Block 3740, lot 034
221 Main St
The 200 most recent permits filed for this property.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 29, 2026 | In progress | 221 Main St | revision to bpa# 202510248119 alteration anchorage detail for installation of phone booths at level 5 & 6 | $10,000 | |
| Sep 14, 2026 | In progress | 221 Main St | Gci, Inc | 12th floor- structural only permit to show anchorage of idf racks. scope also includs removal of seismic bracing requirement for ductwork shown on pa#2026-0312-7419. | |
| Sep 11, 2026 | In progress | 221 Main St | Richlen Construction | new lobby level security improvements-installing turnstiles | $250,000 |
| Jul 17, 2026 | In progress | 221 Main St | Prima Acquire Inc Dba Lahue And Associat | four evacuation maps on 6th floor. 27" x 18" | $1,500 |
| Jun 25, 2026 | In progress | 221 Main St | Richlen Construction | deferred electrical for 4th floor suite 400 office ti under permit 202604028757. | $175,000 |
| Jun 25, 2026 | In progress | 221 Main St | Richlen Construction | suite 400: reconfigure existing ductwork, ceiling diffusers, and grilles. provided vav boxes and suspended transfer air fan. | $75,000 |
| May 21, 2026 | In progress | 221 Main St | Sabah International Incorporated | 10th fl l- ref pa 202512222392 there is an existing 2-way communication system back bone installed in the building. provide 2 way communication system call station | $9,000 |
| May 21, 2026 | Completed | 221 Main St | Sabah International Incorporated | 11th fl l- ref pa 202512151826 there is an existing 2-way communication system back bone installed in the building. provide 2 way communication system call station | $9,000 |
| Apr 29, 2026 | In progress | 221 Main St | Skyline Construction | ste 770: 2 new phone booths in existing office. new outlets for phone booths | $10,000 |
| Apr 20, 2026 | Completed | 221 Main St | Principal Builders Inc. | 10th & 11th fl - evac maps | $958 |
| Apr 16, 2026 | Completed | 221 Main St | Principal Builders Inc. | revision to 202512222392 10th/f & 202512151826 11th/f: showing shaft due to unforseen conditions, power & lighting refiguration. lighting & ceiling modification, add emergency release buttom at elevator lobby doors | |
| Apr 2, 2026 | In progress | 221 Main St | Richlen Construction | 4th floor: limited interior demo & construction of non-strucutral elements ~ partitions - finishes, electrical outlets, ceiling treatments, lighting & switches & restroom upgrades. scope does not affect fixture quantities, occ load or p.o.t. no exterior work. | $238,237 |
| Mar 12, 2026 | In progress | 221 Main St | Gci, Inc | 12th fl - interior ti in an existing building new construction of new partitions, case work & mep upgrades; millwork on 12th fl | $3,500,000 |
| Feb 25, 2026 | Completed | 221 Main St | Gci, Inc | ste 1200 interior demo only - tenant readiness. ab-017 applies | $78,000 |
| Feb 5, 2026 | In progress | 221 Main St | Pioneer Fire Inc. | 5th and 6th flr. relocate (29) uprights. convert (43) uprights to pendents, (35) uprights to pendants add (6) pendents. gcti: 202510248119 | $28,250 |
| Jan 13, 2026 | In progress | 221 Main St | Mc Millan Electric | to erect projecting double face electrical sign | $10,000 |
| Dec 31, 2025 | In progress | 221 Main St | Gci, Inc | demolition of structural deck between level 5 and 6. construct new stair. | $700,000 |
| Dec 22, 2025 | Completed | 221 Main St | Principal Builders Inc. | 10/f. t.i (n) non structural partitions, ceiling, finishes, fixtures. demo under pa# 202511069080. | $3,900,000 |
| Dec 15, 2025 | Completed | 221 Main St | Principal Builders Inc. | 11/fl- ti demo (e) and build (n) partitions (non-structural) accoustical/ceiling, finishes, millwork (n) cafe | $4,000,000 |
| Dec 9, 2025 | In progress | 221 Main St | Gci, Inc | 5/fl-(n) interior ti to include mechanical and electrical . structrual for movable wall. includes mep work | $3,927,000 |
| Dec 9, 2025 | In progress | 221 Main St | Gci, Inc | 6th fl - new construction, mech & elec & structural header for movable walls; power, lighting & signal; install new 37 cooling units, 1 new wshp, new duct | $6,158,186 |
| Nov 6, 2025 | Completed | 221 Main St | Principal Builders Inc. | 10/fl: demo existing non structured partitions, ceilings, lights fixtures, millwork and finishes per ab-017 | $176,364 |
| Nov 6, 2025 | Completed | 221 Main St | Principal Builders Inc. | 11/f: demo at non-structural partitions, ceilings, lights fixtures, millwork and finishes. per ab017 | $179,229 |
| Oct 24, 2025 | In progress | 221 Main St | Gci, Inc | demo of existing partitions ceilings and associated mep & finishes on 5th and 6th floor. | $10,000 |
| Sep 9, 2025 | Completed | 221 Main St | Gci, Inc | priority processing per ab-004.t.i of suites 104 & 250 on 1st fl & 2nd fl to create space for non-profit,private school for for grade 6-12, deferred submittal for pa202504043725 to construct an indoor climbing wall. | |
| Aug 26, 2025 | Completed | 221 Main St | Sabah International Incorporated | 1&2/fl-this is a fire alarm tenant improvement. demo existing notification appliances from (e) circuit as shown on plans. ref#: 202504043725 | $54,000 |
| Jul 25, 2025 | Completed | 221 Main St | Pioneer Fire Inc. | add & relocating sprinklers to new ceiling and wall configuration. re-locate 77 pendants, add 24 pendants, add 6 upright heads. ref pa# 202504043725 | $29,850 |
