L C Builders Inc.
- Based in
- San Francisco
- On San Francisco permits
- Apr 2013 to May 2026
- Last 24 months
- 16 permits filed
67 permits since 2000: 53 completed, 8 in progress, 2 never finaled, 4 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 20, 2026 | In progress issued Jun 2026 | 558 24th Av | replace 4 windows in-kind at rear. convert 2 (e) windows into (n) sliding door at rear. replace door at rear. replace siding at rear & at lightwell. no work at g/f or front facade.Details
replace 4 windows in-kind at rear. convert 2 (e) windows into (n) sliding door at rear. replace door at rear. replace siding at rear & at lightwell. no work at g/f or front facade. | $10,000 |
| Apr 8, 2026 | Completed final sign-off Jun 2026 | 1772 Union St | revision to 202602105638: legalization of unpermitted window replacement-38 total, non visible from the street. to comply with physical inspection report #cc-8727Details
revision to 202602105638: legalization of unpermitted window replacement-38 total, non visible from the street. to comply with physical inspection report #cc-8727 | $5,000 |
| Mar 19, 2026 | In progress issued Jul 2026 | 2840 16th St | ti for proposed gallery located in vacant retail space 1st floor of (e) building w/ ground level entrance. 3 accessible restrooms are (e) & permitted under #201707051030-s. fire sprinkler & alarm to be design build under separate permit.Details
ti for proposed gallery located in vacant retail space 1st floor of (e) building w/ ground level entrance. 3 accessible restrooms are (e) & permitted under #201707051030-s. fire sprinkler & alarm to be design build under separate permit. | $970,200 |
| Feb 10, 2026 | Completed final sign-off Jun 2026 | 1772 Union St | to comply with physical inspection report #cc-8727Details
to comply with physical inspection report #cc-8727 | $150 |
| Feb 10, 2026 | Completed final sign-off Jun 2026 | 1772 Union St | legalization of unpermitted window replacement-18 total, non visible from the street. to comply with physical inspection report #cc-8727Details
legalization of unpermitted window replacement-18 total, non visible from the street. to comply with physical inspection report #cc-8727 | $5,000 |
| Feb 10, 2026 | Completed final sign-off Apr 2026 | 1772 Union St | legalization of unpermitted recessed light fixtures replacement throughout the commercial level on ground floor. to comply with physical inspection report #cc-8727Details
legalization of unpermitted recessed light fixtures replacement throughout the commercial level on ground floor. to comply with physical inspection report #cc-8727 | $4,000 |
| Dec 15, 2025 | Completed final sign-off Dec 2025 | 591 04th Av | revision to permit #201910174823, revise green landscaping ordiance at front setback.Details
revision to permit #201910174823, revise green landscaping ordiance at front setback. | |
| Dec 15, 2025 | Completed final sign-off Dec 2025 | 589 04th Av | to obtain final inspection for work approved under pa 202404170147. all work is complete.Details
to obtain final inspection for work approved under pa 202404170147. all work is complete. | |
| Dec 8, 2025 | Completed final sign-off Jun 2026 | 1772 Union St | g/f commercial: add a new closet wall in the alley for new electric panels. add a new partition wall to create an office room. do ada upgrade.Details
g/f commercial: add a new closet wall in the alley for new electric panels. add a new partition wall to create an office room. do ada upgrade. | $25,000 |
| Nov 4, 2025 | Completed final sign-off Sep 2026 | 1070 Clay St | remodel (e) kitchen, bathroom, & replace (e) furnace/ water heater w/ new at 1/f & 2/f. remove/replace (e) window w/ new at side & back of building.Details
remodel (e) kitchen, bathroom, & replace (e) furnace/ water heater w/ new at 1/f & 2/f. remove/replace (e) window w/ new at side & back of building. | $120,000 |
| Oct 24, 2025 | In progress issued Apr 2026 | 1178 Folsom St | second floor: tenant improvement including mechanical at roof. basement partition no residences at second floor, supportive offices only.Details
