Permit GraphShortlistSan Francisco building permits since 2000

Nicholas Detorres

License
C33742
Architect
About the California Architects Board
Look the license up with the state (Architects Board)
Listed as
architect, designer
Firm
Ware Malcomb
Based in
San Francisco
On San Francisco permits
May 2016 to Jul 2026

56 permits since 2000 (architect on 55 permits, designer on 1 permit): 47 completed, 1 in progress, 4 never finaled, 4 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Peacock Construction (21), Rudolph Commercial Interiors Inc, Rci (6), Field Construction Inc. (5), D A Pope Inc (4), Principal Builders Inc. (3), Skyline Construction (3), Rudolph And Sletten Inc (2), Bcci Construction Company, Deacon Corp Of California, Dome Construction Corp, M C S Construction Services, Richlen Construction, Rossi Builders Inc., Tom Hammer Construction Llc, Whitney Commercial Construction
Engineers
Amit Wadhwa (2), Levi G. Abarte (2), Jose Herrera, Kevin M. Sotto, Ranko Koprivica

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jul 31, 2026In progress
filed Jul 2026, not yet issued
4397 24th Stinterior renovation of an attic, 676 sq ft of attic space to be remodeled into useable space into 2nd fl unit. new interior roof dormers facing east and west on building per exterior elevations. partial 2nd floor-stair cases, bedroom #3 and adjacent closet.
Details
Permit
202607315903

interior renovation of an attic, 676 sq ft of attic space to be remodeled into useable space into 2nd fl unit. new interior roof dormers facing east and west on building per exterior elevations. partial 2nd floor-stair cases, bedroom #3 and adjacent closet.

Open the permit page

$175,000
Apr 25, 2022Completed
final sign-off Nov 2022
50 California StPrincipal Builders Inc.23rd fl: t.i. work includes non-structural renovations of partitions, flooring, ceilings, doors, fixtures, and finishes. mep deferred.
Details
Permit
202204252951
Permit issued
May 16, 2022
Final sign-off
Nov 9, 2022

23rd fl: t.i. work includes non-structural renovations of partitions, flooring, ceilings, doors, fixtures, and finishes. mep deferred.

Open the permit page

$1,600,000
Nov 19, 2021Expired or cancelled
withdrawn Jul 2026
4397 24th Stinterior renovation of 2nd fl and attic of 2 story muliti family residential building. 676 sf of attic space to be remodeled into usable space of 2nd fl. addition of exterior roof dormers facing east and west on building
Details
Permit
202111192809

interior renovation of 2nd fl and attic of 2 story muliti family residential building. 676 sf of attic space to be remodeled into usable space of 2nd fl. addition of exterior roof dormers facing east and west on building

Open the permit page

$175,000
Dec 12, 2019Never finaled
issued Dec 2019, no final
425 Market StRichlen Constructionrevision to pa#2019-0903-0426: for lighting title 24 changes and finish changes
Details
Permit
201912129362
Permit issued
Dec 23, 2019

revision to pa#2019-0903-0426: for lighting title 24 changes and finish changes

Open the permit page

Dec 10, 2019Completed
final sign-off Mar 2021
575 Market StM C S Construction Servicescommon areas and restrooms which includes removing and adding new finishes to the common areas and upgrading the restrooms to comple with code
Details
Permit
201912109158
Permit issued
Dec 23, 2019
Final sign-off
Mar 18, 2021

common areas and restrooms which includes removing and adding new finishes to the common areas and upgrading the restrooms to comple with code

Open the permit page

$16,157
Dec 10, 2019Completed
final sign-off Jun 2020
33 New Montgomery StRudolph Commercial Interiors Inc, Rciscope includes demo of (e) demising wall, partitions, doors, millwork, ceiling, power, lighting, and finishes. standard ti improvements (non-structural) including new partitions, doors & hardware, glizing, power, ceiling, lighting, finishes and millwork. update of 2rd flr men & women restrooms
Details
Permit
201912109156
Permit issued
Dec 23, 2019
Final sign-off
Jun 4, 2020

scope includes demo of (e) demising wall, partitions, doors, millwork, ceiling, power, lighting, and finishes. standard ti improvements (non-structural) including new partitions, doors & hardware, glizing, power, ceiling, lighting, finishes and millwork. update of 2rd flr men & women restrooms

