Dpr Construction A
- Based in
- Redwood City
- On San Francisco permits
- Dec 2021 to Aug 2026
- Last 24 months
- 49 permits filed
91 permits since 2000: 58 completed, 27 in progress, 6 never finaled.
Of the 6 never-finaled permits, 6 are 3 to 5 years old. 3 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 18, 2026 | In progress issued Sep 2026 | 55 Spear St | demolition of 5th and 6th floor communicating stair to intermediary landing, floor infill at openning and restroom upgrades. no hvac or electrical modifications.Details
demolition of 5th and 6th floor communicating stair to intermediary landing, floor infill at openning and restroom upgrades. no hvac or electrical modifications. | $350,000 |
| Aug 5, 2026 | In progress issued Sep 2026 | 1725 03rd St | partial floor tenant improvement of the 3rd floor.Details
partial floor tenant improvement of the 3rd floor. | $847,440 |
| Jun 29, 2026 | In progress issued Jul 2026 | 101 California St | 15/f - ste 1500: deferred mep work for permit# 202604018658Details
15/f - ste 1500: deferred mep work for permit# 202604018658 | $320,000 |
| Jun 23, 2026 | Completed final sign-off Aug 2026 | 799 Market St | 6th and 7th floors: partial interior tenant remodel at 6th and 7th floors. additional power data, reception area closet reconfiguration. plumbing and electrical included, no mechanical.Details
6th and 7th floors: partial interior tenant remodel at 6th and 7th floors. additional power data, reception area closet reconfiguration. plumbing and electrical included, no mechanical. | $325,000 |
| May 15, 2026 | Completed final sign-off Aug 2026 | 799 Market St | 7/f: partial interior t.i. new partial framed wall and cased opening at storage area. replace select storefront with new interior framed portition. mechanical & electrical included.Details
7/f: partial interior t.i. new partial framed wall and cased opening at storage area. replace select storefront with new interior framed portition. mechanical & electrical included. | $120,000 |
| Apr 1, 2026 | In progress issued Jun 2026 | 101 California St | 15floor/suite 1500. includes demo + new construction of non-str partitions. glazing ceiling, fixtures, finishes, millwood and doors + hardware; mep to be permitted separately.Details
15floor/suite 1500. includes demo + new construction of non-str partitions. glazing ceiling, fixtures, finishes, millwood and doors + hardware; mep to be permitted separately. | $1,968,546 |
| Mar 17, 2026 | Completed final sign-off May 2026 | 1 Market St | 15th floor: mech - demo mech systems, removal perimeter induction units vav boxes. relocate (2) vav boxes new fire smoke damper. electrical - fire smoke damage electrical.Details
15th floor: mech - demo mech systems, removal perimeter induction units vav boxes. relocate (2) vav boxes new fire smoke damper. electrical - fire smoke damage electrical. | $20,000 |
| Mar 5, 2026 | Completed final sign-off May 2026 | 400 Howard St | retrofit door (interior). install new door. (interior). small partition wall (interior)Details
retrofit door (interior). install new door. (interior). small partition wall (interior) | $25,000 |
| Dec 15, 2025 | Completed final sign-off May 2026 | 1 Market St | 15th floor. demolition of (e) non-structural partitions, doors, frame, finishes. mep deferred for ceiling, light and plumbing fixtures in as existing unoccupied space. ab-017 appliesDetails
15th floor. demolition of (e) non-structural partitions, doors, frame, finishes. mep deferred for ceiling, light and plumbing fixtures in as existing unoccupied space. ab-017 applies | $150,000 |
| Nov 20, 2025 | In progress issued Jan 2026 | 499 Illinois St | 2nd floor: lab 251- installation of new electrical receptacles from an existing panel and strap equipment anchorage. ref #202402216284Details
2nd floor: lab 251- installation of new electrical receptacles from an existing panel and strap equipment anchorage. ref #202402216284 | $25,000 |
| Nov 14, 2025 | Completed final sign-off Aug 2026 | 350 California St | 21st fl - minor renovation of non-load bearing interior partitions and ceilings w/in 800 sf. a limited number of non-load bearing interior partitions, ceilings and finishes will be added. new furnishings will be provided within the limited affected areas. no change to building use, egress orDetails
