Nicholas Detorres
- Listed as
- architect, designer
- Firm
- Ware Malcomb
- Based in
- San Francisco
- On San Francisco permits
- May 2016 to Jul 2026
56 permits since 2000 (architect on 55 permits, designer on 1 permit): 47 completed, 1 in progress, 4 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 31, 2026 | In progress filed Jul 2026, not yet issued | 4397 24th St | interior renovation of 2nd floor and attic, 676 sq ft of attic space to be remodeled into useable space into 2nd fl unit. new interior roof dormers facing east and west on building per exterior elevations total of remodel is 1936 sq ftDetails
interior renovation of 2nd floor and attic, 676 sq ft of attic space to be remodeled into useable space into 2nd fl unit. new interior roof dormers facing east and west on building per exterior elevations total of remodel is 1936 sq ft | $175,000 | |
| Apr 25, 2022 | Completed final sign-off Nov 2022 | 50 California St | Principal Builders Inc. | 23rd fl: t.i. work includes non-structural renovations of partitions, flooring, ceilings, doors, fixtures, and finishes. mep deferred.Details
23rd fl: t.i. work includes non-structural renovations of partitions, flooring, ceilings, doors, fixtures, and finishes. mep deferred. | $1,600,000 |
| Nov 19, 2021 | Expired or cancelled withdrawn Jul 2026 | 4397 24th St | interior renovation of 2nd fl and attic of 2 story muliti family residential building. 676 sf of attic space to be remodeled into usable space of 2nd fl. addition of exterior roof dormers facing east and west on buildingDetails
interior renovation of 2nd fl and attic of 2 story muliti family residential building. 676 sf of attic space to be remodeled into usable space of 2nd fl. addition of exterior roof dormers facing east and west on building | $175,000 | |
| Dec 12, 2019 | Never finaled issued Dec 2019, no final | 425 Market St | Richlen Construction | revision to pa#2019-0903-0426: for lighting title 24 changes and finish changesDetails
revision to pa#2019-0903-0426: for lighting title 24 changes and finish changes | |
| Dec 10, 2019 | Completed final sign-off Jun 2020 | 33 New Montgomery St | Rudolph Commercial Interiors Inc, Rci | scope includes demo of (e) demising wall, partitions, doors, millwork, ceiling, power, lighting, and finishes. standard ti improvements (non-structural) including new partitions, doors & hardware, glizing, power, ceiling, lighting, finishes and millwork. update of 2rd flr men & women restroomsDetails
scope includes demo of (e) demising wall, partitions, doors, millwork, ceiling, power, lighting, and finishes. standard ti improvements (non-structural) including new partitions, doors & hardware, glizing, power, ceiling, lighting, finishes and millwork. update of 2rd flr men & women restrooms | $166,157 |
| Dec 10, 2019 | Completed final sign-off Mar 2021 | 575 Market St | M C S Construction Services | common areas and restrooms which includes removing and adding new finishes to the common areas and upgrading the restrooms to comple with codeDetails
common areas and restrooms which includes removing and adding new finishes to the common areas and upgrading the restrooms to comple with code | $16,157 |
| Aug 26, 2019 | Completed final sign-off Feb 2020 | 100 Pine St | Rossi Builders Inc. | suite #2900: the scope of work inlcludes non-load bearing partition sidelight, power portion of ceiling grid and tile. new non load bearing interior partition, lighting, power and finishes. mep will be deffered. n/a for maherDetails
suite #2900: the scope of work inlcludes non-load bearing partition sidelight, power portion of ceiling grid and tile. new non load bearing interior partition, lighting, power and finishes. mep will be deffered. n/a for maher | $690,000 |
| Aug 20, 2019 | Completed final sign-off Jan 2020 | 575 Market St | Field Construction Inc. | demo of 3 phone rooms (non loade bearing partitions), miner ceiling, light fixtures and finishes. 6 new offices (non load bearing, non rted partitions) new cewiling/grid tile, lighting fixtures, power signal and finishesDetails