Open the permit page

$166,157
Aug 26, 2019Completed
final sign-off Feb 2020
100 Pine StRossi Builders Inc.suite #2900: the scope of work inlcludes non-load bearing partition sidelight, power portion of ceiling grid and tile. new non load bearing interior partition, lighting, power and finishes. mep will be deffered. n/a for maher
Details
Permit
201908269827
Permit issued
Aug 27, 2019
Final sign-off
Feb 27, 2020

suite #2900: the scope of work inlcludes non-load bearing partition sidelight, power portion of ceiling grid and tile. new non load bearing interior partition, lighting, power and finishes. mep will be deffered. n/a for maher

Open the permit page

$690,000
Aug 20, 2019Completed
final sign-off Jan 2020
575 Market StField Construction Inc.demo of 3 phone rooms (non loade bearing partitions), miner ceiling, light fixtures and finishes. 6 new offices (non load bearing, non rted partitions) new cewiling/grid tile, lighting fixtures, power signal and finishes
Details
Permit
201908209246
Permit issued
Aug 20, 2019
Final sign-off
Jan 24, 2020

demo of 3 phone rooms (non loade bearing partitions), miner ceiling, light fixtures and finishes. 6 new offices (non load bearing, non rted partitions) new cewiling/grid tile, lighting fixtures, power signal and finishes

Open the permit page

$150,000
Jul 26, 2019Completed
final sign-off Mar 2020
149 New Montgomery StWhitney Commercial Constructionsuite #201: minimal wall ceiling alteration, power and data adjusted as appropriate.
Details
Permit
201907267027
Permit issued
Aug 14, 2019
Final sign-off
Mar 4, 2020

suite #201: minimal wall ceiling alteration, power and data adjusted as appropriate.

Open the permit page

$100,000
Jul 23, 2019Expired or cancelled
cancelled Jan 2026
149 New Montgomery St2nd flr. minimal wall ceiling alteration, power and data adjusted as appropriate
Details
Permit
201907236614

2nd flr. minimal wall ceiling alteration, power and data adjusted as appropriate

Open the permit page

$120,000
Jun 7, 2019Completed
final sign-off Mar 2020
33 New Montgomery StPeacock Construction8th flr, suite 850. demo 5 rooms, power & relocate light fixtures, 2 (n) connference rm's and 1 phone rm. non-load bearing parititions & finshes. upgrade restrooms. mep's deferred.
Details
Permit
201906072808
Permit issued
Jun 19, 2019
Final sign-off
Mar 11, 2020

8th flr, suite 850. demo 5 rooms, power & relocate light fixtures, 2 (n) connference rm's and 1 phone rm. non-load bearing parititions & finshes. upgrade restrooms. mep's deferred.

Open the permit page

$382,000
May 20, 2019Completed
final sign-off Aug 2020
33 New Montgomery StPeacock Construction2nd fl: expansion of extg suite #220: includes demo of extg wall, door, millwork, ceiling, glazing,power, ltg, plmg, & finishes. standard t.i. non structural including nw walls, doors, glazing, power, plmg, ceiling, ltg, finishes, & millwork. update 2nd fl. men's/women's restroom. to comply 2016 cbc
Details
Permit
201905201090
Permit issued
Jun 5, 2019
Final sign-off
Aug 18, 2020

2nd fl: expansion of extg suite #220: includes demo of extg wall, door, millwork, ceiling, glazing,power, ltg, plmg, & finishes. standard t.i. non structural including nw walls, doors, glazing, power, plmg, ceiling, ltg, finishes, & millwork. update 2nd fl. men's/women's restroom. to comply 2016 cbc

Open the permit page

$488,920
Mar 27, 2019Completed
final sign-off Jul 2020
180 Sansome StPeacock Constructiondemo of finishes & millwork of (e) 1st flr lobby. new construction consists of providing new finishes, new millwork and new elect
Details
Permit
201903276364
Permit issued
Aug 28, 2019
Final sign-off
Jul 21, 2020

demo of finishes & millwork of (e) 1st flr lobby. new construction consists of providing new finishes, new millwork and new elect

Open the permit page

$200,000
Mar 26, 2019Completed
final sign-off Jan 2020
300 California StD A Pope Inc1/f: demo of an (e) non-structural mezzanine. terminate all ele back to source. no structural work assocated with scope. fire/life safety/ele under sep permit. maher n/a.
Details
Permit
201903266237
Permit issued
Mar 27, 2019
Final sign-off
Jan 17, 2020

1/f: demo of an (e) non-structural mezzanine. terminate all ele back to source. no structural work assocated with scope. fire/life safety/ele under sep permit. maher n/a.

