From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 6, 2026 | Completed final sign-off Sep 2026 | 150 California St | Mayco Commercial Construction Inc | 17th fl - replacement of light fixtures and associated circuiting & controls. add transfer fan. add/relocated diffusers and registers per new layout. relocate thermostats ref pa 202602065382Details
17th fl - replacement of light fixtures and associated circuiting & controls. add transfer fan. add/relocated diffusers and registers per new layout. relocate thermostats ref pa 202602065382 | $110,000 |
| Aug 5, 2026 | In progress issued Sep 2026 | 150 California St | A-1 Modular Inc | 8/fl- install phone booth | $800 |
| Jun 24, 2026 | In progress issued Jun 2026 | 150 California St | Matrix Hg Inc | replace 2 existing boilers with new condensing gas fire boilers located in the roof penthouse.Details
replace 2 existing boilers with new condensing gas fire boilers located in the roof penthouse. | $198,000 |
| Apr 22, 2026 | Completed final sign-off Jun 2026 | 150 California St | Mayco Commercial Construction Inc | 6th floor: relocate 1 vav box, add diffusor, registers, return grills, with associated duct work, air balancing, relocate (e) thermostat. (ref 202510016451)Details
6th floor: relocate 1 vav box, add diffusor, registers, return grills, with associated duct work, air balancing, relocate (e) thermostat. (ref 202510016451) | $39,186 |
| Apr 22, 2026 | Completed final sign-off Jun 2026 | 150 California St | Mayco Commercial Construction Inc | deferred electrical. #650 6th floor: new office ti conference room center: lighting, fixtures, and associated circuiting/controls, power/sigmal, & signal devices w/ associated wiring. (ref 202510016451)Details
deferred electrical. #650 6th floor: new office ti conference room center: lighting, fixtures, and associated circuiting/controls, power/sigmal, & signal devices w/ associated wiring. (ref 202510016451) | $121,554 |
| Apr 22, 2026 | Completed final sign-off Jun 2026 | 150 California St | Mayco Commercial Construction Inc | 9th fl - office tenant retrofit: new and altered lighting layout, circuiting and controls. mechanical ll- add transfer fan. add diffuser and registers with associated duct work. air balance. relocated thermostats ref pa 202602175990Details
9th fl - office tenant retrofit: new and altered lighting layout, circuiting and controls. mechanical ll- add transfer fan. add diffuser and registers with associated duct work. air balance. relocated thermostats ref pa 202602175990 | $31,700 |
| Feb 17, 2026 | Completed final sign-off Jun 2026 | 150 California St | Mayco Commercial Construction Inc | 9th fl, ste 900 selective demo of int'r partitions, ceiling and lighting; new non-structuarl partitions, doors, frames, hardware and sidelights; new finishes, minor ceiling rework including relocated and some new lightingDetails
9th fl, ste 900 selective demo of int'r partitions, ceiling and lighting; new non-structuarl partitions, doors, frames, hardware and sidelights; new finishes, minor ceiling rework including relocated and some new lighting | $342,500 |
| Feb 6, 2026 | Completed final sign-off Sep 2026 | 150 California St | Mayco Commercial Construction Inc | 17/f: minor t.i. to make market ready: no occupancy at completion. future t.i. sep permit. renovations/upgrades to(e) restrooms.Details
17/f: minor t.i. to make market ready: no occupancy at completion. future t.i. sep permit. renovations/upgrades to(e) restrooms. | $450,000 |
| Feb 4, 2026 | In progress issued Feb 2026 | 150 California St | Prima Acquire Inc Dba Lahue And Associat | 6th floor: 3 evacuation signs. fire only.Details
6th floor: 3 evacuation signs. fire only. | |
| Jan 23, 2026 | Completed final sign-off Jun 2026 | 150 California St | Mayco Commercial Construction Inc | 6th, 9th, & 16th floors:office building common restroom lighting remodel: lighting fixtures and associated circuiting/controls. ref. arch permit: 202505055757Details
6th, 9th, & 16th floors:office building common restroom lighting remodel: lighting fixtures and associated circuiting/controls. ref. arch permit: 202505055757 | $89,000 |
| Dec 12, 2025 | Completed final sign-off May 2026 | 150 California St | Rapid Fire Safety&Security Llc Dba Pafa | 6th fl: fire alarm ti.: adding 2 speakers strobes, 1 smoke detector and 1 relay module to (e) notifer nfs2-3030 fire alarm system. ref bpa: 202510016451Details
6th fl: fire alarm ti.: adding 2 speakers strobes, 1 smoke detector and 1 relay module to (e) notifer nfs2-3030 fire alarm system. ref bpa: 202510016451 | $8,268 |
| Dec 8, 2025 | Completed final sign-off Feb 2026 | 150 California St | Pioneer Fire Inc. | ste 650. relocate (4) pendents, (4) concelaed pendnets, add (1) concealed pendent, convert (2) pendents to uprights. gfti # 202510016451Details
ste 650. relocate (4) pendents, (4) concelaed pendnets, add (1) concealed pendent, convert (2) pendents to uprights. gfti # 202510016451 | $2,750 |
| Oct 1, 2025 | Completed final sign-off Jun 2026 | 150 California St | Mayco Commercial Construction Inc | 6/fl- ti of (e) suite 650 to include interior non structural demo , non structural partitions, doors, frames, hardware, sidelights, finishes and millwork, ceiling and lightingDetails
6/fl- ti of (e) suite 650 to include interior non structural demo , non structural partitions, doors, frames, hardware, sidelights, finishes and millwork, ceiling and lighting | $199,018 |
| Aug 20, 2025 | Completed final sign-off Oct 2025 | 150 California St | Pioneer Fire Inc. | 6th, 9th & 16th fl ref pa # 2025-0505-5757. relocate 12 concealed sprinklersDetails
6th, 9th & 16th fl ref pa # 2025-0505-5757. relocate 12 concealed sprinklers | $3,000 |
| May 7, 2025 | Completed final sign-off Jul 2025 | 150 California St | Mayco Commercial Construction Inc | 8th fl- office tenant retrofit: lighting fixtures and associated circuiting/controls, power and signal devices and associated wiring. deffered elec for arch #2025-0110-8086Details
8th fl- office tenant retrofit: lighting fixtures and associated circuiting/controls, power and signal devices and associated wiring. deffered elec for arch #2025-0110-8086 | $87,222 |
| May 7, 2025 | Completed final sign-off Sep 2025 | 150 California St | Mayco Commercial Construction Inc | 8th fl- add diffusers, registers and transfer grilles. add 1 vav and 3 transfer fans. modify duct work. air balance deffered mech for arch #2025-0110-8086Details
8th fl- add diffusers, registers and transfer grilles. add 1 vav and 3 transfer fans. modify duct work. air balance deffered mech for arch #2025-0110-8086 | $83,680 |
| May 5, 2025 | Completed final sign-off Jul 2026 | 150 California St | Mayco Commercial Construction Inc | 6th, 9th, & 16th floors: remodel of existing restrooms.Details
6th, 9th, & 16th floors: remodel of existing restrooms. | $410,400 |
| Apr 21, 2025 | Completed final sign-off Apr 2025 | 150 California St | Rapid Fire Safety&Security Llc Dba Pafa | 8/f: fire alarm t.i - adding 15 speaker-strobes, 3 speakers, 4 smoke detectors and 3 relays to (e) notifier nfs2-3030 fire alarm system. relocating 1 smoke detector. ref permit 202501108086.Details
8/f: fire alarm t.i - adding 15 speaker-strobes, 3 speakers, 4 smoke detectors and 3 relays to (e) notifier nfs2-3030 fire alarm system. relocating 1 smoke detector. ref permit 202501108086. | $15,895 |
| Mar 20, 2025 | In progress filed Mar 2025, not yet issued | 150 California St | American Builders Company Inc | install ada signage, evacuation maps and logo at reception areaDetails
install ada signage, evacuation maps and logo at reception area | $1,500 |
| Feb 12, 2025 | Completed final sign-off Feb 2025 | 150 California St | Rapid Fire Safety&Security Llc Dba Pafa | fire alarm permit pa#: 202307313327. air sampling system is being provided in two transformers. vaults instead of smoke detector.Details
fire alarm permit pa#: 202307313327. air sampling system is being provided in two transformers. vaults instead of smoke detector. | |
| Feb 4, 2025 | Completed final sign-off Apr 2025 | 150 California St | Pioneer Fire Inc. | 8th/fl: add (2) uprights, relocate (48) pendents gc#2025-0110-8086.Details
8th/fl: add (2) uprights, relocate (48) pendents gc#2025-0110-8086. | $100 |
| Feb 3, 2025 | Completed final sign-off Mar 2025 | 150 California St | Mayco Commercial Construction Inc | 5/f: remodel common corridor, pel (public elevator lobby) and restroom lighting, circuiting and assicated controls. ref architectural permit 202410293929.Details
5/f: remodel common corridor, pel (public elevator lobby) and restroom lighting, circuiting and assicated controls. ref architectural permit 202410293929. | $65,850 |
| Jan 10, 2025 | Completed final sign-off Jul 2025 | 150 California St | Mayco Commercial Construction Inc | 8/fl-interior ti altering 2 suites into 3 suites. work includes demo and construct of partitions, doors, ceilings, lighting and finishes. mep deferred.Details
8/fl-interior ti altering 2 suites into 3 suites. work includes demo and construct of partitions, doors, ceilings, lighting and finishes. mep deferred. | $1,233,496 |
| Dec 10, 2024 | Completed final sign-off Jan 2025 | 150 California St | Mayco Commercial Construction Inc | restroom lighting remodel and open office update control. ref pa #202408309800 and revision to pa #202410163090Details
restroom lighting remodel and open office update control. ref pa #202408309800 and revision to pa #202410163090 | $85,000 |
| Nov 20, 2024 | Completed final sign-off Dec 2024 | 150 California St | Pioneer Fire Inc. | 5th fl- ref pa #2024-1029-3929 relocate (13) pendentsDetails
5th fl- ref pa #2024-1029-3929 relocate (13) pendents | $3,250 |
| Nov 1, 2024 | Completed final sign-off Dec 2024 | 150 California St | Pribuss Engineering Inc | 23/f: gc pa# 202408158808 - fire sprinkler ti for renovated office space - modify 47 heads.Details