demo of 3 phone rooms (non loade bearing partitions), miner ceiling, light fixtures and finishes. 6 new offices (non load bearing, non rted partitions) new cewiling/grid tile, lighting fixtures, power signal and finishes | $150,000 |
| Jul 26, 2019 | Completed final sign-off Mar 2020 | 149 New Montgomery St | Whitney Commercial Construction | suite #201: minimal wall ceiling alteration, power and data adjusted as appropriate.Details
suite #201: minimal wall ceiling alteration, power and data adjusted as appropriate. | $100,000 |
| Jul 23, 2019 | Expired or cancelled cancelled Jan 2026 | 149 New Montgomery St | 2nd flr. minimal wall ceiling alteration, power and data adjusted as appropriateDetails
2nd flr. minimal wall ceiling alteration, power and data adjusted as appropriate | $120,000 | |
| Jun 7, 2019 | Completed final sign-off Mar 2020 | 33 New Montgomery St | Peacock Construction | 8th flr, suite 850. demo 5 rooms, power & relocate light fixtures, 2 (n) connference rm's and 1 phone rm. non-load bearing parititions & finshes. upgrade restrooms. mep's deferred.Details
8th flr, suite 850. demo 5 rooms, power & relocate light fixtures, 2 (n) connference rm's and 1 phone rm. non-load bearing parititions & finshes. upgrade restrooms. mep's deferred. | $382,000 |
| May 20, 2019 | Completed final sign-off Aug 2020 | 33 New Montgomery St | Peacock Construction | 2nd fl: expansion of extg suite #220: includes demo of extg wall, door, millwork, ceiling, glazing,power, ltg, plmg, & finishes. standard t.i. non structural including nw walls, doors, glazing, power, plmg, ceiling, ltg, finishes, & millwork. update 2nd fl. men's/women's restroom. to comply 2016 cbcDetails
2nd fl: expansion of extg suite #220: includes demo of extg wall, door, millwork, ceiling, glazing,power, ltg, plmg, & finishes. standard t.i. non structural including nw walls, doors, glazing, power, plmg, ceiling, ltg, finishes, & millwork. update 2nd fl. men's/women's restroom. to comply 2016 cbc | $488,920 |
| Mar 27, 2019 | Completed final sign-off Jul 2020 | 180 Sansome St | Peacock Construction | demo of finishes & millwork of (e) 1st flr lobby. new construction consists of providing new finishes, new millwork and new electDetails
demo of finishes & millwork of (e) 1st flr lobby. new construction consists of providing new finishes, new millwork and new elect | $200,000 |
| Mar 26, 2019 | Completed final sign-off Jan 2020 | 300 California St | D A Pope Inc | 1/f: demo of an (e) non-structural mezzanine. terminate all ele back to source. no structural work assocated with scope. fire/life safety/ele under sep permit. maher n/a.Details
1/f: demo of an (e) non-structural mezzanine. terminate all ele back to source. no structural work assocated with scope. fire/life safety/ele under sep permit. maher n/a. | $50,000 |
| Dec 28, 2018 | Completed final sign-off Apr 2019 | 33 New Montgomery St | Peacock Construction | 9th flr - demo & construction of non structural partitions, millwork, ele, glazing, doors, ceiling grid and tile, lighting & finishes. new work constist of non-structurual interior partitions, doors, glazing, electrivcal,ceilings til and grib, millwork, lighting and finishes.Details
9th flr - demo & construction of non structural partitions, millwork, ele, glazing, doors, ceiling grid and tile, lighting & finishes. new work constist of non-structurual interior partitions, doors, glazing, electrivcal,ceilings til and grib, millwork, lighting and finishes. | $275,000 |
| Dec 21, 2018 | Expired or cancelled cancelled Jan 2026 | 240 Stockton St | scope of project includes demo of interior non structural partitons, doors,frames, hardware, acoustical ceiling tile, and grid, lighting, elec, plumbing, millwork and finishes. new consturction consistist of interior non structural partitons, doors, frames, glazing, plumbing, lighting, lec, ceiling,Details
scope of project includes demo of interior non structural partitons, doors,frames, hardware, acoustical ceiling tile, and grid, lighting, elec, plumbing, millwork and finishes. new consturction consistist of interior non structural partitons, doors, frames, glazing, plumbing, lighting, lec, ceiling, | $500,000 | |
