Block 3735, lot 059
201 03rd St
- City’s use
- Commercial Office
- Built
- 1983
- Stories
- 12
- Building
- 340,000 sq ft
- Lot
- 32,800 sq ft
- Zoning
- C3OSD
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 22, 2026 | In progress filed Sep 2026, not yet issued | 201 03rd St | Prima Acquire Inc Dba Lahue And Associat | revision to pa #202605070874 to change color of sign from black to white by painting the sign.Details
revision to pa #202605070874 to change color of sign from black to white by painting the sign. | |
| May 7, 2026 | In progress issued May 2026 | 201 03rd St | Prima Acquire Inc Dba Lahue And Associat | revision to 202602236335 (halo illuminated reverse chanel letters mounted to aluminum raceway) attachment change due to field conditions. change of attachment counter sink at top attachment can't use to toggle anchor @ 36" o.c.(mcmaster carr g4255a or gaual) thru 3" min. conc (3/8" dia toggle anchorDetails
revision to 202602236335 (halo illuminated reverse chanel letters mounted to aluminum raceway) attachment change due to field conditions. change of attachment counter sink at top attachment can't use to toggle anchor @ 36" o.c.(mcmaster carr g4255a or gaual) thru 3" min. conc (3/8" dia toggle anchor | |
| Mar 2, 2026 | Completed final sign-off May 2026 | 201 03rd St | Anderson, Rowe & Buckley, Inc. | as built for pa 202601204115 - 3 headsDetails
as built for pa 202601204115 - 3 heads | |
| Feb 23, 2026 | In progress issued Mar 2026 | 201 03rd St | Prima Acquire Inc Dba Lahue And Associat | install a halo-illuminated reverse-channel letters, single faced mounted to aluminum raceways sign: "harvey" on the 3rd streetDetails
install a halo-illuminated reverse-channel letters, single faced mounted to aluminum raceways sign: "harvey" on the 3rd street | $70,000 |
| Feb 23, 2026 | In progress issued Feb 2026 | 201 03rd St | Prima Acquire Inc Dba Lahue And Associat | updated evacuation plans on floors 5,6,7.Details
updated evacuation plans on floors 5,6,7. | $2,000 |
| Feb 20, 2026 | Completed final sign-off Apr 2026 | 201 03rd St | Gci, Inc | 2nd & 3rd - installing phone booths. phone booths will be anchored to the existing slab with post installed anchorsDetails
2nd & 3rd - installing phone booths. phone booths will be anchored to the existing slab with post installed anchors | $25,000 |
| Feb 12, 2026 | Completed final sign-off Mar 2026 | 201 03rd St | Pyro-Comm Systems, Inc. | 5th floor. fire alarm, 5 ceiling speaker strobes to be added. pa ref#: 202511260530Details
5th floor. fire alarm, 5 ceiling speaker strobes to be added. pa ref#: 202511260530 | $2,000 |
| Feb 12, 2026 | In progress issued Mar 2026 | 201 03rd St | Skyline Construction | 5th/f - revison to approved permit# 2025-1126-0530. demo of moveable wall. construct new wall, new door and upgrade to mechanical electrical equipement due to new room.Details
5th/f - revison to approved permit# 2025-1126-0530. demo of moveable wall. construct new wall, new door and upgrade to mechanical electrical equipement due to new room. | $50,000 |
| Feb 11, 2026 | In progress issued Feb 2026 | 201 03rd St | Pyro-Comm Systems, Inc. | 6th fl ref pa #2025-1126-0534: 11 ceiling speaker strobes to be added to provide proper coverage.Details
6th fl ref pa #2025-1126-0534: 11 ceiling speaker strobes to be added to provide proper coverage. | $7,000 |
| Jan 20, 2026 | In progress issued Jan 2026 | 201 03rd St | Anderson, Rowe & Buckley, Inc. | 5th & 6th fl ref pa #2025-1126-0530 & 2025-1126-0534 : fire sprinkler ti. relocate 40, add 2 total 42Details
5th & 6th fl ref pa #2025-1126-0530 & 2025-1126-0534 : fire sprinkler ti. relocate 40, add 2 total 42 | $32,960 |
| Dec 12, 2025 | In progress issued Feb 2026 | 201 03rd St | Skyline Construction | 7th fl - interior ti demo includes of non-structural partitions construction includes millwork, finishes, ceiling, mech & elec upgradesDetails
7th fl - interior ti demo includes of non-structural partitions construction includes millwork, finishes, ceiling, mech & elec upgrades | $425,000 |
| Nov 26, 2025 | In progress issued Dec 2025 | 201 03rd St | Skyline Construction | 5/f: office tenant improvement. removal of non-structural walls, finishes, and lighting. new construction of non-structural walls, finishes, millwork, ceiling. mechanical and electrical upgradesDetails
5/f: office tenant improvement. removal of non-structural walls, finishes, and lighting. new construction of non-structural walls, finishes, millwork, ceiling. mechanical and electrical upgrades | $725,000 |
| Nov 26, 2025 | In progress issued Dec 2025 | 201 03rd St | Skyline Construction | 6th fl. office t.i demo of flooring. removal of non structural walls, finishes, lighting, new construction of non structural walls, finishes, mech, elec upgrade. no structural work involvedDetails
6th fl. office t.i demo of flooring. removal of non structural walls, finishes, lighting, new construction of non structural walls, finishes, mech, elec upgrade. no structural work involved | $475,000 |
| Nov 14, 2025 | Completed final sign-off Feb 2026 | 201 03rd St | Pyro-Comm Systems, Inc. | 5 smoke detectors, 2 duct detectors, 4 relay modules, 14 strobes, 1 wall strobe, 21 ceiling speaker strobes, 4 door holds to be added. reference pa#202504104089Details
5 smoke detectors, 2 duct detectors, 4 relay modules, 14 strobes, 1 wall strobe, 21 ceiling speaker strobes, 4 door holds to be added. reference pa#202504104089 | $8,000 |
| Oct 31, 2025 | Completed final sign-off Dec 2025 | 201 03rd St | Golden Gate Fire Protection Inc | fire sprinkkler t.i; relocate 41 pendents, 17 uprights and 22 concealed pendents on the 9/f. ref t.i. 202504104089Details
fire sprinkkler t.i; relocate 41 pendents, 17 uprights and 22 concealed pendents on the 9/f. ref t.i. 202504104089 | $20,000 |
| Oct 8, 2025 | Completed final sign-off May 2026 | 201 03rd St | Pioneer Fire Inc. | 12th fl- relocate 12 pendants, add 9 concealed pendants, add 4 concealed pendants, 2 uprights and remove 3 pendants.Details
12th fl- relocate 12 pendants, add 9 concealed pendants, add 4 concealed pendants, 2 uprights and remove 3 pendants. | $5,000 |
| Sep 16, 2025 | In progress issued Sep 2025 | 201 03rd St | Pyro-Comm Systems, Inc. | 2th fl - fire larm 2 smoke detectors, 1 relay module, 10 ceiling strobes, 1 ceiling speaker strobe to be added. ref pa 2025097090400Details
2th fl - fire larm 2 smoke detectors, 1 relay module, 10 ceiling strobes, 1 ceiling speaker strobe to be added. ref pa 2025097090400 | $4,000 |
| Sep 8, 2025 | Completed final sign-off May 2026 | 201 03rd St | Field Construction Inc. | 12th fl- revision to pa # 2025-0709-0400. new entry suite door and structural detail for tv mounting system.Details
12th fl- revision to pa # 2025-0709-0400. new entry suite door and structural detail for tv mounting system. | |
| Sep 3, 2025 | Completed final sign-off May 2026 | 201 03rd St | Field Construction Inc. | mep mechanical & electrical ref pa 202508132909Details
mep mechanical & electrical ref pa 202508132909 | $135,000 |
| Aug 20, 2025 | Completed final sign-off May 2026 | 201 03rd St | Pioneer Fire Inc. | 12 floor; relocate (25) pendants, and (7) concealed heads add (1) pendant and (3) concealed heads. convert (2) uprights into concealed heads. remove (2) pendent heads. ref: 202507090400Details
12 floor; relocate (25) pendants, and (7) concealed heads add (1) pendant and (3) concealed heads. convert (2) uprights into concealed heads. remove (2) pendent heads. ref: 202507090400 | $5,000 |
| Aug 13, 2025 | Completed final sign-off May 2026 | 201 03rd St | Field Construction Inc. | 12th floor: revision to permit#202507090400. reduce(2) new conference rooms, (e) reception millwork to remain. (n) spec for finishes and lighting.Details
12th floor: revision to permit#202507090400. reduce(2) new conference rooms, (e) reception millwork to remain. (n) spec for finishes and lighting. | |
| Jul 9, 2025 | Completed final sign-off May 2026 | 201 03rd St | Field Construction Inc. | 12 flr; t.i. on 12th flr. scope of work includes demolition of non-structural partitions,doors, and sidelights, millwork, ceiling and lighting, and finishes and power, construction of mother's room and accessible single user all gender restroom and existing accessibility upgradesDetails
12 flr; t.i. on 12th flr. scope of work includes demolition of non-structural partitions,doors, and sidelights, millwork, ceiling and lighting, and finishes and power, construction of mother's room and accessible single user all gender restroom and existing accessibility upgrades | $1,200,000 |
| Jun 23, 2025 | Completed final sign-off Dec 2025 | 201 03rd St | Thomas Swan Sign Co Inc | install 1 illuminated address wall sign: "201" 75" x 36"Details
install 1 illuminated address wall sign: "201" 75" x 36" | $4,000 |
| May 30, 2025 | In progress issued Jun 2025 | 201 03rd St | Field Construction Inc. | 1st fl electrical only ref 2025-0325-2997Details
1st fl electrical only ref 2025-0325-2997 | $10,000 |
| Apr 23, 2025 | Completed final sign-off Apr 2026 | 201 03rd St | Hp Build | 9/f: ti including- demo of non structural partitions, doors, sidelights, millwork, ceiling, lighting, and finishes. new construction includes new non structural partitions, doors, sidelights, millwork, ceiling, lighting, and finishes. upgrades to existing restrooms and construction of new accessibleDetails