| Apr 15, 2025 | Completed | 221 Main St | Gci, Inc | priority processing per ab-004.t.i of suites 104 & 250 on 1st fl & 2nd fl to create space for non-profit,private school for for grade 6-12,interior demolition of interior,including portion of 2nd fl structural slab for(n) stair opening,construction of(n)paritions doors,ceilings,finishes,fixtures. | $10,000,000 |
| Feb 5, 2025 | Completed | 221 Main St | Sabah International Incorporated | 16/fl: modification to existing fire alarm system on the 16th floor. add (2) new speakers/ strobes -ceilng mounted. add (4) strobe -ceiling mounted. ref: pa#2025-0106-7752 | $17,296 |
| Feb 4, 2025 | Completed | 221 Main St | Pioneer Fire Inc. | 16 fl: relocate (37) pendents, convert (17) pendents to uprights. ref pa 202501067752 | $4,200 |
| Feb 4, 2025 | Completed | 221 Main St | Gci, Inc | 1st & 2nd/f: interior demo per sfdbi ab-107. interior demolition of non-structural elements including but not limited to: interior partitions, doors, finishes, ceilings, lighting, mechanical ducts and equipment, outlets and switches. | $427,000 |
| Jan 16, 2025 | Completed | 221 Main St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system tenant improvements add 1 fire sprinkler ref pa# 2024-1015-2993 | $624 |
| Jan 6, 2025 | Completed | 221 Main St | Novo Construction Inc | 16th floor: partial floor and ceiling demolition of existing tenant space. new interior partitios, ceilings, and finishes. mechanical and electrical work included. | $1,086,562 |
| Dec 17, 2024 | Completed | 221 Main St | Anderson, Rowe & Buckley, Inc. | 9th fl - add 1 sprinkler, existing fire sprinkler system tenant improvement ref pa 202410152989 | $600 |
| Nov 25, 2024 | In progress | 221 Main St | Principal Builders Inc. | 9/f: deferred submital to pa# 202410152989 for structural anchorage of relocated phone booth. | |
| Nov 14, 2024 | In progress | 221 Main St | Principal Builders Inc. | 9+14/fl- ref 202410152989 and 202410152993- defered electrical work | |
| Nov 8, 2024 | Completed | 221 Main St | R L H Fire Protection Inc | 5th floor. fire sprinkler permit. relocate 7 and delete 1 fire sprinkler in suite 520 | $2,500 |
| Nov 5, 2024 | Completed | 221 Main St | Sabah International Incorporated | 1st fl - fire alarm ti - new initiating devices will be tied to the existing slc circuit. new notification appliances will be connected to existing power supply with existing circuit. ref pa 202403147834 | $27,473 |
| Nov 5, 2024 | Completed | 221 Main St | Sabah International Incorporated | 5th fl - fire alarm ti - new ceiling strobes will be tied to the existing nac appliances and will be connected to the existing power supply using the existing circuit ref pa 202410032275 | $18,365 |
| Oct 21, 2024 | Completed | 221 Main St | Mastec Network Solutions Inc | removeing antennas, rrus , coas and hard lines. removing cabinets, meter and electrical cans with assoicated h frames. returing site to original condition. patching with (e) wall material | $20,000 |
| Oct 15, 2024 | In progress | 221 Main St | Principal Builders Inc. | 9/f: ti - selective demo of non-load bearing walls and doors.l new gyp soffit and millwork in break 912. new millwork in (e) mothers room 905. selective demo of (e) finishes and finish alterations to (e) office. | $30,000 |
| Oct 15, 2024 | In progress | 221 Main St | Principal Builders Inc. | 14/f: new gyp soffit and millwork in break 1415. selective demo of (e) finishes and finish updates to the (e) office. | $50,000 |
| Oct 8, 2024 | In progress | 221 Main St | Sabah International Incorporated | the intent of this project is an addition to the (e) edwards est3 fire alarm control unit with a new telguard ceullular communicator. ref# 202405071542 | $7,134 |
| Oct 3, 2024 | Completed | 221 Main St | Richlen Construction | 5th flr, ste 520: shall consist of limited interior demolition and const. of non-struc elements including but not necessary lmted to partitions, finishes, electrical outlets and switches. work does not affect fixture quantities, occupant load or path of travel. | $291,009 |
| Sep 11, 2024 | Completed | 221 Main St | Gci, Inc | revise pa# 202403147834: to show updated fixtures, finishes, revised partitions, joists, and posts. | |
| Sep 5, 2024 | Completed | 221 Main St | Gci, Inc | deferred permit from pa# 2024-0314-7834: for installation of climbing wall in main gym | |
| Aug 20, 2024 | Completed | 221 Main St | R L H Fire Protection Inc | fire sprinkler permit relocate 50, add 8 and remove 3 sprinklers on the 1st fl ref pa 202403147834 | $15,000 |
| Aug 15, 2024 | In progress | 221 Main St | Premier Sign Installations | install a single faced eletric wall sign btw 3rd & 4th level " docsign" | $10,000 |
| May 22, 2024 | In progress | 221 Main St | Principal Builders Inc. | 8th/f: revision to 202311019990- revised structural design | |
| May 7, 2024 | Completed | 221 Main St | Sabah International Incorporated | 1/fl- add new remote fire alarm annunciator with controls to engineering office located on garage floor. ref pa#202311019990 | $17,049 |
| May 1, 2024 | In progress | 221 Main St | Sabah International Incorporated | 8th fl - as builts ref pa 202403268592 | |
