Block 0107, lot 007
1155 Battery St
- City’s use
- Commercial Office
- Built
- 1982
- Stories
- 7
- Building
- 360,713 sq ft
- Lot
- 72,646 sq ft
- Zoning
- C2
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
154 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 18, 2025 | Completed final sign-off Nov 2025 | 1155 Battery St | Skyline Construction | new 2022 title 24 compliant exterior lighting and controls. ref 202412025916Details
new 2022 title 24 compliant exterior lighting and controls. ref 202412025916 | $3,000 |
| Sep 10, 2025 | Completed final sign-off Mar 2026 | 1155 Battery St | Alliance Roofing Co Inc | re-roofing (no hotworks)Details
re-roofing (no hotworks) | $604,438 |
| Sep 10, 2025 | Completed final sign-off Aug 2026 | 1155 Battery St | Diablo Telecom & Construction Inc | at&t modification of an (e) wireless facility consisting of lower 3 and add 3 air6419-b77 g antennas; remove 4 190ah batteries; install 1 bbu, 1 +24v to 58v retrofit kit, 1 expansion shelf, 11 58v converters, 1 48v recifiier (1) 15 amp dc breaker, (3)50amp dc breaker, (1) 2nd row 58v buss bar;Details
at&t modification of an (e) wireless facility consisting of lower 3 and add 3 air6419-b77 g antennas; remove 4 190ah batteries; install 1 bbu, 1 +24v to 58v retrofit kit, 1 expansion shelf, 11 58v converters, 1 48v recifiier (1) 15 amp dc breaker, (3)50amp dc breaker, (1) 2nd row 58v buss bar; | $50,200 |
| Sep 4, 2025 | Completed final sign-off Sep 2025 | 1155 Battery St | Fire Stop Sprinkler Company | add 4 pendant heads. as built #202507251598Details
add 4 pendant heads. as built #202507251598 | $17,886 |
| Aug 20, 2025 | Completed final sign-off Sep 2025 | 1155 Battery St | Pyro-Comm Systems, Inc. | fire alarm as built. as-built based off field changes. delete 1 pull station and charge device address to match field. pa#: 202507160865.Details
fire alarm as built. as-built based off field changes. delete 1 pull station and charge device address to match field. pa#: 202507160865. | |
| Jul 30, 2025 | In progress issued Sep 2025 | 1155 Battery St | Interior Systems Contracting Inc. | revision to pa 202503263121 updates to add dropped ceiling soffit to enclose mechanical unitsDetails
revision to pa 202503263121 updates to add dropped ceiling soffit to enclose mechanical units | $4,951 |
| Jul 25, 2025 | In progress issued Jul 2025 | 1155 Battery St | Fire Stop Sprinkler Company | replace 6 pendent heads & 37 upright heads ref# 202503263121Details
replace 6 pendent heads & 37 upright heads ref# 202503263121 | $17,886 |
| Jul 16, 2025 | Completed final sign-off Sep 2025 | 1155 Battery St | Pyro-Comm Systems, Inc. | fire alarm. 1 relay module, 5 speaker strobes, 1 pull station to added to provie proper coverage. pa#: 202407317680.Details
fire alarm. 1 relay module, 5 speaker strobes, 1 pull station to added to provie proper coverage. pa#: 202407317680. | $1,500 |
| Jun 26, 2025 | Completed final sign-off Jul 2025 | 1155 Battery St | Pyro-Comm Systems, Inc. | fire alarm as built ref pa # 2025-0410-4099 note #25 changed from temporal 3 to whooping sound. added strobe in survey 1r17. removed and replaced some detector in elevator lobbyDetails
fire alarm as built ref pa # 2025-0410-4099 note #25 changed from temporal 3 to whooping sound. added strobe in survey 1r17. removed and replaced some detector in elevator lobby | |
| May 13, 2025 | Completed final sign-off Jun 2025 | 1155 Battery St | Aaa Restaurant Fire Control Llc | ground fl ref pa # 2024-0705-5905: furnish and install one (1) ul-300 fire system in the cafeteria.Details
ground fl ref pa # 2024-0705-5905: furnish and install one (1) ul-300 fire system in the cafeteria. | $5,000 |
| Apr 10, 2025 | In progress issued Apr 2025 | 1155 Battery St | Pyro-Comm Systems, Inc. | 1 power supply , 3 smoke detectors, 9 duct detectors, 16 ceiling strobes, 9 wall speaker strobes, 34 ceiling speaker strobes to be added to provide proper coverage. ref 202407317680Details
1 power supply , 3 smoke detectors, 9 duct detectors, 16 ceiling strobes, 9 wall speaker strobes, 34 ceiling speaker strobes to be added to provide proper coverage. ref 202407317680 | $14,000 |
| Mar 26, 2025 | In progress issued Jul 2025 | 1155 Battery St | Interior Systems Contracting Inc. | ground fl - interior tenant fit-out adjacent to existing public plaza. work includes interior partitions, wall fixture, light fixsture, electrical outlets. convert portion of office to accessory retail. resttroom and drinking fountain under bpa# 202501178624. electrical deferred.Details
ground fl - interior tenant fit-out adjacent to existing public plaza. work includes interior partitions, wall fixture, light fixsture, electrical outlets. convert portion of office to accessory retail. resttroom and drinking fountain under bpa# 202501178624. electrical deferred. | $900,000 |
| Mar 24, 2025 | In progress issued Mar 2025 | 1155 Battery St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system - tenant improvements. 1 added, 1 relocated, & 1 relocated and change out sprinkler. apn 202412025935Details
existing fire sprinkler system - tenant improvements. 1 added, 1 relocated, & 1 relocated and change out sprinkler. apn 202412025935 | $1,250 |
| Mar 3, 2025 | In progress issued May 2025 | 1155 Battery St | Skyline Construction | revision to pa#2024-0705-5905 to revise entry portal header, level landing and deffered structural for stairsDetails
revision to pa#2024-0705-5905 to revise entry portal header, level landing and deffered structural for stairs | |
| Feb 27, 2025 | In progress issued Feb 2025 | 1155 Battery St | C B F Inc | 5th fl- ref pa # 2024-0927-1790 new power a signal title 24Details
5th fl- ref pa # 2024-0927-1790 new power a signal title 24 | $18,500 |
| Feb 18, 2025 | Completed final sign-off Jul 2025 | 1155 Battery St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system. tenant improvement. add 5 and relocate and change out 11 sprinklers. arch pa# 202412025935Details
existing fire sprinkler system. tenant improvement. add 5 and relocate and change out 11 sprinklers. arch pa# 202412025935 | $6,600 |
| Feb 18, 2025 | Completed final sign-off Feb 2025 | 1155 Battery St | Golden Gate Fire Protection Inc | relocate 5 pendent sprinklers on 5/f. reference ti pa # 202501238948Details
relocate 5 pendent sprinklers on 5/f. reference ti pa # 202501238948 | $1,250 |