9/f: ti including- demo of non structural partitions, doors, sidelights, millwork, ceiling, lighting, and finishes. new construction includes new non structural partitions, doors, sidelights, millwork, ceiling, lighting, and finishes. upgrades to existing restrooms and construction of new accessible | $3,967,600 |
| Mar 25, 2025 | Completed final sign-off Nov 2025 | 201 03rd St | Field Construction Inc. | front entry door, exterior glazing infill and lighting upgrades at the (e) entry on 3rd st.Details
front entry door, exterior glazing infill and lighting upgrades at the (e) entry on 3rd st. | $70,000 |
| Aug 21, 2024 | Completed final sign-off Aug 2024 | 201 03rd St | Golden Gate Fire Protection Inc | ground fl: ref pa # 2024-0418-0226 relocate 4 pendent sprinklers in the lobby levelDetails
ground fl: ref pa # 2024-0418-0226 relocate 4 pendent sprinklers in the lobby level | $3,000 |
| Aug 19, 2024 | Completed final sign-off Jan 2025 | 201 03rd St | Commercial Interior Builders Inc | ground fl ref pa# 2024-0418-0226 new power and signal devices. new 2022 title 24 complaint lighting and controlsDetails
ground fl ref pa# 2024-0418-0226 new power and signal devices. new 2022 title 24 complaint lighting and controls | $20,000 |
| Jun 27, 2024 | In progress issued Oct 2025 | 201 03rd St | R P Gen. Contr. Dba: R P Gen. Constr. En | prop h: new remodel of (e) restaruant on the ground fl. demo of walls, doors, ceilings,interior/exterior.finishes,fixtures,casework,storfronts,(e)signage,mep systems,(n)interior front of fixures,bar,storefront,bar/grill equipment & exterior finishes.Details
prop h: new remodel of (e) restaruant on the ground fl. demo of walls, doors, ceilings,interior/exterior.finishes,fixtures,casework,storfronts,(e)signage,mep systems,(n)interior front of fixures,bar,storefront,bar/grill equipment & exterior finishes. | $750,000 |
| Apr 18, 2024 | Completed final sign-off Jan 2025 | 201 03rd St | Commercial Interior Builders Inc | construction of interior storefront system and doors in lobbyDetails
construction of interior storefront system and doors in lobby | $100,000 |
| Jan 19, 2024 | Completed final sign-off Jan 2024 | 201 03rd St | Pioneer Fire Inc. | 11/f: as builts to #202312202813, relocate 6 pendents. ref ti pa# 202308043775.Details
11/f: as builts to #202312202813, relocate 6 pendents. ref ti pa# 202308043775. | $1,500 |
| Dec 20, 2023 | Completed final sign-off Jan 2024 | 201 03rd St | Pioneer Fire Inc. | 11th fl: relocate (8) pendents, add (2) pendents. ref 202308043775.Details
11th fl: relocate (8) pendents, add (2) pendents. ref 202308043775. | $1,500 |
| Oct 26, 2023 | Completed final sign-off May 2024 | 201 03rd St | Gci, Inc | 11/f: new power a signal devices. title 24 compliant lighting controls. restroom upgrades in reference 202308043775.Details
11/f: new power a signal devices. title 24 compliant lighting controls. restroom upgrades in reference 202308043775. | $180,000 |
| Oct 26, 2023 | Completed final sign-off May 2024 | 201 03rd St | Gci, Inc | 11th floor: new power and signal devices. title 24 compliant lighting controls. lobby and corridor.Details
11th floor: new power and signal devices. title 24 compliant lighting controls. lobby and corridor. | $50,000 |
| Aug 4, 2023 | Completed final sign-off May 2024 | 201 03rd St | Gci, Inc | construction of non-structural partitions, finishes, light fixtures, accessibility upgrades at restroomDetails
construction of non-structural partitions, finishes, light fixtures, accessibility upgrades at restroom | $250,000 |
| Jun 16, 2022 | Completed final sign-off May 2023 | 201 03rd St | Pioneer Fire Inc. | 10th flr: adjusting automated sprinkler system to provide coverage per area of construction modification. gcti# 202205184470Details
10th flr: adjusting automated sprinkler system to provide coverage per area of construction modification. gcti# 202205184470 | $14,250 |
| May 18, 2022 | Completed final sign-off Sep 2022 | 201 03rd St | M C S Construction Services | 10/f: deferred mep permit. title 24 electrical & mechanical. ref t.i. pa202203180322. maher n/a.Details
10/f: deferred mep permit. title 24 electrical & mechanical. ref t.i. pa202203180322. maher n/a. | |
| May 10, 2022 | Completed final sign-off Sep 2022 | 201 03rd St | Pyro-Comm Systems, Inc. | 10th fl fire alarm: addition to an existing fire alarm system. 1 smoke detector, 7 ceiling strobes, and 11 ceiling speaker strobes to be added to provide proper coverage. ref pa# 202203180322Details
10th fl fire alarm: addition to an existing fire alarm system. 1 smoke detector, 7 ceiling strobes, and 11 ceiling speaker strobes to be added to provide proper coverage. ref pa# 202203180322 | $5,000 |
| Mar 18, 2022 | Completed final sign-off Sep 2022 | 201 03rd St | M C S Construction Services | 10th fl: demo of non-structural partitions, ceilings, lighting & finishes. new construction of non-structural partition, ceiling, lighting, electrical, millwork, and finishes.Details
10th fl: demo of non-structural partitions, ceilings, lighting & finishes. new construction of non-structural partition, ceiling, lighting, electrical, millwork, and finishes. | $1,300,000 |
| Feb 16, 2022 | Completed final sign-off Aug 2022 | 201 03rd St | Pyro-Comm Systems, Inc. | fire alarm voluntary addition to the existing. 1 new telguard cellular dialer and 1 monitor module will be installed to the existing facu.Details
fire alarm voluntary addition to the existing. 1 new telguard cellular dialer and 1 monitor module will be installed to the existing facu. | $500 |
| Nov 9, 2021 | Completed final sign-off Dec 2021 | 201 03rd St | Pyro-Comm Systems, Inc. | fire alarm: 10th floor: this is an addition of 1 smoke detector and 2 ceiling speaker strobe to provide proper coverage. ref app#202107234982Details
fire alarm: 10th floor: this is an addition of 1 smoke detector and 2 ceiling speaker strobe to provide proper coverage. ref app#202107234982 | $1,500 |
| Nov 9, 2021 | Completed final sign-off Dec 2021 | 201 03rd St | Pyro-Comm Systems, Inc. | 10th floor: this is an addition of 1 ceiling speaker strobe to provide proper coverage. ref app#202107234982Details
10th floor: this is an addition of 1 ceiling speaker strobe to provide proper coverage. ref app#202107234982 | $500 |
| Nov 8, 2021 | Never finaled issued Nov 2021, no final | 201 03rd St | Pyro-Comm Systems, Inc. | 12/f suite 1200: as builts to show 7 added smoke detectors, 1 relay module, 2 ceiling speaker strobes. ref permit 202105130372.Details
12/f suite 1200: as builts to show 7 added smoke detectors, 1 relay module, 2 ceiling speaker strobes. ref permit 202105130372. | |
| Nov 4, 2021 | Completed final sign-off Nov 2021 | 201 03rd St | Pioneer Fire Inc. | 12/f: relocate 7 (e) uprights/pendents, add 4 pendent, remove 1 pendent. ref t.i. pa202003035769.Details
12/f: relocate 7 (e) uprights/pendents, add 4 pendent, remove 1 pendent. ref t.i. pa202003035769. | |
| Oct 28, 2021 | Completed final sign-off Sep 2022 | 201 03rd St | Gci, Inc | installn of (n) sculpture at extg exter grnd level plaza demo including removal of extg raised deck wood slat panels & any sub-deck items.(pedinstall concrete slab on grade and/or grade fill)for new work. install include nw metal sculpture, nw concrete base with n lghtg & n steel, as requiredDetails
installn of (n) sculpture at extg exter grnd level plaza demo including removal of extg raised deck wood slat panels & any sub-deck items.(pedinstall concrete slab on grade and/or grade fill)for new work. install include nw metal sculpture, nw concrete base with n lghtg & n steel, as required | $40,000 |
| Oct 13, 2021 | Completed final sign-off Feb 2022 | 201 03rd St | Gci, Inc | 10/f: install (1) inline exhaust fan in the all gender bathroom in level 10, redistrution ductwork lighting & power. "landlord" ref t.i. 202107234982.Details
10/f: install (1) inline exhaust fan in the all gender bathroom in level 10, redistrution ductwork lighting & power. "landlord" ref t.i. 202107234982. | $100,000 |
| Oct 13, 2021 | Completed final sign-off Mar 2022 | 201 03rd St | Gci, Inc | 10/f: insatll 1 water source heatpump fan coile for service room on level 10, redistribute ductwork, lighting, power. "climate corp" ref t.i. 202107234982.Details
10/f: insatll 1 water source heatpump fan coile for service room on level 10, redistribute ductwork, lighting, power. "climate corp" ref t.i. 202107234982. | $100,000 |
| Oct 5, 2021 | Completed final sign-off Mar 2022 | 201 03rd St | M C S Construction Services | ste 1200. revision to pa# 202106303515. revision to corridor lighting, added ceiling tile and grid.Details
ste 1200. revision to pa# 202106303515. revision to corridor lighting, added ceiling tile and grid. | |
| Sep 16, 2021 | Completed final sign-off Nov 2021 | 201 03rd St | 10/f: fire sprinkler permit. relocate 15 and add 6 sprinklers. ref. ti pa 202107234982 and 202108065962.Details
10/f: fire sprinkler permit. relocate 15 and add 6 sprinklers. ref. ti pa 202107234982 and 202108065962. | $7,000 | |
| Aug 6, 2021 | Completed final sign-off Mar 2022 | 201 03rd St | Gci, Inc | 10/f: demolition of non-structural partitions, celing, lighting, millwork and finishes. new construction of non-structural partitions, ceilings, lighting, electrical millwork & finishes.Details