| Apr 26, 2024 | In progress | 221 Main St | Source Planning And Construction Inc | revision to pa 202401264744 to clarify occupancy load calculation | |
| Apr 23, 2024 | In progress | 221 Main St | Principal Builders Inc. | 8th floor- rev 202403137701- minor mechanical change | $5,000 |
| Apr 10, 2024 | Completed | 221 Main St | Gci, Inc | work on ground fl,consists of interior demo of non-structrural elements indlcuding but not necessarily limited to,interior partitions,doors,finishes,ceilings,lighting,mech & elec outlets & switches.addition of(n)gender neutral restrooms. | $1,375,798 |
| Apr 2, 2024 | In progress | 221 Main St | Aaa Restaurant Fire Control/Dba Aaa Fire | furnish and install 1 ansul r 102 fire suppression system in the main kitchen area on the gr fl. 202402085559 | $6,941 |
| Mar 28, 2024 | Completed | 221 Main St | Anderson, Rowe & Buckley, Inc. | revision to pa# 202402015049. remove notation of fire hose feed from plan. | |
| Mar 26, 2024 | In progress | 221 Main St | Sabah International Incorporated | modification to fire alarm system. existing 2 way communication system back bone installed in the building. provide 2 way communication system. ref 202311019990 | $29,522 |
| Mar 21, 2024 | In progress | 221 Main St | Principal Builders Inc. | revision to 202311019990 to remove two previously proposed stand pipe hose cabinets due to not being required by current code cbc 905.4 within 100 ft. | |
| Mar 13, 2024 | In progress | 221 Main St | Principal Builders Inc. | 8th floor: revision to 202311019990. mechanical only. | |
| Mar 12, 2024 | Completed | 221 Main St | R L H Fire Protection Inc | ti 202401264744-fire sprinkler to relocate (2) sprinklers, add (8) sprinklers and remove (3) sprikler on the 7th floor | $5,000 |
| Mar 5, 2024 | Completed | 221 Main St | Sabah International Incorporated | 7th fl provide modification of the existing fire alarm system. add (6) speaker/strobes-ceiling mounted. add (5) strobes/ceiling mounted. remove (1) speaker/strobe- ceiling mounted | $16,214 |
| Feb 9, 2024 | In progress | 221 Main St | Source Planning And Construction Inc | 12th floor:common area finish upgrades: including lighting, flooring, wall finishes. no construction or elevator modifications. extg and occupancy will not be affected. electrical modifications will be submitted as trade permit only. mep deferred. | $229,327 |
| Feb 9, 2024 | In progress | 221 Main St | Source Planning And Construction Inc | 5th floor:common area finish upgrades: including lighting, flooring, wall finishes. no construction or elevator modifications. extg and occupancy will not be affected. electrical modifications will be submitted as trade permit only. mep deferred. | $217,534 |
| Feb 8, 2024 | In progress | 221 Main St | Richlen Construction | 1st fl suite 102 replacement of existing hood with a new hood at existing current location within suite | $5,000 |
| Feb 1, 2024 | Completed | 221 Main St | Anderson, Rowe & Buckley, Inc. | 8th floor:extg fire sprinkler system t.i. relocate 62 upright, add 8 upright,relocate 67 pendent and add 10 pendent sprinkers. remove 8,ref pa#202311019990. added class 1 standpipe hose connections on one side of exit opening of a horizontal exit. | $85,500 |
| Jan 26, 2024 | In progress | 221 Main St | Source Planning And Construction Inc | suite #700: 7th floor: consists of limited interior demolition & construction of non-structural elements including but not limited to partitions, finishes, electrical outlets and switches. scope of work also includes restroom ada acessibility upgrades. mep plans will be sumitted as seperate permit | $271,648 |
| Nov 16, 2023 | Expired or cancelled | 221 Main St | Pribuss Engineering Inc | 3rd fl - modify sprinkler head locations to accommodate new ceiling and partition layout for existing office space. total sprinklers - 02 | $1,028 |
| Nov 1, 2023 | In progress | 221 Main St | Principal Builders Inc. | 8th flr. office ti. non-structural partitions. structural header for movable walls. new acoustical ceiling. new finishes. all interior work. | $4,001,826 |
| Oct 18, 2023 | Completed | 221 Main St | Gci, Inc | conversion of open space into enclosed meeting rooms. new accessible drinking fountain. new air distribution 1 new vav box, power lighting and signal | $150,000 |
| Oct 17, 2023 | Completed | 221 Main St | Sabah International Incorporated | ground fl, ref 202402085559 #. provide a modification of the (e) fire alarm cafe ground floor kitchen hood supervision. new devices will be tied to the (e) fire alarm system; add 1 monitor module to supervise an (e) kitchen hood | $12,945 |
| Oct 17, 2023 | In progress | 221 Main St | Principal Builders Inc. | 8th floor - demo of non structrual partitions, ceilings, light fixtures, millwork and finishes per ab-117. | $65,000 |
| Sep 13, 2023 | Completed | 221 Main St | Gci, Inc | 16th fl, ste 1600 mechanical reconfiguration of (e) ductwork to accommodate new layout. exiting vav noxes to remain. no new equipment. new power & data for work stations, new lighting & controls | $150,000 |
| Sep 8, 2023 | Never finaled | 221 Main St | R L H Fire Protection Inc | 16/f ste 1600: t.i. improvement per new wall and ceiling layout, new sprinklers 6, relocated spinklers 10 deleted sprinklers 4, ref pa# 202308235061. | $7,000 |
