

$46,782
Jan 14, 2021Completed
final sign-off May 2021
150 California StTeam Commercial Construction Inc.18/f:relocate 2 vav's. add 1 transfer fan. add diffuser, registers, transfer grills. modify & add new ductwork. relocate (e) thermostats. air balancing. add 1 new fire smoke damper. ref pa# 202010025731
Details
Permit
202101142708
Permit issued
Mar 26, 2021
Final sign-off
May 17, 2021

18/f:relocate 2 vav's. add 1 transfer fan. add diffuser, registers, transfer grills. modify & add new ductwork. relocate (e) thermostats. air balancing. add 1 new fire smoke damper. ref pa# 202010025731

Open the permit page

$36,440
Jan 14, 2021Completed
final sign-off May 2021
150 California StTeam Commercial Construction Inc.provide lighting tenant improvements to 8,553 sqft of office area. ref pa# 202010015636.
Details
Permit
202101142705
Permit issued
Mar 8, 2021
Final sign-off
May 24, 2021

provide lighting tenant improvements to 8,553 sqft of office area. ref pa# 202010015636.

Open the permit page

$53,901
Jan 14, 2021Completed
final sign-off May 2021
150 California StTeam Commercial Construction Inc.7/f: add 1 vav box & 1 transfer fan. add diffusers, registers, return grills, & add new ductwork. connect new vav to (e) ddc controls & relocate (e) thermostats/air balancing. ref pa# 202010015636.
Details
Permit
202101142707
Permit issued
Mar 8, 2021
Final sign-off
May 17, 2021

7/f: add 1 vav box & 1 transfer fan. add diffusers, registers, return grills, & add new ductwork. connect new vav to (e) ddc controls & relocate (e) thermostats/air balancing. ref pa# 202010015636.

Open the permit page

$43,622
Dec 17, 2020Never finaled
issued Feb 2021, no final
150 California StCapitol Electric Constinstall (3) hardwired switches, (7) new ceiling speakers. relocate existing magnetic door holder and associated smoke detector. remove preaction system equipment. ref. to permit 2020-1002-5731.
Details
Permit
202012171293
Permit issued
Feb 2, 2021

install (3) hardwired switches, (7) new ceiling speakers. relocate existing magnetic door holder and associated smoke detector. remove preaction system equipment. ref. to permit 2020-1002-5731.

Open the permit page

$11,875
Dec 17, 2020Completed
final sign-off May 2021
150 California StCapitol Electric Const7th fl, ste 700: install (12) new ceiling speaker and (12) new wall strobes (1) smoke detector. ref to ti permit # 2020.1001.5031
Details
Permit
202012171292
Permit issued
Mar 25, 2021
Final sign-off
May 17, 2021

7th fl, ste 700: install (12) new ceiling speaker and (12) new wall strobes (1) smoke detector. ref to ti permit # 2020.1001.5031

Open the permit page

$10,485
Nov 5, 2020Completed
final sign-off Jul 2021
150 California StPioneer Fire Inc.fire sprinkler relocate 41 pendents, relocate 3 uprights, add 1 pendent, add 1 upright and remove 2 uprights.
Details
Permit
202011058230
Permit issued
Jun 8, 2021
Final sign-off
Jul 12, 2021

fire sprinkler relocate 41 pendents, relocate 3 uprights, add 1 pendent, add 1 upright and remove 2 uprights.

Open the permit page

$9,500
Oct 28, 2020Completed
final sign-off Dec 2020
150 California StPioneer Fire Inc.fire sprinklers relocate 62 pendents and remove 3 uprights.
Details
Permit
202010287629
Permit issued
Dec 9, 2020
Final sign-off
Dec 31, 2020

fire sprinklers relocate 62 pendents and remove 3 uprights.

Open the permit page

$9,500
Oct 2, 2020Completed
final sign-off May 2021
150 California StTeam Commercial Construction Inc.interior t.i. including non-structural demo and construction of (n) non-structural partitons, glazing, ceilings, lighting, millwork,and finishes. no change in occupancy, area or use, mep & life safety under sep. permit n/a maher
Details
Permit
202010025731
Permit issued
Dec 9, 2020
Final sign-off
May 25, 2021

interior t.i. including non-structural demo and construction of (n) non-structural partitons, glazing, ceilings, lighting, millwork,and finishes. no change in occupancy, area or use, mep & life safety under sep. permit n/a maher

Open the permit page

$680,467
Oct 1, 2020Completed
final sign-off Aug 2021
150 California StTeam Commercial Construction Inc.ground floor - new non struct partitions, ceiling & lighting, millwork and finishes, no change in occuancy area or use, mep, life safety, sprinklers under sep permit
Details
Permit
202010015683
Permit issued
Dec 28, 2020
Final sign-off
Aug 16, 2021

ground floor - new non struct partitions, ceiling & lighting, millwork and finishes, no change in occuancy area or use, mep, life safety, sprinklers under sep permit

Open the permit page

$30,750
Oct 1, 2020Completed
final sign-off May 2021
150 California StTeam Commercial Construction Inc.7th flr. interior tenant improvement. demo fo restroom & elevator lobby. constructin of non-structural partitions, ceilings, casework & finishes. no change in occupancy use or area. mep, life safety & sprinklers are under serparate permit.
Details
Permit
202010015636
Permit issued
Jan 6, 2021
Final sign-off
May 17, 2021

7th flr. interior tenant improvement. demo fo restroom & elevator lobby. constructin of non-structural partitions, ceilings, casework & finishes. no change in occupancy use or area. mep, life safety & sprinklers are under serparate permit.

Open the permit page

$672,516
Sep 18, 2020Completed
final sign-off Jul 2021
150 California StPioneer Fire Inc.ground flr - relocate 5 sprinkler heads-pendents in janitor break room.
Details
Permit
202009184497
Permit issued
Sep 30, 2020
Final sign-off
Jul 12, 2021

ground flr - relocate 5 sprinkler heads-pendents in janitor break room.

Open the permit page

$2,500
Jul 1, 2020Completed
final sign-off Sep 2020
150 California StTeam Commercial Construction Inc.revision to pa #2019-0508-0066: addition of 1 office, electrical, lighting. addition of av monitos, card readers, cameras and power for furniture.
Details
Permit
202007019486
Permit issued
Aug 21, 2020
Final sign-off
Sep 30, 2020

revision to pa #2019-0508-0066: addition of 1 office, electrical, lighting. addition of av monitos, card readers, cameras and power for furniture.

Open the permit page

$41,000
Feb 24, 2020Completed
final sign-off Oct 2020
150 California StPioneer Fire Inc.7/f: suite 700: fire sprinklers (66 heads) return to warm shell. ref pa202002053554.
Details
Permit
202002245169
Permit issued
Feb 24, 2020
Final sign-off
Oct 19, 2020

7/f: suite 700: fire sprinklers (66 heads) return to warm shell. ref pa202002053554.

Open the permit page

$7,000
Feb 5, 2020Completed
final sign-off Jul 2020
150 California Stper ab-017- non-structural demo of partitions, millwork, ceiling and lighting only, no change in occupancy use, or area, mep, life safety and sprinklers under sep permit
Details
Permit
202002053554
Permit issued
Feb 13, 2020
Final sign-off
Jul 24, 2020

per ab-017- non-structural demo of partitions, millwork, ceiling and lighting only, no change in occupancy use, or area, mep, life safety and sprinklers under sep permit

Open the permit page

$49,200
Oct 31, 2019Completed
final sign-off Nov 2019
150 California StCapitol Electric Const8th fl - install 2 new speakers and relocate 3 speakers and 5 strobes. ref pa 201905080066
Details
Permit
201910316125
Permit issued
Oct 31, 2019
Final sign-off
Nov 15, 2019

8th fl - install 2 new speakers and relocate 3 speakers and 5 strobes. ref pa 201905080066

Open the permit page

$9,785
Oct 3, 2019Completed
final sign-off Oct 2020
150 California StTeam Commercial Construction Inc.8th floor: provide lighting tenant improvements to 3,625 sq ft of office space. add 1 transfer fan, 1 supply and linear diffusers. modify and add new ductwork. relocate (e) thermostats, air balance.
Details
Permit
201910033411
Permit issued
Oct 3, 2019
Final sign-off
Oct 20, 2020

8th floor: provide lighting tenant improvements to 3,625 sq ft of office space. add 1 transfer fan, 1 supply and linear diffusers. modify and add new ductwork. relocate (e) thermostats, air balance.