21st fl - minor renovation of non-load bearing interior partitions and ceilings w/in 800 sf. a limited number of non-load bearing interior partitions, ceilings and finishes will be added. new furnishings will be provided within the limited affected areas. no change to building use, egress or | $190,000 |
| Oct 27, 2025 | Completed final sign-off Jan 2026 | 1 Market St | level 2 revision to pa # 2025-0618-9024. dph food service scope.Details
level 2 revision to pa # 2025-0618-9024. dph food service scope. | |
| Oct 10, 2025 | Completed final sign-off Jan 2026 | 1 Market St | level 2: revision to pa #202506189024. revised bathroom layout. no plumbing fixtures added or deleted.Details
level 2: revision to pa #202506189024. revised bathroom layout. no plumbing fixtures added or deleted. | |
| Oct 8, 2025 | In progress issued Oct 2025 | 1725 03rd St | replacement of (e) duct supports w/ vibration isolatorDetails
replacement of (e) duct supports w/ vibration isolator | $15,000 |
| Sep 26, 2025 | In progress issued Nov 2025 | 1 Market St | 4/fl- ti demo (e) and install (n) partitions, millwork, finishes, mech, electrical . no structrual or exterior work . no addition of plumbing fixtures.Details
4/fl- ti demo (e) and install (n) partitions, millwork, finishes, mech, electrical . no structrual or exterior work . no addition of plumbing fixtures. | $387,128 |
| Sep 10, 2025 | Completed final sign-off Jan 2026 | 1 Market St | level 2 - revision to pa 202506189024. minor reivisons to lighting.Details
level 2 - revision to pa 202506189024. minor reivisons to lighting. | |
| Aug 14, 2025 | In progress issued Sep 2025 | 1 Market St | l5: revision to pa# 202506209163. t.i. deleting facilities qu lab rooms from scope. new taining room, catering pantry, and breakd area. dph on seperate permit.no exterior work. demo and new partitions.Details
l5: revision to pa# 202506209163. t.i. deleting facilities qu lab rooms from scope. new taining room, catering pantry, and breakd area. dph on seperate permit.no exterior work. demo and new partitions. | $2,229,805 |
| Aug 14, 2025 | In progress issued Sep 2025 | 1 Market St | l2: t.i. to demo and install new partitions, millwork, finishes, mep. new rent space, catering pantry, no exterior. dph on seperate permit.Details
l2: t.i. to demo and install new partitions, millwork, finishes, mep. new rent space, catering pantry, no exterior. dph on seperate permit. | $1,964,650 |
| Jul 7, 2025 | Completed final sign-off Oct 2025 | 1 Market St | 33rd-35th floors: guardrail at stair. ref pa#202501228840Details
33rd-35th floors: guardrail at stair. ref pa#202501228840 | $20,000 |
| Jun 20, 2025 | In progress issued Jul 2025 | 1 Market St | level 5. t.i. (n) partitions, finishes, lighting, restroom remodel. no exterior.Details
level 5. t.i. (n) partitions, finishes, lighting, restroom remodel. no exterior. | $693,000 |
| Jun 18, 2025 | Completed final sign-off Sep 2025 | 1 Market St | 2/fl-revision 202505237202- reduction of soft demo areaDetails
2/fl-revision 202505237202- reduction of soft demo area | |
| Jun 18, 2025 | Completed final sign-off Jan 2026 | 1 Market St | 2/fl-ref demo permit 202505237202- ti (n) partitions, finishes, millwork, bathrooms, no exterior work.Details
2/fl-ref demo permit 202505237202- ti (n) partitions, finishes, millwork, bathrooms, no exterior work. | $2,060,000 |
| Jun 3, 2025 | Completed final sign-off Dec 2025 | 1 Market St | l 4: t.i. new non-structural partitions, finishes, lighting, hvac. no exterior or structural work.Details
l 4: t.i. new non-structural partitions, finishes, lighting, hvac. no exterior or structural work. | $105,000 |
| May 23, 2025 | Completed final sign-off Sep 2025 | 1 Market St | level 2 soft demo only. no exterior, structural, ceiling demo. ab017. no demo of dropped ceiling until the sprinkler subcontractor pulls deferred sprinkler permit to upturn heads.Details
level 2 soft demo only. no exterior, structural, ceiling demo. ab017. no demo of dropped ceiling until the sprinkler subcontractor pulls deferred sprinkler permit to upturn heads. | $150,000 |