10/f: demolition of non-structural partitions, celing, lighting, millwork and finishes. new construction of non-structural partitions, ceilings, lighting, electrical millwork & finishes. | $800,000 |
| Jul 23, 2021 | Never finaled issued Sep 2021, no final | 201 03rd St | Gci, Inc | 10th fl: demolition of non-structural partitions, partial ceiling, lighting & finishes. new construction of full height demising walls to create 2 new suites, upgrade in existing accessible restrooms & new accessible all gender restrooms. fire alarm/sprinklers under sep permits.Details
10th fl: demolition of non-structural partitions, partial ceiling, lighting & finishes. new construction of full height demising walls to create 2 new suites, upgrade in existing accessible restrooms & new accessible all gender restrooms. fire alarm/sprinklers under sep permits. | $648,000 |
| Jun 30, 2021 | Completed final sign-off Mar 2022 | 201 03rd St | M C S Construction Services | rev to pa 202103035769 full floor ti updates to new interior non lod bearing partitions, mechanical, plumbing, electrical and finishes.Details
rev to pa 202103035769 full floor ti updates to new interior non lod bearing partitions, mechanical, plumbing, electrical and finishes. | |
| May 13, 2021 | Completed final sign-off Dec 2022 | 201 03rd St | Pyro-Comm Systems, Inc. | modify existing fire alarm system. add, replace notification devices 12th floor ti. install 29 devices, replace 16 devices. ref. ti $2021-0303-5769 (suite 1200 t.i.)Details
modify existing fire alarm system. add, replace notification devices 12th floor ti. install 29 devices, replace 16 devices. ref. ti $2021-0303-5769 (suite 1200 t.i.) | $20,000 |
| Apr 29, 2021 | Completed final sign-off Jan 2022 | 201 03rd St | revision to pa# 202009204566. removing 2 beams from original plan.Details
revision to pa# 202009204566. removing 2 beams from original plan. | ||
| Mar 30, 2021 | Completed final sign-off Nov 2021 | 201 03rd St | Pioneer Fire Inc. | relocate existing pendents & uprights convert existing uprights to pendents. gcti# 2020-0303-5769Details
relocate existing pendents & uprights convert existing uprights to pendents. gcti# 2020-0303-5769 | $5,000 |
| Mar 3, 2021 | Completed final sign-off Mar 2022 | 201 03rd St | M C S Construction Services | suite 1200 on 12/f: interior ti includes selective non structural demo, new interior non load bearing partitions, mep and finishes.Details
suite 1200 on 12/f: interior ti includes selective non structural demo, new interior non load bearing partitions, mep and finishes. | $1,600,000 |
| Feb 9, 2021 | Never finaled issued Mar 2021, no final | 201 03rd St | Anderson, Rowe & Buckley, Inc. | re-install 14 uprights due to tenant improvementDetails
re-install 14 uprights due to tenant improvement | $105,000 |
| Jan 14, 2021 | Completed final sign-off Sep 2021 | 201 03rd St | Pyro-Comm Systems, Inc. | fire alarm; 2 ceiling speaker strobes to be added to existing facu. permit reference # 2020-0920-4566Details
fire alarm; 2 ceiling speaker strobes to be added to existing facu. permit reference # 2020-0920-4566 | $1,000 |
| Oct 30, 2020 | Completed final sign-off Jan 2021 | 201 03rd St | Pyro-Comm Systems, Inc. | fire alarm. this is a demo to core & shell project. the space/fl will be unoccupied. minimum coverage.Details
fire alarm. this is a demo to core & shell project. the space/fl will be unoccupied. minimum coverage. | $1,500 |
| Sep 20, 2020 | Completed final sign-off Jan 2022 | 201 03rd St | Clune Construction Company L P | infill a staircase opening from the 4th to 5th floor. maher n/a.Details
infill a staircase opening from the 4th to 5th floor. maher n/a. | $500,000 |
| Sep 18, 2020 | Completed final sign-off Feb 2021 | 201 03rd St | Pioneer Fire Inc. | remove existing diesel fire pumpDetails
remove existing diesel fire pump | $4,950 |
| Sep 15, 2020 | Completed final sign-off Oct 2022 | 201 03rd St | Ayoob & Peery Plumbing Co Inc | 12th fl: demo to shell. relocate (2), change out (149) and remove (24) outlets in order to conform with the new wall and ceiling layout of the tenant improvement. jb # 20-663Details
12th fl: demo to shell. relocate (2), change out (149) and remove (24) outlets in order to conform with the new wall and ceiling layout of the tenant improvement. jb # 20-663 | $33,975 |
| Sep 14, 2020 | Completed final sign-off Jan 2021 | 201 03rd St | Gci, Inc | 12th fl. demo only. interior commercial t.i. non structural partitions, ceilings & lighting millwork. ab-017 applies.Details
12th fl. demo only. interior commercial t.i. non structural partitions, ceilings & lighting millwork. ab-017 applies. | $150,000 |
| Jun 18, 2020 | Completed final sign-off Aug 2020 | 201 03rd St | Anderson, Rowe & Buckley, Inc. | decommission/remove (e) pre-action unit, transfer wet supply to existing dry-pipe system. entire 12th floor will now be a wet system & will be monitored by flow switches located at csp risers in the stair vestibules. all existing sprinkler heads are to remain. provide (1) seismic brace at new pipingDetails
decommission/remove (e) pre-action unit, transfer wet supply to existing dry-pipe system. entire 12th floor will now be a wet system & will be monitored by flow switches located at csp risers in the stair vestibules. all existing sprinkler heads are to remain. provide (1) seismic brace at new piping | $3,000 |
| Apr 17, 2019 | Never finaled issued Apr 2019, no final | 201 03rd St | Skyline Construction | electrical work for ti on the 11th flr ref 201811054983Details
electrical work for ti on the 11th flr ref 201811054983 | $75,000 |
| Mar 1, 2019 | Completed final sign-off Mar 2019 | 201 03rd St | Ayoob & Peery Plumbing Co Inc | to obtain final inspection for work approved under pa# 201507161741 all work is completeDetails
to obtain final inspection for work approved under pa# 201507161741 all work is complete | |
| Jan 16, 2019 | Never finaled issued Jan 2019, no final | 201 03rd St | Pyro-Comm Systems, Inc. | fire alarm replacement of 4 speaker strobes and 1 speaker penthouseDetails
fire alarm replacement of 4 speaker strobes and 1 speaker penthouse | $2,500 |
| Jan 16, 2019 | Completed final sign-off Mar 2019 | 201 03rd St | Pyro-Comm Systems, Inc. | fire alarm ti add 1 relay, 11 strobes, 12 speaker strobes to be hooked up to e fa panel ref 201811054983Details
fire alarm ti add 1 relay, 11 strobes, 12 speaker strobes to be hooked up to e fa panel ref 201811054983 | $12,000 |
| Jan 11, 2019 | Completed final sign-off Feb 2019 | 201 03rd St | Pyro-Comm Systems, Inc. | fire alarm ti- voulntary replacement of 22 wall mounted strobes to be added to (e) facuDetails
fire alarm ti- voulntary replacement of 22 wall mounted strobes to be added to (e) facu | $10,500 |
| Jan 11, 2019 | Completed final sign-off Feb 2019 | 201 03rd St | Golden Gate Fire Protection Inc | 11th flr. fire sprinklers. relocate 12 upright sprinklers, relocate 25 pendent sprinklers. ref t.i pa # 201809069282Details
11th flr. fire sprinklers. relocate 12 upright sprinklers, relocate 25 pendent sprinklers. ref t.i pa # 201809069282 | $19,425 |
| Jan 9, 2019 | Completed final sign-off Jul 2019 | 201 03rd St | Skyline Construction | 11th fl - mechanical work ti on the 11th floor to include 3 new vav's and redistribution of existing ductwork for new floor layout. ref pa 2018-1105-4983Details
11th fl - mechanical work ti on the 11th floor to include 3 new vav's and redistribution of existing ductwork for new floor layout. ref pa 2018-1105-4983 | $40,000 |
| Nov 5, 2018 | Completed final sign-off Jul 2019 | 201 03rd St | Skyline Construction | 11/f: t.i. to include interior demo of partitions, ceiing and finishes. construction of new partitions, ceiling and fixtures. mep under sep permit.Details
11/f: t.i. to include interior demo of partitions, ceiing and finishes. construction of new partitions, ceiling and fixtures. mep under sep permit. | $1,500,000 |
| Sep 6, 2018 | Never finaled issued Sep 2018, no final | 201 03rd St | Skyline Construction | 11th fl - demo of existing communication stair, handrails, guardrals, structural stell concrete floor slab, drywall, soffits, non-load bearing partitions. new construction of concrete floor slab. maher n/a.Details
11th fl - demo of existing communication stair, handrails, guardrals, structural stell concrete floor slab, drywall, soffits, non-load bearing partitions. new construction of concrete floor slab. maher n/a. | $355,000 |
| Aug 8, 2018 | Never finaled issued Aug 2018, no final | 201 03rd St | Western Allied Mechanical Inc. | demo 1 (e) non condensing boiler and associated piping and elec. install 2 smaller (n) condensing boilers with associated piping and flue. no alterations to builiding structure or mech. rm. all work in boiler room.Details
demo 1 (e) non condensing boiler and associated piping and elec. install 2 smaller (n) condensing boilers with associated piping and flue. no alterations to builiding structure or mech. rm. all work in boiler room. | $276,000 |
| Jun 22, 2018 | Expired or cancelled cancelled Nov 2022 | 201 03rd St | installation of (2) stem lithium battery eneryg storage system (ess) the ess will be used to offset peak demand charges by discharging directly into the facilities elec. distribution system, the monitoring and control system detects both when to charge, and when to dischageDetails