23/f: gc pa# 202408158808 - fire sprinkler ti for renovated office space - modify 47 heads. | $23,500 |
| Oct 29, 2024 | Completed final sign-off Mar 2025 | 150 California St | Mayco Commercial Construction Inc | 5/fl- remodel of (e) common corridor, elevator lobby and restroomsDetails
5/fl- remodel of (e) common corridor, elevator lobby and restrooms | $211,864 |
| Oct 21, 2024 | Completed final sign-off Jan 2025 | 150 California St | Rapid Fire Safety&Security Llc Dba Pafa | 22nd floor: fire alarm t.i. as built submittal per sffd inspection request, record drawings update bill of materials installed. delete 1 speaker strobes and 1 speaker. ref pa#202410072434Details
22nd floor: fire alarm t.i. as built submittal per sffd inspection request, record drawings update bill of materials installed. delete 1 speaker strobes and 1 speaker. ref pa#202410072434 | |
| Oct 16, 2024 | Completed final sign-off Nov 2024 | 150 California St | Acco Engineered Systems Inc. Dba Acco En | 3rd floor:revision to pa #202407267360. nrca-mch-03 initially checked off but test is not required.Details
3rd floor:revision to pa #202407267360. nrca-mch-03 initially checked off but test is not required. | |
| Oct 16, 2024 | Completed final sign-off Jan 2025 | 150 California St | Mayco Commercial Construction Inc | work on 22nd flr. permit revisions for 202408309800; relocating detectable warming strips and removal of railing in garage. finish and fixtures changes in restrooms. no mechanical work. electrical deferredDetails
work on 22nd flr. permit revisions for 202408309800; relocating detectable warming strips and removal of railing in garage. finish and fixtures changes in restrooms. no mechanical work. electrical deferred | |
| Oct 7, 2024 | Completed final sign-off Jan 2025 | 150 California St | Rapid Fire Safety&Security Llc Dba Pafa | 22/f: fire alarm t.i.: adding 8 speaker-strobes and 1 speaker to (e) notified nfs2-3030 fire alarm system. ref pa 202408309800.Details
22/f: fire alarm t.i.: adding 8 speaker-strobes and 1 speaker to (e) notified nfs2-3030 fire alarm system. ref pa 202408309800. | $8,970 |
| Sep 18, 2024 | Completed final sign-off Dec 2024 | 150 California St | Rapid Fire Safety&Security Llc Dba Pafa | fire alarm ti. relocating 1 s/d, adding 15 speaker strobes to existing notifier nfs2-3030 fire alarm system. adding 1 call station to jeron 2 way communication system. ref 202408158808Details
fire alarm ti. relocating 1 s/d, adding 15 speaker strobes to existing notifier nfs2-3030 fire alarm system. adding 1 call station to jeron 2 way communication system. ref 202408158808 | $14,870 |
| Aug 30, 2024 | Completed final sign-off Jan 2025 | 150 California St | Mayco Commercial Construction Inc | 22/fl-ti to include soft demo of select non structural partitions and patching of finish and ceiling tile restroom. upgrade include relocating plumbing fixtures and accessories mep deferred.Details
22/fl-ti to include soft demo of select non structural partitions and patching of finish and ceiling tile restroom. upgrade include relocating plumbing fixtures and accessories mep deferred. | $190,275 |
| Aug 15, 2024 | Completed final sign-off Feb 2025 | 150 California St | Principal Builders Inc. | 23rd/f: demo of non-structural interior partitions & new contruction of interior partitions, break room millwork, mep & lighting. no structural work inclued in scope, no imcrease in area. no change in occupancy or useDetails
23rd/f: demo of non-structural interior partitions & new contruction of interior partitions, break room millwork, mep & lighting. no structural work inclued in scope, no imcrease in area. no change in occupancy or use | $1,031,140 |
| Jul 29, 2024 | In progress issued Jul 2024 | 150 California St | Rapid Fire Safety&Security Llc Dba Pafa | 3/f suite 300: ref to t.i. 202405313389. fire alarm adding 5 speakers & 11 speaker strobes to e) notifier nfs2-3030 fire alarm system, adding 1 call station to e) jeron 2-way comm. systemDetails
3/f suite 300: ref to t.i. 202405313389. fire alarm adding 5 speakers & 11 speaker strobes to e) notifier nfs2-3030 fire alarm system, adding 1 call station to e) jeron 2-way comm. system | $13,190 |
| Jul 26, 2024 | Completed final sign-off Nov 2024 | 150 California St | Source Planning And Construction Inc | ste: 300 ref pa # 2024-0531-3389 deferred mechanical & electricalDetails
ste: 300 ref pa # 2024-0531-3389 deferred mechanical & electrical | $175,000 |
| Jul 24, 2024 | Completed final sign-off Aug 2024 | 150 California St | Pioneer Fire Inc. | 3rd fl: ref pa # 2024-0531-3389 add (1) pendent & relocate (10) pendentsDetails
3rd fl: ref pa # 2024-0531-3389 add (1) pendent & relocate (10) pendents | $2,200 |
| May 31, 2024 | Completed final sign-off Nov 2024 | 150 California St | Source Planning And Construction Inc | ste. 300- office ti for minor renovation to include demo of non load bearing interior partitions and celiing tiles, (n) partitions and finsishes will be added for open office with a few conference rooms and offices. no exterior work or change of use,occupancy or egress.Details
ste. 300- office ti for minor renovation to include demo of non load bearing interior partitions and celiing tiles, (n) partitions and finsishes will be added for open office with a few conference rooms and offices. no exterior work or change of use,occupancy or egress. | $375,000 |
| Aug 16, 2023 | Completed final sign-off Sep 2023 | 150 California St | Capitol Electric Const | 11th fl - modification of (e) life safety system ref pa 2022-1222-8926. install 16 new speakers and 19 new strobes; install 1 new smoke detectorDetails
11th fl - modification of (e) life safety system ref pa 2022-1222-8926. install 16 new speakers and 19 new strobes; install 1 new smoke detector | $46,526 |
| Jul 31, 2023 | In progress issued Dec 2023 | 150 California St | Pacific Auxiliary Fire Alarm | fire alarm system voluntary replace one to one with notifier nfs2-3030. adding 2-way communication system.Details
fire alarm system voluntary replace one to one with notifier nfs2-3030. adding 2-way communication system. | $244,440 |
| Jun 29, 2023 | Completed final sign-off Oct 2023 | 150 California St | Team Commercial Construction Inc. | 11/f: t.i. lighting fixtures, power & signal devices, ref pa# 202212228926.Details
11/f: t.i. lighting fixtures, power & signal devices, ref pa# 202212228926. | $226,000 |
| Jun 29, 2023 | Completed final sign-off Oct 2023 | 150 California St | Team Commercial Construction Inc. | 11/f: add 2-vav box & 3-transfer fans, modify & add new duct work, relocate thermostats, ref pa# 202212228926.Details
11/f: add 2-vav box & 3-transfer fans, modify & add new duct work, relocate thermostats, ref pa# 202212228926. | $175,000 |
| Apr 6, 2023 | Completed final sign-off Dec 2023 | 150 California St | Gci, Inc | 20/f: revision to pa# 2022-1013-4259 for revised lighting designDetails
20/f: revision to pa# 2022-1013-4259 for revised lighting design | |
| Mar 23, 2023 | Completed final sign-off Aug 2023 | 150 California St | Pioneer Fire Inc. | 11/f: relocate 78 pendents, convert 7 pendents to uprights, remove 4 pendents.t.i. pa 202212228926Details
11/f: relocate 78 pendents, convert 7 pendents to uprights, remove 4 pendents.t.i. pa 202212228926 | $11,700 |
| Mar 9, 2023 | Never finaled issued Mar 2023, no final | 150 California St | Capitol Electric Const | 20/f ste# 2000: modification of existing life safety system, ref pa# 202210134259, install new 2-speakers and 8-strobes, install new 3-fire smoke dampers, 3-addressible output module and 1-duct mounting plate, relocation of existing speakers and strobes.Details
20/f ste# 2000: modification of existing life safety system, ref pa# 202210134259, install new 2-speakers and 8-strobes, install new 3-fire smoke dampers, 3-addressible output module and 1-duct mounting plate, relocation of existing speakers and strobes. | $16,500 |
| Feb 28, 2023 | Completed final sign-off Mar 2023 | 150 California St | Golden Gate Fire Protection Inc | 20th fl - fire sprinklers relocate 14 concealed pendents and 2 pendents. ref pa 2022-1013-4259Details
20th fl - fire sprinklers relocate 14 concealed pendents and 2 pendents. ref pa 2022-1013-4259 | $9,920 |
| Dec 22, 2022 | Completed final sign-off Oct 2023 | 150 California St | Team Commercial Construction Inc. | 11/flr (suites 1100, 1125 & 1150): ti including demo & construction of partitions, doors, ceilings, lighting, millwork, retrooms and finishes.Details
11/flr (suites 1100, 1125 & 1150): ti including demo & construction of partitions, doors, ceilings, lighting, millwork, retrooms and finishes. | $657,716 |
| Oct 13, 2022 | Completed final sign-off Dec 2023 | 150 California St | Gci, Inc | 20th fl tenent improvement including new rooms, elevator lobby, reception, conference rooms, amenity space, mep, fixtures, finishes & equipment, and offices.Details
20th fl tenent improvement including new rooms, elevator lobby, reception, conference rooms, amenity space, mep, fixtures, finishes & equipment, and offices. | $920,000 |
| Aug 23, 2022 | Never finaled issued Oct 2022, no final | 150 California St | Team Commercial Construction Inc. | 10/f: relocate 1 vav box and add 3 transfer fans. add idffusers, registeres & transfer grilles. modifty and add a new dutwork, relocate (e) thermostats, add fsd. ref ti 202106243169, 202204071782, 202205204677, 202201145998.Details
10/f: relocate 1 vav box and add 3 transfer fans. add idffusers, registeres & transfer grilles. modifty and add a new dutwork, relocate (e) thermostats, add fsd. ref ti 202106243169, 202204071782, 202205204677, 202201145998. | $57,401 |
| Aug 23, 2022 | Never finaled issued Oct 2022, no final | 150 California St | Team Commercial Construction Inc. | provide lighting ti to 8035 sq feet office area. ref 202106243169/202204071782/202205204677/202201145998Details
