Michelle Sullivan
- Listed as
- architect, engineer
- Firm
- Ssdp
- Based in
- San Francisco
- On San Francisco permits
- Oct 2008 to Sep 2026
158 permits since 2000 (architect on 158 permits, engineer on 2 permits): 135 completed, 7 in progress, 8 never finaled, 8 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 158.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 9, 2026 | In progress issued Sep 2026 | 1035 Van Ness Av | D & H Construction | revision to bpa: 202510157392 - as requested by the project mechanical plan checker, this permit revsion documents the (e) ptac, or baseboard heater and bathroom exhaust fans that are remain in the project and removes the words ("design-build")Details
revision to bpa: 202510157392 - as requested by the project mechanical plan checker, this permit revsion documents the (e) ptac, or baseboard heater and bathroom exhaust fans that are remain in the project and removes the words ("design-build") | |
| Aug 11, 2026 | In progress issued Sep 2026 | 1033 Van Ness Av | D & H Construction | the 1015 and 1033 ven ness ave project consists of providing tenant improvements to the existing gr fl vacant commercial space for existing building tenants. the proposed architectural scope is all interior and does not include any additions to the existing building footprint or envelope.Details
the 1015 and 1033 ven ness ave project consists of providing tenant improvements to the existing gr fl vacant commercial space for existing building tenants. the proposed architectural scope is all interior and does not include any additions to the existing building footprint or envelope. | $161,648 |
| Jul 17, 2026 | In progress issued Jul 2026 | 1035 Van Ness Av | D & H Construction | revision to pa# 202510157392: lv 1 - removal of storefront @ new mailroom, mailbox layout revision adding door from mailroom to 1015 vanness space + remove partition wall and door, add door from 1033 van ness space to storage room. lv 5 - add interior partition w/ rated door and interior window...Details
revision to pa# 202510157392: lv 1 - removal of storefront @ new mailroom, mailbox layout revision adding door from mailroom to 1015 vanness space + remove partition wall and door, add door from 1033 van ness space to storage room. lv 5 - add interior partition w/ rated door and interior window... | $60,000 |
| Jul 17, 2025 | Completed final sign-off Nov 2025 | 657 Clay St | Amone Corp | second and third floor plan common bathroom ( room 205 & 303) revision to reflect existing conditions correctly as requestd by field inspector. revision to bpa#2024-0419-0348Details
second and third floor plan common bathroom ( room 205 & 303) revision to reflect existing conditions correctly as requestd by field inspector. revision to bpa#2024-0419-0348 | |
| Jun 5, 2025 | In progress issued Jan 2026 | 629 Post St | D & H Construction | ed 13-01:bsmt,1/f upgrades to offices/common area;elevator to bsmt.alt (e) entrances for ada; voluntary seismic upgrades, soft story retro.alt 1/f residences:20 of 63 units upgrade w/ (n) cooking area. limited ceiling r/r in-kind for floor ties passthrough for seismic upgrade.Details
ed 13-01:bsmt,1/f upgrades to offices/common area;elevator to bsmt.alt (e) entrances for ada; voluntary seismic upgrades, soft story retro.alt 1/f residences:20 of 63 units upgrade w/ (n) cooking area. limited ceiling r/r in-kind for floor ties passthrough for seismic upgrade. | $12,000,000 |
| Jun 4, 2025 | Completed final sign-off Nov 2025 | 585 Geary St | Amone Corp | revision to pa 202406114202 basement interior work includes replacing flooring, plumbing fixtures and doors. additional work includes 2 (n) door openings, 1 (n) partition wall, 1 (n) cabinet, countertop & sink. mechanical work includes mini split heat pump unit, energy recover ventilatorDetails
revision to pa 202406114202 basement interior work includes replacing flooring, plumbing fixtures and doors. additional work includes 2 (n) door openings, 1 (n) partition wall, 1 (n) cabinet, countertop & sink. mechanical work includes mini split heat pump unit, energy recover ventilator | $196,400 |
| Apr 30, 2025 | Completed final sign-off Mar 2026 | 1178 Folsom St | L C Builders Inc. | unit #406,506 & 601 conversion of 3 residential units (studio b type) to mobility units (b-m type) enlarge bathroom to provide circular turning space per cbc 11b-304.3.1 inside the bathroom. relocate (e) toilet & tub, (n) accessible lavatory. relocate (e) accessible pocket door. (n) kitchen counterDetails
unit #406,506 & 601 conversion of 3 residential units (studio b type) to mobility units (b-m type) enlarge bathroom to provide circular turning space per cbc 11b-304.3.1 inside the bathroom. relocate (e) toilet & tub, (n) accessible lavatory. relocate (e) accessible pocket door. (n) kitchen counter | $200,000 |
| Apr 30, 2025 | In progress issued Oct 2025 | 835 Turk St | D & H Construction | ab-004:renovate 114 sro units,1 mgr 1 br with units reduced to 108 (including #101 prev converted to common space) to provide req mobility units & trash rooms.bsmnt: structural brace frames,rev egress stair & exit door at elm st; remove clay tile walls at bsmt,g/f.mep scope at boiler rm.Details
ab-004:renovate 114 sro units,1 mgr 1 br with units reduced to 108 (including #101 prev converted to common space) to provide req mobility units & trash rooms.bsmnt: structural brace frames,rev egress stair & exit door at elm st; remove clay tile walls at bsmt,g/f.mep scope at boiler rm. | $16,000,000 |
| Apr 30, 2025 | Completed final sign-off May 2026 | 1174 Folsom St | L C Builders Inc. | g/f ste #a t.i. included 1 unisex bathroom w/ toilet & lavatory. lunch area counter w/ upper cabinets, sink, refrigerator, file storage room, prefabricated movable meeting pod w/ integrated ventilation, moveable , mep improvementsDetails
g/f ste #a t.i. included 1 unisex bathroom w/ toilet & lavatory. lunch area counter w/ upper cabinets, sink, refrigerator, file storage room, prefabricated movable meeting pod w/ integrated ventilation, moveable , mep improvements | $500,000 |
| Mar 31, 2025 | Completed final sign-off Nov 2025 | 657 Clay St | Amone Corp | interior unit entry door and door frame replace in kind per ca historical bldg code. the replaced door and frame will maintain the (e) door dimensions. the door and frame will be upgraded to be 20 minute fire rated, and new single motion lever and lock door hardware will be installed.Details
