Block 2094, lot 006
2001 37th Av
100 permits filed for this property since 2000.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 26, 2026 | Completed | 2001 37th Av | Devcon Construction | this restroom remodel project involves modification of 5 existing restrooms to include selective demolition and construction of restroom fixtures, accessories, toilet and unrinal partitions, counter tops, lighting and fixtures. | $209,208 |
| Mar 20, 2026 | In progress | 2001 37th Av | Reprohaus Corp | non-electric sign within campus; sign name as: st. ignatius college preparatory | $3,000 |
| Feb 25, 2026 | Completed | 2001 37th Av | Alliance Roofing Co Inc | reroof. no hotworks | $600,609 |
| Feb 18, 2026 | Expired or cancelled | 2001 37th Av | Alliance Roofing Co Inc | re-roofing: prime substrate w/vapor barrier - build up roof with 1" fesco insulation - not mopped down to concrete-substrate. install 1" iso 1/2" densdeck - adherred to concrete substrat adher 72 mil pvc roofing to decks jen, no hot work. crrc#0674-0002a. sri 91 | $1,533,022 |
| Oct 30, 2025 | In progress | 2001 37th Av | Devcon Construction | removal of a section of carpet & interior glass storefront, patching, & installation of new bike racks serivng 70 total bikes, within the existing cats tutoring center at saint ignatious college preparatory. no additional demo or new construction is proposed. | $10,000 |
| Jun 23, 2025 | In progress | 2001 37th Av | Preston Pipelines Infrastructure Llc. | fire service underground for (e) 3 story addition/alteration ref pa # 2023-0725-2968 | $5,000 |
| Jun 20, 2025 | In progress | 2001 37th Av | Devcon Construction | plumbing review & stormwater control pid review for 3 story alteration permit ref pa # 2023-0725-2968 | |
| Nov 15, 2024 | Completed | 2001 37th Av | Devcon Construction | installation of fountain & steel gates. all work within property lines. | $50,000 |
| May 17, 2024 | Completed | 2001 37th Av | United Systems Fire And Security Llc | as built 202402095611 | |
| May 1, 2024 | Completed | 2001 37th Av | Devcon Construction | partial interior non structural demo only per ab017 | $45,000 |
| Apr 5, 2024 | Completed | 2001 37th Av | United Systems Fire And Security Llc | stand alone facu will be installed in electrical room @ parking garage. new 1 pull station in each portable. new (2) smoke detector in each portable. new power supply and synchronize module | $32,063 |
| Mar 5, 2024 | Completed | 2001 37th Av | Devcon Construction | install 12 temporary modular classroom buildings (as approved by state) on (e) field. construction included ramps, stairs, & electrical hookups.lighting not included. | $120,000 |
| Feb 22, 2024 | Completed | 2001 37th Av | Aaa Restaurant Fire Control/Dba Aaa Fire | furnish and install (1) ansul r-102 fire system in the main kitchen area on the ground floor. | $5,000 |
| Feb 12, 2024 | Completed | 2001 37th Av | B F P Fire Protection | relocate 4 add 2 fire sprinklers per remodel. ref 202402095611. | $10,000 |
| Feb 9, 2024 | Completed | 2001 37th Av | United Systems Fire And Security Llc | a t.i for snack shack located on the upper level, section 1 at st. igndtius college. relocation of (1) existing horn/strobe. addition of (1) horn strobe for kitchen area. addition of (1) new monitor module for new kitchen hood system. ref pa# 202309126403 | $15,900 |
| Sep 12, 2023 | Completed | 2001 37th Av | Devcon Construction | interior ti to the (e) snack shack including new walls, metal wall panels, rubber flooring, epoxy flooring, w/self coving base & operable corrugated metal doors, snack-shack includes grab & go area & point of service check out locations. | $550,000 |
| Jul 25, 2023 | In progress | 2001 37th Av | Devcon Construction | $75,000,000 | |
