Block 3706, lot 047
799 Market St
- City’s use
- Commercial Retail
- Built
- 1968
- Stories
- 8
- Building
- 155,871 sq ft
- Lot
- 17,000 sq ft
- Zoning
- C3R
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
151 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 24, 2026 | Completed final sign-off Sep 2026 | 799 Market St | Levitch Associates, Inc. | 5/f suite 500: legalize installation of (5) freestanding privacy phone booths within existing office space. to comply with sffd nov 2603-0123.Details
5/f suite 500: legalize installation of (5) freestanding privacy phone booths within existing office space. to comply with sffd nov 2603-0123. | $15,000 |
| Jun 23, 2026 | Completed final sign-off Aug 2026 | 799 Market St | Dpr Construction A | 6th and 7th floors: partial interior tenant remodel at 6th and 7th floors. additional power data, reception area closet reconfiguration. plumbing and electrical included, no mechanical.Details
6th and 7th floors: partial interior tenant remodel at 6th and 7th floors. additional power data, reception area closet reconfiguration. plumbing and electrical included, no mechanical. | $325,000 |
| May 15, 2026 | Completed final sign-off Aug 2026 | 799 Market St | Dpr Construction A | 7/f: partial interior t.i. new partial framed wall and cased opening at storage area. replace select storefront with new interior framed portition. mechanical & electrical included.Details
7/f: partial interior t.i. new partial framed wall and cased opening at storage area. replace select storefront with new interior framed portition. mechanical & electrical included. | $120,000 |
| Dec 16, 2025 | Completed final sign-off Jan 2026 | 799 Market St | Aaa Restaurant Fire Control Llc | add/relocate 5 sprinkler heads 7th fl. ref f/s 202510227874Details
add/relocate 5 sprinkler heads 7th fl. ref f/s 202510227874 | $8,400 |
| Dec 10, 2025 | In progress issued Dec 2025 | 799 Market St | Rapid Fire Safety&Security Llc Dba Pafa | fire alarm t.i.: adding 1 strobe, 1 speaker-strobe, relocating 1 strobe & 1 speaker to e) notifier nfs2-3030 fire alarm ststem, ref to 202502281309Details
fire alarm t.i.: adding 1 strobe, 1 speaker-strobe, relocating 1 strobe & 1 speaker to e) notifier nfs2-3030 fire alarm ststem, ref to 202502281309 | $7,128 |
| Dec 3, 2025 | Completed final sign-off Mar 2026 | 799 Market St | Rapid Fire Safety&Security Llc Dba Pafa | 7/f: fire alarm t.i - adding 8 speaker-strobes to existing notifier nfs2-3030 fire alarm system. ref permit 202510298474Details
7/f: fire alarm t.i - adding 8 speaker-strobes to existing notifier nfs2-3030 fire alarm system. ref permit 202510298474 | $12,040 |
| Oct 29, 2025 | Completed final sign-off Mar 2026 | 799 Market St | Marchetti Group | 7/f suite 700: new lighting and new mechanical duct at open office. deffered permit for pa#2025-1022-7874. lighting replacement at private office, restroom & storage.Details
7/f suite 700: new lighting and new mechanical duct at open office. deffered permit for pa#2025-1022-7874. lighting replacement at private office, restroom & storage. | $95,000 |
| Oct 22, 2025 | Completed final sign-off Mar 2026 | 799 Market St | Marchetti Group | 7th floor: spec t.i. (building only). remove existing conf. room for open office. break room remodeling. accessibility work. lavatories replacement, accessible toilet stalls; adjustment at men and women, drinking fountain replacement, urinal adjustment.Details
7th floor: spec t.i. (building only). remove existing conf. room for open office. break room remodeling. accessibility work. lavatories replacement, accessible toilet stalls; adjustment at men and women, drinking fountain replacement, urinal adjustment. | $125,000 |
| Oct 20, 2025 | Completed final sign-off Mar 2026 | 799 Market St | Rapid Fire Safety&Security Llc Dba Pafa | fire alarm ti: adding 15 speaker strobes to existing notifier nfs2-3030 fire alarm system. ref 6th fl : 202508223756 7th fl 202507140713Details
fire alarm ti: adding 15 speaker strobes to existing notifier nfs2-3030 fire alarm system. ref 6th fl : 202508223756 7th fl 202507140713 | $11,406 |
| Oct 7, 2025 | Completed final sign-off Feb 2026 | 799 Market St | Aaa Restaurant Fire Control Llc | add/relocate 133 sprinkler heads. ref ti 202508223756Details
add/relocate 133 sprinkler heads. ref ti 202508223756 | $65,000 |
| Sep 15, 2025 | Completed final sign-off Mar 2026 | 799 Market St | Marchetti Group | 7th floor: remove existing t-bar, mechanical utility and lighting at (open office) of the remaining suite (interior soft demolitions). per ab-017.Details
7th floor: remove existing t-bar, mechanical utility and lighting at (open office) of the remaining suite (interior soft demolitions). per ab-017. | $5,000 |
| Aug 22, 2025 | Completed final sign-off Mar 2026 | 799 Market St | Marchetti Group | 6/7-floor- internal non egress stair walls patching, interior wall at internal stair patching, 35sf, smoke draft patching at internal stairs 35sfDetails
6/7-floor- internal non egress stair walls patching, interior wall at internal stair patching, 35sf, smoke draft patching at internal stairs 35sf | $35,000 |
| Jul 25, 2025 | Completed final sign-off Mar 2026 | 799 Market St | Marchetti Group | 6th & 7th/f: lighting replacement 2 elevator lobby, open office at ste 600 & 700, break room at ste# 700. mech duct replacemenr at open office suites 600 & 700 (suite 600 & 700 are single suite w/ e) internal stair)Details
6th & 7th/f: lighting replacement 2 elevator lobby, open office at ste 600 & 700, break room at ste# 700. mech duct replacemenr at open office suites 600 & 700 (suite 600 & 700 are single suite w/ e) internal stair) | $65,000 |
| Jul 14, 2025 | Completed final sign-off Mar 2026 | 799 Market St | Marchetti Group | 6/f -interior soft demolition: existing non load bearig wall to be removed. remove (e) door (e) stair and guard to remanin, remove (e) t-bar ceiling and lighting at hatched area 6065 sfDetails
6/f -interior soft demolition: existing non load bearig wall to be removed. remove (e) door (e) stair and guard to remanin, remove (e) t-bar ceiling and lighting at hatched area 6065 sf | $28,000 |
| Jul 10, 2025 | In progress filed Jul 2025, not yet issued | 799 Market St | Marchetti Group | 5th floor: lighting replacement inside elevator lobby.Details
