FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 29, 2026In progress221 Main Strevision to bpa# 202510248119 alteration anchorage detail for installation of phone booths at level 5 & 6$10,000
Sep 14, 2026In progress221 Main StGci, Inc12th floor- structural only permit to show anchorage of idf racks. scope also includs removal of seismic bracing requirement for ductwork shown on pa#2026-0312-7419.
Sep 11, 2026In progress221 Main StRichlen Constructionnew lobby level security improvements-installing turnstiles$250,000
Jul 17, 2026In progress221 Main StPrima Acquire Inc Dba Lahue And Associatfour evacuation maps on 6th floor. 27" x 18"$1,500
Jun 25, 2026In progress221 Main StRichlen Constructiondeferred electrical for 4th floor suite 400 office ti under permit 202604028757.$175,000
Jun 25, 2026In progress221 Main StRichlen Constructionsuite 400: reconfigure existing ductwork, ceiling diffusers, and grilles. provided vav boxes and suspended transfer air fan.$75,000
May 21, 2026In progress221 Main StSabah International Incorporated10th fl l- ref pa 202512222392 there is an existing 2-way communication system back bone installed in the building. provide 2 way communication system call station$9,000
May 21, 2026Completed221 Main StSabah International Incorporated11th fl l- ref pa 202512151826 there is an existing 2-way communication system back bone installed in the building. provide 2 way communication system call station$9,000
Apr 29, 2026In progress221 Main StSkyline Constructionste 770: 2 new phone booths in existing office. new outlets for phone booths$10,000
Apr 20, 2026Completed221 Main StPrincipal Builders Inc.10th & 11th fl - evac maps$958
Apr 16, 2026Completed221 Main StPrincipal Builders Inc.revision to 202512222392 10th/f & 202512151826 11th/f: showing shaft due to unforseen conditions, power & lighting refiguration. lighting & ceiling modification, add emergency release buttom at elevator lobby doors
Apr 2, 2026In progress221 Main StRichlen Construction4th floor: limited interior demo & construction of non-strucutral elements ~ partitions - finishes, electrical outlets, ceiling treatments, lighting & switches & restroom upgrades. scope does not affect fixture quantities, occ load or p.o.t. no exterior work.$238,237
Mar 12, 2026In progress221 Main StGci, Inc12th fl - interior ti in an existing building new construction of new partitions, case work & mep upgrades; millwork on 12th fl$3,500,000
Feb 25, 2026Completed221 Main StGci, Incste 1200 interior demo only - tenant readiness. ab-017 applies$78,000
Feb 5, 2026In progress221 Main StPioneer Fire Inc.5th and 6th flr. relocate (29) uprights. convert (43) uprights to pendents, (35) uprights to pendants add (6) pendents. gcti: 202510248119$28,250
Jan 13, 2026In progress221 Main StMc Millan Electricto erect projecting double face electrical sign$10,000
Dec 31, 2025In progress221 Main StGci, Incdemolition of structural deck between level 5 and 6. construct new stair.$700,000
Dec 22, 2025Completed221 Main StPrincipal Builders Inc.10/f. t.i (n) non structural partitions, ceiling, finishes, fixtures. demo under pa# 202511069080.$3,900,000
Dec 15, 2025Completed221 Main StPrincipal Builders Inc.11/fl- ti demo (e) and build (n) partitions (non-structural) accoustical/ceiling, finishes, millwork (n) cafe$4,000,000
Dec 9, 2025In progress221 Main StGci, Inc5/fl-(n) interior ti to include mechanical and electrical . structrual for movable wall. includes mep work$3,927,000
Dec 9, 2025In progress221 Main StGci, Inc6th fl - new construction, mech & elec & structural header for movable walls; power, lighting & signal; install new 37 cooling units, 1 new wshp, new duct$6,158,186
Nov 6, 2025Completed221 Main StPrincipal Builders Inc.10/fl: demo existing non structured partitions, ceilings, lights fixtures, millwork and finishes per ab-017$176,364
Nov 6, 2025Completed221 Main StPrincipal Builders Inc.11/f: demo at non-structural partitions, ceilings, lights fixtures, millwork and finishes. per ab017$179,229
Oct 24, 2025In progress221 Main StGci, Incdemo of existing partitions ceilings and associated mep & finishes on 5th and 6th floor.$10,000
Sep 9, 2025Completed221 Main StGci, Incpriority processing per ab-004.t.i of suites 104 & 250 on 1st fl & 2nd fl to create space for non-profit,private school for for grade 6-12, deferred submittal for pa202504043725 to construct an indoor climbing wall.