Open the permit page

$50,000
Dec 28, 2018Completed
final sign-off Apr 2019
33 New Montgomery StPeacock Construction9th flr - demo & construction of non structural partitions, millwork, ele, glazing, doors, ceiling grid and tile, lighting & finishes. new work constist of non-structurual interior partitions, doors, glazing, electrivcal,ceilings til and grib, millwork, lighting and finishes.
Details
Permit
201812289310
Permit issued
Jan 16, 2019
Final sign-off
Apr 11, 2019

9th flr - demo & construction of non structural partitions, millwork, ele, glazing, doors, ceiling grid and tile, lighting & finishes. new work constist of non-structurual interior partitions, doors, glazing, electrivcal,ceilings til and grib, millwork, lighting and finishes.

Open the permit page

$275,000
Dec 21, 2018Expired or cancelled
cancelled Jan 2026
240 Stockton Stscope of project includes demo of interior non structural partitons, doors,frames, hardware, acoustical ceiling tile, and grid, lighting, elec, plumbing, millwork and finishes. new consturction consistist of interior non structural partitons, doors, frames, glazing, plumbing, lighting, lec, ceiling,
Details
Permit
201812219036

scope of project includes demo of interior non structural partitons, doors,frames, hardware, acoustical ceiling tile, and grid, lighting, elec, plumbing, millwork and finishes. new consturction consistist of interior non structural partitons, doors, frames, glazing, plumbing, lighting, lec, ceiling,

Open the permit page

$500,000
Oct 19, 2018Completed
final sign-off Mar 2019
201 California StPeacock Constructionsute 1530, 15th fl - selective demo and new construction of interior partitions, glazing, doors/frames, lighting, power. no structural work
Details
Permit
201810193657
Permit issued
Oct 30, 2018
Final sign-off
Mar 14, 2019

sute 1530, 15th fl - selective demo and new construction of interior partitions, glazing, doors/frames, lighting, power. no structural work

Open the permit page

$225,000
Oct 19, 2018Completed
final sign-off Nov 2019
201 California StPeacock Construction9th fl - demo of common area, elevator, lobby and restrooms for new finishes and lighting; 12th fl - demo of common area and elevator lobby for new finishes and lighting
Details
Permit
201810193655
Permit issued
Jan 7, 2019
Final sign-off
Nov 22, 2019

9th fl - demo of common area, elevator, lobby and restrooms for new finishes and lighting; 12th fl - demo of common area and elevator lobby for new finishes and lighting

Open the permit page

$137,564
Oct 11, 2018Completed
final sign-off Oct 2018
240 Stockton StRudolph And Sletten Inc4th fl, ste 400 revision to 2018-0320-4096 plumbing inspector wanted note on page a6.1 detail 3 in record
Details
Permit
201810112883
Permit issued
Oct 12, 2018
Final sign-off
Oct 19, 2018

4th fl, ste 400 revision to 2018-0320-4096 plumbing inspector wanted note on page a6.1 detail 3 in record

Open the permit page

Jul 26, 2018Completed
final sign-off Jan 2019
33 New Montgomery StPeacock Construction10/f suite 1000: project is a second generation t.i. including demo of non-bearning walls, millwork, finishes & portion of cooridor, also new interior partitions, glazing, door/frames, lighting, power,
Details
Permit
201807265575
Permit issued
Jul 30, 2018
Final sign-off
Jan 31, 2019

10/f suite 1000: project is a second generation t.i. including demo of non-bearning walls, millwork, finishes & portion of cooridor, also new interior partitions, glazing, door/frames, lighting, power,

Open the permit page

$500,000
Jul 25, 2018Completed
final sign-off Jan 2019
33 New Montgomery StPeacock Construction9th fl ; suite 950- remodel of an existing vacant suite. demo includes wall, doors, frmaes, ceiling & lighting of the common corridor for reconfiguration. new non-structure interior walls, door, frames glaze, millwork, plumbing, electrical, ceiling, light fixtures & finishes
Details
Permit
201807255463
Permit issued
Jul 30, 2018
Final sign-off
Jan 31, 2019