interior unit entry door and door frame replace in kind per ca historical bldg code. the replaced door and frame will maintain the (e) door dimensions. the door and frame will be upgraded to be 20 minute fire rated, and new single motion lever and lock door hardware will be installed. | $75,000 |
| Aug 16, 2024 | Completed final sign-off Mar 2025 | 3055 16th St | Plant Construction Co, Lp | revision to pa# 2022-1107-6021 100% affordable housing additional structural support required at the storefront. revised storefront, repair & finishes to match existing.Details
revision to pa# 2022-1107-6021 100% affordable housing additional structural support required at the storefront. revised storefront, repair & finishes to match existing. | $30,000 |
| Jun 25, 2024 | Completed final sign-off Nov 2025 | 585 Geary St | Amone Corp | 100% affordable housing:interior work:renovations to mep, fixtures,& arch finishes.interior work is modernization to the units & shared common areas.interior scope to the units includes(n)cabinetry,countertops,appliances & replacing plumb fixtures.Details
100% affordable housing:interior work:renovations to mep, fixtures,& arch finishes.interior work is modernization to the units & shared common areas.interior scope to the units includes(n)cabinetry,countertops,appliances & replacing plumb fixtures. | $2,500,000 |
| May 14, 2024 | Completed final sign-off Aug 2025 | 585 Geary St | Amone Corp | repair and normal maintenance for in kind replacement in all units. includes window painting at front facade in and kind window replacement at rear,east,and west elevation.not visiable from street. scope includes new flooring,interior painting, and interior volutary signage.Details
repair and normal maintenance for in kind replacement in all units. includes window painting at front facade in and kind window replacement at rear,east,and west elevation.not visiable from street. scope includes new flooring,interior painting, and interior volutary signage. | $355,000 |
| May 3, 2024 | Completed final sign-off Jul 2025 | 1100 Palou Av | Mulhall Construction Inc. | existing cmu trash enclosure to receive metal roof with steel column supports and metal infill panels.Details
existing cmu trash enclosure to receive metal roof with steel column supports and metal infill panels. | $10,000 |
| May 3, 2024 | Completed final sign-off Jul 2025 | 1033 Oakdale Av | Mulhall Construction Inc. | existing cmu trash enclosure to receive metal roof with steel column supports and metal infill panels.Details
existing cmu trash enclosure to receive metal roof with steel column supports and metal infill panels. | $10,000 |
| May 3, 2024 | Completed final sign-off Jul 2025 | 1152 Palou Av | Mulhall Construction Inc. | existing cmu trash enclosure to receive metal roof with steel column supports and metal infill panels.Details
existing cmu trash enclosure to receive metal roof with steel column supports and metal infill panels. | $10,000 |
| May 3, 2024 | Completed final sign-off Jul 2025 | 1077 Oakdale Av | Mulhall Construction Inc. | existing cmu trash enclosure to receive metal roof with steel column supports and metal infill panels.Details
existing cmu trash enclosure to receive metal roof with steel column supports and metal infill panels. | $10,000 |
| May 3, 2024 | Completed final sign-off Jul 2025 | 778 Kirkwood Av | Mulhall Construction Inc. | (e) cmu trash enclosure to receive metal roof with metal column supports and metal infill panels.Details
(e) cmu trash enclosure to receive metal roof with metal column supports and metal infill panels. | $10,000 |
| May 3, 2024 | Completed final sign-off Jul 2025 | 1096 Palou Av | Mulhall Construction Inc. | existing cmu trash enclosure to receive metal roof with steel column supports and metal infill panels.Details
existing cmu trash enclosure to receive metal roof with steel column supports and metal infill panels. | $10,000 |
| May 3, 2024 | In progress issued Oct 2024 | 754 Kirkwood Av | Mulhall Construction Inc. | (e) cmu trash enclosure to receive metal roof with metal column supports and metal infill panels.Details
(e) cmu trash enclosure to receive metal roof with metal column supports and metal infill panels. | $10,000 |
| Apr 19, 2024 | Completed final sign-off Nov 2025 | 657 Clay St | Amone Corp | scope:repair & normal maintenance for in kind replacement of appliances & finishes, providing a utility sink, insulating extg hot water laterals, mech. repairs & hallway ventilation, in kind lighting fixutres & receptacles, new flooring, interior painting, in kind window replacement,Details
scope:repair & normal maintenance for in kind replacement of appliances & finishes, providing a utility sink, insulating extg hot water laterals, mech. repairs & hallway ventilation, in kind lighting fixutres & receptacles, new flooring, interior painting, in kind window replacement, | $2,500,000 |
| Apr 4, 2024 | Completed final sign-off Jul 2025 | 740 Jerrold Av | the project consists of new construction of a boardwalk ramp and sloped walkways connecting 2 viewing platforms. the boardwalk ramp, sloped walkways and viewing platforms consist of plastic composite slip-resistant decking supported above the (e) grade. wooden railings with handrails and wire mesh..Details
the project consists of new construction of a boardwalk ramp and sloped walkways connecting 2 viewing platforms. the boardwalk ramp, sloped walkways and viewing platforms consist of plastic composite slip-resistant decking supported above the (e) grade. wooden railings with handrails and wire mesh.. | $970,000 | |
| May 31, 2023 | Completed final sign-off Dec 2023 | 777 Broadway | Bbi - Con Inc | revision to 202010015613. exterior: structural repairs/framing, new replacement in kind windows as nail fin, plaster in kind replacement associated waterproofing. voluntary removal of solar thermal system fromDetails
revision to 202010015613. exterior: structural repairs/framing, new replacement in kind windows as nail fin, plaster in kind replacement associated waterproofing. voluntary removal of solar thermal system from | $1,000,000 |
| May 23, 2023 | Completed final sign-off Aug 2024 | 1527 Grant Av | Bbi - Con Inc | revision to bpa#202010217056, common shared kitchen revisions on 2/f & 3/f, change appliances, shelving, sink type from original permit. no residential guestrooms will be removed.Details
revision to bpa#202010217056, common shared kitchen revisions on 2/f & 3/f, change appliances, shelving, sink type from original permit. no residential guestrooms will be removed. | $30,000 |