Aug 26, 2025Completed221 Main StSabah International Incorporated1&2/fl-this is a fire alarm tenant improvement. demo existing notification appliances from (e) circuit as shown on plans. ref#: 202504043725$54,000
Jul 25, 2025Completed221 Main StPioneer Fire Inc.add & relocating sprinklers to new ceiling and wall configuration. re-locate 77 pendants, add 24 pendants, add 6 upright heads. ref pa# 202504043725$29,850
Apr 15, 2025Completed221 Main StGci, Incpriority processing per ab-004.t.i of suites 104 & 250 on 1st fl & 2nd fl to create space for non-profit,private school for for grade 6-12,interior demolition of interior,including portion of 2nd fl structural slab for(n) stair opening,construction of(n)paritions doors,ceilings,finishes,fixtures.$10,000,000
Feb 5, 2025Completed221 Main StSabah International Incorporated16/fl: modification to existing fire alarm system on the 16th floor. add (2) new speakers/ strobes -ceilng mounted. add (4) strobe -ceiling mounted. ref: pa#2025-0106-7752$17,296
Feb 4, 2025Completed221 Main StPioneer Fire Inc.16 fl: relocate (37) pendents, convert (17) pendents to uprights. ref pa 202501067752$4,200
Feb 4, 2025Completed221 Main StGci, Inc1st & 2nd/f: interior demo per sfdbi ab-107. interior demolition of non-structural elements including but not limited to: interior partitions, doors, finishes, ceilings, lighting, mechanical ducts and equipment, outlets and switches.$427,000
Jan 16, 2025Completed221 Main StAnderson, Rowe & Buckley, Inc.existing fire sprinkler system tenant improvements add 1 fire sprinkler ref pa# 2024-1015-2993$624
Jan 6, 2025Completed221 Main StNovo Construction Inc16th floor: partial floor and ceiling demolition of existing tenant space. new interior partitios, ceilings, and finishes. mechanical and electrical work included.$1,086,562
Dec 17, 2024Completed221 Main StAnderson, Rowe & Buckley, Inc.9th fl - add 1 sprinkler, existing fire sprinkler system tenant improvement ref pa 202410152989$600
Nov 25, 2024In progress221 Main StPrincipal Builders Inc.9/f: deferred submital to pa# 202410152989 for structural anchorage of relocated phone booth.
Nov 14, 2024In progress221 Main StPrincipal Builders Inc.9+14/fl- ref 202410152989 and 202410152993- defered electrical work
Nov 8, 2024Completed221 Main StR L H Fire Protection Inc5th floor. fire sprinkler permit. relocate 7 and delete 1 fire sprinkler in suite 520$2,500
Nov 5, 2024Completed221 Main StSabah International Incorporated1st fl - fire alarm ti - new initiating devices will be tied to the existing slc circuit. new notification appliances will be connected to existing power supply with existing circuit. ref pa 202403147834$27,473
Nov 5, 2024Completed221 Main StSabah International Incorporated5th fl - fire alarm ti - new ceiling strobes will be tied to the existing nac appliances and will be connected to the existing power supply using the existing circuit ref pa 202410032275$18,365
Oct 21, 2024Completed221 Main StMastec Network Solutions Incremoveing antennas, rrus , coas and hard lines. removing cabinets, meter and electrical cans with assoicated h frames. returing site to original condition. patching with (e) wall material$20,000
Oct 15, 2024In progress221 Main StPrincipal Builders Inc.9/f: ti - selective demo of non-load bearing walls and doors.l new gyp soffit and millwork in break 912. new millwork in (e) mothers room 905. selective demo of (e) finishes and finish alterations to (e) office.$30,000
Oct 15, 2024In progress221 Main StPrincipal Builders Inc.14/f: new gyp soffit and millwork in break 1415. selective demo of (e) finishes and finish updates to the (e) office.$50,000
Oct 8, 2024In progress221 Main StSabah International Incorporatedthe intent of this project is an addition to the (e) edwards est3 fire alarm control unit with a new telguard ceullular communicator. ref# 202405071542$7,134
Oct 3, 2024Completed221 Main StRichlen Construction5th flr, ste 520: shall consist of limited interior demolition and const. of non-struc elements including but not necessary lmted to partitions, finishes, electrical outlets and switches. work does not affect fixture quantities, occupant load or path of travel.$291,009
Sep 11, 2024Completed221 Main StGci, Increvise pa# 202403147834: to show updated fixtures, finishes, revised partitions, joists, and posts.
Sep 5, 2024Completed221 Main StGci, Incdeferred permit from pa# 2024-0314-7834: for installation of climbing wall in main gym
Aug 20, 2024Completed221 Main StR L H Fire Protection Incfire sprinkler permit relocate 50, add 8 and remove 3 sprinklers on the 1st fl ref pa 202403147834$15,000
Aug 15, 2024In progress221 Main StPremier Sign Installationsinstall a single faced eletric wall sign btw 3rd & 4th level " docsign"$10,000
May 22, 2024In progress221 Main StPrincipal Builders Inc.8th/f: revision to 202311019990- revised structural design
May 7, 2024Completed221 Main StSabah International Incorporated1/fl- add new remote fire alarm annunciator with controls to engineering office located on garage floor. ref pa#202311019990$17,049
May 1, 2024In progress221 Main StSabah International Incorporated8th fl - as builts ref pa 202403268592
Apr 26, 2024In progress221 Main StSource Planning And Construction Increvision to pa 202401264744 to clarify occupancy load calculation
Apr 23, 2024In progress221 Main StPrincipal Builders Inc.8th floor- rev 202403137701- minor mechanical change$5,000
Apr 10, 2024Completed221 Main StGci, Incwork on ground fl,consists of interior demo of non-structrural elements indlcuding but not necessarily limited to,interior partitions,doors,finishes,ceilings,lighting,mech & elec outlets & switches.addition of(n)gender neutral restrooms.$1,375,798
Apr 2, 2024In progress221 Main StAaa Restaurant Fire Control/Dba Aaa Firefurnish and install 1 ansul r 102 fire suppression system in the main kitchen area on the gr fl. 202402085559$6,941
Mar 28, 2024Completed221 Main StAnderson, Rowe & Buckley, Inc.revision to pa# 202402015049. remove notation of fire hose feed from plan.