5th floor: lighting replacement inside elevator lobby. | $12,000 |
| Jul 9, 2025 | Completed final sign-off Mar 2026 | 799 Market St | Marchetti Group | lighting replacement, 3 power receptacles at main lobby, 1742 sf (1st fl)Details
lighting replacement, 3 power receptacles at main lobby, 1742 sf (1st fl) | $50,000 |
| Feb 28, 2025 | In progress issued Apr 2025 | 799 Market St | Sequoia Pacific Builders Inc | partial t.i. to existing t.i. space including new fitting rooms, new turnstiles at entry, 1 replacement exit door, new power for checkout counter, new outlets in existing fitting rooms.Details
partial t.i. to existing t.i. space including new fitting rooms, new turnstiles at entry, 1 replacement exit door, new power for checkout counter, new outlets in existing fitting rooms. | $75,000 |
| Sep 25, 2024 | Completed final sign-off Feb 2025 | 799 Market St | Blue's Roofing Co | re-roofingDetails
re-roofing | $800,000 |
| Apr 14, 2022 | Never finaled issued Apr 2022, no final | 799 Market St | Pacific Auxiliary Fire Alarm | fire alarm t.i.: replacing obsolete equipment with new digital audio amplifier amd power supply on (e) notifiier nfs2-3030 fire alarm system.Details
fire alarm t.i.: replacing obsolete equipment with new digital audio amplifier amd power supply on (e) notifiier nfs2-3030 fire alarm system. | $12,312 |
| Nov 26, 2019 | Completed final sign-off Jan 2021 | 799 Market St | Pacific Auxiliary Fire Alarm | 6th & 7th fl - fire alarm ti, adding 3 speaker/strobes, removing 1 speaker, removing 1 smoke detector to/from existing notifier nfs2-3030 fire alarm systemDetails
6th & 7th fl - fire alarm ti, adding 3 speaker/strobes, removing 1 speaker, removing 1 smoke detector to/from existing notifier nfs2-3030 fire alarm system | $7,298 |
| Sep 27, 2019 | Expired or cancelled cancelled Jan 2026 | 799 Market St | Pacific Ridge Builders Inc | rev to pa# 201908078172; add non-rated enclosure to rated platform lid over abandoned staircaseDetails
rev to pa# 201908078172; add non-rated enclosure to rated platform lid over abandoned staircase | $10,000 |
| Sep 18, 2019 | Completed final sign-off Nov 2019 | 799 Market St | Red Hawk Fire & Security Ca Llc | 7th fl - add 2 sprinklers in area of work to provide coverage to new stairwell, walls and ceiling additionDetails
7th fl - add 2 sprinklers in area of work to provide coverage to new stairwell, walls and ceiling addition | $6,300 |
| Sep 11, 2019 | Never finaled issued Sep 2019, no final | 799 Market St | Pacific Ridge Builders Inc | 6th & 7th floors - mep for 2019-0807-8172Details
6th & 7th floors - mep for 2019-0807-8172 | $48,700 |
| Aug 7, 2019 | Completed final sign-off Nov 2021 | 799 Market St | Pacific Ridge Builders Inc | 6th & 7th flr - new 2 hr rated encloseure around (e) interconnecting stair. convert 2 (e) huddle rooms into 2 all gender neutral single accessible restroomsDetails
6th & 7th flr - new 2 hr rated encloseure around (e) interconnecting stair. convert 2 (e) huddle rooms into 2 all gender neutral single accessible restrooms | $165,000 |
| Apr 5, 2018 | Expired or cancelled cancelled Jan 2020 | 799 Market St | Gci, Inc | installation of roof deck with guardrails. landscaping, mechanical screens. provide accessable elevator landing. ** maher: n/a **Details
installation of roof deck with guardrails. landscaping, mechanical screens. provide accessable elevator landing. ** maher: n/a ** | $190,000 |
| Mar 13, 2018 | Expired or cancelled withdrawn Apr 2018 | 799 Market St | raise single elevator (1) level to provide roof access. add (n) occupiable roof deck w/ (n) lighting, landscaping, gas fire pit, storage space, mechanical screens & guardrailsDetails
raise single elevator (1) level to provide roof access. add (n) occupiable roof deck w/ (n) lighting, landscaping, gas fire pit, storage space, mechanical screens & guardrails | $1,200,000 | |
| Jul 28, 2017 | Never finaled issued Jul 2017, no final | 799 Market St | street spaceDetails
street space | ||
| Jun 20, 2017 | Completed final sign-off Oct 2017 | 799 Market St | City Mechanical Inc | remove and replace cooling tower on roof. not visible from street. maher n/a.Details
remove and replace cooling tower on roof. not visible from street. maher n/a. | $260,000 |
| Jun 19, 2017 | Never finaled issued Jun 2017, no final | 799 Market St | Pacific Auxiliary Fire Alarm | 5/f #500- t.i. 9 new speakers strobes, 2 new smoke detectors, and 1 relay module are being added to existing system. additionally tenants are locking elevator doors, emergency phone for two way communication is being installed - viking system. ref: #201704214525. maher naDetails
5/f #500- t.i. 9 new speakers strobes, 2 new smoke detectors, and 1 relay module are being added to existing system. additionally tenants are locking elevator doors, emergency phone for two way communication is being installed - viking system. ref: #201704214525. maher na | $16,982 |
| Jun 16, 2017 | Never finaled issued Jun 2017, no final | 799 Market St | street space permitDetails
street space permit | ||
| May 17, 2017 | Completed final sign-off Dec 2017 | 799 Market St | Gci, Inc | #500: new electrical- new lighting & branch circuiting. maintain some (e) power. & mechanical, demo (e) main duct, vav boxes, install new main duct, vav boxes & low side duct work ref 201704214525 maher naDetails
#500: new electrical- new lighting & branch circuiting. maintain some (e) power. & mechanical, demo (e) main duct, vav boxes, install new main duct, vav boxes & low side duct work ref 201704214525 maher na | $130,000 |
| May 4, 2017 | Completed final sign-off Jun 2017 | 799 Market St | Golden Gate Fire Protection Inc | 5th flr: fire sprinklers relocate 1 upright sprinkler. relocate 17 pendents sprinklers. ti 2017-0421-4525 maher naDetails
5th flr: fire sprinklers relocate 1 upright sprinkler. relocate 17 pendents sprinklers. ti 2017-0421-4525 maher na | $9,450 |
| May 3, 2017 | Completed final sign-off Dec 2017 | 799 Market St | Metropolitan Electrical Construction | 5th floor suite 500 - title -24. ref pa #201608245850. n/a maher ordinanceDetails
5th floor suite 500 - title -24. ref pa #201608245850. n/a maher ordinance | $27,000 |