| Jun 8, 2023 | Expired or cancelled | 2001 37th Av | install 2 new frp screens on roof, install new antennas, install 3 new radios, remove and replace 100 amp panel w/200 amp panel, remove all coat cables and (e) frp screens and antenna mounts, relocate (e) cabinets within (e) equipment room | $35,000 | |
| Apr 21, 2022 | Expired or cancelled | 2001 37th Av | install 2 new antennas, 2 new frp screens on roof, installation 3 new antennas behind frp screens, removing all extg antenna mounts, frp screens, remove all extg coak y hybrid cabes. replace with new hybrid cables, install new power & equipment rack, relocation, extg cabinet witin equipment room. | $30,000 | |
| Nov 15, 2021 | Completed | 2001 37th Av | Quality Telecom Consultants | verizon: new telecommunications facility to be install on (e) stadium light including 9 total antennas, 6 rru's, 4 surge suppressors, and other supporting equipment. this pa is submitted with a sow appreal under 2018-012648apl. | $190,000 |
| Aug 3, 2021 | Completed | 2001 37th Av | Intermountain Electric Company | revision to bpa 202011038079. change in f4 pole footing. | $9,000 |
| Jul 26, 2021 | Completed | 2001 37th Av | Metropolitan Electrical Construction | raise 3 antennas by 5'2" at alpha & gamma. extend 1 existing frp screen at alpha and gamma. remove 3 existing antennas. remove 2 existing rruw b5. remove 2 existing rruw bs. see plan attached. | $41,000 |
| Dec 24, 2020 | Expired or cancelled | 2001 37th Av | modification to an existing t-mobile wireless facility. remove 3 antennas, 12 rru's. install 3 frp shrouds, 6 antennas, 6 rru's. | $40,000 | |
| Nov 3, 2020 | Completed | 2001 37th Av | Intermountain Electric Company | installation of (4) sport field lighting poles and fixtures including associative electrical infrastructure and additional improvements at st. ignatius football field. | $1,300,000 |
| May 11, 2020 | Completed | 2001 37th Av | Velex Inc | remove & replace 3 (e) antennaes with 3 (n) antenneas. remove & replace 2 (e) frp screens with 2 (n) frp screens; remove 3rrus and install 3 new rrus. | $25,000 |
| Sep 11, 2019 | Completed | 2001 37th Av | Red Hawk Fire & Security Ca Llc | fire alarm as built for 201908088392 | |
| Sep 6, 2019 | Completed | 2001 37th Av | Red Hawk Fire & Security Ca Llc | fire alarm as built for app#201804136256. correct area of work on floor plan. scope is located on lower level bldg h, athletic/theater not in music bldg, 2nd flr mech room as stated on #2018-0413-6256. n/a for maher | |
| Sep 3, 2019 | Completed | 2001 37th Av | Devcon Construction | revision to permit #201905221392. rename storage room 102b to electrical room. move entry room to new electrical room. | |
| Aug 9, 2019 | Completed | 2001 37th Av | Red Hawk Fire & Security Ca Llc | fire alarm ti 1st floor classroom renovation. add 1 horn/strobe, relocate 1 horn strobe & 2 smoke detectors as shown on plans. ref pa 2019-0522-1392 | $2,000 |
| Aug 8, 2019 | Never finaled | 2001 37th Av | Geo M Robinson & Co | 1st flr music room, fire sprinklers. add 3 pendents, relocate 9 pendents | $7,320 |
| Jul 26, 2019 | Completed | 2001 37th Av | Devcon Construction | in-kind window replacement at classroom building | $87,000 |
| May 22, 2019 | Completed | 2001 37th Av | Devcon Construction | reclassify ground fl music storage for classroom. reclassify batting cage/exercise room to 2 classrooms. add 2 exterior windows and 3 doors. | $42,000 |
| May 16, 2019 | In progress | 2001 37th Av | street space | ||
| Dec 12, 2018 | Completed | 2001 37th Av | Cupertino Electric Inc. | install electric vehicle charging stations (16) and ada striping. 14 standard stalls 2 ada stalls | $180,000 |
| May 15, 2018 | Completed | 2001 37th Av | Parsons Environment & Infrasteructure | replace (5) existing antennas with (5) new antennas. replace existing power cabinet with new cabinet. maher na | $25,000 |
| Apr 13, 2018 | Completed | 2001 37th Av | Red Hawk Fire & Security Ca Llc | add one addressable heat detector in boiler room. maher na | $500 |
