Devcon Construction
- Based in
- Milpitas
- On San Francisco permits
- Nov 2001 to Nov 2026
- Last 24 months
- 34 permits filed
147 permits since 2000: 93 completed, 30 in progress, 18 never finaled, 6 expired or cancelled.
Of the 18 never-finaled permits, 2 are 5 to 10 years old, 16 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 147.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 10, 2026 | In progress filed Nov 2026, not yet issued | 2001 37th Av | revision to pa#202307252968 s6. proposes modifications to exterior doors adjacent to roof terrace a and roof terrace b at level 3. add maglocks to some doors for additional security after hours when these terrace will be unoccupied. eliminate door actuators from doors adjacent to terraces.Details
revision to pa#202307252968 s6. proposes modifications to exterior doors adjacent to roof terrace a and roof terrace b at level 3. add maglocks to some doors for additional security after hours when these terrace will be unoccupied. eliminate door actuators from doors adjacent to terraces. | $25,000 |
| Oct 29, 2026 | In progress issued Nov 2026 | 449 Avenue H | deferred seismic bracing of suspended mechanical and electrical systems. ref bpa: 2025.0903.4495, 2026.0310.7301 and 2026.0506.0741Details
deferred seismic bracing of suspended mechanical and electrical systems. ref bpa: 2025.0903.4495, 2026.0310.7301 and 2026.0506.0741 | |
| Oct 29, 2026 | In progress issued Nov 2026 | 449 Avenue H | deffered submital anchorage for mechanical equipment ref pa# 2025-0903-4495, 2026-0310-7301, 2026-0506-0741.Details
deffered submital anchorage for mechanical equipment ref pa# 2025-0903-4495, 2026-0310-7301, 2026-0506-0741. | |
| Sep 3, 2026 | In progress issued Sep 2026 | 345 Spear St | revision to 202512211612. revision to lighting controols and t24 forms. update to remove daylighting contls and demand response due to installed lighting power being less than 80% of allowed lighting power.Details
revision to 202512211612. revision to lighting controols and t24 forms. update to remove daylighting contls and demand response due to installed lighting power being less than 80% of allowed lighting power. | |
| Aug 5, 2026 | In progress issued Sep 2026 | 345 Spear St | 5th fl - replacement of (4) pairs of doors at two 5th floor elevator lobby vestibules. mep and 2 way comms system under separate permitDetails
5th fl - replacement of (4) pairs of doors at two 5th floor elevator lobby vestibules. mep and 2 way comms system under separate permit | $70,000 |
| Jul 30, 2026 | In progress issued Sep 2026 | 345 Spear St | 5th fl - revision to pa 202512111612 & 202606263991 adjustment to egress stairs 2 & 5. the (e) 36" doors will be upgraded to 48" and the vestibule will be enlarged to accommodate teh wider doors with a 2-hr rated construction assembly electrical revisions includedDetails
5th fl - revision to pa 202512111612 & 202606263991 adjustment to egress stairs 2 & 5. the (e) 36" doors will be upgraded to 48" and the vestibule will be enlarged to accommodate teh wider doors with a 2-hr rated construction assembly electrical revisions included | $160,000 |
| Jul 23, 2026 | In progress issued Sep 2026 | 345 Spear St | ground floor: separate mep pemit for small t.i. converting an existing restaurant to event space. ref pa #202606022357Details
ground floor: separate mep pemit for small t.i. converting an existing restaurant to event space. ref pa #202606022357 | $300,000 |
| Jul 21, 2026 | In progress issued Sep 2026 | 345 Spear St | 1st floor: this set of documents is for the tenant improvement of a portion of the ground floor to become a bike repair space. no electrical bikes shall be servicedDetails
1st floor: this set of documents is for the tenant improvement of a portion of the ground floor to become a bike repair space. no electrical bikes shall be serviced | $350,000 |
| Jul 21, 2026 | In progress issued Sep 2026 | 345 Spear St | mep permit for tenant improvement converting an existing restaurant and office space to event space. ref 202512111591Details
mep permit for tenant improvement converting an existing restaurant and office space to event space. ref 202512111591 | $350,000 |
| Jul 1, 2026 | In progress issued Jul 2026 | 449 Avenue H | deferred mep seismic bracing. ref permit 202509034495.Details
deferred mep seismic bracing. ref permit 202509034495. | |
| Jun 26, 2026 | In progress issued Jul 2026 | 345 Spear St | revison to bpa# 202512111612 5/f: removal of hardlid ceiling, architectural archways and reconfiguration of lighting.Details
revison to bpa# 202512111612 5/f: removal of hardlid ceiling, architectural archways and reconfiguration of lighting. | |
| Jun 2, 2026 | In progress issued Jul 2026 | 345 Spear St | ti of a portion of the ground floor: includes the construction of non- bearing partitions, finishes, doors, frames, and hardware. mep under seperate permit.Details