| Sep 6, 2023 | Completed | 221 Main St | Sabah International Incorporated | provide a modification of the (e) fire alarm system for the 16th floor. relocate (4) (e) speaker/strobe - ceiling mounted. remove (1) (e) speaker/strobe - ceiling mounted. ref #202308235061 | $10,767 |
| Aug 23, 2023 | Completed | 221 Main St | Gci, Inc | 16/f: interior demolition of (e) offices & conference room. construction of (2)(n) conference rooms & (3) offices. includes restroom ada upgrades. mep will be separate permit. previously approve path of travel permit #202108126350 | $550,000 |
| Jul 20, 2023 | In progress | 221 Main St | removing antennas, rrus, coax and hardlines. removing cabinets, meters, and electrical cans w/ associated h-frames. returning site to original condition. | $20,000 | |
| Jun 8, 2023 | Completed | 221 Main St | Principal Builders Inc. | 9f, 14f, 15f - minor ti to (e) 9f, 14f, 15f pantry & support areas for sfdph & safety compliance | $120,000 |
| Dec 23, 2022 | Never finaled | 221 Main St | Principal Builders Inc. | minor t.i. to (e) 14th fl. office space to install single occupant phone booths per plan and associated electrical work | $40,000 |
| Dec 23, 2022 | Never finaled | 221 Main St | Principal Builders Inc. | minor t.i of (e) office including demo of non-load bearing partitions to turn 2 (e) offices into 1 (n) larger office, install of (n) single user phone booths and electrical as required | $40,000 |
| Dec 23, 2022 | Never finaled | 221 Main St | Principal Builders Inc. | minor t.i. to (e) 9th fl office space to install single occupant phone booths per plan elec work as needed | $40,000 |
| Nov 18, 2022 | Completed | 221 Main St | Anderson, Rowe & Buckley, Inc. | fire pump replacement. maintenance only. | $25,000 |
| Nov 16, 2022 | Never finaled | 221 Main St | Anderson, Rowe & Buckley, Inc. | 12th floor-sutie #1250:demo extg duct and hvac equip. install new duct and hvac equip. ref permit 202208231033 | $44,000 |
| Oct 14, 2022 | Completed | 221 Main St | Capitol Electric Const | provide power and lighting for spec suite 1240 refe 202206025455 | $8,530 |
| Aug 23, 2022 | Completed | 221 Main St | Sabah International Incorporated | suite 1250: provide modification of (e) f/a system, add (1) ceiling mount strobe & (2) ceiling mount speaker/strobe, relocate (3) ceiling mount notification devices to provide proper candella coverage. ref bpa#202206025455 | $11,034 |
| Aug 16, 2022 | Completed | 221 Main St | R L H Fire Protection Inc | 12/f: ti ti improvement to suite 1250 only relocate 10 (e) pendents, relocate 16 pendents to upright; delete 3 (e) pendent sprinklers. ref 202206025455. | $1,500 |
| Jul 18, 2022 | Never finaled | 221 Main St | Acco Engineered Systems Inc. Dba Acco En | basement: install 4in settlement joint. structural cuts in basement due to water main pipe repair. minor structural entities. | $72,928 |
| Jun 2, 2022 | Completed | 221 Main St | Richlen Construction | suite 1250: project scope consists of minimal demolition of interior suite partitions along with associated pwer/data, glazing, doors, millwork & lighting. construction consists of minimal amount of nw interior partitions w/power data, glazing, doors, millwork & lighting common area restrm upgrades. | $302,501 |
| Apr 22, 2022 | Completed | 221 Main St | Golden Gate Fire Protection Inc | 13th fl, ste 1340: : fire sprinkler - relocate 1 upright sprinkler. ti ref pa# 202201246529. | $1,000 |
| Apr 5, 2022 | Completed | 221 Main St | Sabah International Incorporated | modify (e) fire alarm system. add 1 control relay, 1 smoke detector. ref ti pa# 202201246529. | $11,230 |
| Mar 25, 2022 | Completed | 221 Main St | Sabah International Incorporated | ste 580. as built permit pa# 202201135948. additional work added: add (1) led ceiling mount speaker/strobe. remove (1) led wall mount speaker/strobe. | |
| Feb 3, 2022 | Completed | 221 Main St | Sabah International Incorporated | suite 1310: modify (e) fire alarm system, add (4) ceiling speaker/strobes. ref bpa# 202112144352 | $10,056 |
| Jan 24, 2022 | Completed | 221 Main St | Rossi Builders Inc. | suite 1340: interior t.i. in (e) space. rmeove (e) walls. replace with full height, upgarde building security card readers, match (e) finishes. no exterior or restroom work. | $528,197 |
| Jan 13, 2022 | Completed | 221 Main St | Sabah International Incorporated | ste 580: t.i pa# 2021-1013-0345. modify existing fire alarm system. add (11) led ceiling speaker/strobes, (11) led ceiling strobes, (1) led wall speaker/strobe, (1) control relay for access control tie in. | $24,356 |
| Jan 11, 2022 | Completed | 221 Main St | Source Planning And Construction Inc | 5th fl,ste 580- remove fire smoke dampers from project. none required and none existing. correction of the record. ref pa# 202110130345. | |
| Jan 4, 2022 | Completed | 221 Main St | Golden Gate Fire Protection Inc | 5th fl - fire sprinklers relocate 50 pendant sprinklers and relocate 4 uprights. ref pa 2021-1013-0345 | $27,000 |
| Dec 28, 2021 | Completed | 221 Main St | Golden Gate Fire Protection Inc | 13/f suite 1310: fire sprinklers, relocate 1 pendent sprinkler and add 2 pendents. ref ti permit 202112144352. | $2,000 |
| Dec 14, 2021 | Completed | 221 Main St | Source Planning And Construction Inc | scope consist of bulding a new wellness room,finish upgrades & new light fisture @ wellness room. minor retroom upgrades will be perfomed as well to meet the 20% rule.the suite is currently unocupied,electrical & mechanical,plumbing modifications will be submitted as a trade permit. | $54,967 |