| Apr 21, 2017 | Completed final sign-off Dec 2017 | 799 Market St | Gci, Inc | 5/f #500- full floor revision to pa#201608245850, commercial t.i., demo and new non bearing partitions, new office doors & frames, new millwork, new finishes. buildout new conference rooms. n/a ordinance #155-13Details
5/f #500- full floor revision to pa#201608245850, commercial t.i., demo and new non bearing partitions, new office doors & frames, new millwork, new finishes. buildout new conference rooms. n/a ordinance #155-13 | $325,000 |
| Dec 16, 2016 | Completed final sign-off Feb 2017 | 799 Market St | Pacific Auxiliary Fire Alarm | 5th flr: add 22 speaker/strobes , 1 strobe and 1 smk det to (e) notification nfs2-3030 for suite 500. ref 201608245850 maher naDetails
5th flr: add 22 speaker/strobes , 1 strobe and 1 smk det to (e) notification nfs2-3030 for suite 500. ref 201608245850 maher na | $10,810 |
| Nov 14, 2016 | Completed final sign-off Dec 2017 | 799 Market St | Acco Engineered Systems Inc. Dba Acco En | ste 500: ref. permit 201608245850; tenant improvement ductwork replacement; maher n/aDetails
ste 500: ref. permit 201608245850; tenant improvement ductwork replacement; maher n/a | $120,000 |
| Oct 25, 2016 | Completed final sign-off Jan 2017 | 799 Market St | Golden Gate Fire Protection Inc | 5th floor fire sprinkler: relcoate 119 upright sprinklers, relocate 24 pendent sprinklers. ref #201608245850. n/a maher ordinanceDetails
5th floor fire sprinkler: relcoate 119 upright sprinklers, relocate 24 pendent sprinklers. ref #201608245850. n/a maher ordinance | $76,505 |
| Sep 16, 2016 | Completed final sign-off Oct 2016 | 799 Market St | Pacific Auxiliary Fire Alarm | 6th & 7th floors: fire alarm: add 23 speaker/strobes, 2 speakers & 2smoke detectors. ref 201606170309 maher naDetails
6th & 7th floors: fire alarm: add 23 speaker/strobes, 2 speakers & 2smoke detectors. ref 201606170309 maher na | $15,500 |
| Aug 24, 2016 | Completed final sign-off Dec 2017 | 799 Market St | Gci, Inc | 5th floor suite 500 tenant improvement - non load bearing partitions, ceiling & finishes. mech/elec/plumbing under separate permit. n/a maher ordinanceDetails
5th floor suite 500 tenant improvement - non load bearing partitions, ceiling & finishes. mech/elec/plumbing under separate permit. n/a maher ordinance | $220,000 |
| Aug 23, 2016 | Completed final sign-off Sep 2016 | 799 Market St | R L H Fire Protection Inc | fire sprinkler relocate 71, add 5, delete 8 pendent sprinklers. relocate 6, add 29, delete 4 uprights on 6th and 7th fl. ti 201606170309Details
fire sprinkler relocate 71, add 5, delete 8 pendent sprinklers. relocate 6, add 29, delete 4 uprights on 6th and 7th fl. ti 201606170309 | $33,400 |
| Aug 19, 2016 | Completed final sign-off Nov 2016 | 799 Market St | Principal Builders Inc. | structural work to install stairs between 6th & 7th floors refer to 2016-0617-0309 maher na. fire alarm and sprinkler deferred.Details
structural work to install stairs between 6th & 7th floors refer to 2016-0617-0309 maher na. fire alarm and sprinkler deferred. | $286,000 |
| Aug 8, 2016 | Completed final sign-off Nov 2016 | 799 Market St | Principal Builders Inc. | 6 &7 flrs: title 24 electrical to install new lighting and power, please refer to pa 201606170309 for ti work; maher n/aDetails
6 &7 flrs: title 24 electrical to install new lighting and power, please refer to pa 201606170309 for ti work; maher n/a | $267,625 |
| Aug 8, 2016 | Completed final sign-off Nov 2016 | 799 Market St | Principal Builders Inc. | t-24 mechanical to install new equipment on floor 6 & 7. ref pa 2016-0617-0309 for ti work. maher naDetails
t-24 mechanical to install new equipment on floor 6 & 7. ref pa 2016-0617-0309 for ti work. maher na | $207,875 |
| Jun 17, 2016 | Completed final sign-off Dec 2016 | 799 Market St | Principal Builders Inc. | flrs: 6&7: partial t.i. to build partitions,doors,millwork & finishes in existing tenant space . mep, communicating stair and fire sprinklers/alarms on separate permits; maher n/aDetails
flrs: 6&7: partial t.i. to build partitions,doors,millwork & finishes in existing tenant space . mep, communicating stair and fire sprinklers/alarms on separate permits; maher n/a | $1,600,000 |
| Jun 15, 2016 | Completed final sign-off Nov 2016 | 799 Market St | Principal Builders Inc. | 6th & 7th flr: demo of (e) partition doors & finishes. remain vacant per ab017 all ada under ti permit. maher na. associated with ti 2016-0617-0309.Details
6th & 7th flr: demo of (e) partition doors & finishes. remain vacant per ab017 all ada under ti permit. maher na. associated with ti 2016-0617-0309. | $28,400 |
| Apr 15, 2016 | Completed final sign-off Jun 2016 | 799 Market St | Gci, Inc | 5th flor/suite 500: revision to ref pa 201602028558 & 2016 0224 0331 - deffered electrical for accessible restrooms. maher naDetails
5th flor/suite 500: revision to ref pa 201602028558 & 2016 0224 0331 - deffered electrical for accessible restrooms. maher na | |
| Mar 31, 2016 | Completed final sign-off Jun 2016 | 799 Market St | Pacific Auxiliary Fire Alarm | 5th flr: fire alarm, add two strobes to existing system due to tenant improvement on the fifth floor. ref. bldg 201602240331; maher n/aDetails
5th flr: fire alarm, add two strobes to existing system due to tenant improvement on the fifth floor. ref. bldg 201602240331; maher n/a | $1,300 |
| Mar 29, 2016 | Completed final sign-off Apr 2016 | 799 Market St | Golden Gate Fire Protection Inc | 5th floor fire sprinklers - relocate 8 pendant sprinklers. ref #201602240331. n/a maher ordinanceDetails
5th floor fire sprinklers - relocate 8 pendant sprinklers. ref #201602240331. n/a maher ordinance | $4,120 |
| Feb 29, 2016 | Never finaled issued Feb 2016, no final | 799 Market St | street spaceDetails
street space | ||
| Feb 24, 2016 | Completed final sign-off Jun 2016 | 799 Market St | Gci, Inc | 5th floor - expansion of accessible restrooms, add drinking fountain. maher na changing door at elevator lobby, in-fill wall near attached to exit stairDetails
5th floor - expansion of accessible restrooms, add drinking fountain. maher na changing door at elevator lobby, in-fill wall near attached to exit stair | $66,000 |
