Ryan Bogart
- License
- 6104
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- engineer
- Firm
- Zfa Structural Engineers
- Based in
- San Francisco
- On San Francisco permits
- Jan 2022 to Nov 2026
13 permits since 2000 (engineer on 13 permits): 7 completed, 4 in progress, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Plant Construction Co, Lp (2), D & H Construction, E & C Builders Inc, Gci, Inc, Hl81 Construction Inc., Lombardi Property Development, Oliver & Company Inc., Rwr Construction Inc, Sc Builders, Inc, Walls Construction And Contracting Inc
- Architects
- Douglas W. Mehl (2), Michelle E. Sullivan (2), Adam Murphy, Albert Costa, Emily Gosack, Irving Gonzales, Mark K Hogan, Richard Sweers Ii, Susan Aitken
- Engineers
- Bruce Douglas (2), Stephen Howarter (2), Jacqueline K. Lingwei Luk, Michelle Anne Sullivan
- Authorized agents
- Matthew Adams
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 5
- Commercial 6
- Other or unknown 2
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 13, 2026 | In progress issued Nov 2026 | 1751 Green St | Rwr Construction Inc | strengthening (e) retaining wall between 1854 vallejo & 1751 green st with a new reinforced concrete (shotcrete). retaining wall on concrete grade beam & hand dug pier. approx 27'2" long 10 max retained height, per zfa structural engineer plans. special inspection & observation to comply withDetails
strengthening (e) retaining wall between 1854 vallejo & 1751 green st with a new reinforced concrete (shotcrete). retaining wall on concrete grade beam & hand dug pier. approx 27'2" long 10 max retained height, per zfa structural engineer plans. special inspection & observation to comply with | $42,602 |
| Feb 20, 2026 | Completed final sign-off Apr 2026 | 201 03rd St | Gci, Inc | 2nd & 3rd - installing phone booths. phone booths will be anchored to the existing slab with post installed anchorsDetails
2nd & 3rd - installing phone booths. phone booths will be anchored to the existing slab with post installed anchors | $25,000 |
| Jan 29, 2026 | In progress issued Jul 2026 | 320 14th St | Hl81 Construction Inc. | legalization of 2 units: 320 & 324, through the adu program (sfpc 207.1).Details
legalization of 2 units: 320 & 324, through the adu program (sfpc 207.1). | $134,000 |
| Jun 2, 2025 | Completed final sign-off Oct 2025 | 400 Howard St | Sc Builders, Inc | 4th flr - permit revision to 202504023527 - deconfiguration of non-structural demising partitions, light fixtures of ceiling assembly, millwork, plumbing, power outlets and finishes and structuralDetails
4th flr - permit revision to 202504023527 - deconfiguration of non-structural demising partitions, light fixtures of ceiling assembly, millwork, plumbing, power outlets and finishes and structural | |
| Apr 30, 2025 | In progress issued Oct 2025 | 835 Turk St | D & H Construction | ab-004:renovate 114 sro units,1 mgr 1 br with units reduced to 108 (including #101 prev converted to common space) to provide req mobility units & trash rooms.bsmnt: structural brace frames,rev egress stair & exit door at elm st; remove clay tile walls at bsmt,g/f.mep scope at boiler rm.Details
ab-004:renovate 114 sro units,1 mgr 1 br with units reduced to 108 (including #101 prev converted to common space) to provide req mobility units & trash rooms.bsmnt: structural brace frames,rev egress stair & exit door at elm st; remove clay tile walls at bsmt,g/f.mep scope at boiler rm. | $16,000,000 |
| May 7, 2024 | Completed final sign-off Aug 2026 | 350 Brannan St | Lombardi Property Development | 2/f -demolition existing ceiling height partition, construction of new full height partitions, doors, millwork and finishes. associated power/lighting distribution, associated mechanical system distribution, associated life safety system changes and plumbing. structural scope of work encompassesDetails
2/f -demolition existing ceiling height partition, construction of new full height partitions, doors, millwork and finishes. associated power/lighting distribution, associated mechanical system distribution, associated life safety system changes and plumbing. structural scope of work encompasses | $375,000 |
| Mar 20, 2024 | Expired or cancelled expired Aug 2026 | 121 07th St | E & C Builders Inc | revision to pa 202312041851 - minor project structural modifications to new guest rooms; floors 2-4 to lobby and to public restrooms;Details
revision to pa 202312041851 - minor project structural modifications to new guest rooms; floors 2-4 to lobby and to public restrooms; | |
| Dec 13, 2023 | In progress issued May 2024 | 350 Brannan St | decommission and demolition of (e) freight elevator. infill pit with new grade floor slab. establish and document wholesale sales use on the ground floor pursuant to the sf planning code.Details
decommission and demolition of (e) freight elevator. infill pit with new grade floor slab. establish and document wholesale sales use on the ground floor pursuant to the sf planning code. | $10,000 | |
| May 24, 2023 | Completed final sign-off May 2024 | 741 South Van Ness Av | Oliver & Company Inc. | accessibility upgrades to an existing non-sprinklered unconditioned 2-story & mezzanine wood frame assembly building. accessibility changes at entry & platform lift and bathroom.Details
accessibility upgrades to an existing non-sprinklered unconditioned 2-story & mezzanine wood frame assembly building. accessibility changes at entry & platform lift and bathroom. | $312,000 |
| Mar 24, 2023 | Completed final sign-off Feb 2025 | 550 03rd St | Walls Construction And Contracting Inc | replace (e) stair at lobby, new interior partitions & new floor infill @ 2nd fl, at (e) double height spacesDetails
replace (e) stair at lobby, new interior partitions & new floor infill @ 2nd fl, at (e) double height spaces | $133,000 |
| Nov 7, 2022 | Completed final sign-off Mar 2025 | 3055 16th St | Plant Construction Co, Lp | mayor ed 13-01. 100% affordable. grd lvl and bsmt only interior improvement. sow: repurpose g/fl of former retail location to a reception, offices, exercise rm, residents non-cooking/warming only kitchen, enterepreneurial space, offices, bsmt remains storage & mechanical equip. space. new windows...Details
mayor ed 13-01. 100% affordable. grd lvl and bsmt only interior improvement. sow: repurpose g/fl of former retail location to a reception, offices, exercise rm, residents non-cooking/warming only kitchen, enterepreneurial space, offices, bsmt remains storage & mechanical equip. space. new windows... | $700,000 |
| Mar 23, 2022 | Never finaled filed Mar 2022, never issued | 3019 23rd St | interior,exterior and soft story structural upgrade. rehab 6unit,3 story apt bldg.reconstrct (e)wood stairs,(e)wood siding&(e)window in-kind.(n)roof covering.repair or replacement all(e)fixtures, finishes and casework@all(e)kitchen&bathroom. replace space conditioning system.Details
interior,exterior and soft story structural upgrade. rehab 6unit,3 story apt bldg.reconstrct (e)wood stairs,(e)wood siding&(e)window in-kind.(n)roof covering.repair or replacement all(e)fixtures, finishes and casework@all(e)kitchen&bathroom. replace space conditioning system. | $746,583 | |
| Jan 21, 2022 | Completed final sign-off Mar 2022 | 2800 Bryant St | Plant Construction Co, Lp | revision of structural assemblies to suit field conditions & revise approved/issued bpa#202014161152Details
revision of structural assemblies to suit field conditions & revise approved/issued bpa#202014161152 |