installation of (2) stem lithium battery eneryg storage system (ess) the ess will be used to offset peak demand charges by discharging directly into the facilities elec. distribution system, the monitoring and control system detects both when to charge, and when to dischage | $30,000 | |
| Jun 19, 2018 | Completed final sign-off Jun 2018 | 201 03rd St | Pyro-Comm Systems, Inc. | 2nd & 3rd flr - fire alarm as builts 201803073048- moving duct detectorDetails
2nd & 3rd flr - fire alarm as builts 201803073048- moving duct detector | |
| May 31, 2018 | Never finaled issued May 2018, no final | 201 03rd St | street space w/mta | ||
| Mar 7, 2018 | Completed final sign-off Jun 2018 | 201 03rd St | Pyro-Comm Systems, Inc. | 2nd & 3rd fl: pyro comm will provide 1 power supply, 1 smoke detector, 1 duct dector and 26 audible visual devices. ref ti #201802080713.Details
2nd & 3rd fl: pyro comm will provide 1 power supply, 1 smoke detector, 1 duct dector and 26 audible visual devices. ref ti #201802080713. | $10,000 |
| Mar 7, 2018 | Completed final sign-off Jun 2018 | 201 03rd St | Pyro-Comm Systems, Inc. | 2nd & 3rd fl: pyro comm will provide (1) rps, (3) relay modules (7) smoke detectors, (4) ceiling strobes, (28) ceiling mount speaker strobes and (33) wall mount speaker strobes. ref ti #201802080713.Details
2nd & 3rd fl: pyro comm will provide (1) rps, (3) relay modules (7) smoke detectors, (4) ceiling strobes, (28) ceiling mount speaker strobes and (33) wall mount speaker strobes. ref ti #201802080713. | $20,000 |
| Mar 6, 2018 | Completed final sign-off Apr 2018 | 201 03rd St | Anderson, Rowe & Buckley, Inc. | 2 & 3rd flr -(e) fire sprinklers system ti 362 relocated, 40 added, 57 plugged ref 201802080713 maher naDetails
2 & 3rd flr -(e) fire sprinklers system ti 362 relocated, 40 added, 57 plugged ref 201802080713 maher na | $200,000 |
| Feb 28, 2018 | Completed final sign-off Nov 2018 | 201 03rd St | Principal Builders Inc. | revision to app# 201802080713 to show reconfigured partitions on 3rd floor tiDetails
revision to app# 201802080713 to show reconfigured partitions on 3rd floor ti | |
| Feb 22, 2018 | Completed final sign-off Nov 2018 | 201 03rd St | Principal Builders Inc. | 2nd flr - t-24 mep to install new mechanical system, lighting & power. ref pa 201802080713Details
2nd flr - t-24 mep to install new mechanical system, lighting & power. ref pa 201802080713 | $486,618 |
| Feb 22, 2018 | Completed final sign-off Nov 2018 | 201 03rd St | Principal Builders Inc. | 3rd flr - t-24 mep to install new mechanical system, lighting & power. ref pa 201802080713//vif card readers complianceDetails
3rd flr - t-24 mep to install new mechanical system, lighting & power. ref pa 201802080713//vif card readers compliance | $486,618 |
| Feb 8, 2018 | Completed final sign-off Sep 2018 | 201 03rd St | Principal Builders Inc. | ti on 2nd and 3rd floors to demo and construct new partitions, framing, doors, millwork, ceilings & finishes. mep, life safety and sprinklers on separate permitDetails
ti on 2nd and 3rd floors to demo and construct new partitions, framing, doors, millwork, ceilings & finishes. mep, life safety and sprinklers on separate permit | $1,703,063 |
| Nov 14, 2017 | Completed final sign-off Dec 2017 | 201 03rd St | Pyro-Comm Systems, Inc. | add new monitor module for the new fire pump controller. this is a ti to ex building. reference 201710181525Details
add new monitor module for the new fire pump controller. this is a ti to ex building. reference 201710181525 | $1,000 |
| Nov 2, 2017 | Completed final sign-off Dec 2017 | 201 03rd St | 5/f- fire sprinklers: 3 relocted and 3 added pendent heads. ref 201708144792Details
5/f- fire sprinklers: 3 relocted and 3 added pendent heads. ref 201708144792 | $1,875 | |
| Oct 24, 2017 | Never finaled issued Oct 2017, no final | 201 03rd St | street space | ||
| Oct 18, 2017 | Completed final sign-off Jan 2018 | 201 03rd St | Pyro-Comm Systems, Inc. | fa ti 8th fl: add (38) nal devices; (1) module; (1) remote power supply. connect to (e) fa system. ref pa #201708144787. maher naDetails
fa ti 8th fl: add (38) nal devices; (1) module; (1) remote power supply. connect to (e) fa system. ref pa #201708144787. maher na | $15,000 |
| Sep 29, 2017 | Completed final sign-off Feb 2018 | 201 03rd St | 8th fl: fire sprinkler permit - relocate 31 and delte 3 pendent sprinklers. install 39 new pendents and 29 new uprgihts. ref pa 2017-0814-4787Details
8th fl: fire sprinkler permit - relocate 31 and delte 3 pendent sprinklers. install 39 new pendents and 29 new uprgihts. ref pa 2017-0814-4787 | $25,000 | |
| Aug 14, 2017 | Completed final sign-off Mar 2018 | 201 03rd St | Principal Builders Inc. | 5th fl - interior ti at building core restrooms. full demo of plumbing fixtures, finishes, partitins and ceilings. construction of new partitions, ceiling, plumbing, toilet partitions and finishes. meps includedDetails
5th fl - interior ti at building core restrooms. full demo of plumbing fixtures, finishes, partitins and ceilings. construction of new partitions, ceiling, plumbing, toilet partitions and finishes. meps included | $175,000 |
| Aug 14, 2017 | Completed final sign-off Apr 2018 | 201 03rd St | Principal Builders Inc. | 8th fl - interior ti includes building (n) non structural partitions, new and revised meps and life safety work. structural scope to include movable walls and steel storefront systemsDetails
8th fl - interior ti includes building (n) non structural partitions, new and revised meps and life safety work. structural scope to include movable walls and steel storefront systems | $3,900,000 |
| Aug 1, 2017 | Completed final sign-off Jan 2018 | 201 03rd St | Installation Services Inc. Dba Bay Area | install (1) illuminated electric single faced wall sign. "capital one"Details
install (1) illuminated electric single faced wall sign. "capital one" | $7,000 |
| Jun 28, 2017 | Completed final sign-off Dec 2017 | 201 03rd St | Pioneer Fire Inc. | replace existing electric fire pump with a new electric fire pump with same rating of 750 gpm @ 145 psi; install new controller for the new electric fire pump including all required sensing lineDetails
replace existing electric fire pump with a new electric fire pump with same rating of 750 gpm @ 145 psi; install new controller for the new electric fire pump including all required sensing line | $10,000 |
| Jun 28, 2017 | Completed final sign-off Sep 2017 | 201 03rd St | Pyro-Comm Systems, Inc. | 8/f- fire alarm t.i., add (30) nacs, (10) devices, (1) rps to fire alarm system. connect to (e) fa system. t.i.pa# 201705156568Details
8/f- fire alarm t.i., add (30) nacs, (10) devices, (1) rps to fire alarm system. connect to (e) fa system. t.i.pa# 201705156568 | $15,000 |
| Jun 7, 2017 | Completed final sign-off Aug 2017 | 201 03rd St | Pribuss Engineering Inc | 8th flr - fire sprinkler ti. relocate 192, add 37, total 229. ref: 201705156568Details
8th flr - fire sprinkler ti. relocate 192, add 37, total 229. ref: 201705156568 | $118,000 |
| Jun 1, 2017 | Completed final sign-off Aug 2017 | 201 03rd St | M C S Construction Services | 3rd floor: electrical work only under t.i. ref app#201704204423Details
3rd floor: electrical work only under t.i. ref app#201704204423 | $20,000 |
| Jun 1, 2017 | Completed final sign-off Aug 2017 | 201 03rd St | M C S Construction Services | 2nd floor: electrical work only for t.i. ref app#201704204420Details
2nd floor: electrical work only for t.i. ref app#201704204420 | $20,000 |
| May 22, 2017 | Completed final sign-off May 2017 | 201 03rd St | Anderson, Rowe & Buckley, Inc. | 6th floor - existing fire sprinkler system ti - 6 relocated pendent sprinklers, 16 added pendent sprinklers, 27 relocatd upright sprinklers, 12 added upright sprinklers. ref pa 2016-1220-5389Details
6th floor - existing fire sprinkler system ti - 6 relocated pendent sprinklers, 16 added pendent sprinklers, 27 relocatd upright sprinklers, 12 added upright sprinklers. ref pa 2016-1220-5389 | $30,000 |
| May 16, 2017 | Completed final sign-off Jun 2017 | 201 03rd St | Pyro-Comm Systems, Inc. | floor addition of 4 nac appliances in unoccupied space for minimal notification coverage ref 201703020478Details
floor addition of 4 nac appliances in unoccupied space for minimal notification coverage ref 201703020478 | $1,500 |
| May 15, 2017 | Completed final sign-off Sep 2017 | 201 03rd St | Principal Builders Inc. | 8th fl - interior demo of nonstructural partition and selective . demo at restrooms, building new non structural partitions. mep includedl life safety, and sprinkler drawing under separate permitDetails
8th fl - interior demo of nonstructural partition and selective . demo at restrooms, building new non structural partitions. mep includedl life safety, and sprinkler drawing under separate permit | $1,020,000 |
| May 8, 2017 | Never finaled issued May 2017, no final | 201 03rd St | Pioneer Fire Inc. | return system to warm shell - 2nd floor ref pa 2017-0302-0483 and 3rd floor - ref pa 2017-0302-0478Details
return system to warm shell - 2nd floor ref pa 2017-0302-0483 and 3rd floor - ref pa 2017-0302-0478 | $36,541 |
| May 8, 2017 | Completed final sign-off May 2017 | 201 03rd St | Pioneer Fire Inc. | relocate 1 pendent fire sprinkler ref pa 2015-0703-0626Details
relocate 1 pendent fire sprinkler ref pa 2015-0703-0626 | $2,000 |