| Nov 29, 2022 | In progress issued Jun 2024 | 1501 Sunnydale Av | Guzman Construction Group Inc. | priority processing. mayor's dir #17-02. erect a 5-story,89 dwelling units,with parking,assembly and offices. type va.Details
priority processing. mayor's dir #17-02. erect a 5-story,89 dwelling units,with parking,assembly and offices. type va. | $45,000,000 |
| Nov 9, 2022 | Completed final sign-off Jul 2025 | 5630 Mission St | Plant Construction Co, Lp | 100% affordable housing. bldg c - interior sow: (n) offices, meeting rooms, storage, ada bathroom, lobby, community room w/ warming kitchen. exterior sow: repurposed areas for (n) offices, community room, and open space. deferred submittals: sprinkler and alarm systems.Details
100% affordable housing. bldg c - interior sow: (n) offices, meeting rooms, storage, ada bathroom, lobby, community room w/ warming kitchen. exterior sow: repurposed areas for (n) offices, community room, and open space. deferred submittals: sprinkler and alarm systems. | $1,509,900 |
| Nov 9, 2022 | Completed final sign-off Jul 2025 | 5630 Mission St | Plant Construction Co, Lp | 100% affordable housing. bldg a & b (shared foundation) - interior sow: gound level (n) resident services office, ada bathrooms, storage and accessory use for on-site staff/residents. exterior sow: (n) trash rooms. deferred submittals: sprinkler and alarm systems.Details
100% affordable housing. bldg a & b (shared foundation) - interior sow: gound level (n) resident services office, ada bathrooms, storage and accessory use for on-site staff/residents. exterior sow: (n) trash rooms. deferred submittals: sprinkler and alarm systems. | $2,541,816 |
| Nov 7, 2022 | Completed final sign-off Mar 2025 | 3055 16th St | Plant Construction Co, Lp | mayor ed 13-01. 100% affordable. grd lvl and bsmt only interior improvement. sow: repurpose g/fl of former retail location to a reception, offices, exercise rm, residents non-cooking/warming only kitchen, enterepreneurial space, offices, bsmt remains storage & mechanical equip. space. new windows...Details
mayor ed 13-01. 100% affordable. grd lvl and bsmt only interior improvement. sow: repurpose g/fl of former retail location to a reception, offices, exercise rm, residents non-cooking/warming only kitchen, enterepreneurial space, offices, bsmt remains storage & mechanical equip. space. new windows... | $700,000 |
| Sep 20, 2022 | Expired or cancelled withdrawn Dec 2022 | 1060 Howard St | 3/fl ti interior modernization only repurposing a portion of the (e) open office on the third floor into a new flex office, expanding the warming kitchenette to a new full size ktichen. adding a new accesible shower and repurposing an (e) office into a meditation room by applying new finishes.Details
3/fl ti interior modernization only repurposing a portion of the (e) open office on the third floor into a new flex office, expanding the warming kitchenette to a new full size ktichen. adding a new accesible shower and repurposing an (e) office into a meditation room by applying new finishes. | $490,000 | |
| Feb 2, 2022 | Completed final sign-off Jun 2023 | 2445 Mariposa St | Plant Construction Co, Lp | voluntary structural retrofit within existing garages, waterproofing repair at deck areas above garages. no changes to occupancy or use.Details
voluntary structural retrofit within existing garages, waterproofing repair at deck areas above garages. no changes to occupancy or use. | $5,500,000 |
| Nov 5, 2021 | Completed final sign-off Oct 2022 | 1201 Powell St | Amone Corp | res'l units not in scope. provide a new accessible all gender restrm to comm'l retail space on gr fl; new all gender restrm includes (n) door, frameand hardware, (n) paint, flooring, toilet, lavatory, bath accessories, efficient lighting, gfci rated outlets. (n) storage shelving. no addition and noDetails
res'l units not in scope. provide a new accessible all gender restrm to comm'l retail space on gr fl; new all gender restrm includes (n) door, frameand hardware, (n) paint, flooring, toilet, lavatory, bath accessories, efficient lighting, gfci rated outlets. (n) storage shelving. no addition and no | $20,000 |
| Jun 3, 2021 | Completed final sign-off Oct 2021 | 3138 Kamille Ct | Nibbi Bros Assoc Inc. | mayoral ed13-01.interior-repair/replacement include new paint, flooring, plumbing fixtures, smoke & carbon monoxide detectors, light fixtures, door hardware, & hvac equipment. exterior-changing (e) door to a window, exterior light fixtures & signage. no addition/additional condition space proposedDetails
mayoral ed13-01.interior-repair/replacement include new paint, flooring, plumbing fixtures, smoke & carbon monoxide detectors, light fixtures, door hardware, & hvac equipment. exterior-changing (e) door to a window, exterior light fixtures & signage. no addition/additional condition space proposed | $375,000 |
| Nov 3, 2020 | Completed final sign-off Oct 2022 | 900 Jackson St | Amone Corp | rehab 9 of 17 units. #1,2,4,5,9,10,12,14,&15. replace doors, hardware, flooring, toilets, lavatories, appliances, cabinets, countertops, tub surrounds, elect. outlets in kitchens & baths, new elect. heaters, new elect. water heaters, repair plumbing, new windows in select locations, paint, roofing.Details
rehab 9 of 17 units. #1,2,4,5,9,10,12,14,&15. replace doors, hardware, flooring, toilets, lavatories, appliances, cabinets, countertops, tub surrounds, elect. outlets in kitchens & baths, new elect. heaters, new elect. water heaters, repair plumbing, new windows in select locations, paint, roofing. | $1,500,000 |
| Oct 28, 2020 | Completed final sign-off Mar 2023 | 1204 Mason St | Bbi - Con Inc | 100% affor. rehab of 24 units. interior: (n) paint, floors, fixtures, cabinetry, door hardware, lighting, countertops. mep (n) ducting for range exahust. exterior work is patch and repair. sprinklers, alarms & solar thermal panels & water storage tanks, under separate permit. no change to occ./use.Details
100% affor. rehab of 24 units. interior: (n) paint, floors, fixtures, cabinetry, door hardware, lighting, countertops. mep (n) ducting for range exahust. exterior work is patch and repair. sprinklers, alarms & solar thermal panels & water storage tanks, under separate permit. no change to occ./use. | $7,600,000 |
| Oct 21, 2020 | Completed final sign-off Aug 2024 | 1527 Grant Av | Bbi - Con Inc | 100% affordable 34 sro units full non.structural rehabscope includes: new paint, flooring, fixtures, lighting, hardware in common area and units. mep duct work.(n)retrofit windows on flrs 2&3. wood on grant side & clad on cadel place. exterior paint no work performed in the public right of way.Details