ti of a portion of the ground floor: includes the construction of non- bearing partitions, finishes, doors, frames, and hardware. mep under seperate permit. | $300,000 |
| May 26, 2026 | Completed final sign-off Sep 2026 | 2001 37th Av | this restroom remodel project involves modification of 5 existing restrooms to include selective demolition and construction of restroom fixtures, accessories, toilet and unrinal partitions, counter tops, lighting and fixtures.Details
this restroom remodel project involves modification of 5 existing restrooms to include selective demolition and construction of restroom fixtures, accessories, toilet and unrinal partitions, counter tops, lighting and fixtures. | $209,208 |
| May 22, 2026 | In progress issued Oct 2026 | 449 Avenue H | revision to pa # 202509034495 for added exterior pool, shifted pathway, added bldg pad at nw corner, mech, & plaumbing, lighting & electrical revisions, reference delta 12 for revisions. reference folowing permit revisions for tracking: #202602045167 & 202603107301.Details
revision to pa # 202509034495 for added exterior pool, shifted pathway, added bldg pad at nw corner, mech, & plaumbing, lighting & electrical revisions, reference delta 12 for revisions. reference folowing permit revisions for tracking: #202602045167 & 202603107301. | $100,000 |
| Apr 8, 2026 | In progress issued May 2026 | 449 Avenue H | deferred glulam beam connections permit and superstructure revision. reference pa# 2025.0903.4495Details
deferred glulam beam connections permit and superstructure revision. reference pa# 2025.0903.4495 | |
| Mar 27, 2026 | In progress issued Apr 2026 | 345 Spear St | 5/f- revision to pa# 202512111612: division of existing reading room to individual small conference and phone rooms.Details
5/f- revision to pa# 202512111612: division of existing reading room to individual small conference and phone rooms. | |
| Mar 24, 2026 | In progress issued May 2026 | 345 Spear St | 4-5/fl- ti includes the installation of (n) comunicationg stairDetails
4-5/fl- ti includes the installation of (n) comunicationg stair | $250,000 |
| Mar 10, 2026 | In progress issued Apr 2026 | 449 Avenue H | revision 202509034495 for in ground spas. reference 202602045167 for foundation and pump room revisions. electrical deferred for separate submittal. no change in use or size. no exterior changes. revised occ. load of exterior courtyard.Details
revision 202509034495 for in ground spas. reference 202602045167 for foundation and pump room revisions. electrical deferred for separate submittal. no change in use or size. no exterior changes. revised occ. load of exterior courtyard. | $10,000 |
| Feb 5, 2026 | Completed final sign-off Apr 2026 | 449 Avenue H | revision to ground improvement. ref pa #202510167538Details
revision to ground improvement. ref pa #202510167538 | |
| Feb 4, 2026 | In progress issued Feb 2026 | 449 Avenue H | revision to foundation for future spa ref pa # 2025-0903-4495. architectural & mep elements of spa will be submitted separately. add change of groundskeeping covered area to pump room.Details
revision to foundation for future spa ref pa # 2025-0903-4495. architectural & mep elements of spa will be submitted separately. add change of groundskeeping covered area to pump room. | $10,000 |
| Jan 14, 2026 | Completed final sign-off Jun 2026 | 100 Hooper St | t.i. to establish a separate tenant space on the 4th floor of 100 hooper st. work includes new non-structural partition, new doors, exit signage, ceiling adjustments, & floor refinishing. no exterior work, structural modifications or improvments outside of 4th floor proposed in this scope of work.Details
t.i. to establish a separate tenant space on the 4th floor of 100 hooper st. work includes new non-structural partition, new doors, exit signage, ceiling adjustments, & floor refinishing. no exterior work, structural modifications or improvments outside of 4th floor proposed in this scope of work. | $175,000 |
| Dec 11, 2025 | In progress issued Jul 2026 | 345 Spear St | 1/fl- scope of work tenant improvement including, non bearing partitions, ceilings, lights, doors, frames, hardware and casework and restroom upgrades for new event space. meps deferred.Details
1/fl- scope of work tenant improvement including, non bearing partitions, ceilings, lights, doors, frames, hardware and casework and restroom upgrades for new event space. meps deferred. | $367,000 |
| Dec 11, 2025 | In progress issued Mar 2026 | 345 Spear St | 5/fl- ti includes constrution of non bearing partitions finishes door frames and hardware. this also includes the construction of (n) electrical lighting, and mechanical that will tie into the (e) systemDetails
5/fl- ti includes constrution of non bearing partitions finishes door frames and hardware. this also includes the construction of (n) electrical lighting, and mechanical that will tie into the (e) system | $300,000 |