second floor: tenant improvement including mechanical at roof. basement partition no residences at second floor, supportive offices only. | $98,000 |
| Jun 27, 2025 | In progress issued Apr 2026 | 1815 Egbert Av | replacing (e) old 4-pipe chilled/hot water system with new vrf system. existing ahu and ventilation system to remain.Details
replacing (e) old 4-pipe chilled/hot water system with new vrf system. existing ahu and ventilation system to remain. | $500,000 |
| Apr 30, 2025 | Completed final sign-off Mar 2026 | 1178 Folsom St | unit #406,506 & 601 conversion of 3 residential units (studio b type) to mobility units (b-m type) enlarge bathroom to provide circular turning space per cbc 11b-304.3.1 inside the bathroom. relocate (e) toilet & tub, (n) accessible lavatory. relocate (e) accessible pocket door. (n) kitchen counterDetails
unit #406,506 & 601 conversion of 3 residential units (studio b type) to mobility units (b-m type) enlarge bathroom to provide circular turning space per cbc 11b-304.3.1 inside the bathroom. relocate (e) toilet & tub, (n) accessible lavatory. relocate (e) accessible pocket door. (n) kitchen counter | $200,000 |
| Apr 30, 2025 | Completed final sign-off May 2026 | 1174 Folsom St | g/f ste #a t.i. included 1 unisex bathroom w/ toilet & lavatory. lunch area counter w/ upper cabinets, sink, refrigerator, file storage room, prefabricated movable meeting pod w/ integrated ventilation, moveable , mep improvementsDetails
g/f ste #a t.i. included 1 unisex bathroom w/ toilet & lavatory. lunch area counter w/ upper cabinets, sink, refrigerator, file storage room, prefabricated movable meeting pod w/ integrated ventilation, moveable , mep improvements | $500,000 |
| Apr 14, 2025 | Completed final sign-off Jun 2025 | 2976 23rd St | demo and patching existing damage plaster on interior walls and ceiling approx 350 sqftDetails
demo and patching existing damage plaster on interior walls and ceiling approx 350 sqft | $6,000 |
| Oct 11, 2024 | Completed final sign-off Jun 2025 | 1519 33rd Av | replace partial (e) footing w/ new (approx. 15 lf).Details
replace partial (e) footing w/ new (approx. 15 lf). | $3,500 |
| Aug 15, 2024 | Completed final sign-off Oct 2024 | 3156 Turk Bl | expand and remodel existing bath on top floor unit b. reloage entrance location to adjacent storage room. relocate storage room door.Details
expand and remodel existing bath on top floor unit b. reloage entrance location to adjacent storage room. relocate storage room door. | $15,000 |
| Jun 17, 2024 | In progress issued Sep 2025 | 133 Denslowe Dr | remodel (e) kitchen, rmeove a load beraring wall and adding new post and beam.Details
remodel (e) kitchen, rmeove a load beraring wall and adding new post and beam. | $40,000 |
| May 14, 2024 | Completed final sign-off Oct 2024 | 2976 23rd St | minor dryrot repair. repair/replace (e) deck planks (less than 50%). exterior siding replacement to match (e) wood. remove/refurbish (e) metal structure (remove rust). all work at rear, no work visible from street.Details
minor dryrot repair. repair/replace (e) deck planks (less than 50%). exterior siding replacement to match (e) wood. remove/refurbish (e) metal structure (remove rust). all work at rear, no work visible from street. | $109,000 |
| Apr 17, 2024 | Expired or cancelled expired Dec 2025 | 589 04th Av | revision 201910174823- to reduce the size of the foundation located at the left and center area of the building and modify the amount of rebar used.Details
revision 201910174823- to reduce the size of the foundation located at the left and center area of the building and modify the amount of rebar used. | |
| Apr 17, 2024 | In progress issued Apr 2024 | 583 04th Av | foundation replacement at south side of buildingDetails
foundation replacement at south side of building | $46,000 |
| Sep 20, 2023 | Completed final sign-off Aug 2024 | 3661 19th St | residential upgrades for 12 unit apartment: 1. upgrade unit electrical sub panels. 2. upgrade fire alarm system. 3. interior painting for units. 4. replace unit #103,202,303,304 carpet. 5. replace unit #202, 203, 301, 303, 304, 104 gas heater in kind. 6. replace 12 units bathtub in kind.Details