100% affordable 34 sro units full non.structural rehabscope includes: new paint, flooring, fixtures, lighting, hardware in common area and units. mep duct work.(n)retrofit windows on flrs 2&3. wood on grant side & clad on cadel place. exterior paint no work performed in the public right of way. | $5,800,000 |
| Oct 1, 2020 | Completed final sign-off Dec 2023 | 777 Broadway | Bbi - Con Inc | rehab/repair of 31 units work to include: (n) mep-lighting, electrical and plumbing. (n) fixtures, cabinets, shelves, & countertops. (n) retrofit windows, sprinklers, alarms & solar thermal panels & water tanks, under separate permit. no change to occupancy or use.Details
rehab/repair of 31 units work to include: (n) mep-lighting, electrical and plumbing. (n) fixtures, cabinets, shelves, & countertops. (n) retrofit windows, sprinklers, alarms & solar thermal panels & water tanks, under separate permit. no change to occupancy or use. | $6,100,000 |
| Aug 12, 2019 | Completed final sign-off Dec 2019 | 2445 Mariposa St | Guzman Construction Group Inc. | revision to pa 201901281364: administrative permit to include unit #'s (e) exterior walls at 109, 209, 309 in work scope to repair damages from dry=rot. the damaged framing and finish materials will be replace in kind; cost of construction included in original pa 201901281364.Details
revision to pa 201901281364: administrative permit to include unit #'s (e) exterior walls at 109, 209, 309 in work scope to repair damages from dry=rot. the damaged framing and finish materials will be replace in kind; cost of construction included in original pa 201901281364. | |
| Jul 2, 2019 | Completed final sign-off Jul 2019 | 152 Kiska Rd | Nibbi Bros Assoc Inc. | administrative permit for tech infeasibility request for 152 kiska rd in building 722 westbrook pats ref 201511031586. includes "equivalent facilitation" within the plan sets for off-site accomodations.Details
administrative permit for tech infeasibility request for 152 kiska rd in building 722 westbrook pats ref 201511031586. includes "equivalent facilitation" within the plan sets for off-site accomodations. | |
| Jul 2, 2019 | Completed final sign-off Jul 2019 | 75 Northridge Rd | Nibbi Bros Assoc Inc. | administrative permit for tech infeasibility request for 75 and 81 northridge in building 725 at westbrook apts ref 201511031596 includes "equivalent facilitation" within the plan sets for off-site accomodations.Details
administrative permit for tech infeasibility request for 75 and 81 northridge in building 725 at westbrook apts ref 201511031596 includes "equivalent facilitation" within the plan sets for off-site accomodations. | |
| Jul 2, 2019 | Completed final sign-off Jul 2019 | 132 Kiska Rd | Nibbi Bros Assoc Inc. | administrative permit for tech infeasibility request for 132 and 138 kiska rd in building 727 at westbrook apts. ref 201511031581. includes "equivalent facilitation" within the plan sets for off-site accomodations.Details
administrative permit for tech infeasibility request for 132 and 138 kiska rd in building 727 at westbrook apts. ref 201511031581. includes "equivalent facilitation" within the plan sets for off-site accomodations. | |
| Jul 2, 2019 | Completed final sign-off Jul 2019 | 1 Harbor Rd | Nibbi Bros Assoc Inc. | revision to pa #201511031554. administrative permit to correct process in which application was approved. this permit application shall acknowledge the work to be performed at unit(s) #1 & 3 to be based on "barrier removal" process.Details
revision to pa #201511031554. administrative permit to correct process in which application was approved. this permit application shall acknowledge the work to be performed at unit(s) #1 & 3 to be based on "barrier removal" process. | |
| Jul 2, 2019 | Completed final sign-off Jul 2019 | 43 Northridge Rd | Nibbi Bros Assoc Inc. | administrative permit for tech infeasibility request for 43 and 53 northridge rd building 719 westbrook apts. ref 201511031593 includes "equivalent facilitation" within the plan sets for off-site accomodations.Details
administrative permit for tech infeasibility request for 43 and 53 northridge rd building 719 westbrook apts. ref 201511031593 includes "equivalent facilitation" within the plan sets for off-site accomodations. | |
| Jul 2, 2019 | Completed final sign-off Jul 2019 | 73 Northridge Rd | Nibbi Bros Assoc Inc. | revision to app#201511031595. administrative permit to correct process in which application was approved. this permit application shall acknowledge the work to be performed at unit #73 to be based on "barrier removal" process.Details
revision to app#201511031595. administrative permit to correct process in which application was approved. this permit application shall acknowledge the work to be performed at unit #73 to be based on "barrier removal" process. | |
| Jul 2, 2019 | Completed final sign-off Jul 2019 | 120 Northridge Rd | Nibbi Bros Assoc Inc. | admin permit for techical infeasibility request for 120 northridge rd in building 735 westbrook apts ref 201511031583. includes "equivalent facilitation" within the plan sets for off-site accomodations.Details
admin permit for techical infeasibility request for 120 northridge rd in building 735 westbrook apts ref 201511031583. includes "equivalent facilitation" within the plan sets for off-site accomodations. | |
| Feb 7, 2019 | Completed final sign-off Mar 2019 | 90 Kiska Rd | Nibbi Bros Assoc Inc. | revision to pa's 201511031602 and 201805240109. at community area, a storage area is converting to baby-changing accomodation (all interior work) w/ baby-changing tables being removed from mens and women's room. new baby changing area is not gender specificDetails
revision to pa's 201511031602 and 201805240109. at community area, a storage area is converting to baby-changing accomodation (all interior work) w/ baby-changing tables being removed from mens and women's room. new baby changing area is not gender specific | $200 |
| Jan 28, 2019 | Completed final sign-off Dec 2019 | 2445 Mariposa St | Guzman Construction Group Inc. | repair dry rot damages in kind (e)exterior walls around fire escape balcat units 102,202,302,104,204,304,106,206&306 original finish and framing with new weather resistant barrier and flashing and guardrail anchors to wall with improved details. work not visible from street.Details