provide lighting ti to 8035 sq feet office area. ref 202106243169/202204071782/202205204677/202201145998 | $63,420 |
| May 20, 2022 | Completed final sign-off Dec 2022 | 150 California St | Team Commercial Construction Inc. | 10/f: rev to pa202106243169: interior t.i. to include demo and construction of partitions, dloors, ceilings, lighting, millwork and finishes. mep deferred. maher n/a.Details
10/f: rev to pa202106243169: interior t.i. to include demo and construction of partitions, dloors, ceilings, lighting, millwork and finishes. mep deferred. maher n/a. | $4,000 |
| Apr 7, 2022 | Completed final sign-off Dec 2022 | 150 California St | Team Commercial Construction Inc. | ste 1025: revision to pa# 202106243169. interior t.i. adding 1 new private office and extending conference room. fire alarm and sprinkler under sep permit, if applic.Details
ste 1025: revision to pa# 202106243169. interior t.i. adding 1 new private office and extending conference room. fire alarm and sprinkler under sep permit, if applic. | $7,000 |
| Mar 9, 2022 | Completed final sign-off Dec 2022 | 150 California St | Capitol Electric Const | 10th floor:modification of extg life safety system. install 16 new speakers and 22 new strobes.install 1 new dual sync module. ref pa#202201145998.Details
10th floor:modification of extg life safety system. install 16 new speakers and 22 new strobes.install 1 new dual sync module. ref pa#202201145998. | $16,500 |
| Feb 25, 2022 | Completed final sign-off Mar 2022 | 150 California St | Capitol Electric Const | 3rd fl: modification of existing life safety system to 3rd floor ti work in reference to ti permit 202106172696. install new (6) speakers and (10) strobes. relocation of an (e) smoke detector to new idf room.Details
3rd fl: modification of existing life safety system to 3rd floor ti work in reference to ti permit 202106172696. install new (6) speakers and (10) strobes. relocation of an (e) smoke detector to new idf room. | $16,500 |
| Jan 28, 2022 | Never finaled issued Jan 2022, no final | 150 California St | Capitol Electric Const | suite 200: as-built rev to pa202201075586: install 5 wall strobes & 6 ceiling speaker. remove scope of work where says "relocate of an existing smoke detector to a new idf room."Details
suite 200: as-built rev to pa202201075586: install 5 wall strobes & 6 ceiling speaker. remove scope of work where says "relocate of an existing smoke detector to a new idf room." | |
| Jan 14, 2022 | Completed final sign-off Dec 2022 | 150 California St | Team Commercial Construction Inc. | revision to pa# 202106243169. interior t.i. including construction of partitions, lighting & finishes for 4 additional offices. mep deferred.Details
revision to pa# 202106243169. interior t.i. including construction of partitions, lighting & finishes for 4 additional offices. mep deferred. | $10,500 |
| Jan 12, 2022 | Completed final sign-off Apr 2022 | 150 California St | M C S Construction Services | demo of non-structural partition & misc built in millwork. construct new partition to patch opening. patch & replace adjacent finishes/ceilings as needed. no impact to mep system or life/fire safety/sprinkler systems.Details
demo of non-structural partition & misc built in millwork. construct new partition to patch opening. patch & replace adjacent finishes/ceilings as needed. no impact to mep system or life/fire safety/sprinkler systems. | $24,000 |
| Jan 7, 2022 | Completed final sign-off Feb 2022 | 150 California St | Capitol Electric Const | suite #200: install (5) wall strobes and (6) ceilling speakers to pa# 2021-0916-8520Details
suite #200: install (5) wall strobes and (6) ceilling speakers to pa# 2021-0916-8520 | $2,500 |
| Dec 23, 2021 | Completed final sign-off Feb 2022 | 150 California St | Golden Gate Fire Protection Inc | 2/f: fire sprinklers: relocate 13 pendent sprinklers and relocate 7 uprights. ref ti permit 202109168520.Details
2/f: fire sprinklers: relocate 13 pendent sprinklers and relocate 7 uprights. ref ti permit 202109168520. | $4,500 |
| Dec 7, 2021 | Completed final sign-off Mar 2022 | 150 California St | Team Commercial Construction Inc. | 3/f: title 24: provide lighting tenant improvements to 5,883 sq ft of office area. pa 202106172696.Details
3/f: title 24: provide lighting tenant improvements to 5,883 sq ft of office area. pa 202106172696. | $172,420 |
| Dec 7, 2021 | Completed final sign-off Mar 2022 | 150 California St | Team Commercial Construction Inc. | 3rd floor: add (1) vav box, relocate (1) vav box and relocate 1 transfer fan. add diffuser, register, return grilles, add new ductwork, relocate existing thermostats and add (1) thermostat ref pa# 202106172696.Details
3rd floor: add (1) vav box, relocate (1) vav box and relocate 1 transfer fan. add diffuser, register, return grilles, add new ductwork, relocate existing thermostats and add (1) thermostat ref pa# 202106172696. | $63,801 |
| Oct 26, 2021 | Completed final sign-off Mar 2022 | 150 California St | Pioneer Fire Inc. | 10th floor: relocate(67)pendent heads,convert (6)to upright(6)to concealed,remove (1) add (3).Details
10th floor: relocate(67)pendent heads,convert (6)to upright(6)to concealed,remove (1) add (3). | $1,000 |
| Sep 16, 2021 | Completed final sign-off Jul 2022 | 150 California St | Clune Construction Company L P | 2nd fl ste 200: (e) tenant space. modifying (e) partitions, doors, ceilings, and finishes, as well as lighting, power and mechanical systems.Details
2nd fl ste 200: (e) tenant space. modifying (e) partitions, doors, ceilings, and finishes, as well as lighting, power and mechanical systems. | $888,000 |
| Sep 9, 2021 | Completed final sign-off Dec 2021 | 150 California St | Pioneer Fire Inc. | 3/f: relocate (13) pendent heads, (3) uprights, convert (13) pendent sprinkler heads to upright, remove (3) upright, add (3) pendents, (3) uprights. ref bpa# 202106172696Details
3/f: relocate (13) pendent heads, (3) uprights, convert (13) pendent sprinkler heads to upright, remove (3) upright, add (3) pendents, (3) uprights. ref bpa# 202106172696 | |
| Jun 24, 2021 | Completed final sign-off Dec 2022 | 150 California St | Team Commercial Construction Inc. | 10/f: interior t.i. including demo and construction of partitions, doors, ceilings, lighting millwork and finishes. no changes in occupancy, use, or area. mep is deffered.Details
10/f: interior t.i. including demo and construction of partitions, doors, ceilings, lighting millwork and finishes. no changes in occupancy, use, or area. mep is deffered. | $657,716 |
| Jun 24, 2021 | Never finaled issued Jun 2021, no final | 150 California St | Capitol Electric Const | 1st fl: install (1) new duct smoke detector and relay module for activation of new fire smoke damper to pa 202101213050Details
1st fl: install (1) new duct smoke detector and relay module for activation of new fire smoke damper to pa 202101213050 | $2,500 |
| Jun 17, 2021 | Completed final sign-off Mar 2022 | 150 California St | Team Commercial Construction Inc. | 3rd fl: interior tenant improvement including demo and construction of partitions, doors, ceilings, lighting, millwork and finishes, no structural, no change in area or occupancy, mep and fire, life safety is deferredDetails
3rd fl: interior tenant improvement including demo and construction of partitions, doors, ceilings, lighting, millwork and finishes, no structural, no change in area or occupancy, mep and fire, life safety is deferred | $955,510 |
| Jan 21, 2021 | Completed final sign-off Aug 2021 | 150 California St | Team Commercial Construction Inc. | tenant improvements: provide lighting to 400 sq. ft. of office breakroom/kitchen area. ref pa 202010015683.Details
tenant improvements: provide lighting to 400 sq. ft. of office breakroom/kitchen area. ref pa 202010015683. | $20,742 |
| Jan 21, 2021 | Completed final sign-off Aug 2021 | 150 California St | Team Commercial Construction Inc. | install split system heat pump. install new ductwork and fan coil unit, new fire smoke damper, new cpi control panel, new duct smoke detector for fsd. ref pa 202010015683.Details
install split system heat pump. install new ductwork and fan coil unit, new fire smoke damper, new cpi control panel, new duct smoke detector for fsd. ref pa 202010015683. | $28,404 |
| Jan 14, 2021 | Completed final sign-off May 2021 | 150 California St | Team Commercial Construction Inc. | 18/f: provide lighting tenant improvements to 5,222 sqft of office area. ref pa# 202010025731.Details
18/f: provide lighting tenant improvements to 5,222 sqft of office area. ref pa# 202010025731. | $46,782 |
| Jan 14, 2021 | Completed final sign-off May 2021 | 150 California St | Team Commercial Construction Inc. | 18/f:relocate 2 vav's. add 1 transfer fan. add diffuser, registers, transfer grills. modify & add new ductwork. relocate (e) thermostats. air balancing. add 1 new fire smoke damper. ref pa# 202010025731Details
18/f:relocate 2 vav's. add 1 transfer fan. add diffuser, registers, transfer grills. modify & add new ductwork. relocate (e) thermostats. air balancing. add 1 new fire smoke damper. ref pa# 202010025731 | $36,440 |
| Jan 14, 2021 | Completed final sign-off May 2021 | 150 California St | Team Commercial Construction Inc. | provide lighting tenant improvements to 8,553 sqft of office area. ref pa# 202010015636.Details
provide lighting tenant improvements to 8,553 sqft of office area. ref pa# 202010015636. | $53,901 |
| Jan 14, 2021 | Completed final sign-off May 2021 | 150 California St | Team Commercial Construction Inc. | 7/f: add 1 vav box & 1 transfer fan. add diffusers, registers, return grills, & add new ductwork. connect new vav to (e) ddc controls & relocate (e) thermostats/air balancing. ref pa# 202010015636.Details