| May 23, 2025 | In progress issued Jun 2025 | 1 Market St | 5th fl - soft demo only. no exterior, structural, ceiling demo abo17. no demo of dropped ceiling until the sprinkler subcontractor pulls deferred sprinkler permit to upturn heads.Details
5th fl - soft demo only. no exterior, structural, ceiling demo abo17. no demo of dropped ceiling until the sprinkler subcontractor pulls deferred sprinkler permit to upturn heads. | $40,000 |
| May 23, 2025 | Completed final sign-off Oct 2026 | 1 Warriors Wy | new pre.fabricated shipping container installed at exterior terrace.Details
new pre.fabricated shipping container installed at exterior terrace. | $10,000 |
| May 23, 2025 | Completed final sign-off Nov 2025 | 1 Market St | 4th fl - soft demo only. no exterior, structural, ceiling demo abo17. no demo of dropped ceiling until the sprinkler subcontractor pulls deferred sprinkler permit to upturn heads.Details
4th fl - soft demo only. no exterior, structural, ceiling demo abo17. no demo of dropped ceiling until the sprinkler subcontractor pulls deferred sprinkler permit to upturn heads. | $18,000 |
| May 9, 2025 | Completed final sign-off Oct 2025 | 55 Spear St | for adminstrative purposes only. change of address from 1 market st to 55 spear st for pa #2025-0122-8840 (b/l 3713/007)Details
for adminstrative purposes only. change of address from 1 market st to 55 spear st for pa #2025-0122-8840 (b/l 3713/007) | |
| May 8, 2025 | In progress issued May 2025 | 1725 03rd St | 11 th floor: revision to pa#202410092681. minor lighting, electrical, mechanical and finishes updates. no impact on occupancy or exiting. ref pa #202503273175Details
11 th floor: revision to pa#202410092681. minor lighting, electrical, mechanical and finishes updates. no impact on occupancy or exiting. ref pa #202503273175 | |
| May 7, 2025 | Completed final sign-off Jul 2025 | 345 California St | 22nd fl- soft demo of non-load bearing partition, (n) partition to shift ~16" to match existing wall. new light (1) in existing act system. carpet/paint finishes throughoutDetails
22nd fl- soft demo of non-load bearing partition, (n) partition to shift ~16" to match existing wall. new light (1) in existing act system. carpet/paint finishes throughout | $400,000 |
| May 7, 2025 | In progress issued May 2025 | 1655 03rd St | 7/fl- revision 2 to 202410092683. updates to trainng room. scren and niche sizes removal of room schedules modified lighting . ref 202504184789Details
7/fl- revision 2 to 202410092683. updates to trainng room. scren and niche sizes removal of room schedules modified lighting . ref 202504184789 | |
| Apr 28, 2025 | Completed final sign-off Oct 2025 | 55 Spear St | for administrative purposes only, change of address from 1 market st to 55 spear st for pa# 202412166922 (revision to 202410102710, b/l 3713/007, 1 market st) & 202410102710 (t.i. for 35th level, b/l 3713/006, 1 market st)Details
for administrative purposes only, change of address from 1 market st to 55 spear st for pa# 202412166922 (revision to 202410102710, b/l 3713/007, 1 market st) & 202410102710 (t.i. for 35th level, b/l 3713/006, 1 market st) | |
| Apr 21, 2025 | In progress issued May 2025 | 1725 03rd St | cafe-mb4-revision 202410092679- revised smoke control matrix and minor updated per field conditions.Details
cafe-mb4-revision 202410092679- revised smoke control matrix and minor updated per field conditions. | |
| Apr 18, 2025 | In progress issued May 2025 | 1655 03rd St | forum mb3, 7th and 8th floors: revision to pa# 202410092683: revised smoke control matrix and minor update per field conditions.Details
forum mb3, 7th and 8th floors: revision to pa# 202410092683: revised smoke control matrix and minor update per field conditions. | |
| Mar 31, 2025 | Completed final sign-off Nov 2025 | 333 Bush St | 10/fl- ti (n) open office spaces single user restroom, non structural partitions, fixtures, finishes and associated mepDetails
10/fl- ti (n) open office spaces single user restroom, non structural partitions, fixtures, finishes and associated mep | $3,134,840 |
| Mar 27, 2025 | In progress issued May 2025 | 1725 03rd St | 11th/fl: revision to pa#2024-1009-2681. minor adjustments to non-structrural partitions/doors, lightening, finishes and clarification of design intent. no effect on occupancy/exitingDetails