| Feb 2, 2016 | Expired or cancelled cancelled Jan 2026 | 799 Market St | 5th floor: modification of extg t.i. to include construction of non-load bearing partitions, new light fixtures including reswitching, new office doors/frames, new millwork, sinks, finishes and accessible restrooms. n/a for maher.Details
5th floor: modification of extg t.i. to include construction of non-load bearing partitions, new light fixtures including reswitching, new office doors/frames, new millwork, sinks, finishes and accessible restrooms. n/a for maher. | $331,286 | |
| Dec 14, 2015 | Expired or cancelled cancelled Jan 2026 | 799 Market St | interior remodel of existing ross store, 1st fl remove select jewelry cases, add new showcase fixtures and register with new wiring and relocation of specified fixturesDetails
interior remodel of existing ross store, 1st fl remove select jewelry cases, add new showcase fixtures and register with new wiring and relocation of specified fixtures | $121,797 | |
| Dec 14, 2015 | Completed final sign-off Jun 2016 | 799 Market St | Gci, Inc | 5th floor: demo of non-structural partitions, ceilings, light fixtures, millwork, plbmg, finishes. n/a for maherDetails
5th floor: demo of non-structural partitions, ceilings, light fixtures, millwork, plbmg, finishes. n/a for maher | $40,000 |
| Oct 26, 2015 | Expired or cancelled cancelled Jan 2026 | 799 Market St | 1st floor: installation of new jewelry & watch counters. maher naDetails
1st floor: installation of new jewelry & watch counters. maher na | $30,000 | |
| Aug 6, 2015 | Completed final sign-off Nov 2015 | 799 Market St | Field Construction Inc. | 7th floor - revision to appl #201312113963: door operators @ restroom entries.Details
7th floor - revision to appl #201312113963: door operators @ restroom entries. | $11,000 |
| Apr 2, 2015 | Never finaled issued Apr 2015, no final | 799 Market St | Gci, Inc | to obtain final inspection for work approved under pa#200804180059. all work is complete. compliance with maher ordinance no. 155-13 not required.Details
to obtain final inspection for work approved under pa#200804180059. all work is complete. compliance with maher ordinance no. 155-13 not required. | |
| Mar 31, 2015 | Completed final sign-off Mar 2016 | 799 Market St | Gci, Inc | to obtain final inspection for work approved under pa# 200003285207. all work is complete.Details
to obtain final inspection for work approved under pa# 200003285207. all work is complete. | |
| Mar 31, 2015 | Never finaled issued Apr 2015, no final | 799 Market St | Gci, Inc | to obtain final inspection for work approved under pa# 200103144209. all work is complete.Details
to obtain final inspection for work approved under pa# 200103144209. all work is complete. | |
| Mar 31, 2015 | Completed final sign-off Apr 2015 | 799 Market St | Gci, Inc | to obtain final inspection for work approved under pa# 200802285891. all work is complete.Details
to obtain final inspection for work approved under pa# 200802285891. all work is complete. | |
| Mar 31, 2015 | Completed final sign-off Apr 2015 | 799 Market St | Gci, Inc | to obtain final inspection for work approved under pa# 09502204. all work is complete.Details
to obtain final inspection for work approved under pa# 09502204. all work is complete. | |
| Mar 31, 2015 | Never finaled issued Apr 2015, no final | 799 Market St | Gci, Inc | to obtain final inspection for work approved under pa# 09815706. all work is complete.Details
to obtain final inspection for work approved under pa# 09815706. all work is complete. | |
| Mar 31, 2015 | Never finaled issued Apr 2015, no final | 799 Market St | Gci, Inc | to obtain final inspection for work approved under pa# 09810600. all work is complete.Details
to obtain final inspection for work approved under pa# 09810600. all work is complete. | |
| Mar 31, 2015 | Never finaled issued Apr 2015, no final | 799 Market St | Gci, Inc | to obtain final inspection for work approved under pa# 09809368. all work is complete.Details
to obtain final inspection for work approved under pa# 09809368. all work is complete. | |
| Mar 31, 2015 | Never finaled issued Apr 2015, no final | 799 Market St | Gci, Inc | to obtain final inspection for work approved under pa# 201003144211. all work is complete.Details
to obtain final inspection for work approved under pa# 201003144211. all work is complete. | |
| Dec 4, 2014 | Completed final sign-off Dec 2014 | 799 Market St | Stanley Access Tech | to comply with nov 201473743, install power door operator on front left hand side entry door & on market street exit door, total of 2 door operators (32" clean openings); maher n/aDetails
to comply with nov 201473743, install power door operator on front left hand side entry door & on market street exit door, total of 2 door operators (32" clean openings); maher n/a | |
| Nov 19, 2014 | Never finaled issued Nov 2014, no final | 799 Market St | Gci, Inc | lighting, power & signal. electrical work per pa# 201310310778 & 201403271850. n/a maher ordinance #155-13Details
lighting, power & signal. electrical work per pa# 201310310778 & 201403271850. n/a maher ordinance #155-13 | $49,000 |
| Nov 19, 2014 | Completed final sign-off Nov 2015 | 799 Market St | Gci, Inc | mechanical work per pa# 201310310778. & 201403271850. n/a ordinance #155-13Details
mechanical work per pa# 201310310778. & 201403271850. n/a ordinance #155-13 | $72,000 |
| Nov 3, 2014 | Completed final sign-off Jan 2015 | 799 Market St | Matrix Hg Inc | revise distribution ductwork to accommodate the new open office layout. remove perforated diffusers, slot diffusers & flex duct runouts, provide new round distribution ductwork w/side mounted supply registers.revise ductwork & diff in conference rm 805 & break area 807, repl supply diffusers &Details
revise distribution ductwork to accommodate the new open office layout. remove perforated diffusers, slot diffusers & flex duct runouts, provide new round distribution ductwork w/side mounted supply registers.revise ductwork & diff in conference rm 805 & break area 807, repl supply diffusers & | $16,000 |
| Oct 7, 2014 | Expired or cancelled cancelled Mar 2015 | 799 Market St | Acco Engineered Systems Inc. Dba Acco En | replace existing boiler with new boilerDetails
replace existing boiler with new boiler | $220,000 |