Open the permit page

$62,250
Oct 3, 2019Completed
final sign-off Sep 2020
150 California StTeam Commercial Construction Inc.8th flr. provide lighting improvements to 1,153 sq ft of office space
Details
Permit
201910033410
Permit issued
Oct 3, 2019
Final sign-off
Sep 3, 2020

8th flr. provide lighting improvements to 1,153 sq ft of office space

Open the permit page

$11,940
Aug 7, 2019Completed
final sign-off Nov 2019
150 California StPioneer Fire Inc.8th floor: relocate 30 pendents, 5 uprights. add 1 pendent and remove 1 pendent gc ti 201907014790
Details
Permit
201908078155
Permit issued
Aug 7, 2019
Final sign-off
Nov 15, 2019

8th floor: relocate 30 pendents, 5 uprights. add 1 pendent and remove 1 pendent gc ti 201907014790

Open the permit page

$12,000
Jul 1, 2019Completed
final sign-off Sep 2020
150 California StTeam Commercial Construction Inc.demo. of non structural walls, and finishes, construction of non-structural walls,plumbing, and finishes, mechanical, electrical plumbing, life safety and sprinklers to be design build under sep permits n/a maher
Details
Permit
201907014790
Permit issued
Jul 3, 2019
Final sign-off
Sep 3, 2020

demo. of non structural walls, and finishes, construction of non-structural walls,plumbing, and finishes, mechanical, electrical plumbing, life safety and sprinklers to be design build under sep permits n/a maher

Open the permit page

$181,548
Jun 25, 2019Completed
final sign-off Aug 2019
150 California StTeam Commercial Construction Inc.2/f: provide lighting tenant improvement to 1600 sq feet of common area. ref 201810314577
Details
Permit
201906254327
Permit issued
Jun 25, 2019
Final sign-off
Aug 14, 2019

2/f: provide lighting tenant improvement to 1600 sq feet of common area. ref 201810314577

Open the permit page

$15,200
May 8, 2019Completed
final sign-off Sep 2020
150 California StTeam Commercial Construction Inc.8th flr. demo of non-structural walls, plumb and ceiling systems. construct (n) tenant partitions incl non-structural walls, plumb & lighting. mech, electr, plumb, life safety & sprinkler to be design-build under separate permits.
Details
Permit
201905080066
Permit issued
Jul 3, 2019
Final sign-off
Sep 30, 2020

8th flr. demo of non-structural walls, plumb and ceiling systems. construct (n) tenant partitions incl non-structural walls, plumb & lighting. mech, electr, plumb, life safety & sprinkler to be design-build under separate permits.

Open the permit page

$304,876
Apr 12, 2019Never finaled
issued Apr 2019, no final
150 California StTeam Commercial Construction Inc.revision to 201810304577. submittal of technical infeasibility to leave accessible toilet in place. maher n/a.
Details
Permit
201904127816
Permit issued
Apr 15, 2019

revision to 201810304577. submittal of technical infeasibility to leave accessible toilet in place. maher n/a.

Open the permit page

Apr 10, 2019Completed
final sign-off Oct 2019
150 California StPioneer Fire Inc.2nd fl - relocate 10 pendents ref pa 2018-1031-4577
Details
Permit
201904107573
Permit issued
Apr 10, 2019
Final sign-off
Oct 1, 2019

2nd fl - relocate 10 pendents ref pa 2018-1031-4577

Open the permit page

$5,000
Feb 22, 2019Completed
final sign-off Jul 2019
150 California StCapitol Electric Constf/a for ste 200: install 11 strobes and 13 speakers. ref ti #201811024829.
Details
Permit
201902223604
Permit issued
Feb 22, 2019
Final sign-off
Jul 19, 2019

f/a for ste 200: install 11 strobes and 13 speakers. ref ti #201811024829.

Open the permit page

$18,773
Jan 11, 2019Completed
final sign-off Jul 2019
150 California StTeam Commercial Construction Inc.2nd fl - provide lighting ti to 6066 sq ft of office space. add 2 vav boxes and relocate 1 transfer fan/add supply and return diffusers and add new ductwork; add 2 thermostats and relocate existing thermostat air balancing
Details
Permit
201901110128
Permit issued
Jan 11, 2019
Final sign-off
Jul 12, 2019

2nd fl - provide lighting ti to 6066 sq ft of office space. add 2 vav boxes and relocate 1 transfer fan/add supply and return diffusers and add new ductwork; add 2 thermostats and relocate existing thermostat air balancing

Open the permit page

$57,373
Dec 10, 2018Completed
final sign-off Feb 2019
150 California StPioneer Fire Inc.relocate 33 pendents, 10 uprights and remove 8 pendents ref 201811024829 suite 200
Details
Permit
201812107882
Permit issued
Dec 10, 2018
Final sign-off
Feb 6, 2019

relocate 33 pendents, 10 uprights and remove 8 pendents ref 201811024829 suite 200

Open the permit page

$19,896
Nov 2, 2018Completed
final sign-off Jul 2019
150 California StTeam Commercial Construction Inc.ti on 2nd floor-non struct demo. new non struc partitions, doors, glazing, ceiling, lights, millwork, finishes. no change in area, occup or use. mep/fire/life safety under sep permit maher na
Details
Permit
201811024829
Permit issued
Nov 2, 2018
Final sign-off
Jul 12, 2019

ti on 2nd floor-non struct demo. new non struc partitions, doors, glazing, ceiling, lights, millwork, finishes. no change in area, occup or use. mep/fire/life safety under sep permit maher na

Open the permit page

$481,140
Oct 31, 2018Completed
final sign-off Aug 2019
150 California StTeam Commercial Construction Inc.non struct demo (n) struct partitions, doors, finishes, toilet fixtures & accessories. no change in occupancy or use or area. mep, life safety, sprinklers under sep permit
Details
Permit
201810314577
Permit issued
Nov 2, 2018
Final sign-off
Aug 14, 2019

non struct demo (n) struct partitions, doors, finishes, toilet fixtures & accessories. no change in occupancy or use or area. mep, life safety, sprinklers under sep permit

Open the permit page

$131,836
Sep 17, 2018Never finaled
issued Sep 2018, no final
150 California StTeam Commercial Construction Inc.9/f: relocate vav box to locatoin shown on plans. connect to supply air main/install vav box in location shown on plans. connect to supply air main. install exhaust fan, connect to (e) supply air main. ref pa201803012543. maher n/a.
Details
Permit
201809170412
Permit issued
Sep 20, 2018

9/f: relocate vav box to locatoin shown on plans. connect to supply air main/install vav box in location shown on plans. connect to supply air main. install exhaust fan, connect to (e) supply air main. ref pa201803012543. maher n/a.

Open the permit page

$22,405
Sep 11, 2018Never finaled
issued Sep 2018, no final
150 California StTeam Commercial Construction Inc.#900: parcial scope office tenant retrofit. lighting, lighting controls. ref app#201803012543. new exit signage for egress path
Details
Permit
201809119641
Permit issued
Sep 20, 2018

#900: parcial scope office tenant retrofit. lighting, lighting controls. ref app#201803012543. new exit signage for egress path

Open the permit page

$84,800
Jul 5, 2018Completed
final sign-off Jul 2018
150 California StGolden Gate Fire Protection Inc4/f: fire sprinkler only relocate 3 pendents & 2 uprights for the 4th fl at cbre. ref pa 2018-0524-0021
Details
Permit
201807053758
Permit issued
Jul 5, 2018
Final sign-off
Jul 13, 2018

4/f: fire sprinkler only relocate 3 pendents & 2 uprights for the 4th fl at cbre. ref pa 2018-0524-0021

Open the permit page

$1,250
Jul 5, 2018Completed
final sign-off Jul 2018
150 California StCapitol Electric Constsuite 400 fire alarm: install 2 new speaker, 2 strobes; relocate 5 strobes, 2 speaker strobe. ref ti #201804267420.
Details
Permit
201807053848
Permit issued
Jul 6, 2018
Final sign-off
Jul 13, 2018

suite 400 fire alarm: install 2 new speaker, 2 strobes; relocate 5 strobes, 2 speaker strobe. ref ti #201804267420.