| Oct 19, 2018 | Completed final sign-off Nov 2019 | 201 California St | Peacock Construction | 9th fl - demo of common area, elevator, lobby and restrooms for new finishes and lighting; 12th fl - demo of common area and elevator lobby for new finishes and lightingDetails
9th fl - demo of common area, elevator, lobby and restrooms for new finishes and lighting; 12th fl - demo of common area and elevator lobby for new finishes and lighting | $137,564 |
| Oct 19, 2018 | Completed final sign-off Mar 2019 | 201 California St | Peacock Construction | sute 1530, 15th fl - selective demo and new construction of interior partitions, glazing, doors/frames, lighting, power. no structural workDetails
sute 1530, 15th fl - selective demo and new construction of interior partitions, glazing, doors/frames, lighting, power. no structural work | $225,000 |
| Oct 11, 2018 | Completed final sign-off Oct 2018 | 240 Stockton St | Rudolph And Sletten Inc | 4th fl, ste 400 revision to 2018-0320-4096 plumbing inspector wanted note on page a6.1 detail 3 in recordDetails
4th fl, ste 400 revision to 2018-0320-4096 plumbing inspector wanted note on page a6.1 detail 3 in record | |
| Jul 26, 2018 | Completed final sign-off Jan 2019 | 33 New Montgomery St | Peacock Construction | 10/f suite 1000: project is a second generation t.i. including demo of non-bearning walls, millwork, finishes & portion of cooridor, also new interior partitions, glazing, door/frames, lighting, power,Details
10/f suite 1000: project is a second generation t.i. including demo of non-bearning walls, millwork, finishes & portion of cooridor, also new interior partitions, glazing, door/frames, lighting, power, | $500,000 |
| Jul 25, 2018 | Completed final sign-off Jan 2019 | 33 New Montgomery St | Peacock Construction | 9th fl ; suite 950- remodel of an existing vacant suite. demo includes wall, doors, frmaes, ceiling & lighting of the common corridor for reconfiguration. new non-structure interior walls, door, frames glaze, millwork, plumbing, electrical, ceiling, light fixtures & finishesDetails
9th fl ; suite 950- remodel of an existing vacant suite. demo includes wall, doors, frmaes, ceiling & lighting of the common corridor for reconfiguration. new non-structure interior walls, door, frames glaze, millwork, plumbing, electrical, ceiling, light fixtures & finishes | $715,200 |
| Jul 23, 2018 | Completed final sign-off Nov 2019 | 201 California St | Peacock Construction | the scope of project includes the 12 floor restrooms upgrade. remodeling and upgrade the mend's and women's restrooms to comply with cbc 2016. replacing light fixtures with new building standard led light fixtures. all work on the 12th floor.Details
the scope of project includes the 12 floor restrooms upgrade. remodeling and upgrade the mend's and women's restrooms to comply with cbc 2016. replacing light fixtures with new building standard led light fixtures. all work on the 12th floor. | $95,000 |
| Jun 18, 2018 | Completed final sign-off Dec 2019 | 55 02nd St | Principal Builders Inc. | ti on 23rd fl build out 11,500sf in a class a high rise bldg w/fully sprinkler w/complete life safety, scope consist of non-load beaing partitions, safety glaze panel w/aluminum frame, new doors, ceiling, millwork and finishes throughout. maher naDetails
ti on 23rd fl build out 11,500sf in a class a high rise bldg w/fully sprinkler w/complete life safety, scope consist of non-load beaing partitions, safety glaze panel w/aluminum frame, new doors, ceiling, millwork and finishes throughout. maher na | $690,000 |
| Jun 18, 2018 | Completed final sign-off Dec 2019 | 55 02nd St | Principal Builders Inc. | ti on 22rd fl build out 11,500sf in a class a high rise bldg w/fully sprinkler w/complete life safety, scope consist of non-load beaing partitions, safety glaze panel w/aluminum frame, new doors, ceiling, millwork and finishes throughout. full flr demo. maher naDetails
ti on 22rd fl build out 11,500sf in a class a high rise bldg w/fully sprinkler w/complete life safety, scope consist of non-load beaing partitions, safety glaze panel w/aluminum frame, new doors, ceiling, millwork and finishes throughout. full flr demo. maher na | $690,000 |