Mar 26, 2024In progress221 Main StSabah International Incorporatedmodification to fire alarm system. existing 2 way communication system back bone installed in the building. provide 2 way communication system. ref 202311019990$29,522
Mar 21, 2024In progress221 Main StPrincipal Builders Inc.revision to 202311019990 to remove two previously proposed stand pipe hose cabinets due to not being required by current code cbc 905.4 within 100 ft.
Mar 13, 2024In progress221 Main StPrincipal Builders Inc.8th floor: revision to 202311019990. mechanical only.
Mar 12, 2024Completed221 Main StR L H Fire Protection Incti 202401264744-fire sprinkler to relocate (2) sprinklers, add (8) sprinklers and remove (3) sprikler on the 7th floor$5,000
Mar 5, 2024Completed221 Main StSabah International Incorporated7th fl provide modification of the existing fire alarm system. add (6) speaker/strobes-ceiling mounted. add (5) strobes/ceiling mounted. remove (1) speaker/strobe- ceiling mounted$16,214
Feb 9, 2024In progress221 Main StSource Planning And Construction Inc12th floor:common area finish upgrades: including lighting, flooring, wall finishes. no construction or elevator modifications. extg and occupancy will not be affected. electrical modifications will be submitted as trade permit only. mep deferred.$229,327
Feb 9, 2024In progress221 Main StSource Planning And Construction Inc5th floor:common area finish upgrades: including lighting, flooring, wall finishes. no construction or elevator modifications. extg and occupancy will not be affected. electrical modifications will be submitted as trade permit only. mep deferred.$217,534
Feb 8, 2024In progress221 Main StRichlen Construction1st fl suite 102 replacement of existing hood with a new hood at existing current location within suite$5,000
Feb 1, 2024Completed221 Main StAnderson, Rowe & Buckley, Inc.8th floor:extg fire sprinkler system t.i. relocate 62 upright, add 8 upright,relocate 67 pendent and add 10 pendent sprinkers. remove 8,ref pa#202311019990. added class 1 standpipe hose connections on one side of exit opening of a horizontal exit.$85,500
Jan 26, 2024In progress221 Main StSource Planning And Construction Incsuite #700: 7th floor: consists of limited interior demolition & construction of non-structural elements including but not limited to partitions, finishes, electrical outlets and switches. scope of work also includes restroom ada acessibility upgrades. mep plans will be sumitted as seperate permit$271,648
Nov 16, 2023Expired or cancelled221 Main StPribuss Engineering Inc3rd fl - modify sprinkler head locations to accommodate new ceiling and partition layout for existing office space. total sprinklers - 02$1,028
Nov 1, 2023In progress221 Main StPrincipal Builders Inc.8th flr. office ti. non-structural partitions. structural header for movable walls. new acoustical ceiling. new finishes. all interior work.$4,001,826
Oct 18, 2023Completed221 Main StGci, Incconversion of open space into enclosed meeting rooms. new accessible drinking fountain. new air distribution 1 new vav box, power lighting and signal$150,000
Oct 17, 2023Completed221 Main StSabah International Incorporatedground fl, ref 202402085559 #. provide a modification of the (e) fire alarm cafe ground floor kitchen hood supervision. new devices will be tied to the (e) fire alarm system; add 1 monitor module to supervise an (e) kitchen hood$12,945
Oct 17, 2023In progress221 Main StPrincipal Builders Inc.8th floor - demo of non structrual partitions, ceilings, light fixtures, millwork and finishes per ab-117.$65,000
Sep 13, 2023Completed221 Main StGci, Inc16th fl, ste 1600 mechanical reconfiguration of (e) ductwork to accommodate new layout. exiting vav noxes to remain. no new equipment. new power & data for work stations, new lighting & controls$150,000
Sep 8, 2023Never finaled221 Main StR L H Fire Protection Inc16/f ste 1600: t.i. improvement per new wall and ceiling layout, new sprinklers 6, relocated spinklers 10 deleted sprinklers 4, ref pa# 202308235061.$7,000
Sep 6, 2023Completed221 Main StSabah International Incorporatedprovide a modification of the (e) fire alarm system for the 16th floor. relocate (4) (e) speaker/strobe - ceiling mounted. remove (1) (e) speaker/strobe - ceiling mounted. ref #202308235061$10,767
Aug 23, 2023Completed221 Main StGci, Inc16/f: interior demolition of (e) offices & conference room. construction of (2)(n) conference rooms & (3) offices. includes restroom ada upgrades. mep will be separate permit. previously approve path of travel permit #202108126350$550,000
Jul 20, 2023In progress221 Main Stremoving antennas, rrus, coax and hardlines. removing cabinets, meters, and electrical cans w/ associated h-frames. returning site to original condition.$20,000