Open the permit page

$10,500
Jun 22, 2018Expired or cancelled
cancelled Nov 2022
150 California Stinstallation of 2 stem lithium ion batter enery storage system ess. the ess will be used to offset peak demand charges by discharging directly into the facilities electrical distribution system. the monitoring and contnrolling detects both when to charge and when to discharge
Details
Permit
201806222728

installation of 2 stem lithium ion batter enery storage system ess. the ess will be used to offset peak demand charges by discharging directly into the facilities electrical distribution system. the monitoring and contnrolling detects both when to charge and when to discharge

Open the permit page

$55,000
Jun 15, 2018Never finaled
issued Jun 2018, no final
150 California StCapitol Electric Consttitle 24. suites 610 & 650. installation of new led lights
Details
Permit
201806152010
Permit issued
Jun 15, 2018

title 24. suites 610 & 650. installation of new led lights

Open the permit page

$2,973
May 24, 2018Never finaled
issued May 2018, no final
150 California StBcci Construction Company4th floor: mep to support approval arch ref app#201804267420
Details
Permit
201805240021
Permit issued
May 24, 2018

4th floor: mep to support approval arch ref app#201804267420

Open the permit page

$45,000
May 10, 2018Completed
final sign-off Nov 2018
150 California StCapitol Electric Constfa ste #900: modification of existing l/s system by installing (10) new speakers and (10) strobes. 1 smoke detector outside of lobby doors ref 201803012543 maher na
Details
Permit
201805108787
Permit issued
May 17, 2018
Final sign-off
Nov 14, 2018

fa ste #900: modification of existing l/s system by installing (10) new speakers and (10) strobes. 1 smoke detector outside of lobby doors ref 201803012543 maher na

Open the permit page

$12,630
Apr 26, 2018Never finaled
issued May 2018, no final
150 California StBcci Construction Companyscope of project is remodel of e office space at 150 calif 4th fl demo and new non struc int walls, pwr/data, minor lightng,divide e idf rm into 1 n storage,1 small idf rm, 1 e conv into 1 new office 1 conferende, 1 new phone, 1 new wllnes rm upgrd restrooms
Details
Permit
201804267420
Permit issued
May 16, 2018

scope of project is remodel of e office space at 150 calif 4th fl demo and new non struc int walls, pwr/data, minor lightng,divide e idf rm into 1 n storage,1 small idf rm, 1 e conv into 1 new office 1 conferende, 1 new phone, 1 new wllnes rm upgrd restrooms

Open the permit page

$734,453
Apr 3, 2018Completed
final sign-off Apr 2018
150 California StPioneer Fire Inc.suite 900. relocate 13 pendents and 8 uprights. gc permit # 201803012543
Details
Permit
201804035378
Permit issued
Apr 3, 2018
Final sign-off
Apr 24, 2018

suite 900. relocate 13 pendents and 8 uprights. gc permit # 201803012543

Open the permit page

$12,964
Mar 1, 2018Completed
final sign-off Nov 2018
150 California StTeam Commercial Construction Inc.partial remodel interior load bearing ptns, finishes, doors, reconstruct interior non bearing partitions, doors, finishes. relocated lighting, restroom upgrades, no ext work. no struct work. no hazardous matter. all mech/ele/life safety engineering fire sprinkler work are derfeered to design build
Details
Permit
201803012543
Permit issued
Mar 12, 2018
Final sign-off
Nov 30, 2018

partial remodel interior load bearing ptns, finishes, doors, reconstruct interior non bearing partitions, doors, finishes. relocated lighting, restroom upgrades, no ext work. no struct work. no hazardous matter. all mech/ele/life safety engineering fire sprinkler work are derfeered to design build

Open the permit page

$511,400
Feb 9, 2018Never finaled
issued Feb 2018, no final
150 California StTeam Commercial Construction Inc.#600: relocate and provide new supply air diffusers, return air grilles, thermostats and balance for new air flows. install new ductwork. ref app#201801199043. n/a for maher
Details
Permit
201802090912
Permit issued
Feb 9, 2018

#600: relocate and provide new supply air diffusers, return air grilles, thermostats and balance for new air flows. install new ductwork. ref app#201801199043. n/a for maher

Open the permit page

$3,214
Feb 6, 2018Never finaled
issued Feb 2018, no final
150 California StA S F Electric Incelectrical revisions & title 24 electrical for ref 201801199043; n/a maher
Details
Permit
201802060437
Permit issued
Feb 6, 2018

electrical revisions & title 24 electrical for ref 201801199043; n/a maher

Open the permit page

$12,000
Feb 5, 2018Completed
final sign-off Feb 2018
150 California StA S F Electric Incsuite 600, installation & relocation of life safety devices, 3 new strobs, 1 new speaker, 2 strob relocates.
Details
Permit
201802050318
Permit issued
Feb 5, 2018
Final sign-off
Feb 15, 2018

suite 600, installation & relocation of life safety devices, 3 new strobs, 1 new speaker, 2 strob relocates.

Open the permit page

$15,000
Jan 19, 2018Completed
final sign-off Feb 2018
150 California StPioneer Fire Inc.relocate 6 pendents, add 1 maher na
Details
Permit
201801199048
Permit issued
Jan 19, 2018
Final sign-off
Feb 15, 2018

relocate 6 pendents, add 1 maher na

Open the permit page

$900
Jan 19, 2018Completed
final sign-off Aug 2018
150 California StTeam Commercial Construction Inc.suite 600: 3231 sq ft office t.i. with non-load bearing walls. mep's on seperate permit. n/a for maher
Details
Permit
201801199043
Permit issued
Jan 22, 2018
Final sign-off
Aug 23, 2018

suite 600: 3231 sq ft office t.i. with non-load bearing walls. mep's on seperate permit. n/a for maher

Open the permit page

$126,000
Dec 21, 2017Completed
final sign-off Jun 2018
150 California StAcco Engineered Systems Inc. Dba Acco En1st floor: replace a 4.5 ton wshp with a 4ton wshp. maher n/a
Details
Permit
201712217084
Permit issued
Dec 21, 2017
Final sign-off
Jun 15, 2018

1st floor: replace a 4.5 ton wshp with a 4ton wshp. maher n/a

Open the permit page

$37,502
Dec 19, 2017Expired or cancelled
cancelled Jan 2026
150 California StAnderson, Rowe & Buckley, Inc.fire sprinkler ti relocate 1 fire sprinkler head
Details
Permit
201712196825

fire sprinkler ti relocate 1 fire sprinkler head

Open the permit page

$520
Dec 19, 2017Never finaled
issued Dec 2017, no final
150 California StAnderson, Rowe & Buckley, Inc.fire sprinkler ti relocate 1 fire sprinkler head. arch. 201712126277. maher n/a
Details
Permit
201712196826
Permit issued
Dec 19, 2017

fire sprinkler ti relocate 1 fire sprinkler head. arch. 201712126277. maher n/a

Open the permit page

$520
Dec 12, 2017Completed
final sign-off Jan 2018
150 California StPrincipal Builders Inc.14th floor - demolition of existing 80 sq ft breakroom & admin area to remove one partition, replace millwork, & ceiling. n/a maher ordinance
Details
Permit
201712126277
Permit issued
Dec 13, 2017
Final sign-off
Jan 9, 2018

14th floor - demolition of existing 80 sq ft breakroom & admin area to remove one partition, replace millwork, & ceiling. n/a maher ordinance

Open the permit page

$20,600
Jun 23, 2017Never finaled
issued Jun 2017, no final
150 California StC B F Inc17th floor - addition to existing life system, includes 1 strobe, 1 speaker. n/a maher ordinance
Details
Permit
201706230193
Permit issued
Jun 23, 2017

17th floor - addition to existing life system, includes 1 strobe, 1 speaker. n/a maher ordinance

Open the permit page

$3,000
Apr 14, 2017Completed
final sign-off Jul 2017
150 California StCapitol Electric Constinstall one new relay module to release elevator lobby door locks.
Details
Permit
201704143991
Permit issued
Apr 14, 2017
Final sign-off
Jul 12, 2017

install one new relay module to release elevator lobby door locks.