| Dec 11, 2025 | In progress issued Sep 2026 | 345 Spear St | 1/fl- ti of commerical kitchen at kills plaza. work includes construction of non bearing parititons, finishes, doors, frames and hardwareDetails
1/fl- ti of commerical kitchen at kills plaza. work includes construction of non bearing parititons, finishes, doors, frames and hardware | $240,000 |
| Dec 11, 2025 | In progress issued Sep 2026 | 345 Spear St | tenant improvement of first floor fitness space at hills plaza. tenant improvement includes construction of non-bearing partition, finishes, doors, frames, and hardwareDetails
tenant improvement of first floor fitness space at hills plaza. tenant improvement includes construction of non-bearing partition, finishes, doors, frames, and hardware | $350,000 |
| Dec 11, 2025 | In progress issued Feb 2026 | 345 Spear St | 5th/f: reconfigure (e) micro-kitchen, selective demo of finishes t.i. construction of non-bearing partitions,lights finishes, doors, frames, casework & hardware. construction of new electrical, lighting, mech plumbing that will tie into e) systemDetails
5th/f: reconfigure (e) micro-kitchen, selective demo of finishes t.i. construction of non-bearing partitions,lights finishes, doors, frames, casework & hardware. construction of new electrical, lighting, mech plumbing that will tie into e) system | $200,000 |
| Dec 11, 2025 | In progress issued Jan 2026 | 345 Spear St | 1/fl- scope of work includes selective demo of finishes, non bearing partition, ceilings, lights, doors, frames, hardware and caseworkDetails
1/fl- scope of work includes selective demo of finishes, non bearing partition, ceilings, lights, doors, frames, hardware and casework | $100,000 |
| Dec 11, 2025 | In progress issued Jan 2026 | 345 Spear St | 5th/f: selective demo of finishes, non beariing partitions, ceiling, lights, doors, frames, hardware & caseworkDetails
5th/f: selective demo of finishes, non beariing partitions, ceiling, lights, doors, frames, hardware & casework | $75,000 |
| Oct 30, 2025 | In progress issued Aug 2026 | 2001 37th Av | removal of a section of carpet & interior glass storefront, patching, & installation of new bike racks serivng 70 total bikes, within the existing cats tutoring center at saint ignatious college preparatory. no additional demo or new construction is proposed.Details
removal of a section of carpet & interior glass storefront, patching, & installation of new bike racks serivng 70 total bikes, within the existing cats tutoring center at saint ignatious college preparatory. no additional demo or new construction is proposed. | $10,000 |
| Oct 16, 2025 | Completed final sign-off Apr 2026 | 449 Avenue H | soil improvement. design build const of vibro displacement column (vdc) & 1 vibro compaction ground improvement. ground improvement only & exclude design & construction of foundation shoring. temporary construction pad grading & final pad grading. ref to grading pa# 202510066801Details
soil improvement. design build const of vibro displacement column (vdc) & 1 vibro compaction ground improvement. ground improvement only & exclude design & construction of foundation shoring. temporary construction pad grading & final pad grading. ref to grading pa# 202510066801 | $534,000 |
| Oct 6, 2025 | Completed final sign-off Apr 2026 | 449 Avenue H | treasure island. rough grading to excavate approx 20,000 cubic yard of soil & transport material to dumpsite @ 4th st/avenue h locate 1/4 mile se. depth of excavation varies from 0.1 to 5.7'. additionally 5,000 cubic yard of soil (depths rang from 0.1 to 5.6') will be placed as compact fill.Details
treasure island. rough grading to excavate approx 20,000 cubic yard of soil & transport material to dumpsite @ 4th st/avenue h locate 1/4 mile se. depth of excavation varies from 0.1 to 5.7'. additionally 5,000 cubic yard of soil (depths rang from 0.1 to 5.6') will be placed as compact fill. | $560,000 |
| Sep 18, 2025 | In progress issued Jan 2026 | 449 Avenue H | **premium plan review**new construction of type ii-b (sprinklered), 1-story steel and mass timber structure to include training facility (locker room, weight training, athletic training, hydotherapy & offices). 2 parking areas and 3 full size pitches and outdoor multi-function training area.Details
**premium plan review**new construction of type ii-b (sprinklered), 1-story steel and mass timber structure to include training facility (locker room, weight training, athletic training, hydotherapy & offices). 2 parking areas and 3 full size pitches and outdoor multi-function training area. | $31,100,000 |
| Jun 20, 2025 | In progress issued Jul 2025 | 2001 37th Av | plumbing review & stormwater control pid review for 3 story alteration permit ref pa # 2023-0725-2968Details