| Feb 6, 2025 | Completed final sign-off Feb 2025 | 1155 Battery St | Pyro-Comm Systems, Inc. | 5/f: fire alarm 1 ceiling speaker strobe to be added to provide poper coverage. ref pa# 202501238948.Details
5/f: fire alarm 1 ceiling speaker strobe to be added to provide poper coverage. ref pa# 202501238948. | $500 |
| Jan 24, 2025 | Completed final sign-off Jul 2025 | 1155 Battery St | Anderson, Rowe & Buckley, Inc. | 1st fl ref pa # 2024-0731-7680 existing fire sprinkler system tiDetails
1st fl ref pa # 2024-0731-7680 existing fire sprinkler system ti | |
| Jan 23, 2025 | In progress issued Jan 2025 | 1155 Battery St | Sc Builders, Inc | 5th & 7th fl revision to pa # 2024-0927-1790 modification of (e) conference rooms & offices. new interior partitions. new doors & finishes. minor rework of (e) mech & electrical under separate permit for projectDetails
5th & 7th fl revision to pa # 2024-0927-1790 modification of (e) conference rooms & offices. new interior partitions. new doors & finishes. minor rework of (e) mech & electrical under separate permit for project | |
| Jan 17, 2025 | In progress issued Feb 2025 | 1155 Battery St | Skyline Construction | ground fl: revision to pa# 202407317680. new gender neutral restroom and drinking fountain.Details
ground fl: revision to pa# 202407317680. new gender neutral restroom and drinking fountain. | $40,000 |
| Jan 9, 2025 | In progress issued Apr 2025 | 1155 Battery St | Skyline Construction | mechanical, electrical and plumbing work for ti on 1st fl. ref pa 202407317680Details
mechanical, electrical and plumbing work for ti on 1st fl. ref pa 202407317680 | $475,000 |
| Dec 2, 2024 | Completed final sign-off Aug 2025 | 1155 Battery St | Skyline Construction | floor 1: removal of existing toilet stall, plumbing fixtures, ceiing, restroom accessories & all finishes. proposed:combine existing separated restrooms into a single all gender restroom with shared vanity. all new plumbing fixture accessories & full height partitions/doors & finishes.Details
floor 1: removal of existing toilet stall, plumbing fixtures, ceiing, restroom accessories & all finishes. proposed:combine existing separated restrooms into a single all gender restroom with shared vanity. all new plumbing fixture accessories & full height partitions/doors & finishes. | $350,000 |
| Dec 2, 2024 | Completed final sign-off Nov 2025 | 1155 Battery St | Skyline Construction | level 1: demo e) storefront, alter e) landscape. n) entry & storefront & landscaping w/ walkway & stairDetails
level 1: demo e) storefront, alter e) landscape. n) entry & storefront & landscaping w/ walkway & stair | $300,000 |
| Sep 27, 2024 | In progress issued Jan 2025 | 1155 Battery St | Sc Builders, Inc | 4,5, and 7th fl multi level area ti modifications of existing spaces to conference rooms and office. new interior partitions, new doors and new finishes rk f e mech and electrical. 4th fl 880 sf, 5th 1404 sf, 7th fl 1472 sfDetails
4,5, and 7th fl multi level area ti modifications of existing spaces to conference rooms and office. new interior partitions, new doors and new finishes rk f e mech and electrical. 4th fl 880 sf, 5th 1404 sf, 7th fl 1472 sf | $300,000 |
| Sep 9, 2024 | Completed final sign-off Aug 2025 | 1155 Battery St | Skyline Construction | 1st floor:demo removal of existing non load brearing partitions, fixtures and casework. demolition of ceiling permitted separatelyDetails
1st floor:demo removal of existing non load brearing partitions, fixtures and casework. demolition of ceiling permitted separately | $198,000 |
| Jul 31, 2024 | Completed final sign-off Sep 2025 | 1155 Battery St | Skyline Construction | 1/f: interior tenant improvement includes new non-load bearing partitions, ceiling, lighting, finishes, and casework.Details
1/f: interior tenant improvement includes new non-load bearing partitions, ceiling, lighting, finishes, and casework. | $8,000,000 |
| Jul 5, 2024 | In progress issued Aug 2024 | 1155 Battery St | Skyline Construction | 1/f: demo (e) storefront and replace with (n) entry doors. (n) non-accessible exterior stair and vestibule.Details
1/f: demo (e) storefront and replace with (n) entry doors. (n) non-accessible exterior stair and vestibule. | $150,000 |
| Dec 21, 2022 | Never finaled filed Dec 2022, never issued | 1155 Battery St | 4/f: ti: nonstructural partitions, restrooms, ceilings, fixtures, finishes. mep.Details
4/f: ti: nonstructural partitions, restrooms, ceilings, fixtures, finishes. mep. | $4,500,000 | |
| Dec 21, 2022 | Never finaled filed Dec 2022, never issued | 1155 Battery St | 5/f: ti: nonstructural partitions, restrooms, ceilings, fixtures, finishes. mep.Details
5/f: ti: nonstructural partitions, restrooms, ceilings, fixtures, finishes. mep. | $4,500,000 | |
| Dec 21, 2022 | Never finaled filed Dec 2022, never issued | 1155 Battery St | 3/f: ti: nonstructural partitions, restrooms, ceiling, fixtures, finishes. including mep. life safety deferred.Details
3/f: ti: nonstructural partitions, restrooms, ceiling, fixtures, finishes. including mep. life safety deferred. | $4,500,000 | |
| Dec 21, 2022 | Never finaled filed Dec 2022, never issued | 1155 Battery St | 6/f: ti: nonstructural partitions, restrooms, ceilings, fixtures, finishes. mep.Details
6/f: ti: nonstructural partitions, restrooms, ceilings, fixtures, finishes. mep. | $4,500,000 | |
| Sep 20, 2022 | Never finaled filed Sep 2022, never issued | 1155 Battery St | 2/f: t.i., new non-load bearing partitions, ceilings, lighting, mep, finishes, & casework. install of horizontal exit assemblyDetails
2/f: t.i., new non-load bearing partitions, ceilings, lighting, mep, finishes, & casework. install of horizontal exit assembly | $5,300,000 | |
| Sep 8, 2022 | In progress issued Apr 2024 | 1155 Battery St | Skyline Construction | barrier removal on site & in common spaces of (e) 7-story office building. required accessbility upgrades per 118-202.4Details
barrier removal on site & in common spaces of (e) 7-story office building. required accessbility upgrades per 118-202.4 | $250,000 |
| Sep 6, 2022 | Never finaled issued Sep 2022, no final | 1155 Battery St | level 2: interior only non-structural per ab-017. area of demo to remain vacant until all accessibility features have been restored.Details
level 2: interior only non-structural per ab-017. area of demo to remain vacant until all accessibility features have been restored. | $45,000 | |