| Apr 20, 2017 | Completed final sign-off Aug 2017 | 201 03rd St | M C S Construction Services | 2/f #200- revision to full floor ti pa#201703020483 including demolition & new partitions, ceilings, lighting, finishes and restroom stall partition layout. n/a ordinance #155-13. create more open office area with two new conference rooms.Details
2/f #200- revision to full floor ti pa#201703020483 including demolition & new partitions, ceilings, lighting, finishes and restroom stall partition layout. n/a ordinance #155-13. create more open office area with two new conference rooms. | $50,000 |
| Apr 20, 2017 | Completed final sign-off Aug 2017 | 201 03rd St | M C S Construction Services | 3/f suite #300- full floor revision to ti pa#201703020478 including demolition & new partitions, glazing, lighting, finishes and restroom stall partition layout. n/a ordinance #155-13, widen exits (single door to double door), bathroom mods.Details
3/f suite #300- full floor revision to ti pa#201703020478 including demolition & new partitions, glazing, lighting, finishes and restroom stall partition layout. n/a ordinance #155-13, widen exits (single door to double door), bathroom mods. | $50,000 |
| Apr 18, 2017 | Completed final sign-off Aug 2017 | 201 03rd St | Pyro-Comm Systems, Inc. | 5th floor - fire alarm t.i. - add 1 smoke detector, 3 modules, 4 relays & 1 speaker/strobe. connect to (e0 fire alarm system. ref pa #201611172948.Details
5th floor - fire alarm t.i. - add 1 smoke detector, 3 modules, 4 relays & 1 speaker/strobe. connect to (e0 fire alarm system. ref pa #201611172948. | $5,000 |
| Apr 18, 2017 | Never finaled issued Apr 2017, no final | 201 03rd St | Pioneer Fire Inc. | 9/f #950- relocate 12 pendents. t.i. pa#201702240051.Details
9/f #950- relocate 12 pendents. t.i. pa#201702240051. | $14,126 |
| Apr 14, 2017 | Completed final sign-off Jun 2017 | 201 03rd St | Pyro-Comm Systems, Inc. | 11th flr fire alarm ti: suite 1100: add 1 module/control relay to system for sound sytsem shunt. shuts down sound for the floor when there is a fire alarm. connect to (e) fa systemDetails
11th flr fire alarm ti: suite 1100: add 1 module/control relay to system for sound sytsem shunt. shuts down sound for the floor when there is a fire alarm. connect to (e) fa system | $500 |
| Apr 4, 2017 | Completed final sign-off May 2017 | 201 03rd St | Pyro-Comm Systems, Inc. | fa ti to suite 600 add (19) speaker strobes, (7) strobes, (1) speaker, (1) duct detector (3) smoke detector, (a) relay module, connect to (e) fire alarm system. ref pa 2016-1220-5389Details
fa ti to suite 600 add (19) speaker strobes, (7) strobes, (1) speaker, (1) duct detector (3) smoke detector, (a) relay module, connect to (e) fire alarm system. ref pa 2016-1220-5389 | $20,000 |
| Apr 3, 2017 | Completed final sign-off Aug 2017 | 201 03rd St | M C S Construction Services | suite 950 9th flr: mep for new electrical and mechanical ref 201702240051Details
suite 950 9th flr: mep for new electrical and mechanical ref 201702240051 | $89,876 |
| Apr 3, 2017 | Expired or cancelled cancelled Jan 2026 | 201 03rd St | M C S Construction Services | 3rd flr electrical changes to bathrooms/mens and womensDetails
3rd flr electrical changes to bathrooms/mens and womens | $2,500 |
| Mar 28, 2017 | Completed final sign-off May 2017 | 201 03rd St | Pyro-Comm Systems, Inc. | #950- fire alarm ti add to suite 950. relocate 6 speaker strobes, replace 2 strobes with new, replace 2 speakers with new, provide 3 new speaker/ strobes. connect to e fire alarm system pa 201702240051Details
#950- fire alarm ti add to suite 950. relocate 6 speaker strobes, replace 2 strobes with new, replace 2 speakers with new, provide 3 new speaker/ strobes. connect to e fire alarm system pa 201702240051 | $7,500 |
| Mar 2, 2017 | Completed final sign-off Aug 2017 | 201 03rd St | M C S Construction Services | 3rd floor: scope of work includes demolition of extg partitions, ceilings, lights, millwork and finishes. newly constructed partitions, ceiling patchwork and finishes.Details
3rd floor: scope of work includes demolition of extg partitions, ceilings, lights, millwork and finishes. newly constructed partitions, ceiling patchwork and finishes. | $200,000 |
| Mar 2, 2017 | Completed final sign-off Aug 2017 | 201 03rd St | M C S Construction Services | 2nd floor: scope of work includes demolition of extg partitions, ceilings, lights, millwork and finishes. newly constructed partitions, ceiling patchwork and finishes.Details
2nd floor: scope of work includes demolition of extg partitions, ceilings, lights, millwork and finishes. newly constructed partitions, ceiling patchwork and finishes. | $200,000 |
| Feb 24, 2017 | Completed final sign-off Jul 2017 | 201 03rd St | M C S Construction Services | 9th floor suite 950 - scope of work includes improvements to unoccupied suite : demolitoin of existing partitions, ceilings, lights, millwork & finishes. new non-structural partitions, ceilings, light fixtrues, millwork & finishes.Details
9th floor suite 950 - scope of work includes improvements to unoccupied suite : demolitoin of existing partitions, ceilings, lights, millwork & finishes. new non-structural partitions, ceilings, light fixtrues, millwork & finishes. | $475,000 |
| Jan 27, 2017 | Completed final sign-off Feb 2017 | 201 03rd St | Commercial Interior Builders Inc | 6th fl - demolition of non structural partitions in non occupied spaces, ref 201701268006 for modification of sprinklers. per ab-017Details
6th fl - demolition of non structural partitions in non occupied spaces, ref 201701268006 for modification of sprinklers. per ab-017 | $31,894 |
| Jan 27, 2017 | Never finaled issued Jan 2017, no final | 201 03rd St | Pyro-Comm Systems, Inc. | 7th floor: t.i. add 3 speaker/strobes, 1 duct detector and 1 relay. connect to extg fire alarm system. ref app#201612205389Details
7th floor: t.i. add 3 speaker/strobes, 1 duct detector and 1 relay. connect to extg fire alarm system. ref app#201612205389 | $5,000 |
| Jan 27, 2017 | Completed final sign-off Mar 2017 | 201 03rd St | Skender Construction Llc | revision to pa 2016-1031-1523 installation of doors in game room for noise reduction.Details
revision to pa 2016-1031-1523 installation of doors in game room for noise reduction. | $40,000 |
| Jan 26, 2017 | Completed final sign-off Mar 2017 | 201 03rd St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system - tenant improvements 42 change outlets, 11 plugged outletsDetails
existing fire sprinkler system - tenant improvements 42 change outlets, 11 plugged outlets | $8,400 |
| Jan 26, 2017 | Completed final sign-off Feb 2017 | 201 03rd St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system tenant improvments - 6 added & 2 relocated sprinklers. ref pa 2016-1031-1523Details
existing fire sprinkler system tenant improvments - 6 added & 2 relocated sprinklers. ref pa 2016-1031-1523 | $2,200 |
| Jan 18, 2017 | Completed final sign-off Feb 2017 | 201 03rd St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system ti on the 4th floor - add 37 sprinklers, relocate 171 sprinklers. ref pa 2016-1220-5389Details
existing fire sprinkler system ti on the 4th floor - add 37 sprinklers, relocate 171 sprinklers. ref pa 2016-1220-5389 | $53,000 |
| Dec 22, 2016 | Completed final sign-off Jun 2017 | 201 03rd St | Gci, Inc | deferred mep for 2016-0703-0626, 2016-0523-8147 for package food outlet. no seating for food prep. no exteriorDetails
deferred mep for 2016-0703-0626, 2016-0523-8147 for package food outlet. no seating for food prep. no exterior | |
| Dec 21, 2016 | Completed final sign-off Jun 2017 | 201 03rd St | Gci, Inc | revised finshes for future grab and go. revision to previously approved 2016-0523-8147Details
revised finshes for future grab and go. revision to previously approved 2016-0523-8147 | |
| Dec 20, 2016 | Completed final sign-off Nov 2017 | 201 03rd St | Clune Construction Company L P | interior ti including selective demo, partition, electrical,ceiling, finish. mep work. maher naDetails
interior ti including selective demo, partition, electrical,ceiling, finish. mep work. maher na | $2,800,000 |
| Dec 19, 2016 | Never finaled issued Dec 2016, no final | 201 03rd St | Clune Construction Company L P | temp shoring pemrit for partial demo of 5/f for interoconnection stairwell from 4/f to 5/f. ref pa#201611172948.Details
temp shoring pemrit for partial demo of 5/f for interoconnection stairwell from 4/f to 5/f. ref pa#201611172948. | $10,000 |
| Nov 17, 2016 | Completed final sign-off Nov 2017 | 201 03rd St | Clune Construction Company L P | 4th & 5th floors: interior ti w/ (e) communication stair previously closed off w/rated enclosure. select demo of non structl partitions. structural scope includes relocation of (e) stair between 4th/5th flr and enlargement of (e) opening in 5th flr slab.new hand/guardrails.minor revisions to hvac/elDetails
4th & 5th floors: interior ti w/ (e) communication stair previously closed off w/rated enclosure. select demo of non structl partitions. structural scope includes relocation of (e) stair between 4th/5th flr and enlargement of (e) opening in 5th flr slab.new hand/guardrails.minor revisions to hvac/el | $95,000 |
| Nov 16, 2016 | Completed final sign-off Mar 2017 | 201 03rd St | Pyro-Comm Systems, Inc. | 4th floor: t.i. addition to provide new fire alarm devices, connect to extg fire alarm system. ref app#201610039371 n/a for maherDetails