plumbing review & stormwater control pid review for 3 story alteration permit ref pa # 2023-0725-2968 | |
| Jun 17, 2025 | In progress issued Aug 2025 | 2225 Jerrold Av | new manufacturing restrooms. new door hardware on (e) doors. re-stripe (e) parking lot for 37 parking space off mckinnon ave. new accessible ramp to main entry. replacement of 3 overhead loading doors. new accessible parking off jerrold aveDetails
new manufacturing restrooms. new door hardware on (e) doors. re-stripe (e) parking lot for 37 parking space off mckinnon ave. new accessible ramp to main entry. replacement of 3 overhead loading doors. new accessible parking off jerrold ave | $700,000 |
| Nov 15, 2024 | Completed final sign-off Mar 2025 | 2001 37th Av | installation of fountain & steel gates. all work within property lines.Details
installation of fountain & steel gates. all work within property lines. | $50,000 |
| May 1, 2024 | Completed final sign-off Jan 2025 | 2001 37th Av | partial interior non structural demo only per ab017Details
partial interior non structural demo only per ab017 | $45,000 |
| Mar 5, 2024 | Completed final sign-off Jul 2024 | 2001 37th Av | install 12 temporary modular classroom buildings (as approved by state) on (e) field. construction included ramps, stairs, & electrical hookups.lighting not included.Details
install 12 temporary modular classroom buildings (as approved by state) on (e) field. construction included ramps, stairs, & electrical hookups.lighting not included. | $120,000 |
| Sep 12, 2023 | Completed final sign-off Mar 2025 | 2001 37th Av | interior ti to the (e) snack shack including new walls, metal wall panels, rubber flooring, epoxy flooring, w/self coving base & operable corrugated metal doors, snack-shack includes grab & go area & point of service check out locations.Details
interior ti to the (e) snack shack including new walls, metal wall panels, rubber flooring, epoxy flooring, w/self coving base & operable corrugated metal doors, snack-shack includes grab & go area & point of service check out locations. | $550,000 |
| Jul 25, 2023 | In progress issued Aug 2024 | 2001 37th Av | the project consist of a proposed 142500 gsf addition of educational and accessory spaces to an existing education building. the existing building is 3 stories and the addition proposed is three stories plus basement. approximately 58800 gsf of existing educationaland accessory spaces will beDetails
the project consist of a proposed 142500 gsf addition of educational and accessory spaces to an existing education building. the existing building is 3 stories and the addition proposed is three stories plus basement. approximately 58800 gsf of existing educationaland accessory spaces will be | $75,000,000 |
| Mar 4, 2022 | Completed final sign-off Jun 2022 | 749 Toland St | r.30 insulation to underside of roof deck; r.19 insulation to exterior walls @ warehouse only. mep under seperate permit.Details
r.30 insulation to underside of roof deck; r.19 insulation to exterior walls @ warehouse only. mep under seperate permit. | $325,000 |
| Apr 6, 2021 | Completed final sign-off May 2021 | 1598 Bay St | demo exterior wall 5-6" none bearing wall. replace 5-6" of metal studs, re plaster (e) wall, install brick veneer. comply w/ bid nov# 202174751. no plans per bid/ces site visit.Details
demo exterior wall 5-6" none bearing wall. replace 5-6" of metal studs, re plaster (e) wall, install brick veneer. comply w/ bid nov# 202174751. no plans per bid/ces site visit. | $9,000 |
| Aug 13, 2020 | Completed final sign-off Apr 2026 | 2500 Turk Bl | (east building): revision to pa# 201611303815-s4 (sprinkler). no sprinklers will be installed in the elevator pits for this student housing project.Details
(east building): revision to pa# 201611303815-s4 (sprinkler). no sprinklers will be installed in the elevator pits for this student housing project. | |
| Aug 13, 2020 | Never finaled issued Sep 2020, no final | 2500 Turk Bl | (west building): revision to pa# 201611303820-s4 (sprinkler). no sprinklers will be installed in the elevator pits for this student housing project.Details
(west building): revision to pa# 201611303820-s4 (sprinkler). no sprinklers will be installed in the elevator pits for this student housing project. | |
| Sep 3, 2019 | Completed final sign-off Oct 2019 | 2001 37th Av | revision to permit #201905221392. rename storage room 102b to electrical room. move entry room to new electrical room.Details
revision to permit #201905221392. rename storage room 102b to electrical room. move entry room to new electrical room. | |
| Aug 14, 2019 | Completed final sign-off Nov 2021 | 2335 Golden Gate Av | revision to pa #201811156026, reduction in the scope of project, elimination of the enlargement of the south lobby entrance & addition of a canvenience stairway, minor revision to mechanical rm, it does not change bldg use, occup, height or measurably impact egress or life safety.Details