Open the permit page

$3,500
Mar 10, 2017Completed
final sign-off Apr 2017
150 California StPrincipal Builders Inc.t-24 electrical to provide new lighting and power to 17th flr, ti ref pa 201612306307
Details
Permit
201703101230
Permit issued
Mar 17, 2017
Final sign-off
Apr 7, 2017

t-24 electrical to provide new lighting and power to 17th flr, ti ref pa 201612306307

Open the permit page

$6,000
Feb 22, 2017Completed
final sign-off Mar 2017
150 California St17th flr: fire sprinkler relocate 3 sidewall. ref ti 2016-1230-6307
Details
Permit
201702229889
Permit issued
Feb 22, 2017
Final sign-off
Mar 1, 2017

17th flr: fire sprinkler relocate 3 sidewall. ref ti 2016-1230-6307

Open the permit page

$1,000
Feb 21, 2017Completed
final sign-off Mar 2017
150 California StPrincipal Builders Inc.16th floor - revision to 201611303811 to indicate door hold opens on electrical plan per inspector comment
Details
Permit
201702219790
Permit issued
Feb 22, 2017
Final sign-off
Mar 20, 2017

16th floor - revision to 201611303811 to indicate door hold opens on electrical plan per inspector comment

Open the permit page

Feb 9, 2017Completed
final sign-off Feb 2017
150 California StTeam Commercial Construction Inc.remove existing partitions of 9th floor spec space
Details
Permit
201702099045
Permit issued
Feb 9, 2017
Final sign-off
Feb 15, 2017

remove existing partitions of 9th floor spec space

Open the permit page

$38,540
Feb 9, 2017Completed
final sign-off Mar 2017
150 California StPeacock Construction23rd flr: t-24 mechanical for work under:201611223335 maher na
Details
Permit
201702099095
Permit issued
Mar 2, 2017
Final sign-off
Mar 9, 2017

23rd flr: t-24 mechanical for work under:201611223335 maher na

Open the permit page

$1,500
Jan 27, 2017Completed
final sign-off Mar 2017
150 California StPeacock Construction23rd floor: t-24 electrical for work done under app#201611223335. n/a for maher.
Details
Permit
201701278080
Permit issued
Jan 31, 2017
Final sign-off
Mar 9, 2017

23rd floor: t-24 electrical for work done under app#201611223335. n/a for maher.

Open the permit page

Dec 30, 2016Completed
final sign-off Apr 2017
150 California StPrincipal Builders Inc.17th full floor arch ti: partial demo of 3 interior non load bearing partitions, finishes, doors, construct 1 interior non load bearing partition & finishes, adjusted switching, restroom upgrade. all mep/fire/life safety work under sep permit. no new light fixtures no structural no hazmat maher na
Details
Permit
201612306307
Permit issued
Feb 10, 2017
Final sign-off
Apr 7, 2017

17th full floor arch ti: partial demo of 3 interior non load bearing partitions, finishes, doors, construct 1 interior non load bearing partition & finishes, adjusted switching, restroom upgrade. all mep/fire/life safety work under sep permit. no new light fixtures no structural no hazmat maher na

Open the permit page

$121,000
Dec 14, 2016Completed
final sign-off Dec 2016
150 California StGolden Gate Fire Protection Incfire sprinklers: relocate 5 pendent sprinklers on the 23rd floor for northgate t.i. maher na
Details
Permit
201612144898
Permit issued
Dec 14, 2016
Final sign-off
Dec 30, 2016

fire sprinklers: relocate 5 pendent sprinklers on the 23rd floor for northgate t.i. maher na

Open the permit page

$1,500
Dec 12, 2016Completed
final sign-off Mar 2017
150 California StPrincipal Builders Inc.16th floor: evacuation signage. n/a for maher
Details
Permit
201612124726
Permit issued
Dec 13, 2016
Final sign-off
Mar 20, 2017

16th floor: evacuation signage. n/a for maher

Open the permit page

$1,200
Nov 30, 2016Completed
final sign-off Mar 2017
150 California StPrincipal Builders Inc.16th floor: title 24 mechanical, electrical to install new exhaust fan, lighting and power, relocate diffusers and thermostats. please refer to app#2016-0831-6455. n/a maher
Details
Permit
201611303811
Permit issued
Dec 5, 2016
Final sign-off
Mar 20, 2017

16th floor: title 24 mechanical, electrical to install new exhaust fan, lighting and power, relocate diffusers and thermostats. please refer to app#2016-0831-6455. n/a maher

Open the permit page

$180,000
Nov 22, 2016Completed
final sign-off Mar 2017
150 California StPeacock Construction23rd flr: new interior partitions,. ceiling, light fixtures, doors and finishes. fire/life safety under sep permit. ref demo 201610261172 maher na
Details
Permit
201611223335
Permit issued
Dec 1, 2016
Final sign-off
Mar 9, 2017

23rd flr: new interior partitions,. ceiling, light fixtures, doors and finishes. fire/life safety under sep permit. ref demo 201610261172 maher na

Open the permit page

$185,600
Nov 9, 2016Completed
final sign-off Dec 2016
150 California StW. Bradley Electric16th floor: modifications to extg fire alarm system adding 9 devices. ref app#201608316455
Details
Permit
201611092361
Permit issued
Nov 9, 2016
Final sign-off
Dec 15, 2016

16th floor: modifications to extg fire alarm system adding 9 devices. ref app#201608316455

Open the permit page

$5,000
Nov 2, 2016Completed
final sign-off Nov 2016
150 California StPribuss Engineering Incfire sprinkler t.i. under gc permit #201608316455 for the 16th floor. relocate 27 and add 1. total= 14,484.96
Details
Permit
201611021768
Permit issued
Nov 3, 2016
Final sign-off
Nov 23, 2016

fire sprinkler t.i. under gc permit #201608316455 for the 16th floor. relocate 27 and add 1. total= 14,484.96

Open the permit page

$14,485
Oct 26, 2016Completed
final sign-off Mar 2017
150 California StPeacock Construction23/f- demo only, demo of existing non-structural partitions, ceiling grid and tile, lighting and finishes per ab-017. n/a ordinance #155-13
Details
Permit
201610261172
Permit issued
Oct 26, 2016
Final sign-off
Mar 9, 2017

23/f- demo only, demo of existing non-structural partitions, ceiling grid and tile, lighting and finishes per ab-017. n/a ordinance #155-13

Open the permit page

$15,500
Aug 31, 2016Completed
final sign-off Dec 2016
150 California StPrincipal Builders Inc.interior impr. demo extg non-load bearing partitions, clg grids & tiles lighting & finishes. nw const. includes nw interior partitions, cldg & lighting fixtures, casework & nw doors & finishes. fire life safety, fire sprinkler & mep eng are deferred submittals. no exterior work,hazmat, &
Details
Permit
201608316455
Permit issued
Oct 12, 2016
Final sign-off
Dec 13, 2016

interior impr. demo extg non-load bearing partitions, clg grids & tiles lighting & finishes. nw const. includes nw interior partitions, cldg & lighting fixtures, casework & nw doors & finishes. fire life safety, fire sprinkler & mep eng are deferred submittals. no exterior work,hazmat, &

Open the permit page

$682,600
Aug 16, 2016Completed
final sign-off Feb 2017
150 California StAcco Engineered Systems Inc. Dba Acco En1/f- install one(1) new heat pump for supplemental cooling. n/a ordinance #155-13
Details
Permit
201608165086
Permit issued
Aug 16, 2016
Final sign-off
Feb 9, 2017

1/f- install one(1) new heat pump for supplemental cooling. n/a ordinance #155-13

Open the permit page

$30,000
Jul 29, 2016Never finaled
issued Dec 2016, no final
150 California StCapitol Electric Const10th floor: this project involves addition of selected power outlets for new tenant equipment. no change to lighting fixtures or controls. no change to partitions or (e) for the tenant space. maher na
Details
Permit
201607293709
Permit issued
Dec 29, 2016