| Jun 23, 2022 | Never finaled issued Jun 2022, no final | 1155 Battery St | Dpr Construction A | work consist of removing test sample from steel column space weld metal for testing by others. sample areas required reinforcing prior to removing samples as indicated on plan. remove & replace (e) finishes & spray applied fire proofing as required. fls: 2, 4, 6.Details
work consist of removing test sample from steel column space weld metal for testing by others. sample areas required reinforcing prior to removing samples as indicated on plan. remove & replace (e) finishes & spray applied fire proofing as required. fls: 2, 4, 6. | $5,000 |
| May 16, 2022 | Completed final sign-off Nov 2022 | 1155 Battery St | Electric Tech Construction Inc | at&t modification unmanned telecom facility, relocate (2)(e) antennas, install (3)new antenna behind (e) frp screening, install new rf safety signs, barricades/stripping on rooftop, install (3)#6 awg dc power trunks to dc9, remove (8)155 att batteries, install (4) new 170ah batteries in (e) batteryDetails
at&t modification unmanned telecom facility, relocate (2)(e) antennas, install (3)new antenna behind (e) frp screening, install new rf safety signs, barricades/stripping on rooftop, install (3)#6 awg dc power trunks to dc9, remove (8)155 att batteries, install (4) new 170ah batteries in (e) battery | $45,000 |
| Oct 17, 2020 | Completed final sign-off May 2021 | 1155 Battery St | Electric Tech Construction Inc | remove/replace 3 antennas, 3 rrus, power plant. . add 3 dc9 surge suppressors. add new battery rack. add 11 new rectifiers.Details
remove/replace 3 antennas, 3 rrus, power plant. . add 3 dc9 surge suppressors. add new battery rack. add 11 new rectifiers. | $32,000 |
| Jul 24, 2018 | Completed final sign-off Mar 2019 | 1155 Battery St | Electric Tech Construction Inc | att modification r&r 6 (e) antennas w/6 new antennas, install 9 new rrus and other small equipment, remove unusual equip. no proposal change to (e) batteries maher naDetails
att modification r&r 6 (e) antennas w/6 new antennas, install 9 new rrus and other small equipment, remove unusual equip. no proposal change to (e) batteries maher na | $51,000 |
| Jul 23, 2018 | Expired or cancelled cancelled Jan 2026 | 1155 Battery St | 1/f: add electric card reader access to ground floor exit discharge door at interior stairway.Details
1/f: add electric card reader access to ground floor exit discharge door at interior stairway. | $2,000 | |
| Apr 6, 2018 | Never finaled issued Apr 2018, no final | 1155 Battery St | Liberty Fire Systems Inc | to obtain final inspection for work approved under pa#201503241694. all work is complete. n/a for maher.Details
to obtain final inspection for work approved under pa#201503241694. all work is complete. n/a for maher. | |
| Dec 6, 2017 | Expired or cancelled cancelled Jun 2018 | 1155 Battery St | swap (3) existing antennas for (3) new antennas, add (3) new radio models, add (2) fiber trunk lines, add (1) xmu unit inside (e) rack & add dc/fiber jumpers. ** maher: n/a **Details
swap (3) existing antennas for (3) new antennas, add (3) new radio models, add (2) fiber trunk lines, add (1) xmu unit inside (e) rack & add dc/fiber jumpers. ** maher: n/a ** | $15,000 | |
| Dec 30, 2016 | Never finaled issued Dec 2016, no final | 1155 Battery St | C B F Inc | 6th floor - electrical work consisting of 8 fixtures, 4 receptacles. lighting and receptacles only, no fire alarm no card readers. ref pa #201611031860. n/a maher ordinanceDetails
6th floor - electrical work consisting of 8 fixtures, 4 receptacles. lighting and receptacles only, no fire alarm no card readers. ref pa #201611031860. n/a maher ordinance | $4,000 |
| Dec 1, 2016 | Completed final sign-off Jan 2017 | 1155 Battery St | R.M.R. Construction Company | 6th flr: revision to application 2016-1103-1860; reduce scope, eliminate one office, no mechanical or fire alarm work. (life safety deferred)Details
6th flr: revision to application 2016-1103-1860; reduce scope, eliminate one office, no mechanical or fire alarm work. (life safety deferred) | |
| Nov 29, 2016 | Completed final sign-off Dec 2016 | 1155 Battery St | Liberty Fire Systems Inc | add and relocate fire sprinklers at 6 th fl tiDetails
add and relocate fire sprinklers at 6 th fl ti | $4,000 |
| Nov 3, 2016 | Completed final sign-off Jan 2017 | 1155 Battery St | R.M.R. Construction Company | 6/f -construction of non-structural partitions, doors/frames, hardware, drywall, accoustical ceilings and finishes.Details
6/f -construction of non-structural partitions, doors/frames, hardware, drywall, accoustical ceilings and finishes. | $120,000 |
| Feb 16, 2016 | Completed final sign-off Feb 2016 | 1155 Battery St | Liberty Fire Systems Inc | add and relocate 12 fire sprinklers at t.i. #201601086664Details
add and relocate 12 fire sprinklers at t.i. #201601086664 | $6,000 |
| Jan 8, 2016 | Completed final sign-off Mar 2016 | 1155 Battery St | R.M.R. Construction Company | 3rd flr: selective demolition & construction of non-load bearing partitions,light fixture,relocation & new including re-switching,new office doors,frame & reuse of (e) selected materials if practicable & new finishes; maher n/a. mep/life safety deferred.Details
3rd flr: selective demolition & construction of non-load bearing partitions,light fixture,relocation & new including re-switching,new office doors,frame & reuse of (e) selected materials if practicable & new finishes; maher n/a. mep/life safety deferred. | $75,000 |
| Apr 17, 2015 | Completed final sign-off May 2015 | 1155 Battery St | Pyro-Comm Systems, Inc. | new fire alarm deice added as part of elevator upgrade to include 1 relay module. maher - not req'dDetails
new fire alarm deice added as part of elevator upgrade to include 1 relay module. maher - not req'd | $3,150 |
| Mar 24, 2015 | Never finaled issued Mar 2015, no final | 1155 Battery St | Liberty Fire Systems Inc | demo fire sprinklers at elevator, machine room and hoistway. remove 3 total sprinklers. maher n/a.Details
demo fire sprinklers at elevator, machine room and hoistway. remove 3 total sprinklers. maher n/a. | $1,000 |
| Dec 23, 2014 | Completed final sign-off Jan 2015 | 1155 Battery St | R.M.R. Construction Company | revivison to 201409176624 revision to exiting diagram occupant load calculations. adjust error for sizing of the space to reflect a3 area of break areaDetails