revision to pa #201811156026, reduction in the scope of project, elimination of the enlargement of the south lobby entrance & addition of a canvenience stairway, minor revision to mechanical rm, it does not change bldg use, occup, height or measurably impact egress or life safety. | |
| Aug 13, 2019 | Completed final sign-off Apr 2021 | 2800 Turk Bl | rev to 201710110911.accom prop arch layout-new openings will add to (e)concrete wall w/remain portion wall strengthened by inc thickens of wall&infill(e)opening by casting new concrete against (e)wall&tying 2 walls together via epoxy dowels.Details
rev to 201710110911.accom prop arch layout-new openings will add to (e)concrete wall w/remain portion wall strengthened by inc thickens of wall&infill(e)opening by casting new concrete against (e)wall&tying 2 walls together via epoxy dowels. | $75,000 |
| Jul 26, 2019 | Completed final sign-off Sep 2020 | 2001 37th Av | in-kind window replacement at classroom buildingDetails
in-kind window replacement at classroom building | $87,000 |
| May 22, 2019 | Completed final sign-off Oct 2019 | 2001 37th Av | reclassify ground fl music storage for classroom. reclassify batting cage/exercise room to 2 classrooms. add 2 exterior windows and 3 doors.Details
reclassify ground fl music storage for classroom. reclassify batting cage/exercise room to 2 classrooms. add 2 exterior windows and 3 doors. | $42,000 |
| Nov 15, 2018 | Completed final sign-off Nov 2021 | 2335 Golden Gate Av | addition of approx 4,900 sq ft. reconfigure west side upper level to create (n) west entry lobby, southwest corner & club/event space. will reduce total seating capacity by approx 650. minor alteration to south entrance & interiors of north & south lobbies are included.Details
addition of approx 4,900 sq ft. reconfigure west side upper level to create (n) west entry lobby, southwest corner & club/event space. will reduce total seating capacity by approx 650. minor alteration to south entrance & interiors of north & south lobbies are included. | $6,800,000 |
| Jun 22, 2018 | Completed final sign-off Mar 2024 | 2500 Turk Bl | design of a temp shoring & permanent retaining wall system for the lone mountain sobrato hall project @ usf. the excavation with cuts upt o 28 ft. will be shored using temp & permanent tieback soldier beams. ref pa# 2016/11/30/3815-s (east bldg) & pa# 2016/11/30/3820-s (west bldg)Details
design of a temp shoring & permanent retaining wall system for the lone mountain sobrato hall project @ usf. the excavation with cuts upt o 28 ft. will be shored using temp & permanent tieback soldier beams. ref pa# 2016/11/30/3815-s (east bldg) & pa# 2016/11/30/3820-s (west bldg) | $909,000 |
| Jun 22, 2018 | Completed final sign-off Mar 2024 | 2500 Turk Bl | design of a temp shoring & permanent retaining wall system for the lone mountain sobrato hall project @ usf. the excavation with cuts upt o 28 ft. will be shored using temp & permanent tieback soldier beams. ref pa# 2016/11/30/3815-s (east bldg) & pa# 2016/11/30/3820-s (west bldg)Details
design of a temp shoring & permanent retaining wall system for the lone mountain sobrato hall project @ usf. the excavation with cuts upt o 28 ft. will be shored using temp & permanent tieback soldier beams. ref pa# 2016/11/30/3815-s (east bldg) & pa# 2016/11/30/3820-s (west bldg) | $1,980,000 |
| Apr 9, 2018 | Completed final sign-off Jun 2024 | 2500 Turk Bl | demolition of a type 4, 1-story maintenance building for usf campus.Details
demolition of a type 4, 1-story maintenance building for usf campus. | $20,000 |
| Aug 29, 2017 | Completed final sign-off May 2018 | 1201 Tennessee St | revision to structural and mounting details of previously approved sunshades and awnings under pa #201312234917 and #201701318334. maher naDetails
revision to structural and mounting details of previously approved sunshades and awnings under pa #201312234917 and #201701318334. maher na | |
| Aug 29, 2017 | Completed final sign-off Sep 2017 | 1201 Tennessee St | revision to app: #201312234917 s8. as built plans for distributed antenna system (das). maher naDetails
revision to app: #201312234917 s8. as built plans for distributed antenna system (das). maher na | |
| Aug 14, 2017 | Completed final sign-off Oct 2017 | 1201 Tennessee St | mechanical revisions to pa#201312234917 as built of fire smoke dampers. n/a ordinance #155-13Details
mechanical revisions to pa#201312234917 as built of fire smoke dampers. n/a ordinance #155-13 | |
| Jun 30, 2017 | Never finaled issued Dec 2017, no final | 1598 Bay St | deferred submittal- metal stairs. shop drawings #2015-1223-5830Details
deferred submittal- metal stairs. shop drawings #2015-1223-5830 | |
| Jun 16, 2017 | Completed final sign-off Oct 2017 | 1201 Tennessee St | for recording purpose to clarify number of dwelling units as 263 as approved in pa#201312234917 addemdum #5Details