| Mar 20, 2018 | Never finaled | 2001 37th Av | Shah & Associates Inc Dba P D C Corporat | at&t modification: r&r 9 (e) antennas, w/9 new. r&r 9 (e) rrusa w/3new rrus; install 6 (n) rrus; remove unused equip; install striping and barricades per emf report maher na | $38,000 |
| Jul 11, 2017 | Completed | 2001 37th Av | Red Hawk Fire & Security Ca Llc | add 1 new smoke, relocate 1 existing smoke, add 2 new horns/strobes, relocate 1 existing pull station, relocate 2 existing horns/strobes. | $2,500 |
| Jun 20, 2017 | Completed | 2001 37th Av | Geo M Robinson & Co | modification to existing building in level 2 by relocating 7 ssp due to new room, 204a, 204b, 207a, 207b. ref ti 2017-0407-3466. | $2,000 |
| Apr 7, 2017 | Completed | 2001 37th Av | Devcon Construction | music building - convert existing office on 2nd fl to 2 gender neutral single occupant bathrooms. convert existing garment storage room on 2nd fl to student loundge and office | $18,000 |
| May 5, 2016 | Completed | 2001 37th Av | Grand Industries Inc | voluntary seismic upgrade of gym - wall to roof connections @ north wall & bracing of roof discontinuity. upgrade first floor bathrooms for accessibility. | $25,000 |
| May 4, 2016 | Expired or cancelled | 2001 37th Av | remodel (e) men & women's restrooms, provide accessible plumbing fixtures & accessories, signage | $8,000 | |
| Jan 6, 2016 | Completed | 2001 37th Av | Metropolitan Electrical Construction | modification to an extg at&t facility including removing and replacing 3 antennas, installing new rrus. installing new dc power cables. removing an extg dc 2 surge suppresers & 2 tma; and replacing with 3 new dc6 surge suppressors. | $28,000 |
| Mar 18, 2015 | Never finaled | 2001 37th Av | street space | ||
| May 20, 2014 | Completed | 2001 37th Av | Plant Construction Company Lp | soft demolition, interior per ab-017. t.i. under seperate permit. no structural work, bldg to remain vacant during demolition /ab-017 work. | $30,000 |
| Apr 4, 2014 | Completed | 2001 37th Av | Pacific Door & Hardware Inc | replacement of existing exterior doors | $400,000 |
| Apr 3, 2014 | Never finaled | 2001 37th Av | Plant Construction Company Lp | seismic retrofit to existing buildings. | $1,100,000 |
| Oct 28, 2013 | Completed | 2001 37th Av | Nu Rev Communications Inc. | modification to an extg at&t facility consisting of adding 3 new rru s on roof | $15,000 |
| Jul 15, 2011 | Completed | 2001 37th Av | Geo M Robinson & Co | extend 14-existing ceiling sprinklers & relocate partial 2" line due to revision of mechanical duct piping. | $1,440 |
| Jun 29, 2011 | Completed | 2001 37th Av | Devcon Construction | revision to pa# 2011.04.27.4890 to include foundation only. | |
| Jun 16, 2011 | Completed | 2001 37th Av | Acco Engineered Systems Inc. Dba Acco En | 1)replace 2 extg pool units in mechanical room and corresponding air cooled condensing units, 2) install new ductwork and drum louvers. | $705,000 |
| May 11, 2011 | Completed | 2001 37th Av | replace (e) press box with new press box at athletic field. | $220,000 | |
| Apr 27, 2011 | Completed | 2001 37th Av | Devcon Construction | replacement of existing exterior aluminum bleachers & provide accessible seating. | $550,000 |
| Apr 7, 2011 | Completed | 2001 37th Av | United Power & Communication Inc. | remove & replace 4 antennas, add 6 rru's, new splice box, 3 surge suppressors. add gps unit, add 6601 cabinet in new rock, new conduit for dc power | $65,000 |
| Feb 25, 2011 | Completed | 2001 37th Av | Transceive Communications Inc. | to obtain final inspection for work approved under app#200802084385. all work is complete | |