| Sep 18, 2014 | Never finaled issued Sep 2014, no final | 799 Market St | Acco Engineered Systems Inc. Dba Acco En | remove and replace bldg chiller add vfds to chw pumpsDetails
remove and replace bldg chiller add vfds to chw pumps | $550,000 |
| Aug 29, 2014 | Completed final sign-off Mar 2015 | 799 Market St | Gh Group Inc. | g/f-interior remodel of existing retail including remove existing fitting rooms for additional sales floor, selective demo of interior non-bearing walls, new finishes at areas of work. n/a maher ordinanceDetails
g/f-interior remodel of existing retail including remove existing fitting rooms for additional sales floor, selective demo of interior non-bearing walls, new finishes at areas of work. n/a maher ordinance | $25,000 |
| Apr 10, 2014 | Completed final sign-off May 2015 | 799 Market St | Pacific Auxiliary Fire Alarm | 4th floor: add 8 speaker/strobes, 2 strobe and one smoke detector. ref app#201310310778. n/a for the maher ordinance#155-13Details
4th floor: add 8 speaker/strobes, 2 strobe and one smoke detector. ref app#201310310778. n/a for the maher ordinance#155-13 | $7,000 |
| Mar 27, 2014 | Completed final sign-off Nov 2015 | 799 Market St | Gci, Inc | new tenant improvement to construct new non structural partition doors, millwork and finishes. previously permitted as a spec suite and all ada approved under 201310310778. mep, ls, sprinklers on separate permitDetails
new tenant improvement to construct new non structural partition doors, millwork and finishes. previously permitted as a spec suite and all ada approved under 201310310778. mep, ls, sprinklers on separate permit | $420,000 |
| Mar 26, 2014 | Completed final sign-off May 2014 | 799 Market St | Pioneer Fire Inc. | 4th floor - remodel outlined area consisting of 3 relocated uprights, 8 relocated pendants & 2 added pendants. ref #201310310778. compliance with ordinance #155-13 not requiredDetails
4th floor - remodel outlined area consisting of 3 relocated uprights, 8 relocated pendants & 2 added pendants. ref #201310310778. compliance with ordinance #155-13 not required | $4,946 |
| Feb 27, 2014 | Expired or cancelled cancelled Sep 2017 | 799 Market St | install a non-electric double faced banner with wall bracketDetails
install a non-electric double faced banner with wall bracket | $5,000 | |
| Dec 11, 2013 | Completed final sign-off Jan 2017 | 799 Market St | Field Construction Inc. | 7th floor: project consist of minor demoliiton and construction of 2 internal partitions for new coffee rooms. the suite is currently occuppied. mechanical, electrical, life safety, and sprinkler system, are not includedDetails
7th floor: project consist of minor demoliiton and construction of 2 internal partitions for new coffee rooms. the suite is currently occuppied. mechanical, electrical, life safety, and sprinkler system, are not included | $42,000 |
| Nov 18, 2013 | Never finaled issued Nov 2013, no final | 799 Market St | Gci, Inc | revision to appl #2013.1002.8313 - to reinforce connection on store front door.Details
revision to appl #2013.1002.8313 - to reinforce connection on store front door. | $1,000 |
| Oct 31, 2013 | Completed final sign-off Nov 2015 | 799 Market St | Gci, Inc | tenant improvement on 4th floor to construct new partitions doors, millwork, and finishes for spec suite. mep, life safety, sprinklers on separate permit.Details
tenant improvement on 4th floor to construct new partitions doors, millwork, and finishes for spec suite. mep, life safety, sprinklers on separate permit. | $350,000 |
| Oct 3, 2013 | Completed final sign-off Oct 2013 | 799 Market St | Pacific Auxiliary Fire Alarm | add 31 speaker strobes, 4 strobes, 3 speakers, 1 module to existing fire alarm system as part of ti on the 4th, 6th fl. ref 201308063650Details
add 31 speaker strobes, 4 strobes, 3 speakers, 1 module to existing fire alarm system as part of ti on the 4th, 6th fl. ref 201308063650 | $24,000 |
| Oct 2, 2013 | Completed final sign-off Feb 2015 | 799 Market St | Gci, Inc | structural sdetails for door framing at store front. ref 201306048614 for ti work. inspection to be done under permit 201310028313Details
structural sdetails for door framing at store front. ref 201306048614 for ti work. inspection to be done under permit 201310028313 | $7,000 |
| Sep 30, 2013 | Completed final sign-off Oct 2013 | 799 Market St | Golden Gate Fire Protection Inc | 6th floor-relocate 130 fire sprinklers, add 147 fire sprinklers, remove 10 sprinklers. ti ref #2013-0806-3650Details
6th floor-relocate 130 fire sprinklers, add 147 fire sprinklers, remove 10 sprinklers. ti ref #2013-0806-3650 | $142,655 |
| Sep 26, 2013 | Completed final sign-off Oct 2013 | 799 Market St | Pacific Auxiliary Fire Alarm | add 4 speaker/strobes on the 4th floor. ref. const. bldg pa# 201307252740Details
add 4 speaker/strobes on the 4th floor. ref. const. bldg pa# 201307252740 | $3,000 |
| Sep 12, 2013 | Completed final sign-off Oct 2013 | 799 Market St | Ayoob & Peery Plumbing Co Inc | 4th floor-change out fire sprinkler heads per tenant improvement - 46 changed out reference ti 2013.0725.2790Details
4th floor-change out fire sprinkler heads per tenant improvement - 46 changed out reference ti 2013.0725.2790 | $23,644 |
| Aug 20, 2013 | Never finaled issued Aug 2013, no final | 799 Market St | evacution maps for 799 market st lobby (2), 4th floor (3), 6th floor (3) & 8th floor (3).Details
evacution maps for 799 market st lobby (2), 4th floor (3), 6th floor (3) & 8th floor (3). | $3,300 | |
| Aug 9, 2013 | Completed final sign-off Jun 2014 | 799 Market St | Pacific Auxiliary Fire Alarm | add 13 speaker/strobes, 1 smoke detector and 1 relay to extg f.a. system due to a t.i. on the 8th floor. ref app#201306068878Details
add 13 speaker/strobes, 1 smoke detector and 1 relay to extg f.a. system due to a t.i. on the 8th floor. ref app#201306068878 | $10,000 |
| Aug 6, 2013 | Completed final sign-off Jan 2014 | 799 Market St | Novo Construction Inc | build out of tenant space on 4th and 6th fl to consist of new non load bearing alls and new restrooms and shower. also to include alterations to vav boxes ductwork, air distribution and thermostats on 6th flDetails