for recording purpose to clarify number of dwelling units as 263 as approved in pa#201312234917 addemdum #5 | |
| Apr 7, 2017 | Completed final sign-off Jul 2017 | 2001 37th Av | music building - convert existing office on 2nd fl to 2 gender neutral single occupant bathrooms. convert existing garment storage room on 2nd fl to student loundge and officeDetails
music building - convert existing office on 2nd fl to 2 gender neutral single occupant bathrooms. convert existing garment storage room on 2nd fl to student loundge and office | $18,000 |
| Jan 31, 2017 | Completed final sign-off Oct 2017 | 1201 Tennessee St | revision pa #201312234917 to show shop drawings structural details & calculations per awnigns & sun shades. n/a maher ordinanceDetails
revision pa #201312234917 to show shop drawings structural details & calculations per awnigns & sun shades. n/a maher ordinance | |
| Jan 31, 2017 | Completed final sign-off Oct 2017 | 1201 Tennessee St | revision pa #201312234917 for balcony guardrail shop drawings & structural calculations & details. n/a maher ordinanceDetails
revision pa #201312234917 for balcony guardrail shop drawings & structural calculations & details. n/a maher ordinance | |
| Jan 31, 2017 | Completed final sign-off Oct 2017 | 1201 Tennessee St | revision pa #201312234917 for stairs & railings sturctural detail & calculations & shop drawings. n/a maher ordinanceDetails
revision pa #201312234917 for stairs & railings sturctural detail & calculations & shop drawings. n/a maher ordinance | |
| Jan 20, 2017 | Completed final sign-off Feb 2017 | 2130 Fulton St | to obtain final inspection for work approved under pa # 200507127459. all work is complete. n/a maherDetails
to obtain final inspection for work approved under pa # 200507127459. all work is complete. n/a maher | |
| Dec 19, 2016 | Completed final sign-off Oct 2017 | 1201 Tennessee St | revision pa#201312234917 by adding details of roof ventilation as approved attached ab-005. n/a ordinance #155-13Details
revision pa#201312234917 by adding details of roof ventilation as approved attached ab-005. n/a ordinance #155-13 | |
| Dec 6, 2016 | Completed final sign-off Sep 2017 | 1201 Tennessee St | revise previously approved electrical plans under app#201312234917 to resolve discrepancies with fire/smoke detectors between prevously approved mechanical plans requester by fire department. revise addendum #5Details
revise previously approved electrical plans under app#201312234917 to resolve discrepancies with fire/smoke detectors between prevously approved mechanical plans requester by fire department. revise addendum #5 | |
| Nov 30, 2016 | Completed final sign-off Jul 2024 | 2500 Turk Bl | (west building) to erect 5 stories, no basement with 1 level type i-a over 4 levels type 5-a, 71 units student residence hall with amenity office. (r-2,b,a-3,s-2)Details
(west building) to erect 5 stories, no basement with 1 level type i-a over 4 levels type 5-a, 71 units student residence hall with amenity office. (r-2,b,a-3,s-2) | $34,000,000 |
| Nov 30, 2016 | Completed final sign-off Jul 2024 | 2500 Turk Bl | (east building) to erect 4 stories with 1 basement, type va building, 84 units student residence hall with amenity office. (r-2,b,a-3,s-2)Details
(east building) to erect 4 stories with 1 basement, type va building, 84 units student residence hall with amenity office. (r-2,b,a-3,s-2) | $38,000,000 |
| Oct 17, 2016 | Completed final sign-off Oct 2017 | 1201 Tennessee St | revision to 201312234917-s5 to revise by adding details at ventilation at ridgeDetails
revision to 201312234917-s5 to revise by adding details at ventilation at ridge | |
| Aug 5, 2016 | Completed final sign-off Sep 2017 | 1201 Tennessee St | revision to app#201312234917 to extend 8' wall to an extg retaining wall which was approved at the planning commission. n/a for maherDetails
revision to app#201312234917 to extend 8' wall to an extg retaining wall which was approved at the planning commission. n/a for maher | |
| May 27, 2016 | Completed final sign-off Aug 2017 | 1201 Tennessee St | revision to ref pa2016 1223 4817 add #5 note on sheet ms.02 sff a b 2.05 #1 only requested by sffd fire protection engineer. maher naDetails
revision to ref pa2016 1223 4817 add #5 note on sheet ms.02 sff a b 2.05 #1 only requested by sffd fire protection engineer. maher na | |
| Dec 23, 2015 | Completed final sign-off Nov 2018 | 1598 Bay St | to erect 4 stories, 1 basement, 28 units residential & commercial building. ** maher: n/a **Details
to erect 4 stories, 1 basement, 28 units residential & commercial building. ** maher: n/a ** | $10,500,000 |
| Jul 22, 2015 | Never finaled issued Jul 2015, no final | 444 De Haro St | revision to approved pa 201503029724, scope is to revise duct smoke detector (dsd)to smoke detector (sd) and add fire alarm matrix per fir inspector's request,no new work, maher n/aDetails