revivison to 201409176624 revision to exiting diagram occupant load calculations. adjust error for sizing of the space to reflect a3 area of break area | $127,000 |
| Nov 13, 2014 | Completed final sign-off Dec 2014 | 1155 Battery St | Liberty Fire Systems Inc | fire sprinklers at office ceiling upgrade 1st fl- 13 replaces, 24 relocates with new heads, 4 deletes. n/a maher ordinanceDetails
fire sprinklers at office ceiling upgrade 1st fl- 13 replaces, 24 relocates with new heads, 4 deletes. n/a maher ordinance | $18,500 |
| Oct 28, 2014 | Completed final sign-off Dec 2014 | 1155 Battery St | Pyro-Comm Systems, Inc. | 1st floor - new fire alarm devices for t.i. to existing building to include: 4 speaker/strobes. maher n/a.Details
1st floor - new fire alarm devices for t.i. to existing building to include: 4 speaker/strobes. maher n/a. | $2,000 |
| Oct 28, 2014 | Completed final sign-off Jan 2015 | 1155 Battery St | Comfort Dynamics Inc. | 1st fl: tenant improvement, installation of 1 new watersource heat pump, replacement of 4 vav boxes. gc permit # 201409176624Details
1st fl: tenant improvement, installation of 1 new watersource heat pump, replacement of 4 vav boxes. gc permit # 201409176624 | $55,000 |
| Oct 20, 2014 | Completed final sign-off Jan 2015 | 1155 Battery St | C B F Inc | power and lighting upgrades, life safety upgrades. n/a maher ordinance #155-13. ref 201409176624Details
power and lighting upgrades, life safety upgrades. n/a maher ordinance #155-13. ref 201409176624 | $80,000 |
| Sep 26, 2014 | Completed final sign-off Nov 2014 | 1155 Battery St | Pyro-Comm Systems, Inc. | new fire alarm devices added to tenant improvement to include: 3 speaker/strobes ref 2014-0806-3153Details
new fire alarm devices added to tenant improvement to include: 3 speaker/strobes ref 2014-0806-3153 | $2,000 |
| Sep 17, 2014 | Completed final sign-off Jan 2015 | 1155 Battery St | R.M.R. Construction Company | construction of non structural partitions, doors/frames/hardware, millwork, drywall acoustical ceiling finishes. mech, elect, plumb & fire life safety under separate permit. n/a for maher.Details
construction of non structural partitions, doors/frames/hardware, millwork, drywall acoustical ceiling finishes. mech, elect, plumb & fire life safety under separate permit. n/a for maher. | $147,000 |
| Sep 16, 2014 | Completed final sign-off Oct 2014 | 1155 Battery St | Liberty Fire Systems Inc | 6th floor - add & relcoate 6 fire sprinklers. t.i. #2014.0806.3153. n/a maher ordinanceDetails
6th floor - add & relcoate 6 fire sprinklers. t.i. #2014.0806.3153. n/a maher ordinance | $3,000 |
| Sep 11, 2014 | Completed final sign-off Nov 2014 | 1155 Battery St | C B F Inc | 6th floor - provide lighting / power - title 24 work, ref t.i. #2014.0806.3153Details
6th floor - provide lighting / power - title 24 work, ref t.i. #2014.0806.3153 | $30,000 |
| Aug 6, 2014 | Completed final sign-off Nov 2014 | 1155 Battery St | R.M.R. Construction Company | 6/f - t.i. non-structural part, doors/ frames/ hardware, millwork, drywall, finishes, mech, and electrical. fire sprinkler and fire life safety is design build by general contractor.Details
6/f - t.i. non-structural part, doors/ frames/ hardware, millwork, drywall, finishes, mech, and electrical. fire sprinkler and fire life safety is design build by general contractor. | $98,000 |
| Jul 23, 2014 | Completed final sign-off Sep 2014 | 1155 Battery St | R.M.R. Construction Company | 6th floor: demolition of interior non-structural. partitions doors frames and hard millwork ceiling finishes mech and elec. n/a for the maher ordinance #155-13Details
6th floor: demolition of interior non-structural. partitions doors frames and hard millwork ceiling finishes mech and elec. n/a for the maher ordinance #155-13 | $20,000 |
| Jul 23, 2014 | Completed final sign-off Sep 2014 | 1155 Battery St | R.M.R. Construction Company | 1st floor: demolition of extg non-structural wall/ partitions doors frames and hard millwork ceiling finishes. mech and elec and plumbing. n/a for the maher ordinance #155-13Details
1st floor: demolition of extg non-structural wall/ partitions doors frames and hard millwork ceiling finishes. mech and elec and plumbing. n/a for the maher ordinance #155-13 | $30,000 |
| Jun 2, 2014 | Completed final sign-off Sep 2014 | 1155 Battery St | Triton Tower Inc | a modification to an extg at&t unmanned telecom. facility conisting of adding 3 new rrus-12 units three new a-2 modules, removing 2 extg rbs 2206 cabinets and replace with one new 23 inch rack, remove an extg dul unit and install one new dus 41 unit. n/a maher ordinance # 155-13Details
a modification to an extg at&t unmanned telecom. facility conisting of adding 3 new rrus-12 units three new a-2 modules, removing 2 extg rbs 2206 cabinets and replace with one new 23 inch rack, remove an extg dul unit and install one new dus 41 unit. n/a maher ordinance # 155-13 | $15,000 |
| Nov 5, 2013 | Completed final sign-off Dec 2013 | 1155 Battery St | Carrier Corporation | remove and replace cooling tower, new cooling tower will be of equal cooling capacity and locate in the same location on the roofDetails
remove and replace cooling tower, new cooling tower will be of equal cooling capacity and locate in the same location on the roof | $150,000 |
| Feb 17, 2012 | Completed final sign-off Jul 2012 | 1155 Battery St | Pyro-Comm Systems, Inc. | add new fire alarm devices to 1st floor areas, replace existing fire alarm devices with new devices, new monitor module to existing kitchen hood system. 9 smokes, 6 duct detectors 25 av devicesDetails
add new fire alarm devices to 1st floor areas, replace existing fire alarm devices with new devices, new monitor module to existing kitchen hood system. 9 smokes, 6 duct detectors 25 av devices | $9,000 |
| Jan 24, 2012 | Completed final sign-off Apr 2012 | 1155 Battery St | Cci Com'l Constr & Improv**See 985808*** | revision to appl #2011.10.19.7123 - elimate welded connection, bolted connections used for bus shelter.Details
revision to appl #2011.10.19.7123 - elimate welded connection, bolted connections used for bus shelter. | |
| Jan 24, 2012 | Expired or cancelled cancelled Nov 2024 | 1155 Battery St | Cci Com'l Constr & Improv**See 985808*** | revision to appl #2011.10.19.7119 - revise new exit from two to one (occupant load verification). project manager debra lehtone (293.7135) dlehtone@bararch.comDetails