9th fl ; suite 950- remodel of an existing vacant suite. demo includes wall, doors, frmaes, ceiling & lighting of the common corridor for reconfiguration. new non-structure interior walls, door, frames glaze, millwork, plumbing, electrical, ceiling, light fixtures & finishes

Open the permit page

$715,200
Jul 23, 2018Completed
final sign-off Nov 2019
201 California StPeacock Constructionthe scope of project includes the 12 floor restrooms upgrade. remodeling and upgrade the mend's and women's restrooms to comply with cbc 2016. replacing light fixtures with new building standard led light fixtures. all work on the 12th floor.
Details
Permit
201807235197
Permit issued
Jan 7, 2019
Final sign-off
Nov 22, 2019

the scope of project includes the 12 floor restrooms upgrade. remodeling and upgrade the mend's and women's restrooms to comply with cbc 2016. replacing light fixtures with new building standard led light fixtures. all work on the 12th floor.

Open the permit page

$95,000
Jun 18, 2018Completed
final sign-off Dec 2019
55 02nd StPrincipal Builders Inc.ti on 23rd fl build out 11,500sf in a class a high rise bldg w/fully sprinkler w/complete life safety, scope consist of non-load beaing partitions, safety glaze panel w/aluminum frame, new doors, ceiling, millwork and finishes throughout. maher na
Details
Permit
201806182100
Permit issued
Jul 25, 2018
Final sign-off
Dec 5, 2019

ti on 23rd fl build out 11,500sf in a class a high rise bldg w/fully sprinkler w/complete life safety, scope consist of non-load beaing partitions, safety glaze panel w/aluminum frame, new doors, ceiling, millwork and finishes throughout. maher na

Open the permit page

$690,000
Jun 18, 2018Completed
final sign-off Dec 2019
55 02nd StPrincipal Builders Inc.ti on 22rd fl build out 11,500sf in a class a high rise bldg w/fully sprinkler w/complete life safety, scope consist of non-load beaing partitions, safety glaze panel w/aluminum frame, new doors, ceiling, millwork and finishes throughout. full flr demo. maher na
Details
Permit
201806182102
Permit issued
Jul 25, 2018
Final sign-off
Dec 5, 2019

ti on 22rd fl build out 11,500sf in a class a high rise bldg w/fully sprinkler w/complete life safety, scope consist of non-load beaing partitions, safety glaze panel w/aluminum frame, new doors, ceiling, millwork and finishes throughout. full flr demo. maher na

Open the permit page

$690,000
May 24, 2018Completed
final sign-off Jun 2018
33 New Montgomery StRudolph Commercial Interiors Inc, Rci5th fl - revision to pa 2018-0301-2596, change designation of room from server to electrical room. n/a for maher.
Details
Permit
201805240017
Permit issued
May 24, 2018
Final sign-off
Jun 25, 2018

5th fl - revision to pa 2018-0301-2596, change designation of room from server to electrical room. n/a for maher.

Open the permit page

May 21, 2018Completed
final sign-off Nov 2018
33 New Montgomery StPeacock Constructionproject of an (e) office space, 12th fl - minor demo of (e) door/frame, plumbing & outlets. (n) non-structural interior wall. 4 new offices, 1 conference room, 1 break area and 1 it closet
Details
Permit
201805219610
Permit issued
May 30, 2018
Final sign-off
Nov 20, 2018

project of an (e) office space, 12th fl - minor demo of (e) door/frame, plumbing & outlets. (n) non-structural interior wall. 4 new offices, 1 conference room, 1 break area and 1 it closet

Open the permit page

$75,000
May 18, 2018Completed
final sign-off Jul 2020
300 California StD A Pope Incamep ti - scope of project includes 2 single use ada shower and toilet room facilities. new partitoins, glazing, door/frames, ceilings, lighting, power, millwork, sinks inlcuded. no strucutral work associated with this work, fire under separate permits
Details
Permit
201805189535
Permit issued
Jul 11, 2018
Final sign-off
Jul 9, 2020

amep ti - scope of project includes 2 single use ada shower and toilet room facilities. new partitoins, glazing, door/frames, ceilings, lighting, power, millwork, sinks inlcuded. no strucutral work associated with this work, fire under separate permits