| Jul 21, 2010 | Completed | 2001 37th Av | Cba Site Services Inc. | modification to e unmanned telecomm facility consisting of adding n 19" rack w n 3418 cabinet, 2 n pbc 02 cabinets inside e equip room. also add 3 n rrvs and n fiber lines and removing replace 3 e antennas w n antennas w 7 rets ret powered by low voltage signaled through e coax cables | $68,000 |
| May 18, 2010 | Never finaled | 2001 37th Av | street space permit | ||
| Sep 30, 2009 | Completed | 2001 37th Av | removal of sprinkler heads in bathrooms, store rooms and offices on 1st and 2nd floor in north school building. | $2,500 | |
| Jul 14, 2009 | Completed | 2001 37th Av | Cccs, Inc | remove (e) 3206 cabinet and install 3418 cabinet for units 850/1900. add optical fiber for 3418 cabinet. install remote electronic tilts on umts antenna. | $5,000 |
| Dec 23, 2008 | Expired or cancelled | 2001 37th Av | add 2 new lines at antenna position 1 for units. remove tdma cabinets technology and install 2nd carrier umts kit technology. install ret on umts antennas. no visuasl impact | $5,000 | |
| Nov 4, 2008 | Never finaled | 2001 37th Av | Mc Millan Electric | install new lighting in the orradre courtyard-16 lights, 4 switches | $8,500 |
| Oct 29, 2008 | Completed | 2001 37th Av | Devcon Construction | revision to appl. 200806093956, change # of automatic door unlocking from 7 doors to 4 doors locations as shown. also change keynote 3 ato indicate automatic door unlocking at 1 leaf of keynoted double doors rather than 2. | |
| Oct 10, 2008 | Completed | 2001 37th Av | revision to 200806093956 approved roof canopy. design build construction, structural details for canopy at courtyard | $50,000 | |
| Sep 29, 2008 | Completed | 2001 37th Av | Geo M Robinson & Co | revision to pa #200807247538, revised riser detail for fire sprinklers. | |
| Sep 16, 2008 | Never finaled | 2155 37th Av | add new house number for book store. | ||
| Sep 9, 2008 | Never finaled | 2001 37th Av | street space permit | ||
| Sep 2, 2008 | Completed | 2001 37th Av | revision to pa# 2008-0319-7499-for kitchen equipment replacement: relocate exit signs to clarify exit path. | $100 | |
| Jul 24, 2008 | Completed | 2001 37th Av | Geo M Robinson & Co | installation of new overhead automatic fire sprikler system to new canopy in ex courtyard. system feed from (e) 4" ug up in (e) bathroom, 44 ssp & 19 hsw. total 63 hds. | $7,750 |
| Jul 11, 2008 | Completed | 2001 37th Av | Paragon Mechanical Inc | installation of exhaust system for kitchen in school cafeteria | $150,000 |
| Jun 27, 2008 | Completed | 2001 37th Av | Aaa Restaurant Fire Control/Dba Aaa Fire | installation of a new ul300 ansul fire supression system in the kitchen hood on 1st floor. | $8,000 |
| Jun 20, 2008 | Completed | 2001 37th Av | Geo M Robinson & Co | revision to 200804179947: reconfigure fire sprinkler system, reduce to 34 ssp | |
| Jun 9, 2008 | Completed | 2001 37th Av | new roof canopy over (e) courtyard. | $1,300,000 | |
| Jun 3, 2008 | Completed | 2001 37th Av | courtyard demolition (non-structureal) remove ex. planters benches, flat work and landscape. | $11,000 | |
| Apr 17, 2008 | Completed | 2001 37th Av | Geo M Robinson & Co | alteration to existing fire sprinkler system per remodel of kitchen. install 37 pendents. | $7,500 |
| Apr 4, 2008 | Completed | 2001 37th Av | Red Hawk Fire & Security Ca Llc | replace ex. fire alarm system with new addressable fire alarm system. | $170,000 |
| Mar 19, 2008 | Completed | 2001 37th Av | remodel existing kitchen, relocate chef's office & toilet rooms for staff. fire sprinkler & fire alarm under separate permit. | $1,300,000 | |
| Feb 8, 2008 | Never finaled | 2001 37th Av | removing 5 existing antennas and replacing with 6 new antennas. two new antennas @ north, @ south & @ east elevation. | $15,000 | |
| Apr 11, 2007 | Completed | 2001 37th Av | application for 524 mechanical energy compliance for mech work only. scope includes n mechanical ducts and wquipment in new 3 level structure approved under 200304238870. the envelope and arch approvals were approved under 200511238870 | $140,000 | |