| May 24, 2018 | Completed final sign-off Jun 2018 | 33 New Montgomery St | Rudolph Commercial Interiors Inc, Rci | 5th fl - revision to pa 2018-0301-2596, change designation of room from server to electrical room. n/a for maher.Details
5th fl - revision to pa 2018-0301-2596, change designation of room from server to electrical room. n/a for maher. | |
| May 21, 2018 | Completed final sign-off Nov 2018 | 33 New Montgomery St | Peacock Construction | project of an (e) office space, 12th fl - minor demo of (e) door/frame, plumbing & outlets. (n) non-structural interior wall. 4 new offices, 1 conference room, 1 break area and 1 it closetDetails
project of an (e) office space, 12th fl - minor demo of (e) door/frame, plumbing & outlets. (n) non-structural interior wall. 4 new offices, 1 conference room, 1 break area and 1 it closet | $75,000 |
| May 18, 2018 | Completed final sign-off Jul 2020 | 300 California St | D A Pope Inc | amep ti - scope of project includes 2 single use ada shower and toilet room facilities. new partitoins, glazing, door/frames, ceilings, lighting, power, millwork, sinks inlcuded. no strucutral work associated with this work, fire under separate permitsDetails
amep ti - scope of project includes 2 single use ada shower and toilet room facilities. new partitoins, glazing, door/frames, ceilings, lighting, power, millwork, sinks inlcuded. no strucutral work associated with this work, fire under separate permits | $300,000 |
| May 18, 2018 | Completed final sign-off Jul 2020 | 300 California St | D A Pope Inc | demolish part of concrte panel on halleck streets to accommodate new hollow metal doors. demolish part of corridor walls and add new and 1 hr rated wall at corridor, new finishes and lighting throughout corridor, new finsihes and lighting throughout corridor. new fire smoke detector and fsd.no maheDetails
demolish part of concrte panel on halleck streets to accommodate new hollow metal doors. demolish part of corridor walls and add new and 1 hr rated wall at corridor, new finishes and lighting throughout corridor, new finsihes and lighting throughout corridor. new fire smoke detector and fsd.no mahe | $250,000 |
| Apr 26, 2018 | Never finaled issued May 2018, no final | 150 California St | Bcci Construction Company | scope of project is remodel of e office space at 150 calif 4th fl demo and new non struc int walls, pwr/data, minor lightng,divide e idf rm into 1 n storage,1 small idf rm, 1 e conv into 1 new office 1 conferende, 1 new phone, 1 new wllnes rm upgrd restroomsDetails
scope of project is remodel of e office space at 150 calif 4th fl demo and new non struc int walls, pwr/data, minor lightng,divide e idf rm into 1 n storage,1 small idf rm, 1 e conv into 1 new office 1 conferende, 1 new phone, 1 new wllnes rm upgrd restrooms | $734,453 |
| Mar 20, 2018 | Completed final sign-off Oct 2018 | 240 Stockton St | Rudolph And Sletten Inc | full floor arch ti 4th floor -demo of non-bearing walls, millwork. finishes & portion of corridor. also, new interior partitions, glazing, door/frames, lighting, power, millwork & new finishes. there is no structural work associated with this scope of work. upgrade 2 unisex restroom & path of travelDetails
full floor arch ti 4th floor -demo of non-bearing walls, millwork. finishes & portion of corridor. also, new interior partitions, glazing, door/frames, lighting, power, millwork & new finishes. there is no structural work associated with this scope of work. upgrade 2 unisex restroom & path of travel | $500,000 |
| Mar 1, 2018 | Completed final sign-off May 2018 | 475 Brannan St | Skyline Construction | suite #400: demo of (e) reception wall for new glazing. adding hardware to existing door previously burried in wall construction. (ref approved pa #201801239294). maher naDetails
suite #400: demo of (e) reception wall for new glazing. adding hardware to existing door previously burried in wall construction. (ref approved pa #201801239294). maher na | $10,000 |