7/f: add 1 vav box & 1 transfer fan. add diffusers, registers, return grills, & add new ductwork. connect new vav to (e) ddc controls & relocate (e) thermostats/air balancing. ref pa# 202010015636. | $43,622 |
| Dec 17, 2020 | Never finaled issued Feb 2021, no final | 150 California St | Capitol Electric Const | install (3) hardwired switches, (7) new ceiling speakers. relocate existing magnetic door holder and associated smoke detector. remove preaction system equipment. ref. to permit 2020-1002-5731.Details
install (3) hardwired switches, (7) new ceiling speakers. relocate existing magnetic door holder and associated smoke detector. remove preaction system equipment. ref. to permit 2020-1002-5731. | $11,875 |
| Dec 17, 2020 | Completed final sign-off May 2021 | 150 California St | Capitol Electric Const | 7th fl, ste 700: install (12) new ceiling speaker and (12) new wall strobes (1) smoke detector. ref to ti permit # 2020.1001.5031Details
7th fl, ste 700: install (12) new ceiling speaker and (12) new wall strobes (1) smoke detector. ref to ti permit # 2020.1001.5031 | $10,485 |
| Nov 5, 2020 | Completed final sign-off Jul 2021 | 150 California St | Pioneer Fire Inc. | fire sprinkler relocate 41 pendents, relocate 3 uprights, add 1 pendent, add 1 upright and remove 2 uprights.Details
fire sprinkler relocate 41 pendents, relocate 3 uprights, add 1 pendent, add 1 upright and remove 2 uprights. | $9,500 |
| Oct 28, 2020 | Completed final sign-off Dec 2020 | 150 California St | Pioneer Fire Inc. | fire sprinklers relocate 62 pendents and remove 3 uprights.Details
fire sprinklers relocate 62 pendents and remove 3 uprights. | $9,500 |
| Oct 2, 2020 | Completed final sign-off May 2021 | 150 California St | Team Commercial Construction Inc. | interior t.i. including non-structural demo and construction of (n) non-structural partitons, glazing, ceilings, lighting, millwork,and finishes. no change in occupancy, area or use, mep & life safety under sep. permit n/a maherDetails
interior t.i. including non-structural demo and construction of (n) non-structural partitons, glazing, ceilings, lighting, millwork,and finishes. no change in occupancy, area or use, mep & life safety under sep. permit n/a maher | $680,467 |
| Oct 1, 2020 | Completed final sign-off Aug 2021 | 150 California St | Team Commercial Construction Inc. | ground floor - new non struct partitions, ceiling & lighting, millwork and finishes, no change in occuancy area or use, mep, life safety, sprinklers under sep permitDetails
ground floor - new non struct partitions, ceiling & lighting, millwork and finishes, no change in occuancy area or use, mep, life safety, sprinklers under sep permit | $30,750 |
| Oct 1, 2020 | Completed final sign-off May 2021 | 150 California St | Team Commercial Construction Inc. | 7th flr. interior tenant improvement. demo fo restroom & elevator lobby. constructin of non-structural partitions, ceilings, casework & finishes. no change in occupancy use or area. mep, life safety & sprinklers are under serparate permit.Details
7th flr. interior tenant improvement. demo fo restroom & elevator lobby. constructin of non-structural partitions, ceilings, casework & finishes. no change in occupancy use or area. mep, life safety & sprinklers are under serparate permit. | $672,516 |
| Sep 18, 2020 | Completed final sign-off Jul 2021 | 150 California St | Pioneer Fire Inc. | ground flr - relocate 5 sprinkler heads-pendents in janitor break room.Details
ground flr - relocate 5 sprinkler heads-pendents in janitor break room. | $2,500 |
| Jul 1, 2020 | Completed final sign-off Sep 2020 | 150 California St | Team Commercial Construction Inc. | revision to pa #2019-0508-0066: addition of 1 office, electrical, lighting. addition of av monitos, card readers, cameras and power for furniture.Details
revision to pa #2019-0508-0066: addition of 1 office, electrical, lighting. addition of av monitos, card readers, cameras and power for furniture. | $41,000 |
| Feb 24, 2020 | Completed final sign-off Oct 2020 | 150 California St | Pioneer Fire Inc. | 7/f: suite 700: fire sprinklers (66 heads) return to warm shell. ref pa202002053554.Details
7/f: suite 700: fire sprinklers (66 heads) return to warm shell. ref pa202002053554. | $7,000 |
| Feb 5, 2020 | Completed final sign-off Jul 2020 | 150 California St | per ab-017- non-structural demo of partitions, millwork, ceiling and lighting only, no change in occupancy use, or area, mep, life safety and sprinklers under sep permitDetails
per ab-017- non-structural demo of partitions, millwork, ceiling and lighting only, no change in occupancy use, or area, mep, life safety and sprinklers under sep permit | $49,200 | |
| Oct 31, 2019 | Completed final sign-off Nov 2019 | 150 California St | Capitol Electric Const | 8th fl - install 2 new speakers and relocate 3 speakers and 5 strobes. ref pa 201905080066Details
8th fl - install 2 new speakers and relocate 3 speakers and 5 strobes. ref pa 201905080066 | $9,785 |
| Oct 3, 2019 | Completed final sign-off Oct 2020 | 150 California St | Team Commercial Construction Inc. | 8th floor: provide lighting tenant improvements to 3,625 sq ft of office space. add 1 transfer fan, 1 supply and linear diffusers. modify and add new ductwork. relocate (e) thermostats, air balance.Details
8th floor: provide lighting tenant improvements to 3,625 sq ft of office space. add 1 transfer fan, 1 supply and linear diffusers. modify and add new ductwork. relocate (e) thermostats, air balance. | $62,250 |
| Oct 3, 2019 | Completed final sign-off Sep 2020 | 150 California St | Team Commercial Construction Inc. | 8th flr. provide lighting improvements to 1,153 sq ft of office spaceDetails
8th flr. provide lighting improvements to 1,153 sq ft of office space | $11,940 |
| Aug 7, 2019 | Completed final sign-off Nov 2019 | 150 California St | Pioneer Fire Inc. | 8th floor: relocate 30 pendents, 5 uprights. add 1 pendent and remove 1 pendent gc ti 201907014790Details
8th floor: relocate 30 pendents, 5 uprights. add 1 pendent and remove 1 pendent gc ti 201907014790 | $12,000 |
| Jul 1, 2019 | Completed final sign-off Sep 2020 | 150 California St | Team Commercial Construction Inc. | demo. of non structural walls, and finishes, construction of non-structural walls,plumbing, and finishes, mechanical, electrical plumbing, life safety and sprinklers to be design build under sep permits n/a maherDetails
demo. of non structural walls, and finishes, construction of non-structural walls,plumbing, and finishes, mechanical, electrical plumbing, life safety and sprinklers to be design build under sep permits n/a maher | $181,548 |
| Jun 25, 2019 | Completed final sign-off Aug 2019 | 150 California St | Team Commercial Construction Inc. | 2/f: provide lighting tenant improvement to 1600 sq feet of common area. ref 201810314577Details
2/f: provide lighting tenant improvement to 1600 sq feet of common area. ref 201810314577 | $15,200 |
| May 8, 2019 | Completed final sign-off Sep 2020 | 150 California St | Team Commercial Construction Inc. | 8th flr. demo of non-structural walls, plumb and ceiling systems. construct (n) tenant partitions incl non-structural walls, plumb & lighting. mech, electr, plumb, life safety & sprinkler to be design-build under separate permits.Details
8th flr. demo of non-structural walls, plumb and ceiling systems. construct (n) tenant partitions incl non-structural walls, plumb & lighting. mech, electr, plumb, life safety & sprinkler to be design-build under separate permits. | $304,876 |
| Apr 12, 2019 | Never finaled issued Apr 2019, no final | 150 California St | Team Commercial Construction Inc. | revision to 201810304577. submittal of technical infeasibility to leave accessible toilet in place. maher n/a.Details
revision to 201810304577. submittal of technical infeasibility to leave accessible toilet in place. maher n/a. | |
| Apr 10, 2019 | Completed final sign-off Oct 2019 | 150 California St | Pioneer Fire Inc. | 2nd fl - relocate 10 pendents ref pa 2018-1031-4577Details
2nd fl - relocate 10 pendents ref pa 2018-1031-4577 | $5,000 |
| Feb 22, 2019 | Completed final sign-off Jul 2019 | 150 California St | Capitol Electric Const | f/a for ste 200: install 11 strobes and 13 speakers. ref ti #201811024829.Details
f/a for ste 200: install 11 strobes and 13 speakers. ref ti #201811024829. | $18,773 |
| Jan 11, 2019 | Completed final sign-off Jul 2019 | 150 California St | Team Commercial Construction Inc. | 2nd fl - provide lighting ti to 6066 sq ft of office space. add 2 vav boxes and relocate 1 transfer fan/add supply and return diffusers and add new ductwork; add 2 thermostats and relocate existing thermostat air balancingDetails
2nd fl - provide lighting ti to 6066 sq ft of office space. add 2 vav boxes and relocate 1 transfer fan/add supply and return diffusers and add new ductwork; add 2 thermostats and relocate existing thermostat air balancing | $57,373 |
| Dec 10, 2018 | Completed final sign-off Feb 2019 | 150 California St | Pioneer Fire Inc. | relocate 33 pendents, 10 uprights and remove 8 pendents ref 201811024829 suite 200Details
relocate 33 pendents, 10 uprights and remove 8 pendents ref 201811024829 suite 200 | $19,896 |
| Nov 2, 2018 | Completed final sign-off Jul 2019 | 150 California St | Team Commercial Construction Inc. | ti on 2nd floor-non struct demo. new non struc partitions, doors, glazing, ceiling, lights, millwork, finishes. no change in area, occup or use. mep/fire/life safety under sep permit maher naDetails
ti on 2nd floor-non struct demo. new non struc partitions, doors, glazing, ceiling, lights, millwork, finishes. no change in area, occup or use. mep/fire/life safety under sep permit maher na | $481,140 |
| Oct 31, 2018 | Completed final sign-off Aug 2019 | 150 California St | Team Commercial Construction Inc. | non struct demo (n) struct partitions, doors, finishes, toilet fixtures & accessories. no change in occupancy or use or area. mep, life safety, sprinklers under sep permitDetails