| Mar 2, 2007 | Expired or cancelled | 2001 37th Av | Devcon Construction | new toilet and sink at (e) storage. change use from storage to team room. provide accessible shower in (e) shower. above changes to pa# 2005/11/23/8870, occupant load established. sprinkler & life safety under separate permit. | $50,000 |
| Feb 12, 2007 | Never finaled | 2001 37th Av | revision to 200511238870-s4 fire alarm and fier sprinkler. | ||
| Feb 8, 2007 | Never finaled | 2001 37th Av | Golden Bear Fire Protect. | install fire sprinklers under (e) canopy & new canopy. | $3,200 |
| Oct 27, 2006 | Never finaled | 2001 37th Av | street space & sidewalk | ||
| Oct 26, 2006 | Never finaled | 2001 37th Av | Devcon Construction | structural & civil changes to issued pa# 2005/11/23/8870. addendum 1 - structural & addendum 2 - architectural & civil due to (e) site conditions. | |
| Oct 17, 2006 | Never finaled | 2001 37th Av | revision to appl#200511238870 provide fittings and devices for panel handling & erection. | ||
| Sep 11, 2006 | Never finaled | 2001 37th Av | foundation pile work only under this permit. increase pile lenght from 35' to 40'x16" 0 for 37 piles revision to app#200511238870 | $10,000 | |
| Aug 31, 2006 | Expired or cancelled | 2001 37th Av | istall new enetry canoppy over existinisg exterior courtyard., structurde & mep are under separate permit. sprikler suytem under separate permit | $300,000 | |
| Jun 30, 2006 | Completed | 2001 37th Av | Preston Pipelines Inc | fire sprinkler underground. | $25,000 |
| Jun 29, 2006 | Expired or cancelled | 2001 37th Av | installation of two microcell antennas on parapet wall with the associated equipment cabinet mounted on the penthouse wall at roof level. | $60,000 | |
| Jun 1, 2006 | Never finaled | 2001 37th Av | Malcolm Drilling Co Inc | provide temporary shoring for proposed excavation. ref to pa 200511238870 within inside campus. | $120,000 |
| Nov 23, 2005 | Completed | 2001 37th Av | horizontal addition to construct a new three level structure. the bldg will be located in northeast corner of athletic field area. replacing (e) outdoor batting cages. the bldg will include cheral room, classroom, batting cages, storage, weight room, snack bar, patio deck. | $1,000,000 | |
| Sep 7, 2005 | Expired or cancelled | 2001 37th Av | changing antennas on sector q from dual to level polar within the existing stealth area on the side of the building | $10,000 | |
| Aug 13, 2002 | Never finaled | 2001 37th Av | C. Overaa & Co | fire alarm detection-2new smoke dectory. 1 new oykk statuib ,2 new duct detectors. 7new strosses.9 n | $9,200 |
| Aug 7, 2002 | Never finaled | 2001 37th Av | installation of 6 panel type antennas contained in a fiberglass cover | $50,000 | |
| May 10, 2002 | Expired or cancelled | 2001 37th Av | Robert A. Bothman, Inc. | structural design for retaining walls @ pole vault and ball wall | $60,000 |
| Mar 18, 2002 | Expired or cancelled | 2001 37th Av | Robert A. Bothman, Inc. | track & field site improvement (replace/underground/sidewalk/football field & track surface upgrade) | $2,000,000 |
| Feb 1, 2002 | Expired or cancelled | 2001 37th Av | C. Overaa & Co | relocate offices and work room/rearr workroom and storage/replace ceilings/rplc heating & air cond. | $500,000 |
| Oct 1, 2001 | Expired or cancelled | 2001 37th Av | sidewalk repair | ||
| Jun 4, 2001 | Expired or cancelled | 2001 37th Av | Webcor Construction Inc. | cement bleacher in swimming pool area, new slab w/drains @ entry plaza | $40,000 |
| May 22, 2001 | Completed | 2001 37th Av | Webcor Construction Inc. | dmo soffitt apply fire proofing restore exterior plaster cosmetic repair work | $30,000 |
| Jul 26, 2000 | Expired or cancelled | 2001 37th Av | Utilities & C C Inc | unmanned wireless data facility | $19,640 |