| Mar 1, 2018 | Completed final sign-off Aug 2018 | 33 New Montgomery St | Rudolph Commercial Interiors Inc, Rci | 5/f: suite 500 - ti dmeo of non-load bearing walls, millwork, finishes and ceiling, new interior partitions, glazing, doors/frames, lighting, power, and millwork. there is no structural work associated. mep deferred. maher naDetails
5/f: suite 500 - ti dmeo of non-load bearing walls, millwork, finishes and ceiling, new interior partitions, glazing, doors/frames, lighting, power, and millwork. there is no structural work associated. mep deferred. maher na | $350,000 |
| Feb 9, 2018 | Completed final sign-off Sep 2018 | 33 New Montgomery St | Peacock Construction | revision to existing permit #201708084172, per inspector comments. maher naDetails
revision to existing permit #201708084172, per inspector comments. maher na | $100 |
| Jan 23, 2018 | Completed final sign-off May 2018 | 475 Brannan St | Skyline Construction | suite #400: demo portion of extg demising wall for new fire rated door. new interior partitions and doors for 3 new phone rooms. n/a for maherDetails
suite #400: demo portion of extg demising wall for new fire rated door. new interior partitions and doors for 3 new phone rooms. n/a for maher | $300,000 |
| Jan 23, 2018 | Completed final sign-off Oct 2018 | 33 New Montgomery St | Peacock Construction | suite #520: new non rated full height partition and door to accomodate 1 new i.t. closet. no structural.application for technical infeasibilty n/a for maherDetails
suite #520: new non rated full height partition and door to accomodate 1 new i.t. closet. no structural.application for technical infeasibilty n/a for maher | $15,000 |
| Jan 12, 2018 | Never finaled issued Jan 2018, no final | 33 New Montgomery St | Peacock Construction | 8/f: revision to pa 2017-0818-5218 revise location of copy, breakroom and private office, ste 880 revised egress path as result.Details
8/f: revision to pa 2017-0818-5218 revise location of copy, breakroom and private office, ste 880 revised egress path as result. | |
| Dec 7, 2017 | Completed final sign-off Nov 2018 | 201 California St | Peacock Construction | 4th & 6th floors - remodeling of men's women's restroom, replace (e) corridor light fixtures, remodel (e) elevator lobby, replace (e) corridor light fixturesDetails
4th & 6th floors - remodeling of men's women's restroom, replace (e) corridor light fixtures, remodel (e) elevator lobby, replace (e) corridor light fixtures | $718,196 |
| Dec 7, 2017 | Completed final sign-off Mar 2018 | 33 New Montgomery St | Rudolph Commercial Interiors Inc, Rci | approval for technical infeasibility, new ada openers at (e) restrooms ref pa 2015-0821-4973; n/a maherDetails
approval for technical infeasibility, new ada openers at (e) restrooms ref pa 2015-0821-4973; n/a maher | $8,000 |
| Nov 9, 2017 | Completed final sign-off Feb 2018 | 149 New Montgomery St | Tom Hammer Construction Llc | 2/f- t.i. including demolition, new walls, ceilings, millwork, and finishes.Details
2/f- t.i. including demolition, new walls, ceilings, millwork, and finishes. | $140,000 |
| Sep 8, 2017 | Completed final sign-off Oct 2017 | 33 New Montgomery St | Rudolph Commercial Interiors Inc, Rci | suite #220: pre-construction demolition of interior non-bearing walls, interior glazing, and finishes per ab-017. tenant improvement permit required under separate submittal. maher naDetails
suite #220: pre-construction demolition of interior non-bearing walls, interior glazing, and finishes per ab-017. tenant improvement permit required under separate submittal. maher na | $25,000 |
| Aug 31, 2017 | Completed final sign-off Nov 2017 | 300 California St | D A Pope Inc | revision to app#201705247498. revised ceiling scope and additional interior partitions and revised electrical & mechanical work. n/a for maher.Details
revision to app#201705247498. revised ceiling scope and additional interior partitions and revised electrical & mechanical work. n/a for maher. | |
| Aug 18, 2017 | Completed final sign-off Oct 2018 | 33 New Montgomery St | Peacock Construction | 8th floor: suite 880 partial floor ti includes demolition. construction of new interior partition, glazing, doors/frames, lighting,power, millork and sinks. this is no structural work associated with this scope of work. n/a for maher. mep/fire under separate permit(s).Details