Jun 8, 2023Completed221 Main StPrincipal Builders Inc.9f, 14f, 15f - minor ti to (e) 9f, 14f, 15f pantry & support areas for sfdph & safety compliance$120,000
Dec 23, 2022Never finaled221 Main StPrincipal Builders Inc.minor t.i. to (e) 14th fl. office space to install single occupant phone booths per plan and associated electrical work$40,000
Dec 23, 2022Never finaled221 Main StPrincipal Builders Inc.minor t.i of (e) office including demo of non-load bearing partitions to turn 2 (e) offices into 1 (n) larger office, install of (n) single user phone booths and electrical as required$40,000
Dec 23, 2022Never finaled221 Main StPrincipal Builders Inc.minor t.i. to (e) 9th fl office space to install single occupant phone booths per plan elec work as needed$40,000
Nov 18, 2022Completed221 Main StAnderson, Rowe & Buckley, Inc.fire pump replacement. maintenance only.$25,000
Nov 16, 2022Never finaled221 Main StAnderson, Rowe & Buckley, Inc.12th floor-sutie #1250:demo extg duct and hvac equip. install new duct and hvac equip. ref permit 202208231033$44,000
Oct 14, 2022Completed221 Main StCapitol Electric Constprovide power and lighting for spec suite 1240 refe 202206025455$8,530
Aug 23, 2022Completed221 Main StSabah International Incorporatedsuite 1250: provide modification of (e) f/a system, add (1) ceiling mount strobe & (2) ceiling mount speaker/strobe, relocate (3) ceiling mount notification devices to provide proper candella coverage. ref bpa#202206025455$11,034
Aug 16, 2022Completed221 Main StR L H Fire Protection Inc12/f: ti ti improvement to suite 1250 only relocate 10 (e) pendents, relocate 16 pendents to upright; delete 3 (e) pendent sprinklers. ref 202206025455.$1,500
Jul 18, 2022Never finaled221 Main StAcco Engineered Systems Inc. Dba Acco Enbasement: install 4in settlement joint. structural cuts in basement due to water main pipe repair. minor structural entities.$72,928
Jun 2, 2022Completed221 Main StRichlen Constructionsuite 1250: project scope consists of minimal demolition of interior suite partitions along with associated pwer/data, glazing, doors, millwork & lighting. construction consists of minimal amount of nw interior partitions w/power data, glazing, doors, millwork & lighting common area restrm upgrades.$302,501
Apr 22, 2022Completed221 Main StGolden Gate Fire Protection Inc13th fl, ste 1340: : fire sprinkler - relocate 1 upright sprinkler. ti ref pa# 202201246529.$1,000
Apr 5, 2022Completed221 Main StSabah International Incorporatedmodify (e) fire alarm system. add 1 control relay, 1 smoke detector. ref ti pa# 202201246529.$11,230
Mar 25, 2022Completed221 Main StSabah International Incorporatedste 580. as built permit pa# 202201135948. additional work added: add (1) led ceiling mount speaker/strobe. remove (1) led wall mount speaker/strobe.
Feb 3, 2022Completed221 Main StSabah International Incorporatedsuite 1310: modify (e) fire alarm system, add (4) ceiling speaker/strobes. ref bpa# 202112144352$10,056
Jan 24, 2022Completed221 Main StRossi Builders Inc.suite 1340: interior t.i. in (e) space. rmeove (e) walls. replace with full height, upgarde building security card readers, match (e) finishes. no exterior or restroom work.$528,197
Jan 13, 2022Completed221 Main StSabah International Incorporatedste 580: t.i pa# 2021-1013-0345. modify existing fire alarm system. add (11) led ceiling speaker/strobes, (11) led ceiling strobes, (1) led wall speaker/strobe, (1) control relay for access control tie in.$24,356
Jan 11, 2022Completed221 Main StSource Planning And Construction Inc5th fl,ste 580- remove fire smoke dampers from project. none required and none existing. correction of the record. ref pa# 202110130345.
Jan 4, 2022Completed221 Main StGolden Gate Fire Protection Inc5th fl - fire sprinklers relocate 50 pendant sprinklers and relocate 4 uprights. ref pa 2021-1013-0345$27,000
Dec 28, 2021Completed221 Main StGolden Gate Fire Protection Inc13/f suite 1310: fire sprinklers, relocate 1 pendent sprinkler and add 2 pendents. ref ti permit 202112144352.$2,000
Dec 14, 2021Completed221 Main StSource Planning And Construction Incscope consist of bulding a new wellness room,finish upgrades & new light fisture @ wellness room. minor retroom upgrades will be perfomed as well to meet the 20% rule.the suite is currently unocupied,electrical & mechanical,plumbing modifications will be submitted as a trade permit.$54,967
Oct 25, 2021Completed221 Main StWestern Allied Mechanical Inc.removal and replacement of the existing tenant cooling towers (2 ea), replacement of condenser water pumps (2 ea), and installation of a new filtration system (1 ea). install a total of (4 ea) vfd's; 2 for the cooling towers and 2 for the condernser water pumps.$409,600
Oct 15, 2021Completed221 Main StBcci Construction Companyrevise egress and occupancy analysis for a-2 assembly area. ref 202102184912.