revision to appl #2011.10.19.7119 - revise new exit from two to one (occupant load verification). project manager debra lehtone (293.7135) dlehtone@bararch.com | |
| Oct 31, 2011 | Completed final sign-off Dec 2011 | 1155 Battery St | Cci Com'l Constr & Improv**See 985808*** | to erect electric wall signDetails
to erect electric wall sign | $21,000 |
| Oct 31, 2011 | Completed final sign-off Dec 2011 | 1155 Battery St | Cci Com'l Constr & Improv**See 985808*** | to erect electric ground signDetails
to erect electric ground sign | $5,000 |
| Oct 31, 2011 | Completed final sign-off Dec 2011 | 1155 Battery St | Cci Com'l Constr & Improv**See 985808*** | to erect electric ground signDetails
to erect electric ground sign | $5,000 |
| Oct 19, 2011 | Completed final sign-off Apr 2012 | 1155 Battery St | Cci Com'l Constr & Improv**See 985808*** | remodel 2 each private bus sheltersDetails
remodel 2 each private bus shelters | $61,345 |
| Oct 19, 2011 | Completed final sign-off Jul 2012 | 1155 Battery St | Cci Com'l Constr & Improv**See 985808*** | reclassification of lobby to a-3 occupancy. add 2 new exit. provide occupant load calculatin for sffd assembly permit.Details
reclassification of lobby to a-3 occupancy. add 2 new exit. provide occupant load calculatin for sffd assembly permit. | $20,000 |
| Aug 11, 2011 | Expired or cancelled cancelled Jan 2026 | 1155 Battery St | install new monument logo outside building within project site.Details
install new monument logo outside building within project site. | $5,000 | |
| Aug 11, 2011 | Expired or cancelled cancelled Jan 2026 | 1155 Battery St | $21,000 | ||
| Jun 9, 2011 | Completed final sign-off Sep 2011 | 1155 Battery St | Metropolitan Electrical Construction | revision to pa# 2011-1119-5301-relocate 3 2 hvac units & it's enclosure to be wall mountedDetails
revision to pa# 2011-1119-5301-relocate 3 2 hvac units & it's enclosure to be wall mounted | |
| May 3, 2011 | Never finaled issued May 2011, no final | 1155 Battery St | Tri-Signal Integration Inc. | penthouse level-add one smoke detector to extg fire alarm system.Details
penthouse level-add one smoke detector to extg fire alarm system. | $1,200 |
| Apr 28, 2011 | Never finaled issued Apr 2011, no final | 1155 Battery St | street space & mta permit | ||
| Apr 7, 2011 | Completed final sign-off Oct 2011 | 1155 Battery St | Metropolitan Electrical Construction | 2 addtional furr-out sheetrock walls and a rigid isulation ceiling. reference to app#201011195301Details
2 addtional furr-out sheetrock walls and a rigid isulation ceiling. reference to app#201011195301 | $4,800 |
| Apr 7, 2011 | Completed final sign-off Aug 2011 | 1155 Battery St | Tri-Signal Integration Inc. | program fire alarm panel to provide door holders bypass for testing purposes.Details
program fire alarm panel to provide door holders bypass for testing purposes. | $500 |
| Dec 27, 2010 | Expired or cancelled cancelled Jan 2026 | 1155 Battery St | fire sprinkler. relocate heads for levi strauss. 1st fcl, 4 heads rtacDetails
fire sprinkler. relocate heads for levi strauss. 1st fcl, 4 heads rtac | $2,000 | |
| Dec 27, 2010 | Never finaled issued Dec 2010, no final | 1155 Battery St | fire sprinkler, relocate headds for levi strauss, 1st flDetails
fire sprinkler, relocate headds for levi strauss, 1st fl | $2,000 | |
| Dec 14, 2010 | Never finaled issued Dec 2010, no final | 1155 Battery St | Tri-Signal Integration Inc. | add 1 duct detector, 2 relay modules, 3 speaker strobes to existing fire alarm systemDetails
add 1 duct detector, 2 relay modules, 3 speaker strobes to existing fire alarm system | $2,500 |
| Nov 19, 2010 | Completed final sign-off Oct 2011 | 1155 Battery St | Metropolitan Electrical Construction | installation of unmanned telecommunication facility consisting of adding 5 equipment cabinets and 9 antennasDetails
installation of unmanned telecommunication facility consisting of adding 5 equipment cabinets and 9 antennas | $150,000 |
| Nov 18, 2010 | Completed final sign-off Aug 2011 | 1155 Battery St | Golden Bear Fire Protect. | installation of fire sprinklers at first floor - 68 heads. relocate existing sprinklers, change pendents to upright, remove excessive sprinklers & update/upgrade seismic bracing attachments for the fire sprinkler system.Details
installation of fire sprinklers at first floor - 68 heads. relocate existing sprinklers, change pendents to upright, remove excessive sprinklers & update/upgrade seismic bracing attachments for the fire sprinkler system. | $34,000 |
| Nov 10, 2010 | Never finaled issued Nov 2010, no final | 1155 Battery St | street space & meter | ||
| Nov 2, 2010 | Completed final sign-off Jan 2011 | 1155 Battery St | Prime Building Construction Inc *Ask Id* | ground flr-(n) non-structural interior partitions, doors & millwork. (n) electrical, lighting & mechanical. no exterior work. remodel retail area at ground floor.Details
ground flr-(n) non-structural interior partitions, doors & millwork. (n) electrical, lighting & mechanical. no exterior work. remodel retail area at ground floor. | $500,000 |
| Oct 25, 2010 | Completed final sign-off Aug 2011 | 1155 Battery St | Tri-Signal Integration Inc. | to test remote microphone per approved procedure, use fire alarm system speakers for pa system, use with remote mic (all equipment is exisitng)Details
to test remote microphone per approved procedure, use fire alarm system speakers for pa system, use with remote mic (all equipment is exisitng) | |
| Oct 14, 2010 | Completed final sign-off Jan 2011 | 1155 Battery St | Western Allied Mechanical Inc. | remove and replace 2 existing heating hot water boilers with two new high efficiency heating hotwater boilers. replace (e) hotwater pump in kind. boilers are in (e) mech. penthouse structureDetails
remove and replace 2 existing heating hot water boilers with two new high efficiency heating hotwater boilers. replace (e) hotwater pump in kind. boilers are in (e) mech. penthouse structure | $125,000 |
| Oct 12, 2010 | Completed final sign-off Aug 2011 | 1155 Battery St | Tri-Signal Integration Inc. | 1st floor - add two (2) smoke detectors, one (1) duct detector, one (1) relay mobule, fourteen (14) speaker/strobes, six (6) strobes, one (1) speaker, one (1) sync mobule to existing fire alarm system.Details