| Oct 25, 2021 | Completed | 221 Main St | Western Allied Mechanical Inc. | removal and replacement of the existing tenant cooling towers (2 ea), replacement of condenser water pumps (2 ea), and installation of a new filtration system (1 ea). install a total of (4 ea) vfd's; 2 for the cooling towers and 2 for the condernser water pumps. | $409,600 |
| Oct 15, 2021 | Completed | 221 Main St | Bcci Construction Company | revise egress and occupancy analysis for a-2 assembly area. ref 202102184912. | |
| Oct 13, 2021 | Completed | 221 Main St | Source Planning And Construction Inc | ste 580: finish upgrade of existing office bldg. no change of occupancy,addition of new partitions, ceilings, millwork,new meps layout and interior finishes. | $1,121,264 |
| Aug 27, 2021 | Completed | 221 Main St | Bcci Construction Company | to comply with abe ordinance. replacement of toe locks at all business entry doors on gr fl and new power door actuator and door signage at spear street retail entry only per abe ordinances. | $20,000 |
| Aug 12, 2021 | Completed | 221 Main St | Bcci Construction Company | grd floor consist at new power door activator and signage. basement consist of restriping of ada stall . 5th floor consist of restroom and drinking fountain upgrades. 5th floor consist of restroom and drinking fountain upgrades. mep deferred separate permit. does not affect occupant load calcs | $181,250 |
| Apr 7, 2021 | Completed | 221 Main St | Sabah International Incorporated | ti # 2021-0218-9912 modify existing fire alarm system. add (4) ceiling speaker/strobes. remove (3) ceiling notification devices. adjust (2) candela ratings of existing mac appliances. | $11,338 |
| Mar 16, 2021 | Completed | 221 Main St | Golden Gate Fire Protection Inc | fire sprinklers; relocate 4 pendent sprinklers on the 13th floor. t.i. ref # 2021-02-18-4912 | $2,000 |
| Feb 18, 2021 | Completed | 221 Main St | Bcci Construction Company | 13/f ste 1340: demo of demising wall, door and multimedia in conference room. new partitions, finishes, millwork, furnishing and electrical. electrical drawing included. | $270,000 |
| Sep 12, 2020 | Completed | 221 Main St | Principal Builders Inc. | 11th flr. deferred electrical for t.i 202008081398. new lighting and controls for restrooms | |
| Sep 3, 2020 | Completed | 221 Main St | Anderson, Rowe & Buckley, Inc. | added 1 sprinkler head. relocate 6 sprinklers. | $3,500 |
| Aug 8, 2020 | Completed | 221 Main St | Principal Builders Inc. | barrier removal to restrooms. existing mechanical, electrical, life safety & sprinklers system are not included. | $20,000 |
| Feb 26, 2020 | Completed | 221 Main St | Sabah International Incorporated | rev to pa# 201910255610; rewire circuits 14.1.2 add 14.1.4 of fire alarm system, add (1) rath call station to 2-way communication system | |
| Jan 29, 2020 | Never finaled | 221 Main St | Sabah International Incorporated | as built for pa# 201801239224. | |
| Jan 23, 2020 | Never finaled | 221 Main St | Vkk Signmakers Inc. | install one illuminated exterior sign "docusign" | $14,700 |
| Jan 17, 2020 | Completed | 221 Main St | Sabah International Incorporated | 16th fl - as built for pa 2019-1002-3254 | |
| Nov 7, 2019 | Completed | 221 Main St | Sabah International Incorporated | 2nd floor: field revision as-built drawings. it reference pa#2019-0620-3958 | |
| Nov 7, 2019 | Completed | 221 Main St | Sabah International Incorporated | 16th floor: modify exisiting fire alarm system. add 2 control relays, 1 duct detector, 4 ceiling strobes, 9 ceiling speaker/strobes, 1 weatherproof speaker/strobe, demo 14 existing speaker/stobe. ti ref. pa# 2019-0911-1302 | $18,088 |
| Nov 5, 2019 | Never finaled | 221 Main St | Lend Lease (Us) Construction Inc | 1/f: install new pre manufactured ramp along south elevation bldg on level 01/ground level which is exterior. temporary rerouting of extg egress path from extg to public way. maher n/a. | $8,000 |
| Oct 29, 2019 | Completed | 221 Main St | Source Planning And Construction Inc | 16th fl - mechanical work for tenant improvement. conversion of the 16th floor cooling only vav with perimeter overhead heating system to traditional vav reheat system for ste 1650 | |
| Oct 25, 2019 | Completed | 221 Main St | Sabah International Incorporated | 14/f: modfify e fire alarm system. add 1 control relay, 1 duct detector, 5 ceiling strobs, 17 ceiling speaker strobes. 5 e speakers, 7 e strobes, 10 e speaker strobes ti 201907317416. | $18,130 |
| Oct 17, 2019 | Completed | 221 Main St | Golden Gate Fire Protection Inc | 16th floor: fire sprinkler only- relocate 7 pendents and 6 conceal heads and also relocate 35 uprights for docusign 16th floor | $24,000 |
| Oct 4, 2019 | Completed | 221 Main St | Gci, Inc | 16th floor: mech and elect: demo extg duct, relocate extg thermostats and grilles. install new equip. partial scope office tenant. retrofit lighting, power and signal, lighting & controlls. ref app#201906102966. n/a for maher. | $100,000 |
| Oct 2, 2019 | Completed | 221 Main St | Sabah International Incorporated | ti 201906102966 modify (e) fa system, add 6 ceiling speaker strobes relocate 7 (e) speaker strobes | $11,900 |