repair dry rot damages in kind (e)exterior walls around fire escape balcat units 102,202,302,104,204,304,106,206&306 original finish and framing with new weather resistant barrier and flashing and guardrail anchors to wall with improved details. work not visible from street. | $30,000 |
| Jan 11, 2019 | Completed final sign-off Mar 2019 | 120 Northridge Rd | Nibbi Bros Assoc Inc. | rad program. revision to pa 2015-1103-1583 widen back door opening and add elevated concrete patio at the backyard of the unit as super-visitable (sv) on site located at 120 northridge bldg 735Details
rad program. revision to pa 2015-1103-1583 widen back door opening and add elevated concrete patio at the backyard of the unit as super-visitable (sv) on site located at 120 northridge bldg 735 | $17,000 |
| Jan 11, 2019 | Completed final sign-off Mar 2019 | 1 Northridge Rd | Nibbi Bros Assoc Inc. | rad program revision to pa 2015-1103-1590 - add backyard an elevated concrete patio & widen back door req by modDetails
rad program revision to pa 2015-1103-1590 - add backyard an elevated concrete patio & widen back door req by mod | $34,000 |
| Jan 11, 2019 | Completed final sign-off Mar 2019 | 42 Northridge Rd | Nibbi Bros Assoc Inc. | rad program. revision to pa 2015-1103-1574 widening the back door opening and adding an elevated dect at the backyard of each of the two mobility units at 42 northridge and 56 northridge bldg 709Details
rad program. revision to pa 2015-1103-1574 widening the back door opening and adding an elevated dect at the backyard of each of the two mobility units at 42 northridge and 56 northridge bldg 709 | $34,000 |
| Jan 11, 2019 | Completed final sign-off Mar 2019 | 152 Kiska Rd | Nibbi Bros Assoc Inc. | rad program revision to pa 2015-1103-1586 elevated concrete patio & widen back door req by modDetails
rad program revision to pa 2015-1103-1586 elevated concrete patio & widen back door req by mod | $17,000 |
| Dec 3, 2018 | Completed final sign-off Jul 2021 | 3001 Folsom St | Nibbi Bros Assoc Inc. | bldg# 5:3001,3007,3021,3023,3025,3031,3035,3037,3045,3049 folsom st.3195-26th st. 3198 kamille ct.100% afford husing bernal dwelg rad,priority process,scope for intr altern,kitch,bath,cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.winw repl.maher comply.Details
bldg# 5:3001,3007,3021,3023,3025,3031,3035,3037,3045,3049 folsom st.3195-26th st. 3198 kamille ct.100% afford husing bernal dwelg rad,priority process,scope for intr altern,kitch,bath,cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.winw repl.maher comply. | $1,864,510 |
| Dec 3, 2018 | Completed final sign-off Jul 2021 | 3161 Kamille Ct | Nibbi Bros Assoc Inc. | bldg 2:3161,3165,3169,3171,3175,3177,3183,3185,3189 kamille ct. 100% afford husing bernal dwelg rad,priority process,scope for intr altern, kitch,bath,cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardward,hvac equip.winw repl.maher comply.Details
bldg 2:3161,3165,3169,3171,3175,3177,3183,3185,3189 kamille ct. 100% afford husing bernal dwelg rad,priority process,scope for intr altern, kitch,bath,cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardward,hvac equip.winw repl.maher comply. | $1,864,510 |
| Dec 3, 2018 | Completed final sign-off Jul 2021 | 3111 Kamille Ct | Nibbi Bros Assoc Inc. | bldg 15 - 3111,3115,3117,3121,3125,3127,3131,3137,3141 kamille court.100% afford husing bernal dwelg rad,priority process,scope for intr altern, kitch,bath,cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.winw repl.maher comply.Details
bldg 15 - 3111,3115,3117,3121,3125,3127,3131,3137,3141 kamille court.100% afford husing bernal dwelg rad,priority process,scope for intr altern, kitch,bath,cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.winw repl.maher comply. | $1,864,510 |
| Dec 3, 2018 | Completed final sign-off Jul 2021 | 3168 Kamille Ct | Nibbi Bros Assoc Inc. | bldg# 8. 3168,3176,3178,3180,3186,3188 kamile ct.100% afford husing bernal dwelg rad,priority process,scope for intr altern, kitch,bath,counter top,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.window replacement. maher comply.Details
bldg# 8. 3168,3176,3178,3180,3186,3188 kamile ct.100% afford husing bernal dwelg rad,priority process,scope for intr altern, kitch,bath,counter top,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.window replacement. maher comply. | $1,864,510 |
| Dec 3, 2018 | Never finaled issued May 2019, no final | 3138 Kamille Ct | Nibbi Bros Assoc Inc. | bldg# 13. 3138,3140 kamille court.100% afford husing bernal welg, rad,priority process,scope for intr altern, kitch, bath,cabinet, countertops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.window replacement. maher comply.Details
bldg# 13. 3138,3140 kamille court.100% afford husing bernal welg, rad,priority process,scope for intr altern, kitch, bath,cabinet, countertops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.window replacement. maher comply. | $100,000 |
| Dec 3, 2018 | Completed final sign-off Jul 2021 | 3165 26th St | Nibbi Bros Assoc Inc. | bldg# 6:3165,3167,3169,3171,3173,3175,3181,3183,3185-26 st. 100% afford husing bernal dwelg rad,priority process,scope for intr altern,kitch bath, cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.winw repl.maher comply.Details
bldg# 6:3165,3167,3169,3171,3173,3175,3181,3183,3185-26 st. 100% afford husing bernal dwelg rad,priority process,scope for intr altern,kitch bath, cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.winw repl.maher comply. | $1,864,510 |
| Dec 3, 2018 | Completed final sign-off Jul 2021 | 3118 Cesar Chavez St | Nibbi Bros Assoc Inc. | bldg 17 - 3118,3120,3122,3126,3128,3130,3132,3136,3138 cesar chavez st. 100% afford husing bernal dwelg rad,priority process,scope for intr altern, kitch,bath,cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.winw repl.maher comply.Details
bldg 17 - 3118,3120,3122,3126,3128,3130,3132,3136,3138 cesar chavez st. 100% afford husing bernal dwelg rad,priority process,scope for intr altern, kitch,bath,cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.winw repl.maher comply. | $1,864,510 |
| Dec 3, 2018 | Completed final sign-off Sep 2021 | 3115 26th St | Nibbi Bros Assoc Inc. | bldg#10.3111,3115,3117,3121,3125,3127,3131,3133,3141-26 street.100% afford husing bernal dwelg rad,priority process,scope for intr altern,kitch, bath,cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardwarw,hvac equip.window replacement. maher comply.Details