11th/fl: revision to pa#2024-1009-2681. minor adjustments to non-structrural partitions/doors, lightening, finishes and clarification of design intent. no effect on occupancy/exiting | |
| Mar 24, 2025 | Completed final sign-off Jul 2025 | 499 Illinois St | revision 202402216284- 1/fl/loading dock only -ti include storage space enclosed with chain link fenceDetails
revision 202402216284- 1/fl/loading dock only -ti include storage space enclosed with chain link fence | $7,500 |
| Mar 21, 2025 | Completed final sign-off Apr 2025 | 220 Montgomery St | 9/f: installation of a single interior glazed wall & sliding door to create a new room for haworth's office furniture showroom.Details
9/f: installation of a single interior glazed wall & sliding door to create a new room for haworth's office furniture showroom. | $40,000 |
| Jan 22, 2025 | Completed final sign-off Oct 2025 | 1 Market St | interior ti of (n) communicating stair between levels 34 & 35 & (e) communicating stair between levels 33 & 34. new stair construction to include slab demo as well as finishes, lighting & fire safety.Details
interior ti of (n) communicating stair between levels 34 & 35 & (e) communicating stair between levels 33 & 34. new stair construction to include slab demo as well as finishes, lighting & fire safety. | $150,000 |
| Jan 21, 2025 | Completed final sign-off Jul 2025 | 1 Warriors Wy | ref 202409039980- install ceiling hung artistic display in valkyries lockerroomDetails
ref 202409039980- install ceiling hung artistic display in valkyries lockerroom | $2,000 |
| Jan 7, 2025 | Completed final sign-off Jun 2025 | 1 Market St | 7/fl- ref 202412025921- to support approved arch permit to include (n) heat pump, lighting, plumbing for employee cafeDetails
7/fl- ref 202412025921- to support approved arch permit to include (n) heat pump, lighting, plumbing for employee cafe | $250,000 |
| Dec 16, 2024 | Completed final sign-off May 2025 | 1 Market St | 35th fl revision to 202410102710 to include minor partition changes, corresponding mep and needed structural beam penetrationDetails
35th fl revision to 202410102710 to include minor partition changes, corresponding mep and needed structural beam penetration | $7,000 |
| Dec 2, 2024 | Completed final sign-off Jun 2025 | 1 Market St | 7th floor: remove and replace finishes and equipment in commercial kitchen. mep def.Details
7th floor: remove and replace finishes and equipment in commercial kitchen. mep def. | $210,000 |
| Nov 12, 2024 | Completed final sign-off Feb 2025 | 1 Warriors Wy | space 11: new fire fixture at backyard patio, work includes electrical and plumbing.Details
space 11: new fire fixture at backyard patio, work includes electrical and plumbing. | $10,000 |
| Oct 23, 2024 | In progress issued Nov 2024 | 1655 03rd St | 2nd fl, mb 3 ti demo (e) & (n) non-structural partitions, doors, millwork, finishes. no mechanical work. no electrical workDetails
2nd fl, mb 3 ti demo (e) & (n) non-structural partitions, doors, millwork, finishes. no mechanical work. no electrical work | $98,832 |
| Oct 10, 2024 | Completed final sign-off May 2025 | 1 Market St | 35th fl: interior ti construction of non load bearing partitions, new doors, frames & glazing, new ceilings, lights, new millwork & finishes. modifications to mech & plumbing systems shall allow base building infrastructure to remain intact & operationalDetails
35th fl: interior ti construction of non load bearing partitions, new doors, frames & glazing, new ceilings, lights, new millwork & finishes. modifications to mech & plumbing systems shall allow base building infrastructure to remain intact & operational | $3,760,780 |
| Oct 9, 2024 | In progress issued Jan 2025 | 1725 03rd St | 6&7/fl- partial floor ti including non structural partition demo with new non structural paritions, doors, glazing millwork and finishes throughout project includes new fully engineered mep systems serving the tenant areas. scope of remodel includes the addition of a horizontal exit. includesDetails