residential upgrades for 12 unit apartment: 1. upgrade unit electrical sub panels. 2. upgrade fire alarm system. 3. interior painting for units. 4. replace unit #103,202,303,304 carpet. 5. replace unit #202, 203, 301, 303, 304, 104 gas heater in kind. 6. replace 12 units bathtub in kind. | $600,000 |
| Sep 18, 2023 | Completed final sign-off Sep 2024 | 1170 Columbus Av | repurpose existing e3 multi-purpose room into a i4 classroom, consisting of nap area, diaper changeing area for infants ages 0 to 2. add an ada all gender adult restroom.Details
repurpose existing e3 multi-purpose room into a i4 classroom, consisting of nap area, diaper changeing area for infants ages 0 to 2. add an ada all gender adult restroom. | $149,600 |
| Feb 2, 2023 | Completed final sign-off Mar 2024 | 1772 Union St | repair dryrot on the rear stairs. less than 50%.Details
repair dryrot on the rear stairs. less than 50%. | $1,800 |
| Jan 20, 2023 | Completed final sign-off Nov 2023 | 840 Powell St | (1) kitchen remodel, new kitchen cabinets and appliances. remodel (3) bathrooms and (1) powder room. install (n) fixtures to (e) locations. (3) shower pans. replace (e) outlets to (n) outlets; replace (e) lighting fixtures to (n) fixtures.Details
(1) kitchen remodel, new kitchen cabinets and appliances. remodel (3) bathrooms and (1) powder room. install (n) fixtures to (e) locations. (3) shower pans. replace (e) outlets to (n) outlets; replace (e) lighting fixtures to (n) fixtures. | $90,000 |
| Dec 8, 2022 | In progress issued Feb 2026 | 558 24th Av | extension at rear g/f (~67 sq ft).new fire rated wall at 2/f deck.Details
extension at rear g/f (~67 sq ft).new fire rated wall at 2/f deck. | $20,000 |
| Dec 1, 2022 | Completed final sign-off Nov 2023 | 840 Powell St | selected demo for (1) kitchen cabinets & fixtures; (2) bathroom cabinets & fixtures.Details
selected demo for (1) kitchen cabinets & fixtures; (2) bathroom cabinets & fixtures. | $750 |
| Oct 31, 2022 | Completed final sign-off Jul 2024 | 3133 Taraval St | revision to bpa#201905231498-r1 for install on 176 sq. ft. warming kitchen @ g/f shell space. kitchen for warming/prep/serving purposes only for preprepared senior meal service, electric appliance only. revision to exterior front entry to re-level for accessible entryDetails
revision to bpa#201905231498-r1 for install on 176 sq. ft. warming kitchen @ g/f shell space. kitchen for warming/prep/serving purposes only for preprepared senior meal service, electric appliance only. revision to exterior front entry to re-level for accessible entry | $35,000 |
| Sep 16, 2022 | Completed final sign-off Mar 2023 | 3283 22nd St | unit 1107: kitchen and bathroom remodelDetails
unit 1107: kitchen and bathroom remodel | $90,000 |
| Mar 15, 2022 | Completed final sign-off Jul 2025 | 4109 Pacheco St | interior renovation of 1 kitchen & 2 bathrooms, new 2nd floor deck at rear yard with stairs to gradeDetails
interior renovation of 1 kitchen & 2 bathrooms, new 2nd floor deck at rear yard with stairs to grade | $165,000 |
| Aug 26, 2021 | Expired or cancelled expired Jun 2023 | 3289 22nd St | unit 1107: renovation of kitchen and bathroom similar. interior painting.Details
unit 1107: renovation of kitchen and bathroom similar. interior painting. | $20,000 |
| Mar 16, 2021 | Completed final sign-off Jan 2022 | 558 24th Av | legalize (e) bathroom at ground fl. construct 1 new bedroom and 1 new storage at ground fl. infill and construct 1 new bedroom at ground fl.Details
legalize (e) bathroom at ground fl. construct 1 new bedroom and 1 new storage at ground fl. infill and construct 1 new bedroom at ground fl. | $75,000 |
| Feb 9, 2021 | Completed final sign-off Feb 2022 | 2380 Folsom St | voluntary barrier removal & lowering of entry to sidewalk level for increased accessibility. renovation of existing 2nd floor kitchen into new fully accessible bathroom. renovation of existing 3rd floor kitchen into new fully accessible kitchen.Details
voluntary barrier removal & lowering of entry to sidewalk level for increased accessibility. renovation of existing 2nd floor kitchen into new fully accessible bathroom. renovation of existing 3rd floor kitchen into new fully accessible kitchen. | $20,000 |
