L C Builders Inc.
- Based in
- San Francisco
- On San Francisco permits
- Apr 2013 to May 2026
- Last 24 months
- 16 permits filed
67 permits since 2000: 53 completed, 8 in progress, 2 never finaled, 4 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
6 stairs permits: 5 completed, 1 in progress. Typically 255 days from filing to permit and 586 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 2, 2023 | Completed final sign-off Mar 2024 | 1772 Union St | repair dryrot on the rear stairs. less than 50%.Details
repair dryrot on the rear stairs. less than 50%. | $1,800 |
| Mar 15, 2022 | Completed final sign-off Jul 2025 | 4109 Pacheco St | interior renovation of 1 kitchen & 2 bathrooms, new 2nd floor deck at rear yard with stairs to gradeDetails
interior renovation of 1 kitchen & 2 bathrooms, new 2nd floor deck at rear yard with stairs to grade | $165,000 |
| Nov 18, 2020 | In progress issued Sep 2026 | 2601 Lawton St | -remove violation #2019-003659 enf -legalize the ground floor to adu (add kitchen, remodel 2 bathrooms) -legalize lawton street illegal infilled porch add spiral stair to second floor rear.Details
-remove violation #2019-003659 enf -legalize the ground floor to adu (add kitchen, remodel 2 bathrooms) -legalize lawton street illegal infilled porch add spiral stair to second floor rear. | $10,000 |
| Feb 20, 2019 | Completed final sign-off Apr 2022 | 289 Bradford St | converting unconditioned 1st fl to habitable: 1/f (n) multi-use & bath, (n) stair connecting 1st & 2nd fl. (n) windows at 1st & 3rd fl. (n) rear yard patio. (n) siding at rear side.Details
converting unconditioned 1st fl to habitable: 1/f (n) multi-use & bath, (n) stair connecting 1st & 2nd fl. (n) windows at 1st & 3rd fl. (n) rear yard patio. (n) siding at rear side. | $90,000 |
| Dec 18, 2018 | Completed final sign-off Jul 2019 | 19 Bessie St | construct new bedroom at ground flr. relocate kitchen replace (e) window to sliding door at rear of bld. construct new bedroom, bath at basement level. construct new staircase to connect ground level and basement.Details
construct new bedroom at ground flr. relocate kitchen replace (e) window to sliding door at rear of bld. construct new bedroom, bath at basement level. construct new staircase to connect ground level and basement. | $45,000 |
| Oct 18, 2018 | Completed final sign-off Dec 2020 | 506 Bella Vista Wy | horizontal addition with (2) bedrooms, exterior stair & remodeling of family rm & laundry on lower lvl. (n) roof deck at upper level over addition. (n) door to deck.Details
horizontal addition with (2) bedrooms, exterior stair & remodeling of family rm & laundry on lower lvl. (n) roof deck at upper level over addition. (n) door to deck. | $110,000 |