build out of tenant space on 4th and 6th fl to consist of new non load bearing alls and new restrooms and shower. also to include alterations to vav boxes ductwork, air distribution and thermostats on 6th fl | $750,000 |
| Aug 5, 2013 | Never finaled issued Aug 2013, no final | 799 Market St | Novo Construction Inc | demo part of level 4 and most of level 6 per ab-017. mech, bldg & fire & life safety under separate permit.Details
demo part of level 4 and most of level 6 per ab-017. mech, bldg & fire & life safety under separate permit. | $60,000 |
| Aug 1, 2013 | Never finaled issued Aug 2013, no final | 799 Market St | Gci, Inc | demo and partial upgrade to restrooms on 6th floorDetails
demo and partial upgrade to restrooms on 6th floor | $20,000 |
| Jul 31, 2013 | Completed final sign-off Aug 2013 | 799 Market St | Pioneer Fire Inc. | lobby level & 8th floor-replace 79 (e) pendents with 79 new uprights, remove 3 & lower 1Details
lobby level & 8th floor-replace 79 (e) pendents with 79 new uprights, remove 3 & lower 1 | $17,885 |
| Jul 25, 2013 | Completed final sign-off Nov 2015 | 799 Market St | Gci, Inc | tenant improvement 4th fl to demo non structural walls and finishes and construct new non structural walls and finishes. upgrade restrooms for ada compliance mep,life safety, sprinklers on separate permitDetails
tenant improvement 4th fl to demo non structural walls and finishes and construct new non structural walls and finishes. upgrade restrooms for ada compliance mep,life safety, sprinklers on separate permit | $200,000 |
| Jun 6, 2013 | Completed final sign-off Mar 2015 | 799 Market St | Gci, Inc | 8th floor tenant improvement to add prtitions doors & finishes. all mep, life safety, & sprinklers to follow on separate permit.Details
8th floor tenant improvement to add prtitions doors & finishes. all mep, life safety, & sprinklers to follow on separate permit. | $300,000 |
| Jun 4, 2013 | Completed final sign-off Mar 2015 | 799 Market St | Gci, Inc | lobby level. t.i demolition of (e) storefront to replace (e) finishing & add push button & door operator for ada upgrade to make entry compliant. work is in office entryway,not retail entryway. electrical, mechanical life safety & sprinkler under separte permit.Details
lobby level. t.i demolition of (e) storefront to replace (e) finishing & add push button & door operator for ada upgrade to make entry compliant. work is in office entryway,not retail entryway. electrical, mechanical life safety & sprinkler under separte permit. | $30,000 |
| Jun 3, 2013 | Completed final sign-off Aug 2014 | 799 Market St | Gci, Inc | 8th floor-demolition of non structural partitions, doors, ceiling grid & finishes, per ab-017 space shall remain vacant & ada info will be provided on future t.i permitDetails
8th floor-demolition of non structural partitions, doors, ceiling grid & finishes, per ab-017 space shall remain vacant & ada info will be provided on future t.i permit | $20,000 |
| May 24, 2013 | Completed final sign-off Oct 2015 | 799 Market St | Gci, Inc | g/f - remodel main entrance lobby- to demo and construct non-load bearing partitions, millwork and finishes. mep, life safety and sprinklers on seperate permits.Details
g/f - remodel main entrance lobby- to demo and construct non-load bearing partitions, millwork and finishes. mep, life safety and sprinklers on seperate permits. | $120,000 |
| May 22, 2013 | Completed final sign-off Mar 2015 | 799 Market St | Gci, Inc | lobby level barrier removal. replacing door hardware with panic hardware & adding handrails to exist ramp inside. mech/elec/plumbing & life safety sprinklers under separate permit.Details
lobby level barrier removal. replacing door hardware with panic hardware & adding handrails to exist ramp inside. mech/elec/plumbing & life safety sprinklers under separate permit. | $10,000 |
| Jan 25, 2013 | Completed final sign-off Mar 2013 | 799 Market St | R L H Fire Protection Inc | remove existing sprinkler pipe from the top of the eleator shafts and the evelator machine room. add 1 upright in the 8th fl electrical roomDetails
remove existing sprinkler pipe from the top of the eleator shafts and the evelator machine room. add 1 upright in the 8th fl electrical room | $2,000 |
| Jan 17, 2013 | Completed final sign-off May 2013 | 799 Market St | Peacock Construction Inc | demo only of non-structural interior partitions. tenant space to remain vacant per ab-017Details
demo only of non-structural interior partitions. tenant space to remain vacant per ab-017 | $17,000 |
| Jun 14, 2012 | Never finaled issued Jun 2012, no final | 799 Market St | Pacific Auxiliary Fire Alarm | relocate 1 existing speaker strobeDetails
relocate 1 existing speaker strobe | $600 |
| May 31, 2012 | Completed final sign-off Jun 2013 | 799 Market St | Bevilacqua & Sons | work on 7th floor - project involves selective demolition of non load bearing partitions of (e) tenant improvement space. comply with ab-017.Details
work on 7th floor - project involves selective demolition of non load bearing partitions of (e) tenant improvement space. comply with ab-017. | $5,000 |
| May 18, 2012 | Expired or cancelled withdrawn Dec 2013 | 799 Market St | 7th floor: this project involves modification of extg t.i. space and expansion of the men's restrooms & barrier removal, including selective demolition an & construction of non load bearing partitions, partial new suspended ceiling grid & tile, new office doors & frames, millwork and new finishes.Details
7th floor: this project involves modification of extg t.i. space and expansion of the men's restrooms & barrier removal, including selective demolition an & construction of non load bearing partitions, partial new suspended ceiling grid & tile, new office doors & frames, millwork and new finishes. | $55,000 | |
| Aug 29, 2011 | Completed final sign-off Sep 2011 | 799 Market St | Pacific Auxiliary Fire Alarm | basement & 3rd floors-adding of 2 strobesDetails
basement & 3rd floors-adding of 2 strobes | $1,700 |
| Jun 15, 2011 | Completed final sign-off Jul 2011 | 799 Market St | Sure Fire Protection | 3rd floor-add & or relocate 15 fire sprinklers for construction of new changing roomDetails
3rd floor-add & or relocate 15 fire sprinklers for construction of new changing room | $6,000 |