non struct demo (n) struct partitions, doors, finishes, toilet fixtures & accessories. no change in occupancy or use or area. mep, life safety, sprinklers under sep permit | $131,836 |
| Sep 17, 2018 | Never finaled issued Sep 2018, no final | 150 California St | Team Commercial Construction Inc. | 9/f: relocate vav box to locatoin shown on plans. connect to supply air main/install vav box in location shown on plans. connect to supply air main. install exhaust fan, connect to (e) supply air main. ref pa201803012543. maher n/a.Details
9/f: relocate vav box to locatoin shown on plans. connect to supply air main/install vav box in location shown on plans. connect to supply air main. install exhaust fan, connect to (e) supply air main. ref pa201803012543. maher n/a. | $22,405 |
| Sep 11, 2018 | Never finaled issued Sep 2018, no final | 150 California St | Team Commercial Construction Inc. | #900: parcial scope office tenant retrofit. lighting, lighting controls. ref app#201803012543. new exit signage for egress pathDetails
#900: parcial scope office tenant retrofit. lighting, lighting controls. ref app#201803012543. new exit signage for egress path | $84,800 |
| Jul 5, 2018 | Completed final sign-off Jul 2018 | 150 California St | Golden Gate Fire Protection Inc | 4/f: fire sprinkler only relocate 3 pendents & 2 uprights for the 4th fl at cbre. ref pa 2018-0524-0021Details
4/f: fire sprinkler only relocate 3 pendents & 2 uprights for the 4th fl at cbre. ref pa 2018-0524-0021 | $1,250 |
| Jul 5, 2018 | Completed final sign-off Jul 2018 | 150 California St | Capitol Electric Const | suite 400 fire alarm: install 2 new speaker, 2 strobes; relocate 5 strobes, 2 speaker strobe. ref ti #201804267420.Details
suite 400 fire alarm: install 2 new speaker, 2 strobes; relocate 5 strobes, 2 speaker strobe. ref ti #201804267420. | $10,500 |
| Jun 22, 2018 | Expired or cancelled cancelled Nov 2022 | 150 California St | installation of 2 stem lithium ion batter enery storage system ess. the ess will be used to offset peak demand charges by discharging directly into the facilities electrical distribution system. the monitoring and contnrolling detects both when to charge and when to dischargeDetails
installation of 2 stem lithium ion batter enery storage system ess. the ess will be used to offset peak demand charges by discharging directly into the facilities electrical distribution system. the monitoring and contnrolling detects both when to charge and when to discharge | $55,000 | |
| Jun 15, 2018 | Never finaled issued Jun 2018, no final | 150 California St | Capitol Electric Const | title 24. suites 610 & 650. installation of new led lightsDetails
title 24. suites 610 & 650. installation of new led lights | $2,973 |
| May 24, 2018 | Never finaled issued May 2018, no final | 150 California St | Bcci Construction Company | 4th floor: mep to support approval arch ref app#201804267420Details
4th floor: mep to support approval arch ref app#201804267420 | $45,000 |
| May 10, 2018 | Completed final sign-off Nov 2018 | 150 California St | Capitol Electric Const | fa ste #900: modification of existing l/s system by installing (10) new speakers and (10) strobes. 1 smoke detector outside of lobby doors ref 201803012543 maher naDetails
fa ste #900: modification of existing l/s system by installing (10) new speakers and (10) strobes. 1 smoke detector outside of lobby doors ref 201803012543 maher na | $12,630 |
| Apr 26, 2018 | Never finaled issued May 2018, no final | 150 California St | Bcci Construction Company | scope of project is remodel of e office space at 150 calif 4th fl demo and new non struc int walls, pwr/data, minor lightng,divide e idf rm into 1 n storage,1 small idf rm, 1 e conv into 1 new office 1 conferende, 1 new phone, 1 new wllnes rm upgrd restroomsDetails
scope of project is remodel of e office space at 150 calif 4th fl demo and new non struc int walls, pwr/data, minor lightng,divide e idf rm into 1 n storage,1 small idf rm, 1 e conv into 1 new office 1 conferende, 1 new phone, 1 new wllnes rm upgrd restrooms | $734,453 |
| Apr 3, 2018 | Completed final sign-off Apr 2018 | 150 California St | Pioneer Fire Inc. | suite 900. relocate 13 pendents and 8 uprights. gc permit # 201803012543Details
suite 900. relocate 13 pendents and 8 uprights. gc permit # 201803012543 | $12,964 |
| Mar 1, 2018 | Completed final sign-off Nov 2018 | 150 California St | Team Commercial Construction Inc. | partial remodel interior load bearing ptns, finishes, doors, reconstruct interior non bearing partitions, doors, finishes. relocated lighting, restroom upgrades, no ext work. no struct work. no hazardous matter. all mech/ele/life safety engineering fire sprinkler work are derfeered to design buildDetails
partial remodel interior load bearing ptns, finishes, doors, reconstruct interior non bearing partitions, doors, finishes. relocated lighting, restroom upgrades, no ext work. no struct work. no hazardous matter. all mech/ele/life safety engineering fire sprinkler work are derfeered to design build | $511,400 |
| Feb 9, 2018 | Never finaled issued Feb 2018, no final | 150 California St | Team Commercial Construction Inc. | #600: relocate and provide new supply air diffusers, return air grilles, thermostats and balance for new air flows. install new ductwork. ref app#201801199043. n/a for maherDetails
#600: relocate and provide new supply air diffusers, return air grilles, thermostats and balance for new air flows. install new ductwork. ref app#201801199043. n/a for maher | $3,214 |
| Feb 6, 2018 | Never finaled issued Feb 2018, no final | 150 California St | A S F Electric Inc | electrical revisions & title 24 electrical for ref 201801199043; n/a maherDetails
electrical revisions & title 24 electrical for ref 201801199043; n/a maher | $12,000 |
| Feb 5, 2018 | Completed final sign-off Feb 2018 | 150 California St | A S F Electric Inc | suite 600, installation & relocation of life safety devices, 3 new strobs, 1 new speaker, 2 strob relocates.Details
suite 600, installation & relocation of life safety devices, 3 new strobs, 1 new speaker, 2 strob relocates. | $15,000 |
| Jan 19, 2018 | Completed final sign-off Feb 2018 | 150 California St | Pioneer Fire Inc. | relocate 6 pendents, add 1 maher naDetails
relocate 6 pendents, add 1 maher na | $900 |
| Jan 19, 2018 | Completed final sign-off Aug 2018 | 150 California St | Team Commercial Construction Inc. | suite 600: 3231 sq ft office t.i. with non-load bearing walls. mep's on seperate permit. n/a for maherDetails
suite 600: 3231 sq ft office t.i. with non-load bearing walls. mep's on seperate permit. n/a for maher | $126,000 |
| Dec 21, 2017 | Completed final sign-off Jun 2018 | 150 California St | Acco Engineered Systems Inc. Dba Acco En | 1st floor: replace a 4.5 ton wshp with a 4ton wshp. maher n/aDetails
1st floor: replace a 4.5 ton wshp with a 4ton wshp. maher n/a | $37,502 |
| Dec 19, 2017 | Expired or cancelled cancelled Jan 2026 | 150 California St | Anderson, Rowe & Buckley, Inc. | fire sprinkler ti relocate 1 fire sprinkler head | $520 |
| Dec 19, 2017 | Never finaled issued Dec 2017, no final | 150 California St | Anderson, Rowe & Buckley, Inc. | fire sprinkler ti relocate 1 fire sprinkler head. arch. 201712126277. maher n/aDetails
fire sprinkler ti relocate 1 fire sprinkler head. arch. 201712126277. maher n/a | $520 |
| Dec 12, 2017 | Completed final sign-off Jan 2018 | 150 California St | Principal Builders Inc. | 14th floor - demolition of existing 80 sq ft breakroom & admin area to remove one partition, replace millwork, & ceiling. n/a maher ordinanceDetails
14th floor - demolition of existing 80 sq ft breakroom & admin area to remove one partition, replace millwork, & ceiling. n/a maher ordinance | $20,600 |
| Jun 23, 2017 | Never finaled issued Jun 2017, no final | 150 California St | C B F Inc | 17th floor - addition to existing life system, includes 1 strobe, 1 speaker. n/a maher ordinanceDetails
17th floor - addition to existing life system, includes 1 strobe, 1 speaker. n/a maher ordinance | $3,000 |
| Apr 14, 2017 | Completed final sign-off Jul 2017 | 150 California St | Capitol Electric Const | install one new relay module to release elevator lobby door locks.Details
install one new relay module to release elevator lobby door locks. | $3,500 |
| Mar 10, 2017 | Completed final sign-off Apr 2017 | 150 California St | Principal Builders Inc. | t-24 electrical to provide new lighting and power to 17th flr, ti ref pa 201612306307Details
t-24 electrical to provide new lighting and power to 17th flr, ti ref pa 201612306307 | $6,000 |
| Feb 22, 2017 | Completed final sign-off Mar 2017 | 150 California St | 17th flr: fire sprinkler relocate 3 sidewall. ref ti 2016-1230-6307Details
17th flr: fire sprinkler relocate 3 sidewall. ref ti 2016-1230-6307 | $1,000 | |
| Feb 21, 2017 | Completed final sign-off Mar 2017 | 150 California St | Principal Builders Inc. | 16th floor - revision to 201611303811 to indicate door hold opens on electrical plan per inspector commentDetails
16th floor - revision to 201611303811 to indicate door hold opens on electrical plan per inspector comment | |
| Feb 9, 2017 | Completed final sign-off Feb 2017 | 150 California St | Team Commercial Construction Inc. | remove existing partitions of 9th floor spec spaceDetails
remove existing partitions of 9th floor spec space | $38,540 |
| Feb 9, 2017 | Completed final sign-off Mar 2017 | 150 California St | Peacock Construction | 23rd flr: t-24 mechanical for work under:201611223335 maher naDetails
23rd flr: t-24 mechanical for work under:201611223335 maher na | $1,500 |
| Jan 27, 2017 | Completed final sign-off Mar 2017 | 150 California St | Peacock Construction | 23rd floor: t-24 electrical for work done under app#201611223335. n/a for maher.Details