8th floor: suite 880 partial floor ti includes demolition. construction of new interior partition, glazing, doors/frames, lighting,power, millork and sinks. this is no structural work associated with this scope of work. n/a for maher. mep/fire under separate permit(s). | $150,000 |
| Aug 8, 2017 | Completed final sign-off Jan 2018 | 33 New Montgomery St | Peacock Construction | the scope of this project is for 15th & 17th floor: 15th fl - demolition of 2 offices, (1) it rm & portion of corridor, removing & relocating light fixtures & salvage undamaged ceiling, tiles for reuse. there is no structural work associated with this scope is work. maher naDetails
the scope of this project is for 15th & 17th floor: 15th fl - demolition of 2 offices, (1) it rm & portion of corridor, removing & relocating light fixtures & salvage undamaged ceiling, tiles for reuse. there is no structural work associated with this scope is work. maher na | $200,000 |
| Jul 18, 2017 | Completed final sign-off Jan 2018 | 33 New Montgomery St | Rudolph Commercial Interiors Inc, Rci | ti in (e) suite 1400. removal of finishes, demo of (e) it room. demo of ceiling tile & grid and gypsum ceiling. construct new it room, phone room (non-rated full height interior partitions. construct new ceiling and down lights. new building standard door frame, power, finishes. no structuralDetails
ti in (e) suite 1400. removal of finishes, demo of (e) it room. demo of ceiling tile & grid and gypsum ceiling. construct new it room, phone room (non-rated full height interior partitions. construct new ceiling and down lights. new building standard door frame, power, finishes. no structural | $50,000 |
| Jun 19, 2017 | Completed final sign-off Jan 2018 | 201 California St | Peacock Construction | basement- remodel (e) unisex/shower, freight elevator lobby, main elevator lobby & mail room. removal of (e) non structural partition, electrical & lighting. new installation of non-structural partition, door, electrical, lighting, plumbing & counter top. no structural work. n/a ordinance #155-13Details
basement- remodel (e) unisex/shower, freight elevator lobby, main elevator lobby & mail room. removal of (e) non structural partition, electrical & lighting. new installation of non-structural partition, door, electrical, lighting, plumbing & counter top. no structural work. n/a ordinance #155-13 | $118,384 |
| Jun 6, 2017 | Completed final sign-off Nov 2017 | 33 New Montgomery St | Field Construction Inc. | 11th fl. suite 1100: revision to pa #201611162844. modify elevator lobby doors with new 20 minute fire rated smoke and draft door assembly. maher na.Details
11th fl. suite 1100: revision to pa #201611162844. modify elevator lobby doors with new 20 minute fire rated smoke and draft door assembly. maher na. | $20,000 |
| May 23, 2017 | Completed final sign-off Aug 2017 | 475 Brannan St | Skyline Construction | suite 430: new interior glazing, misc. electrical. no plumbing improvements. no structural work. no improvements to extg compliant restrooms. n/a for maherDetails
suite 430: new interior glazing, misc. electrical. no plumbing improvements. no structural work. no improvements to extg compliant restrooms. n/a for maher | $168,989 |
| May 2, 2017 | Completed final sign-off Oct 2017 | 201 California St | Peacock Construction | 15th fl a/mep t.i. - project include demolition of two (2) existing unisex restrooms and power/signal. new interior partitions for offices, glazing, doors/frames, lighting, power, millwork and sinks, there is no structural work associated with this scope of work. fire under separate permit n/a maherDetails
15th fl a/mep t.i. - project include demolition of two (2) existing unisex restrooms and power/signal. new interior partitions for offices, glazing, doors/frames, lighting, power, millwork and sinks, there is no structural work associated with this scope of work. fire under separate permit n/a maher | $1,252,707 |