bldg#10.3111,3115,3117,3121,3125,3127,3131,3133,3141-26 street.100% afford husing bernal dwelg rad,priority process,scope for intr altern,kitch, bath,cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardwarw,hvac equip.window replacement. maher comply. | $1,864,510 |
| Dec 3, 2018 | Completed final sign-off Sep 2021 | 3128 Kamille Ct | Nibbi Bros Assoc Inc. | bldg# 12. 3128 kamille court. 100% afford husing bernal dwelg rad,priority process,scope for intr altern, kitch, bath, cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardward,hvac equip. maher comply.Details
bldg# 12. 3128 kamille court. 100% afford husing bernal dwelg rad,priority process,scope for intr altern, kitch, bath, cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardward,hvac equip. maher comply. | $300,000 |
| Dec 3, 2018 | Completed final sign-off Jul 2021 | 1300 Treat Wy | Nibbi Bros Assoc Inc. | bldg# 7.1300,1328,1338,1340,1348,1368,1380,1386,1388,1398 treat wy.3155-26th st.3156 kamille ct.100% afford husing bernal dwelg rad,priority process,scope for intr altern, kitch, bath, cabtctrtops&rec,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.window replacet. maher comply.Details
bldg# 7.1300,1328,1338,1340,1348,1368,1380,1386,1388,1398 treat wy.3155-26th st.3156 kamille ct.100% afford husing bernal dwelg rad,priority process,scope for intr altern, kitch, bath, cabtctrtops&rec,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.window replacet. maher comply. | $1,864,510 |
| Dec 3, 2018 | Completed final sign-off Jul 2021 | 1400 Treat Wy | Nibbi Bros Assoc Inc. | bldg 3:1400,1418,1438,1440,1448,1452,1460,1468,1488,1490,1496,1498 treat 3150 cesar chavez st.3151 kamile ct,100% afford husing bernal dwelg rad,priority process,intr altern,kitch,bath, cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.winw repl.maher-yesDetails
bldg 3:1400,1418,1438,1440,1448,1452,1460,1468,1488,1490,1496,1498 treat 3150 cesar chavez st.3151 kamile ct,100% afford husing bernal dwelg rad,priority process,intr altern,kitch,bath, cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.winw repl.maher-yes | $1,864,510 |
| Dec 3, 2018 | Completed final sign-off Jul 2021 | 3050 Harrison St | Nibbi Bros Assoc Inc. | bldg 16 - 3050,3056,3060,3062,3068,3072,3076,3078,3082,3088,3090,3096,3098 harrison st.3100 cesar chavez.3101 kamille.100% afford husing bernal dwelg rad,priority process.intr altern,kitch,bath,cabtctrtops&rec,pnt&flrg,plmb fix,aplce,smk&carn monxde detr,lte fix,dr hardware,hvac eq.winw repl.maher-yDetails
bldg 16 - 3050,3056,3060,3062,3068,3072,3076,3078,3082,3088,3090,3096,3098 harrison st.3100 cesar chavez.3101 kamille.100% afford husing bernal dwelg rad,priority process.intr altern,kitch,bath,cabtctrtops&rec,pnt&flrg,plmb fix,aplce,smk&carn monxde detr,lte fix,dr hardware,hvac eq.winw repl.maher-y | $1,864,510 |
| Dec 3, 2018 | Completed final sign-off Jul 2021 | 1301 Treat Wy | Nibbi Bros Assoc Inc. | bldg# 9.1301,1327,1337,1341,1349,1369,1381,1385,1389,1399 treat.3148 kamille ct.3149-26th st.100% afford husing bernal dwelg rad,priority process,scope for intr altern, kitch, bath,cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.window replt.maher comply.Details
bldg# 9.1301,1327,1337,1341,1349,1369,1381,1385,1389,1399 treat.3148 kamille ct.3149-26th st.100% afford husing bernal dwelg rad,priority process,scope for intr altern, kitch, bath,cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.window replt.maher comply. | $1,864,510 |
| Dec 3, 2018 | Completed final sign-off Sep 2021 | 3000 Harrison St | Nibbi Bros Assoc Inc. | bldg 11 - 3000,3008,3012,3016,3018,3028,3038,3040,3046,3048 harrison st. 3100 kamille ct.3101-26th st.100% afford husing bernal dwelg rad,priority process,scope for intr altern,kitch,bath,cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.winw repl.maher-yDetails
bldg 11 - 3000,3008,3012,3016,3018,3028,3038,3040,3046,3048 harrison st. 3100 kamille ct.3101-26th st.100% afford husing bernal dwelg rad,priority process,scope for intr altern,kitch,bath,cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.winw repl.maher-y | $1,864,510 |
| Dec 3, 2018 | Completed final sign-off Jul 2021 | 3168 Cesar Chavez St | Nibbi Bros Assoc Inc. | bldg# 4:3168,3170,3172,3176,3178,3180,3182,3186,3188 cesar chavez st.100% afford husing bernal dwelg rad,priority process,scope for intr altern, kitch,bath,cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.winw repl. maher comply.Details
bldg# 4:3168,3170,3172,3176,3178,3180,3182,3186,3188 cesar chavez st.100% afford husing bernal dwelg rad,priority process,scope for intr altern, kitch,bath,cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.winw repl. maher comply. | $1,864,510 |
| Dec 3, 2018 | Completed final sign-off Sep 2021 | 1401 Treat Wy | Nibbi Bros Assoc Inc. | bldg 14 - 1401,1415,1439,1441,1449,1453,1461,1469,1489,1491,1495,1497 treat.3148 cesar chavez.3149 kamille.100% afford husing bernal dwelg rad,priority process,intr altern,kitch,bath,cabtctrtops&rec, pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.winw repl.maher-yesDetails
bldg 14 - 1401,1415,1439,1441,1449,1453,1461,1469,1489,1491,1495,1497 treat.3148 cesar chavez.3149 kamille.100% afford husing bernal dwelg rad,priority process,intr altern,kitch,bath,cabtctrtops&rec, pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.winw repl.maher-yes | $1,864,510 |
| Dec 3, 2018 | Completed final sign-off Jul 2021 | 3051 Folsom St | Nibbi Bros Assoc Inc. | bldg 1:3051,3055,3059,3065,3069,3075,3077,3079,3085,3095 folsom st,3197 kamille ct,3198 cesar chavez.100% afford husing bernal dwelg rad,priority process,scope:intr altern,kitch,bath,cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.winw repl. maher comply.Details
bldg 1:3051,3055,3059,3065,3069,3075,3077,3079,3085,3095 folsom st,3197 kamille ct,3198 cesar chavez.100% afford husing bernal dwelg rad,priority process,scope:intr altern,kitch,bath,cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.winw repl. maher comply. | $1,864,510 |
| Nov 5, 2018 | Completed final sign-off Jun 2019 | 90 Kiska Rd | Nibbi Bros Assoc Inc. | rev to pa# 201805240109 & 201511031602; the revised scope of work consist of the orginal scope of work in the original permit sets and additional structural support for fire sprinkler lines, mep units, foundation repair, and miscellaneous roof framing notesDetails
rev to pa# 201805240109 & 201511031602; the revised scope of work consist of the orginal scope of work in the original permit sets and additional structural support for fire sprinkler lines, mep units, foundation repair, and miscellaneous roof framing notes | $80,000 |