Open the permit page

$300,000
May 18, 2018Completed
final sign-off Jul 2020
300 California StD A Pope Incdemolish part of concrte panel on halleck streets to accommodate new hollow metal doors. demolish part of corridor walls and add new and 1 hr rated wall at corridor, new finishes and lighting throughout corridor, new finsihes and lighting throughout corridor. new fire smoke detector and fsd.no mahe
Details
Permit
201805189531
Permit issued
Jun 13, 2018
Final sign-off
Jul 9, 2020

demolish part of concrte panel on halleck streets to accommodate new hollow metal doors. demolish part of corridor walls and add new and 1 hr rated wall at corridor, new finishes and lighting throughout corridor, new finsihes and lighting throughout corridor. new fire smoke detector and fsd.no mahe

Open the permit page

$250,000
Apr 26, 2018Never finaled
issued May 2018, no final
150 California StBcci Construction Companyscope of project is remodel of e office space at 150 calif 4th fl demo and new non struc int walls, pwr/data, minor lightng,divide e idf rm into 1 n storage,1 small idf rm, 1 e conv into 1 new office 1 conferende, 1 new phone, 1 new wllnes rm upgrd restrooms
Details
Permit
201804267420
Permit issued
May 16, 2018

scope of project is remodel of e office space at 150 calif 4th fl demo and new non struc int walls, pwr/data, minor lightng,divide e idf rm into 1 n storage,1 small idf rm, 1 e conv into 1 new office 1 conferende, 1 new phone, 1 new wllnes rm upgrd restrooms

Open the permit page

$734,453
Mar 20, 2018Completed
final sign-off Oct 2018
240 Stockton StRudolph And Sletten Incfull floor arch ti 4th floor -demo of non-bearing walls, millwork. finishes & portion of corridor. also, new interior partitions, glazing, door/frames, lighting, power, millwork & new finishes. there is no structural work associated with this scope of work. upgrade 2 unisex restroom & path of travel
Details
Permit
201803204096
Permit issued
Apr 30, 2018
Final sign-off
Oct 19, 2018

full floor arch ti 4th floor -demo of non-bearing walls, millwork. finishes & portion of corridor. also, new interior partitions, glazing, door/frames, lighting, power, millwork & new finishes. there is no structural work associated with this scope of work. upgrade 2 unisex restroom & path of travel

Open the permit page

$500,000
Mar 1, 2018Completed
final sign-off Aug 2018
33 New Montgomery StRudolph Commercial Interiors Inc, Rci5/f: suite 500 - ti dmeo of non-load bearing walls, millwork, finishes and ceiling, new interior partitions, glazing, doors/frames, lighting, power, and millwork. there is no structural work associated. mep deferred. maher na
Details
Permit
201803012596
Permit issued
Mar 7, 2018
Final sign-off
Aug 10, 2018

5/f: suite 500 - ti dmeo of non-load bearing walls, millwork, finishes and ceiling, new interior partitions, glazing, doors/frames, lighting, power, and millwork. there is no structural work associated. mep deferred. maher na

Open the permit page

$350,000
Mar 1, 2018Completed
final sign-off May 2018
475 Brannan StSkyline Constructionsuite #400: demo of (e) reception wall for new glazing. adding hardware to existing door previously burried in wall construction. (ref approved pa #201801239294). maher na
Details
Permit
201803012598
Permit issued
Mar 5, 2018
Final sign-off
May 18, 2018

suite #400: demo of (e) reception wall for new glazing. adding hardware to existing door previously burried in wall construction. (ref approved pa #201801239294). maher na

Open the permit page

$10,000
Feb 9, 2018Completed
final sign-off Sep 2018
33 New Montgomery StPeacock Constructionrevision to existing permit #201708084172, per inspector comments. maher na
Details
Permit
201802090886
Permit issued
Apr 19, 2018
Final sign-off
Sep 24, 2018

revision to existing permit #201708084172, per inspector comments. maher na

Open the permit page

$100
Jan 23, 2018Completed
final sign-off Oct 2018
33 New Montgomery StPeacock Constructionsuite #520: new non rated full height partition and door to accomodate 1 new i.t. closet. no structural.application for technical infeasibilty n/a for maher
Details
Permit
201801239296
Permit issued
Feb 7, 2018
Final sign-off
Oct 30, 2018

suite #520: new non rated full height partition and door to accomodate 1 new i.t. closet. no structural.application for technical infeasibilty n/a for maher