| Nov 18, 2020 | In progress issued Sep 2026 | 2601 Lawton St | -remove violation #2019-003659 enf -legalize the ground floor to adu (add kitchen, remodel 2 bathrooms) -legalize lawton street illegal infilled porch add spiral stair to second floor rear.Details
-remove violation #2019-003659 enf -legalize the ground floor to adu (add kitchen, remodel 2 bathrooms) -legalize lawton street illegal infilled porch add spiral stair to second floor rear. | $10,000 |
| Nov 13, 2020 | Completed final sign-off Dec 2021 | 619 21st Av | response to nov 202046691: partially rebuild front wall and garage door on 1/f due to car-crash. structur work per plans.Details
response to nov 202046691: partially rebuild front wall and garage door on 1/f due to car-crash. structur work per plans. | $22,000 |
| Jul 6, 2020 | Completed final sign-off Jan 2021 | 65 Dellbrook Av | kitchen remodel in-kind. no structural work. remodel 2 bathrooms at 2nd flr in-kind. new 4" led recessed lights and rewiringDetails
kitchen remodel in-kind. no structural work. remodel 2 bathrooms at 2nd flr in-kind. new 4" led recessed lights and rewiring | $50,000 |
| Oct 17, 2019 | Completed final sign-off Dec 2025 | 589 04th Av | raise bldg 2.5' vertical/horizontal add & int'r renov.1st fl: (n)garage/storage. 2nd fl:(n)unit 1:(3)beds(2)bths,laundry/living/dining, kitche,baywindow,front balcony & reardeck. 3rd fl:(n)unit 2:(3)beds,(2)baths,laundry,living/dining,kitchen,bay window,front/rear balconyDetails
raise bldg 2.5' vertical/horizontal add & int'r renov.1st fl: (n)garage/storage. 2nd fl:(n)unit 1:(3)beds(2)bths,laundry/living/dining, kitche,baywindow,front balcony & reardeck. 3rd fl:(n)unit 2:(3)beds,(2)baths,laundry,living/dining,kitchen,bay window,front/rear balcony | $400,000 |
| Jul 24, 2019 | Completed final sign-off Nov 2019 | 328 San Jose Av | at second floor only - kitchen: replace (e) kitchen cabinets and flooring - no exterior, no structural work no ordinances.Details
at second floor only - kitchen: replace (e) kitchen cabinets and flooring - no exterior, no structural work no ordinances. | $8,000 |
| May 23, 2019 | Completed final sign-off Jul 2024 | 3133 Taraval St | convert (e) single family dwelling to community center for seniors as approved under motion no.20278. includes rear horizontal and vertical addition.Details
convert (e) single family dwelling to community center for seniors as approved under motion no.20278. includes rear horizontal and vertical addition. | $250,000 |
| Feb 20, 2019 | Completed final sign-off Apr 2022 | 289 Bradford St | converting unconditioned 1st fl to habitable: 1/f (n) multi-use & bath, (n) stair connecting 1st & 2nd fl. (n) windows at 1st & 3rd fl. (n) rear yard patio. (n) siding at rear side.Details
converting unconditioned 1st fl to habitable: 1/f (n) multi-use & bath, (n) stair connecting 1st & 2nd fl. (n) windows at 1st & 3rd fl. (n) rear yard patio. (n) siding at rear side. | $90,000 |
| Dec 18, 2018 | Completed final sign-off Jul 2019 | 19 Bessie St | construct new bedroom at ground flr. relocate kitchen replace (e) window to sliding door at rear of bld. construct new bedroom, bath at basement level. construct new staircase to connect ground level and basement.Details
construct new bedroom at ground flr. relocate kitchen replace (e) window to sliding door at rear of bld. construct new bedroom, bath at basement level. construct new staircase to connect ground level and basement. | $45,000 |
| Oct 18, 2018 | Completed final sign-off Dec 2020 | 506 Bella Vista Wy | horizontal addition with (2) bedrooms, exterior stair & remodeling of family rm & laundry on lower lvl. (n) roof deck at upper level over addition. (n) door to deck.Details
horizontal addition with (2) bedrooms, exterior stair & remodeling of family rm & laundry on lower lvl. (n) roof deck at upper level over addition. (n) door to deck. | $110,000 |
| Oct 5, 2018 | Completed final sign-off Nov 2020 | 1246 Lombard St | replace (e) concrete retaining wall appx 18 ft at west side of propertyDetails
replace (e) concrete retaining wall appx 18 ft at west side of property | $15,000 |