Oct 13, 2021Completed221 Main StSource Planning And Construction Incste 580: finish upgrade of existing office bldg. no change of occupancy,addition of new partitions, ceilings, millwork,new meps layout and interior finishes.$1,121,264
Aug 27, 2021Completed221 Main StBcci Construction Companyto comply with abe ordinance. replacement of toe locks at all business entry doors on gr fl and new power door actuator and door signage at spear street retail entry only per abe ordinances.$20,000
Aug 12, 2021Completed221 Main StBcci Construction Companygrd floor consist at new power door activator and signage. basement consist of restriping of ada stall . 5th floor consist of restroom and drinking fountain upgrades. 5th floor consist of restroom and drinking fountain upgrades. mep deferred separate permit. does not affect occupant load calcs$181,250
Apr 7, 2021Completed221 Main StSabah International Incorporatedti # 2021-0218-9912 modify existing fire alarm system. add (4) ceiling speaker/strobes. remove (3) ceiling notification devices. adjust (2) candela ratings of existing mac appliances.$11,338
Mar 16, 2021Completed221 Main StGolden Gate Fire Protection Incfire sprinklers; relocate 4 pendent sprinklers on the 13th floor. t.i. ref # 2021-02-18-4912$2,000
Feb 18, 2021Completed221 Main StBcci Construction Company13/f ste 1340: demo of demising wall, door and multimedia in conference room. new partitions, finishes, millwork, furnishing and electrical. electrical drawing included.$270,000
Sep 12, 2020Completed221 Main StPrincipal Builders Inc.11th flr. deferred electrical for t.i 202008081398. new lighting and controls for restrooms
Sep 3, 2020Completed221 Main StAnderson, Rowe & Buckley, Inc.added 1 sprinkler head. relocate 6 sprinklers.$3,500
Aug 8, 2020Completed221 Main StPrincipal Builders Inc.barrier removal to restrooms. existing mechanical, electrical, life safety & sprinklers system are not included.$20,000
Feb 26, 2020Completed221 Main StSabah International Incorporatedrev to pa# 201910255610; rewire circuits 14.1.2 add 14.1.4 of fire alarm system, add (1) rath call station to 2-way communication system
Jan 29, 2020Never finaled221 Main StSabah International Incorporatedas built for pa# 201801239224.
Jan 23, 2020Never finaled221 Main StVkk Signmakers Inc.install one illuminated exterior sign "docusign"$14,700
Jan 17, 2020Completed221 Main StSabah International Incorporated16th fl - as built for pa 2019-1002-3254
Nov 7, 2019Completed221 Main StSabah International Incorporated2nd floor: field revision as-built drawings. it reference pa#2019-0620-3958
Nov 7, 2019Completed221 Main StSabah International Incorporated16th floor: modify exisiting fire alarm system. add 2 control relays, 1 duct detector, 4 ceiling strobes, 9 ceiling speaker/strobes, 1 weatherproof speaker/strobe, demo 14 existing speaker/stobe. ti ref. pa# 2019-0911-1302$18,088
Nov 5, 2019Never finaled221 Main StLend Lease (Us) Construction Inc1/f: install new pre manufactured ramp along south elevation bldg on level 01/ground level which is exterior. temporary rerouting of extg egress path from extg to public way. maher n/a.$8,000
Oct 29, 2019Completed221 Main StSource Planning And Construction Inc16th fl - mechanical work for tenant improvement. conversion of the 16th floor cooling only vav with perimeter overhead heating system to traditional vav reheat system for ste 1650
Oct 25, 2019Completed221 Main StSabah International Incorporated14/f: modfify e fire alarm system. add 1 control relay, 1 duct detector, 5 ceiling strobs, 17 ceiling speaker strobes. 5 e speakers, 7 e strobes, 10 e speaker strobes ti 201907317416.$18,130
Oct 17, 2019Completed221 Main StGolden Gate Fire Protection Inc16th floor: fire sprinkler only- relocate 7 pendents and 6 conceal heads and also relocate 35 uprights for docusign 16th floor$24,000
Oct 4, 2019Completed221 Main StGci, Inc16th floor: mech and elect: demo extg duct, relocate extg thermostats and grilles. install new equip. partial scope office tenant. retrofit lighting, power and signal, lighting & controlls. ref app#201906102966. n/a for maher.$100,000
Oct 2, 2019Completed221 Main StSabah International Incorporatedti 201906102966 modify (e) fa system, add 6 ceiling speaker strobes relocate 7 (e) speaker strobes$11,900
Sep 16, 2019Completed221 Main StGolden Gate Fire Protection Incfire sprinkler only. relocate 17 pendents, add 1. relocate 2 concealed heads. relocate 40 uprights for docusign 14th fl$30,000
Sep 11, 2019Completed221 Main StPrincipal Builders Inc.16/f: t.i. demo and construct new non-load bearing partition, ceilings, doors, milwork, fniisehs & mep system. fire sprinklers and life safety deferred. maher n/a.$650,000
Sep 9, 2019Completed221 Main StR L H Fire Protection Incfire sprinkler - relocate 5 and add 3 pendent sprinklers on the 16th. ref 201906102966$2,500
Aug 6, 2019Completed221 Main StGolden Gate Fire Protection Inc2nd fl - fire sprinkler only. relocate 36 pendents, add 1 relocate 3 conceal heads, relocate 47, add8 upright for tradeshift. ref pa 2019-0513-0444$52,500