Open the permit page

$15,000
Jan 23, 2018Completed
final sign-off May 2018
475 Brannan StSkyline Constructionsuite #400: demo portion of extg demising wall for new fire rated door. new interior partitions and doors for 3 new phone rooms. n/a for maher
Details
Permit
201801239294
Permit issued
Feb 7, 2018
Final sign-off
May 18, 2018

suite #400: demo portion of extg demising wall for new fire rated door. new interior partitions and doors for 3 new phone rooms. n/a for maher

Open the permit page

$300,000
Jan 12, 2018Never finaled
issued Jan 2018, no final
33 New Montgomery StPeacock Construction8/f: revision to pa 2017-0818-5218 revise location of copy, breakroom and private office, ste 880 revised egress path as result.
Details
Permit
201801128511
Permit issued
Jan 22, 2018

8/f: revision to pa 2017-0818-5218 revise location of copy, breakroom and private office, ste 880 revised egress path as result.

Open the permit page

Dec 7, 2017Completed
final sign-off Mar 2018
33 New Montgomery StRudolph Commercial Interiors Inc, Rciapproval for technical infeasibility, new ada openers at (e) restrooms ref pa 2015-0821-4973; n/a maher
Details
Permit
201712075838
Permit issued
Feb 1, 2018
Final sign-off
Mar 2, 2018

approval for technical infeasibility, new ada openers at (e) restrooms ref pa 2015-0821-4973; n/a maher

Open the permit page

$8,000
Dec 7, 2017Completed
final sign-off Nov 2018
201 California StPeacock Construction4th & 6th floors - remodeling of men's women's restroom, replace (e) corridor light fixtures, remodel (e) elevator lobby, replace (e) corridor light fixtures
Details
Permit
201712075843
Permit issued
Feb 7, 2018
Final sign-off
Nov 15, 2018

4th & 6th floors - remodeling of men's women's restroom, replace (e) corridor light fixtures, remodel (e) elevator lobby, replace (e) corridor light fixtures

Open the permit page

$718,196
Nov 9, 2017Completed
final sign-off Feb 2018
149 New Montgomery StTom Hammer Construction Llc2/f- t.i. including demolition, new walls, ceilings, millwork, and finishes.
Details
Permit
201711093690
Permit issued
Dec 14, 2017
Final sign-off
Feb 15, 2018

2/f- t.i. including demolition, new walls, ceilings, millwork, and finishes.

Open the permit page

$140,000
Sep 8, 2017Completed
final sign-off Oct 2017
33 New Montgomery StRudolph Commercial Interiors Inc, Rcisuite #220: pre-construction demolition of interior non-bearing walls, interior glazing, and finishes per ab-017. tenant improvement permit required under separate submittal. maher na
Details
Permit
201709087376
Permit issued
Sep 15, 2017
Final sign-off
Oct 23, 2017

suite #220: pre-construction demolition of interior non-bearing walls, interior glazing, and finishes per ab-017. tenant improvement permit required under separate submittal. maher na

Open the permit page

$25,000
Aug 31, 2017Completed
final sign-off Nov 2017
300 California StD A Pope Increvision to app#201705247498. revised ceiling scope and additional interior partitions and revised electrical & mechanical work. n/a for maher.
Details
Permit
201708316541
Permit issued
Sep 22, 2017
Final sign-off
Nov 6, 2017

revision to app#201705247498. revised ceiling scope and additional interior partitions and revised electrical & mechanical work. n/a for maher.

Open the permit page

Aug 18, 2017Completed
final sign-off Oct 2018
33 New Montgomery StPeacock Construction8th floor: suite 880 partial floor ti includes demolition. construction of new interior partition, glazing, doors/frames, lighting,power, millork and sinks. this is no structural work associated with this scope of work. n/a for maher. mep/fire under separate permit(s).
Details
Permit
201708185218
Permit issued
Jan 22, 2018
Final sign-off
Oct 30, 2018

8th floor: suite 880 partial floor ti includes demolition. construction of new interior partition, glazing, doors/frames, lighting,power, millork and sinks. this is no structural work associated with this scope of work. n/a for maher. mep/fire under separate permit(s).