4th floor: t.i. addition to provide new fire alarm devices, connect to extg fire alarm system. ref app#201610039371 n/a for maher | $20,000 |
| Nov 16, 2016 | Completed final sign-off Dec 2017 | 201 03rd St | Gizmo Art Production Inc. | installation of 750 lb artwork(sculpture) from extg concrete ceiling over stair well interior.Details
installation of 750 lb artwork(sculpture) from extg concrete ceiling over stair well interior. | $47,000 |
| Oct 31, 2016 | Completed final sign-off Mar 2017 | 201 03rd St | Skender Construction Llc | 7th fl: minor intrerior ti on a single tenant floor including selective demo, partitions, ceiling and finish, mech and elec work. life safety deferred.Details
7th fl: minor intrerior ti on a single tenant floor including selective demo, partitions, ceiling and finish, mech and elec work. life safety deferred. | $250,000 |
| Oct 11, 2016 | Completed final sign-off Nov 2017 | 201 03rd St | Clune Construction Company L P | 4th floor: interior demo of single tenant floor including demo of non structural partitions & selective demo at restroomsDetails
4th floor: interior demo of single tenant floor including demo of non structural partitions & selective demo at restrooms | $125,000 |
| Oct 3, 2016 | Never finaled issued Nov 2016, no final | 201 03rd St | Clune Construction Company L P | interior t.i. on 4th floor, including new partitions, new & revise hvac - electrical - plumbing. structural scope to include movable partitions, and steel storefront system. see pa# 2016-1011-9903 for demo.Details
interior t.i. on 4th floor, including new partitions, new & revise hvac - electrical - plumbing. structural scope to include movable partitions, and steel storefront system. see pa# 2016-1011-9903 for demo. | $4,389,293 |
| Jul 19, 2016 | Completed final sign-off Aug 2016 | 201 03rd St | Bcci Construction Company | 6/f- revision to pa 2015-0828-5519 to reclassify room 674a as an education classroom (training) roomDetails
6/f- revision to pa 2015-0828-5519 to reclassify room 674a as an education classroom (training) room | |
| Jul 19, 2016 | Completed final sign-off Sep 2016 | 201 03rd St | Stockham Construction | revision to pa 2015-0703-0626 & 2015-0708-0892 egress plan revisionDetails
revision to pa 2015-0703-0626 & 2015-0708-0892 egress plan revision | |
| Jul 7, 2016 | Never finaled issued Jul 2016, no final | 201 03rd St | Stockham Construction | mep work only for approved ti 2016 0523 8147 for grab & go area (130 sf) adjacent to (e) restaurantDetails
mep work only for approved ti 2016 0523 8147 for grab & go area (130 sf) adjacent to (e) restaurant | $10,000 |
| May 23, 2016 | Completed final sign-off Jun 2017 | 201 03rd St | Stockham Construction | revision to pa #201507030626: scope is to install 'take out' counter adjacent ot reataurant 130 sq ft including (n) wall, floor & ceiling finishes. m.e.p. & fire protection under separate pemrits. no exterior work.Details
revision to pa #201507030626: scope is to install 'take out' counter adjacent ot reataurant 130 sq ft including (n) wall, floor & ceiling finishes. m.e.p. & fire protection under separate pemrits. no exterior work. | $20,000 |
| Mar 15, 2016 | Completed final sign-off Mar 2019 | 201 03rd St | Gci, Inc | ada hardship technical infeasibility request. existing clearance between core wall & structural column does not allow 44" clearance. ref pa 2015-0806-3509Details
ada hardship technical infeasibility request. existing clearance between core wall & structural column does not allow 44" clearance. ref pa 2015-0806-3509 | |
| Mar 1, 2016 | Completed final sign-off Jun 2016 | 201 03rd St | Pyro-Comm Systems, Inc. | fire alarm evacuation matrix to be modified per stairwell addition on 5/f, 6/f, 7/f. t.i. pa#2015-0217-8521 & 2015-0810-3765.Details
fire alarm evacuation matrix to be modified per stairwell addition on 5/f, 6/f, 7/f. t.i. pa#2015-0217-8521 & 2015-0810-3765. | $1,000 |
| Mar 1, 2016 | Never finaled issued Mar 2016, no final | 201 03rd St | Clune Construction Company L P | shower remodel on 7th floor. referenced 2015.1230.6151Details
shower remodel on 7th floor. referenced 2015.1230.6151 | $210,000 |
| Feb 2, 2016 | Completed final sign-off Jun 2016 | 201 03rd St | Pyro-Comm Systems, Inc. | 6th floor new fire alarm appliances added to a ti in an existing building to include (8) speaker/strobes, (1) strobe. ref pa 2015-0828-5519Details
6th floor new fire alarm appliances added to a ti in an existing building to include (8) speaker/strobes, (1) strobe. ref pa 2015-0828-5519 | $6,000 |
| Feb 2, 2016 | Never finaled issued Feb 2016, no final | 201 03rd St | Pyro-Comm Systems, Inc. | 7th floor new fire alarm devices for ti in an (e) building to include: (1) power supply (1) monitor module (2) relay modules (1) duct detector (45) speaker/strobes (12) strobes (2) weather proof speaker/strobes (1) weather proof strobe. ref pa 2015-0828-5521Details
7th floor new fire alarm devices for ti in an (e) building to include: (1) power supply (1) monitor module (2) relay modules (1) duct detector (45) speaker/strobes (12) strobes (2) weather proof speaker/strobes (1) weather proof strobe. ref pa 2015-0828-5521 | $13,430 |
| Jan 19, 2016 | Completed final sign-off Sep 2016 | 201 03rd St | Golden Gate Fire Protection Inc | 6th & 7th flrs: fire sprinklers: relocate 49 upright sprinklers on the 6th flr. relocate 6 pendent sprinklers and 234 upright sprinklers on the 7th flr. relocate 60 pendants.Details
6th & 7th flrs: fire sprinklers: relocate 49 upright sprinklers on the 6th flr. relocate 6 pendent sprinklers and 234 upright sprinklers on the 7th flr. relocate 60 pendants. | $179,220 |
| Dec 30, 2015 | Never finaled issued Feb 2016, no final | 201 03rd St | Clune Construction Company L P | 6th & 7th fl. interior t-i. new conf rooms, private offices, phone rooms. added idf rooms on ea. fl; added men's, women's restrooms, open area work stns. added drywall ceilings & acoustical ceilings sealed concrete & carpet flooring misc millwork at pantry locations. life safety deferred.Details
6th & 7th fl. interior t-i. new conf rooms, private offices, phone rooms. added idf rooms on ea. fl; added men's, women's restrooms, open area work stns. added drywall ceilings & acoustical ceilings sealed concrete & carpet flooring misc millwork at pantry locations. life safety deferred. | $3,815,244 |
| Dec 17, 2015 | Completed final sign-off Feb 2016 | 201 03rd St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system ti - 20 added sprinklers, 5 relocated sprinklers. ref 2015-0825-5521 (6th floor) and 2014-1120-2135 (5th floor)Details
existing fire sprinkler system ti - 20 added sprinklers, 5 relocated sprinklers. ref 2015-0825-5521 (6th floor) and 2014-1120-2135 (5th floor) | $12,500 |
| Dec 16, 2015 | Never finaled issued Dec 2015, no final | 201 03rd St | Stockham Construction | revision to 201507030626. revision removes egress door and shows revised egress path from kitchen via common path of travel. no change to occupant loadDetails
revision to 201507030626. revision removes egress door and shows revised egress path from kitchen via common path of travel. no change to occupant load | |
| Dec 16, 2015 | Never finaled issued Dec 2015, no final | 201 03rd St | street space | ||
| Dec 14, 2015 | Completed final sign-off Aug 2016 | 201 03rd St | Bcci Construction Company | suite 620-revision to pa 2015-0330-2290 structural detail for a bookcaseDetails
suite 620-revision to pa 2015-0330-2290 structural detail for a bookcase | $850 |
| Dec 10, 2015 | Completed final sign-off Jan 2016 | 201 03rd St | Pribuss Engineering Inc | suite # 620: fire sprinkelr as built permit# 201510169908. add: 07(x514.62) total 3602.34. ref app#201508285521Details
suite # 620: fire sprinkelr as built permit# 201510169908. add: 07(x514.62) total 3602.34. ref app#201508285521 | $3,602 |
| Dec 3, 2015 | Never finaled issued Dec 2015, no final | 201 03rd St | Gci, Inc | delete fire smoke damper at exhaust louver ref 201406269630Details
delete fire smoke damper at exhaust louver ref 201406269630 | |
| Dec 3, 2015 | Completed final sign-off Jul 2016 | 201 03rd St | Bcci Construction Company | 6 & 7 floors: revision to issued pa 201508103765 to revise structural detail.Details
6 & 7 floors: revision to issued pa 201508103765 to revise structural detail. | |
| Dec 3, 2015 | Completed final sign-off Jul 2016 | 201 03rd St | Bcci Construction Company | 5/6 floors: revision to issued pa 201502178521 to revise structural details.Details
5/6 floors: revision to issued pa 201502178521 to revise structural details. | |
| Nov 18, 2015 | Completed final sign-off Jan 2016 | 201 03rd St | Certified Fire & Safety Co | install ul300 ansul fire systems (4 ea) to protect kitchen hoods and cooking equipment and pollution control units. two separate systems- ref pa 2015-0703-0626Details
install ul300 ansul fire systems (4 ea) to protect kitchen hoods and cooking equipment and pollution control units. two separate systems- ref pa 2015-0703-0626 | $10,000 |
| Nov 9, 2015 | Completed final sign-off Nov 2015 | 201 03rd St | Pyro-Comm Systems, Inc. | new fire alarm appliances for ti in an (e) building to include: (10) speakers, (8) speaker/strobes, (8) strobes. ref pa 2015-0602-7738Details
new fire alarm appliances for ti in an (e) building to include: (10) speakers, (8) speaker/strobes, (8) strobes. ref pa 2015-0602-7738 | $7,400 |