6&7/fl- partial floor ti including non structural partition demo with new non structural paritions, doors, glazing millwork and finishes throughout project includes new fully engineered mep systems serving the tenant areas. scope of remodel includes the addition of a horizontal exit. includes | $2,113,464 |
| Oct 9, 2024 | In progress issued Jan 2025 | 1655 03rd St | 7&8/fl-mb3- ti demo non structrual paritions. (n) non structural partitions doors glazing millwork and finishes (n) mep and (n) horizontal exitDetails
7&8/fl-mb3- ti demo non structrual paritions. (n) non structural partitions doors glazing millwork and finishes (n) mep and (n) horizontal exit | $2,328,962 |
| Oct 9, 2024 | In progress issued Feb 2025 | 1725 03rd St | 11/fl-mb4- partial floor ti including non structural partition demo with new non structural paritions, doors, glazing millwork and finishes throughout project includes new fully engineered mep systems serving the tenant areas. no change in occupancy, use or areaDetails
11/fl-mb4- partial floor ti including non structural partition demo with new non structural paritions, doors, glazing millwork and finishes throughout project includes new fully engineered mep systems serving the tenant areas. no change in occupancy, use or area | $1,570,332 |
| Sep 24, 2024 | In progress issued Oct 2024 | 1725 03rd St | mb4(tower 4) new furniture phone booths floors: 3, 4, 5, 8, 9, and 10.Details
mb4(tower 4) new furniture phone booths floors: 3, 4, 5, 8, 9, and 10. | $53,000 |
| Sep 24, 2024 | In progress issued Sep 2024 | 1655 03rd St | mb3/bldg new phone booths floors 3, 4,5, 6, 9, 10, 11. parking area modifications and power door actuators.Details
mb3/bldg new phone booths floors 3, 4,5, 6, 9, 10, 11. parking area modifications and power door actuators. | $53,000 |
| Sep 3, 2024 | Completed final sign-off Aug 2025 | 1 Warriors Wy | interior renovation to existing staff storage, locker room, restroom, changing rooms, to make room for future wnba locker room and new men's changing space.Details
interior renovation to existing staff storage, locker room, restroom, changing rooms, to make room for future wnba locker room and new men's changing space. | $1,498,000 |
| Aug 23, 2024 | Completed final sign-off Feb 2025 | 1 Warriors Wy | revision to pa 202403137744 changes inside revision to veranda layout; added dimensions for field clarifications; millwork and detail updates; and revised finish scheduleDetails
revision to pa 202403137744 changes inside revision to veranda layout; added dimensions for field clarifications; millwork and detail updates; and revised finish schedule | |
| Aug 20, 2024 | Completed final sign-off Jul 2025 | 499 Illinois St | 2nd floor deferred structual for pa# 202402216284. provide anchorage for lab equipment.Details
2nd floor deferred structual for pa# 202402216284. provide anchorage for lab equipment. | |
| Jul 29, 2024 | Completed final sign-off Dec 2024 | 1 Warriors Wy | ste 102: revision to 202403208274 change in storefront design @ level 2 & 3 south tower. removal of structure scope of additional structural support for new storefront construction. removal of speccial inspection in association w/ removal of structure scopeDetails
ste 102: revision to 202403208274 change in storefront design @ level 2 & 3 south tower. removal of structure scope of additional structural support for new storefront construction. removal of speccial inspection in association w/ removal of structure scope | |
| Jul 23, 2024 | In progress issued Aug 2024 | 1 Warriors Wy | interior soft demo of (e) staff storage, locker room and changing rooms to make ready for future wnba lock room and new men's changing space. approx 7200 sq ft per ab-017.Details
interior soft demo of (e) staff storage, locker room and changing rooms to make ready for future wnba lock room and new men's changing space. approx 7200 sq ft per ab-017. | $30,000 |
| Jul 19, 2024 | In progress issued Aug 2024 | 1655 03rd St | mission bay 3 bldg level 7 interior non structural demo no fixture increaseDetails
mission bay 3 bldg level 7 interior non structural demo no fixture increase | $25,000 |
| Jul 19, 2024 | In progress issued Aug 2024 | 1725 03rd St | mission bay 4 bldg level 6 interior non structural demo no fixture increaseDetails
mission bay 4 bldg level 6 interior non structural demo no fixture increase | $30,000 |