revision to approved pa 201503029724, scope is to revise duct smoke detector (dsd)to smoke detector (sd) and add fire alarm matrix per fir inspector's request,no new work, maher n/a | |
| Jun 10, 2015 | Completed final sign-off Sep 2017 | 1201 Tennessee St | revision to app#201312234917-s. change to pad elevation of dwelling units. n/a for maherDetails
revision to app#201312234917-s. change to pad elevation of dwelling units. n/a for maher | |
| Mar 10, 2015 | Completed final sign-off May 2015 | 555 19th St | non-rated, non structural, aluminum framed, tempered, glass partitions and doors.Details
non-rated, non structural, aluminum framed, tempered, glass partitions and doors. | $31,465 |
| Mar 2, 2015 | Completed final sign-off Oct 2015 | 444 De Haro St | revisions to approved pa# 2014 0626 9566 as noted on plans. work includes new 2nd floor entry area. new demising wall to create subteway space, av room reconfiguration. maher - not req'dDetails
revisions to approved pa# 2014 0626 9566 as noted on plans. work includes new 2nd floor entry area. new demising wall to create subteway space, av room reconfiguration. maher - not req'd | |
| Feb 27, 2015 | Completed final sign-off Sep 2017 | 1201 Tennessee St | pile load test program per plan to test soil condition. maher - not req'dDetails
pile load test program per plan to test soil condition. maher - not req'd | $10,000 |
| Oct 30, 2014 | Completed final sign-off Feb 2020 | 638 19th St | unit #0c2: commercial tenant improvement to existing commercial space. existing permitted ada compliant bathroom, existing permitted entrance, ada compliant ramp, elec, lighting, new interior partitons wallsDetails
unit #0c2: commercial tenant improvement to existing commercial space. existing permitted ada compliant bathroom, existing permitted entrance, ada compliant ramp, elec, lighting, new interior partitons walls | $43,000 |
| Aug 8, 2014 | Completed final sign-off May 2015 | 1201 Tennessee St | demolish 2 stories storage. maher n/aDetails
demolish 2 stories storage. maher n/a | $200,000 |
| Jun 26, 2014 | Completed final sign-off Oct 2015 | 444 De Haro St | 2nd fl - tenant improvements to (e) office suite on 2nd fl. construction of (n) mezzanine w/ stairs & ramp. open offices & support spaces. (n) lighting & electrical power/data. (n) mechanical systems incl radiant fl. (n) plumbing for added restrms & showers. n/a for maher ordinance.Details
2nd fl - tenant improvements to (e) office suite on 2nd fl. construction of (n) mezzanine w/ stairs & ramp. open offices & support spaces. (n) lighting & electrical power/data. (n) mechanical systems incl radiant fl. (n) plumbing for added restrms & showers. n/a for maher ordinance. | $3,384,842 |
| Mar 27, 2014 | Completed final sign-off Sep 2014 | 27 South Park | work @ unit# 201 only. interior tenant improvement to (e) office space on the 2nd floor. work to include new partitions, move glazed paritions, new underlayment & carpet. mep under separate permit. ** maher: compliance with ordinance no# 155-13 not required **Details
work @ unit# 201 only. interior tenant improvement to (e) office space on the 2nd floor. work to include new partitions, move glazed paritions, new underlayment & carpet. mep under separate permit. ** maher: compliance with ordinance no# 155-13 not required ** | $175,000 |
| Dec 23, 2013 | Completed final sign-off Sep 2017 | 1201 Tennessee St | erect a 6 story residential and commercial building.Details
erect a 6 story residential and commercial building. | $55,000,000 |
| Nov 7, 2013 | Never finaled issued Nov 2013, no final | 1600 15th St | revision to appl #2013.1015.9212 - add one relay module for stair #2 garage door release & connect to existing fire alarm system of the bldg. revision to fire alarm 2007-1001-4208 s7Details
revision to appl #2013.1015.9212 - add one relay module for stair #2 garage door release & connect to existing fire alarm system of the bldg. revision to fire alarm 2007-1001-4208 s7 | $500 |
| Oct 15, 2013 | Completed final sign-off Dec 2013 | 1600 15th St | revsion of submitted approved egress plan to enhance resident security. pa #2007-1001-4208, ground floor.Details
revsion of submitted approved egress plan to enhance resident security. pa #2007-1001-4208, ground floor. | |
| May 17, 2013 | Completed final sign-off Sep 2013 | 1880 Mission St | revision to pa# 2007-1001-4208/s4-passenger elevatorDetails
revision to pa# 2007-1001-4208/s4-passenger elevator | |
| May 16, 2013 | Completed final sign-off Sep 2013 | 1880 Mission St | revision to app#200710014208 s3 shifting shearwall and detailing along per structural detail revised.Details
revision to app#200710014208 s3 shifting shearwall and detailing along per structural detail revised. | |