| Oct 29, 2015 | Completed final sign-off Dec 2015 | 201 03rd St | grnd flr: revision to approved mep permit pa 201508103780, mep revisions only. work includes fsd removal @ dishwasher and colrd prep; exhaust duct & addition of 3m firewrap per direction of field inspector.Details
grnd flr: revision to approved mep permit pa 201508103780, mep revisions only. work includes fsd removal @ dishwasher and colrd prep; exhaust duct & addition of 3m firewrap per direction of field inspector. | $2,500 | |
| Oct 22, 2015 | Completed final sign-off Jan 2016 | 201 03rd St | Bcci Construction Company | 7th floor: electrical work associated with approved pa 201510089175Details
7th floor: electrical work associated with approved pa 201510089175 | $22,000 |
| Oct 22, 2015 | Completed final sign-off Jan 2016 | 201 03rd St | Bcci Construction Company | 6th floor: electrical work associated with approved pa 201506027737Details
6th floor: electrical work associated with approved pa 201506027737 | $22,000 |
| Oct 16, 2015 | Completed final sign-off Jan 2016 | 201 03rd St | Pribuss Engineering Inc | ste 620, fire sprinkler ti under general contractor ref pa 2015-0828-5521 & 2015-0330-2290. relocate 101 & add 14, plugging 9Details
ste 620, fire sprinkler ti under general contractor ref pa 2015-0828-5521 & 2015-0330-2290. relocate 101 & add 14, plugging 9 | $27,396 |
| Oct 8, 2015 | Completed final sign-off Dec 2015 | 201 03rd St | Bcci Construction Company | 7th fl restroom upgrade, new or revised mep and life safety under sep permitDetails
7th fl restroom upgrade, new or revised mep and life safety under sep permit | $28,800 |
| Oct 7, 2015 | Completed final sign-off Nov 2015 | 201 03rd St | Pyro-Comm Systems, Inc. | new fire alarm devices added tenant improvement in existing buiklding 1 power supply, 1 monitor module, 2 relay module, 16 speaker/strobes, 3 strobes. ref pa # 201503302290 & 201508255521Details
new fire alarm devices added tenant improvement in existing buiklding 1 power supply, 1 monitor module, 2 relay module, 16 speaker/strobes, 3 strobes. ref pa # 201503302290 & 201508255521 | $9,000 |
| Sep 30, 2015 | Completed final sign-off Jan 2016 | 201 03rd St | Pyro-Comm Systems, Inc. | 1st floor:new fire alarm devices added to tenant build out in an extg bldg to include: 1 power supply, 12 modules, 2 smoke detectors, 6 duct detectors, 16 speaker/strobes, 2 strobes. ref app#201507030626.Details
1st floor:new fire alarm devices added to tenant build out in an extg bldg to include: 1 power supply, 12 modules, 2 smoke detectors, 6 duct detectors, 16 speaker/strobes, 2 strobes. ref app#201507030626. | $13,430 |
| Sep 29, 2015 | Completed final sign-off Apr 2016 | 201 03rd St | Golden Gate Sign Company Inc. | erect illum signDetails
erect illum sign | $5,000 |
| Sep 29, 2015 | Never finaled issued Oct 2015, no final | 201 03rd St | Golden Gate Sign Company Inc. | erect illum sign | $10,000 |
| Sep 25, 2015 | Completed final sign-off Dec 2015 | 201 03rd St | Gci, Inc | change of use from a-3 to a-2 public. refer to permit #201404022225Details
change of use from a-3 to a-2 public. refer to permit #201404022225 | |
| Sep 17, 2015 | Completed final sign-off Oct 2015 | 201 03rd St | Pioneer Fire Inc. | rework (e) sprinkler piping to accomodate new generator room, consisting of a relocated quick response 200 degress teflon coated upright sprinklers and new pipingDetails
rework (e) sprinkler piping to accomodate new generator room, consisting of a relocated quick response 200 degress teflon coated upright sprinklers and new piping | $8,749 |
| Sep 3, 2015 | Completed final sign-off Aug 2016 | 201 03rd St | Bcci Construction Company | #615 & #620- mechanical work associated with approved pa#201508285519 & 201508285521 (revision to pa#201503302290) inclduing new vav boxes, heat pumps, fan and lighting.Details
#615 & #620- mechanical work associated with approved pa#201508285519 & 201508285521 (revision to pa#201503302290) inclduing new vav boxes, heat pumps, fan and lighting. | $320,000 |
| Aug 28, 2015 | Completed final sign-off Aug 2016 | 201 03rd St | Bcci Construction Company | 6th flr; ste #620: revision to approved permit 201503302290 to reconfigure the suite & associated structural work, mep & fire life safety under separate permit.Details
6th flr; ste #620: revision to approved permit 201503302290 to reconfigure the suite & associated structural work, mep & fire life safety under separate permit. | |
| Aug 28, 2015 | Completed final sign-off Aug 2016 | 201 03rd St | Bcci Construction Company | 6th flr, ste 615: interior t.i. including partitions, finishes, lighting & structural & ceiling, mep & life safety under separate permit.Details
6th flr, ste 615: interior t.i. including partitions, finishes, lighting & structural & ceiling, mep & life safety under separate permit. | $300,000 |
| Aug 27, 2015 | Completed final sign-off Jan 2016 | 201 03rd St | Eco Fire Sprinklers Inc | 1st floor, install 106 new sprinklers in area of work for tenant improvement, ref pa 2015-0703-0626Details
1st floor, install 106 new sprinklers in area of work for tenant improvement, ref pa 2015-0703-0626 | $31,800 |
| Aug 19, 2015 | Never finaled issued Aug 2015, no final | 201 03rd St | Gci, Inc | 1st flr: replacing storefront dual doors w/single door ref pa 2015 0122 6354 & 2015 0713 1304Details
1st flr: replacing storefront dual doors w/single door ref pa 2015 0122 6354 & 2015 0713 1304 | |
| Aug 11, 2015 | Completed final sign-off Feb 2016 | 201 03rd St | Bcci Construction Company | ste 620 minor demolition and the build back of demising partitions & doorsDetails
ste 620 minor demolition and the build back of demising partitions & doors | $12,000 |
| Aug 10, 2015 | Completed final sign-off Sep 2016 | 201 03rd St | Stockham Construction | mep for new restaurant t.i. approved under app#201507030626. mep work only.Details
mep for new restaurant t.i. approved under app#201507030626. mep work only. | $250,000 |
| Aug 10, 2015 | Completed final sign-off Jul 2016 | 201 03rd St | Bcci Construction Company | new steel stair between 6th and 7th flr including structural work and associated mechanical.Details
new steel stair between 6th and 7th flr including structural work and associated mechanical. | $519,000 |
| Aug 7, 2015 | Completed final sign-off Jan 2016 | 201 03rd St | Pyro-Comm Systems, Inc. | basement - new fire alarm devices - added for new generator being installed in the basement to include: (1) power supply, (4) monitor modules, (1) speaker/strobe & replacing (14) strobes. ref pa #2014.0626.9630.Details
basement - new fire alarm devices - added for new generator being installed in the basement to include: (1) power supply, (4) monitor modules, (1) speaker/strobe & replacing (14) strobes. ref pa #2014.0626.9630. | $7,400 |
| Aug 6, 2015 | Completed final sign-off Mar 2019 | 201 03rd St | Gci, Inc | new entry doors on the 11th fl. remove card reader from existing lobby s door mep deferred. restroom demo, new ada compliant restroom as required by 11nb202.4Details
new entry doors on the 11th fl. remove card reader from existing lobby s door mep deferred. restroom demo, new ada compliant restroom as required by 11nb202.4 | $50,000 |
| Jul 24, 2015 | Completed final sign-off Oct 2016 | 201 03rd St | Truebeck Construction | 9th floor - deferred electrical permit drawings for pa #2015.0602.7738.Details
9th floor - deferred electrical permit drawings for pa #2015.0602.7738. | $187,000 |
| Jul 22, 2015 | Never finaled issued Jul 2015, no final | 201 03rd St | street space permit | ||
| Jul 17, 2015 | Completed final sign-off Jul 2015 | 201 03rd St | 9th floor: fire sprinkler permit: relocate 20, add 1 and delete 1 pendent sprinkler. t. i. app# 201506027738Details
9th floor: fire sprinkler permit: relocate 20, add 1 and delete 1 pendent sprinkler. t. i. app# 201506027738 | $10,794 | |
| Jul 17, 2015 | Completed final sign-off Jun 2016 | 201 03rd St | Bcci Construction Company | 5/f: revision to pa#2015-0521-6895 & pa#2015-0528-7362 to comply with electrical inspector's request to document actual existing condition (i.e., these are as-builts).Details
5/f: revision to pa#2015-0521-6895 & pa#2015-0528-7362 to comply with electrical inspector's request to document actual existing condition (i.e., these are as-builts). | |
| Jul 16, 2015 | Completed final sign-off Mar 2019 | 201 03rd St | Ayoob & Peery Plumbing Co Inc | demo existing pre-action valve & equipment and convert to wet system.Details
demo existing pre-action valve & equipment and convert to wet system. | $1,800 |
| Jul 14, 2015 | Completed final sign-off Sep 2015 | 201 03rd St | Pyro-Comm Systems, Inc. | ground fl & 7th fl: new fire alarm devices added to extg fire alarm sysem system in an extg bldg to include: 2 relay modules, 1 mini monitor module, 1 yellow pull station for unlocking stairwell doors.Details
ground fl & 7th fl: new fire alarm devices added to extg fire alarm sysem system in an extg bldg to include: 2 relay modules, 1 mini monitor module, 1 yellow pull station for unlocking stairwell doors. | $2,743 |
| Jul 13, 2015 | Never finaled issued Jul 2015, no final | 201 03rd St | Gci, Inc | rev. to appl #2015.0122.6354 - only revision is to provide rated shaft from (n) grills to (e) rated shaft for fresh air system. separate rev. permit is required for changes to doors at shop front facing howard st.Details