| Feb 18, 2011 | Completed final sign-off Mar 2011 | 799 Market St | T C B Builders Inc | revision to pa# 2011.01.05.7882, remove new bathroom from scope of work indicated on approved and issued permitDetails
revision to pa# 2011.01.05.7882, remove new bathroom from scope of work indicated on approved and issued permit | |
| Feb 16, 2011 | Completed final sign-off May 2011 | 799 Market St | Pacific Auxiliary Fire Alarm | addition of 81 strobes, 18 speaker/strobes, 15 speakers & 1 relay & 1 switch for tenant improvement for basement, 1st, 2nd, 3rd, 7th & 8th floors. (38 of the 81 strobes are replacement of existing device)Details
addition of 81 strobes, 18 speaker/strobes, 15 speakers & 1 relay & 1 switch for tenant improvement for basement, 1st, 2nd, 3rd, 7th & 8th floors. (38 of the 81 strobes are replacement of existing device) | $52,000 |
| Jan 6, 2011 | Completed final sign-off Mar 2011 | 799 Market St | R L H Fire Protection Inc | 5th floor sprinkler system upgrade to existing system, relcoate 15 heads.Details
5th floor sprinkler system upgrade to existing system, relcoate 15 heads. | $7,500 |
| Jan 5, 2011 | Completed final sign-off Mar 2011 | 799 Market St | T C B Builders Inc | phase 2: reconfigure (e) non-bearing partition modify, elec., mech., fire protection.Details
phase 2: reconfigure (e) non-bearing partition modify, elec., mech., fire protection. | $40,000 |
| Jan 5, 2011 | Completed final sign-off Mar 2011 | 799 Market St | T C B Builders Inc | phase 1: reconfigure (e) non-load bearing partition modify (e) elec., mech., fire protection.Details
phase 1: reconfigure (e) non-load bearing partition modify (e) elec., mech., fire protection. | $50,000 |
| Dec 22, 2010 | Completed final sign-off Jan 2011 | 799 Market St | T C B Builders Inc | soft demo of non structural partitoins at 5th floor office space per ab-009- construction separte permitDetails
soft demo of non structural partitoins at 5th floor office space per ab-009- construction separte permit | $10,000 |
| Oct 5, 2010 | Expired or cancelled expired Oct 2013 | 799 Market St | replacement of existing with new evacuation signs floors: basement, 1,4,5,6,7,8Details
replacement of existing with new evacuation signs floors: basement, 1,4,5,6,7,8 | $5,000 | |
| Feb 1, 2010 | Completed final sign-off Oct 2011 | 799 Market St | Gh Group Inc. | ross - dress for less; misc. replacement of finishes, removal and relocation of dressing areas. removal and relocation of cashier's stations. misc. lighting and ceiling modifications. work on basement, 1st/street level, 2nd and 3rd levels. sprinkler & fire alarm work under seperate appl.Details
ross - dress for less; misc. replacement of finishes, removal and relocation of dressing areas. removal and relocation of cashier's stations. misc. lighting and ceiling modifications. work on basement, 1st/street level, 2nd and 3rd levels. sprinkler & fire alarm work under seperate appl. | $170,000 |
| Mar 31, 2009 | Never finaled issued Mar 2009, no final | 799 Market St | R L H Fire Protection Inc | add one head in elevator shaft.Details
add one head in elevator shaft. | $1,000 |
| Mar 31, 2009 | Never finaled issued Mar 2009, no final | 799 Market St | Pacific Auxiliary Fire Alarm | add 1 heat detector, 2 fire fighter phone jacks and 3 relays as part of the freight elevator modernizationDetails
add 1 heat detector, 2 fire fighter phone jacks and 3 relays as part of the freight elevator modernization | $4,000 |
| Mar 31, 2009 | Never finaled issued Mar 2009, no final | 799 Market St | R L H Fire Protection Inc | delete 4 heads in the elevator machine room, delete 2 in elevator shaft, add all piping related to this scope. per 3/6/09 letter approved by fire marshallDetails
delete 4 heads in the elevator machine room, delete 2 in elevator shaft, add all piping related to this scope. per 3/6/09 letter approved by fire marshall | $1,000 |
| Mar 27, 2009 | Never finaled issued Mar 2009, no final | 799 Market St | street space permit.Details
street space permit. | ||
| Feb 23, 2009 | Never finaled issued Mar 2009, no final | 799 Market St | Pacific Auxiliary Fire Alarm | at 4 & 6 fl. addition of 5 speakers, 13 speakers/strobes and 35 strobes.Details
at 4 & 6 fl. addition of 5 speakers, 13 speakers/strobes and 35 strobes. | $26,000 |
| Feb 12, 2009 | Completed final sign-off Mar 2009 | 799 Market St | Pacific Auxiliary Fire Alarm | as built/revision to 200805071481 for fire alarm systemDetails
as built/revision to 200805071481 for fire alarm system | |
| Jan 12, 2009 | Never finaled issued Jan 2009, no final | 799 Market St | R L H Fire Protection Inc | remove 6 spinkler heads from the elevator shaft and elevator mechanical room.Details
remove 6 spinkler heads from the elevator shaft and elevator mechanical room. | $1,000 |
| Aug 28, 2008 | Completed final sign-off Aug 2008 | 799 Market St | Ayoob & Peery Plumbing Co Inc | sprinkler umbrella permit to meet req's for high rise sprinkler ordinance.Details
sprinkler umbrella permit to meet req's for high rise sprinkler ordinance. | |
| Jun 27, 2008 | Never finaled issued Jun 2008, no final | 799 Market St | Pacific Auxiliary Fire Alarm | revision to pa# 2008-0507-1481-changes to the fan and damper control panelDetails
revision to pa# 2008-0507-1481-changes to the fan and damper control panel | |
| Jun 16, 2008 | Never finaled issued Jun 2008, no final | 799 Market St | R L H Fire Protection Inc | 5th floor: ti for fire sprinklers on the 5th floor. relocate 5 heads, delete 6 heads and add 3 sprinkler heads.Details
5th floor: ti for fire sprinklers on the 5th floor. relocate 5 heads, delete 6 heads and add 3 sprinkler heads. | $3,000 |
| May 8, 2008 | Expired or cancelled expired Oct 2013 | 799 Market St | refer to pa# 2008-0418-0059; m.e.p onlyDetails
refer to pa# 2008-0418-0059; m.e.p only | $130,000 | |
| May 7, 2008 | Completed final sign-off Mar 2009 | 799 Market St | Pacific Auxiliary Fire Alarm | replacement of existing fire alarm system. installation of new notifier fire alarm system.Details
replacement of existing fire alarm system. installation of new notifier fire alarm system. | $350,000 |
| May 7, 2008 | Never finaled issued May 2008, no final | 799 Market St | Pacific Auxiliary Fire Alarm | installation of new (temporary) fire alarm control panel and replacement of existing devices and addition of devices for 5th floor ti.Details