Open the permit page

$150,000
Aug 8, 2017Completed
final sign-off Jan 2018
33 New Montgomery StPeacock Constructionthe scope of this project is for 15th & 17th floor: 15th fl - demolition of 2 offices, (1) it rm & portion of corridor, removing & relocating light fixtures & salvage undamaged ceiling, tiles for reuse. there is no structural work associated with this scope is work. maher na
Details
Permit
201708084172
Permit issued
Sep 12, 2017
Final sign-off
Jan 26, 2018

the scope of this project is for 15th & 17th floor: 15th fl - demolition of 2 offices, (1) it rm & portion of corridor, removing & relocating light fixtures & salvage undamaged ceiling, tiles for reuse. there is no structural work associated with this scope is work. maher na

Open the permit page

$200,000
Jul 18, 2017Completed
final sign-off Jan 2018
33 New Montgomery StRudolph Commercial Interiors Inc, Rciti in (e) suite 1400. removal of finishes, demo of (e) it room. demo of ceiling tile & grid and gypsum ceiling. construct new it room, phone room (non-rated full height interior partitions. construct new ceiling and down lights. new building standard door frame, power, finishes. no structural
Details
Permit
201707182259
Permit issued
Jul 25, 2017
Final sign-off
Jan 16, 2018

ti in (e) suite 1400. removal of finishes, demo of (e) it room. demo of ceiling tile & grid and gypsum ceiling. construct new it room, phone room (non-rated full height interior partitions. construct new ceiling and down lights. new building standard door frame, power, finishes. no structural

Open the permit page

$50,000
Jun 19, 2017Completed
final sign-off Jan 2018
201 California StPeacock Constructionbasement- remodel (e) unisex/shower, freight elevator lobby, main elevator lobby & mail room. removal of (e) non structural partition, electrical & lighting. new installation of non-structural partition, door, electrical, lighting, plumbing & counter top. no structural work. n/a ordinance #155-13
Details
Permit
201706199675
Permit issued
Jun 22, 2017
Final sign-off
Jan 26, 2018

basement- remodel (e) unisex/shower, freight elevator lobby, main elevator lobby & mail room. removal of (e) non structural partition, electrical & lighting. new installation of non-structural partition, door, electrical, lighting, plumbing & counter top. no structural work. n/a ordinance #155-13

Open the permit page

$118,384
Jun 6, 2017Completed
final sign-off Nov 2017
33 New Montgomery StField Construction Inc.11th fl. suite 1100: revision to pa #201611162844. modify elevator lobby doors with new 20 minute fire rated smoke and draft door assembly. maher na.
Details
Permit
201706068548
Permit issued
Sep 29, 2017
Final sign-off
Nov 20, 2017

11th fl. suite 1100: revision to pa #201611162844. modify elevator lobby doors with new 20 minute fire rated smoke and draft door assembly. maher na.

Open the permit page

$20,000
May 23, 2017Completed
final sign-off Aug 2017
475 Brannan StSkyline Constructionsuite 430: new interior glazing, misc. electrical. no plumbing improvements. no structural work. no improvements to extg compliant restrooms. n/a for maher
Details
Permit
201705237348
Permit issued
Jun 6, 2017
Final sign-off
Aug 7, 2017

suite 430: new interior glazing, misc. electrical. no plumbing improvements. no structural work. no improvements to extg compliant restrooms. n/a for maher

Open the permit page

$168,989
May 2, 2017Completed
final sign-off Oct 2017
201 California StPeacock Construction15th fl a/mep t.i. - project include demolition of two (2) existing unisex restrooms and power/signal. new interior partitions for offices, glazing, doors/frames, lighting, power, millwork and sinks, there is no structural work associated with this scope of work. fire under separate permit n/a maher
Details
Permit
201705025380
Permit issued
Jun 5, 2017
Final sign-off
Oct 5, 2017

15th fl a/mep t.i. - project include demolition of two (2) existing unisex restrooms and power/signal. new interior partitions for offices, glazing, doors/frames, lighting, power, millwork and sinks, there is no structural work associated with this scope of work. fire under separate permit n/a maher

Open the permit page

$1,252,707
Apr 17, 2017Completed
final sign-off Nov 2017
33 New Montgomery StField Construction Inc.as builts to 2017.0120.7557 updated drawings to show existing elevator door conditions
Details
Permit
201704174133
Permit issued
Apr 18, 2017
Final sign-off
Nov 21, 2017

as builts to 2017.0120.7557 updated drawings to show existing elevator door conditions