| Jul 19, 2024 | In progress issued Aug 2024 | 1725 03rd St | mission bay 4 bldg level 11 interior non structural demo no fixture increaseDetails
mission bay 4 bldg level 11 interior non structural demo no fixture increase | $20,000 |
| Jun 14, 2024 | Completed final sign-off Dec 2024 | 3838 California St | limited construction of a new radiology xray room and control room in suite 707. suite is currently vacant. no affect to occupancy and/or exitingDetails
limited construction of a new radiology xray room and control room in suite 707. suite is currently vacant. no affect to occupancy and/or exiting | $74,910 |
| Mar 27, 2024 | Completed final sign-off Feb 2025 | 1 Warriors Wy | tenant improvement of (e) space to (n) sports bar & supporting back of house spaces. scope includes non-load bearing partitions, ceiling, millwork,finishes,lighting,mechanical,eletrical, audiovisual, and plumbingDetails
tenant improvement of (e) space to (n) sports bar & supporting back of house spaces. scope includes non-load bearing partitions, ceiling, millwork,finishes,lighting,mechanical,eletrical, audiovisual, and plumbing | $11,435,000 |
| Mar 20, 2024 | Completed final sign-off Dec 2024 | 1 Warriors Wy | south tower level 2&3 space 11: demo of (e) storefront system and construction of (n) storefront system and supports on level 2 and 3. oc11Details
south tower level 2&3 space 11: demo of (e) storefront system and construction of (n) storefront system and supports on level 2 and 3. oc11 | $200,000 |
| Mar 15, 2024 | Completed final sign-off Apr 2025 | 50 California St | 31/f: demolition of non-structural partitions, millwork, finishes, ceiling, lighting and plumbing. construction of non-structural partitions, millwork, finishes, ceiling, light, new demising partitions and non-rated common corridor. no change in occupancy, use or area.Details
31/f: demolition of non-structural partitions, millwork, finishes, ceiling, lighting and plumbing. construction of non-structural partitions, millwork, finishes, ceiling, light, new demising partitions and non-rated common corridor. no change in occupancy, use or area. | $2,551,472 |
| Feb 21, 2024 | Completed final sign-off Jul 2025 | 499 Illinois St | 2nd floor: interior t.i. includes new non-load bearing partitions, doors, ceiling and finishes. mep included.Details
2nd floor: interior t.i. includes new non-load bearing partitions, doors, ceiling and finishes. mep included. | $500,000 |
| Jan 29, 2024 | Completed final sign-off Oct 2024 | 1 Warriors Wy | south tower level 2 and 3, space 11: work includes concrete topping slab at level 2, infill slab opening and new concrete slab on level 3, new steel stair frame, and improvements as shown on plans.Details
south tower level 2 and 3, space 11: work includes concrete topping slab at level 2, infill slab opening and new concrete slab on level 3, new steel stair frame, and improvements as shown on plans. | $525,000 |
| Jan 3, 2024 | In progress filed Jan 2024, not yet issued | 490 Brannan St | temp support of excavation system consiting of an internally braced cutter soil mix (csm) shoring wall. deferred submittal of pa 2022112227014.Details
temp support of excavation system consiting of an internally braced cutter soil mix (csm) shoring wall. deferred submittal of pa 2022112227014. | $6,860,000 |
| Dec 7, 2023 | Completed final sign-off Feb 2024 | 185 Berry St | suite 6000: scope of work on the 1st fl shall consist of interior demolition of non-structural partitions including power/data, doors/frames/hardware, finishes, and ceiling/lighting. tenant space remain vacant under ab-017.Details
suite 6000: scope of work on the 1st fl shall consist of interior demolition of non-structural partitions including power/data, doors/frames/hardware, finishes, and ceiling/lighting. tenant space remain vacant under ab-017. | $240,000 |
| Sep 21, 2023 | Completed final sign-off Jan 2024 | 55 Francisco St | 6/f: single flr tenant remodel on flr 6 to include restroom upgrades, huddle rooms, telephone rooms, meeting rooms and lunch room. scope includes new ceilings finishes, mep, lfs fire alarm & sprinklers under separate permit.Details