23rd floor: t-24 electrical for work done under app#201611223335. n/a for maher. | |
| Dec 30, 2016 | Completed final sign-off Apr 2017 | 150 California St | Principal Builders Inc. | 17th full floor arch ti: partial demo of 3 interior non load bearing partitions, finishes, doors, construct 1 interior non load bearing partition & finishes, adjusted switching, restroom upgrade. all mep/fire/life safety work under sep permit. no new light fixtures no structural no hazmat maher naDetails
17th full floor arch ti: partial demo of 3 interior non load bearing partitions, finishes, doors, construct 1 interior non load bearing partition & finishes, adjusted switching, restroom upgrade. all mep/fire/life safety work under sep permit. no new light fixtures no structural no hazmat maher na | $121,000 |
| Dec 14, 2016 | Completed final sign-off Dec 2016 | 150 California St | Golden Gate Fire Protection Inc | fire sprinklers: relocate 5 pendent sprinklers on the 23rd floor for northgate t.i. maher naDetails
fire sprinklers: relocate 5 pendent sprinklers on the 23rd floor for northgate t.i. maher na | $1,500 |
| Dec 12, 2016 | Completed final sign-off Mar 2017 | 150 California St | Principal Builders Inc. | 16th floor: evacuation signage. n/a for maherDetails
16th floor: evacuation signage. n/a for maher | $1,200 |
| Nov 30, 2016 | Completed final sign-off Mar 2017 | 150 California St | Principal Builders Inc. | 16th floor: title 24 mechanical, electrical to install new exhaust fan, lighting and power, relocate diffusers and thermostats. please refer to app#2016-0831-6455. n/a maherDetails
16th floor: title 24 mechanical, electrical to install new exhaust fan, lighting and power, relocate diffusers and thermostats. please refer to app#2016-0831-6455. n/a maher | $180,000 |
| Nov 22, 2016 | Completed final sign-off Mar 2017 | 150 California St | Peacock Construction | 23rd flr: new interior partitions,. ceiling, light fixtures, doors and finishes. fire/life safety under sep permit. ref demo 201610261172 maher naDetails
23rd flr: new interior partitions,. ceiling, light fixtures, doors and finishes. fire/life safety under sep permit. ref demo 201610261172 maher na | $185,600 |
| Nov 9, 2016 | Completed final sign-off Dec 2016 | 150 California St | W. Bradley Electric | 16th floor: modifications to extg fire alarm system adding 9 devices. ref app#201608316455Details
16th floor: modifications to extg fire alarm system adding 9 devices. ref app#201608316455 | $5,000 |
| Nov 2, 2016 | Completed final sign-off Nov 2016 | 150 California St | Pribuss Engineering Inc | fire sprinkler t.i. under gc permit #201608316455 for the 16th floor. relocate 27 and add 1. total= 14,484.96Details
fire sprinkler t.i. under gc permit #201608316455 for the 16th floor. relocate 27 and add 1. total= 14,484.96 | $14,485 |
| Oct 26, 2016 | Completed final sign-off Mar 2017 | 150 California St | Peacock Construction | 23/f- demo only, demo of existing non-structural partitions, ceiling grid and tile, lighting and finishes per ab-017. n/a ordinance #155-13Details
23/f- demo only, demo of existing non-structural partitions, ceiling grid and tile, lighting and finishes per ab-017. n/a ordinance #155-13 | $15,500 |
| Aug 31, 2016 | Completed final sign-off Dec 2016 | 150 California St | Principal Builders Inc. | interior impr. demo extg non-load bearing partitions, clg grids & tiles lighting & finishes. nw const. includes nw interior partitions, cldg & lighting fixtures, casework & nw doors & finishes. fire life safety, fire sprinkler & mep eng are deferred submittals. no exterior work,hazmat, &Details
interior impr. demo extg non-load bearing partitions, clg grids & tiles lighting & finishes. nw const. includes nw interior partitions, cldg & lighting fixtures, casework & nw doors & finishes. fire life safety, fire sprinkler & mep eng are deferred submittals. no exterior work,hazmat, & | $682,600 |
| Aug 16, 2016 | Completed final sign-off Feb 2017 | 150 California St | Acco Engineered Systems Inc. Dba Acco En | 1/f- install one(1) new heat pump for supplemental cooling. n/a ordinance #155-13Details
1/f- install one(1) new heat pump for supplemental cooling. n/a ordinance #155-13 | $30,000 |
| Jul 29, 2016 | Never finaled issued Dec 2016, no final | 150 California St | Capitol Electric Const | 10th floor: this project involves addition of selected power outlets for new tenant equipment. no change to lighting fixtures or controls. no change to partitions or (e) for the tenant space. maher naDetails
10th floor: this project involves addition of selected power outlets for new tenant equipment. no change to lighting fixtures or controls. no change to partitions or (e) for the tenant space. maher na | $18,000 |
| Nov 13, 2015 | Completed final sign-off Apr 2016 | 150 California St | Richlen Construction | 18th floor: mechanical work-modification of (e) hvac systems-addition of vav box w/controls air balance. building pa 2015-1002-8676. maher naDetails
18th floor: mechanical work-modification of (e) hvac systems-addition of vav box w/controls air balance. building pa 2015-1002-8676. maher na | $12,000 |
| Oct 28, 2015 | Completed final sign-off Apr 2016 | 150 California St | Ayoob & Peery Plumbing Co Inc | 18th floor, t.i: add 2, relocate 4 sprinklers to conform to the new ceiling/wall layout. ref pa 2015-1002-8676Details
18th floor, t.i: add 2, relocate 4 sprinklers to conform to the new ceiling/wall layout. ref pa 2015-1002-8676 | $2,000 |
| Oct 2, 2015 | Completed final sign-off Apr 2016 | 150 California St | Richlen Construction | tenant improvement on floor 18, included drywall, doors, finishes. mech and elec under separate permit. maher n/aDetails
tenant improvement on floor 18, included drywall, doors, finishes. mech and elec under separate permit. maher n/a | $200,000 |
| Aug 12, 2015 | Completed final sign-off Oct 2015 | 150 California St | Team Commercial Construction Inc. | suite #275: consturction of alum. and glass non load bearing partition, install laminate flooring and casework per plan. maher n/a.Details
suite #275: consturction of alum. and glass non load bearing partition, install laminate flooring and casework per plan. maher n/a. | $18,000 |
| Jun 2, 2015 | Completed final sign-off Aug 2015 | 150 California St | Ayoob & Peery Plumbing Co Inc | 12th flr: relocate 56 sprinklers. plugged 7 sprinklers and add 6. ref pa 2015 0116 5911 maher naDetails
12th flr: relocate 56 sprinklers. plugged 7 sprinklers and add 6. ref pa 2015 0116 5911 maher na | $31,868 |
| May 19, 2015 | Completed final sign-off Sep 2015 | 150 California St | Field Construction Inc. | 5th flr/suite 500: ti - demo and construction of partitionas, new floor, wall and ceiling finishes. relocated lighting and switches, restroom upgrades. maher naDetails
5th flr/suite 500: ti - demo and construction of partitionas, new floor, wall and ceiling finishes. relocated lighting and switches, restroom upgrades. maher na | $100,000 |
| Apr 10, 2015 | Completed final sign-off Jun 2015 | 150 California St | Team Commercial Construction Inc. | interior office t.i. mechanical and electrical work. ref app#201501095292. n/a for the maher.Details
interior office t.i. mechanical and electrical work. ref app#201501095292. n/a for the maher. | $78,000 |
| Mar 26, 2015 | Completed final sign-off Apr 2015 | 150 California St | Capitol Electric Const | 13th fl: install 9 new strobes and 5 new speakers; relocate 4 existing speakers. t.i. pa# 201501165911. n/a ordinance #155-13Details
13th fl: install 9 new strobes and 5 new speakers; relocate 4 existing speakers. t.i. pa# 201501165911. n/a ordinance #155-13 | $6,537 |
| Mar 26, 2015 | Completed final sign-off Apr 2015 | 150 California St | Capitol Electric Const | 19th fl: install 1 smoke detector, 5 strobes, 2 speakers & 2 door holders; relocate 3 speakers and 2 strobes. t.i. pa# 2015-0109-5292. n/a ordinance #155-13.Details
19th fl: install 1 smoke detector, 5 strobes, 2 speakers & 2 door holders; relocate 3 speakers and 2 strobes. t.i. pa# 2015-0109-5292. n/a ordinance #155-13. | $7,000 |
| Mar 26, 2015 | Completed final sign-off Sep 2015 | 150 California St | Capitol Electric Const | install 9 strobes, 6 speakers. relocate 2 speakers.t.i. pa# 201501165911. n/a ordinance #155-13Details
install 9 strobes, 6 speakers. relocate 2 speakers.t.i. pa# 201501165911. n/a ordinance #155-13 | $6,722 |
| Feb 23, 2015 | Completed final sign-off Apr 2015 | 150 California St | Ayoob & Peery Plumbing Co Inc | 13th floor fire sprinklers - add 2 & relcoate 58 sprinklers to conform w/new wall/ceiling layout. ref pa #2015.0116.5911. n/a maher ordinanceDetails
13th floor fire sprinklers - add 2 & relcoate 58 sprinklers to conform w/new wall/ceiling layout. ref pa #2015.0116.5911. n/a maher ordinance | $30,840 |
| Feb 18, 2015 | Completed final sign-off Mar 2015 | 150 California St | Pioneer Fire Inc. | suite 1900: remodel consisting of 25 relocated pendents and 10 removed pendents t.i. #201501095292 n/a for the maher.Details
suite 1900: remodel consisting of 25 relocated pendents and 10 removed pendents t.i. #201501095292 n/a for the maher. | $8,246 |
| Jan 16, 2015 | Completed final sign-off May 2015 | 150 California St | Team Commercial Construction Inc. | remove extg interior one story non egress communicating stair from between the 18th and 19th floors. infill concrete and steel pan deck to form a 2 hour seperation. n/a for the maher.Details
remove extg interior one story non egress communicating stair from between the 18th and 19th floors. infill concrete and steel pan deck to form a 2 hour seperation. n/a for the maher. | $78,000 |
| Jan 16, 2015 | Never finaled issued Feb 2015, no final | 150 California St | Swinerton Builders | ti 12th and 13th floor: this includes new drywall partitions, finishes and mep. n/a for maher. sprinklers and fire alarm separate permitsDetails