1st floor - add two (2) smoke detectors, one (1) duct detector, one (1) relay mobule, fourteen (14) speaker/strobes, six (6) strobes, one (1) speaker, one (1) sync mobule to existing fire alarm system. | $7,900 |
| Oct 8, 2010 | Completed final sign-off Aug 2011 | 1155 Battery St | Golden Bear Fire Protect. | first fl. 77 heads- relocate existing sprinklers, change pendents to uprights, remoce excessive sprinklers and update/ upgrade siesmic bracing on attachments for sprinkler system.Details
first fl. 77 heads- relocate existing sprinklers, change pendents to uprights, remoce excessive sprinklers and update/ upgrade siesmic bracing on attachments for sprinkler system. | $5,800 |
| Sep 20, 2010 | Never finaled issued Sep 2010, no final | 1155 Battery St | Tri-Signal Integration Inc. | roof level-add 2 relay modules for elevators flashing warning lights (helmets)Details
roof level-add 2 relay modules for elevators flashing warning lights (helmets) | $1,500 |
| Aug 17, 2010 | Completed final sign-off Aug 2011 | 1155 Battery St | Devcon Construction | levi strauss. interior non struc.ti on ground fl only. work includes selective demo and renovation, drywall clgs, finishes, mech, and elec. approx sqft; 32,174 with retail shell enclosure. new showers and new 1-hr rated separation to create separate retail space. occup load verifiy under sep permit.Details
levi strauss. interior non struc.ti on ground fl only. work includes selective demo and renovation, drywall clgs, finishes, mech, and elec. approx sqft; 32,174 with retail shell enclosure. new showers and new 1-hr rated separation to create separate retail space. occup load verifiy under sep permit. | $1,423,000 |
| Aug 5, 2010 | Never finaled issued Aug 2010, no final | 1155 Battery St | street space permit | ||
| Jul 7, 2010 | Never finaled issued Jul 2010, no final | 1155 Battery St | street space and mta | ||
| Jun 22, 2010 | Expired or cancelled expired Mar 2012 | 1155 Battery St | Golden Bear Fire Protect. | fire sprinkler remodel on the 5th, 6th and the 7th floor. relocate ceiling sprinklers for new wall lay out.Details
fire sprinkler remodel on the 5th, 6th and the 7th floor. relocate ceiling sprinklers for new wall lay out. | $97,000 |
| Apr 20, 2010 | Completed final sign-off Aug 2011 | 1155 Battery St | Devcon Construction | rvision to pa# 2009.1124.1989. revised restroom fixtures. new lighting.Details
rvision to pa# 2009.1124.1989. revised restroom fixtures. new lighting. | $10,000 |
| Apr 16, 2010 | Completed final sign-off Aug 2011 | 1155 Battery St | Devcon Construction | deferred submittal permit for aluminum storefront system as referenced in pa# 2009-1218-3508- all work interiorDetails
deferred submittal permit for aluminum storefront system as referenced in pa# 2009-1218-3508- all work interior | |
| Apr 13, 2010 | Completed final sign-off Aug 2011 | 1155 Battery St | Devcon Construction | removal of (e) interior office space on floor 5,6 & 7. ref. application 200912183508for constructionDetails
removal of (e) interior office space on floor 5,6 & 7. ref. application 200912183508for construction | $300,000 |
| Apr 2, 2010 | Expired or cancelled expired Mar 2012 | 1155 Battery St | Golden Bear Fire Protect. | floor 2 & 3 - add & relocate fire sprinklers as tenant improvements. modify/add seismic bracing & restraints, total 1272 heads.Details
floor 2 & 3 - add & relocate fire sprinklers as tenant improvements. modify/add seismic bracing & restraints, total 1272 heads. | $95,400 |
| Mar 12, 2010 | Completed final sign-off Aug 2011 | 1155 Battery St | Tri-Signal Integration Inc. | 2nd thru 7th floors-add 3 power supplies, 3 control modules, 130 speakers, 106 speaker/strobes. 286 strobes & 6 sync modules to (e) fire alarm systemDetails
2nd thru 7th floors-add 3 power supplies, 3 control modules, 130 speakers, 106 speaker/strobes. 286 strobes & 6 sync modules to (e) fire alarm system | $120,000 |
| Mar 10, 2010 | Expired or cancelled expired Mar 2012 | 1155 Battery St | Golden Bear Fire Protect. | 4th floor - add & relocate automatic fire sprinklers for tenant improvements fothe 4th. flr. modify, add seismic restraints. ref. appl.#2009/1218/3508.Details
4th floor - add & relocate automatic fire sprinklers for tenant improvements fothe 4th. flr. modify, add seismic restraints. ref. appl.#2009/1218/3508. | $58,700 |
| Feb 25, 2010 | Never finaled issued Feb 2010, no final | 1155 Battery St | street space | ||
| Feb 3, 2010 | Never finaled issued Feb 2010, no final | 1155 Battery St | street space permit | ||
| Dec 18, 2009 | Completed final sign-off Aug 2011 | 1155 Battery St | Devcon Construction | tenant improvements floor 2 to 7. non-structural interior partitions & finishes for 289.719 sq ft. in (e) levi strauss bldg. 7 story bldg with basement/ garage. project includes renovation of 6 floors of office & support space.Details
tenant improvements floor 2 to 7. non-structural interior partitions & finishes for 289.719 sq ft. in (e) levi strauss bldg. 7 story bldg with basement/ garage. project includes renovation of 6 floors of office & support space. | $22,000,000 |
| Dec 17, 2009 | Never finaled issued Dec 2009, no final | 1155 Battery St | street space permit | ||
| Dec 11, 2009 | Completed final sign-off Jan 2010 | 1155 Battery St | R.M.R. Construction Company | floors 2, 3 & 4. scope of work is limited to interior non structural pre-construction demolition. this area is to remain unoccupied in accordance with sf ab-017.Details
floors 2, 3 & 4. scope of work is limited to interior non structural pre-construction demolition. this area is to remain unoccupied in accordance with sf ab-017. | $675,000 |
| Nov 24, 2009 | Completed final sign-off Aug 2011 | 1155 Battery St | Devcon Construction | restroom remodeling & replace existing restroom fixtures with new. replace (e) "low" water fountain witn new "low" water fountain. restriping (e) accessible parking at basement. mep under separate permit.Details
restroom remodeling & replace existing restroom fixtures with new. replace (e) "low" water fountain witn new "low" water fountain. restriping (e) accessible parking at basement. mep under separate permit. | $250,000 |
| Mar 4, 2009 | Completed final sign-off Mar 2009 | 1155 Battery St | Master Protection Corp. | to obtain final inspection for work approved under pa 200702093832.all work has been completed.Details