6/f: single flr tenant remodel on flr 6 to include restroom upgrades, huddle rooms, telephone rooms, meeting rooms and lunch room. scope includes new ceilings finishes, mep, lfs fire alarm & sprinklers under separate permit. | $1,178,072 |
| Jun 26, 2023 | Completed final sign-off Sep 2026 | 1 Warriors Wy | t.i. furnishing all equipment, materias and labor necessary for the construction and renovation of a laundry facility in room ed.02.19 and ed.02.20 on level 000 of the arena. remove and reinstall in same location.Details
t.i. furnishing all equipment, materias and labor necessary for the construction and renovation of a laundry facility in room ed.02.19 and ed.02.20 on level 000 of the arena. remove and reinstall in same location. | $420,000 |
| Jun 8, 2023 | Completed final sign-off Jul 2023 | 3838 California St | 7/f: construction of new reception desk and cladded partition in suite 715. electrical under sep permitsDetails
7/f: construction of new reception desk and cladded partition in suite 715. electrical under sep permits | $80,000 |
| May 26, 2023 | Never finaled issued Jul 2023, no final | 400 Howard St | administrative revision permit to memorialize existing elevator lobby door locking and communications syste to remain. ref pa# 2022-0824-1165, 2022-0824-1162, 2022-0615-6437, 2022-0713-8419, 2022-0713-8421, 2022-0713-8422Details
administrative revision permit to memorialize existing elevator lobby door locking and communications syste to remain. ref pa# 2022-0824-1165, 2022-0824-1162, 2022-0615-6437, 2022-0713-8419, 2022-0713-8421, 2022-0713-8422 | |
| Mar 13, 2023 | Never finaled issued Mar 2023, no final | 400 Howard St | fire only administrative permit to obtain sffd assembly occupant load stamps (5) for existing assembly spaces. floors 1, 8, 10.Details
fire only administrative permit to obtain sffd assembly occupant load stamps (5) for existing assembly spaces. floors 1, 8, 10. | |
| Dec 2, 2022 | Never finaled filed Dec 2022, never issued | 490 Brannan St | demolition and complete removal of existing billboard structure. billboard number referenced are 2509,541387 and 1546,541389.Details
demolition and complete removal of existing billboard structure. billboard number referenced are 2509,541387 and 1546,541389. | $10,000 |
| Nov 22, 2022 | Never finaled filed Nov 2022, never issued | 490 Brannan St | demolish a 1 story retail-bank bldg type 3-b.Details
demolish a 1 story retail-bank bldg type 3-b. | $150,000 |
| Nov 22, 2022 | Never finaled filed Nov 2022, never issued | 490 Brannan St | erect a new 12 story with 2 basement,no dwelling office bldg.type 1a.Details
erect a new 12 story with 2 basement,no dwelling office bldg.type 1a. | $178,000,000 |
| Nov 15, 2022 | Completed final sign-off May 2024 | 400 Howard St | ground floor ti for reconfiguration of mail/copy area and build out of employee health clinic.Details
ground floor ti for reconfiguration of mail/copy area and build out of employee health clinic. | $400,000 |
| Aug 24, 2022 | Completed final sign-off May 2024 | 400 Howard St | level 3 ti interior only. new partitions, doors, finishes, lighting. new all gender restroomDetails
level 3 ti interior only. new partitions, doors, finishes, lighting. new all gender restroom | $360,000 |
| Aug 24, 2022 | Completed final sign-off May 2024 | 400 Howard St | level 2 interior ti. new partitoins, doors, finishes and lightingDetails
level 2 interior ti. new partitoins, doors, finishes and lighting | $500,000 |
| Jul 27, 2022 | Completed final sign-off Jan 2023 | 1 Warriors Wy | renovate (e) dock command ed 71.01 to first aid rm. add office space in (e) commissary room ec.75.01.Details
renovate (e) dock command ed 71.01 to first aid rm. add office space in (e) commissary room ec.75.01. | $350,000 |
| Jul 19, 2022 | Completed final sign-off Sep 2022 | 1 Market St | 9/f: deferred mechanical sheets for t.i. pa202206146265.Details
9/f: deferred mechanical sheets for t.i. pa202206146265. | $35,000 |
| Jul 13, 2022 | Completed final sign-off May 2024 | 400 Howard St | 9th flr interior t.i - new partitions, doors, finishes, and lightingDetails
9th flr interior t.i - new partitions, doors, finishes, and lighting | $400,000 |