| Sep 16, 2019 | Completed | 221 Main St | Golden Gate Fire Protection Inc | fire sprinkler only. relocate 17 pendents, add 1. relocate 2 concealed heads. relocate 40 uprights for docusign 14th fl | $30,000 |
| Sep 11, 2019 | Completed | 221 Main St | Principal Builders Inc. | 16/f: t.i. demo and construct new non-load bearing partition, ceilings, doors, milwork, fniisehs & mep system. fire sprinklers and life safety deferred. maher n/a. | $650,000 |
| Sep 9, 2019 | Completed | 221 Main St | R L H Fire Protection Inc | fire sprinkler - relocate 5 and add 3 pendent sprinklers on the 16th. ref 201906102966 | $2,500 |
| Aug 6, 2019 | Completed | 221 Main St | Golden Gate Fire Protection Inc | 2nd fl - fire sprinkler only. relocate 36 pendents, add 1 relocate 3 conceal heads, relocate 47, add8 upright for tradeshift. ref pa 2019-0513-0444 | $52,500 |
| Jul 31, 2019 | Completed | 221 Main St | Principal Builders Inc. | 14th flr. tenant improvement to incl new partitions and finishes, ceiling, lighting, mech and electrical. life safety and fire sprinkler under separate permit | $1,100,000 |
| Jun 27, 2019 | Completed | 221 Main St | Source Planning And Construction Inc | ref pa# 201905130444; mep for t.i. | $50,000 |
| Jun 20, 2019 | Completed | 221 Main St | Sabah International Incorporated | 2nd floor: add 1 power supply, 10 strobes & 40 speaker/strobes, rlocate 2 extg door holders, 1 power supply, 1 strobes and 5 speaker/strobes. ref app#201905130444. n/a for maher | $28,965 |
| Jun 10, 2019 | Completed | 221 Main St | Gci, Inc | 16/f: interior tenant improvement: remove select walls, interior glazing, carpet and cieling, add non rated partitions, doors, interior glazing and casework. n/a for maher | $296,000 |
| May 28, 2019 | Completed | 221 Main St | Source Planning And Construction Inc | 2nd fl - structural work for moveable partitions ref pa 2019-0513-0444 | |
| May 20, 2019 | Completed | 221 Main St | Source Planning And Construction Inc | 7th fl: suite #770: mechanical for 201901039531. n/a for maher. | |
| May 13, 2019 | Completed | 221 Main St | Source Planning And Construction Inc | 2nd fl, ste 250 - ti selective demo of non-load bearing partitions and modification of (e) ti. selective demo & construction of non-load bearing partitions. (n) office doors & frmaes, partial (n) ceiling grid/tile. mep under separate permit. life safety & sprinklers under separate permit | $1,556,000 |
| Apr 10, 2019 | Never finaled | 221 Main St | R L H Fire Protection Inc | fire sprinkler permit relocate 34 add 9 and delete 5 sprinklers on the 7th flr ref 201901039531 maher na | $12,000 |
| Apr 4, 2019 | Never finaled | 221 Main St | Sabah International Incorporated | as builts - ref: 2019-0118-0728; corrections: (1) smoke detector instead of (2); (11) ceiling strobes instead of (12). additions: (3) duct smoke detectors; (3) high power control relays. | $15,524 |
| Mar 7, 2019 | Completed | 221 Main St | Source Planning And Construction Inc | 7th flr. electrical work for ti on the 7th fl. ref pa #201901039505. | $35,000 |
| Mar 7, 2019 | Completed | 221 Main St | Sabah International Incorporated | 7/f: modify (e) f/a system. add 1 new booster power supply, 1 new dual input module, 1 new wall strobe, 1 new ceiling strobe, 6 new ceiling speaker/strobe. maher n/a. | $12,784 |
| Mar 7, 2019 | Completed | 221 Main St | Source Planning And Construction Inc | electrical work for ti on the 16th fl. ref pa #201901039509. | $34,000 |
| Mar 7, 2019 | Completed | 221 Main St | Source Planning And Construction Inc | suite 770. electrical work for ti for suite 770. ref pa #201901039531. | $100,000 |
| Feb 20, 2019 | Never finaled | 221 Main St | Novo Construction Inc | 10/f: t.i. to include new partitions, millwork, finishes, ceiling, lighting, mechanincal & electrical. n/a haher | $270,000 |
| Feb 12, 2019 | Completed | 221 Main St | Sabah International Incorporated | ref pa# 201812219008; modify (e) fire alarm system, add (1) power supply, (1) ct2 module and (5) ceiling speaker/strobes | $9,656 |
| Jan 23, 2019 | Completed | 221 Main St | Pioneer Fire Inc. | 15th floor: relocate 55 pendents, remove 4 pendents 201811156051 | $11,605 |
| Jan 18, 2019 | Never finaled | 221 Main St | Sabah International Incorporated | provide a modification of e fire alarm system, add 1 remote pwr supply, 12 strobes, 2 smoke detectors, 21 speaker strobes, 1 input module ti 201811156051 | $16,844 |
| Jan 3, 2019 | Completed | 221 Main St | Source Planning And Construction Inc | 7th fl: building common area improvements, including new lighting wall and fl finishes. mep & fire life safety under separate permit | $15,000 |
| Jan 3, 2019 | Completed | 221 Main St | Source Planning And Construction Inc | suite 770. tenant improvements incl demo of non-structural partitions, new non-structural partitions. mep plus fire life safety under separate permit | $626,000 |
| Jan 3, 2019 | Completed | 221 Main St | Source Planning And Construction Inc | 16th fl: building common area improvements including new lighting wall and floor finishes, mep & fire life safety under separate permit | $15,000 |
| Dec 21, 2018 | Completed | 221 Main St | Pioneer Fire Inc. | 12th floor: relocate 32 pendents, remove 11 pendents ref 201812037236 | $18,861 |