rev. to appl #2015.0122.6354 - only revision is to provide rated shaft from (n) grills to (e) rated shaft for fresh air system. separate rev. permit is required for changes to doors at shop front facing howard st. | $50,000 |
| Jul 9, 2015 | Never finaled issued Jul 2015, no final | 201 03rd St | street space permit | ||
| Jul 8, 2015 | Completed final sign-off Sep 2016 | 201 03rd St | new decorative screens to define outdoor dining area within property line, sliding panels to allow for egress.Details
new decorative screens to define outdoor dining area within property line, sliding panels to allow for egress. | $10,000 | |
| Jul 7, 2015 | Completed final sign-off Jul 2016 | 201 03rd St | Bcci Construction Company | demolition under ab-017 on the 7th floor. construct opening in floor for new stair. arch, mep, sprinkler, and fire alarm revisions under separate applications.Details
demolition under ab-017 on the 7th floor. construct opening in floor for new stair. arch, mep, sprinkler, and fire alarm revisions under separate applications. | $68,000 |
| Jul 3, 2015 | Completed final sign-off Sep 2016 | 201 03rd St | Stockham Construction | t.i. for new restaurant work includes, new partition, fixutres finishes, equipment, mep,and new bathrooms. no exterior work. fire protection under seperate permit. mep under seperate permit.Details
t.i. for new restaurant work includes, new partition, fixutres finishes, equipment, mep,and new bathrooms. no exterior work. fire protection under seperate permit. mep under seperate permit. | $1,200,000 |
| Jul 1, 2015 | Completed final sign-off Feb 2016 | 201 03rd St | Bcci Construction Company | preconstructoin demolition under ab017 of ste 610, 615 & the 7th floor. fire life safty to remain operational.Details
preconstructoin demolition under ab017 of ste 610, 615 & the 7th floor. fire life safty to remain operational. | $195,000 |
| Jun 19, 2015 | Never finaled issued Jun 2015, no final | 201 03rd St | street space | ||
| Jun 4, 2015 | Never finaled issued Jun 2015, no final | 201 03rd St | Gci, Inc | demo ductwork in stall new vav box per plan ref 201503181165Details
demo ductwork in stall new vav box per plan ref 201503181165 | $10,000 |
| Jun 3, 2015 | Never finaled issued Jun 2015, no final | 201 03rd St | Gci, Inc | 12th floor - maintained some of the existing power & signal outlets & provide additional new power branch circuiting & raceway systems as required to new power & signal outlets. ref pa #2015.0318.1165.Details
12th floor - maintained some of the existing power & signal outlets & provide additional new power branch circuiting & raceway systems as required to new power & signal outlets. ref pa #2015.0318.1165. | $30,000 |
| Jun 2, 2015 | Completed final sign-off Dec 2015 | 201 03rd St | Bcci Construction Company | 6th flr: restroom upgrade. all new or revised hvac. ele, plumb and life safety work will be design build and submitted sep.Details
6th flr: restroom upgrade. all new or revised hvac. ele, plumb and life safety work will be design build and submitted sep. | $28,800 |
| Jun 2, 2015 | Completed final sign-off Oct 2016 | 201 03rd St | Truebeck Construction | 9th flr: corridor and restroom upgrades. all new or revised. hvac, ele, plumb & life safety work under sep permit.Details
9th flr: corridor and restroom upgrades. all new or revised. hvac, ele, plumb & life safety work under sep permit. | $187,000 |
| Jun 1, 2015 | Completed final sign-off Dec 2015 | 201 03rd St | Stockham Construction | 1st floor demo: reduction of existing mezzanine for increased ceiling height in advance of future tenant improvement per ab-17Details
1st floor demo: reduction of existing mezzanine for increased ceiling height in advance of future tenant improvement per ab-17 | $25,000 |
| May 28, 2015 | Completed final sign-off Jun 2016 | 201 03rd St | Bcci Construction Company | revision to pa#201412224316 to address changes to the lobbyDetails
revision to pa#201412224316 to address changes to the lobby | |
| May 22, 2015 | Never finaled issued May 2015, no final | 201 03rd St | Pyro-Comm Systems, Inc. | 12th flr: new fire alarm devices - 1 speaker/strobe, 1 strobe. relocate 1 (e) strobe. ref pa 2015 0318 1165Details
12th flr: new fire alarm devices - 1 speaker/strobe, 1 strobe. relocate 1 (e) strobe. ref pa 2015 0318 1165 | $3,470 |
| May 22, 2015 | Completed final sign-off Jul 2015 | 201 03rd St | Pyro-Comm Systems, Inc. | 9th flr: new fire alarm devices added to ti on (e) bld: 1 power supply, 1 monitor module, 7 relay modules, 5 duct detectors, 1 smoke detector, 2 speaker/strobe ceiling, 7 speaker/strobe wall, 1 strobe. ref pa 2015 0303 9779Details
9th flr: new fire alarm devices added to ti on (e) bld: 1 power supply, 1 monitor module, 7 relay modules, 5 duct detectors, 1 smoke detector, 2 speaker/strobe ceiling, 7 speaker/strobe wall, 1 strobe. ref pa 2015 0303 9779 | $6,430 |
| May 21, 2015 | Completed final sign-off Jun 2016 | 201 03rd St | Bcci Construction Company | 5th floor: revision appl. 2014.1222.4316. mechanical revision at new s door as built conditions. acssociated with 2015.0515.6215. maher n/a.Details
5th floor: revision appl. 2014.1222.4316. mechanical revision at new s door as built conditions. acssociated with 2015.0515.6215. maher n/a. | $5,000 |
| May 13, 2015 | Completed final sign-off Jul 2015 | 201 03rd St | 9th floor fire sprinkler permit - relocate 66, add 21, delete 11 pendents, relocate 53 & add 64 uprights. ref t.i. #2015.0303.9779. new clouded ceilings with protection above and below- new bracing calc's-adding 11 braces-Details
9th floor fire sprinkler permit - relocate 66, add 21, delete 11 pendents, relocate 53 & add 64 uprights. ref t.i. #2015.0303.9779. new clouded ceilings with protection above and below- new bracing calc's-adding 11 braces- | $104,856 | |
| May 13, 2015 | Completed final sign-off Jan 2016 | 201 03rd St | Bcci Construction Company | revision to pa#201504022678 . this is a revision to a previous exiting design.Details
revision to pa#201504022678 . this is a revision to a previous exiting design. | $25,000 |
| Apr 27, 2015 | Completed final sign-off May 2015 | 201 03rd St | Ayoob & Peery Plumbing Co Inc | 12th flr: add 2 fire sprinklers per ti 2015 0318 1165Details
12th flr: add 2 fire sprinklers per ti 2015 0318 1165 | $1,028 |
| Apr 22, 2015 | Completed final sign-off Aug 2015 | 201 03rd St | Pacific Auxiliary Fire Alarm | add 69 smoke detectors, 2 relays, 49 speaker/strobes, 1 strobe and 1 speaker as part of a t.i. on 5/f. ref. to pa#201412224316, also relocate 2 existing smoke detectors & 8 existing speaker/strobes.Details
add 69 smoke detectors, 2 relays, 49 speaker/strobes, 1 strobe and 1 speaker as part of a t.i. on 5/f. ref. to pa#201412224316, also relocate 2 existing smoke detectors & 8 existing speaker/strobes. | $70,000 |
| Apr 3, 2015 | Completed final sign-off Dec 2015 | 201 03rd St | Stockham Construction | interior non-structural soft demo. removal of railing, remove & patch sidewalk. remove hung heaters and light - all inside property line; separate ti permit. ab-017 applies.Details
interior non-structural soft demo. removal of railing, remove & patch sidewalk. remove hung heaters and light - all inside property line; separate ti permit. ab-017 applies. | $20,000 |
| Apr 2, 2015 | Completed final sign-off Jan 2016 | 201 03rd St | Bcci Construction Company | 5/f: revision to 201412224316 to remove door and add delayed egressDetails
5/f: revision to 201412224316 to remove door and add delayed egress | $18,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Pyro-Comm Systems, Inc. (38), Bcci Construction Company (20), Gci, Inc (20), M C S Construction Services (14), Pioneer Fire Inc. (13), Anderson, Rowe & Buckley, Inc. (10), Clune Construction Company L P (8), Skyline Construction (8), Stockham Construction (8), Principal Builders Inc. (7), Field Construction Inc. (6), Ayoob & Peery Plumbing Co Inc (4), Golden Gate Fire Protection Inc (4), Prima Acquire Inc Dba Lahue And Associat (4), Commercial Interior Builders Inc (3), Pribuss Engineering Inc (3), Golden Gate Sign Company Inc. (2), Skender Construction Llc (2), Truebeck Construction (2), Certified Fire & Safety Co, Eco Fire Sprinklers Inc, Gizmo Art Production Inc., Hp Build, Installation Services Inc. Dba Bay Area, Pacific Auxiliary Fire Alarm, R P Gen. Contr. Dba: R P Gen. Constr. En, Thomas Swan Sign Co Inc, Western Allied Mechanical Inc.
- Architects
- Teresa Emery (10), Eric Ibsen (6), Joseph Remling (6), Alan Johansen (5), Andrew Potter (5), Marcus A. Hopper (4), Bert Deviterbo (2), Jeffery S. Lewis (2), R Lawrence Good (2), Stanley H Lew (2), Alexander Joseph Pacheco, Geoffrey B Lim, John Verdon, Nicholas Cade
- Engineers
- Stephen Shaffer (7), Amit Wadhwa (6), Alexander Joseph Pacheco (4), Christopher Jordan Malabed (3), Habtom Nugusse Tewelde (2), Joseph Camajani (2), L.H. Nishkian (2), Carl Milsum, Chiang Ng, Henry Holbrook Hyde Iii, Jesus Cabellon Jr., Kylie Lo, Levi G. Abarte, Marc Andrew Steyer, Rebecca Boulter, Rob Moyer, Ryan Bogart, Tucker N. Matthews
- Authorized agents
- Matthew O'reilly, Southwest Sign Co., Wayne Paul Picard
- Designers
- Michael Joseph Donahue (3), Joseph Remling (2), Pioneer Fire Inc. (2), Aldi Indra Gunawan, Golden Gate Fire Protection, Thomas Swan Sign Co Inc
- Pmt consultant/expediters
- Andrew Erickson
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.