ti 12th and 13th floor: this includes new drywall partitions, finishes and mep. n/a for maher. sprinklers and fire alarm separate permits | $850,000 |
| Jan 9, 2015 | Completed final sign-off Jun 2015 | 150 California St | Team Commercial Construction Inc. | interior office ti. remove existing partitons, fixtures, finishes. 19th fl fire/ls, mep sep permitDetails
interior office ti. remove existing partitons, fixtures, finishes. 19th fl fire/ls, mep sep permit | $185,000 |
| Jan 8, 2015 | Completed final sign-off Aug 2015 | 150 California St | Swinerton Builders | demo of existing office space and prep for a future office buildout per ab-017; maher n/aDetails
demo of existing office space and prep for a future office buildout per ab-017; maher n/a | $50,000 |
| Aug 29, 2014 | Completed final sign-off Sep 2014 | 150 California St | H & M Fire Protection, Inc. | relocate (3) three fire sprinklers on 7th flr h&m job #14023 (ref. ti 201406309928); na/ maher ordinance 3 155-13Details
relocate (3) three fire sprinklers on 7th flr h&m job #14023 (ref. ti 201406309928); na/ maher ordinance 3 155-13 | $2,500 |
| Aug 7, 2014 | Completed final sign-off Aug 2014 | 150 California St | Pioneer Fire Inc. | 8th floor relocate 6 pendent fire sprinkler. ref. appl. 2014.0627.9692. maher n/a.Details
8th floor relocate 6 pendent fire sprinkler. ref. appl. 2014.0627.9692. maher n/a. | $3,800 |
| Jul 17, 2014 | Completed final sign-off Nov 2014 | 150 California St | Capitol Electric Const | ste #800 and 850: installation of 9 new ceiling speakers and 7 new strobes. relocation of 6 existing strobes/speaker-strobes.t.i. under seperate permit 201406279692. maher n/aDetails
ste #800 and 850: installation of 9 new ceiling speakers and 7 new strobes. relocation of 6 existing strobes/speaker-strobes.t.i. under seperate permit 201406279692. maher n/a | $15,497 |
| Jun 30, 2014 | Completed final sign-off Nov 2014 | 150 California St | Charles Pankow Builders Ltd | interior renovation of (e) commercial office space including expanded work area, ceiling modifications, lighting, mechanical and related partitions. relocation of one door. accessibility upgrades to existing men's and women's restrooms.Details
interior renovation of (e) commercial office space including expanded work area, ceiling modifications, lighting, mechanical and related partitions. relocation of one door. accessibility upgrades to existing men's and women's restrooms. | $80,000 |
| Jun 30, 2014 | Never finaled issued Jun 2014, no final | 150 California St | Acco Engineered Systems Inc. Dba Acco En | re-route duct work. reference architecture pa #2014-0630-2298.Details
re-route duct work. reference architecture pa #2014-0630-2298. | $7,100 |
| Jun 27, 2014 | Completed final sign-off Dec 2014 | 150 California St | Team Commercial Construction Inc. | office ti separate 1 suite into 2 including common area inclding mech, elec, lighting maher not requiredDetails
office ti separate 1 suite into 2 including common area inclding mech, elec, lighting maher not required | $305,000 |
| Jan 27, 2014 | Completed final sign-off Jun 2016 | 150 California St | Gci, Inc | demolition and construction of non structural partitions finishes, minor electrical work. compliance with ordinace #155-13 not required.Details
demolition and construction of non structural partitions finishes, minor electrical work. compliance with ordinace #155-13 not required. | $100,000 |
| Oct 15, 2013 | Completed final sign-off Feb 2014 | 150 California St | Ward Alan Emery Construction Inc. | 15/f- demo of non structural partitions, construction of ceiling height partitions. rework of grid ceiling and tile. fixture lighting relocate.Details
15/f- demo of non structural partitions, construction of ceiling height partitions. rework of grid ceiling and tile. fixture lighting relocate. | $35,000 |
| Jan 16, 2013 | Never finaled issued Jan 2013, no final | 150 California St | Gci, Inc | modifications to suite 450, demolition of partitions, patching, finishes & electrical.Details
modifications to suite 450, demolition of partitions, patching, finishes & electrical. | $20,000 |
| Oct 24, 2012 | Completed final sign-off Oct 2012 | 150 California St | Mc Millan Electric | fire alarm t.i. - relocate 6 strobes, 4 speakers. 1 new smoke detector, 2 new strobesDetails
fire alarm t.i. - relocate 6 strobes, 4 speakers. 1 new smoke detector, 2 new strobes | $7,200 |
| Oct 11, 2012 | Completed final sign-off Jan 2013 | 150 California St | Principal Builders Inc. | 21st floor:demolition of interior non structural partitions. new non structural partition and finishes. sprinklers under separate permitDetails
21st floor:demolition of interior non structural partitions. new non structural partition and finishes. sprinklers under separate permit | $58,000 |
| Sep 14, 2012 | Never finaled issued Sep 2012, no final | 150 California St | Team Commercial Construction Inc. | 2/fl, suite 200 - provide lighting for ti for 1878 sf of common area. add vav for conference rm. add exhaust fan and grill to telcom rm, add/relocate ceilingsupply and return diffusers per new layout. add 1 tstat for new vav relocate e t-stats for new layout arch 2012-08-03-6474.Details
2/fl, suite 200 - provide lighting for ti for 1878 sf of common area. add vav for conference rm. add exhaust fan and grill to telcom rm, add/relocate ceilingsupply and return diffusers per new layout. add 1 tstat for new vav relocate e t-stats for new layout arch 2012-08-03-6474. | $20,364 |
| Aug 22, 2012 | Completed final sign-off Oct 2012 | 150 California St | Pioneer Fire Inc. | suite #200-relocate & add 12 fire sprinklers to accomodate new build out.Details
suite #200-relocate & add 12 fire sprinklers to accomodate new build out. | $5,500 |
| Aug 3, 2012 | Completed final sign-off Oct 2012 | 150 California St | Team Commercial Construction Inc. | work in unit #200: construction of new partitions, doors, frames, glazing. relocate existing lighting, ceiling grid, tile to remain. mep to separate permitDetails
work in unit #200: construction of new partitions, doors, frames, glazing. relocate existing lighting, ceiling grid, tile to remain. mep to separate permit | $138,000 |
| May 7, 2012 | Completed final sign-off Jun 2012 | 150 California St | Swinerton Builders | replace existing walk up atm with new atm and surround in same locationDetails
replace existing walk up atm with new atm and surround in same location | $7,000 |
| Mar 30, 2012 | Completed final sign-off Apr 2012 | 150 California St | Metropolitan Electrical Construction | 11 wall strobe lights, 1 ceiling speaker strobes, 11 ceiling speakers, 1 smoke detectors. remodel on 4th fl. all devices connected onto life safety systemDetails
11 wall strobe lights, 1 ceiling speaker strobes, 11 ceiling speakers, 1 smoke detectors. remodel on 4th fl. all devices connected onto life safety system | $13,500 |
| Mar 23, 2012 | Never finaled issued Mar 2012, no final | 150 California St | street space with meters | ||
| Mar 19, 2012 | Completed final sign-off Apr 2012 | 150 California St | Pribuss Engineering Inc | relocate 5 sprinklers x 514.62=2573Details
relocate 5 sprinklers x 514.62=2573 | $2,573 |
| Feb 29, 2012 | Completed final sign-off Apr 2012 | 150 California St | Bcci Construction Company | divide 3 offices in existing full floor tenant suite. limited demo of sidelights, new partition and finishes, door, frame, glazing. minor adjustment to ceiling grid and relocate existing lights. relocate existing supply and return mech grilles.Details
divide 3 offices in existing full floor tenant suite. limited demo of sidelights, new partition and finishes, door, frame, glazing. minor adjustment to ceiling grid and relocate existing lights. relocate existing supply and return mech grilles. | $44,500 |
| Feb 6, 2012 | Completed final sign-off Aug 2012 | 150 California St | Pioneer Fire Inc. | 4th floor suite 400 - relocate 20 fire sprinklers, add 2 fire parinklers pendent, add 2 fire sprinklers upright.Details
4th floor suite 400 - relocate 20 fire sprinklers, add 2 fire parinklers pendent, add 2 fire sprinklers upright. | $8,500 |
| Jan 24, 2012 | Completed final sign-off Feb 2012 | 150 California St | Metropolitan Electrical Construction | 5th floor suite #575.install 2 new speakers. install 2 new strobes.Details
5th floor suite #575.install 2 new speakers. install 2 new strobes. | $6,200 |
| Dec 22, 2011 | Completed final sign-off Aug 2012 | 150 California St | Gci, Inc | project improvement involves modifications to suite 400 on the 4th floor at 150 california st, new partitions, doors, frames, glazing, casework, lighting, mechanical, electrical, plumbing, and finishesDetails
project improvement involves modifications to suite 400 on the 4th floor at 150 california st, new partitions, doors, frames, glazing, casework, lighting, mechanical, electrical, plumbing, and finishes | $326,000 |
| Dec 16, 2011 | Completed final sign-off Feb 2012 | 150 California St | Richlen Construction | 11th floor-improvements include construction of new partitions, doors, frames & glazing. mechanical, electrical & life safety work to be done under seperate permitsDetails
11th floor-improvements include construction of new partitions, doors, frames & glazing. mechanical, electrical & life safety work to be done under seperate permits | $38,750 |
| Dec 9, 2011 | Completed final sign-off Feb 2012 | 150 California St | Pioneer Fire Inc. | suite 575- relocate 5 pendent sprinklersDetails
suite 575- relocate 5 pendent sprinklers | $2,500 |
| Oct 28, 2011 | Completed final sign-off Feb 2012 | 150 California St | Richlen Construction | 5th floor-t.i. construction of partitions, breakroom, conference room & minor bathroom upgrades(electrical under separate permit; mech & fire sprinkler & plumb separate permit)Details