| Dec 3, 2018 | Completed | 221 Main St | Novo Construction Inc | mechanical and electrical for ti on 15th flr ref 201811156051 maher na | $25,000 |
| Dec 3, 2018 | Completed | 221 Main St | Novo Construction Inc | 12th fl - ti to include interior demo, new partitions, millwork, ceiling finishes, mechanical and elelctrical, life saftey and fire sprinkler under separate permit | $700,000 |
| Nov 21, 2018 | Never finaled | 221 Main St | Sabah International Incorporated | provide emergency 2-way communication system.install(1) rath head end unit,(1)battery back up supply,(1) fire alarm supervision system,(7) rath call stations,(2) command centers,(2) stairwell unblock buttons. | $51,264 |
| Nov 15, 2018 | Completed | 221 Main St | Novo Construction Inc | 15th fl: ti to include dmeolition of non-load bearing partitionsm door assemblies, ceilings & light fixtures. new partitions, ceiling, light fixtures. mep under sep permit. | $600,000 |
| Jul 25, 2018 | Never finaled | 221 Main St | R L H Fire Protection Inc | 7th flr. fire sprinklers. elevator modernization, remove heads, pipe and fitting from elevator machine room on 7th flr and roof per approval letter dated 5/30/18. | $6,720 |
| Jul 6, 2018 | Completed | 221 Main St | Gci, Inc | electrical. reference app#201803153711. n/a for maher mechanical, sprinkler and fire alarm separte permit. | |
| May 23, 2018 | Completed | 221 Main St | Sabah International Incorporated | ste 250: as built for permit #201804257308. add (3) ceiling speaker/strobes. | |
| May 15, 2018 | Never finaled | 221 Main St | Golden Gate Fire Protection Inc | 2nd and 6th floors: fire sprinkler only. no work on 4th floor restroom. n/a for maher. revision to app#201805118889. bldg t.i. 201801108296 | $1,000 |
| May 11, 2018 | Completed | 221 Main St | Golden Gate Fire Protection Inc | 4/f & 6/f: relocate 6 pendent fire sprinklers total: 3 heads on 4/f restroom & 3 on 6/f restroom. | $3,000 |
| Apr 25, 2018 | Completed | 221 Main St | Sabah International Incorporated | 2nd flr, suite 250 - modify (e) fa system to keep core and common areas intact - add bps, 3 smoke detectors, 7 speaker strobes, 2 strobes. fa ti for rest of floor under separate permit(s). maher na ref#201804116058. | $17,544 |
| Apr 11, 2018 | Completed | 221 Main St | Gci, Inc | 2nd floor/suite 250: revision to app#201801108296 reducing the scope of demo and build back. n/a for maher | |
| Mar 29, 2018 | Completed | 221 Main St | Sabah International Incorporated | suite 1350: provide modification of existing f.a. system: add (1) remote power supply, (1) ccis module, (3) speakers/strobes, (3) strobes. ref bpa #201801128506. maher na. | $10,000 |
| Mar 21, 2018 | Completed | 221 Main St | Gci, Inc | ste 1350 - mechanical & electrical ref pa 2018-0112-8506 | $110,000 |
| Mar 21, 2018 | Completed | 221 Main St | Gci, Inc | ste 1340 - mechanical & electrical ref pa 2018-0116-8668 | $36,220 |
| Mar 21, 2018 | Completed | 221 Main St | Gci, Inc | 2nd fl - mechanical & electrical ref pa 2018-8502 | $85,000 |
| Mar 21, 2018 | Completed | 221 Main St | Gci, Inc | 6th fl - mechanical & electrical ref pa 2018-0116-1870 | $35,000 |
| Mar 15, 2018 | Completed | 221 Main St | Gci, Inc | 4th floor: common area improvements including new lighting, wall and floor finishes. n/a for maher | $70,000 |
| Mar 12, 2018 | Completed | 221 Main St | Golden Gate Fire Protection Inc | 13th flr - fire sprinkler only ref 201801128506 relocate 5 pendents for suite 1350 | $2,750 |
| Mar 1, 2018 | Never finaled | 221 Main St | Gci, Inc | 2nd floor:revision to app#201801128502 to demo extg trash chute and structural details to infill. to add waste receptacle at ada height. n/a maher | $5,000 |
| Feb 22, 2018 | Never finaled | 221 Main St | Gci, Inc | revision to app#201801168670 to demo extg door and corridor wall as shown, prep for header flush with ceiling. demo extg trash chute infill floor as required, reconfigure restroom layout and elevations. n/a for maher | |
| Feb 7, 2018 | Completed | 221 Main St | Gci, Inc | 6th fl, ste 650 ti, includes demo of non-structural partitions and building (n) non-structural partitions. all (n) or revised mep, life safety & sprinklers work will be design build and submitted separately (bldg fully sprinklered). n/a for maher. | $225,000 |
| Jan 23, 2018 | Never finaled | 221 Main St | Sabah International Incorporated | this is a fire alarm system replacement and upgrade to meet 2016 codes based on sffd approved plans of action (three phases combined under this scope) | $153,101 |
| Jan 16, 2018 | Completed | 221 Main St | Gci, Inc | 6th floor: t.i. includes demo of non structural partitions and build back non-structural partitions.(restroom work. mep, life safety and sprinkler under separate permit if needed. (building fully sprinklered) n/a for maher | $162,000 |
| Jan 16, 2018 | Completed | 221 Main St | Gci, Inc | 13th floor: suite #1340. t.i. includes demo of non structural partitions and build new non-structural partitions. mep, life safety and sprinkler under separate permit if needed. (building fully sprinklered) n/a for maher | $200,000 |
| Jan 12, 2018 | Completed | 221 Main St | Gci, Inc | 13th fl suite 1350 ti: the demo of non structural partitions and building new non structural partitions, mep wil be submitted separately. fully sprinkled bldg | $265,000 |