to obtain final inspection for work approved under pa 200702093832.all work has been completed. | |
| Mar 4, 2009 | Completed final sign-off Mar 2009 | 1155 Battery St | R.M.R. Construction Company | to obtain final inspection for work approved under pa 200610124785.all work is completedDetails
to obtain final inspection for work approved under pa 200610124785.all work is completed | |
| Aug 20, 2008 | Completed final sign-off Apr 2009 | 1155 Battery St | John P. Plane Construction Inc. | renew appln #200511047448 200512291207 and 200601172217 for final inspectionDetails
renew appln #200511047448 200512291207 and 200601172217 for final inspection | |
| Aug 20, 2008 | Completed final sign-off Apr 2009 | 1155 Battery St | John P. Plane Construction Inc. | renew app #200511047450 200512291211 and 200601172217 for final inspectionDetails
renew app #200511047450 200512291211 and 200601172217 for final inspection | |
| Jul 28, 2008 | Completed final sign-off Apr 2009 | 1155 Battery St | John P. Plane Construction Inc. | renew pa# 2005/11/04/7447 & pa# 2005/11/04/7451 for final inspection only.Details
renew pa# 2005/11/04/7447 & pa# 2005/11/04/7451 for final inspection only. | |
| Feb 29, 2008 | Expired or cancelled expired Jan 2009 | 1155 Battery St | Acco Engineered Systems Inc. Dba Acco En | renew application #200612139744 and #200612139742 for final inspection.Details
renew application #200612139744 and #200612139742 for final inspection. | |
| Feb 29, 2008 | Completed final sign-off Mar 2008 | 1155 Battery St | Acco Engineered Systems Inc. Dba Acco En | renew appl #200612139745, #200612139746, and #200612139747 for final inspection.Details
renew appl #200612139745, #200612139746, and #200612139747 for final inspection. | |
| Nov 19, 2007 | Completed final sign-off Aug 2008 | 1155 Battery St | 7th floor (argonaut room) remodel which includes: demolition of existing ceiling-height wall, associated electrical outlets, light switch & construction of new non-rated ceiling-height walls.Details
7th floor (argonaut room) remodel which includes: demolition of existing ceiling-height wall, associated electrical outlets, light switch & construction of new non-rated ceiling-height walls. | $10,000 | |
| May 8, 2007 | Completed final sign-off Aug 2007 | 1155 Battery St | oti-1 (6th flor) a minor conference room #6158 on 6th floor including demolition of esxisting conference sliding doors and tracks at ceiling and floor. construction of new non rated ceiling height partition and new door with confroming hardware. now emgineering work.Details
oti-1 (6th flor) a minor conference room #6158 on 6th floor including demolition of esxisting conference sliding doors and tracks at ceiling and floor. construction of new non rated ceiling height partition and new door with confroming hardware. now emgineering work. | $10,000 | |
| Apr 23, 2007 | Expired or cancelled expired Jan 2009 | 1155 Battery St | C B F Inc | new lighting, title 24 installationDetails
new lighting, title 24 installation | $5,000 |
| Feb 26, 2007 | Completed final sign-off May 2007 | 1155 Battery St | ground floor - expand (e) retail/gallery on ground floor. mep under separate permit. new exterior door to plaza - rev. to approved pa#2006/10/24/5938.Details
ground floor - expand (e) retail/gallery on ground floor. mep under separate permit. new exterior door to plaza - rev. to approved pa#2006/10/24/5938. | $20,000 | |
| Feb 9, 2007 | Expired or cancelled expired Jan 2009 | 1155 Battery St | Master Protection Corp. | install ansul fire system in kitchen on 1/f. system is a gallon, 3 seperate systems. kitchenf aces battery streetDetails
install ansul fire system in kitchen on 1/f. system is a gallon, 3 seperate systems. kitchenf aces battery street | $6,500 |
| Dec 13, 2006 | Expired or cancelled expired Jan 2009 | 1155 Battery St | Acco Engineered Systems Inc. Dba Acco En | bldg b - legalization of chiller replacement already installed.Details
bldg b - legalization of chiller replacement already installed. | $80,000 |
| Dec 13, 2006 | Expired or cancelled expired Jan 2009 | 1155 Battery St | Acco Engineered Systems Inc. Dba Acco En | bldg ko - legalization of chiller replacement already installed.Details
bldg ko - legalization of chiller replacement already installed. | $60,000 |
| Dec 13, 2006 | Expired or cancelled expired Jul 2008 | 1155 Battery St | Acco Engineered Systems Inc. Dba Acco En | bldg isc - legalization of chiller & tower replacement.Details
bldg isc - legalization of chiller & tower replacement. | $80,000 |
| Dec 13, 2006 | Expired or cancelled expired Jan 2009 | 1155 Battery St | Acco Engineered Systems Inc. Dba Acco En | bldg e - legalization of chiller replacement already installed.Details
bldg e - legalization of chiller replacement already installed. | $60,000 |
| Dec 13, 2006 | Expired or cancelled expired Jan 2009 | 1155 Battery St | Acco Engineered Systems Inc. Dba Acco En | bldg a - legalization of chiller replacement already installed.Details
bldg a - legalization of chiller replacement already installed. | $60,000 |
| Oct 24, 2006 | Expired or cancelled expired Jan 2009 | 1155 Battery St | oti-2, 3rd fl, el me, ls. | $108,000 | |
| Oct 24, 2006 | Completed final sign-off May 2007 | 1155 Battery St | convert ground floor office area to retail showroom. approx 900 sfDetails
convert ground floor office area to retail showroom. approx 900 sf | $20,000 | |
| Oct 12, 2006 | Expired or cancelled expired Jan 2009 | 1155 Battery St | Potter Fire Protection | relocate (51) fire sprinklers on the 3rd floor onlyDetails
relocate (51) fire sprinklers on the 3rd floor only | $13,000 |
| Sep 15, 2006 | Completed final sign-off Mar 2007 | 1155 Battery St | R.M.R. Construction Company | oti-1, 3rd floor, el, me, ls, sp.Details
oti-1, 3rd floor, el, me, ls, sp. | $300,000 |
| Jan 17, 2006 | Expired or cancelled expired Jan 2009 | 1155 Battery St | C B F Inc | life safety system modifications. 3 strobes.Details
life safety system modifications. 3 strobes. | $2,500 |
| Dec 29, 2005 | Expired or cancelled expired Jan 2009 | 1155 Battery St | Ramcon Company Inc | oti-3, 7th floor sp | $4,900 |
| Dec 29, 2005 | Expired or cancelled expired Jan 2009 | 1155 Battery St | Ramcon Company Inc | oti-3, 7th floor sp | $4,500 |
| Dec 6, 2005 | Expired or cancelled withdrawn Dec 2005 | 1155 Battery St | John Cressa & Sons | oti-3 6th floor/ls me el | $130,000 |