| Sep 5, 2018 | Never finaled issued Sep 2018, no final | 2301 Mission St | revision to pa # 201712196855. structural changes to soffit above limited kitchen vendor enclosure, rev to vendor bar construction and enclosure of kitchen vendor tenants as condition of approval by dphDetails
revision to pa # 201712196855. structural changes to soffit above limited kitchen vendor enclosure, rev to vendor bar construction and enclosure of kitchen vendor tenants as condition of approval by dph | |
| May 16, 2018 | Completed final sign-off Dec 2018 | 2301 Mission St | construction of continuous shaft with a wrapped existing wood floor joist. ref. app #201712196847.Details
construction of continuous shaft with a wrapped existing wood floor joist. ref. app #201712196847. | |
| Mar 28, 2018 | Completed final sign-off Nov 2018 | 309 Holly Park Cr | interior exploration demo. remove ceiling and drywall within 200 sq ft areaDetails
interior exploration demo. remove ceiling and drywall within 200 sq ft area | $3,000 |
| Mar 28, 2018 | Completed final sign-off Apr 2018 | 1345 Taylor St | comply with nov 201843431. replace 1 double hung wood window. clean mold affected walls and baseboard and paint with mold resistant paintDetails
comply with nov 201843431. replace 1 double hung wood window. clean mold affected walls and baseboard and paint with mold resistant paint | $2,000 |
| Mar 28, 2018 | Completed final sign-off Apr 2018 | 1345 Taylor St | comply with nov 201845111. replace exterior rot, damaged door sill, remove moldy surfaces and damaged subfloor and repair subfloor and install new sheet vinylDetails
comply with nov 201845111. replace exterior rot, damaged door sill, remove moldy surfaces and damaged subfloor and repair subfloor and install new sheet vinyl | $2,000 |
| Dec 19, 2017 | Completed final sign-off Sep 2019 | 2301 Mission St | interior remodel of (e) commercial space; including construction of new limited resturaunt vendors (2), with common dining space. reference #201712196847 for commercial space remodel.Details
interior remodel of (e) commercial space; including construction of new limited resturaunt vendors (2), with common dining space. reference #201712196847 for commercial space remodel. | $125,000 |
| Dec 19, 2017 | Completed final sign-off Sep 2019 | 2301 Mission St | interior remodel of (e) commercial space; including, reconfiguration of prfessional services, reconfiguration of retail space & construction of new accessible bathrooms. retail space to be divided into 5 different tenant spaces.Details
interior remodel of (e) commercial space; including, reconfiguration of prfessional services, reconfiguration of retail space & construction of new accessible bathrooms. retail space to be divided into 5 different tenant spaces. | $200,000 |
| Nov 7, 2017 | Completed final sign-off Dec 2017 | 351 Oxford St | dry rot repair at the rear deck less than 50% repair work.Details
dry rot repair at the rear deck less than 50% repair work. | $250 |
| Jul 12, 2017 | Completed final sign-off May 2018 | 1175 Chestnut St | seismic upgrade for soft story as per sfebc, chapter 4d, 2016 cebc appendix a4Details
seismic upgrade for soft story as per sfebc, chapter 4d, 2016 cebc appendix a4 | $160,000 |
| Jun 1, 2017 | Completed final sign-off May 2019 | 309 Holly Park Cr | rear @ vertical addition. fill in (e) open under-deck / house area to create storage. legalize / reduce (e) rear decks. sprinkler building. interior renovation. 2 new bedroom & 2 new baths.Details
rear @ vertical addition. fill in (e) open under-deck / house area to create storage. legalize / reduce (e) rear decks. sprinkler building. interior renovation. 2 new bedroom & 2 new baths. | $280,000 |
| Mar 17, 2017 | Completed final sign-off Mar 2017 | 234 Edinburgh St | revision to pa #201612064203 - change sliding door to (2) 4x6 fixed window at rear of bldg at ground floor.Details
revision to pa #201612064203 - change sliding door to (2) 4x6 fixed window at rear of bldg at ground floor. | |
| Jan 3, 2017 | Completed final sign-off Oct 2019 | 2601 Lawton St | comply w/complaint #201650214 - keep 20% of landscape % 50% permiability in front of building.Details