10th floor: this project involves addition of selected power outlets for new tenant equipment. no change to lighting fixtures or controls. no change to partitions or (e) for the tenant space. maher na

Open the permit page

$18,000
Nov 13, 2015Completed
final sign-off Apr 2016
150 California StRichlen Construction18th floor: mechanical work-modification of (e) hvac systems-addition of vav box w/controls air balance. building pa 2015-1002-8676. maher na
Details
Permit
201511132553
Permit issued
Nov 16, 2015
Final sign-off
Apr 22, 2016

18th floor: mechanical work-modification of (e) hvac systems-addition of vav box w/controls air balance. building pa 2015-1002-8676. maher na

Open the permit page

$12,000
Oct 28, 2015Completed
final sign-off Apr 2016
150 California StAyoob & Peery Plumbing Co Inc18th floor, t.i: add 2, relocate 4 sprinklers to conform to the new ceiling/wall layout. ref pa 2015-1002-8676
Details
Permit
201510280981
Permit issued
Oct 28, 2015
Final sign-off
Apr 13, 2016

18th floor, t.i: add 2, relocate 4 sprinklers to conform to the new ceiling/wall layout. ref pa 2015-1002-8676

Open the permit page

$2,000
Oct 2, 2015Completed
final sign-off Apr 2016
150 California StRichlen Constructiontenant improvement on floor 18, included drywall, doors, finishes. mech and elec under separate permit. maher n/a
Details
Permit
201510028676
Permit issued
Oct 15, 2015
Final sign-off
Apr 22, 2016

tenant improvement on floor 18, included drywall, doors, finishes. mech and elec under separate permit. maher n/a

Open the permit page

$200,000
Aug 12, 2015Completed
final sign-off Oct 2015
150 California StTeam Commercial Construction Inc.suite #275: consturction of alum. and glass non load bearing partition, install laminate flooring and casework per plan. maher n/a.
Details
Permit
201508124046
Permit issued
Aug 13, 2015
Final sign-off
Oct 19, 2015

suite #275: consturction of alum. and glass non load bearing partition, install laminate flooring and casework per plan. maher n/a.

Open the permit page

$18,000
Jun 2, 2015Completed
final sign-off Aug 2015
150 California StAyoob & Peery Plumbing Co Inc12th flr: relocate 56 sprinklers. plugged 7 sprinklers and add 6. ref pa 2015 0116 5911 maher na
Details
Permit
201506027868
Permit issued
Jun 3, 2015
Final sign-off
Aug 7, 2015

12th flr: relocate 56 sprinklers. plugged 7 sprinklers and add 6. ref pa 2015 0116 5911 maher na

Open the permit page

$31,868
May 19, 2015Completed
final sign-off Sep 2015
150 California StField Construction Inc.5th flr/suite 500: ti - demo and construction of partitionas, new floor, wall and ceiling finishes. relocated lighting and switches, restroom upgrades. maher na
Details
Permit
201505196687
Permit issued
May 20, 2015
Final sign-off
Sep 1, 2015

5th flr/suite 500: ti - demo and construction of partitionas, new floor, wall and ceiling finishes. relocated lighting and switches, restroom upgrades. maher na

Open the permit page

$100,000
Apr 10, 2015Completed
final sign-off Jun 2015
150 California StTeam Commercial Construction Inc.interior office t.i. mechanical and electrical work. ref app#201501095292. n/a for the maher.
Details
Permit
201504103299
Permit issued
Apr 10, 2015
Final sign-off
Jun 25, 2015

interior office t.i. mechanical and electrical work. ref app#201501095292. n/a for the maher.

Open the permit page

$78,000
Mar 26, 2015Completed
final sign-off Apr 2015
150 California StCapitol Electric Const13th fl: install 9 new strobes and 5 new speakers; relocate 4 existing speakers. t.i. pa# 201501165911. n/a ordinance #155-13
Details
Permit
201503261969
Permit issued
Mar 26, 2015
Final sign-off
Apr 30, 2015

13th fl: install 9 new strobes and 5 new speakers; relocate 4 existing speakers. t.i. pa# 201501165911. n/a ordinance #155-13

Open the permit page

$6,537
Mar 26, 2015Completed
final sign-off Apr 2015
150 California StCapitol Electric Const19th fl: install 1 smoke detector, 5 strobes, 2 speakers & 2 door holders; relocate 3 speakers and 2 strobes. t.i. pa# 2015-0109-5292. n/a ordinance #155-13.
Details
Permit
201503261970
Permit issued
Mar 26, 2015
Final sign-off
Apr 30, 2015

19th fl: install 1 smoke detector, 5 strobes, 2 speakers & 2 door holders; relocate 3 speakers and 2 strobes. t.i. pa# 2015-0109-5292. n/a ordinance #155-13.

Open the permit page

$7,000
Mar 26, 2015Completed
final sign-off Sep 2015
150 California StCapitol Electric Constinstall 9 strobes, 6 speakers. relocate 2 speakers.t.i. pa# 201501165911. n/a ordinance #155-13
Details
Permit
201503261968
Permit issued
Mar 26, 2015
Final sign-off
Sep 29, 2015

install 9 strobes, 6 speakers. relocate 2 speakers.t.i. pa# 201501165911. n/a ordinance #155-13

Open the permit page

$6,722
Feb 23, 2015Completed
final sign-off Apr 2015
150 California StAyoob & Peery Plumbing Co Inc13th floor fire sprinklers - add 2 & relcoate 58 sprinklers to conform w/new wall/ceiling layout. ref pa #2015.0116.5911. n/a maher ordinance
Details
Permit
201502239091
Permit issued
Feb 24, 2015
Final sign-off
Apr 1, 2015

13th floor fire sprinklers - add 2 & relcoate 58 sprinklers to conform w/new wall/ceiling layout. ref pa #2015.0116.5911. n/a maher ordinance

Open the permit page

$30,840
Feb 18, 2015Completed
final sign-off Mar 2015
150 California StPioneer Fire Inc.suite 1900: remodel consisting of 25 relocated pendents and 10 removed pendents t.i. #201501095292 n/a for the maher.
Details
Permit
201502188640
Permit issued
Feb 27, 2015
Final sign-off
Mar 23, 2015

suite 1900: remodel consisting of 25 relocated pendents and 10 removed pendents t.i. #201501095292 n/a for the maher.

Open the permit page

$8,246
Jan 16, 2015Completed
final sign-off May 2015
150 California StTeam Commercial Construction Inc.remove extg interior one story non egress communicating stair from between the 18th and 19th floors. infill concrete and steel pan deck to form a 2 hour seperation. n/a for the maher.
Details
Permit
201501165910
Permit issued
Jan 16, 2015
Final sign-off
May 20, 2015

remove extg interior one story non egress communicating stair from between the 18th and 19th floors. infill concrete and steel pan deck to form a 2 hour seperation. n/a for the maher.

Open the permit page

$78,000
Jan 16, 2015Never finaled
issued Feb 2015, no final
150 California StSwinerton Buildersti 12th and 13th floor: this includes new drywall partitions, finishes and mep. n/a for maher. sprinklers and fire alarm separate permits
Details
Permit
201501165911
Permit issued
Feb 23, 2015

ti 12th and 13th floor: this includes new drywall partitions, finishes and mep. n/a for maher. sprinklers and fire alarm separate permits

Open the permit page

$850,000
Jan 9, 2015Completed
final sign-off Jun 2015
150 California StTeam Commercial Construction Inc.interior office ti. remove existing partitons, fixtures, finishes. 19th fl fire/ls, mep sep permit
Details
Permit
201501095292
Permit issued
Jan 9, 2015
Final sign-off
Jun 25, 2015

interior office ti. remove existing partitons, fixtures, finishes. 19th fl fire/ls, mep sep permit

Open the permit page

$185,000
Jan 8, 2015Completed
final sign-off Aug 2015
150 California StSwinerton Buildersdemo of existing office space and prep for a future office buildout per ab-017; maher n/a
Details
Permit
201501085172
Permit issued
Jan 8, 2015
Final sign-off
Aug 18, 2015

demo of existing office space and prep for a future office buildout per ab-017; maher n/a

Open the permit page

$50,000
Aug 29, 2014Completed
final sign-off Sep 2014
150 California StH & M Fire Protection, Inc.relocate (3) three fire sprinklers on 7th flr h&m job #14023 (ref. ti 201406309928); na/ maher ordinance 3 155-13
Details
Permit
201408295032
Permit issued
Aug 29, 2014
Final sign-off
Sep 9, 2014

relocate (3) three fire sprinklers on 7th flr h&m job #14023 (ref. ti 201406309928); na/ maher ordinance 3 155-13

Open the permit page

$2,500
Aug 7, 2014Completed
final sign-off Aug 2014
150 California StPioneer Fire Inc.8th floor relocate 6 pendent fire sprinkler. ref. appl. 2014.0627.9692. maher n/a.
Details
Permit
201408073278
Permit issued
Aug 7, 2014
Final sign-off
Aug 21, 2014

8th floor relocate 6 pendent fire sprinkler. ref. appl. 2014.0627.9692. maher n/a.