Jul 31, 2019Completed221 Main StPrincipal Builders Inc.14th flr. tenant improvement to incl new partitions and finishes, ceiling, lighting, mech and electrical. life safety and fire sprinkler under separate permit$1,100,000
Jun 27, 2019Completed221 Main StSource Planning And Construction Incref pa# 201905130444; mep for t.i.$50,000
Jun 20, 2019Completed221 Main StSabah International Incorporated2nd floor: add 1 power supply, 10 strobes & 40 speaker/strobes, rlocate 2 extg door holders, 1 power supply, 1 strobes and 5 speaker/strobes. ref app#201905130444. n/a for maher$28,965
Jun 10, 2019Completed221 Main StGci, Inc16/f: interior tenant improvement: remove select walls, interior glazing, carpet and cieling, add non rated partitions, doors, interior glazing and casework. n/a for maher$296,000
May 28, 2019Completed221 Main StSource Planning And Construction Inc2nd fl - structural work for moveable partitions ref pa 2019-0513-0444
May 20, 2019Completed221 Main StSource Planning And Construction Inc7th fl: suite #770: mechanical for 201901039531. n/a for maher.
May 13, 2019Completed221 Main StSource Planning And Construction Inc2nd fl, ste 250 - ti selective demo of non-load bearing partitions and modification of (e) ti. selective demo & construction of non-load bearing partitions. (n) office doors & frmaes, partial (n) ceiling grid/tile. mep under separate permit. life safety & sprinklers under separate permit$1,556,000
Apr 10, 2019Never finaled221 Main StR L H Fire Protection Incfire sprinkler permit relocate 34 add 9 and delete 5 sprinklers on the 7th flr ref 201901039531 maher na$12,000
Apr 4, 2019Never finaled221 Main StSabah International Incorporatedas builts - ref: 2019-0118-0728; corrections: (1) smoke detector instead of (2); (11) ceiling strobes instead of (12). additions: (3) duct smoke detectors; (3) high power control relays.$15,524
Mar 7, 2019Completed221 Main StSource Planning And Construction Inc7th flr. electrical work for ti on the 7th fl. ref pa #201901039505.$35,000
Mar 7, 2019Completed221 Main StSabah International Incorporated7/f: modify (e) f/a system. add 1 new booster power supply, 1 new dual input module, 1 new wall strobe, 1 new ceiling strobe, 6 new ceiling speaker/strobe. maher n/a.$12,784
Mar 7, 2019Completed221 Main StSource Planning And Construction Incelectrical work for ti on the 16th fl. ref pa #201901039509.$34,000
Mar 7, 2019Completed221 Main StSource Planning And Construction Incsuite 770. electrical work for ti for suite 770. ref pa #201901039531.$100,000
Feb 20, 2019Never finaled221 Main StNovo Construction Inc10/f: t.i. to include new partitions, millwork, finishes, ceiling, lighting, mechanincal & electrical. n/a haher$270,000
Feb 12, 2019Completed221 Main StSabah International Incorporatedref pa# 201812219008; modify (e) fire alarm system, add (1) power supply, (1) ct2 module and (5) ceiling speaker/strobes$9,656
Jan 23, 2019Completed221 Main StPioneer Fire Inc.15th floor: relocate 55 pendents, remove 4 pendents 201811156051$11,605
Jan 18, 2019Never finaled221 Main StSabah International Incorporatedprovide a modification of e fire alarm system, add 1 remote pwr supply, 12 strobes, 2 smoke detectors, 21 speaker strobes, 1 input module ti 201811156051$16,844
Jan 3, 2019Completed221 Main StSource Planning And Construction Inc7th fl: building common area improvements, including new lighting wall and fl finishes. mep & fire life safety under separate permit$15,000
Jan 3, 2019Completed221 Main StSource Planning And Construction Incsuite 770. tenant improvements incl demo of non-structural partitions, new non-structural partitions. mep plus fire life safety under separate permit$626,000
Jan 3, 2019Completed221 Main StSource Planning And Construction Inc16th fl: building common area improvements including new lighting wall and floor finishes, mep & fire life safety under separate permit$15,000
Dec 21, 2018Completed221 Main StPioneer Fire Inc.12th floor: relocate 32 pendents, remove 11 pendents ref 201812037236$18,861
Dec 3, 2018Completed221 Main StNovo Construction Incmechanical and electrical for ti on 15th flr ref 201811156051 maher na$25,000
Dec 3, 2018Completed221 Main StNovo Construction Inc12th fl - ti to include interior demo, new partitions, millwork, ceiling finishes, mechanical and elelctrical, life saftey and fire sprinkler under separate permit$700,000
Nov 21, 2018Never finaled221 Main StSabah International Incorporatedprovide emergency 2-way communication system.install(1) rath head end unit,(1)battery back up supply,(1) fire alarm supervision system,(7) rath call stations,(2) command centers,(2) stairwell unblock buttons.$51,264
Nov 15, 2018Completed221 Main StNovo Construction Inc15th fl: ti to include dmeolition of non-load bearing partitionsm door assemblies, ceilings & light fixtures. new partitions, ceiling, light fixtures. mep under sep permit.$600,000
Jul 25, 2018Never finaled221 Main StR L H Fire Protection Inc7th flr. fire sprinklers. elevator modernization, remove heads, pipe and fitting from elevator machine room on 7th flr and roof per approval letter dated 5/30/18.$6,720
Jul 6, 2018Completed221 Main StGci, Incelectrical. reference app#201803153711. n/a for maher mechanical, sprinkler and fire alarm separte permit.