installation of new (temporary) fire alarm control panel and replacement of existing devices and addition of devices for 5th floor ti. | $11,000 |
| Apr 18, 2008 | Expired or cancelled expired Oct 2013 | 799 Market St | construct new drywall partition for reception, staff room, and equipment room. hvac and elec with title 24 under seperate permit, sprinkler and life safety under seperate permitDetails
construct new drywall partition for reception, staff room, and equipment room. hvac and elec with title 24 under seperate permit, sprinkler and life safety under seperate permit | $110,000 | |
| Apr 3, 2008 | Completed final sign-off Apr 2008 | 799 Market St | T C B Builders Inc | renew pa# 2006/10/11/4654 for final inspection only.Details
renew pa# 2006/10/11/4654 for final inspection only. | |
| Feb 28, 2008 | Expired or cancelled expired Oct 2013 | 799 Market St | 5th floor: demo work only - remove existing non-structural drywall partition.Details
5th floor: demo work only - remove existing non-structural drywall partition. | $10,000 | |
| Jan 25, 2008 | Completed final sign-off Jun 2008 | 799 Market St | Metropolitan Electrical Construction | 7th/fl. ti for fire alarm on the 7th floor. install two new smoke detector relay bases, connect to 4 new fire smoke dampers and interface 2 epo;s.Details
7th/fl. ti for fire alarm on the 7th floor. install two new smoke detector relay bases, connect to 4 new fire smoke dampers and interface 2 epo;s. | $8,250 |
| Oct 11, 2006 | Completed final sign-off Jun 2008 | 799 Market St | T C B Builders Inc | remove extg non rated acoustical layin ceiling grid and tiles. intall 1 hr rated acoustical lay in ceiling grid and tiles. complete assembly 1 hr re- install extg light fixtures and hvac grill. no hvac work, install new subpanel and epo switches. sprklers and life safty under seperate permits/7th flDetails
remove extg non rated acoustical layin ceiling grid and tiles. intall 1 hr rated acoustical lay in ceiling grid and tiles. complete assembly 1 hr re- install extg light fixtures and hvac grill. no hvac work, install new subpanel and epo switches. sprklers and life safty under seperate permits/7th fl | $10,000 |
| Nov 26, 2003 | Expired or cancelled cancelled Sep 2005 | 799 Market St | R S Mac Farlane Company Inc. | oti-1 (7th fl) el, meDetails
oti-1 (7th fl) el, me | $25,000 |
| Sep 2, 2003 | Never finaled issued Sep 2003, no final | 799 Market St | street space permitDetails
street space permit | ||
| Oct 16, 2001 | Completed final sign-off Dec 2001 | 799 Market St | Bcci Construction Company | to renew app#2000/02/14/1824 for final inspection.Details
to renew app#2000/02/14/1824 for final inspection. | |
| Oct 16, 2001 | Completed final sign-off Dec 2001 | 799 Market St | Bcci Construction Company | to renew app#2000/02/14/1828 for final inspection.Details
to renew app#2000/02/14/1828 for final inspection. | |
| Mar 16, 2001 | Completed final sign-off May 2001 | 799 Market St | Starlite Electric Inc. | provide new devices and monitor extg services for extg fire alarm systemDetails
provide new devices and monitor extg services for extg fire alarm system | $17,000 |
| Mar 14, 2001 | Expired or cancelled expired Mar 2004 | 799 Market St | T C B Builders Inc | oit-1 rev. 4th floor, el, me, ls, spDetails
oit-1 rev. 4th floor, el, me, ls, sp | $10,000 |
| Mar 14, 2001 | Expired or cancelled expired Mar 2004 | 799 Market St | T C B Builders Inc | oti-2 rev. 4th floor, el, meDetails
oti-2 rev. 4th floor, el, me | $10,000 |
| Feb 23, 2001 | Completed final sign-off May 2001 | 799 Market St | Sabah International Incorporated | design & install 1 inergen suppression systemDetails
design & install 1 inergen suppression system | $39,289 |
| Jan 26, 2001 | Completed final sign-off May 2001 | 799 Market St | R L H Fire Protection Inc | oti-3 4th floor, sprDetails
oti-3 4th floor, spr | $33,688 |
| Dec 22, 2000 | Completed final sign-off May 2001 | 799 Market St | T C B Builders Inc | oti-2 4th floor el, meDetails
oti-2 4th floor el, me | $95,000 |
| Dec 4, 2000 | Completed final sign-off May 2001 | 799 Market St | T C B Builders Inc | oti-1 4th floor el,me,ls,spDetails
oti-1 4th floor el,me,ls,sp | $175,000 |
| Nov 10, 2000 | Completed final sign-off May 2001 | 799 Market St | T C B Builders Inc | interior demolition of interior partitions - non structural(4th fl only)Details
interior demolition of interior partitions - non structural(4th fl only) | $27,000 |
| Apr 6, 2000 | Completed final sign-off Dec 2001 | 799 Market St | Bcci Construction Company | oti-4 ls, 8th floor, no increase office spaceDetails
oti-4 ls, 8th floor, no increase office space | $8,500 |
| Apr 6, 2000 | Completed final sign-off Dec 2001 | 799 Market St | Bcci Construction Company | oti-4, ls, 7th floorDetails
oti-4, ls, 7th floor | $8,500 |
| Mar 27, 2000 | Completed final sign-off Dec 2001 | 799 Market St | Bcci Construction Company | oti-3:sp only 7th flDetails
oti-3:sp only 7th fl | $8,500 |
| Mar 27, 2000 | Completed final sign-off Dec 2001 | 799 Market St | Bcci Construction Company | oti-3: sp only (8th floor)Details
oti-3: sp only (8th floor) | $8,500 |
| Mar 23, 2000 | Expired or cancelled expired Sep 2000 | 799 Market St | Bcci Construction Company | interior demo only-6th floorDetails
interior demo only-6th floor | $12,000 |
| Mar 7, 2000 | Completed final sign-off Dec 2001 | 799 Market St | Bcci Construction Company | oti-2 me only 8th floorDetails
oti-2 me only 8th floor | $30,000 |
| Mar 7, 2000 | Completed final sign-off Dec 2001 | 799 Market St | Bcci Construction Company | oti-2 7th floor me onlyDetails
oti-2 7th floor me only | $30,000 |
| Feb 25, 2000 | Completed final sign-off Dec 2001 | 799 Market St | oti-2 7th floor elDetails
oti-2 7th floor el | $30,000 | |
| Feb 14, 2000 | Completed final sign-off Dec 2001 | 799 Market St | oti 1 7th floor, el, me, sp & lsDetails
oti 1 7th floor, el, me, sp & ls | $475,000 | |
| Feb 14, 2000 | Completed final sign-off Dec 2001 | 799 Market St | Bcci Construction Company | oti 1 8th floor, el, me, ls & spDetails
oti 1 8th floor, el, me, ls & sp | $410,000 |
| Jan 31, 2000 | Expired or cancelled expired Jan 2001 | 799 Market St | Details
| $29,000 |