Open the permit page

$3,800
Jul 17, 2014Completed
final sign-off Nov 2014
150 California StCapitol Electric Constste #800 and 850: installation of 9 new ceiling speakers and 7 new strobes. relocation of 6 existing strobes/speaker-strobes.t.i. under seperate permit 201406279692. maher n/a
Details
Permit
201407171550
Permit issued
Sep 3, 2014
Final sign-off
Nov 24, 2014

ste #800 and 850: installation of 9 new ceiling speakers and 7 new strobes. relocation of 6 existing strobes/speaker-strobes.t.i. under seperate permit 201406279692. maher n/a

Open the permit page

$15,497
Jun 30, 2014Completed
final sign-off Nov 2014
150 California StCharles Pankow Builders Ltdinterior renovation of (e) commercial office space including expanded work area, ceiling modifications, lighting, mechanical and related partitions. relocation of one door. accessibility upgrades to existing men's and women's restrooms.
Details
Permit
201406309928
Permit issued
Jul 10, 2014
Final sign-off
Nov 7, 2014

interior renovation of (e) commercial office space including expanded work area, ceiling modifications, lighting, mechanical and related partitions. relocation of one door. accessibility upgrades to existing men's and women's restrooms.

Open the permit page

$80,000
Jun 30, 2014Never finaled
issued Jun 2014, no final
150 California StAcco Engineered Systems Inc. Dba Acco Enre-route duct work. reference architecture pa #2014-0630-2298.
Details
Permit
201406309927
Permit issued
Jun 30, 2014

re-route duct work. reference architecture pa #2014-0630-2298.

Open the permit page

$7,100
Jun 27, 2014Completed
final sign-off Dec 2014
150 California StTeam Commercial Construction Inc.office ti separate 1 suite into 2 including common area inclding mech, elec, lighting maher not required
Details
Permit
201406279692
Permit issued
Jul 3, 2014
Final sign-off
Dec 16, 2014

office ti separate 1 suite into 2 including common area inclding mech, elec, lighting maher not required

Open the permit page

$305,000
Jan 27, 2014Completed
final sign-off Jun 2016
150 California StGci, Incdemolition and construction of non structural partitions finishes, minor electrical work. compliance with ordinace #155-13 not required.
Details
Permit
201401277115
Permit issued
Feb 11, 2014
Final sign-off
Jun 1, 2016

demolition and construction of non structural partitions finishes, minor electrical work. compliance with ordinace #155-13 not required.

Open the permit page

$100,000
Oct 15, 2013Completed
final sign-off Feb 2014
150 California StWard Alan Emery Construction Inc.15/f- demo of non structural partitions, construction of ceiling height partitions. rework of grid ceiling and tile. fixture lighting relocate.
Details
Permit
201310159233
Permit issued
Oct 16, 2013
Final sign-off
Feb 10, 2014

15/f- demo of non structural partitions, construction of ceiling height partitions. rework of grid ceiling and tile. fixture lighting relocate.

Open the permit page

$35,000
Jan 16, 2013Never finaled
issued Jan 2013, no final
150 California StGci, Incmodifications to suite 450, demolition of partitions, patching, finishes & electrical.
Details
Permit
201301168095
Permit issued
Jan 30, 2013

modifications to suite 450, demolition of partitions, patching, finishes & electrical.

Open the permit page

$20,000
Oct 24, 2012Completed
final sign-off Oct 2012
150 California StMc Millan Electricfire alarm t.i. - relocate 6 strobes, 4 speakers. 1 new smoke detector, 2 new strobes
Details
Permit
201210242679
Permit issued
Oct 24, 2012
Final sign-off
Oct 31, 2012

fire alarm t.i. - relocate 6 strobes, 4 speakers. 1 new smoke detector, 2 new strobes

Open the permit page

$7,200
Oct 11, 2012Completed
final sign-off Jan 2013
150 California StPrincipal Builders Inc.21st floor:demolition of interior non structural partitions. new non structural partition and finishes. sprinklers under separate permit
Details
Permit
201210111813
Permit issued
Oct 16, 2012
Final sign-off
Jan 10, 2013

21st floor:demolition of interior non structural partitions. new non structural partition and finishes. sprinklers under separate permit

Open the permit page

$58,000
Sep 14, 2012Never finaled
issued Sep 2012, no final
150 California StTeam Commercial Construction Inc.2/fl, suite 200 - provide lighting for ti for 1878 sf of common area. add vav for conference rm. add exhaust fan and grill to telcom rm, add/relocate ceilingsupply and return diffusers per new layout. add 1 tstat for new vav relocate e t-stats for new layout arch 2012-08-03-6474.
Details
Permit
201209149790
Permit issued
Sep 18, 2012

2/fl, suite 200 - provide lighting for ti for 1878 sf of common area. add vav for conference rm. add exhaust fan and grill to telcom rm, add/relocate ceilingsupply and return diffusers per new layout. add 1 tstat for new vav relocate e t-stats for new layout arch 2012-08-03-6474.

Open the permit page

$20,364
Aug 22, 2012Completed
final sign-off Oct 2012
150 California StPioneer Fire Inc.suite #200-relocate & add 12 fire sprinklers to accomodate new build out.
Details
Permit
201208228014
Permit issued
Aug 22, 2012
Final sign-off
Oct 31, 2012

suite #200-relocate & add 12 fire sprinklers to accomodate new build out.

Open the permit page

$5,500
Aug 3, 2012Completed
final sign-off Oct 2012
150 California StTeam Commercial Construction Inc.work in unit #200: construction of new partitions, doors, frames, glazing. relocate existing lighting, ceiling grid, tile to remain. mep to separate permit
Details
Permit
201208036474
Permit issued
Aug 16, 2012
Final sign-off
Oct 31, 2012

work in unit #200: construction of new partitions, doors, frames, glazing. relocate existing lighting, ceiling grid, tile to remain. mep to separate permit

Open the permit page

$138,000
May 7, 2012Completed
final sign-off Jun 2012
150 California StSwinerton Buildersreplace existing walk up atm with new atm and surround in same location
Details
Permit
201205079896
Permit issued
May 7, 2012
Final sign-off
Jun 4, 2012

replace existing walk up atm with new atm and surround in same location

Open the permit page

$7,000
Mar 30, 2012Completed
final sign-off Apr 2012
150 California StMetropolitan Electrical Construction11 wall strobe lights, 1 ceiling speaker strobes, 11 ceiling speakers, 1 smoke detectors. remodel on 4th fl. all devices connected onto life safety system
Details
Permit
201203307173
Permit issued
Mar 30, 2012
Final sign-off
Apr 4, 2012

11 wall strobe lights, 1 ceiling speaker strobes, 11 ceiling speakers, 1 smoke detectors. remodel on 4th fl. all devices connected onto life safety system

Open the permit page

$13,500
Mar 23, 2012Never finaled
issued Mar 2012, no final
150 California Ststreet space with meters
Details
Permit
M309747
Permit issued
Mar 23, 2012

street space with meters

Open the permit page

Mar 19, 2012Completed
final sign-off Apr 2012
150 California StPribuss Engineering Increlocate 5 sprinklers x 514.62=2573
Details
Permit
201203196286
Permit issued
Mar 19, 2012
Final sign-off
Apr 24, 2012

relocate 5 sprinklers x 514.62=2573

Open the permit page

$2,573
Feb 29, 2012Completed
final sign-off Apr 2012
150 California StBcci Construction Companydivide 3 offices in existing full floor tenant suite. limited demo of sidelights, new partition and finishes, door, frame, glazing. minor adjustment to ceiling grid and relocate existing lights. relocate existing supply and return mech grilles.
Details
Permit
201202295067
Permit issued
Mar 1, 2012
Final sign-off
Apr 20, 2012

divide 3 offices in existing full floor tenant suite. limited demo of sidelights, new partition and finishes, door, frame, glazing. minor adjustment to ceiling grid and relocate existing lights. relocate existing supply and return mech grilles.