May 23, 2018Completed221 Main StSabah International Incorporatedste 250: as built for permit #201804257308. add (3) ceiling speaker/strobes.
May 15, 2018Never finaled221 Main StGolden Gate Fire Protection Inc2nd and 6th floors: fire sprinkler only. no work on 4th floor restroom. n/a for maher. revision to app#201805118889. bldg t.i. 201801108296$1,000
May 11, 2018Completed221 Main StGolden Gate Fire Protection Inc4/f & 6/f: relocate 6 pendent fire sprinklers total: 3 heads on 4/f restroom & 3 on 6/f restroom.$3,000
Apr 25, 2018Completed221 Main StSabah International Incorporated2nd flr, suite 250 - modify (e) fa system to keep core and common areas intact - add bps, 3 smoke detectors, 7 speaker strobes, 2 strobes. fa ti for rest of floor under separate permit(s). maher na ref#201804116058.$17,544
Apr 11, 2018Completed221 Main StGci, Inc2nd floor/suite 250: revision to app#201801108296 reducing the scope of demo and build back. n/a for maher
Mar 29, 2018Completed221 Main StSabah International Incorporatedsuite 1350: provide modification of existing f.a. system: add (1) remote power supply, (1) ccis module, (3) speakers/strobes, (3) strobes. ref bpa #201801128506. maher na.$10,000
Mar 21, 2018Completed221 Main StGci, Incste 1350 - mechanical & electrical ref pa 2018-0112-8506$110,000
Mar 21, 2018Completed221 Main StGci, Incste 1340 - mechanical & electrical ref pa 2018-0116-8668$36,220
Mar 21, 2018Completed221 Main StGci, Inc2nd fl - mechanical & electrical ref pa 2018-8502$85,000
Mar 21, 2018Completed221 Main StGci, Inc6th fl - mechanical & electrical ref pa 2018-0116-1870$35,000
Mar 15, 2018Completed221 Main StGci, Inc4th floor: common area improvements including new lighting, wall and floor finishes. n/a for maher$70,000
Mar 12, 2018Completed221 Main StGolden Gate Fire Protection Inc13th flr - fire sprinkler only ref 201801128506 relocate 5 pendents for suite 1350$2,750
Mar 1, 2018Never finaled221 Main StGci, Inc2nd floor:revision to app#201801128502 to demo extg trash chute and structural details to infill. to add waste receptacle at ada height. n/a maher$5,000
Feb 22, 2018Never finaled221 Main StGci, Increvision to app#201801168670 to demo extg door and corridor wall as shown, prep for header flush with ceiling. demo extg trash chute infill floor as required, reconfigure restroom layout and elevations. n/a for maher
Feb 7, 2018Completed221 Main StGci, Inc6th fl, ste 650 ti, includes demo of non-structural partitions and building (n) non-structural partitions. all (n) or revised mep, life safety & sprinklers work will be design build and submitted separately (bldg fully sprinklered). n/a for maher.$225,000
Jan 23, 2018Never finaled221 Main StSabah International Incorporatedthis is a fire alarm system replacement and upgrade to meet 2016 codes based on sffd approved plans of action (three phases combined under this scope)$153,101
Jan 16, 2018Completed221 Main StGci, Inc6th floor: t.i. includes demo of non structural partitions and build back non-structural partitions.(restroom work. mep, life safety and sprinkler under separate permit if needed. (building fully sprinklered) n/a for maher$162,000
Jan 16, 2018Completed221 Main StGci, Inc13th floor: suite #1340. t.i. includes demo of non structural partitions and build new non-structural partitions. mep, life safety and sprinkler under separate permit if needed. (building fully sprinklered) n/a for maher$200,000
Jan 12, 2018Completed221 Main StGci, Inc13th fl suite 1350 ti: the demo of non structural partitions and building new non structural partitions, mep wil be submitted separately. fully sprinkled bldg$265,000
Jan 12, 2018Completed221 Main StGci, Inc2nd ti includes demo of non structural partitions and building new non structural partitons. all new or revised meps, life safety, sprinklers sep permit bldg fully sprinklered$175,000
Jan 10, 2018Completed221 Main StGci, Inc2nd fl, ste 250 ti demo of non-structural partitions and build back non-structural partitions. all new or revised mep, life safety & sprinklers under separate. sprinkler permit number 2018-0108-8036. no other ti within space.$175,000
Jan 8, 2018Completed221 Main StGolden Gate Fire Protection Inc2nd flr: fire sprinkler only,relocate 13 pendents, add 1 relocate 127 uprights & plug off 110 outlets for columbia properties maher na$31,725