comply w/complaint #201650214 - keep 20% of landscape % 50% permiability in front of building. | $3,000 |
| Dec 6, 2016 | Completed final sign-off Mar 2017 | 234 Edinburgh St | remodel (e) kitchen, remove/replace cabinets, counter & fixtures at 2nd floor. legalize one (e) bed room & construct one (n) bed room, one full bath room & one half bath room at ground floorDetails
remodel (e) kitchen, remove/replace cabinets, counter & fixtures at 2nd floor. legalize one (e) bed room & construct one (n) bed room, one full bath room & one half bath room at ground floor | $52,000 |
| Nov 30, 2016 | Never finaled issued Sep 2022, no final | 309 Rutledge St | restore (e) front portion of bldg. replace (e) illegal rear addition with a 2-story addition @ the rear portion of the building.Details
restore (e) front portion of bldg. replace (e) illegal rear addition with a 2-story addition @ the rear portion of the building. | $280,000 |
| Nov 14, 2016 | Completed final sign-off Jan 2018 | 1068 Clay St | remodel extg kitchen, bath room and rewire electrical lighting . all work at 3rd floor.Details
remodel extg kitchen, bath room and rewire electrical lighting . all work at 3rd floor. | $32,000 |
| Aug 1, 2016 | Completed final sign-off Oct 2016 | 2601 Lawton St | revision application # 2016-02-22-0218 repair exterior dry rot. replace existing stucco in-kind visible to the street. no framing. repair rear si,000 siding. approx 1500 sq ft wall (n) stucco & 400 sq ft wood siding repair.Details
revision application # 2016-02-22-0218 repair exterior dry rot. replace existing stucco in-kind visible to the street. no framing. repair rear si,000 siding. approx 1500 sq ft wall (n) stucco & 400 sq ft wood siding repair. | $15,000 |
| Jun 24, 2016 | Expired or cancelled withdrawn Sep 2016 | 2601 Lawton St | enclosure front entry, install one skylight, one window & front door.Details
enclosure front entry, install one skylight, one window & front door. | $8,000 |
| Apr 27, 2016 | Completed final sign-off Dec 2016 | 1175 Chestnut St | #301- replace kitchen cabinet and sink, replace bathroom floor and wall tile, replace bath tub and install new exhaust fan. n/a ordinance #155-13Details
#301- replace kitchen cabinet and sink, replace bathroom floor and wall tile, replace bath tub and install new exhaust fan. n/a ordinance #155-13 | $10,000 |
| Apr 22, 2016 | Completed final sign-off Aug 2016 | 2601 Lawton St | 1)legalize one extg bedroom, construct 2 new bedrooms, 2 half bathrooms & family room at g/f. 2)remove (e) garage door, in-fill with 2 clad wood windows at lawton street.Details
1)legalize one extg bedroom, construct 2 new bedrooms, 2 half bathrooms & family room at g/f. 2)remove (e) garage door, in-fill with 2 clad wood windows at lawton street. | $58,000 |
| Mar 4, 2016 | Completed final sign-off Aug 2016 | 2601 Lawton St | 2nd floor: remodel kitchen and bathroom, remove lathe and plaster and replace with new sheetrock, 5/8 type x. no structural work. electrical and plumbing under seperate permits.Details
2nd floor: remodel kitchen and bathroom, remove lathe and plaster and replace with new sheetrock, 5/8 type x. no structural work. electrical and plumbing under seperate permits. | $60,000 |
| Oct 26, 2015 | Expired or cancelled cancelled Oct 2017 | 1426 06th Av | inside non-structural exploratory demo in kitchen & living rm (ceiling & interior wall approx 200 sf) after exploratory work patch up in-kind.Details
inside non-structural exploratory demo in kitchen & living rm (ceiling & interior wall approx 200 sf) after exploratory work patch up in-kind. | $3,000 |
| Jun 22, 2015 | Completed final sign-off Jul 2015 | 328 San Jose Av | replace rotted wood siding with smooth hardie board near bay window approx 50 s.f.Details
replace rotted wood siding with smooth hardie board near bay window approx 50 s.f. | $3,000 |
| Jun 16, 2014 | Completed final sign-off Mar 2015 | 1610 Sanchez St | repair roofingDetails
repair roofing | $5,000 |
| Apr 9, 2013 | Completed final sign-off Mar 2015 | 1610 Sanchez St | rear horizontal addition. 3rd story vertical addition.Details
rear horizontal addition. 3rd story vertical addition. | $150,000 |