Open the permit page

$44,500
Feb 6, 2012Completed
final sign-off Aug 2012
150 California StPioneer Fire Inc.4th floor suite 400 - relocate 20 fire sprinklers, add 2 fire parinklers pendent, add 2 fire sprinklers upright.
Details
Permit
201202063620
Permit issued
Feb 6, 2012
Final sign-off
Aug 20, 2012

4th floor suite 400 - relocate 20 fire sprinklers, add 2 fire parinklers pendent, add 2 fire sprinklers upright.

Open the permit page

$8,500
Jan 24, 2012Completed
final sign-off Feb 2012
150 California StMetropolitan Electrical Construction5th floor suite #575.install 2 new speakers. install 2 new strobes.
Details
Permit
201201242789
Permit issued
Jan 24, 2012
Final sign-off
Feb 7, 2012

5th floor suite #575.install 2 new speakers. install 2 new strobes.

Open the permit page

$6,200
Dec 22, 2011Completed
final sign-off Aug 2012
150 California StGci, Incproject improvement involves modifications to suite 400 on the 4th floor at 150 california st, new partitions, doors, frames, glazing, casework, lighting, mechanical, electrical, plumbing, and finishes
Details
Permit
201112221178
Permit issued
Feb 1, 2012
Final sign-off
Aug 28, 2012

project improvement involves modifications to suite 400 on the 4th floor at 150 california st, new partitions, doors, frames, glazing, casework, lighting, mechanical, electrical, plumbing, and finishes

Open the permit page

$326,000
Dec 16, 2011Completed
final sign-off Feb 2012
150 California StRichlen Construction11th floor-improvements include construction of new partitions, doors, frames & glazing. mechanical, electrical & life safety work to be done under seperate permits
Details
Permit
201112160872
Permit issued
Jan 5, 2012
Final sign-off
Feb 24, 2012

11th floor-improvements include construction of new partitions, doors, frames & glazing. mechanical, electrical & life safety work to be done under seperate permits

Open the permit page

$38,750
Dec 9, 2011Completed
final sign-off Feb 2012
150 California StPioneer Fire Inc.suite 575- relocate 5 pendent sprinklers
Details
Permit
201112090416
Permit issued
Dec 13, 2011
Final sign-off
Feb 13, 2012

suite 575- relocate 5 pendent sprinklers

Open the permit page

$2,500
Oct 28, 2011Completed
final sign-off Feb 2012
150 California StRichlen Construction5th floor-t.i. construction of partitions, breakroom, conference room & minor bathroom upgrades(electrical under separate permit; mech & fire sprinkler & plumb separate permit)
Details
Permit
201110287885
Permit issued
Nov 17, 2011
Final sign-off
Feb 24, 2012

5th floor-t.i. construction of partitions, breakroom, conference room & minor bathroom upgrades(electrical under separate permit; mech & fire sprinkler & plumb separate permit)

Open the permit page

$187,000
Jul 25, 2011Completed
final sign-off Sep 2011
150 California StAnderson, Rowe & Buckley, Inc.14th floor-tenant improvements to (e) fire sprinkler system-2 added sprinkler.
Details
Permit
201107250991
Permit issued
Jul 25, 2011
Final sign-off
Sep 8, 2011

14th floor-tenant improvements to (e) fire sprinkler system-2 added sprinkler.

Open the permit page

$1,000
Jul 25, 2011Completed
final sign-off Nov 2011
150 California StSwinerton Buildersnew teller line on gr level and mezzanine for (e) bank.
Details
Permit
201107250958
Permit issued
Jul 26, 2011
Final sign-off
Nov 29, 2011

new teller line on gr level and mezzanine for (e) bank.

Open the permit page

$150,000
Jun 23, 2011Completed
final sign-off Aug 2011
150 California StPrincipal Builders Inc.14th floor: addition of new conference room. no change to existing lighting or new lights. no mech or hvac work. new non structural partitions only. life safety/sprinklers sep permit.
Details
Permit
201106238766
Permit issued
Jul 13, 2011
Final sign-off
Aug 30, 2011

14th floor: addition of new conference room. no change to existing lighting or new lights. no mech or hvac work. new non structural partitions only. life safety/sprinklers sep permit.

Open the permit page

$15,000
Apr 15, 2011Completed
final sign-off Jun 2011
150 California StRichlen Construction6th floor #650 tenant improvement including construction of partitions for (2) new offices.
Details
Permit
201104154182
Permit issued
Apr 15, 2011
Final sign-off
Jun 9, 2011

6th floor #650 tenant improvement including construction of partitions for (2) new offices.

Open the permit page

$17,000
Apr 15, 2011Completed
final sign-off May 2011
150 California StMetropolitan Electrical Construction11th floor-install 4 speakers & 4 strobes, install 1 smoke detector
Details
Permit
201104154172
Permit issued
Apr 15, 2011
Final sign-off
May 6, 2011

11th floor-install 4 speakers & 4 strobes, install 1 smoke detector

Open the permit page

$4,200
Mar 23, 2011Completed
final sign-off May 2011
150 California StRichlen Construction#1150- mechanical and electrical for spec suite ti including new and relocated lights, new vav,duct work. (arch 201102170468)
Details
Permit
201103232668
Permit issued
Mar 31, 2011
Final sign-off
May 5, 2011

#1150- mechanical and electrical for spec suite ti including new and relocated lights, new vav,duct work. (arch 201102170468)

Open the permit page

$180,000
Mar 10, 2011Completed
final sign-off Apr 2011
150 California StPioneer Fire Inc.relocate 2 fire sprinklers. remove 1 fire sprinkler
Details
Permit
201103101782
Permit issued
Mar 11, 2011
Final sign-off
Apr 8, 2011

relocate 2 fire sprinklers. remove 1 fire sprinkler

Open the permit page

$1,000
Feb 17, 2011Completed
final sign-off May 2011
150 California StRichlen Constructionunit 1150:tenant improvement including demo and construction of partitions, new ceiling,relocate lights. mech,elect under separate permit. fire sprinkler/alarm under seperate permit.
Details
Permit
201102170468
Permit issued
Feb 28, 2011
Final sign-off
May 5, 2011

unit 1150:tenant improvement including demo and construction of partitions, new ceiling,relocate lights. mech,elect under separate permit. fire sprinkler/alarm under seperate permit.

Open the permit page

$180,000
Jan 20, 2011Completed
final sign-off Feb 2011
150 California StMayta & Jensen18th floor-revision to mech pa# 2010-1119-5343 & arch pa# 2010-1112-4775, consolidate equipment & function on one plan. note: fire alarm work shown on plans must be submitted under separate fire alarm permit/plans.
Details
Permit
201101208667
Permit issued
Jan 25, 2011
Final sign-off
Feb 9, 2011

18th floor-revision to mech pa# 2010-1119-5343 & arch pa# 2010-1112-4775, consolidate equipment & function on one plan. note: fire alarm work shown on plans must be submitted under separate fire alarm permit/plans.