5th floor-t.i. construction of partitions, breakroom, conference room & minor bathroom upgrades(electrical under separate permit; mech & fire sprinkler & plumb separate permit) | $187,000 |
| Jul 25, 2011 | Completed final sign-off Sep 2011 | 150 California St | Anderson, Rowe & Buckley, Inc. | 14th floor-tenant improvements to (e) fire sprinkler system-2 added sprinkler.Details
14th floor-tenant improvements to (e) fire sprinkler system-2 added sprinkler. | $1,000 |
| Jul 25, 2011 | Completed final sign-off Nov 2011 | 150 California St | Swinerton Builders | new teller line on gr level and mezzanine for (e) bank.Details
new teller line on gr level and mezzanine for (e) bank. | $150,000 |
| Jun 23, 2011 | Completed final sign-off Aug 2011 | 150 California St | Principal Builders Inc. | 14th floor: addition of new conference room. no change to existing lighting or new lights. no mech or hvac work. new non structural partitions only. life safety/sprinklers sep permit.Details
14th floor: addition of new conference room. no change to existing lighting or new lights. no mech or hvac work. new non structural partitions only. life safety/sprinklers sep permit. | $15,000 |
| Apr 15, 2011 | Completed final sign-off Jun 2011 | 150 California St | Richlen Construction | 6th floor #650 tenant improvement including construction of partitions for (2) new offices.Details
6th floor #650 tenant improvement including construction of partitions for (2) new offices. | $17,000 |
| Apr 15, 2011 | Completed final sign-off May 2011 | 150 California St | Metropolitan Electrical Construction | 11th floor-install 4 speakers & 4 strobes, install 1 smoke detectorDetails
11th floor-install 4 speakers & 4 strobes, install 1 smoke detector | $4,200 |
| Mar 23, 2011 | Completed final sign-off May 2011 | 150 California St | Richlen Construction | #1150- mechanical and electrical for spec suite ti including new and relocated lights, new vav,duct work. (arch 201102170468)Details
#1150- mechanical and electrical for spec suite ti including new and relocated lights, new vav,duct work. (arch 201102170468) | $180,000 |
| Mar 10, 2011 | Completed final sign-off Apr 2011 | 150 California St | Pioneer Fire Inc. | relocate 2 fire sprinklers. remove 1 fire sprinklerDetails
relocate 2 fire sprinklers. remove 1 fire sprinkler | $1,000 |
| Feb 17, 2011 | Completed final sign-off May 2011 | 150 California St | Richlen Construction | unit 1150:tenant improvement including demo and construction of partitions, new ceiling,relocate lights. mech,elect under separate permit. fire sprinkler/alarm under seperate permit.Details
unit 1150:tenant improvement including demo and construction of partitions, new ceiling,relocate lights. mech,elect under separate permit. fire sprinkler/alarm under seperate permit. | $180,000 |
| Jan 20, 2011 | Completed final sign-off Feb 2011 | 150 California St | Mayta & Jensen | 18th floor-revision to mech pa# 2010-1119-5343 & arch pa# 2010-1112-4775, consolidate equipment & function on one plan. note: fire alarm work shown on plans must be submitted under separate fire alarm permit/plans.Details
18th floor-revision to mech pa# 2010-1119-5343 & arch pa# 2010-1112-4775, consolidate equipment & function on one plan. note: fire alarm work shown on plans must be submitted under separate fire alarm permit/plans. | |
| Jan 19, 2011 | Completed final sign-off Feb 2011 | 150 California St | Metropolitan Electrical Construction | install 1 smoke detector, 1 strobes, 3 modules. all work on 18th floorDetails
install 1 smoke detector, 1 strobes, 3 modules. all work on 18th floor | $7,200 |
| Jan 14, 2011 | Completed final sign-off Feb 2011 | 150 California St | Ayoob & Peery Plumbing Co Inc | 18th floor:install new pre action system and fire sprinkler heads per tenant improvements. 2 sprinkler heads.Details
18th floor:install new pre action system and fire sprinkler heads per tenant improvements. 2 sprinkler heads. | $9,500 |
| Dec 28, 2010 | Completed final sign-off Feb 2011 | 150 California St | Contra Costa Electric Inc | modification to existing life safety system due to tenant improvements consisting of 7 strobes and 6 speakersDetails
modification to existing life safety system due to tenant improvements consisting of 7 strobes and 6 speakers | $9,000 |
| Dec 23, 2010 | Completed final sign-off Feb 2011 | 150 California St | Intelligent Technologies & Services Inc | install new fm200 system and provide pre-action detection for the 18th floor equipment roomDetails
install new fm200 system and provide pre-action detection for the 18th floor equipment room | $9,700 |
| Dec 23, 2010 | Completed final sign-off Mar 2011 | 150 California St | Anderson, Rowe & Buckley, Inc. | 4th flr: office ti to (e) fire sprinkler system. one relocated sprinkler, 3 added sprinklersDetails
4th flr: office ti to (e) fire sprinkler system. one relocated sprinkler, 3 added sprinklers | $2,000 |
| Dec 9, 2010 | Completed final sign-off Mar 2011 | 150 California St | Gci, Inc | tenant improvement to extg 4th floor lobby/corridor to demo partitions and demo and construct ceiling grid and tile, light fixtures,doors framed and finishes, mep/ls/sp to done under separate permit.Details
tenant improvement to extg 4th floor lobby/corridor to demo partitions and demo and construct ceiling grid and tile, light fixtures,doors framed and finishes, mep/ls/sp to done under separate permit. | $70,000 |
| Dec 7, 2010 | Completed final sign-off Feb 2011 | 150 California St | Anderson, Rowe & Buckley, Inc. | 20th fl. relocate 6 fire sprinklers in existing systemDetails
20th fl. relocate 6 fire sprinklers in existing system | $3,000 |
| Dec 7, 2010 | Completed final sign-off Feb 2011 | 150 California St | Bcci Construction Company | mechanical and electrical work associated with approved app#201011175115Details
mechanical and electrical work associated with approved app#201011175115 | $25,000 |
| Nov 23, 2010 | Completed final sign-off Mar 2011 | 150 California St | Mc Millan Electric | suite 650: install 2-ceiling speakers, 4-strobes.Details
suite 650: install 2-ceiling speakers, 4-strobes. | $4,500 |
| Nov 19, 2010 | Completed final sign-off Feb 2011 | 150 California St | Mayta & Jensen | upgrade the existing hvac for the new equipment room. pe rovide new ac and fire protection. pa# 2010.11.12.4775 for referenceDetails
upgrade the existing hvac for the new equipment room. pe rovide new ac and fire protection. pa# 2010.11.12.4775 for reference | $70,000 |
| Nov 17, 2010 | Completed final sign-off Feb 2011 | 150 California St | Bcci Construction Company | tenant improvement on the 20th fl including minor demo, new partitions, ceiling and finishes. mechanical, elec, ls, sprinklers under sep permitDetails
tenant improvement on the 20th fl including minor demo, new partitions, ceiling and finishes. mechanical, elec, ls, sprinklers under sep permit | $210,000 |
| Nov 16, 2010 | Completed final sign-off Mar 2011 | 150 California St | Richlen Construction | mechanical& electrical title 24 for tenant improvement. architectural under permit 2010 1007 2515Details
mechanical& electrical title 24 for tenant improvement. architectural under permit 2010 1007 2515 | $35,000 |
| Nov 12, 2010 | Completed final sign-off Feb 2011 | 150 California St | Mayta & Jensen | 18th floor - convert the existing file room & copy area into a new equipment room with server racks & support devices. upgrade room to 1 hour construction, security, air conditioning & fire protection. fire alarm, sprinkler, and mep under separate permit.Details
18th floor - convert the existing file room & copy area into a new equipment room with server racks & support devices. upgrade room to 1 hour construction, security, air conditioning & fire protection. fire alarm, sprinkler, and mep under separate permit. | $18,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Team Commercial Construction Inc. (44), Pioneer Fire Inc. (23), Capitol Electric Const (20), Mayco Commercial Construction Inc (17), Principal Builders Inc. (10), Richlen Construction (8), Rapid Fire Safety&Security Llc Dba Pafa (7), Gci, Inc (6), Anderson, Rowe & Buckley, Inc. (5), Bcci Construction Company (5), Acco Engineered Systems Inc. Dba Acco En (4), Ayoob & Peery Plumbing Co Inc (4), Golden Gate Fire Protection Inc (4), Metropolitan Electrical Construction (4), Peacock Construction (4), Swinerton Builders (4), Mayta & Jensen (3), Pribuss Engineering Inc (3), A S F Electric Inc (2), Mc Millan Electric (2), Source Planning And Construction Inc (2), A-1 Modular Inc, American Builders Company Inc, C B F Inc, Charles Pankow Builders Ltd, Clune Construction Company L P, Contra Costa Electric Inc, Field Construction Inc., H & M Fire Protection, Inc., Intelligent Technologies & Services Inc, M C S Construction Services, Matrix Hg Inc, Pacific Auxiliary Fire Alarm, Prima Acquire Inc Dba Lahue And Associat, W. Bradley Electric, Ward Alan Emery Construction Inc.
- Architects
- Lawrence Smith (8), George D. Soskin (6), Joyce Polhamus (5), Breck Polley (4), Aston Pereira (2), Jessica Fairchild (2), John Long (2), Kathrine Dwyer (2), Nicholas Brereton (2), Richard Y S Liu (2), Anthony Cataldo, Capital Electric, David Pugh, Douglas Zucker, Guion Chilldress, Jason A. Stoikoff, Nicolas S. Detorres, Robert Wood, Steven Drucker, Tim Murphy, William Diefenbach
- Engineers
- Levi Malabuyo (7), Alexander Joseph Pacheco (5), Dennis Cheung (5), Julian White (4), George L Arellano (3), Xuong Quach (2), Aaron Strauch, Craig Laws, Edward Rivera, Eric Witthaus, Glenn Alan Friedman, Henry Holbrook Hyde Iii, Lindsay M Marion, Matthew Pyon, Shea Culbertson, Sherry Chaumpluke, Stephen Shaffer
- Authorized agents
- Mike Pond (4), Zhan Hang Xue (2), Alexander Joseph Pacheco, Fred Maguire, Lawrence Smith
- Designers
- Bernard Poggetti, Pioneer Fire Protection
- Pmt consultant/expediters
- Andrew Erickson
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.