| Apr 17, 2017 | Completed final sign-off Nov 2017 | 33 New Montgomery St | Field Construction Inc. | as builts to 2017.0120.7557 updated drawings to show existing elevator door conditionsDetails
as builts to 2017.0120.7557 updated drawings to show existing elevator door conditions | |
| Mar 17, 2017 | Expired or cancelled cancelled Jan 2026 | 221 Main St | Dome Construction Corp | 4th floor - demo of non-structural walls, millwork and electrical. it also includes new construction of interior partitions, millwork, electrical and relocation of light fixtureDetails
4th floor - demo of non-structural walls, millwork and electrical. it also includes new construction of interior partitions, millwork, electrical and relocation of light fixture | $80,000 |
| Mar 6, 2017 | Completed final sign-off Oct 2017 | 201 California St | Peacock Construction | suite 500: this scope of this project is new interior partition, doors sidelights, door framing, millwork, break area, and finishes. there is no structural work associated with this scope of work. n/a for maherDetails
suite 500: this scope of this project is new interior partition, doors sidelights, door framing, millwork, break area, and finishes. there is no structural work associated with this scope of work. n/a for maher | $571,423 |
| Feb 27, 2017 | Completed final sign-off Sep 2017 | 201 California St | Peacock Construction | 5,14,15th flrs: demo of elevator lobby & restrooms finishes, ceiling grid & lighting fixtures. installation of new finishes & tenant doors/frames, construction portion of non structural interior wall, ceilings & upgrade restroom. maher na; deferred mep & electricalDetails
5,14,15th flrs: demo of elevator lobby & restrooms finishes, ceiling grid & lighting fixtures. installation of new finishes & tenant doors/frames, construction portion of non structural interior wall, ceilings & upgrade restroom. maher na; deferred mep & electrical | $525,000 |
| Jan 20, 2017 | Completed final sign-off Apr 2017 | 33 New Montgomery St | Field Construction Inc. | 11th floor - revision to pa #201611162844 - open ceiling to hard lid/drop ceiling in reception area. revision to fire sprinkler permit filed separately. n/a maher ordinanceDetails
11th floor - revision to pa #201611162844 - open ceiling to hard lid/drop ceiling in reception area. revision to fire sprinkler permit filed separately. n/a maher ordinance | |
| Nov 30, 2016 | Completed final sign-off May 2017 | 33 New Montgomery St | Peacock Construction | second generation ti include demo of non-bearing walls, millwork, finishes and portion of corridor. also, new interior partitions, glazing, doors/frames, lighting, power, millwork & portion of corridor. there is no structural work associated with this scope of workDetails
second generation ti include demo of non-bearing walls, millwork, finishes and portion of corridor. also, new interior partitions, glazing, doors/frames, lighting, power, millwork & portion of corridor. there is no structural work associated with this scope of work | $150,000 |
| Nov 16, 2016 | Completed final sign-off Nov 2017 | 33 New Montgomery St | Field Construction Inc. | 2nd generation ti includes demo of non bearing walls,millwork, finishes and portion of corridor. new interior partitions, glazing, doors/frames, lighting, power, millwork and portion of corridor, no structural maher naDetails
2nd generation ti includes demo of non bearing walls,millwork, finishes and portion of corridor. new interior partitions, glazing, doors/frames, lighting, power, millwork and portion of corridor, no structural maher na | $550,000 |
| May 10, 2016 | Never finaled issued Oct 2016, no final | 1398 Bryant St | Deacon Corp Of California | 1st floor - create new staff work area & customer waiting area with new rated partitions, celiling, lightin & electrical, wall & floor finishes. no structural work occurs as part of this project. no exterior facade work. maher naDetails
1st floor - create new staff work area & customer waiting area with new rated partitions, celiling, lightin & electrical, wall & floor finishes. no structural work occurs as part of this project. no exterior facade work. maher na | $125,000 |