| Jan 12, 2018 | Completed | 221 Main St | Gci, Inc | 2nd ti includes demo of non structural partitions and building new non structural partitons. all new or revised meps, life safety, sprinklers sep permit bldg fully sprinklered | $175,000 |
| Jan 10, 2018 | Completed | 221 Main St | Gci, Inc | 2nd fl, ste 250 ti demo of non-structural partitions and build back non-structural partitions. all new or revised mep, life safety & sprinklers under separate. sprinkler permit number 2018-0108-8036. no other ti within space. | $175,000 |
| Jan 8, 2018 | Completed | 221 Main St | Golden Gate Fire Protection Inc | 2nd flr: fire sprinkler only,relocate 13 pendents, add 1 relocate 127 uprights & plug off 110 outlets for columbia properties maher na | $31,725 |
| Dec 14, 2017 | Completed | 221 Main St | Sabah International Incorporated | 4/f: patio: add 2 new speaker/strobes and replace (e) speaker/strobe. add new strobe power supply to control strobes and interconnect speakers to (e) speaker circuit. ref t.i. 201708013488. | $10,970 |
| Nov 7, 2017 | Never finaled | 221 Main St | street space | ||
| Oct 10, 2017 | Never finaled | 221 Main St | street space | ||
| Oct 3, 2017 | Never finaled | 221 Main St | street space | ||
| Sep 25, 2017 | Completed | 221 Main St | Sabah International Incorporated | 16th floor ste 1650 - as built fire alarm ref 201708114545. fire alarm. n/a maher ordinance | |
| Sep 1, 2017 | Never finaled | 221 Main St | street space | ||
| Aug 11, 2017 | Completed | 221 Main St | Sabah International Incorporated | provide modification to existing system - add 9 speakers/strobes, 4 strobes, 1 power supply. ref pa 2017-0711-1446. maher na | $10,722 |
| Aug 1, 2017 | Completed | 221 Main St | Pioneer Fire Inc. | suite 1650: relocate (56) pendents, relocate (2) upright and remove 11 pendents. ref. #2017-0711-1446. maher na | $21,389 |
| Aug 1, 2017 | Completed | 221 Main St | Bcci Construction Company | 4th flr patio -provide new lighting & branch circuiting of (e) panel . additional new power branch circuiting & raceway systems to new power & signal outlets. title -24. new sinks, plbg fixtures, instant water heaters, sanitary waste, vent & hot & cold water piping. ref pa #201707111462. n/a maher | $40,000 |
| Jul 25, 2017 | Never finaled | 221 Main St | street space & mta parking meter | ||
| Jul 19, 2017 | Completed | 221 Main St | Gci, Inc | 16/f, #1650- new mech & electrical for pa#201707111446. install (18) new cooling only valve boxes & doct. dist. n/a ordinance #155-13 | $250,000 |
| Jul 11, 2017 | Completed | 221 Main St | Bcci Construction Company | 4th floor - patio - renovation of (e) 4th floor patio and garden within a commercial property. landscape improvements to include reconstructing planter areas and program spaces | $1,200,000 |
| Jul 11, 2017 | Completed | 221 Main St | Gci, Inc | 16th floor, ste 1650 ti includes demo of non-structural partitions and build (n) non-structural partitions. meps, life safety/sprinklers under separate permit if needed. building fully sprinklered | $711,095 |
| Jul 6, 2017 | Never finaled | 221 Main St | Bilcor Inc | 13/f. f/a t.i. - install 7 celing mount speaker strobes, install 1 ceiling mount speaker. ref t.i. pa#201706149299. | $4,500 |
| Jun 14, 2017 | Completed | 221 Main St | Gci, Inc | 7 new cooling only vav boxes and duct relocate/modify perimeter heating ductwork rebalance entire suite | $20,000 |
| Jun 14, 2017 | Completed | 221 Main St | Gci, Inc | #1300: new mechanical, new ddc controls, new ducted dist, new lec, lighting, and branch circuiting | $216,000 |
| May 25, 2017 | Completed | 221 Main St | Pioneer Fire Inc. | relocate 17 pendents. ref pa 2017-0503-5534 | $7,950 |
| May 9, 2017 | Never finaled | 221 Main St | street space | ||
| May 9, 2017 | Completed | 221 Main St | Premier Structures Inc | revision to 201702280316 - partial demo of (e) planter wall and installation of a temp ada ramp with hand and guardrails maher na | $5,000 |
| May 3, 2017 | Completed | 221 Main St | Bilcor Inc | ste. #520: fire alarm t.i. relocate (1) ceiling mount speaker/strobe. install (2) ceiling mount strobe. ref. t.i app#2016-08-04-4259 maher n/a | $1,000 |
| May 3, 2017 | Completed | 221 Main St | Gci, Inc | 13/f #1300: demo non structural partitions, mep. components etc. build back of partitions etc. patch paint & repair, mep., life safety & sprinklers under seperate permit. n/a ordinance #155-13 mep also deferred. | $380,842 |
| Apr 18, 2017 | Completed | 221 Main St | Pioneer Fire Inc. | #520 - relocate 6 pendents. ref pa #201608044259. n/a for maher. | $15,606 |
| Apr 6, 2017 | Completed | 221 Main St | Gci, Inc | 5/f #520- revision to pa#201608044259, new double door, (n) office space etc. n/a ordinance #155-13 | $17,130 |
| Apr 5, 2017 | Never finaled | 221 Main St | Premier Structures Inc | change to temporary wall enclosure, 5 11'1/2, approved on previous permit 201702280316 for approved metal enclosed temporary playground. | |
| Mar 30, 2017 | Never finaled | 221 Main St | street space | ||
| Mar 17, 2017 | Expired or cancelled | 221 Main St | Dome Construction Corp | 4th floor - demo of non-structural walls, millwork and electrical. it also includes new construction of interior partitions, millwork, electrical and relocation of light fixture | $80,000 |
| Mar 15, 2017 | Never finaled | 221 Main St | street space permit |