| Nov 30, 2005 | Completed final sign-off May 2006 | 1155 Battery St | interior non-structural demolition of fpartial 5th flfoor offices. no new construction under this permitDetails
interior non-structural demolition of fpartial 5th flfoor offices. no new construction under this permit | $10,000 | |
| Nov 9, 2005 | Completed final sign-off May 2006 | 1155 Battery St | John Cressa & Sons | oti-3, 6th floor, el, me, ls.Details
oti-3, 6th floor, el, me, ls. | $200,000 |
| Nov 4, 2005 | Expired or cancelled expired May 2006 | 1155 Battery St | John P. Plane Construction Inc. | oti-1, 7th floor, | $24,000 |
| Nov 4, 2005 | Expired or cancelled expired Jan 2009 | 1155 Battery St | John P. Plane Construction Inc. | oti-2, 7th floor, me, el. | $50,000 |
| Nov 4, 2005 | Expired or cancelled expired Jan 2009 | 1155 Battery St | John P. Plane Construction Inc. | oti-2, 7th floor, el, me. | $37,000 |
| Nov 4, 2005 | Expired or cancelled expired Jan 2009 | 1155 Battery St | John P. Plane Construction Inc. | oti-1 architectural 7th floor | $56,000 |
| Nov 3, 2005 | Completed final sign-off May 2006 | 1155 Battery St | John Cressa & Sons | oti-2 6th/fl sp.Details
oti-2 6th/fl sp. | $45,000 |
| Oct 14, 2005 | Completed final sign-off May 2006 | 1155 Battery St | John Cressa & Sons | oti-1, 6th floor, el, me, ls, sp.Details
oti-1, 6th floor, el, me, ls, sp. | $212,000 |
| Mar 26, 2004 | Expired or cancelled expired Jan 2009 | 1155 Battery St | change partition stud size-ceiling ht. 3 5/8 to 2 1/2 stud 24 o.c 25 ga. revi#200403118339. no increDetails
change partition stud size-ceiling ht. 3 5/8 to 2 1/2 stud 24 o.c 25 ga. revi#200403118339. no incre | ||
| Mar 11, 2004 | Expired or cancelled expired Dec 2008 | 1155 Battery St | remodel interior office on 1/f.ventilation seperate permit if need,sprinkler & f/a under sep.permitDetails
remodel interior office on 1/f.ventilation seperate permit if need,sprinkler & f/a under sep.permit | $10,000 | |
| Feb 3, 2004 | Expired or cancelled expired Jan 2009 | 1155 Battery St | renew 200304021265 for final only.Details
renew 200304021265 for final only. | ||
| May 14, 2003 | Expired or cancelled expired Dec 2008 | 1155 Battery St | renew expired permit 9807431-for final to install self contained generator fuel tankDetails
renew expired permit 9807431-for final to install self contained generator fuel tank | ||
| Apr 10, 2003 | Expired or cancelled expired Dec 2008 | 1155 Battery St | Paganini Electric Corp(See Signatories) | add 9 indication devices (strobes) in attrium.Details
add 9 indication devices (strobes) in attrium. | $17,000 |
| Apr 10, 2003 | Expired or cancelled expired Dec 2008 | 1155 Battery St | Columbia Mechanical Contractors | relocate one sprinkler head and add one new sprinkler headDetails
relocate one sprinkler head and add one new sprinkler head | $1,000 |
| Apr 2, 2003 | Expired or cancelled expired Feb 2004 | 1155 Battery St | sign permit - reconstructe ground, non-electric, single faced, window.Details
sign permit - reconstructe ground, non-electric, single faced, window. | ||
| Feb 28, 2003 | Completed final sign-off Dec 2003 | 1155 Battery St | install graphics/exhibits in main lobby (ref.:200302288514)Details
install graphics/exhibits in main lobby (ref.:200302288514) | $357,000 | |
| Dec 20, 2002 | Completed final sign-off Sep 2003 | 1155 Battery St | adding2doorswithcardreaders,optical turnistiles&relocating security desk (ground fl. only)Details
adding2doorswithcardreaders,optical turnistiles&relocating security desk (ground fl. only) | $87,126 | |
| Apr 26, 2002 | Never finaled issued Apr 2003, no final | 1155 Battery St | install new front end for fire alarm systemDetails
install new front end for fire alarm system | $360,000 | |
| Nov 28, 2001 | Expired or cancelled expired Feb 2003 | 1155 Battery St | Acco Engineered Systems Inc. Dba Acco En | replace chillers/provide umc | $120,000 |
| Aug 20, 2001 | Expired or cancelled expired Dec 2008 | 1155 Battery St | John Cressa & Sons | modify existing restrooms to meet ada complanie "at will". flrs 2-7 & new ceiling tiles at corridorDetails
modify existing restrooms to meet ada complanie "at will". flrs 2-7 & new ceiling tiles at corridor | $500,000 |
| Jul 17, 2001 | Expired or cancelled expired Feb 2002 | 1155 Battery St | change in existing diagram per direction of sf fire dept, no construction requiredDetails
change in existing diagram per direction of sf fire dept, no construction required | $100 | |
| Jun 27, 2000 | Expired or cancelled expired Jun 2001 | 1155 Battery St | street space |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- R.M.R. Construction Company (11), Skyline Construction (10), Pyro-Comm Systems, Inc. (9), Acco Engineered Systems Inc. Dba Acco En (8), Cci Com'l Constr & Improv**See 985808*** (7), John P. Plane Construction Inc. (7), Tri-Signal Integration Inc. (7), C B F Inc (6), Devcon Construction (6), Liberty Fire Systems Inc (6), Golden Bear Fire Protect. (5), John Cressa & Sons (5), Anderson, Rowe & Buckley, Inc. (3), Electric Tech Construction Inc (3), Metropolitan Electrical Construction (3), Fire Stop Sprinkler Company (2), Interior Systems Contracting Inc. (2), Master Protection Corp. (2), Ramcon Company Inc (2), Sc Builders, Inc (2), Aaa Restaurant Fire Control Llc, Alliance Roofing Co Inc, Carrier Corporation, Columbia Mechanical Contractors, Comfort Dynamics Inc., Diablo Telecom & Construction Inc, Dpr Construction A, Golden Gate Fire Protection Inc, Paganini Electric Corp(See Signatories), Potter Fire Protection, Prime Building Construction Inc *Ask Id*, Triton Tower Inc, Western Allied Mechanical Inc.
- Architects
- Clement Soga (9), Luda Hoe (8), Jon Randolph Howder (5), Don Dacumos (2), Melissa Pesci (2), Bar Arhitects, Michelle Gayle, Nestor Popowych, Robert Cooley
- Engineers
- Steven Shaeffer (3), Jesus B Cabellon Jr (2), Justin Hosseininejad (2), Alexander Joseph Pacheco, Andrew Haldnae, Clement Soga, James R Gronek, James R Spore, Kylie Lo, Nathaniel Kobb, Nestor Popowycu Valerio-Hernandez, Oleg Uydrug, Robert Vancamp, Robin William Shelton, Rudolfo P Bustos Iii, Russell Berkowitz, Ryan Mcdaniel, Simin Naaseh
- Designers
- Michael Joseph Donahue (2), Anderson, Rowe & Buckley, Inc., Golden Gate Fire Protection
- Pmt consultant/expediters
- Pat Buscovich
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.