| Jun 21, 2018 | Completed final sign-off Apr 2019 | 401 Van Ness Av | D.F.P.F Corp Dba Fine Line Construction | office ti 2 e suites on the 3rd fl war memorial veterans building. total 7525 gross sq ft suite 313 2940 sq ft add sidelites, build 3 interior walls new paint new carpet in 2 offices. suite 310 4585 sq ft new fl finish, new offices, storage rooms, podcast room, storage closed meeting rm per plan,Details
office ti 2 e suites on the 3rd fl war memorial veterans building. total 7525 gross sq ft suite 313 2940 sq ft add sidelites, build 3 interior walls new paint new carpet in 2 offices. suite 310 4585 sq ft new fl finish, new offices, storage rooms, podcast room, storage closed meeting rm per plan, | $853,000 |
| May 24, 2018 | Never finaled issued Sep 2018, no final | 90 Kiska Rd | Nibbi Bros Assoc Inc. | rad priority, alta site, revision to pa #201511031602, project consists interior modernization of existing management office space & addition of new community serving spaces w/i existing footprint of former maintenance shop area, scope also includes new firesprinkler system through.Details
rad priority, alta site, revision to pa #201511031602, project consists interior modernization of existing management office space & addition of new community serving spaces w/i existing footprint of former maintenance shop area, scope also includes new firesprinkler system through. | $1,800,000 |
| Feb 2, 2018 | Never finaled filed Feb 2018, never issued | 1055 Pine St | Hathaway Dinwiddie Co. | rehabilitation of units. add bathrooms & kitchens, new elevator in (e) shaft, new heating, new painting, flooring, new non-residential spaces for residents & management offices, new lighting (replacement), replace water heater.Details
rehabilitation of units. add bathrooms & kitchens, new elevator in (e) shaft, new heating, new painting, flooring, new non-residential spaces for residents & management offices, new lighting (replacement), replace water heater. | $2,000,000 |
| Oct 27, 2017 | Expired or cancelled cancelled Nov 2018 | 230 Eddy St | Bbi - Con Inc | voluntary seismic strengthening of the lateral force resisting system. voluntary accessibility upgrade at building entrance.Details
voluntary seismic strengthening of the lateral force resisting system. voluntary accessibility upgrade at building entrance. | $200,000 |
| Sep 29, 2017 | Completed final sign-off Sep 2019 | 2569 Sutter St | Nibbi Bros Assoc Inc. | revision to #2015-11-05-1901. addition of laundry room to existing basement, serviced gy a new accessible ramp. entry will be a new door in an existing window. the dryer ductwork will fend to the exterior wall with new louvered vents in the existing exterior wall. maher n/aDetails
revision to #2015-11-05-1901. addition of laundry room to existing basement, serviced gy a new accessible ramp. entry will be a new door in an existing window. the dryer ductwork will fend to the exterior wall with new louvered vents in the existing exterior wall. maher n/a | |
| Jun 22, 2017 | Expired or cancelled cancelled Jan 2026 | 133 Northridge Rd | Nibbi Bros Assoc Inc. | revision to pa #201511031601 - new title 24 report for bldg & outdoor lighting.Details
revision to pa #201511031601 - new title 24 report for bldg & outdoor lighting. | |
| Jun 22, 2017 | Expired or cancelled cancelled Jan 2026 | 121 Northridge Rd | Nibbi Bros Assoc Inc. | revision to pa #201511031600 - new title 24 report for this bldg & outdoor lighting.Details
revision to pa #201511031600 - new title 24 report for this bldg & outdoor lighting. | |
| Jun 22, 2017 | Expired or cancelled cancelled Jan 2026 | 42 Harbor Rd | Nibbi Bros Assoc Inc. | revision to pa #201511031568 - new title 24 report for this bldg & outdoor lighting.Details
revision to pa #201511031568 - new title 24 report for this bldg & outdoor lighting. | |
| Jun 22, 2017 | Expired or cancelled cancelled Jan 2026 | 120 Northridge Rd | Nibbi Bros Assoc Inc. | revision to pa #201511031583,01511031554,01511031584 - new title 24 report for outdoor lighting.Details
revision to pa #201511031583,01511031554,01511031584 - new title 24 report for outdoor lighting. | |
| Jun 22, 2017 | Expired or cancelled cancelled Jan 2026 | 54 Harbor Rd | Nibbi Bros Assoc Inc. | revision to pa #201511031569 - new title 24 report for this bldg & outdoor lighting.Details
revision to pa #201511031569 - new title 24 report for this bldg & outdoor lighting. | |
| May 16, 2017 | Never finaled issued Aug 2017, no final | 1049 Golden Gate Av | Guzman Construction Group Inc. | revision to pa #201609268784 - to restrict access to 6 unit decks due to dryrot @ 1089c, 1069f, 1069e, 1049f golden gate ave & 1010c, 1010d buchanan st. not visible from street. all decks are facing the interior courtyard. see planning notes for conditions of approvalDetails
revision to pa #201609268784 - to restrict access to 6 unit decks due to dryrot @ 1089c, 1069f, 1069e, 1049f golden gate ave & 1010c, 1010d buchanan st. not visible from street. all decks are facing the interior courtyard. see planning notes for conditions of approval | $1,200 |
| Apr 21, 2017 | Never finaled issued May 2017, no final | 33 03rd St | Cahill Contractors Llc. | basement to 8/f- voluntary strengthening upgrade to correct short colulmn conditions at specific locations around the vehicle ramp, entrance and exit to garage. n/a ordinance #155-13Details
basement to 8/f- voluntary strengthening upgrade to correct short colulmn conditions at specific locations around the vehicle ramp, entrance and exit to garage. n/a ordinance #155-13 | $700,000 |
| Apr 11, 2017 | Expired or cancelled withdrawn Apr 2019 | 1400 Baker St | Nibbi Bros Assoc Inc. | b-3 - revision to pa #201511051902: lounge space is converted to maintenance room & addition of unisex toilet to maintenance room @ b-3 (rad) basement. add exterior door & exhaust louver for bathroom.Details
b-3 - revision to pa #201511051902: lounge space is converted to maintenance room & addition of unisex toilet to maintenance room @ b-3 (rad) basement. add exterior door & exhaust louver for bathroom. | $75,000 |
| Mar 31, 2017 | Completed final sign-off Aug 2017 | 401 Eucalyptus Dr | Bevilacqua & Sons | voluntary structural strengthening of 2 (e) classroom bldgs., ada upgrade per information sheet da-02 city of sf including (e) girls & boys bathrooms, interior remodel in 2 classroom buildings.Details
