Joseph Camajani
- Listed as
- engineer
- On San Francisco permits
- Jul 2023 to Aug 2026
6 permits since 2000 (engineer on 6 permits): 3 completed, 3 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 26, 2026 | In progress filed Aug 2026, not yet issued | 198 Wisteria Ln | priority mayor 13-01. block c & d: erect 6-story (block c) & (block d), type 3a over 1a construction, market-rate multi-family residential with 243 units.Details
priority mayor 13-01. block c & d: erect 6-story (block c) & (block d), type 3a over 1a construction, market-rate multi-family residential with 243 units. | $95,000,000 | |
| Mar 16, 2026 | In progress issued Jul 2026 | 1800 Owens St | Dome Construction Corp | sector 1, level 1; t.i. to develop a pilates studio. work out area with (12) reformers machines, reception area with merchandise. propose new exterior entrance. approx 100 sqft. of the slab in new entry way to be demo and sloped (1.5% max) for accessiblity.Details
sector 1, level 1; t.i. to develop a pilates studio. work out area with (12) reformers machines, reception area with merchandise. propose new exterior entrance. approx 100 sqft. of the slab in new entry way to be demo and sloped (1.5% max) for accessiblity. | $255,000 |
| Feb 27, 2026 | Completed final sign-off Aug 2026 | 100 Montgomery St | West Coast Build Aka Fairway Constructio | 10/f: demolition of existing non-structural partitions, decorative ceiling baffles, lighting, millwork and finishes. new constructuion of new finishes, millwork and decorative lighting. existing floor plan layout to remain. no change in occupant group. no change in mechanical.Details
10/f: demolition of existing non-structural partitions, decorative ceiling baffles, lighting, millwork and finishes. new constructuion of new finishes, millwork and decorative lighting. existing floor plan layout to remain. no change in occupant group. no change in mechanical. | $525,000 |
| Jul 9, 2025 | Completed final sign-off May 2026 | 201 03rd St | Field Construction Inc. | 12 flr; t.i. on 12th flr. scope of work includes demolition of non-structural partitions,doors, and sidelights, millwork, ceiling and lighting, and finishes and power, construction of mother's room and accessible single user all gender restroom and existing accessibility upgradesDetails
12 flr; t.i. on 12th flr. scope of work includes demolition of non-structural partitions,doors, and sidelights, millwork, ceiling and lighting, and finishes and power, construction of mother's room and accessible single user all gender restroom and existing accessibility upgrades | $1,200,000 |
| Apr 18, 2024 | Completed final sign-off Jan 2025 | 201 03rd St | Commercial Interior Builders Inc | construction of interior storefront system and doors in lobbyDetails
construction of interior storefront system and doors in lobby | $100,000 |
| Jul 25, 2023 | In progress issued Aug 2024 | 2001 37th Av | Devcon Construction | Details
| $75,000,000 |