Dec 14, 2017Completed221 Main StSabah International Incorporated4/f: patio: add 2 new speaker/strobes and replace (e) speaker/strobe. add new strobe power supply to control strobes and interconnect speakers to (e) speaker circuit. ref t.i. 201708013488.$10,970
Nov 7, 2017Never finaled221 Main Ststreet space
Oct 10, 2017Never finaled221 Main Ststreet space
Oct 3, 2017Never finaled221 Main Ststreet space
Sep 25, 2017Completed221 Main StSabah International Incorporated16th floor ste 1650 - as built fire alarm ref 201708114545. fire alarm. n/a maher ordinance
Sep 1, 2017Never finaled221 Main Ststreet space
Aug 11, 2017Completed221 Main StSabah International Incorporatedprovide modification to existing system - add 9 speakers/strobes, 4 strobes, 1 power supply. ref pa 2017-0711-1446. maher na$10,722
Aug 1, 2017Completed221 Main StPioneer Fire Inc.suite 1650: relocate (56) pendents, relocate (2) upright and remove 11 pendents. ref. #2017-0711-1446. maher na$21,389
Aug 1, 2017Completed221 Main StBcci Construction Company4th flr patio -provide new lighting & branch circuiting of (e) panel . additional new power branch circuiting & raceway systems to new power & signal outlets. title -24. new sinks, plbg fixtures, instant water heaters, sanitary waste, vent & hot & cold water piping. ref pa #201707111462. n/a maher$40,000
Jul 25, 2017Never finaled221 Main Ststreet space & mta parking meter
Jul 19, 2017Completed221 Main StGci, Inc16/f, #1650- new mech & electrical for pa#201707111446. install (18) new cooling only valve boxes & doct. dist. n/a ordinance #155-13$250,000
Jul 11, 2017Completed221 Main StBcci Construction Company4th floor - patio - renovation of (e) 4th floor patio and garden within a commercial property. landscape improvements to include reconstructing planter areas and program spaces$1,200,000
Jul 11, 2017Completed221 Main StGci, Inc16th floor, ste 1650 ti includes demo of non-structural partitions and build (n) non-structural partitions. meps, life safety/sprinklers under separate permit if needed. building fully sprinklered$711,095
Jul 6, 2017Never finaled221 Main StBilcor Inc13/f. f/a t.i. - install 7 celing mount speaker strobes, install 1 ceiling mount speaker. ref t.i. pa#201706149299.$4,500
Jun 14, 2017Completed221 Main StGci, Inc7 new cooling only vav boxes and duct relocate/modify perimeter heating ductwork rebalance entire suite$20,000
Jun 14, 2017Completed221 Main StGci, Inc#1300: new mechanical, new ddc controls, new ducted dist, new lec, lighting, and branch circuiting$216,000
May 25, 2017Completed221 Main StPioneer Fire Inc.relocate 17 pendents. ref pa 2017-0503-5534$7,950
May 9, 2017Never finaled221 Main Ststreet space
May 9, 2017Completed221 Main StPremier Structures Increvision to 201702280316 - partial demo of (e) planter wall and installation of a temp ada ramp with hand and guardrails maher na$5,000
May 3, 2017Completed221 Main StBilcor Incste. #520: fire alarm t.i. relocate (1) ceiling mount speaker/strobe. install (2) ceiling mount strobe. ref. t.i app#2016-08-04-4259 maher n/a$1,000
May 3, 2017Completed221 Main StGci, Inc13/f #1300: demo non structural partitions, mep. components etc. build back of partitions etc. patch paint & repair, mep., life safety & sprinklers under seperate permit. n/a ordinance #155-13 mep also deferred.$380,842
Apr 18, 2017Completed221 Main StPioneer Fire Inc.#520 - relocate 6 pendents. ref pa #201608044259. n/a for maher.$15,606
Apr 6, 2017Completed221 Main StGci, Inc5/f #520- revision to pa#201608044259, new double door, (n) office space etc. n/a ordinance #155-13$17,130
Apr 5, 2017Never finaled221 Main StPremier Structures Incchange to temporary wall enclosure, 5 11'1/2, approved on previous permit 201702280316 for approved metal enclosed temporary playground.
Mar 30, 2017Never finaled221 Main Ststreet space
Mar 17, 2017Expired or cancelled221 Main StDome Construction Corp4th floor - demo of non-structural walls, millwork and electrical. it also includes new construction of interior partitions, millwork, electrical and relocation of light fixture$80,000
Mar 15, 2017Never finaled221 Main Ststreet space permit