Kevin Treat
- Listed as
- engineer
- Firm
- Kpw Structural Engineers, Inc.
- Based in
- Oakland
- On San Francisco permits
- Oct 2007 to Sep 2026
14 permits since 2000 (engineer on 14 permits): 10 completed, 1 in progress, 1 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 14, 2026 | In progress issued Sep 2026 | 221 Main St | Gci, Inc | 12th floor- structural only permit to show anchorage of idf racks. scope also includs removal of seismic bracing requirement for ductwork shown on pa#2026-0312-7419.Details
12th floor- structural only permit to show anchorage of idf racks. scope also includs removal of seismic bracing requirement for ductwork shown on pa#2026-0312-7419. | |
| May 1, 2025 | Completed final sign-off Apr 2026 | 3106 Turk Bl | enlarge an exterior 4 x 3 window to 4 x 4. removing existing door and adding 6' sliding door. moving a partition wall back 4' to create 2 rooms. adding a kitchenette with a 2 burner stove top. enlarging an existing bathroom. all work at basement level of homeDetails
enlarge an exterior 4 x 3 window to 4 x 4. removing existing door and adding 6' sliding door. moving a partition wall back 4' to create 2 rooms. adding a kitchenette with a 2 burner stove top. enlarging an existing bathroom. all work at basement level of home | $80,000 | |
| Mar 26, 2025 | Completed final sign-off Apr 2025 | 1335 Webster St | Eric F Anderson Incorporated | revision to pa #202502200649- move one (1) row of bollards approx 10' to the westDetails
revision to pa #202502200649- move one (1) row of bollards approx 10' to the west | |
| Nov 6, 2023 | Completed final sign-off Feb 2024 | 2020 Market St | Eric F Anderson Incorporated | add structural support to (e) frame work of monument sign.Details
add structural support to (e) frame work of monument sign. | $79,787 |
| Jun 14, 2022 | Completed final sign-off Mar 2023 | 3950 24th St | P S R West Coast Builders Inc | tenant improvement to remove 6 existing express checkstands and provide 6 new self service checkstands to include installation of cord station and belt systemDetails
tenant improvement to remove 6 existing express checkstands and provide 6 new self service checkstands to include installation of cord station and belt system | $58,000 |
| Apr 23, 2021 | Expired or cancelled cancelled Nov 2024 | 1765 California St | On Top Construction, Inc. | mep work only. replace like for like reach in cases and replacement of a rtu on rooftop. for dph review only to approved pa 202009154220.Details
mep work only. replace like for like reach in cases and replacement of a rtu on rooftop. for dph review only to approved pa 202009154220. | $200,000 |
| Sep 15, 2020 | Completed final sign-off Oct 2022 | 1765 California St | On Top Construction, Inc. | mep work only. replace like for like reach in cases and replacement of a rtu on rooftop. no walls are being constructed. seismic anchers provided. some work being done in garage below for new equipment.Details
mep work only. replace like for like reach in cases and replacement of a rtu on rooftop. no walls are being constructed. seismic anchers provided. some work being done in garage below for new equipment. | $275,000 |
| May 14, 2019 | Completed final sign-off Mar 2022 | 400 Winston Dr | John Sutti & Associates, Inc. | interior t.i. concrete topping slab, walk in cooler & freezer boxer, restroom facilities,interior partitions, interior fixtures, equipment & seating. ceilings & lighting, associated electric, mechanical, plumbing & refrigeration equipment & systems.Details
interior t.i. concrete topping slab, walk in cooler & freezer boxer, restroom facilities,interior partitions, interior fixtures, equipment & seating. ceilings & lighting, associated electric, mechanical, plumbing & refrigeration equipment & systems. | $8,856,000 |
| Jun 12, 2018 | Completed final sign-off May 2019 | 128 Woodland Av | Arcon Construction Corp | structural revision to pa #201710232009: (n) det. 7/a8.1 & det 11/a8.2. show 4x6 post at 4th fl,no new shear walls requiredDetails
structural revision to pa #201710232009: (n) det. 7/a8.1 & det 11/a8.2. show 4x6 post at 4th fl,no new shear walls required | $1,000 |
| Jun 20, 2017 | Completed final sign-off Oct 2017 | 799 Market St | City Mechanical Inc | remove and replace cooling tower on roof. not visible from street. maher n/a.Details
remove and replace cooling tower on roof. not visible from street. maher n/a. | $260,000 |
| Dec 26, 2013 | Completed final sign-off Jan 2015 | 1995 Turk St | work @ unit# 2 only. addition of bedroom, family room, bathroom, electrical, lighting, structural framing upgrades & new egress. tdl all wood windows @ (e) 1st floor. addition of equipment platform over garage. ** maher: compliance with ordinance no# 155-13 not required **Details
work @ unit# 2 only. addition of bedroom, family room, bathroom, electrical, lighting, structural framing upgrades & new egress. tdl all wood windows @ (e) 1st floor. addition of equipment platform over garage. ** maher: compliance with ordinance no# 155-13 not required ** | $40,000 | |
| Feb 2, 2012 | Completed final sign-off Mar 2012 | 1765 California St | On Top Construction, Inc. | whole food market - opening on parking lot to fill with concrete, for structural work only.Details
whole food market - opening on parking lot to fill with concrete, for structural work only. | $1,500 |
| Sep 16, 2011 | Never finaled issued Feb 2012, no final | 690 Van Ness Av | Allied Teamwork Construction Co | fire repair. rebuild to pre-fire condition (shell only). install 3 complete toilet rooms. fire sprinklers, fire alarm (monitoring) and fire suppression system on separate permits. t. i. demolition completed under pa# 2011 0411 3848. revised to core-shell condition. tenant build back sep permit.Details
fire repair. rebuild to pre-fire condition (shell only). install 3 complete toilet rooms. fire sprinklers, fire alarm (monitoring) and fire suppression system on separate permits. t. i. demolition completed under pa# 2011 0411 3848. revised to core-shell condition. tenant build back sep permit. | $300,000 |
| Oct 17, 2007 | Expired or cancelled expired Mar 2009 | 860 De Haro St | remodel kitchen 3 baths all new windows alum insul all new doors int & ext remove glass atrium remove portion of loft new roof deck new wtr htr. open kitchen to dining new beam new wood flooring tile flooring tile flooring new railing @ entry stair new garage door new water feature @ yard new patioDetails
remodel kitchen 3 baths all new windows alum insul all new doors int & ext remove glass atrium remove portion of loft new roof deck new wtr htr. open kitchen to dining new beam new wood flooring tile flooring tile flooring new railing @ entry stair new garage door new water feature @ yard new patio | $150,000 |