Open the permit page

Mar 17, 2017Expired or cancelled
cancelled Jan 2026
221 Main StDome Construction Corp4th floor - demo of non-structural walls, millwork and electrical. it also includes new construction of interior partitions, millwork, electrical and relocation of light fixture
Details
Permit
201703171752

4th floor - demo of non-structural walls, millwork and electrical. it also includes new construction of interior partitions, millwork, electrical and relocation of light fixture

Open the permit page

$80,000
Mar 6, 2017Completed
final sign-off Oct 2017
201 California StPeacock Constructionsuite 500: this scope of this project is new interior partition, doors sidelights, door framing, millwork, break area, and finishes. there is no structural work associated with this scope of work. n/a for maher
Details
Permit
201703060705
Permit issued
Apr 5, 2017
Final sign-off
Oct 5, 2017

suite 500: this scope of this project is new interior partition, doors sidelights, door framing, millwork, break area, and finishes. there is no structural work associated with this scope of work. n/a for maher

Open the permit page

$571,423
Feb 27, 2017Completed
final sign-off Sep 2017
201 California StPeacock Construction5,14,15th flrs: demo of elevator lobby & restrooms finishes, ceiling grid & lighting fixtures. installation of new finishes & tenant doors/frames, construction portion of non structural interior wall, ceilings & upgrade restroom. maher na; deferred mep & electrical
Details
Permit
201702270134
Permit issued
Mar 2, 2017
Final sign-off
Sep 8, 2017

5,14,15th flrs: demo of elevator lobby & restrooms finishes, ceiling grid & lighting fixtures. installation of new finishes & tenant doors/frames, construction portion of non structural interior wall, ceilings & upgrade restroom. maher na; deferred mep & electrical

Open the permit page

$525,000
Jan 20, 2017Completed
final sign-off Apr 2017
33 New Montgomery StField Construction Inc.11th floor - revision to pa #201611162844 - open ceiling to hard lid/drop ceiling in reception area. revision to fire sprinkler permit filed separately. n/a maher ordinance
Details
Permit
201701207557
Permit issued
Jan 26, 2017
Final sign-off
Apr 4, 2017

11th floor - revision to pa #201611162844 - open ceiling to hard lid/drop ceiling in reception area. revision to fire sprinkler permit filed separately. n/a maher ordinance

Open the permit page

Nov 30, 2016Completed
final sign-off May 2017
33 New Montgomery StPeacock Constructionsecond generation ti include demo of non-bearing walls, millwork, finishes and portion of corridor. also, new interior partitions, glazing, doors/frames, lighting, power, millwork & portion of corridor. there is no structural work associated with this scope of work
Details
Permit
201611303726
Permit issued
Dec 9, 2016
Final sign-off
May 16, 2017

second generation ti include demo of non-bearing walls, millwork, finishes and portion of corridor. also, new interior partitions, glazing, doors/frames, lighting, power, millwork & portion of corridor. there is no structural work associated with this scope of work

Open the permit page

$150,000
Nov 16, 2016Completed
final sign-off Nov 2017
33 New Montgomery StField Construction Inc.2nd generation ti includes demo of non bearing walls,millwork, finishes and portion of corridor. new interior partitions, glazing, doors/frames, lighting, power, millwork and portion of corridor, no structural maher na
Details
Permit
201611162844
Permit issued
Dec 5, 2016
Final sign-off
Nov 21, 2017

2nd generation ti includes demo of non bearing walls,millwork, finishes and portion of corridor. new interior partitions, glazing, doors/frames, lighting, power, millwork and portion of corridor, no structural maher na

Open the permit page

$550,000
May 10, 2016Never finaled
issued Oct 2016, no final
1398 Bryant StDeacon Corp Of California1st floor - create new staff work area & customer waiting area with new rated partitions, celiling, lightin & electrical, wall & floor finishes. no structural work occurs as part of this project. no exterior facade work. maher na
Details
Permit
201605107045
Permit issued
Oct 6, 2016

1st floor - create new staff work area & customer waiting area with new rated partitions, celiling, lightin & electrical, wall & floor finishes. no structural work occurs as part of this project. no exterior facade work. maher na

Open the permit page

$125,000