| Jun 23, 2022 | Never finaled issued Jun 2022, no final | 1155 Battery St | work consist of removing test sample from steel column space weld metal for testing by others. sample areas required reinforcing prior to removing samples as indicated on plan. remove & replace (e) finishes & spray applied fire proofing as required. fls: 2, 4, 6.Details
work consist of removing test sample from steel column space weld metal for testing by others. sample areas required reinforcing prior to removing samples as indicated on plan. remove & replace (e) finishes & spray applied fire proofing as required. fls: 2, 4, 6. | $5,000 |
| Jun 14, 2022 | Completed final sign-off Sep 2022 | 1 Market St | 9th fl steuart tower: tenant improvement for lease ready. include selective demolition, new finishes, new non-bearing partitions, ceilings, accessible restroom, drinking fountain upgrades and employee breakroom. no change of occupancy, no change of use.Details
9th fl steuart tower: tenant improvement for lease ready. include selective demolition, new finishes, new non-bearing partitions, ceilings, accessible restroom, drinking fountain upgrades and employee breakroom. no change of occupancy, no change of use. | $250,000 |
| May 25, 2022 | Completed final sign-off Apr 2024 | 1 Sansome St | 40th fl: provide mechanical tenant improvement for 3579 sqft of office space. install new vav boxes. new heat pump. new piping, and new duct distribution. ref pa# 202112104155 & 202204192475Details
40th fl: provide mechanical tenant improvement for 3579 sqft of office space. install new vav boxes. new heat pump. new piping, and new duct distribution. ref pa# 202112104155 & 202204192475 | $150,000 |
| May 25, 2022 | Completed final sign-off Apr 2024 | 1 Sansome St | 41st fl: provide mechanical tenant improvement for 11920 sqft of office space. install new vav boxes. new heat pump. new piping, and new duct distribution.Details
41st fl: provide mechanical tenant improvement for 11920 sqft of office space. install new vav boxes. new heat pump. new piping, and new duct distribution. | $240,000 |
| May 24, 2022 | Completed final sign-off May 2023 | 1 Sansome St | 41st fl: new power and data for offices. new power for breakroom equipment . new lighting and controls.Details
41st fl: new power and data for offices. new power for breakroom equipment . new lighting and controls. | $500,000 |
| May 24, 2022 | Completed final sign-off May 2023 | 1 Sansome St | 40th fl: new power and data for offices. new power for breakroom equipment . new lighting and controls.Details
40th fl: new power and data for offices. new power for breakroom equipment . new lighting and controls. | $250,000 |
| May 24, 2022 | Completed final sign-off Apr 2024 | 1 Sansome St | 42nd fl: new power and data for offices. new power for breakroom equipment . new lighting and controls.t.i. 202112164529Details
42nd fl: new power and data for offices. new power for breakroom equipment . new lighting and controls.t.i. 202112164529 | $250,000 |
| May 3, 2022 | Completed final sign-off Jan 2024 | 1 Sansome St | 41/f: structural permit for structural beam installed to support an operable wall partition. ref t.i permit 202112164592.Details
41/f: structural permit for structural beam installed to support an operable wall partition. ref t.i permit 202112164592. | $20,000 |
| Apr 19, 2022 | Completed final sign-off Apr 2024 | 1 Sansome St | 40th fl: revision to pa# 202112104155. modification of rated wall to a non-rated wall - storage room #4017a. remove it room from tenant space on 40th fl.Details
40th fl: revision to pa# 202112104155. modification of rated wall to a non-rated wall - storage room #4017a. remove it room from tenant space on 40th fl. | |
| Dec 16, 2021 | Completed final sign-off May 2023 | 1 Sansome St | 42nd fl - ti include demo of non-structural partitions and building new non structural partitions. all new ore revised meps, life safety & sprinklers will be design build and submitted separately (bldg is fully sprinklered)Details
42nd fl - ti include demo of non-structural partitions and building new non structural partitions. all new ore revised meps, life safety & sprinklers will be design build and submitted separately (bldg is fully sprinklered) | $416,000 |