Open the permit page

Jan 19, 2011Completed
final sign-off Feb 2011
150 California StMetropolitan Electrical Constructioninstall 1 smoke detector, 1 strobes, 3 modules. all work on 18th floor
Details
Permit
201101198586
Permit issued
Jan 24, 2011
Final sign-off
Feb 9, 2011

install 1 smoke detector, 1 strobes, 3 modules. all work on 18th floor

Open the permit page

$7,200
Jan 14, 2011Completed
final sign-off Feb 2011
150 California StAyoob & Peery Plumbing Co Inc18th floor:install new pre action system and fire sprinkler heads per tenant improvements. 2 sprinkler heads.
Details
Permit
201101148436
Permit issued
Jan 14, 2011
Final sign-off
Feb 2, 2011

18th floor:install new pre action system and fire sprinkler heads per tenant improvements. 2 sprinkler heads.

Open the permit page

$9,500
Dec 28, 2010Completed
final sign-off Feb 2011
150 California StContra Costa Electric Incmodification to existing life safety system due to tenant improvements consisting of 7 strobes and 6 speakers
Details
Permit
201012287464
Permit issued
Dec 28, 2010
Final sign-off
Feb 15, 2011

modification to existing life safety system due to tenant improvements consisting of 7 strobes and 6 speakers

Open the permit page

$9,000
Dec 23, 2010Completed
final sign-off Feb 2011
150 California StIntelligent Technologies & Services Incinstall new fm200 system and provide pre-action detection for the 18th floor equipment room
Details
Permit
201012237363
Permit issued
Dec 23, 2010
Final sign-off
Feb 9, 2011

install new fm200 system and provide pre-action detection for the 18th floor equipment room

Open the permit page

$9,700
Dec 23, 2010Completed
final sign-off Mar 2011
150 California StAnderson, Rowe & Buckley, Inc.4th flr: office ti to (e) fire sprinkler system. one relocated sprinkler, 3 added sprinklers
Details
Permit
201012237324
Permit issued
Dec 23, 2010
Final sign-off
Mar 16, 2011

4th flr: office ti to (e) fire sprinkler system. one relocated sprinkler, 3 added sprinklers

Open the permit page

$2,000
Dec 9, 2010Completed
final sign-off Mar 2011
150 California StGci, Inctenant improvement to extg 4th floor lobby/corridor to demo partitions and demo and construct ceiling grid and tile, light fixtures,doors framed and finishes, mep/ls/sp to done under separate permit.
Details
Permit
201012096355
Permit issued
Dec 13, 2010
Final sign-off
Mar 16, 2011

tenant improvement to extg 4th floor lobby/corridor to demo partitions and demo and construct ceiling grid and tile, light fixtures,doors framed and finishes, mep/ls/sp to done under separate permit.

Open the permit page

$70,000
Dec 7, 2010Completed
final sign-off Feb 2011
150 California StAnderson, Rowe & Buckley, Inc.20th fl. relocate 6 fire sprinklers in existing system
Details
Permit
201012076240
Permit issued
Dec 7, 2010
Final sign-off
Feb 15, 2011

20th fl. relocate 6 fire sprinklers in existing system

Open the permit page

$3,000
Dec 7, 2010Completed
final sign-off Feb 2011
150 California StBcci Construction Companymechanical and electrical work associated with approved app#201011175115
Details
Permit
201012076261
Permit issued
Dec 10, 2010
Final sign-off
Feb 15, 2011

mechanical and electrical work associated with approved app#201011175115

Open the permit page

$25,000
Nov 23, 2010Completed
final sign-off Mar 2011
150 California StMc Millan Electricsuite 650: install 2-ceiling speakers, 4-strobes.
Details
Permit
201011235553
Permit issued
Nov 24, 2010
Final sign-off
Mar 2, 2011

suite 650: install 2-ceiling speakers, 4-strobes.

Open the permit page

$4,500
Nov 19, 2010Completed
final sign-off Feb 2011
150 California StMayta & Jensenupgrade the existing hvac for the new equipment room. pe rovide new ac and fire protection. pa# 2010.11.12.4775 for reference
Details
Permit
201011195343
Permit issued
Nov 23, 2010
Final sign-off
Feb 9, 2011

upgrade the existing hvac for the new equipment room. pe rovide new ac and fire protection. pa# 2010.11.12.4775 for reference

Open the permit page

$70,000
Nov 17, 2010Completed
final sign-off Feb 2011
150 California StBcci Construction Companytenant improvement on the 20th fl including minor demo, new partitions, ceiling and finishes. mechanical, elec, ls, sprinklers under sep permit
Details
Permit
201011175115
Permit issued
Nov 17, 2010
Final sign-off
Feb 15, 2011

tenant improvement on the 20th fl including minor demo, new partitions, ceiling and finishes. mechanical, elec, ls, sprinklers under sep permit

Open the permit page

$210,000
Nov 16, 2010Completed
final sign-off Mar 2011
150 California StRichlen Constructionmechanical& electrical title 24 for tenant improvement. architectural under permit 2010 1007 2515
Details
Permit
201011165040
Permit issued
Nov 16, 2010
Final sign-off
Mar 2, 2011

mechanical& electrical title 24 for tenant improvement. architectural under permit 2010 1007 2515

Open the permit page

$35,000
Nov 12, 2010Completed
final sign-off Feb 2011
150 California StMayta & Jensen18th floor - convert the existing file room & copy area into a new equipment room with server racks & support devices. upgrade room to 1 hour construction, security, air conditioning & fire protection. fire alarm, sprinkler, and mep under separate permit.
Details
Permit
201011124775
Permit issued
Nov 23, 2010
Final sign-off
Feb 9, 2011

18th floor - convert the existing file room & copy area into a new equipment room with server racks & support devices. upgrade room to 1 hour construction, security, air conditioning & fire protection. fire alarm, sprinkler, and mep under separate permit.

Open the permit page

$18,000

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Team Commercial Construction Inc. (44), Pioneer Fire Inc. (23), Capitol Electric Const (20), Mayco Commercial Construction Inc (17), Principal Builders Inc. (10), Richlen Construction (8), Rapid Fire Safety&Security Llc Dba Pafa (7), Gci, Inc (6), Anderson, Rowe & Buckley, Inc. (5), Bcci Construction Company (5), Acco Engineered Systems Inc. Dba Acco En (4), Ayoob & Peery Plumbing Co Inc (4), Golden Gate Fire Protection Inc (4), Metropolitan Electrical Construction (4), Peacock Construction (4), Swinerton Builders (4), Mayta & Jensen (3), Pribuss Engineering Inc (3), A S F Electric Inc (2), Mc Millan Electric (2), Source Planning And Construction Inc (2), A-1 Modular Inc, American Builders Company Inc, C B F Inc, Charles Pankow Builders Ltd, Clune Construction Company L P, Contra Costa Electric Inc, Field Construction Inc., H & M Fire Protection, Inc., Intelligent Technologies & Services Inc, M C S Construction Services, Matrix Hg Inc, Pacific Auxiliary Fire Alarm, Prima Acquire Inc Dba Lahue And Associat, W. Bradley Electric, Ward Alan Emery Construction Inc.
Architects
Lawrence Smith (8), George D. Soskin (6), Joyce Polhamus (5), Breck Polley (4), Aston Pereira (2), Jessica Fairchild (2), John Long (2), Kathrine Dwyer (2), Nicholas Brereton (2), Richard Y S Liu (2), Anthony Cataldo, Capital Electric, David Pugh, Douglas Zucker, Guion Chilldress, Jason A. Stoikoff, Nicolas S. Detorres, Robert Wood, Steven Drucker, Tim Murphy, William Diefenbach
Engineers
Levi Malabuyo (7), Alexander Joseph Pacheco (5), Dennis Cheung (5), Julian White (4), George L Arellano (3), Xuong Quach (2), Aaron Strauch, Craig Laws, Edward Rivera, Eric Witthaus, Glenn Alan Friedman, Henry Holbrook Hyde Iii, Lindsay M Marion, Matthew Pyon, Shea Culbertson, Sherry Chaumpluke, Stephen Shaffer
Authorized agents
Mike Pond (4), Zhan Hang Xue (2), Alexander Joseph Pacheco, Fred Maguire, Lawrence Smith
Designers
Bernard Poggetti, Pioneer Fire Protection
Pmt consultant/expediters
Andrew Erickson

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.