voluntary structural strengthening of 2 (e) classroom bldgs., ada upgrade per information sheet da-02 city of sf including (e) girls & boys bathrooms, interior remodel in 2 classroom buildings. | $450,000 |
| Sep 26, 2016 | Completed final sign-off Jun 2018 | 1049 Golden Gate Av | Guzman Construction Group Inc. | 11 units only to repair work: replace bathroom fixtures, flooring, replace kitchen cabinets and appliances, replace windows where needed, new paint interior, repair dry rot where seen at bay windows and adjacent walls, reframing at some bay dut to water damage.Details
11 units only to repair work: replace bathroom fixtures, flooring, replace kitchen cabinets and appliances, replace windows where needed, new paint interior, repair dry rot where seen at bay windows and adjacent walls, reframing at some bay dut to water damage. | $1,000,000 |
| Nov 5, 2015 | Completed final sign-off Jun 2019 | 2557 Sutter St | Nibbi Bros Assoc Inc. | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical, plumbing, cabinets, fixtures & finishes.add five addresses.Details
rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical, plumbing, cabinets, fixtures & finishes.add five addresses. | $4,000,000 |
| Nov 5, 2015 | Completed final sign-off Apr 2019 | 2569 Sutter St | Nibbi Bros Assoc Inc. | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, cabinets, fixtures & finishes.add five addresses.Details
rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, cabinets, fixtures & finishes.add five addresses. | $5,200,000 |
| Nov 5, 2015 | Completed final sign-off Apr 2019 | 1501 Broderick St | Nibbi Bros Assoc Inc. | rad priority. exterior rehab: roof, windows, paint, new stand alone trash enclosure. interior rehab: hvac, electrical plumbing, cabinets, fixtures & finishes. (no work on day care space). add five addresses.Details
rad priority. exterior rehab: roof, windows, paint, new stand alone trash enclosure. interior rehab: hvac, electrical plumbing, cabinets, fixtures & finishes. (no work on day care space). add five addresses. | $5,200,000 |
| Nov 5, 2015 | Completed final sign-off Apr 2019 | 2545 Sutter St | Nibbi Bros Assoc Inc. | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, cabinets, fixtures & finishes.add five addresses.Details
rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, cabinets, fixtures & finishes.add five addresses. | $4,000,000 |
| Nov 5, 2015 | Completed final sign-off Apr 2019 | 1400 Baker St | Nibbi Bros Assoc Inc. | rad priority. exterior rehab: roof, windows, paint. provide stand alone trash enclosure. interior rehab: hvac, electrical plumbing, cabinets, fixtures & finishes, provide new laundry room .add five addresses.Details
rad priority. exterior rehab: roof, windows, paint. provide stand alone trash enclosure. interior rehab: hvac, electrical plumbing, cabinets, fixtures & finishes, provide new laundry room .add five addresses. | $5,200,000 |
| Nov 5, 2015 | Completed final sign-off Jun 2019 | 2511 Sutter St | Nibbi Bros Assoc Inc. | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, cabinets, fixtures & finishes. add five addresses.Details
rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, cabinets, fixtures & finishes. add five addresses. | $5,200,000 |
| Nov 3, 2015 | Completed final sign-off Jul 2019 | 83 Northridge Rd | Intrepid Electronic Systems Inc, Nibbi Bros Assoc Inc. | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes.Details
rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,500,000 |
| Nov 3, 2015 | Completed final sign-off May 2019 | 54 Harbor Rd | Intrepid Electronic Systems Inc, Nibbi Bros Assoc Inc. | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes.Details
rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,500,000 |
| Nov 3, 2015 | Never finaled issued Jun 2016, no final | 90 Kiska Rd | Nibbi Bros Assoc Inc. | rad priority. tenant improvements: fixtures & finishes, new paint, flooring, cabinets, lighting.Details
rad priority. tenant improvements: fixtures & finishes, new paint, flooring, cabinets, lighting. | $150,000 |
| Nov 3, 2015 | Completed final sign-off Mar 2019 | 121 Northridge Rd | Intrepid Electronic Systems Inc, Nibbi Bros Assoc Inc. | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes.Details
rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,500,000 |
| Nov 3, 2015 | Completed final sign-off Jul 2019 | 43 Northridge Rd | Intrepid Electronic Systems Inc, Nibbi Bros Assoc Inc. | rad priority. exterior rehab: roof, windows, paint. one stand alone trash enclosure.interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes.Details
rad priority. exterior rehab: roof, windows, paint. one stand alone trash enclosure.interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,500,000 |
| Nov 3, 2015 | Completed final sign-off Jul 2019 | 152 Kiska Rd | Intrepid Electronic Systems Inc, Nibbi Bros Assoc Inc. | rad priority. exterior rehab: roof, windows, paint. 100 sq ft addition to one 5 bd unit and one stand alone trash enclosure. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes.Details
rad priority. exterior rehab: roof, windows, paint. 100 sq ft addition to one 5 bd unit and one stand alone trash enclosure. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,000,000 |
| Nov 3, 2015 | Completed final sign-off Apr 2019 | 112 Kiska Rd | Intrepid Electronic Systems Inc, Nibbi Bros Assoc Inc. | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes.Details
rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,000,000 |
| Nov 3, 2015 | Never finaled issued Jun 2016, no final | 101 Northridge Rd | Intrepid Electronic Systems Inc, Nibbi Bros Assoc Inc. | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes.Details
rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,500,000 |
| Nov 3, 2015 | Completed final sign-off Mar 2019 | 847 Innes Av | Intrepid Electronic Systems Inc, Nibbi Bros Assoc Inc. | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes.Details
rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $2,000,000 |
| Nov 3, 2015 | Completed final sign-off May 2019 | 133 Northridge Rd | Intrepid Electronic Systems Inc, Nibbi Bros Assoc Inc. | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes.Details
rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,500,000 |
| Nov 3, 2015 | Completed final sign-off Mar 2019 | 55 Northridge Rd | Intrepid Electronic Systems Inc, Nibbi Bros Assoc Inc. | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes.Details
rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, fire sprinklers, cabinets, fixtures & finishes. | $1,500,000 |