| Mar 1, 2013 | Completed final sign-off Jun 2013 | 500 Terry A. Francois Bl | provide carpet and paint at 2 extg unfinished stair walls.Details
provide carpet and paint at 2 extg unfinished stair walls. | $200,000 |
| Aug 1, 2012 | Never finaled issued Sep 2012, no final | 1880 Mission St | steel stairs. revision to pa# 2007/10/01/4208 s-3. comments in red on am steel shops are from architect of record. 2010 code.Details
steel stairs. revision to pa# 2007/10/01/4208 s-3. comments in red on am steel shops are from architect of record. 2010 code. | |
| May 10, 2012 | Completed final sign-off May 2012 | 625 Townsend St | 1st floor-revision of 2 existing evacuation map signageDetails
1st floor-revision of 2 existing evacuation map signage | $600 |
| Apr 20, 2012 | Completed final sign-off Sep 2013 | 1880 Mission St | revision to pa#200710014208-s3. submittal of structural hold down system, shop dwgs, calculations and project data.Details
revision to pa#200710014208-s3. submittal of structural hold down system, shop dwgs, calculations and project data. | |
| Jan 25, 2012 | Completed final sign-off Jun 2012 | 625 Townsend St | 1st floor only - (4) new offices, (3) new phone rooms. flooring, av upgrades, related elect, hvac. fire sprinkler under separate permit.Details
1st floor only - (4) new offices, (3) new phone rooms. flooring, av upgrades, related elect, hvac. fire sprinkler under separate permit. | $212,000 |
| Nov 15, 2011 | Completed final sign-off Oct 2013 | 1850 Mission St | shoring & tiebacks per plan. revision to pa #200710014208. for 1880 mission street construction.Details
shoring & tiebacks per plan. revision to pa #200710014208. for 1880 mission street construction. | |
| Jun 29, 2011 | Completed final sign-off Jan 2012 | 2001 37th Av | revision to pa# 2011.04.27.4890 to include foundation only.Details
revision to pa# 2011.04.27.4890 to include foundation only. | |
| May 19, 2011 | Expired or cancelled expired Nov 2015 | 490 Jamestown Av | remove (e) gates per plan, install new fence and gates, new stage, new outdoor concession stand. all work outdoors, no new enclosed spacesDetails
remove (e) gates per plan, install new fence and gates, new stage, new outdoor concession stand. all work outdoors, no new enclosed spaces | $527,000 |
| Apr 27, 2011 | Completed final sign-off Jan 2012 | 2001 37th Av | replacement of existing exterior aluminum bleachers & provide accessible seating.Details
replacement of existing exterior aluminum bleachers & provide accessible seating. | $550,000 |
| Dec 23, 2010 | Expired or cancelled withdrawn Mar 2011 | 601 Townsend St | adobe systems plans to install fuel cell power generating equip in s. exterior veranda at sf facility genreate elec on site.encroach onto public right of way along king st,will be a major encorachment by bsm.Details
adobe systems plans to install fuel cell power generating equip in s. exterior veranda at sf facility genreate elec on site.encroach onto public right of way along king st,will be a major encorachment by bsm. | $425,000 |
| Dec 23, 2010 | Completed final sign-off Oct 2011 | 650 King St | this permit is for install of the fuel cell for generating electricity for adobe systems at the adjacent building at 601 townsend street.Details
this permit is for install of the fuel cell for generating electricity for adobe systems at the adjacent building at 601 townsend street. | $5,000 |
| Nov 4, 2010 | Completed final sign-off Jan 2011 | 601 Townsend St | remodel to existing shower areas & adding 3 new shower stalls each on 1st and 2nd floors.Details
remodel to existing shower areas & adding 3 new shower stalls each on 1st and 2nd floors. | $192,299 |
| Aug 17, 2010 | Completed final sign-off Aug 2011 | 1155 Battery St | levi strauss. interior non struc.ti on ground fl only. work includes selective demo and renovation, drywall clgs, finishes, mech, and elec. approx sqft; 32,174 with retail shell enclosure. new showers and new 1-hr rated separation to create separate retail space. occup load verifiy under sep permit.Details
levi strauss. interior non struc.ti on ground fl only. work includes selective demo and renovation, drywall clgs, finishes, mech, and elec. approx sqft; 32,174 with retail shell enclosure. new showers and new 1-hr rated separation to create separate retail space. occup load verifiy under sep permit. | $1,423,000 |
| Apr 28, 2010 | Completed final sign-off Aug 2010 | 490 Jamestown Av | replacement seats at field level and new field level seatsDetails
replacement seats at field level and new field level seats | $148,000 |
| Apr 28, 2010 | Completed final sign-off Aug 2010 | 490 Jamestown Av | new field level suiteDetails
new field level suite | $118,000 |
| Apr 20, 2010 | Completed final sign-off Aug 2011 | 1155 Battery St | rvision to pa# 2009.1124.1989. revised restroom fixtures. new lighting.Details
rvision to pa# 2009.1124.1989. revised restroom fixtures. new lighting. | $10,000 |